ML20206G330

From kanterella
Jump to navigation Jump to search
SER Supporting Employee Concern Element Rept OP 31309, Plant Improvement/Suggestions
ML20206G330
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/04/1988
From:
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20206G037 List: ... further results
References
NUDOCS 8811220240
Download: ML20206G330 (2)


Text

m I. -.

d "O

E

,p'**h,,'%

UNITED STATES

/

i) i NUCLEAR REGULATORY COMMISSION h.\\~ m(' l i

w Asm NG TON, D. C. 20$55

'%f g z.s

,e SAFETY EVALL'ATION REFCET EY THE OFFICE OF SPEL'AL PROJECTS l

EfGLOYEE C0t CERN ELEMENT REPORT OP 31309, "PLAfiT IMPROVEf4ENT/ SUGGESTIONS" TENNESSEE VALLEY AUTHORITY SEOUOYAH NUCLEAR POWER PLANT UNITS 1 & 2 DOCKET NOS. 50-327 AND 50-328 S.:fe:t Cate;: y:

0:ecati:".s (30000) 5.:: ate;: j:

viscellace:as (3:300)

Ele ent:

Plant I ;rc.e ents/Sug;estiens (31309)

Con: err:

W5N - 0:35 Tre basis for Ele ent Report CP 31309 - SON, Rev 2, dated Novem:er 20, 1955, is tre feilo ir; Watts Bar employee concera. WBN - 0135 i

KEN-0135:

WSN sh;uld invest in both Polar:id cameras and portaDie VCR ca eras for periO s of ti.e when nodification or maintenance work

?

i is to Oe d0ne in a high radiation area. Pi:tures or movies could be reviewed before nand by all who will work on the item to help keep ex; sure cown and to help cc0rdinate between groups going into area.

Su--ary Of Issue Cencern ABN - 0135 was a Watts Bar concern that w&s evaluated to be generically a:clicable to Se:veyah. TVA ;ercei,ed the con:ern as a plant improve ent/ suggestion.

b.

The concern deals with the suggested use of ;hotographic and video eN8 e:ui: ent fer prejeb clarnir; to redu:e radiatie n exposure and

+,o help 000-

< inate ::etneer gres;s goia.; into high radia*i0n areas.

-8 Co n wo

!!!. Evaluati:n OM jg TVA deter-ined by interviews

  • e e:vi: ent presently available and its 0Q usa:e ey eitst! ; :-:aai:attees.

Insta atic an: 35 m ch:to:capni:

[

03-hea5 fs'!'

3*f 1-e

.!e '*. t*e Lea'**

  1. ys':s a*d ALA;S se:t [*s.
    • e

~

d l

" a-

"! ' ' i + ' v i ;-;

2 *

~*;

'"S11 11' A'

3b

'1i'i

~~

~~

';e: 60.90 e**

I*e #e #weli"3 3".: *as MA e:.':*i.; i* a : : ' *.

  • .. e

~*.

a*y

  • .::: g r a:P s 4 *, si t:e s # :- :sst c tages ;*.at are to :e used as i

C0 Q. 0.

training ai0es, fre

Ot #i:Eti:ns g"OuD also uses OF:t0;ra *s fP planning and perf0*?ance Cf Oi #fi: alt and hign ra:dati:n j:Os.

,, r _. _

s 6

0 f

entified that prior to initial criticality tre whole plant *ad TVA also f The pnetographs are available.f:r anyere been phot:gra;hed and apced.IVA used a contractor to film steam generater wne wants to view them.

ecdy current testing ourirg the Unit 1 cycle 3 refueling outage.

the use of photograohs and movie film to aid in TVA conc 1,:ec :nat vini. icing tire and ex00$vre adequately' addresses this generic employee concerr, and concludes that the concern is not valid at Sequoyah.

IV.

Coaclusica; ine NRO staf f believes that the TVA investigation of the tencern was concern as describec in Element adequate, and sneir resolution of the Report OP 31309 is acceptable for restart.

4 l

i e

O