Summary of Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Constellation Energy, Inc Representatives to Discuss the Nine Mile Point Power Station, Units 1 & 2 License Renewal Application
ML041840412
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 07/02/2004
From: Rajender Auluck
NRC/NRR/DRIP/RLEP
To:
Auluck R, NRR/DRIP/RLEP, 415-1025
References
TAC MC3272, TAC MC3273
Download: ML041840412 (7)


Text

July 2, 2004 LICENSEE:

Constellation Energy, Inc.

FACILITY:

Nine Mile Point, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD ON JUNE 16, 2004, BETWEEN THE U.S.

NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND CONSTELLATION ENERGY, INC REPRESENTATIVES TO DISCUSS THE NINE MILE POINT POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 and MC3273)

On June 16, 2004, the NRC staff met with members of Constellation Energy, Inc. (the applicant) in a public meeting to discuss the license renewal application (LRA) for the Nine Mile Point Power Station, Units 1 and 2. The application was submitted by letter dated May 27, 2004. The list of attendees is provided in Enclosure 1, and the meeting agenda is provided in Enclosure 2. A copy of the slides used by the applicant are provided as, and an email sent prior to the meeting by a member of the public is provided in.

The applicant provided an overview of the content of their license renewal application. The applicant also explained the methodology used in determining consistency with NUREG-1801, Generic Aging Lessons Learned (GALL) Report.

/RA/

Rajender Auluck, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-410

Enclosures:

As stated cc w/encl: See next page

July 2, 2004 LICENSEE:

Constellation Energy, Inc.

FACILITY:

Nine Mile Point, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD ON JUNE 16, 2004, BETWEEN THE U.S.

NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND CONSTELLATION ENERGY, INC REPRESENTATIVES TO DISCUSS THE NINE MILE POINT POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 and MC3273)

On June 16, 2004, the NRC staff met with members of Constellation Energy, Inc. (the applicant) in a public meeting to discuss the license renewal application (LRA) for the Nine Mile Point Power Station, Units 1 and 2. The application was submitted by letter dated May 27, 2004. The list of attendees is provided in Enclosure 1, and the meeting agenda is provided in Enclosure 2. A copy of the slides used by the applicant are provided as, and an email sent prior to the meeting by a member of the public is provided in.

The applicant provided an overview of the content of their license renewal application. The applicant also explained the methodology used in determining consistency with NUREG-1801, Generic Aging Lessons Learned (GALL) Report.

/RA/

Rajender Auluck, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-410

Enclosures:

As stated cc w/encl: See next page DISTRIBUTION: See next page Package Accession No.: ML041880398; Letter: ML041840412; Enclosure 3: ML041900140 : E-mail ML041980297 DOCUMENT NAME:C:\\ORPCheckout\\FileNET\\ML041840412.wpd OFFICE:

PM:RLEP SE:RLEP LA:RLEP SC:RLEP NAME:

R. Auluck O. Yee MJenkins S. Lee DATE:

7/2/04 6/29/04 6/29/04 7/2/04 OFFICIAL RECORD COPY

DISTRIBUTION: Meeting Summary between NRC and Nine Mile Point Power Station, Unit 1 and Unit 2, Dated: July 2, 2004, Package Accession No.: ML041880398; Letter: ML041840412; : ML041900140 Enclosure 4: E-mail ML041980297 HARD COPY RLEP RF R. Auluck (PM)

O. Yee E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff V. Nerses K. Chang C. Marco D. Screnci, RI OPA LIST OF PARTICIPANTS MEETING ATTENDANCE LIST June 16, 2004 Participants Affiliation David Dellario Constellation Energy, Inc.

Michael Fallin Constellation Energy, Inc.

Tony Grenci Constellation Energy, Inc.

Carla Logan Constellation Energy, Inc.

Peter Mazzaferro Constellation Energy, Inc.

Ernie Taormina Constellation Energy, Inc.

Russ Wells Constellation Energy, Inc.

Don Warfel Exelon Clifford R. Mark Information Systems Laboratories (NRC Contractor)

Dennis Vandeputte Nine Mile Point Nuclear Station Raj Auluck U.S. Nuclear Regulatory Commission (NRC)

Ken Chang NRC David Chen NRC Pei-Ying Chen NRC Kurt Cozens NRC Johnny Eads NRC Steve Hoffman NRC K. R. Hsu NRC Naeem Iqbal NRC Meena Khanna NRC Sam Lee NRC Y. L. (Renee) Li NRC Clifford R. Marks NRC Sai Wah Ng NRC Paul Prescott NRC Bill Rogers NRC Angelo Stubbs NRC Tomeka Terry NRC Steve West NRC On Yee NRC Jimi Yerokun NRC MEETING BETWEEN THE NRC STAFF AND CONSTELLATION ENERGY, INC.

LICENSE RENEWAL APPLICATION FOR NINE MILE POINT, UNITS 1 AND 2 ROCKVILLE, MARYLAND ROOM T-2B3 AGENDA June 16, 2004 I.

Opening remarks/Agenda II.

Description and Background of NMP 1 & 2 III.

Upcoming Plant Activities IV.

Application Overview V.

LRA Table of Contents VI.

LRA Section 1 Contents VII.

LRA Section 2 Contents VIII.

Scoping and Screening Methodology Section IX.

Plant Level Scoping ResultsSection X.

Database Contents XI.

GALL Consistency Methodology XII.

LRA Section 3 Contents XIII.

LRA Section 4 Contents XIV.

Appendix A Contents XV.

Appendix B Contents XVI.

Appendix D Contents XVII.

Appendix E Contents XVIII. Questions and Answers

Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James R. Evans LIPA P.O. Box 129 Lycoming, NY 10393 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 C. Adrienne Rhodes Chairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group, Inc.

750 East Pratt Street Baltimore, MD 21202 Mr. James M. Petro, Jr., Esquire Counsel Constellation Energy Group 750 East Pratt Street, 5th Floor Baltimore, MD 21202 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Fred Emerson Nuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-3708 Mr. Mark Flaherty Manager - Fleet Licensing R.E. Ginna Nuclear Power Plant 1503 Lake Rd.

Ontario, NY 14519 Mr. M. Steven Leonard General Supervisor - Nuclear Regulatory Matters Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Mr. Peter Mazzaferro Site Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 cc:

Mr. Mike Heffley Senior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093