Letter Sequence Request |
|---|
TAC:MC3272, Control Room Habitability (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML042450123, ML043000333, ML043150211, ML043210580, ML050120217, ML050420328, ML050680270, ML050690308, ML051440459, ML051650086, ML052000147, ML052000163, ML052000175, ML052500572, ML052940236, ML052970007, ML053120311, ML053320201, ML053430012, ML053460458, ML053470313, ML053630052, ML060180205, ML060890579, ML060940577, ML060940622, ML060950413, ML061020154, ML061020166, ML061080367, ML061090064, ML062830307, ML062830317, ML082530250, ML091830049, ML091980454, ML110680289, ML110680291, ML13294A039, ML14063A184, ML14078A594, ML14106A053, ML14148A114
|
MONTHYEARML0414700602004-05-26026 May 2004 Independent Survey of Power-Reactor Licensees Project stage: Request ML0414902132004-05-26026 May 2004 Transmittal of Nine Mile Point Units 1 & 2 Application for Renewed Operating Licenses, Including Environmental Report Project stage: Request ML0419802972004-06-15015 June 2004 License Renewal Application (E-Mail) - Enclosure 4. Gurdziel E-mail, Dated 06/15/2004, Comments to Nine Mile Point License Extension Meeting Project stage: Meeting ML0418404122004-07-0202 July 2004 Summary of Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Constellation Energy, Inc Representatives to Discuss the Nine Mile Point Power Station, Units 1 & 2 License Renewal Application Project stage: Meeting ML0424501232004-09-0202 September 2004 License Renewal Application Work Split Tables Project stage: Other ML0430003332004-10-26026 October 2004 To Audit and Review Plan for Plant Aging Management Reviews and Programs for the Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Other 05000220/LER-2004-004, Regarding Manual Reactor Scram Due to Failure of 13 Feedwater Flow Control Valve Positioner2004-10-29029 October 2004 Regarding Manual Reactor Scram Due to Failure of 13 Feedwater Flow Control Valve Positioner Project stage: Request ML0432002282004-11-0101 November 2004 Draft Safety Evaluation Report Related to the License Renewal of the Arkansas Nuclear One, Unit 2 Project stage: Draft Approval ML0431502112004-11-0909 November 2004 Audit Trip Report Regarding the Constellation Energy Group Application for License Renewal for the Nine Mile Nuclear Station, Units 1 and 2, Dated May 27, 2004 Project stage: Other ML0432105802004-11-15015 November 2004 Audit and Review Plan for Plant Aging Management Reviews and Programs for the Nine Mile Point Nuclear Station, Units 1 and 2 (TAC Nos MC3272 and MC3273.) Project stage: Other ML0432706342004-11-17017 November 2004 Summary of a Meeting Held on October 28, 2004, Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group, Inc. Concerning the Review for the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Meeting ML0432806832004-11-22022 November 2004 Requests for Additional Information for Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0434200492004-12-0303 December 2004 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0434504402004-12-0707 December 2004 Status of Staff Review of the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0435703682004-12-21021 December 2004 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0500403152004-12-21021 December 2004 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Sections 2.3.2, 2.3.4, and B2. 1.32 Project stage: Response to RAI ML0436500032004-12-22022 December 2004 Request for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application, Project stage: RAI ML0500403322004-12-22022 December 2004 License Renewal Application - Responses to NRC Request for Additional Information Regarding Scoping and Screening Methodology Project stage: Response to RAI ML0500601822004-12-22022 December 2004 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Sections 2.2, 2.3.3, and 2.3.4 Project stage: Response to RAI ML0436500062004-12-27027 December 2004 Request for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application, Project stage: RAI ML0501202172005-01-0303 January 2005 License Renewal Application - Response to NRC Letter Dated December 7, 2004 Regarding Status of NRC Staff Review Project stage: Other ML0501102352005-01-0303 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding the Reactor Recirculation Systems Project stage: Response to RAI ML0500604212005-01-0505 January 2005 Revision of Schedule for the Conduct of Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0501902962005-01-0707 January 2005 License Renewal Application - Response to NRC Request for Additional Information Regarding the Nine Mile Point Unit 1 Containment System Project stage: Response to RAI ML0501902922005-01-10010 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Structures Project stage: Response to RAI ML0501902952005-01-10010 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Aging Management of Electrical and Instrumentation and Control Systems Project stage: Response to RAI ML0502404242005-01-13013 January 2005 Request for Additional Information - Nine Mile Point Nuclear Station, Units 1 and 2, Fire Protection Open Items Project stage: RAI ML0501302832005-01-13013 January 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0502103762005-01-13013 January 2005 Request for Additional Information on Open Items for Balance of Plant Section Project stage: RAI ML0502501882005-01-14014 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding the Time-Limited Aging Analysis for Main Steam Isolation Valve Corrosion Allowance and the Closed-Cycle Cooling Water System Project stage: Response to RAI ML0503304632005-01-20020 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Aging Management of Bolting Project stage: Response to RAI ML0503903702005-01-26026 January 2005 . License Renewal Application - Responses to NRC Requests for Additional Information Regarding Aging Management of Auxiliary Systems Project stage: Response to RAI ML0504602332005-01-31031 January 2005 . License Renewal Application - Responses to NRC Requests for Additional Information Regarding Sections 2.2, 2.3.3, and 2.3.4, and Scoping and Screening Methodology Project stage: Response to RAI ML0504504852005-02-0404 February 2005 License Renewal Application - Submittal of Supplemental Information Resulting from the NRC Audit of Aging Management Reviews Project stage: Supplement ML0504104282005-02-10010 February 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0505601992005-02-11011 February 2005 License Renewal Application - Submittal of Supplemental Information for Review of the License Renewal Application Project stage: Supplement ML0504203872005-02-11011 February 2005 Summary of a Conference Call Held with Constellation Energy Group Inc. Concerning the Review of the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Project stage: Approval ML0504203282005-02-11011 February 2005 Summary of a Conference Call Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group, Inc. Concerning the Review for the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Other ML0506100592005-02-14014 February 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding the Reactor Vessel and Reactor Vessel Internal Components Project stage: Response to RAI ML0504601382005-02-14014 February 2005 Summary of a Conference Call Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group Inc. Concerning the Review of the Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Approval ML0505401962005-02-22022 February 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0505402632005-02-23023 February 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0506802702005-03-0303 March 2005 Recovery of Nine Mile Point License Renewal Application Quality Project stage: Other ML0506205912005-03-0303 March 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0506601472005-03-0707 March 2005 Extension of Staff Review Schedule for Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0506903082005-03-10010 March 2005 Summary of a Conference Call Held on February 28, 2005, Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group Inc. Concerning the Review for the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal App Project stage: Other ML0507001342005-03-11011 March 2005 Revision of Schedule for the Conduct of Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0510905402005-04-19019 April 2005 Summary of Meeting Held on March 30, 2005, Between the NRC Staff and the Constellation Energy Group, Inc. Representatives to Discuss the Status of Their Recovery Effort for Nine Mile Point, Units 1 and 2, License Renewal Application Project stage: Meeting ML0514404592005-05-13013 May 2005 Recovery of Nine Point License Renewal Application Quality Project stage: Other ML0516500862005-06-0909 June 2005 Presentation Slides, Nine Mile Point, Units 1 and 2, LRA Status Update Project stage: Other 2005-01-14
[Table View] |
Independent Survey of Power-Reactor Licensees| ML041470060 |
| Person / Time |
|---|
| Site: |
Beaver Valley, Millstone, Monticello, Calvert Cliffs, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Watts Bar, Grand Gulf, Sequoyah, Byron, Arkansas Nuclear, Susquehanna, Prairie Island, Columbia, Seabrook, Brunswick, North Anna, Turkey Point, River Bend, Diablo Canyon, Callaway, Vogtle, Waterford, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Fort Calhoun, Crane  |
|---|
| Issue date: |
05/26/2004 |
|---|
| From: |
Richards S NRC/NRR/DIPM/IIPB |
|---|
| To: |
Richard Anderson, Blevins M, Byrne S, Christian D, Coutu T, Crane C, Edington R, Forbes J, Gannon C, Gasser J, Hinnenkamp P, Jamil D, Rosalyn Jones, Kanda W, Kansler M, Domonique Malone, Mecredy R, Moyer J, Muench R, Myers L, Nazar M, O'Connor W, Overbeck G, Thomas J. Palmisano, Parrish J, Pearce L, Peifer M, Gordon Peterson, Randolph G, Ray H, Ridenoure R, Rueger G, Scalice J, Scarola J, Sheppard J, Shriver B, Skolds J, Solymossy J, Spina J, Stall J, Stinson L, Sumner H, Vanderheyden G, Vanmiddlesworth G, Venable J, Warner M, Gerald Williams, Young D AmerGen Energy Co, Arizona Public Service Co, Calvert Cliffs, Carolina Power & Light Co, Detroit Edison, Dominion Nuclear Connecticut, Duke Energy Corp, Energy Northwest, Entergy Nuclear Operations, Entergy Operations, Exelon Generation Co, FirstEnergy Nuclear Operating Co, Florida Power & Light Co, Florida Power & Light Energy Seabrook, Indiana Michigan Power Co, Nebraska Public Power District (NPPD), Nine Mile Point, Nuclear Management Co, Omaha Public Power District, Pacific Gas & Electric Co, Susquehanna, Public Service Enterprise Group, Rochester Gas & Electric Corp, South Carolina Electric & Gas Co, South Texas, Southern California Edison Co, Southern Nuclear Operating Co, TXU Generation Co, LP, Union Electric Co, Virginia Electric & Power Co (VEPCO), Wolf Creek |
|---|
| Allsopp, D K, NRR/DIPM/IIPB, 415-3073 |
| Shared Package |
|---|
| ML041470233 |
List: |
|---|
| References |
|---|
| Download: ML041470060 (12) |
|
Similar Documents at Beaver Valley, Millstone, Monticello, Calvert Cliffs, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Watts Bar, Grand Gulf, Sequoyah, Byron, Arkansas Nuclear, Susquehanna, Prairie Island, Columbia, Seabrook, Brunswick, North Anna, Turkey Point, River Bend, Diablo Canyon, Callaway, Vogtle, Waterford, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Fort Calhoun, Crane |
|---|
Category:Letter
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Watts Bar]] OR [[:Grand Gulf]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Susquehanna]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Fort Calhoun]] OR [[:Crane]] </code>. |
Text
May 26, 2004 Holders of Licenses for Power Reactors as listed in attachment
SUBJECT:
INDEPENDENT SURVEY OF POWER-REACTOR LICENSEES In April 2004, the U.S. Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary (RIS) 2004-06 to inform all nuclear power plant licensees that the NRC was conducting a survey to gain insights into the impact of its regulatory activities. The purpose of this letter is to remind you of the opportunity to respond to the survey and to request, unless already done, that you distribute the survey information to the responsible managers at your plant site(s). To promote an open exchange of information and independence, the NRC contracted Brookhaven National Laboratory (BNL) to administer the survey.
By letter dated April 23, 2004, BNL mailed you information regarding the survey. This letter also transmitted a unique user identification (ID) and password required to access and submit the survey. The NRC seeks input from four managers at each plant, namely the operations, engineering, licensing, and overall plant manager. Since only one letter was sent to the licensing contact for each plant unit, we request that you distribute the survey information (including password and user ID) to the other three managers so that they can also respond to the survey.
The RIS did not identify BNL as NRCs independent contractor so as to not attract hackers that might challenge BNLs firewall. An unintended consequence of this omission is that some licensees are experiencing difficulty locating the survey instructions. To ensure all licensees have sufficient time to request a new user ID and respond to the survey, the surveys end date has been extended to June 15, 2004.
Requests for a new user ID and password, or questions regarding site access should be directed to the BNL survey coordinator, Edward Grove at 631-344-5558. Content questions should be directed to the NRC survey coordinator, David Allsopp, at 301-415-3073. For your information, enclosed is the initial BNL letter of instruction.
Sincerely,
/RA by J Andersen for/
Stuart A. Richards, Chief Inspection Program Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation
Attachment:
As stated
Enclosure:
BNLs Letter of Instruction
May 26, 2004 Holders of Licenses for Power Reactors as listed in attachment
SUBJECT:
INDEPENDENT SURVEY OF POWER-REACTOR LICENSEES In April 2004, the U.S. Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary (RIS) 2004-06 to inform all nuclear power plant licensees that the NRC was conducting a survey to gain insights into the impact of its regulatory activities. The purpose of this letter is to remind you of the opportunity to respond to the survey and to request, unless already done, that you distribute the survey information to the responsible managers at your plant site(s). To promote an open exchange of information and independence, the NRC contracted Brookhaven National Laboratory (BNL) to administer the survey.
By letter dated April 23, 2004, BNL mailed you information regarding the survey. This letter also transmitted a unique user identification (ID) and password required to access and submit the survey. The NRC seeks input from four managers at each plant, namely the operations, engineering, licensing, and overall plant manager. Since only one letter was sent to the licensing contact for each plant unit, we request that you distribute the survey information (including password and user ID) to the other three managers so that they can also respond to the survey.
The RIS did not identify BNL as NRCs independent contractor so as to not attract hackers that might challenge BNLs firewall. An unintended consequence of this omission is that some licensees are experiencing difficulty locating the survey instructions. To ensure all licensees have sufficient time to request a new user ID and respond to the survey, the surveys end date has been extended to June 15, 2004.
Requests for a new user ID and password, or questions regarding site access should be directed to the BNL survey coordinator, Edward Grove at 631-344-5558. Content questions should be directed to the NRC survey coordinator, David Allsopp, at 301-415-3073. For your information, enclosed is the initial BNL letter of instruction.
Sincerely,
/RA by J Andersen for/
Stuart A. Richards, Chief Inspection Program Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation
Attachment:
As stated
Enclosure:
BNLs Letter of Instruction Distribution: See attached page Package: ML041470233 Letter Accession No. ML041470060 Enclosure BNLs letter: ML041470215 OFFICE DIPM/IIPB DIPM/IIPB DIPM/IIPB NAME DKAllsopp JWAndersen JAndersen for, SARichards DATE 5/26/04 5/26/04 5/26/04 OFFICIAL RECORD COPY
Mr. Roy A. Anderson President and Chief Nuclear Officer PSEG Nuclear LLC-X04 Hope Creek Generating Station Salem Nuclear Generating Station, Units 1 and 2 Post Office Box 236 Hancocks Bridge, NJ 08038 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC Limerick Generating Station, Units 1 and 2 Peach Bottom Atomic Power Station, Units 2 and 3 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Millstone Power Station, Units 2 and 3 Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Vermont Yankee Nuclear Power Station James A. Fitzpatrick Nuclear Power Plant Indian Point Nuclear Generating Units 2 and 3 440 Hamilton Avenue White Plains, NY 10601 Mr. Mark E. Warner, Site Vice President FPL Energy Seac Seabrook Station, Unit 1 P. O Box 300 Seabrook, NH 03874 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station, Units 1 and 2 Post Office Box 4 Shippingport, PA 15077 Attachment Mr. George Vanderheyden, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Calvert Cliffs Nuclear Power Plant, Units 1 and 2 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation R. E. Ginna Nuclear Power Plant Docket No. 50-244 License No. DPR-18 1503 Lake Road Ontario, NY 14519 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC Nine Mile Point Nuclear Station, Units 1 and 2 P.O. Box 63 Lycoming, NY 13093 Mr. Christopher M. Crane President and Chief Nuclear Officer AmerGen Energy Company, LLC Oyster Creek Nuclear Generating Station Clinton Power Station, Unit 1 4300 Winfield Road Warrenville, IL 60555 Mr. Bryce L. Shriver Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC Susquehanna Steam Electric Station, Units 1 and 2 769 Salem Boulevard, NUCSB3 Berwick, PA 18603-0467 Mr. John L. Skolds, Chairman and Chief Executive Officer AmerGen Energy Company, LLC Three Mile Island Nuclear Station, Unit 1 4300 Winfield Road Warrenville, IL 60555 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Virginia Electric and Power Company North Anna Power Station, Units 1 and 2 Surry, Units 1 and 2 Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. D. M. Jamil Vice President Duke Energy Corporation Catawba Nuclear Station, Units 1 and 2 4800 Concord Road York, South Carolina 29745 Mr. L. M. Stinson Vice President - Farley Project Southern Nuclear Operating Company, Inc.
Joseph M. Farley Nuclear Plant, Units 1 and 2 Post Office Box 1295 Birmingham, Alabama 35201-1295 Mr. H. L. Sumner, Jr.
Vice President - Nuclear, Hatch Project Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant, Units 1 and 2 Post Office Box 1295 Birmingham, Alabama 35201-1295 G. R. Peterson, Vice President Duke Energy Corporation William B. Mcguire Nuclear Station, Units 1 and 2 12700 Hagers Ferry Road Huntersville, NC 28078 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation Oconee Nuclear Station, Units 1, 2 and 3 7800 Rochester Highway Seneca, SC 29672 Mr. J. T. Gasser Vice President Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant, Units 1 and 2 Post Office Box 1295 Birmingham, Alabama 35201-1295 Mr. C. J. Gannon Vice President Progress Energy Brunswick Steam Electric Plant, Units 1 and 2 Post Office Box 10429 Southport, North Carolina 28461 Mr. James Scarola, Vice President Carolina Power and Light Company Shearon Harris Nuclear Power Plant, Unit 1 Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165 Mr. Dale E. Young, Vice President ATTN: Supervisor, Licensing and Regulatory Programs Progress Energy Crystal River Nuclear Generating Plant, Unit 3 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. J. W. Moyer, Vice President Carolina Power and Light Company H. B. Robinson Steam Electric Plant, Unit 2 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority Watts Bar Nuclear Plant, Unit 1 Sequoyah Nuclear Plant, Units 1 and 2 Browns Ferry Nuclear Plant, Units 1, 2 and 3 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company St. Lucie, Units 1 and 2 Turkey Point, Units 3 and 4 P.O. Box 14000 Juno Beach, Florida 33408-0420 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Donald C. Cook Nuclear Plant, Units 1 and 2 Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 Mark A. Peifer Site Vice President Nuclear Management Company, LLC Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 Mr. William T. OConnor, Jr.
Vice President - Nuclear Generation Detroit Edison Company Fermi, Unit 2 6400 North Dixie Highway Newport, MI 48166 Mr. Thomas Coutu Site Vice President Nuclear Management Company, LLC Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 Mr. Thomas J. Palmisano Site Vice President Nuclear Management Company, LLC Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637 Mr. Daniel J. Malone Site Vice President Nuclear Management Company, LLC Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Gary D. Van Middlesworth Site Vice President Nuclear Management Company, LLC Point Beach Nuclear Plant, Units 1 and 2 6610 Nuclear Road Two Rivers, WI 54241-9516 Mr. Joseph M. Solymossy Site Vice President Nuclear Management Company, LLC Prairie Island Nuclear Generating Plant, Units 1 and 2 1717 Wakonade Drive East Welch, MN 55089 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC Braidwood Station, Units 1 and 2 Byron Station, Units 1 and 2 Dresden, Units 2 and 3 Lasalle County Station, Units 1 and 2 Quad Cities Nuclear Power Station, Units 1 and 2 4300 Winfield Road Warrenville, IL 60555 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station, Unit 1 5501 North State Route 2 Oak Harbor, OH 43449-9760 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant, Unit 1 P.O. Box 97, A200 10 Center Road Perry, OH 44081 Mr. Jeffrey S. Forbes Site Vice President Entergy Operations, Inc.
Arkansas Nuclear One, Units 1 and 2 1448 S. R. 333 Russellville, AR 72802 Mr. M. R. Blevins Senior Vice President and Principal Nuclear Officer TXU Genration Company, LP Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station P. O. Box 98 Brownville, NE 68321 Mr. George A. Williams Site Vice President Entergy Operations, Inc.
Grand Gulf Nuclear Station, Unit 1 P. O. Box 756 Port Gibson, MS 39150 Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.
River Bend Station, Unit 1 5485 US Highway 61N St. Francisville, LA 70775 Mr. James J. Sheppard President and Chief Executive Officer South Texas Project Nuclear Operating Company South Texas Project Electric Generating Company, Units 1 and 2 STP Nuclear Operating Company P. O. Box 289 Wadsworth, TX 77483 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-2065 Mr. Garry L. Randolph Vice President and Chief Nuclear Officer Union Electric Company Callaway Plant, Unit 1 Post Office Box 620 Fulton, MO 65251 Mr. Gregory M. Rueger Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant, Units 1 and 2 P. O. Box 3 Avila Beach, CA 93424 Mr. R. T. Ridenoure Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station, Unit 1 Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company Palo Verde Nuclear Generating Station, Units 1, 2 and 3 P. O. Box 52034 Phoenix, AZ 85072-2034 Mr. Harold B. Ray Executive Vice President Southern California Edison Company San Onofre Nuclear Generating Station, Units 2 and 3 P.O. Box 128 San Clemente, CA 92674-0128 Mr. J. V. Parrish Chief Executive Officer Energy Northwest Columbia Generating Station P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Wolf Creek Generating Station Post Office Box 411 Burlington, KS 66839 Mr. Stephen A. Byrne Senior Vice President, Nuclear Operations South Carolina Electric and Gas Company Virgil C. Summer Nuclear Station, Unit 1 Post Office Box 88 Jenkinsville, South Carolina 29065