ML052000143
| ML052000143 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 07/14/2005 |
| From: | Spina J Constellation Energy Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NMPIL 1963, TAC MC3272, TAC MC3273 | |
| Download: ML052000143 (17) | |
Text
-
Constellation Energy-P.O. Box 63 Lycoming, NY 13093 Nine Mile Point Nuclear Station July 14, 2005 NMP1L 1963 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Nine Mile Point Units 1 and 2 Docket Nos. 50-220 and 50-410 Facility Operating License Nos. DPR-63 and NPF-69 License Renewal Boundary Drawings (TAC Nos. MC3272 and MC3273)
Gentlemen:
By letter NMPIL 1962 dated July 14, 2005, Nine Mile Point Nuclear Station, LLC (NMPNS) submitted an amended License Renewal Application (LRA) for Nine Mile Point Units 1 and 2.
The amended LRA references boundary drawings used in the re-scoping and screening phase of the project. Enclosed is a copy of these boundary drawings to aid the NRC staff in their review.
These drawings supplement the drawings previously provided to the staff and are for information only. They are not considered part of the amended application.
There are no new commitments contained in this submittal. If you have any questions about this submittal, please contact David Dellario, NMP License Renewal Project Manager, at (315) 349-7141.
Very truly yours, J
es A. Spina ice President Nine Mile Point JAS/JJ/sac
, g12
Page 2 NMPIL 1963
Enclosure:
NMPNS Licensing Renewal Boundary Drawings for Amended LRA cc:
(Nv/ Enclosure)
Mr. S. Collins, NRC Regional Administrator, Region I Mr. N. B. (Tommy) Le, License Renewal Project Manager, NRR (I set) cc:
(wv/o Enclosure)
Mr. G. K. Hunegs, NRC Senior Resident Inspector Mr. T. G. Colburn, Senior Project Manager, NRR (2 copies)
ENCLOSURE Nine Mile Point Nuclear Station License Renewal Boundary Drawin2s for Amended LRA
INDEX OF NINE MILE POINT UNIT 1 LICENSE RENEWAL -
BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-1 8000-C. Sheet 1, Revision 0 License Renewal Boundary Drawing Symbols, Notes, and l
~Acronymsl LR-1 8000-C. Sheet 2. Revision 1 License Renewal Boundary Drawing Symbols, Notes, and Acronyms LR-18002-C. Sheet 1, Revision I Steam Flow, Main Steam & High Press. Turbine LR-l 8002-C. Sheet 2, Revision 0 Steam Flow, Reheat Steam and High Pressure Heaters LR-1 8002-C. Sheet 3. Revision 0 Steam Flow, Low Pressure Turbine and Low Pressure Heaters LR-l 8003-C. Revision 1 Condensate Flow LR-1 8004-C. Revision 1 Feedwater Flow, Low Pressure LR-l 8005-C. Sheet 1. Revision 0 Feedwater Flow, High Pressure LR-1 8005-C. Sheet 2. Revision I Feedwater Flow, High Pressure LR-1 8005-C. Sheet 3. Revision 0 Feedwater Flow High Pressure (Flow Control Valve 29-134)
LR-18006-C. Sheet 1. Revision 1 Drywell & Torus, Isolation & Blocking Valves LR-18006-C. Sheet 2, Revision 0 Drywell & Torus, Isolation & Blocking Valves LR-1 8006-C. Sheet 3. Revision 1 Drywell and Torus Isolation Valves LR-l 8007-C, Sheet 1. Revision 1 Reactor Core Spray LR-18007-C. Sheet 2. Revision 1 Reactor Core Spray LR-l 8008-C. Revision 1 Spent Fuel Storage Pool, Filtering and Cooling System LR-l 8009-C. Sheet 1. Revision 1 Reactor Clean-Up System LR-18009-C, Sheet 2, Revision 1 Reactor Clean-Up System LR-l 8009-C. Sheet 3. Revision 0 Reactor Water Clean-up (RWCU) System, Durability Monitor and Crack Growth Monitor LR-1 8010-C. Sheet 1. Revision 1 Main Condenser Air Removal & Off Gas System LR-18010-C, Sheet 2. Revision 1 Off Gas System, Recombiner Section LR-18010-C. Sheet 4. Revision 0 Off Gas System Preadsorbers and Charcoal Column and Vacuum Pump Section LR-1 8010-C. Sheet 5. Revision 0 Main Condenser Water Box Air Removal LR-1 8011 -C. Sheet 1. Revision 1 Breathing and Service Air Systems LR-1 8011 -C. Sheet 2. Revision 1 Instrument Air System LR-1 8011 -C. Sheet 3. Revision I Reactor Building, Instrument Air System LR-1 8011-C. Sheet 4, Revision I Instrument Air System, Inst. Air Dryers94-168, 94-169 LR-1 8011-C. Sheet 5. Revision 1 Turbine Building, Instrument Air System LR-1 8011-C. Sheet 6. Revision 1 Turbine Auxiliary Extension Building and Screen and Pump House, Instrument Air System LR-18012-C, Sheet 1. Revision 1 Reactor Containment, Spray Raw Water System LR-1 8012-C. Sheet 2, Revision I Reactor Containment, Spray System LR-1 8013-C. Revision I Reactor Building Heating, Cooling and Ventilating System LR-18014-C, Sheet 1. Revision 1 Reactor Containment (Drywell & Torus) Inert Gas (N2)
Purge and Fill, Drywell Cooling System Page 1 of 8
INDEX OF NINE MILE POINT UNIT I LICENSE RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-18014-C. Sheet 2. Revision 1 Drywvell & Torus Leak Rate & Anal., T.I.P. Sys. Electrical Pen & N2 Supply LR-18014-C. Sheet 3. Revision 1 Reactor Containment Drywell & Torus Inert Gas (N2)
Supply No. 11 LR-1 8014-C. Sheet 4. Revision I Reactor Containment Drywvell & Torus Inert Gas (N2)
Supply No. 12 LR-1 8014-C. Sheet 5. Revision 1 Reactor Containment Drywvell and Torus Mechanical and Electrical Penetration Leakage Test Stations LR-18014-C, Sheet 6, Revision I Reactor Containment Drywell and Torus Mechanical and Electrical Penetration Leakage Test Stations LR-18015-C, Revision I Reactor Vessel Instrumentation LR-1 8016-C. Sheet 1, Revision I Control Rod Drive LR-18016-C. Sheet 2, Revision I Control Rod Drive, Scram Dump Volume LR-1 8016-C. Sheet 3. Revision 0 Reactor Vessel Water Level Reference Leg Backfill LR-18017-C. Sheet 1. Revision I Emergency Cooling System LR-1 8018-C, Sheet 1. Revision I Reactor Shutdown Cooling LR-1 8018-C. Sheet 2, Revision I Reactor Shutdown Cooling LR-18019-C. Revision 1 Reactor Liquid Poison System LR-18020-C, Revision I Reactor Recirculation Loops, (Typical of 5)
LR-1 8021 -C. Sheet 1. Revision 0 Turbine Building Heating Cooling And Ventilating Systems LR-1 8021 -C. Sheet 2. Revision 0 Turbine Building Heating Cooling and Ventilating Systems Air Conditioning Sys. for Lab. Areas LR-1 8021-C. Sheet 3. Revision 0 Off-Gas Building, Ventilation Systems LR-1 8022-C. Sheet 1, Revision 1 Service Water Reactor & Turbine Bldgs.
LR-18022-C, Sheet 2, Revision I Reactor Bldg., Closed Loop Cooling System LR-18022-C. Sheet 3. Revision I Turbine Building Closed Loop Cooling System LR-1 8022-C. Sheet 4. Revision 0 Waste Buildings Closed Loop Cooling System LR-1 8022-C. Sheet 5. Revision 0 Waste Buildings Closed Loop Cooling System LR-1 8023-C. Sheet 2, Revision 0 Motor Driven RFW Pump #1 1 & 12, Gear & Motor Oil LR-18024-C. Revision I Feedwater Heaters Misc., Vents and Drains LR-1 8025-C. Revision 0 Turbine Steam Seals and Turbine Drains LR-18026-C. Sheet 1. Revision 1 Emergency Diesel Generator #102, Starting Air, Cooling Water, Lube Oil & Fuel LR-18026-C. Sheet 2. Revision 1 Emergency Diesel Generator #103, Starting Air, Cooling Water, Lube Oil & Fuel LR-1 8027-C. Sheet I. Revision I Service Water, Turbine & Administration Buildings LR-1 8027-C, Sheet 2. Revision 0 Service Water, Reactor Building LR-18027-C. Sheet 3. Revision 0 Service Water, Off Gas and Waste Disposal Buildings LR-18028-C. Sheet I. Revision 0 Waste Disposal Building, Heating & Ventilation System LR-1 8029-C. Revision I Condenser Connections, Condenser Spray & Water Box LR-1 8030-C. Sheet 2. Revision 0 Fire Protection Foam & Spray Water Page 2 of 8
INDEX OF NINE MILE POINT UNIT 1 LICENSE RENEWAL-,
-BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-18030-C, Sheet 3. Revision I Fire Protection, Water System LR-1 8030-C. Sheet 4. Revision 1 Fire Protection, Water System LR-1 8030-C. Sheet 5. Revision 0 Fire Protection, Water System LR-l18030-C, Sheet 6. Revision 0 Fire Protection, Water System LR-1 8030-C. Sheet 7. Revision 0 Fire Protection, Water System LR-l 8030-C. Sheet 8. Revision 0 Fire Protection, Water System LR-1 8030-C. Sheet 9. Revision 0 Fire Protection, Water System LR-18033-C. Sheet 1. Revision I Condensate Demineralizer System LR-18034-C. Sheet 1. Revision I Makeup Demineralizer LR-1 8034-C. Sheet 2, Revision 0 Makeup Demineralizer LR-1 8035-C. Revision 0 Resin Transfer Regeneration LR-1 8036-C. Revision I Sealing Water for Turbine Bldg., Waste Bldg., Reactor Bldg.
_& Screen House LR-1 8037-C. Revision 0 Turbine Lube Oil and Purification LR-18039-C. Sheet 1. Revision 0 Generator, H2 and C02 Systems LR-1 8039-C. Sheet 2. Revision 0 Cardox Fire Extinguishing System LR-18039-C. Sheet 3. Revision 0 Cardox Fire Extinguishing System LR-1 8040-C. Sheet 2. Revision 0 Fuel Oil Handling System, for Emergency Diesel Fire Pump LR-18041-C. Sheet 1. Revision I Sampling Points, Main Steam, Feedwater & Condensate LR-1 8041 -C. Sheet 2. Revision I Sampling Points, Liquids-Shutdown Cooling, Fuel Pool Clean-Up & Liquid Poison Systems LR-1 8041 -C. Sheet 4. Revision 0 Sampling Points, Containment Spray, Core Spray and Circulating Water LR-1 8041-C. Sheet 7. Revision I Sampling Points Reactor Vessel Post Accident LR-1 8042-C. Sheet 1. Revision 0 City Water Piping LR-1 8042-C. Sheet 2, Revision 0 City Water Piping LR-18043-C. Sheet 1. Revision 0 Steam Supply System, Electric Boiler & Condensate Receiver LR-18043-C. Sheet 2. Revision 0 Steam Supply System, Electric Boiler & Condensate Receiver LR-1 8045-C. Sheet 5. Revision 0 Waste Disposal System, 20 GPM Waste Concentrator LR-1 8045-C. Sheet 7. Revision I Waste Disposal System LR-1 8045-C. Sheet 8, Revision 0 Waste Disposal System LR-1 8045-C. Sheet 9. Revision I Waste Disposal System LR-18045-C. Sheet 10. Revision 0 Waste Disposal System LR-18045-C. Sheet 16. Revision 0 Waste Disposal System, Concentrated Waste Transfer System LR-1 8045-C. Sheet 17, Revision 0 Waste Disposal System, Utility Collector Tank LR-1 8046-C. Sheet 1. Revision 0 Air Conditioning Sys. for the Admin. Bldg. - Heating and Ventilation Sys. for Shop Stores and Locker Room LR-18047-C. Revision 0 Control Room, Heating Ventilating & Air Cond. Sys.
Page 3 of 8
INDEX OF NINE MILE POINT UNIT 1 LICENSE RENEWAL' BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE.
LR-18048-C. Revision I Condensate Transfer System, Pump Discharge LR-22108-C. Sheet 9. Revision 0 Instrument Air Supply, Turbine Building, El. 261'-0" @
Column "H-9" LR-22108-C. Sheet 28. Revision 0 Instrument Air Supply, Turbine Building, El. 291'-0" @
Column "H-l0" LR-22108-C. Sheet 34. Revision 0 Instrument Air Supply, Turbine Building, El. 369'-0" @
Column "G-8" LR-22108-C. Sheet 42. Revision 0 Instrument Air Supply, Turbine Building, El. 261'-0" @
Column "D-2" LR-22108-C, Sheet 43. Revision 0 Instrument Air Supply, Turbine Building, El. 261'-0" @
Column "D-3" LR-22109-C, Sheet 3. Revision 0 Instrument Air Supply, Turbine Building, El. 261'-0" @
Column "H-9" LR-22109-C. Sheet 9. Revision 0 Instrument Air Piping LR-22109-C. Sheet 10, Revision 0 Instrument Air Supply, Turbine Building, El. 277'-0" @
Column "BE-5" LR-221 10-C. Sheet 1. Revision 0 Instrument Air Supply, Reactor Building, El. 237'-0" @
Column "L-6" LR-221 10-C, Sheet 2. Revision 0 Instrument Air Supply, Reactor Building, El. 237'-0" @
Column "N-1 "
LR-221 10-C, Sheet 6. Revision 0 Instrument Air Supply, Reactor Building, El. 237'-0" @
Column "P-8" LR-22110-C. Sheet 14, Revision 0 Instrument Air Supply, Reactor Building, El. 281 '-0" @
Column "N-8" LR-221 10-C. Sheet 15, Revision 0 Instrument Air Supply, Reactor Building, El. 281'-0" @
Column "P-12" LR-221 10-C. Sheet 16. Revision 0 Instrument Air Supply, Reactor Building, El. 281'-0" @
Column "N-8" LR-221 10-C. Sheet 19, Revision 0 Instrument Air Supply, Reactor Building, El. 281'-0" @
Column "M-11 "
LR-221 10-C. Sheet 20. Revision 0 Instrument Air Supply, Reactor Building, El. 281'-0" @
Column "L-7" LR-221 10-C. Sheet 21. Revision 0 Instrument Air Supply, Reactor Building, El. 281 '-0" @
Column "N-7" LR-221 10-C, Sheet 22, Revision 0 Instrument Air Supply, Reactor Building, El. 298'-0" @
Column "N-9" LR-221 10-C, Sheet 23, Revision 0 Instrument Air Supply, Reactor Building, El. 298'-0" @
Column "N-10" LR-221 10-C. Sheet 26. Revision 0 Instrument Air Supply, Reactor Building, El. 298'-0" @
_ Column "M-6" LR-22110-C. Sheet 27. Revision 0 Instrument Air Supply, Reactor Building, El. 318'-0" @
Column "L-12" Page 4 of 8
INDEX OF NINE MILE POINT UNIT 1 LICENSE RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-221 10-C. Sheet 28, Revision 0 Instrument Air Supply, Reactor Building, El. 340'-0" (
Column "Q-7" LR-221 I0-C. Sheet 29. Revision 0 Instrument Air Supply, Reactor Building, El. 340'-0" @
Column "P-8" LR-221 10-C. Sheet 30. Revision 0 Instrument Air Supply, Reactor Building, El. 340'-0" @
Column "Q-9" LR-221 10-C. Sheet 33, Revision 0 Instrument Air Supply, Reactor Building, EL. 281'- 0" l
Column "K-9" LR-221 I0-C, Sheet 35. Revision 0 Instrument Air Suppl', Reactor Building, El. 298'-0" @
Column "N-10" LR-221 10-C. Sheet 37. Revision 0 Instrument Air Supply, Reactor Building, El. 237'-0" @
Column "K-10" LR-221 10-C. Sheet 39. Revision 0 Instrument Air Supply, Reactor Building, El. 318'-0" @
Column "P-8" LR-221 10-C. Sheet 40, Revision 0 Instrument Air Supply, Reactor Building, El. 298'-0" @
Column "N-7" LR-221 1 0-C. Sheet 41. Revision 0 Instrument Air Supply, Reactor Building, El. 298'-0" @
Column "N-8" LR-221 10-C. Sheet 42. Revision 0 Instrument Air Supply, Reactor Building, El. 298'-0" @
Column "L-9" LR-221 10-C. Sheet 43. Revision 0 Instrument Air Supply, Reactor Building, El. 261'-0" @
Column "P-l I" LR-2211 0-C. Sheet 46, Revision 0 Instrument Air Supply, Reactor Building, El. 298'-0" @
Column "L-7" LR-221 10-C. Sheet 47, Revision 0 Instrument Air Supply, Reactor Building, El. 281'-0" @
Column "K-7" LR-221 10-C. Sheet 48. Revision 0 Instrument Air Supply, Reactor Building, El. 237'-0" Column "K-7" LR-221 10-C. Sheet 49. Revision 0 Instrument Air Supply, Reactor Building, EL. 298' - 0" Column "M-7" LR-221 11 C. Sheet 1. Revision 0 Instrument Air Supply, Reactor Building, El. 237'-0" @
Column "M-11" LR-2211 1-C, Sheet 5. Revision 0 Instrument Air Supply, Reactor Building, El. 281'-0" @
Column "P-9" LR-2211 1-C. Sheet 6. Revision 0 Instrument Air Supply, Reactor Building, El. 281'-0" @
Column "N-10" LR-221 12-C. Sheet 4. Revision 0 Instrument Piping for Air Supply, Turb. Extension Bldg. El.
289'-9" at Column Mb-16 LR-221 12-C. Sheet 5. Revision 0 Instrument Air Supply, Turbine Extension Building, El. 261'
@ Column "Q-14" LR-221 13-C. Sheet 1. Revision 0 Instrument Piping From Air Supply at Post on Column Row I "NC" Between 13 & 14 Page 5 of 8
INDEX OF NINE MILE POINT UNIT 1 LICENSE RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-22113-C, Sheet 2. Revision 0 Instrument Air Supply, Turbine Extension Building, El. 289'-
9"f ( Column "NC-12A" LR-26939-C. Revision 0 Primary Containment Atmosphere H2-02 Monitor Sys. No.
12 LR-26941-C. Revision I Circulating Water System NPDES Permit LR-26949-C. Revision 0 Primary Containment Atmosphere, H2-02 Monitor System
- 11 LR-35715-C. Revision 0 Screen & Pumphouse Circ. Water Tempering Gate Hyd.
Piping LR-45094-C. Revision 0 Fire Protection, Halon LR-45136-C. Sheet 1. Revision 0 Instrumentation, Valve Schedule LR-45136-C. Sheet 2B. Revision 0 Instrumentation, Valve Schedule LR-45136-C, Sheet 3A, Revision 0 Instrumentation, Valve Schedule LR-45136-C, Sheet 4. Revision 0 Instrumentation Valve Schedule LR-45136-C. Sheet 8. Revision 0 Instrumentation Valve Schedule LR-69002-C. Sheet 1. Revision 0 Main Steam Flow Instrumentation, North Instrument Room R.B. El. 237'-0", Instrument Diagram LR-69002-C. Sheet 2. Revision 0 Main Steam Flow Instrumentation, North Instrument Room R.B. El. 237'-0", Instrument Diagram LR-69002-C. Sheet 3. Revision 0 Turbine First Stage Steam Press Turbine Building El. 277'-0"
& 250'-0" Instrument Diagram LR-69003-C. Sheet 2. Revision 0 Cond. Hotwell LvA Turb. Bldg. El. 243'-0" Instr. Diagram LR-69003-C. Sheet 3. Revision 0 Cond. Hotwell Lv (North) Turb. Bldg. El. 243'--" Instr.
Diagram LR-69005-C. Sheet 3. Revision 0 Instrument Diagram LR-69007-C. Sheet 1. Revision 0 Torus Level SE Corner Instrument Diagram LR-69007-C, Sheet 2. Revision 0 Torus Level Northeast Corner Instrument Diagram LR-69007C. Sheet 5. Revision 0 Core Spray Pump #121 & #122 Suction Press. Instrument Diagram LR-69007C. Sheet 6. Revision 0 Core Spray Pump #111 & #112 Suction Press. Instrument Diagram LR-69012-C. Sheet 3. Revision 0 Primary & Secondary Cont. Spray Press., Reactor Building 281'-0", Instrument Diagram LR-69012-C. Sheet 4. Revision 0 Containment Spray Pumps #111 & #121, Northwest Corner Reactor Build. El. 198'-0", Instrument Diagram LR-69012-C. Sheet 5. Revision 0 Containment Spray Pumps #112 & #122, Northeast Comer Reactor Build. El. 198'-0", Instrument Diagram LR-69013-C. Sheet 1. Revision 0 Reactor Building Emergency Vent Flow Turbine Building Elevation 302'-8" Instrument Diagram LR-69013-C. Sheet 2. Revision 0 Reactor Building Emergency Vent. System Turbine Building Elevation 261'-0" Instrument DiagM LR-69014-C Sheet 1. Revision 0 Drywell Press & LvL, West Instrument Room El. 284'-0" Page 6 of 8
INDEX OF NINE MILE POINT UNIT 1 LICENSE RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA; DRAWING NUMBER TITLE LR-69014-C. Sheet 2. Revision 0 Drywell Press. & Lvl, East Instrument Room El. 284'-O" Instrument Diagram LR-6901 5-C. Sheet 1. Revision 0 Reactor Vessel Level, East Inst. Room El. 284'-0",
Instrument Diagram LR-69015-C, Sheet 2. Revision 0 Reactor Vessel Level, West Inst. Room R.B. El. 284'-0",
Instrument Diagram LR-6901 5-C. Sheet 3, Revision 0 Reactor Vessel Level, (Wide Range) & Pressure, West Inst.
Room R.B. El. 284'-0" LR-69017-C. Sheet 2. Revision 0 Emergency Condenser # 11 Steam Flow, East Instrumentation Room, El. 284'-0" Reactor Building LR-69017-C. Sheet 3. Revision 0 Emergency Condenser # 2 Steam Flow, West Instrumentation Room, El. 284'-0" Reactor Building LR-69020-C. Sheet 1, Revision 0 Reactor Recirc. Loop #11 Recirc. Flow, Instrument Room R.B. El. 237'-O", Instrument Diagram LR-69020-C. Sheet 2, Revision 0 Reactor Recirc. Loop #12 Recirc. Flow, Instrument Room R.B. El. 237'-0" LR-69020-C. Sheet 3. Revision 0 Reactor Recirc. Loop #13 Recirc. Flow, Instrument Room R.B. El. 237'-0", Instrument Diagram LR-69020-C. Sheet 4. Revision 0 Reactor Recirc. Loop #14 Recirc. Flow, Instrument Room R.B. El. 237'-0", Instrument Diagram LR-69020-C. Sheet 5. Revision 0 Reactor Recirc. Loop #15 Recirc. Flow, Instrument Room R.B. El. 237'-0", Instrument Diagram LR-69020-C. Sheet 6, Revision 0 Reactor Recirc. Pump #11 Seal Press, Lower Inst. Room R.B. El. 237', Instrument Diagram LR-69020-C, Sheet 7, Revision 0 Reactor Recirc. Pump #12 Seal Press, Lower Inst. Room R.B. El. 237', Instrument Diagram LR-69020-C. Sheet 8. Revision 0 Reactor Recirc. Pump #13 Seal Press, Lower Inst. Room R.B. El. 237', Instrument Diagram LR-69020-C, Sheet 9. Revision 0 Reactor Recirc. Pump #14 Seal Press, Lower Inst. Room R.B. El. 237', Instrument Diagram LR-69020-C. Sheet 10, Revision 0 Reactor Recirc. Pump #15 Seal Press, Lower Inst. Room R.B. El. 237', Instrument Diagram LR-69020-C, Sheet 11, Revision 0 Rx Recirc. Loop #11 Pump Diff. Press, Instrument Room R.B. El. 237'-0", Instrument Diagram LR-69020-C, Sheet 12. Revision 0 Rx Recirc. Loop #12 Pump Duff. Press, Instrument Room R.B. El. 237'-O", Instrument Diagram LR-69020-C. Sheet 13, Revision 0 Rx Recirc. Loop #13 Pump Diff. Press, Instrument Room R.B. El. 237'-0", Instrument Diagram LR-69020-C. Sheet 14. Revision 0 Rx Recirc. Loop #14 Pump Diff. Press, Instrument Room R.B. El. 237'-0", Instrument Diagram LR-69020-C. Sheet 15. Revision 0 Rx Recirc. Loop #15 Pump Diff. Press, Instrument Room R.B. El. 237'-0", Instrument Diagram Page 7 of 8
-.INDEX OF NINE MILE POINT UNIT I LICENSE-RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-69023-C. Sheet 1, Revision 0 RFW PMP #11 Lube oil pressure instrument diagram LR-69023-C, Sheet 2, Revision 0 RFW PMP #12 Lube oil pressure instrument diagram LR-69030-C, Sheet 2, Revision 0 Fire Protection (Water) Hdr Pressure Screen House EL. 256'-
l_
0" Instrument Diagram LR-F69015C, Sheet 4, Revision 0 RV Level & Pressure West Inst. Room Instrument Diagram LR-F69015C, Sheet 5, Revision 0 RV Level & Pressure East Inst. Room Instrument Diagram LR-F69015C, Sheet 6, Revision 0 RV Level and Core dP Lower Inst. Room Instrument lI Diagram LR-NMP-S-1, Revision 0 License Renewal Site Plan (applies to NMPI and NMP2)
Page 8 of 8
INDEX OF NINE MILE POINT UNIT 2 LICENSE RENEWAL' BOUNDARY DRAWINGSFORAMENDEDLRA DRAWING NUMBER TITLE LR-000. Sheet A. Revision 0 License Renewal Boundary Drawing Symbols, Notes, and Acronyms LR-000. Sheet B. Revision 0 License Renewal Boundary Drawing Symbols, Notes, and Acronyms LR-000. Sheet C. Revision 0 License Renewal Boundary Drawing Symbols, Notes, and Acronyms LR-000. Sheet D. Revision 0 License Renewal Boundary Drawing Symbols, Notes, and Acronyms LR-000, Sheet E. Revision 0 License Renewal Boundary Drawing Symbols, Notes, and Acronyms LR-000. Sheet F. Revision 1 License Renewal Boundary Drawing Symbols, Notes, and Acronyms LR-001, Sheet A. Revision 0 Main Steam LR-001. Sheet B. Revision 0 Main Steam LR-001. Sheet C. Revision 0 Main Steam LR-001, Sheet D. Revision 0 Main Steam LR-001. Sheet E. Revision 1 Main Steam LR-001. Sheet F. Revision 1 Main Steam LR-001. Sheet G. Revision 0 Main Steam LR-001, Sheet H. Revision 0 Main Steam LR-001, Sheet J. Revision 0 Main Steam LR-001. Sheet K. Revision 0 Main Steam LR-002. Sheet A, Revision 0 Moisture Separators and Reheaters LR-002. Sheet B. Revision 0 Moisture Separators and Reheaters LR-002. Sheet C. Revision 0 Moisture Separators and Reheaters LR-002, Sheet D. Revision 0 Moisture Separators and Reheaters LR-003, Sheet A. Revision 1 Condensate System LR-003. Sheet B. Revision 0 Condensate System LR-003, Sheet C. Revision 0 Condensate System LR-003. Sheet D. Revision 0 Condensate System LR-004. Sheet A. Revision 1 Condensate Storage and Transfer LR-004. Sheet B. Revision 1 Condensate Makeup and Transfer LR-006. Sheet A. Revision I Feedwater System LR-006, Sheet B. Revision 1 Feedwater System LR-006. Sheet C. Revision 0 Feedwater System LR-008. Sheet A, Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008. Sheet B. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008, Sheet C. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008. Sheet D. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008. Sheet E. Revision 0 Feedwater Heaters and Extraction Steam Systems Page 1 of 6
INDEX OF NINE MILE POINT UNIT 2 LICENSE RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-008. Sheet F. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008, Sheet G. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008, Sheet H. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008. Sheet J. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008. Sheet K, Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008. Sheet L, Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008. Sheet M, Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008, Sheet N. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008, Sheet P. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008, Sheet 0. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008. Sheet R. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008. Sheet S. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008, Sheet T. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-008, Sheet U. Revision 0 Feedwater Heaters and Extraction Steam Systems LR-009. Sheet A. Revision 0 Condenser Air Removal System LR-01 0, Sheet C. Revision 0 Circulating Water, Acid & Hypochlorite LR-010. Sheet D, Revision 0 Circulating Water, Acid & Hypochlorite LR-01 1, Sheet A, Revision 1 Service Water System LR-01 1, Sheet B. Revision 0 Service Water System LR-01 1, Sheet C. Revision I Service Water System LR-01 1, Sheet D, Revision 1 Service Water System LR-01 1, Sheet E, Revision 1 Service Water System LR-01 1, Sheet F. Revision 1 Service Water System LR-01 1. Sheet G. Revision 1 Service Water System LR-01 1, Sheet H. Revision I Service Water System LR-01 1. Sheet J. Revision 1 Service Water System LR-01 1. Sheet K. Revision 0 Service Water System LR-01. Sheet L. Revision 1 Service Water System LR-01 1. Sheet M, Revision 1 Service Water System LR-011. Sheet P. Revision I Service Water System LR-01 1. Sheet Q. Revision I Service Water System LR-013. Sheet A. Revision 1 Reactor Building Closed Loop Cooling Water LR-013. Sheet B, Revision I Reactor Building Closed Loop Cooling Water LR-013. Sheet C. Revision I Reactor Building Closed Loop Cooling Water LR-013, Sheet D. Revision I Reactor Building Closed Loop Cooling Water LR-013, Sheet E. Revision 1 Reactor Building Closed Loop Cooling Water LR-013. Sheet F. Revision 0 Reactor Building Closed Loop Cooling Water LR-01 3, Sheet G. Revision 0 Reactor Building Closed Loop Cooling Water LR-014. Sheet E. Revision 0 Turbine Building Closed Loop Cooling LR-01 6. Sheet A. Revision 0 Makeup Water Storage LR-01 7. Sheet B. Revision 0 Sampling System Page 2 of 6
INDEX OF NINE MILE POINT UNIT 2 LICENSE RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-017, Sheet G. Revision 1 Sampling System LR-019. Sheet D, Revision I Instrument & Service Air LR-019, Sheet E, Revision 0 Instrument & Service Air LR-019, Sheet F. Revision 0 Instrument & Service Air LR-019, Sheet G. Revision I Instrument & Service Air LR-019, Sheet J. Revision 0 Instrument & Service Air LR-019, Sheet L, Revision 0 Instrument & Service Air LR-01 9, Sheet M, Revision I Instrument & Service Air LR-020, Sheet, Revision 0 Breathing Air LR-025_ Sheet A, Revision 0 Clean Steam Reboiler and Auxiliary Cond.
LR-025, Sheet B, Revision 0 Clean Steam Reboiler and Auxiliary Cond LR-025, Sheet C. Revision 0 Clean Steam Reboiler and Auxiliary Cond LR-025, Sheet D, Revision 0 Clean Steam Reboiler and Auxiliary Cond LR-025, Sheet D, Revision 0 Clean Steam Reboiler and Auxiliary Cond LR-025, Sheet F, Revision 0 Clean Steam Reboiler and Auxiliary Cond LR-025, Sheet G. Revision 0 Clean Steam Reboiler and Auxiliary Cond LR-028, Sheet A. Revision 1 Nuclear Boiler and Process Instrumentation LR-028. Sheet B, Revision 0 Nuclear Boiler and Process Instrumentation LR-028. Sheet C. Revision 0 Nuclear Boiler and Process Instrumentation LR-029, Sheet A. Revision 1 Reactor Recirculation System LR-029, Sheet B. Revision 1 Reactor Recirculation System LR-029, Sheet C. Revision I Reactor Recirculation System LR-030. Sheet A, Revision 0 Control Rod Drive Hydraulic System LR-030, Sheet B, Revision 0 Control Rod Drive Hydraulic System LR-030. Sheet C. Revision I Control Rod Drive Hydraulic System LR-031. Sheet A. Revision 1 Residual Heat Removal System LR-031, Sheet B, Revision I Residual Heat Removal System LR-031, Sheet C. Revision I Residual Heat Removal System LR-03 1, Sheet D, Revision 1 Residual Heat Removal System LR-031, Sheet E, Revision 1 Residual Heat Removal System LR-031, Sheet F, Revision 1 Residual Heat Removal System LR-031, Sheet G. Revision 1 Residual Heat Removal System LR-032, Sheet A. Revision 1 Low Pressure Core Spray LR-033, Sheet A, Revision 1 High Pressure Core Spray System LR-033, Sheet B, Revision 1 High Pressure Core Spray System LR-035, Sheet A. Revision 1 Reactor Core Isolation Cooling LR-035. Sheet B, Revision 1 Reactor Core Isolation Cooling LR-035. Sheet C. Revision 1 Reactor Core Isolation Cooling LR-035, Sheet D. Revision I Reactor Core Isolation Cooling LR-036, Sheet A, Revision I Standby Liquid Control LR-037. Sheet A, Revision I Reactor Water Cleanup System Page 3 of 6
INDEX OF NINE MILE POINT-UNIT 2 LICENSE RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-037, Sheet B, Revision 1 Reactor Water Cleanup System LR-037, Sheet C, Revision 0 Reactor Water Cleanup System LR-037, Sheet D, Revision 0 Reactor Water Cleanup System LR-037, Sheet E. Revision 0 Reactor Water Cleanup System LR-037, Sheet F. Revision 0 Reactor Water Cleanup System LR-038. Sheet A. Revision 1 Fuel Pool Cooling & Clean Up LR-038, Sheet B. Revision 1 Fuel Pool Cooling & Clean Up LR-038, Sheet C. Revision 1 Fuel Pool Cooling & Clean Up LR-040, Sheet J. Revision 0 Radioactive Liquid Waste System LR-043, Sheet A, Revision 0 Fire Protection - Water LR-043. Sheet B, Revision 0 Fire Protection - Water LR-043, Sheet C. Revision 0 Fire Protection - Water LR-043, Sheet D, Revision 0 Fire Protection - Water LR-043, Sheet E. Revision 0 Fire Protection - Water LR-043, Sheet F. Revision 0 Fire Protection - Water LR-043, Sheet G. Revision 1 Fire Protection - Water LR-043, Sheet H. Revision 0 Fire Protection - Water LR-044. Sheet A, Revision 0 Fire Protection - Foam LR-044, Sheet B. Revision 0 Fire Protection - Foam LR-045, Sheet A. Revision 0 Fire Protection, C02 System LR-045, Sheet B. Revision 0 Fire Protection, Low Pressure, C02 LR-045, Sheet C. Revision 0 Fire Protection, C02 System LR-046, Sheet A. Revision 0 Fire Protection - Halon LR-048, Sheet A. Revision 0 Auxiliary Boiler System LR-048, Sheet B. Revision 0 Auxiliary Boiler System LR-048. Sheet C. Revision 0 Auxiliary Boiler System LR-049, Sheet C. Revision 0 Hot Water and Glycol LR-050, Sheet A, Revision 1 Domestic Water LR-050. Sheet B. Revision 0 Domestic Water LR-051. Sheet B. Revision 0 Sanitary Plumbing LR-052, Sheet A, Revision 0 Rx Building Ventilation & Cat I Area Coolers LR-052, Sheet B. Revision 0 Rx Building Ventilation & Cat I Area Coolers LR-052, Sheet C, Revision 0 Rx Building Ventilation & Cat I Area Coolers LR-052, Sheet D, Revision 0 Rx Building Ventilation & Cat I Area Coolers LR-052, Sheet E, Revision 0 Rx Building Ventilation & Cat I Area Coolers LR-052, Sheet F. Revision 0 Rx Building Ventilation & Cat I Area Coolers LR-052, Sheet G. Revision 0 Rx Building Ventilation & Cat I Area Coolers LR-052, Sheet H. Revision 1 Rx Building Ventilation & Cat I Area Coolers LR-053, Sheet A, Revision 1 Control Building Chilled Water LR-053, Sheet B. Revision 0 Control Building Ventilation and Air Conditioning LR-053, Sheet C, Revision 0 Control Building Ventilation and Air Conditioning Page4of6
INDEX OF NINE MILE POINT UNIT 2 LICENSE RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-053. Sheet D. Revision 0 Control Building Ventilation and Air Conditioning LR-053, Sheet E. Revision 0 Control Building Ventilation and Air Conditioning LR-053, Sheet F. Revision 0 Control Building Ventilation and Air Conditioning LR-054, Sheet A. Revision 0 Chilled Water and Normal Switchgear Building Ventilation LR-057, Sheet A, Revision 0 Diesel Generator Building Ventilation LR-058, Sheet A, Revision 0 Screenwell & Diesel Fire Pump Room Vent LR-058, Sheet B. Revision 0 Screenwell & Diesel Fire Pump Room Vent LR-059, Sheet B. Revision 0 Electrical Tunnels and Miscellaneous Vent System LR-059, Sheet C. Revision 0 Electrical Tunnels and Miscellaneous Vent System LR-060, Sheet A. Revision 0 Drywell Cooling LR-061, Sheet A. Revision I Primary Containment Purge & Standby Gas Treatment LR-061. Sheet B. Revision 1 Primary Containment Purge & Standby Gas Treatment LR-061, Sheet C. Revision I Stand-By Gas LR-062, Sheet A. Revision I DBA Hydrogen Recombiner lLR-062 Sheet B. Revision 0 DBA Hydrogen Recombiner LR-063. Sheet A. Revision I Reactor Building Equipment and Floor Drains LR-063, Sheet B. Revision 0 Reactor Building Equipment and Floor Drains LR-063, Sheet C. Revision 1 Reactor Building Equipment and Floor Drains LR-063, Sheet D. Revision 1 Reactor Building Equipment and Floor Drains LR-063, Sheet E, Revision 1 Reactor Building Equipment and Floor Drains LR-064, Sheet G. Revision 0 Turbine Building Drains LR-064, Sheet J. Revision 0 Turbine Building Drains LR-066, Sheet B. Revision I Miscellaneous Drains LR-066, Sheet C. Revision 0 Miscellaneous Drains LR-066, Sheet D. Revision 0 Miscellaneous Drains LR-066, Sheet F, Revision 0 Miscellaneous Drains LR-066, Sheet G. Revision 0 Miscellaneous Drains LR-066, Sheet H. Revision 0 Miscellaneous Drains LR-066, Sheet H. Revision 0 Miscellaneous Drains LR-066, Sheet K. Revision 0 Miscellaneous Drains LR-066, Sheet L, Revision 0 Miscellaneous Drains LR-067. Sheet A. Revision I Drywell Equipment Drains LR-081, Sheet A. Revision 1 Instrumentation Diagram Containment Leakage Monitoring System LR-082, Sheet A, Revision I Piping & Instrumentation Diagram Containment Atmosphere l_
Monitoring System LR-082, Sheet B. Revision 1 Piping & Instrumentation Diagram Containment Atmosphere l_
Monitoring System LR-104, Sheet A, Revision 1 Standby Diesel Gen. System LR-_104, Sheet B. Revision I Standby Diesel Gen. System LR-104, Sheet C, Revision I Standby Diesel Gen. System Page 5 of 6
INDEX OF NINE MILE POINT UNIT 2 LICENSE RENEWAL BOUNDARY DRAWINGS FOR AMENDED LRA DRAWING NUMBER TITLE LR-104, Sheet D, Revision 0 Jacket Water Standby Diesel Generator System LR-104, Sheet E. Revision 0 Lube Oil Standby Diesel Generator System LR-104, Sheet F. Revision 0 Fuel Oil Schematic Standby Diesel Generator System LR-1 05, Sheet B. Revision I Nitrogen System LR-1 06. Sheet A, Revision 0 Post Accident Sampling LR-1 1, Sheet A, Revision 0 Service Water Chemical Treatment System LR-l 15. Sheet A, Revision I Alternate Decay Heat Removal System LR-12177-EM-38A, Revision 0 Arrangement Neutron Monitoring System - Reactor Building LR-400758, Revision 0 DRMS Offline Liquid Monitor Service Water System LR-400759, Revision 0 DRMS Offline Gas Particulate Monitor Reactor Building Ventilation LR-400762. Revision 0 DRMS Offline Gas Monitor Control Room Ventilation LR-400863. Revision 0 DRMS Offline Gas Particulate Monitor Containment Monitoring System Page 6 of 6