ML23005A232: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML23005A232
| number = ML23005A232
| issue date = 01/30/2023
| issue date = 01/30/2023
| title = Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 4, to Nuhoms Eos System Request for Supplemental Information
| title = Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 4, to Nuhoms Eos System Request for Supplemental Information
| author name = Jacobs C
| author name = Jacobs C
| author affiliation = NRC/NMSS/DFM/STLB
| author affiliation = NRC/NMSS/DFM/STLB
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 30, 2023 Prakash Narayanan Chief Technical Officer TN Americas LLC 7135 Minstrel Way, Suite 300 Columbia, MD 21045
{{#Wiki_filter:OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Prakash Narayanan Chief Technical Officer TN Americas LLC 7135 Minstrel Way, Suite 300 Columbia, MD 21045


==SUBJECT:==
==SUBJECT:==
Line 25: Line 25:


==Dear Prakash Narayanan:==
==Dear Prakash Narayanan:==
By {{letter dated|date=September 29, 2022|text=letter dated September 29, 2022}}, TN Americas LLC (TN) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for Certificate of Compliance No. 1042, Amendment No. 4, to the NUHOMS EOS System, pursuant to the requirements of Part 72 of Title 10 of the Code of Federal Regulations.
By {{letter dated|date=September 29, 2022|text=letter dated September 29, 2022}}, TN Americas LLC (TN) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for Certificate of Compliance No. 1042, Amendment No. 4, to the NUHOMS EOS System, pursuant to the requirements of Part 72 of Title 10 of the Code of Federal Regulations.
The staff has performed an acceptance review of your application to determine if the application contained sufficient technical information to begin a detailed technical review. The staff has determined that the application does not provide sufficient technical information to begin a detailed review and that additional supplemental information is needed. The information needed to continue our review is described in the enclosed request for supplemental information (RSI). contains non-proprietary RSIs and Observations. Enclosure 2 contains proprietary RSIs and Observations.
The staff has performed an acceptance review of your application to determine if the application contained sufficient technical information to begin a detailed technical review. The staff has determined that the application does not provide sufficient technical information to begin a detailed review and that additional supplemental information is needed. The information needed to continue our review is described in the enclosed request for supplemental information (RSI). contains non-proprietary RSIs and Observations. Enclosure 2 contains proprietary RSIs and Observations.
In order to schedule our technical review, responses to the enclosed RSIs should be provided within 60 days from the date of this letter. If TN is unable to meet this response date, please notify us at least two weeks in advance of your new submittal date and the reasons for the delay. If TN is not able to respond within this timeframe or RSI responses provided to the NRC do not provide sufficient information, the application may not be accepted for review.
In order to schedule our technical review, responses to the enclosed RSIs should be provided within 60 days from the date of this letter. If TN is unable to meet this response date, please notify us at least two weeks in advance of your new submittal date and the reasons for the delay. If TN is not able to respond within this timeframe or RSI responses provided to the NRC do not provide sufficient information, the application may not be accepted for review.
Upon removal of Enclosure 2 this document is non-sensitive.
Upon removal of Enclosure 2 this document is non-sensitive.
OFFICIAL USE ONLY PROPRIETARY INFORMATION
January 30, 2023


OFFICIAL USE ONLY PROPRIETARY INFORMATION P. Narayanan                                 Please reference Docket No. 72-1042, CAC No. 001028 and EPID: L-2022-LLA-0017 in future correspondence related to the acceptance review for this licensing action. If you have any questions, please contact me at (301) 415-6825.
OFFICIAL USE ONLY PROPRIETARY INFORMATION P. Narayanan OFFICIAL USE ONLY PROPRIETARY INFORMATION Please reference Docket No. 72-1042, CAC No. 001028 and EPID: L-2022-LLA-0017 in future correspondence related to the acceptance review for this licensing action. If you have any questions, please contact me at (301) 415-6825.
Sincerely, Signed by Jacobs, Christian on 01/30/23 Christian Jacobs, Senior Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-1042 CAC No.: 001028 EPID: L-2022-LLA-0017
Sincerely, Christian Jacobs, Senior Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-1042 CAC No.: 001028 EPID: L-2022-LLA-0017


==Enclosures:==
==Enclosures:==
: 1. RSIs and Observations (non-proprietary)
: 1. RSIs and Observations (non-proprietary)
: 2. RSIs and Observations (proprietary)
: 2. RSIs and Observations (proprietary)
OFFICIAL USE ONLY PROPRIETARY INFORMATION
Signed by Jacobs, Christian on 01/30/23


ML23005A231; Ltr ML23005A232 OFFICE             NMSS/DFM/STLB         NMSS/DFM/STLB NAME               CJacobs           CJ CJacobs       CJ DATE               Jan 9, 2023           Jan 30, 2023}}
ML23005A231; Ltr ML23005A232 OFFICE NMSS/DFM/STLB NMSS/DFM/STLB NAME CJacobs CJacobs DATE Jan 9, 2023 Jan 30, 2023}}

Latest revision as of 11:43, 27 November 2024

Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 4, to Nuhoms Eos System – Request for Supplemental Information
ML23005A232
Person / Time
Site: 07201042
Issue date: 01/30/2023
From: Christian Jacobs
Storage and Transportation Licensing Branch
To: Narayanan P
TN Americas LLC
Shared Package
ML23005A231 List:
References
CAC 001028, EPID L- 2022-LLA-0017
Download: ML23005A232 (1)


Text

OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Prakash Narayanan Chief Technical Officer TN Americas LLC 7135 Minstrel Way, Suite 300 Columbia, MD 21045

SUBJECT:

ACCEPTANCE REVIEW OF TN AMERICAS LLC APPLICATION FOR CERTIFICATE OF COMPLIANCE NO. 1042, AMENDMENT NO. 4, TO NUHOMS EOS SYSTEM (DOCKET NO. 72-1042, CAC NO. 001028, EPID: L-2022-LLA-0017) - REQUEST FOR SUPPLEMENTAL INFORMATION

Dear Prakash Narayanan:

By letter dated September 29, 2022, TN Americas LLC (TN) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for Certificate of Compliance No. 1042, Amendment No. 4, to the NUHOMS EOS System, pursuant to the requirements of Part 72 of Title 10 of the Code of Federal Regulations.

The staff has performed an acceptance review of your application to determine if the application contained sufficient technical information to begin a detailed technical review. The staff has determined that the application does not provide sufficient technical information to begin a detailed review and that additional supplemental information is needed. The information needed to continue our review is described in the enclosed request for supplemental information (RSI). contains non-proprietary RSIs and Observations. Enclosure 2 contains proprietary RSIs and Observations.

In order to schedule our technical review, responses to the enclosed RSIs should be provided within 60 days from the date of this letter. If TN is unable to meet this response date, please notify us at least two weeks in advance of your new submittal date and the reasons for the delay. If TN is not able to respond within this timeframe or RSI responses provided to the NRC do not provide sufficient information, the application may not be accepted for review.

Upon removal of Enclosure 2 this document is non-sensitive.

January 30, 2023

OFFICIAL USE ONLY PROPRIETARY INFORMATION P. Narayanan OFFICIAL USE ONLY PROPRIETARY INFORMATION Please reference Docket No. 72-1042, CAC No. 001028 and EPID: L-2022-LLA-0017 in future correspondence related to the acceptance review for this licensing action. If you have any questions, please contact me at (301) 415-6825.

Sincerely, Christian Jacobs, Senior Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-1042 CAC No.: 001028 EPID: L-2022-LLA-0017

Enclosures:

1. RSIs and Observations (non-proprietary)
2. RSIs and Observations (proprietary)

Signed by Jacobs, Christian on 01/30/23

ML23005A231; Ltr ML23005A232 OFFICE NMSS/DFM/STLB NMSS/DFM/STLB NAME CJacobs CJacobs DATE Jan 9, 2023 Jan 30, 2023