Letter Sequence Request |
|---|
EPID:L-2018-LLA-0043, Package: Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Supplemental Information (Approved, Closed) CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement
Results
Other: ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML19177A014, ML20136A049, ML20136A050, ML20136A051
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI 2018-01-11
[Table View] |
Text
orano Columbia Office 7135 Minstrel Way Columbia, MD 21045 Tel: (410) 910-6900
@Orano_USA U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 February')'.! 5, 2018 J
\\E-50547
/
\\
I
'--~
_ _/
Subject:
Application for Amendment 1 to the NUHOMS EOS System, Revision O (Docket No. 72-1042)
In accordance with 1 O CFR 72.244, TN Americas LLC herewith submits its application to amend Certificate of Compliance (CoC) 1042 for the NU HOMS EOS System. The scope of Amendment 1 is described in Enclosure 2.
includes a mark-up of proposed changes to the CoC document.
provides a complete revision to the Technical Specifications (TS) with proposed changes annotated. The proprietary version of the Updated Final Safety Analysis Report (UFSAR) changed pages and drawings associated with Amendment 1 are included as Enclosure 5 with a footer on each changed page annotated as "72-1042 Amendment 1, Revision 0, February 2018." The public version of these UFSAR changed pages is provided as Enclosure 6.
Certaira portions of this submittal include proprietary information, which may not be used for any purpose other than to support the NRG staffs review of the application.
In accordance with 10 CFR 2.390, TN Americas LLC is providing an affidavit (Enclosure 1 ), specifically requesting that this proprietary information be withheld from public disclosure. The submittal also includes security-related information.
With the exception of Enclosure 8, public versions of portions containing proprietary and/or security-related information are provided. Enclosure 7 provides a listing of the computer files associated with CoC 1042 Amendment 1. Enclosure 8 contains the computer files associated with this amendment submittal. Since Enclosure 8 contains entirely proprietary information, no public version is provided.
TN Americas LLC has a contract with' one of our existing customers who desires to use the ch~nges to CoC 1042 described in this amendment application.
TN Americas LLC requests that the staff assign appropriate priority for review of this application, consistent with the issuance of a request for additional information, if needed, in order for Amendment 1 to become final effective within 15 months (by May 15, 2019).
. /V M 5 5 2-~
Enclosures transmitted herein contain SUNSI. When separated from enclosures, this transmittal document is decontrolled.
Document Control Desk February 15, 2018 E-50547 Page 2 of 3 This submittal is being provided as an electronic submission, using the optical storage media (OSM) provision from Section 4 of the NRC Guidance for Electronic Submissions to the NRC.
Accordingly, we have included a Document Components listing and OSM #1, OSM #2, and OSM #3 listings at the end of this cover letter.
TN Americas LLC looks forward to working with the NRC staff on this amendment application.
We are prepared to meet with the staff to resolve any questions the staff might have. Should the NRC staff require additional information to support review of this application, please do not hesitate to contact Mr. Dennis Williford at 704-805-2223, or me at 410-910-6881.
Sincerely, Jayant Bondre Chief Technical Officer cc:
Chris Jacobs (NRC SFM) as follows:
One paper copy of this cover letter Six computer disks containing this cover letter and Enclosures 1 through 7 Gne hard drive with Enclosure 8
Enclosures:
- 1. Affidavit Pursuant to 1 O CFR 2.390
- 2. Description, Justification, and Evaluation of Amendment 1 Changes
- 3. Proposed Certificate.of Compliance No. 1042 Amendment 1, Revision O Markup
- 4. Proposed Technical Specifications, CoC 1042 Amendment 1, Revision 0
- 5. Proposed Amendment 1, Revision O Changes to the NUHOMS EOS System Updated Final Safety Analysis Report (Proprietary and Security-Related Version)
- 6. Proposed Amendment 1, Revision O Changes to the NU HOMS EOS System Updated Final Safety Analysis Report (Public Version)
- 7. Listing of Computer Files Contained in Enclosure 8 8'. Certain Computer Files Associated with Certificate of Compliance 1042 Amendment 1 (Proprietary) (contained on one hard drive)
Document Control Desk February 15, 2018 Document Components:
001 Public Transmittal Letter.pdf, 914,285 bytes 002 Public Encl 1 Affidavit.pdf, 756,910 bytes 003 Public Encl 2 Description etc,Amd 1.pdf, 82,382 bytes 004 Public Encl 3 Proposed Amd 1 Coe Markup.pdf, 240,394 bytes 005 Public Encl 4 Proposed Amd 1 Tech Specs.pdf, 1,181,436 bytes E-50547 Page 3 of 3 006 SUNS! Encl 5 Proposed Amd 1 UFSAR Changes Ch 1 to 14.pdf, 28,157,436 bytes 007 SUNS! Encl 5 Proposed Amd 1 UFSAR Changes Ch A1 to A14.pdf, 67,206,744 bytes 008 Public Encl 6 Proposed Amd 1 UFSAR Changes Ch 1 to 14.pdf, 11,432,532 bytes 009 Public Encl 6 Proposed Amd 1 UFSAR Changes Ch A1 to A14.pdf, 36,026,852 bytes 010 Public Encl 7 List of files on Encl 8.pdf, 98,058 bytes 011 SUNSI Encl 8 Computer Files Associated with Amd 1 (hard drive), 90,386,804,736 bytes, Proprietary 0SM#1 (Entire submittal except for the portable hard drive) (Disk):
001 Public Transmittal Letter.pdf, 914,285 bytes 002 Public Encl 1 Affidavit.pdf, 756,910 bytes 003 Public Encl 2 Description etc Amd 1.pdf, 82,382 bytes 004 Public Encl 3 Proposed Amd 1 Coe Markup.pdf, 240,394 bytes 005 Public Encl 4 Proposed Amd 1 Tech Specs.pdf, 1,181,436 bytes 006 SUNSI Encl 5 Proposed Amd *1 UFSAR Changes Ch 1 to 14.pdf, 28,157,436 bytes 007 SUNS! Encl 5 Proposed Amd 1 UFSAR Changes Ch A1 to A14.pdf, 67,206,744 bytes 008 Public Encl 6 Proposed Amd 1 UFSAR Changes Ch 1 to 14.pdf, 11,432,532 bytes 009 Public Encl 6 Proposed Amd 1 UFSAR Changes Ch A1 to A14.pdf, 36,026,852 bytes 01 O Public Encl 7 List of files on Encl 8.pdf, 98,058 bytes 0SM#2 (Enclosure 8 portable hard drive):
011 SUNSI Encl 8 Computer Files Associated with Amd 1 (hard drive), 90,386,804,736 bytes, Proprietary 0SM#3 (Public Information Only) (Disk):
001 Public Transmittal Letter.pdf, 914,285 bytes 002 Public Encl 1 Affidavit.pdf, 756,910 bytes 003 Public Encl 2 Description etc Amd 1.pdf, 82,382 bytes 004 Public Encl 3 Proposed Amd 1 Coe Markup.pdf, 240,394 bytes 005 Public Encl 4 Proposed Amd 1 Tech Specs.pdf, 1,181,436 bytes 008 Public Encl 6 Proposed Amd 1 UFSAR Changes Ch 1 to 14.pdf, 11,432,532 bytes 009 Public Encl 6 Proposed Amd 1 UFSAR Changes Ch A1 to A14.pdf, 36,026,852 bytes 01 O Public Encl 7 List of files on Encl 8.pdf, 98,058 bytes