Letter Sequence Other |
|---|
CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2018-LLA-0043, Package: Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to Nuhoms Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Supplemental Information (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI 2018-01-11
[Table View] |
Text
RSIs and Responses to E-52372 Page 1 of 4 Criticality/Shielding CRITICALITY/SHIELDING RSI 1 The staff issued an RSI requesting specification of the new contents, which includes failed fuel and damaged fuel, and information on how the failed fuel is confined in the fuel cell.
In response to the staffs RSI, the applicant referred to the definition of intact fuel in Table 2-3 and 2-4 from the Safety Analysis Report, Revision 0. The staff notes that the information in these referenced tables is inconsistent with the definition of failed fuel in the applicants proposed Technical Specifications included with the submittal. Therefore, the staff cannot determine the characteristics of the new contents necessary to perform a criticality and shielding review of the cask design. Specifically, the allowable quantity of the contents per fuel cell and the physical form and the dimensions (i.e., rod segments, loose pellets) is needed. In order to determine the geometry and source distributions for the contents, the staff needs to understand how the content is confined in the fuel cell and the potential for fuel relocation/reconfiguration under normal and off-normal operations and accident conditions.
The staff needs this information to proceed with its review to determine if the NUHOMS EOS system with the requested new contents meets the regulatory requirements of 10 CFR 72.124(a), 72.124(b), 10 CFR 72.236(c), and 10 CFR 72.236(d).
RESPONSE TO CRITICALITY/SHIELDING RSI 1:
Fuel may be categorized as intact, damaged, or failed. The potential for fuel reconfiguration for each of these fuel categories under normal, off-normal, and accident conditions has been added as new Updated Final Safety Analysis Report (UFSAR) Table 2-4a. The criticality, shielding, and thermal analyses consider fuel reconfiguration as appropriate, and damaged and failed fuel contents are limited considering reconfiguration.
All fuel categorized as failed shall be placed in a failed fuel canister (FFC). Accordingly, the definition of failed fuel in Section 1.1 of the Technical Specifications (TS) is revised to reflect this. Failed fuel may include fuel assemblies, fuel rods, segments of fuel rods, fuel pellets, and debris. As described in the response to Materials RSI 1,drawing sheets showing the FFC have been added to UFSAR Drawing EOS01-1010-SAR in Chapter 1. FFCs are not required for damaged fuel assemblies, as damaged fuel assemblies maintain their geometry under normal and off-normal conditions.
The pressurized water reactor (PWR) fuel assembly classes are summarized in UFSAR Table 2-2 and Table 2-4. The failed fuel content of each FFC is limited to the maximum metric tons of uranium (MTU) of an intact fuel assembly for each class. These limits are summarized in the TS as Table 2 and included in the UFSAR as new Table 2-4b to provide the maximum uranium loadings per FFC for failed PWR fuel. TS Section 2.1 is also revised to refer to TS Table 2 for maximum uranium loadings.
UFSAR Chapter 6 (Shielding Evaluation) and Chapter 7 (Criticality Evaluation) have also been revised to clearly indicate that no credit is taken for the FFC or any secondary containers.
Reference made to the RSB (rod storage basket) has been deleted throughout the chapters because the RSB is simply an example of a type of secondary container, and no credit is taken for secondary containers.
RSIs and Responses to E-52372 Page 2 of 4 Failed control components may also be stored inside an FFC. The maximum Co-60 content for failed control components is the same as intact control components and is defined in TS Table 3.
The characteristics of the spent fuel to be stored have also been updated in UFSAR Section 2.2 to reflect the changes in this response associated with failed fuel.
Application Impact:
TS Sections 1.1 and 2.1 are revised as described in the response. TS Table 2 is added as described in the response.
UFSAR Sections 2.2, 6.3.2, 7, 7.1, 7.2, 7.3.1, and 7.4 have been revised as described in the response.
UFSAR Tables 7-80, and 7-81 have been revised and Tables 2-4a and 2-4b have been added as described in the response.
UFSAR Figures 7-25 and 7-26 have been revised as described in the response.
RSIs and Responses to E-52372 Page 3 of 4 Materials MATERIALS RSI 1 With respect to the use of the damaged/failed fuel basket end caps and rod storage baskets 1.
(or similar components) for the storage of failed fuel, provide the following information:
- a. Clarify if the rod storage basket (or a similar component) performs any safety functions, such as confinement of gross fuel particles, debris, or damaged assemblies to a known volume within the dry shielded canister. Clarify how these components are relied on in the criticality, shielding, thermal, and structural evaluations, and in loading and retrievability operations.
- b. Provide design bases information and drawings for the rod storage basket (or a similar component) if these components perform or support safety functions.
- c. Provide an explanation of how the system meets the regulatory requirements of 10 CFR 72.236(h) and (m), and how the system is designed to allow the users to meet the regulatory requirements of 10 CFR 72.122(h)(1) if the rod storage basket (or a similar component) is categorized as not important to safety.
- d. Clarify whether failed fuel would always be placed in a rod storage basket (or a similar component).
This information is necessary to determine compliance with 10 CFR 72.236(b), (h) and (m).
RESPONSE TO MATERIALS RSI 1:
A failed fuel canister (FFC) has been added to the design and shall be used to handle failed fuel, as described in the following response.
- a. The EOS-37PTH DSC is designed to accommodate up to eight damaged fuel assemblies (FAs) or up to four FFCs, with the balance intact FAs. The definition of failed fuel has been revised in Section 1.1 of the Technical Specifications. The design of the new EOS-37PTH FFC (shown in new sheets of revised Updated Final Safety Analysis Report (UFSAR)
Drawing EOS01-1010-SAR) is similar to the FFCs already licensed for the 32PTH1 and 24PTH baskets, as discussed in Sections U.3.6.4 and P.3.6.4, respectively, of the CoC 1004 UFSAR. The FFC is protected by the fuel compartments and the only safety function is to confine the failed fuel (including particles and debris) to a known volume in the dry shielded canister. The FFC is not relied on in the criticality, shielding, thermal, or structural evaluations to perform a safety function. The FFC has slots on the upper portion of the liner to facilitate lifting and or unloading (and retrievability) of the FFC with the enclosed failed fuel contents, and a structural evaluation of the FFC, for lifting and handling, has been added to UFSAR Section 3.9.2.1A. UFSAR Chapter 9 has been revised to include operating procedures for the FFC, including handling during loading and unloading.
- b. The FFC geometry and the materials used for its fabrication are shown on a revision to UFSAR drawing EOS01-1010-SAR. A structural evaluation of the FFC is presented in UFSAR Section 3.9.2.1A.
RSIs and Responses to E-52372 Page 4 of 4
- c. The FFC is categorized as important-to-safety. Each FFC is constructed of sheet metal, and provided with a welded bottom closure and a removable top closure. Consistent with 10 CFR 72.122(h)(1), this ensures that failed fuel is confined so that degradation of the fuel during storage will not pose operational safety problems with respect to its removal from storage. The FFC has slots on the upper portion of the liner to facilitate lifting and unloading (and retrievability) of the FFC with the enclosed failed fuel contents using normal fuel handling means, thus ensuring compliance with 10 CFR 72.236(h) and (m). The FFC is provided with screens at the bottom and top to contain the failed fuel and allow fill/drainage of water from the FFC during loading operations.
- d. Consistent with the revised definition of failed fuel in Section 1.1 of the Technical Specifications, failed fuel will always be loaded into an FFC.
Other conforming changes associated with the FFCs have also been made to UFSAR Chapters 2, 3, 4, 5 and 6.
Application Impact:
Technical Specifications Section 1.1 has been revised as described in the response.
UFSAR Sections 1.1, 1.2.1.1, 1.2.3.1, 1.4.1, 2.2, 2.4.2.1, 3.9.2.3A, 3.9.2.5, 4, 4.9.6.1, 4.9.6.2, 5.1, 6.1, 6.2.2, 9.1.1, 9.1.2 and 9.2.2 have been revised as described in the response.
UFSAR Section 3.9.2.1A has been added as described in the response.
UFSAR Tables 2-1 and 4.9.6-10 have been revised as described in the response.
UFSAR Figure 4.9.6-8 has been revised as described in the response.
UFSAR Drawing EOS01-1010-SAR has been revised as described in the response.