Letter Sequence Response to RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI 2018-01-11
[Table View] |
Text
Orano TN 7160 Riverwood Drive Suite 200 Columbia, MD 21046 USA Tel: 410-910-6900 Fax: 434-260-8480 Enclosures transmitted herein contain SUNSI. When separated from enclosures, this transmittal document is decontrolled.
September 11, 2020 E-57451 U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852
Subject:
Response to Request for Additional Information - Application for Amendment 17 to Standardized NUHOMS Certificate of Compliance No.
1004 for Spent Fuel Storage Casks, Revision 1 (Docket No. 72-1004, CAC No. 001028, EPID: L-2020-LLA-0128)
Reference:
Letter from Yen-Ju Chen (NRC) to Prakash Narayanan (TN Americas LLC),
Amendment No. 17 to Certificate of Compliance No. 1004 for the Standardized NUHOMS System - Request for Additional Information, dated August 31, 2020 TN Americas LLC (TN) hereby submits our response to the Request for Additional Information (RAI) forwarded by the letter referenced above. Enclosure 2, herein, provides the response to the RAI. The RAI response did not require changes to the Application for Amendment 17, the Certificate of Compliance (CoC) Appendices, or to the UFSAR. The public version of the RAI response is provided as Enclosure 3. Portions of this RAI response include proprietary information, which may not be used for any purpose other than to support NRC staff review of the application. In accordance with 10 CFR 2.390, TN is providing an affidavit (Enclosure 1), specifically requesting that this proprietary information be withheld from public disclosure.
Should you have any questions regarding this submittal, please do not hesitate to contact Mr. Douglas Yates at 434-832-3101 or me at 410-910-6859.
Sincerely, Prakash Narayanan Chief Technical Officer cc: Chris Jacobs, NRC DFM
Enclosures:
- 1. Affidavit Pursuant to 10 CFR 2.390
- 2. RAI and Response (Proprietary Version)
- 3. RAI and Response (Public Version)
Am ricas'h.J,..C t te of Maryland County of Ho ard
)
ss.
)
AFFIDAVIT PlJR UANT TO 10 CFR 2.390 Enclosure l to E-5745 I l, Prakash ara anan, depose and say that I am the Chi f Technical Officer of TN Americas LLC, duly authorized to e ecute this affida it, and have revie ed or caused to have reviewed the information that is identified as proprietary and referenced in the paragraph immediately below. 1 wn submitting this affidavit in confonnancc with the pro i ion of 10 CFR 2.390 ofth Commi ion's regulations for withholding this infonnation.
The infonnation for which proprietary treatrn nt is sought meets the provisions of paragraph (a) (4) of Section 2.390 of the Cornmis ion's regulation. The infonnation i contained in Enclosure 2 as listed below:
- , Portions of the Respon to the Rcque t for Additional lnfonnation This document has been appropriately designated as proprietary.
I ha e personal knowledge of the criteria and procedures utilized by Americas LLC in designating information as a trade secret, privileged or as confidential commercial or financial information.
Pursuant to the provisions of paragraph (b) (4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public di closure, included in the abo e referenced document, should be withheld.
I) The information sought to be withheld from public disclosure involves portions of the response to the requ st for additional information related to the analysis of the Standardized NUHOMS dry spent fuel storage system, which are owned and have been held in confidence by TN Americas LLC.
- 2) The infonnation is of a type customarily held in confidence by TN Americas LLC, and not customarily disclosed to the public. TN Americas LLC has a rational basis for determining the types of infonnation customarily held in confidence by it.
- 3) Public disclosure of the infonnation is likely to cause substantial harm to the competitive position of Americas LLC, because the information consists of descriptions of the design of dry spent fuel storage systems, the application of which provide a competitive economic advantage. The availability of such information to competitors would enable them to modify their product to better compete with TN Americas LLC, take marketing or other actions to improve their product's position or impair the position of TN Americas LLC's product, and avoid developing similar data and analyses in support of their processes, methods or apparatus.
Funher the deponent sayeth not.
Prakash Narayanan Chief Technical Officer, TN Americas LLC Subscribed and sworn before me this 11 111 day of September, 2020.
6=~
otary Publi~
My Commission Expires JO I /l,1,k23 Page I of I RONDA JONES NOTARY PUBLIC o TGOMERY COUNTY MARYlAND MISS\\
EXP RES OC
to E-57451 RAI and Response (Proprietary Version)
Withheld Pursuant to 10 CFR 2.390
RAI and Response - Public to E-57451 Page 1 of 4 RAI 8-1:
Provide the data and analysis that supports the conclusion that the neutron and gamma radiation exposures associated with the amendment are bounded by the Standardized NUHOMS Certificate of Compliance (CoC) renewal time-limited aging analysis (TLAA),
Evaluation of Neutron Fluence and Gamma Radiation on Storage System Structural Materials.
The renewal of the Standardized NUHOMS CoC included a TLAA to demonstrate that neutron and gamma radiation exposures will not lead to embrittlement of the structural materials during the period of extended operation (AREVA, 2015). The TLAA is summarized in FSAR Section 12.2.5. The amendment application states that the amendment does not impact the TLAA because the neutron and gamma sources associated with the amendment are bounded by those already considered by the TLAA.
The staff requests additional information to support the conclusion that radiation embrittlement remains a non-credible aging mechanism for the storage system structural materials. Provide the neutron and gamma radiation source data or calculated cumulative radiation exposure data for the structural materials and demonstrate that the TLAA remains bounding.
This information is needed to evaluate compliance with 10 CFR 72.236(g).
Reference AREVA, 2015. AREVA Inc. Non-Proprietary Certificate of Compliance Renewal Application for the Standardized NUHOMS System Certificate of Compliance No. 1004 (Docket No. 72-1004)
Revision 1, Appendix 3E, October 2015 (ADAMS Accession No. ML15295A349).
Response to RAI 8-1:
Neutron Fluence The neutron source increases significantly for lower enrichments. Historically, CoC No. 1004 neutron sources were computed with burnup/enrichment combinations that are significantly conservative compared to those from actual operating reactors. In the TLAA neutron fluence analysis, the limiting 69BTH dry shielded canister (DSC) analysis is performed for a burnup of 62 GWd/MTU and an enrichment of 2.6%. The computed neutron source at 3 years cooling is
[
] (see Appendix 3E, Table 3E-2).
In CoC 1004, Amendment 17, minimum enrichments are selected based on a review of fuel assembly discharge data, which are summarized in CoC 1004 UFSAR Table T.5-29. For a burnup of 62 GWd/MTU, a minimum enrichment of 3.8% is used, as indicated in UFSAR Section T.5.2.6. For this reason, the computed neutron sources for Amendment 17 are significantly lower than the values used in the TLAA analysis, despite the shorter cooling time used in Amendment 17. In Amendment 17, the largest neutron source used in the 61BTH DSC analysis is 4.919x108 n/s at a cooling time of 1.3 years (see UFSAR Table T.5-18c), which is approximately half of the neutron source used in the TLAA analysis at a cooling time of 3 years.
Despite the shorter cooling time, the neutron source is significantly lower due to the more realistic burnup/enrichment assumption.
RAI and Response - Public to E-57451 Page 2 of 4 In addition, in the TLAA documented in Appendix 3E of the CoC 1004 renewal application and summarized in UFSAR Section 12.2.5, the total neutron fluence is approximately [
] of the embrittlement limit. The neutron fluence within a horizontal storage module (HSM) is too low to have any effect on embrittlement.
Therefore, the current TLAA neutron fluence analysis bounds Amendment 17, and no change is required to CoC 1004 UFSAR Section 12.2.5 or CoC 1004 Amendment 17.
Gamma Energy Deposition In Appendix 3E of the CoC 1004 renewal application, gamma energy deposition in the concrete is computed for both the 37PTH DSC and 69BTH DSC. These DSCs are selected to bound all other pressurized water reactor (PWR) and boiling water reactor (BWR) DSCs. The results are:
] rad for the 37PTH DSC (see Section 3E.3 of Appendix 3E)
] rad for the 69BTH DSC (see Section 3E.3 of Appendix 3E)
Therefore, for gamma energy deposition, the 37PTH DSC bounds the 69BTH DSC by more than a factor of two. The reduction in cooling time to 1 year in Amendment 17 increases the gamma energy deposition for the BWR DSCs, but the PWR DSC remains bounding.
This may be demonstrated explicitly by adding a 1-year cooling time data point to the gamma energy deposition analysis. Because this data point is added to the existing methodology, the penalizing burnup/enrichment combination of 62 GWd/MTU and 2.6% is utilized. This source is provided in Table 8-1-1. Note that the decay heat for this source is 4.6 kW, which far exceeds the DSC fuel assembly heat limit and is conservative. The Table 8-1-1 source is added to the 69BTH DSC MCNP model to compute the gamma energy deposition rate in the concrete, which is provided in Table 8-1-2.
The total integrated gamma energy deposition is [
] rad, which represents a [
]
increase over the 69BTH DSC value reported in Appendix 3E of the CoC 1004 renewal application. However, the 37PTH DSC gamma energy deposition remains bounding, with a value of [
] rad.
Therefore, the current TLAA gamma energy deposition analysis also bounds Amendment 17, and no change is required to CoC 1004 UFSAR Section 12.2.5 or CoC 1004 Amendment 17.
Impact:
No change as a result of this RAI.
RAI and Response - Public to E-57451 Page 3 of 4 Proprietary Information on Pages 3 and 4 Withheld Pursuant to 10 CFR 2.390