ML20105A172

From kanterella
Jump to navigation Jump to search

Interim Storage Partners, LLC - Submittal of Supplemental Information in Support of RAI, Part 3
ML20105A172
Person / Time
Site: Consolidated Interim Storage Facility
Issue date: 04/07/2020
From: Boshoven J
Consolidated Interim Storage Facility
To:
Document Control Desk, Division of Fuel Management
Shared Package
ML20105A171 List:
References
CAC 001028, E-56508, EPID L-2017-NEW-0002
Download: ML20105A172 (3)


Text

P.O. Box 1129

  • interimstoragepartners.com April 7, 2020 E-56508 Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852

Subject:

Submittal of Supplemental Information in Support of RAI, Part 3, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002

Reference:

1.

Letter from Jeffery D. Isakson to Director, Division of Fuel Management (NRC), Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Parts 2, 3, and 4, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002, E-56415, dated April 7, 2020 Interim Storage Partners LLC (ISP) hereby submits supplemental information to support the continued review of the WCS CISF License Application. Contained in this submittal are copies of two revised calculations for the Storage Pads proposed at the CISF.

The calculations are NAC004-CALC-04, Revision 2 and AREVATN001-CALC-001, Revision 2. A third calculation related to the Storage Pads, NAC004-CALC-01, Revision 2 was included in Enclosure 9 of submittal E-56415 [1]. The calculations are proprietary in their entirety. Enclosure 1 includes affidavits pursuant to 10 CFR 2.390 for ISP, TN Americas, and NAC International and Enclosure 2 includes copies of calculations NAC004-CALC-04, Revision 2 and AREVATN001-CALC-001, Revision 2.

Document Control Desk E-56508 Page 2 of 3 Should you have any questions regarding this submission, please contact me via telephone at (410) 910-6955, or by email at jack.boshoven@orano.group.

Sincerely, k Boshoven Chief Engineer CISF, Licensing and Engineering Interim Storage Partners LLC cc:

John-Chau Nguyen, Senior Project Manager, U.S. NRC Jeff Isakson, ISP LLC Elicia Sanchez, ISP LLC Renee Murdock, ISP LLC

Enclosures:

1.

Affidavits Pursuant to 10 CFR 2.390

a.

Interim Storage Partners

b.

NAC International

2.

Proprietary Calculations

a.

"Soil Structure Interaction Analysis of Independent Spent Fuel Storage Installation (ISFSI) Concrete Pad at Andrews, TX," NAC004-CALC-04, Revision 2

b.

"ISFSI Pad Design for WCS at Andrews, Texas," AREVATN001 -CALC-001, Revision 2

Document Control Desk E-56508 Page 3 of 3 Document Components:

001 PUBLIC Transmittal Letter.pdf, 545,854 bytes 002 PUBLIC Encl 1 Affidavits.pdf, 2,228,086 bytes 003 SUNSI Encl 2 Calculations.pdf, 14,289,145 bytes, Proprietary OSM#1 (Entire Submittal):

001 PUBLIC Transmittal Letter.pdf, 545,854 bytes 002 PUBLIC Encl 1 Affidavits.pdf, 2,228,086 bytes 003 SUNSI Encl 2 Calculations.pdf, 14,289,145 bytes, Proprietary OSM#2 (Public Information Only):

001 PUBLIC Transmittal Letter.pdf, 545,854 bytes 002 PUBLIC Encl 1 Affidavits.pdf, 2,228,086 bytes