Interim Storage Partners (ISP) First Request for Additional Information (RAI) Proposed Submittal Schedule, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002
ML19156A059
Person / Time
Site: Consolidated Interim Storage Facility
Issue date: 05/31/2019
From: Boshoven J
Consolidated Interim Storage Facility
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CAC 001028, E-54395, EPID L-2017-NEW-0002
Download: ML19156A059 (4)


Text

INTERIM STORAGE PARTNE~S May 31, 2019 E-54395 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852

Subject:

Interim Storage Partners (ISP) First Request for Additional Information (RAI) Proposed Submittal Schedule, Docket 72-.1050 CAC/EPID 001028/L-2017-N EW-0002

Reference:

1.

Letter from John-Chau Nguyen (NRC) to Jeffery D. Isakson, "Interim Storage Partners' License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Docket 72-1050 - First Request for Additional Information, Part 1," dated November 16, 2018

2.

Letter from John-Chau Nguyen (NRC) to Elicia Sanchez (ISP),

Interim Storage Partners' License Application to Construct and Operate the Waste Control Specialists Consolidated interim Storage Facility, Andrews County, Texas, Docket No. 72-1050 -

First Request for Additional Information Part 1, Physical Security",

dated November 6, 2018

3.

Letter from John-Chau Nguyen (NRC) to Jeffery D. Isakson, "Interim Storage Partners LLC's License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Docket No. 72-1050 -

First Request for Additional Information, Part 2," dated March 6, 2019

4.

Letter from John-Chau Nguyen (NRC) to Jeffery D. Isakson, "Interim Storage Partners LLC's License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Docket No. 72-1050 -

First Request for Additional Information, Part 3," dated April 23, 2019 P.O. Box 1129

  • interimstoragepartners.com

Document Control Desk E-54395 Page 2 of 4 Interim Storage Partners LLC hereby submits the following Submittal Schedule for responding to the remaining RAls documented in References 1 through 4 in support of the continued review of the WCS Consolidated Interim Storage Facility (CISF) License Application. The schedule below is based on the practice that has been adopted where ISP submits draft responses, including License Application change pages, followed by a public or partially dosed meeting to discuss the draft responses with the NRC staff. The schedule provides the submittal date for the draft responses, the date by which ISP assumes the public or partially closed meetings can be completed for the identified RAls, and the date for submittal of the final RAI responses.

Table 1 provides the submittal schedule for the RAls from Reference 1, Table 2 for the RAls from Reference 3, Table 3 for Reference 2 RAls and finally Table 4 for the RAls associated with Reference 4.

Table 1 Submittal Schedule for Reference [1] RAls (Part 1 RAls)

Submittal of Draft Complete Meeting with RAI Responses to NRC NRC Staff on Draft Issue RAI Response Responses NP-2.2-1 NP-2.2-2 NP-2.4-1 NP-2.4-3 Complete Complete May 31, 2019 NP-15-x EP-x P-15-x NP-2.4-2 NP-2.6-1 NP-2.6-2 NP-2.6-6 Complete Complete June 30, 2019 P-2.6-1 P-2.6-2 P-2.6-4 NP-2.6-3 NP-2.6-4 NP-2.6-5 See Table 2 Pad RAls See Table 2 Pad RAls See Table 2 Pad RAls P-2.6-3 P-2.6-5 P-2.6-6

Document Control Desk Table 2 E-54395 Page 3 of 4 Submittal Schedule for Reference [3] RAls (Part 2 RAls)

Submittal of Draft Complete Meeting RAI Responses to NRG with NRG Staff on Issue RAI Response Draft Responses PLC-x TS-x NP-3-x, (Except NP-3-5)

NP-4-x NP-5-1 NP-7-2 NP-8-x NP-9-x NP-11-x NP-12-x NP-13-x July 26, 2019 September 27, 2019 November 22, 2019 NP-A-x NP-B-x NP-C-x NP-D-x NP-E-x NP-F-x NP-G-X NP-H-1 P-5-x P-9-x CHB NP-3-5 NP-7-1 NP-7-9 October 18, 2019 December 20, 2019 January 31, 2020 NP-7-10 NP-7-11 NP-7-12 NP-7-15 Pad NP-7-3 NP-7-4 NP-7-5 NP-7-6 NP-7-7 NP-7-8 P-7-1 November 1, 2019 December 20, 2019 January 31, 2020 RAls from Table 1:

NP-2.6-3 NP-2.6-4 NP-2.6-5 P-2.6-3 P-2.6-5 P-2.6-6

Document Control Desk Table 3 E-54395 Page 4 of 4 Submittal Schedule for Reference [2] RAls (Physical Security Plan RAls)

Submittal of Draft Complete Meeting with RAI Responses to NRC NRC Staff on Draft Issue RAI Response Responses Remaining 11 June 28, 2019 August 16, 2019 September 30, 2019 Table 4 Submittal Schedule for Reference [4] RAls (Environmental Report RAls)

Submittal of Draft Complete Meeting with RAI Responses to NRC NRC Staff on Draft Issue RAI Response Responses TS-x October 18, 2019 December 20, 2019 January 31, 2020 Balance of August 30, 2019 September 27, 2019 November 22, 2019 RAls Should you have any questions regarding this submission, please contact me by telephone at (410) 910-6955, or by email at jack.boshoven@orano.group.

Sincerely, Jack Boshoven Chief Engineer CISF, Licensing and Engineering Interim Storage Partners LLC cc:

John-Chau Nguyen, Senior Project Manager, U.S. NRG Jeff Isakson, ISP LLC Elicia Sanchez, ISP LLC Renee Murdock, ISP LLC