|
|
| (11 intermediate revisions by the same user not shown) |
| Line 2: |
Line 2: |
| | number = ML18022A077 | | | number = ML18022A077 |
| | issue date = 01/22/2018 | | | issue date = 01/22/2018 |
| | title = Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized Nuhoms Certificate of Compliance No. 1004 for Spent Fuel Storage Casks | | | title = Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks |
| | author name = Rahimi M | | | author name = Rahimi M |
| | author affiliation = NRC/NMSS/DSFM/SFLB | | | author affiliation = NRC/NMSS/DSFM/SFLB |
| Line 9: |
Line 9: |
| | docket = 07201004 | | | docket = 07201004 |
| | license number = | | | license number = |
| | contact person = Jacobs C J | | | contact person = Jacobs C |
| | case reference number = CAC 001028, EPID L-2017-PMP-0001 | | | case reference number = CAC 001028, EPID L-2017-PMP-0001 |
| | package number = ML18022A076 | | | package number = ML18022A076 |
| | document type = Letter | | | document type = Letter |
| | page count = 3 | | | page count = 3 |
| | project = EPID:L-2017-PMP-0001 | | | project = CAC:001028, EPID:L-2017-PMP-0001 |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:J. Bondre UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 22, 2018 Mr. Jayant Bondre Vice President, Chief Technical Officer TN Americas LLC 7135 Minstrel Way, Suite 300 Columbia, MD 21045 | | {{#Wiki_filter:J. Bondre UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 22, 2018 Mr. Jayant Bondre Vice President, Chief Technical Officer TN Americas LLC 7135 Minstrel Way, Suite 300 Columbia, MD 21045 |
|
| |
|
| SUBJECT: CORRECTION TO TN AMERICAS LLC TECHNICAL SPECIFICATIONS FOR RENEWED AMENDMENTS NO. 11, REVISION 1 AND NO. 13, REVISION 1 TO STANDARDIZED NUHOMS CERTIFICATE OF COMPLIANCE NO. 1004 FOR SPENT FUEL STORAGE CASKS, (CAC NO. 001028, DOCKET NO. 72-1004, EPID: L-2017-PMP-0001) | | ==SUBJECT:== |
| Dear Mr. Bondre:
| | CORRECTION TO TN AMERICAS LLC TECHNICAL SPECIFICATIONS FOR RENEWED AMENDMENTS NO. 11, REVISION 1 AND NO. 13, REVISION 1 TO STANDARDIZED NUHOMS CERTIFICATE OF COMPLIANCE NO. 1004 FOR SPENT FUEL STORAGE CASKS, (CAC NO. 001028, DOCKET NO. 72-1004, EPID: L-2017-PMP-0001) |
|
| |
|
| By email dated January 10, 2018 (ML18016A723), Donis Shaw of TN Americas LLC notified the U.S. Nuclear Regulatory Commission (NRC) staff that the title for Figure 1-15 of the Technical Specifications for Amendment No. 13, Revision 1 of the Standardized NUHOMS Certificate of Compliance (CoC) No. 1004 for Spent Fuel Storage Casks was incorrect. Specifically, the title did not include the 24PTH-S-LC Dry Shielded Cask (DSC). | | ==Dear Mr. Bondre:== |
| | By email dated January 10, 2018 (ML18016A723), Donis Shaw of TN Americas LLC notified the U.S. Nuclear Regulatory Commission (NRC) staff that the title for Figure 1-15 of the Technical Specifications for Amendment No. 13, Revision 1 of the Standardized NUHOMS Certificate of Compliance (CoC) No. 1004 for Spent Fuel Storage Casks was incorrect. Specifically, the title did not include the 24PTH-S-LC Dry Shielded Cask (DSC). |
| | Upon further review, the NRC staff determined that the title of Figure 1-15 in the technical specifications was inadvertently changed during the Revision 1 process for the 13 amendments for CoC No. 1004. Specifically, the title for Figure 1-15 was unintentionally changed in the technical specifications for Amendment 11, Revision 1 and Amendment 13, Revision 1, from Heat Load Zoning Configuration Number 5 for 24PTH-S-LC DSC (with or without Control Components)(2) to Heat Load Zoning Configuration Number 5 for 24PTH-S and 24PTH-L DSCs (with or without Control Components)(2). This minor editorial and non-substantive error was carried forward to Renewed Amendments No. 11, Revision 1, and No. 13, Revision 1. |
| | NRC processed a corrective amendment to change the title of Figure 1-15 in the technical specifications for the Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1. |
| | Enclosures 1 (ML18022A078) and 2 (ML18022A079) contain the revised title for Figure 1-15 included in the corrected technical specifications for the CoC No. 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 respectively. |
| | A notice will be published on January 24, 2018, in the Federal Register reflecting this action. |
| | The information provided to the Federal Register to notice this action can be found at ML18018B297. |
| | |
| | Please reference CAC No. 001028, Docket No. 72-1004, EPID: L-2017-PMP-0001 in future correspondence related to this corrective action. If you have any questions, please contact me at (301) 415-6802. |
| | Sincerely, |
| | /RA John Nguyen Acting for/ |
| | Meraj Rahimi, Acting Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards CAC No.: 001028 Docket No.: 72-1004 EPID: L-2017-PMP-0001 |
|
| |
|
| Upon further review, the NRC staff determined that the title of Figure 1-15 in the technical specifications was inadvertently changed during the Revision 1 process for the 13 amendments for CoC No. 1004. Specifically, the title for Figure 1-15 was unintentionally changed in the technical specifications for Amendment 11, Revision 1 and Amendment 13, Revision 1, from "Heat Load Zoning Configuration Number 5 for 24PTH-S-LC DSC (with or without Control Components)(2)" to "Heat Load Zoning Configuration Number 5 for 24PTH-S and 24PTH-L DSCs (with or without Control Components)(2)". This minor editorial and non-substantive error was carried forward to Renewed Amendments No. 11, Revision 1, and No. 13, Revision 1.
| | ==Enclosures:== |
| NRC processed a corrective amendment to change the title of Figure 1-15 in the technical specifications for the Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1.
| | As stated |
| Enclosures 1 (ML18022A078) and 2 (ML18022A079) contain the revised title for Figure 1-15 included in the corrected technical specifications for the CoC No. 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 respectively.
| |
|
| |
|
| A notice will be published on January 24, 2018, in the Federal Register reflecting this action. The information provided to the Federal Register to notice this action can be found at ML18018B297.
| | CORRECTION TO TN AMERICAS LLC TECHNICAL SPECIFICATIONS FOR RENEWED AMENDMENTS NO. 11, REVISION. 1 AND NO. 13, REVISION 1 TO STANDARDIZED NUHOMS CERTIFICATE OF COMPLIANCE NO. 1004 FOR SPENT FUEL STORAGE CASKS, (CAC NO. 001028, DOCKET NO. 72-1004, EPID: L-2017-PMP-0001), DOCUMENT DATE: JANUARY 22, 2018 DISTRIBUTION: |
| J. Bondre -2- Please reference CAC No. 001028, Docket No. 72-1004, EPID: L-2017-PMP-0001 in future correspondence related to this corrective action. If you have any questions, please contact me at (301) 415-6802. Sincerely,
| | DSFM r/f JBielecki CGallaher CBladey KMorgan-Butler Letter: G:/SFST/Jacobs/CoC 1004 Renewal/Final Corrected Amd 11 & 13 letter to TN/ CoC 1004 Corrected TS - Fig 1-15 Title_letter to TN OGC NLO.docx ADAMS Package No. ML18022A076 OFC: |
| /RA John Nguyen Acting for/ Meraj Rahimi, Acting Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards CAC No.: 001028 Docket No.: 72-1004 EPID: L-2017-PMP-0001 Enclosures: As stated J. Bondre -3- CORRECTION TO TN AMERICAS LLC TECHNICAL SPECIFICATIONS FOR RENEWED AMENDMENTS NO. 11, REVISION. 1 AND NO. 13, REVISION 1 TO STANDARDIZED NUHOMS CERTIFICATE OF COMPLIANCE NO. 1004 FOR SPENT FUEL STORAGE CASKS, (CAC NO. 001028, DOCKET NO. 72-1004, EPID: L-2017-PMP-0001), DOCUMENT DATE: JANUARY 22, 2018 DISTRIBUTION: DSFM r/f JBielecki CGallaher CBladey KMorgan-Butler Letter: G:/SFST/Jacobs/CoC 1004 Renewal/Final Corrected Amd 11 & 13 letter to TN/ CoC 1004 Corrected TS - Fig 1-15 Title_letter to TN OGC NLO.docx ADAMS Package No. ML18022A076 OFC: DSFM DSFM OGC DSFM NAME: CJacobs WWheatley JBielecki JNguyen for MRahimi DATE: 01-12-18 01-12-18 01-18-18 01/22/18 OFFICIAL RECORD COPY
| | DSFM DSFM OGC DSFM NAME: |
| }} | | CJacobs WWheatley JBielecki JNguyen for MRahimi DATE: |
| | 01-12-18 01-12-18 01-18-18 01/22/18 OFFICIAL RECORD COPY}} |
Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19003A5182003-05-0505 May 2003 Enclosure - Letter of Credit SB 22.401 Project stage: Other ML19003A5192004-05-12012 May 2004 Enclosure - Letter of Credit SB 22.493 Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML19008A4782017-06-15015 June 2017 Enclosure - Letter of Credit 68133845 Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML18016A7232018-01-10010 January 2018 1/10/2018, E-Mail from D. Shaw/Areva to C. Jacobs/Nmss/Dsfm Urgent Need for a Tech Spec Administrative Change Project stage: Request ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request 2017-06-15
[Table View] |
Text
J. Bondre UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 22, 2018 Mr. Jayant Bondre Vice President, Chief Technical Officer TN Americas LLC 7135 Minstrel Way, Suite 300 Columbia, MD 21045
SUBJECT:
CORRECTION TO TN AMERICAS LLC TECHNICAL SPECIFICATIONS FOR RENEWED AMENDMENTS NO. 11, REVISION 1 AND NO. 13, REVISION 1 TO STANDARDIZED NUHOMS CERTIFICATE OF COMPLIANCE NO. 1004 FOR SPENT FUEL STORAGE CASKS, (CAC NO. 001028, DOCKET NO. 72-1004, EPID: L-2017-PMP-0001)
Dear Mr. Bondre:
By email dated January 10, 2018 (ML18016A723), Donis Shaw of TN Americas LLC notified the U.S. Nuclear Regulatory Commission (NRC) staff that the title for Figure 1-15 of the Technical Specifications for Amendment No. 13, Revision 1 of the Standardized NUHOMS Certificate of Compliance (CoC) No. 1004 for Spent Fuel Storage Casks was incorrect. Specifically, the title did not include the 24PTH-S-LC Dry Shielded Cask (DSC).
Upon further review, the NRC staff determined that the title of Figure 1-15 in the technical specifications was inadvertently changed during the Revision 1 process for the 13 amendments for CoC No. 1004. Specifically, the title for Figure 1-15 was unintentionally changed in the technical specifications for Amendment 11, Revision 1 and Amendment 13, Revision 1, from Heat Load Zoning Configuration Number 5 for 24PTH-S-LC DSC (with or without Control Components)(2) to Heat Load Zoning Configuration Number 5 for 24PTH-S and 24PTH-L DSCs (with or without Control Components)(2). This minor editorial and non-substantive error was carried forward to Renewed Amendments No. 11, Revision 1, and No. 13, Revision 1.
NRC processed a corrective amendment to change the title of Figure 1-15 in the technical specifications for the Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1.
Enclosures 1 (ML18022A078) and 2 (ML18022A079) contain the revised title for Figure 1-15 included in the corrected technical specifications for the CoC No. 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 respectively.
A notice will be published on January 24, 2018, in the Federal Register reflecting this action.
The information provided to the Federal Register to notice this action can be found at ML18018B297.
Please reference CAC No. 001028, Docket No. 72-1004, EPID: L-2017-PMP-0001 in future correspondence related to this corrective action. If you have any questions, please contact me at (301) 415-6802.
Sincerely,
/RA John Nguyen Acting for/
Meraj Rahimi, Acting Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards CAC No.: 001028 Docket No.: 72-1004 EPID: L-2017-PMP-0001
Enclosures:
As stated
CORRECTION TO TN AMERICAS LLC TECHNICAL SPECIFICATIONS FOR RENEWED AMENDMENTS NO. 11, REVISION. 1 AND NO. 13, REVISION 1 TO STANDARDIZED NUHOMS CERTIFICATE OF COMPLIANCE NO. 1004 FOR SPENT FUEL STORAGE CASKS, (CAC NO. 001028, DOCKET NO. 72-1004, EPID: L-2017-PMP-0001), DOCUMENT DATE: JANUARY 22, 2018 DISTRIBUTION:
DSFM r/f JBielecki CGallaher CBladey KMorgan-Butler Letter: G:/SFST/Jacobs/CoC 1004 Renewal/Final Corrected Amd 11 & 13 letter to TN/ CoC 1004 Corrected TS - Fig 1-15 Title_letter to TN OGC NLO.docx ADAMS Package No. ML18022A076 OFC:
DSFM DSFM OGC DSFM NAME:
CJacobs WWheatley JBielecki JNguyen for MRahimi DATE:
01-12-18 01-12-18 01-18-18 01/22/18 OFFICIAL RECORD COPY