November 6, 2020
SUBJECT:
SURRY POWER STATION - INTEGRATED INSPECTION REPORT 05000280/2020003 AND 05000281/2020003; AND 07200055/2020002
Dear Mr. Stoddard:
On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station. On October 23, 2020, the NRC inspectors discussed the results of this inspection with Mr. Doug Lawrence, Surry Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects
Docket Nos. 05000280, 05000281
07200055 License Nos. DPR-32 and DPR-37
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000280 and 05000281; 07200055
License Numbers:
Report Numbers:
05000280/2020003 and 05000281/2020003; 07200055/2020002
Enterprise Identifier: I-2020-003-0063; I-2020-002-0096
Licensee:
Virginia Electric and Power Company
Facility:
Surry Power Station
Location:
Surry, VA
Inspection Dates:
July 01, 2020 to September 30, 2020
Inspectors:
L. McKown, Senior Resident Inspector
B. Towne, Resident Inspector
A. Butcavage, Reactor Inspector
J. Diaz-Velez, Senior Health Physicist
B. Kellner, Senior Health Physicist
W. Pursley, Health Physicist
S. Sanchez, Senior Emergency Preparedness Inspector
Approved By:
Stewart N. Bailey, Chief
Reactor Projects Branch 4
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Surry Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near rated thermal power for the entire inspection period.
Unit 2 operated at or near rated thermal power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted.
As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather associated with Hurricane Isaias on August 3, 2020.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2 Containment Spray Train 'A' on July 7, 2020.
- (2) Unit 2 Atmospheric Power Operated Relief Valve Actuation trains on July 21, 2020.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 1, Auxiliary Building 45 foot -10 inch elevation on July 7, 2020.
- (2) Station Blackout Alternate AC diesel generator on August 3, 2020.
- (3) Unit 2, Cable Tunnel on August 19, 2020.
- (4) Unit 1, Mechanical Equipment Room #1 on September 21, 2020.
- (5) Unit 2, Mechanical Equipment Room #5 on September 28, 2020.
Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill in mechanical equipment room #1 on September 21, 2020.
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Fuel Building Internal Flooding Assessment associated with Piping Tunnel Flood Level Switch Probe 112A on September 10, 2020.
71111.07T - Heat Sink Performance Triennial Review (IP Section 03.02)
The inspector evaluated heat exchanger/sink performance based on the following samples:
- (1) Section 02.02b
- Component Cooling Water Heat Exchanger 1-CC-E-1A
- Component Cooling Water Heat Exchanger 1-CC-E-1C
- (2) Section 02.02c
- EDG Nos. 01-EE-EG-1 and 03-EE-EG-1-Cooler Hx
- (3) Section 02.02d, specifically Sections 02.02d # 5A and 02.02d # 6G were completed SW-P-1A Emergency Service Water (SW) Pump Monthly Test SW-P-1C Emergency Service Water Pump Monthly Test
- Reviewed a sample of dispositions of 2017 CRs on Intake Canal
- Reviewed Discharge Tunnel and Discharge Canal Maintenance Practices
- Reviewed Sample of latest flow tests from 1-OSP-SW-008, for Re-circulation Spray Hxs, 1-RS-E-1B and 1 -RS-E-1C, to confirm required SW gravity flow cooling water was achieved
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room as Tropical Storm Isaias passed over the station, on August 3, 2020.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator training in the simulator associated with control rod malfunctions and adverse control room conditions requiring evacuation and alternate plant shutdown on September 24, 2020.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Steam generator power operated relief valve logic controllers following multiple spurious operation on August 6, 2020.
- (2) Motor driven fire pump relief valve upon discovery that the valve persistently lifts during pump run on August 28, 2020.
Quality Control (IP Section 03.02) (1 Sample)
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:
- (1) Failure and safety classification of charging pump component cooling water pumps on September 29, 2020.
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed;
- (1) Reliability challenges of Unit 1 'B' safety injection accumulator relief valve concurrent with offsite line switching for transformer #1 work and corrective maintenance on the
'B' fire water tank level control system, July 1, 2020.
- (2) Unit 2 elevated risk due to extended unavailability of turbine driven auxiliary feedwater train due to steam admission valve failure on July 16, 2020.
- (3) Unit 1 elevated risk due to hot weather alert concurrent with #1 emergency diesel generator surveillance testing on July 20, 2020.
- (4) Units 1 and 2 risk during multiple concurrently scheduled risk-significant activities including Unit 2 containment entry, Unit 1 annunciator modification, Unit 2 Hi Hi consequence limiting safeguard testing using a modified procedure on August 24, 2020.
- (5) Unit 1 risk associated with emergent 531 Suffolk 500kV line switching due to fire during 'A' charging cooling water pump extended out of service window on September 16, 2020.
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) CR1149697, functionality of the Unit 1, 'B' safety injection accumulator following multiple lifts of the tank relief valve on July 1, 2020.
- (2) CR1151619, 2-MS-PCV-202A, the Unit 2 turbine driven auxiliary feedwater pump, 'A' steam admission valve failure to close on July 15, 2020.
- (3) CR1147101, failure of the 'D' control room chiller local control switch on July 28, 2020.
- (4) CR1156323, challenges with alternate AC diesel (station blackout) generator starting air on September 28, 2020.
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Temporary Modification of the Unit 1, 'B' safety injection (SI) accumulator code relief path, on July 2, 2020.
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
- (1) Replacement of Unit 2 turbine driven auxiliary feedwater pump steam admission valve, 2-MS-PCV-202A, solenoid operator (WO38204221675) on July 16, 2020.
- (2) Troubleshooting and replacement of testing subcomponents discovered failed during 1-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing (WO38204211435)on July 30, 2020.
(3)
'C' Steam generator power operated relief valve anti-rotation rail coupling block corrective maintenance (WO38204220362) on August 10, 2020.
(4)
- 2 emergency diesel generator monthly testing following #2 fuel oil transfer pump preventive maintenance window (WO38103842633) on August 24, 2020.
- (5) Replacement of the unit 1 'A' charging component cooling water pump following discovery of internal interference (WO38103722315) on September 16, 2020.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) Unit 1, 1-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing on July 29, 2020.
(2)0-OSP-AAC-001, Quarterly Test of Alternate AC Diesel Generator, on August 3, 2020.
- (3) Unit 2, 2-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing using a new procedure based upon prior challenges at Unit 1 on August 26, 2020.
Inservice Testing (IP Section 03.01) (1 Sample)
(1)0-OPT-SW-003, 'C' Emergency Service Water Pump, 1-SW-P-1C, IST quarterly testing, August 19, 2020.
71114.03 - Emergency Response Organization Staffing and Augmentation System
Inspection Review (IP Section 02.01-02.02) (1 Sample)
- (1) The inspector completed the evaluation of the readiness of the emergency response organization on September 9, 2020. This was a continuation of an inspection that was performed remotely during the week of June 22, 2020, but was unable to be completed due to aspects that did not lend themselves to being performed remotely. Inspection Report 2020-002 documented the initial inspection activities.
71114.05 - Maintenance of Emergency Preparedness
Inspection Review (IP Section 02.01 - 02.11) (1 Sample)
- (1) The inspector completed the evaluation of the maintenance of the emergency preparedness program on September 9, 2020. This was a continuation of an inspection that was performed remotely during the week of June 22, 2020, but was unable to be completed due to aspects that did not lend themselves to being performed remotely. Inspection Report 2020-002 documented the initial inspection activities.
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated a licensee emergency planning drill in the simulator and technical support center, on July 23, 2020. The drill involved the release of flammable gas within a location important to safe shutdown as well as the sequential loss of all three fission product barriers while establishing a new communication and reporting methodology.
RADIATION SAFETY
71124.01 - Radiological Hazard Assessment and Exposure Controls
Radiological Hazard Assessment (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.
Instructions to Workers (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated radiological protection-related instructions to plant workers.
Contamination and Radioactive Material Control (IP Section 03.03) (3 Samples)
The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material.
- (1) Observed licensee surveys of personnel and equipment from a remote Radiologically Controlled Area (RCA) at the Independent Spent Fuel Storage Installation (ISFSI).
- (2) Observed workers exiting the primary RCA exit point during normal plant operations.
- (3) Observed workers exiting the auxiliary building and entering outdoor RCA (yard)using hand and foot monitors during normal operation.
Radiological Hazards Control and Work Coverage (IP Section 03.04) (5 Samples)
The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.
The inspectors also reviewed Radiation Work Planning documents including, radiological surveys, TEDE ALARA evaluation documentation, radiological briefing sheets/attendance rosters, etc. for the following Radiation Work Permits (RWPs):
(1)2020-3109, U2R29 NDE/ISI Inspections, Revision 0 (2)2020-3507, U2R29 Blind Flange Removal/Installation, Revision 0 (3)2020-3508, U2R29 Reactor Head Lift, Revision 0 (4)2020-3527, U2R29 Fuel Transfer System Inspection and Repair, Revision 0 (5)2020-3533, U2R29 U-2 Containment Diving Activities to Repair Fuel Transfer Equipment and/or Cables, Revision 0
High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (4 Samples)
The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:
- (1) Unit 1 Volume Control Tank (VCT) (Posted Locked High Radiation Area (LHRA))
(3)6' Resin Transfer Area (Posted LHRA)
- (4) Auxiliary Building 2' Ion Exchanger Alley (LHRA)
Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
- (1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation
Permanent Ventilation Systems (IP Section 03.01) (2 Samples)
The inspectors evaluated the configuration of the following permanently installed ventilation systems:
- (1) Unit 2 Reactor Auxiliary Building Ventilation System
- (2) Unit 2 Fuel Handling Building Exhaust System
Temporary Ventilation Systems (IP Section 03.02) (1 Sample)
The inspectors evaluated the configuration of the following temporary ventilation systems:
- (1) High Efficiency Purifying Air Filter Unit #HV-500-25 in the Auxiliary Building Basement near the Unit 2 component cooling water pumps
Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)
- (1) The inspectors reviewed routine maintenance records for respiratory protection devices including powered air purifying respirators staged at the respirator issue point inside the RCA.
Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)
- (1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses by requesting a functional test of SCBA Unit #s 19 and 20 staged at the Unit 2 Reactor Building Personnel Access.
71124.04 - Occupational Dose Assessment
Source Term Characterization (IP Section 03.01) (1 Sample)
- (1) To evaluate licensee performance as it pertains to radioactive source term characterization, the inspectors reviewed the licensee's annual, "Bioassay Program Significant Radionuclide & Whole Body Counting Action Level Determination,"
assessment performed per procedure, 0-HSP-BSRD-001 to determine hard to detect transuranic isotope contributions in internal exposures..
External Dosimetry (IP Section 03.02) (1 Sample)
- (1) The inspectors reviewed licensee methods for determining individual exposures when dosimetry equipment fails, reviewed passive monitoring storage and control methods and verified the licensee dosimeter processor maintained its NAVLAP certification current for 2018, 2019 and to date in 2020 to evaluate licensee performance as it pertains to external dosimetry that is used to assign occupational dose.
Internal Dosimetry (IP Section 03.03) (1 Sample)
The inspectors evaluated the following internal dose assessments for actual internal exposures:
- (1) Potential internal exposure event that occurred during diving in the Unit 2 transfer cavity May 13, 2020. The potential exposure required the licensee to perform in-vivo analysis (whole body count) and in-vitro analysis (urine sample) for a diver (PID# 46709).
Special Dosimetric Situations (IP Section 03.04) (1 Sample)
The inspectors evaluated the following special dosimetric situations:
- (1) There were no examples where workers were assigned SDE from distinct or dispersed beta emitters during the inspection period. The licensee does not employ the use of EDEX to determine dose from multiple compartments and there were no declared pregnant worker records reviewed.
71124.05 - Radiation Monitoring Instrumentation
Walkdowns and Observations (IP Section 03.01) (6 Samples)
The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:
- (1) ARMs in the Auxiliary Building, Spent Fuel Pool and the Surry Radwaste Facility.
- (2) Portable ion chambers stored ready for use' at the RCA exit Instrument Issue Point and the Instrumentation Calibration Laboratory.
- (3) Personnel contamination monitors in use at the RCA exit.
- (4) Small Article Monitors at the radiological controlled area exit.
- (5) Continuous Air Monitors at various locations in the auxiliary building
- (6) Germanium Detectors in the radiochemistry laboratory.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
MS06: Emergency AC Power Systems (IP Section 02.05)===
- (1) Unit 1 (July 1, 2017 - June 30, 2020)
- (2) Unit 2 (July 1, 2017 - June 30, 2020)
MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)
- (1) Unit 1 (July 1, 2017 - June 30, 2020)
- (2) Unit 2 (July 1, 2017 - June 30, 2020)
MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)
- (1) Unit 1 (July 1, 2017 - June 30, 2020)
- (2) Unit 2 (July 1, 2017 - June 30, 2020)
MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)
- (1) Unit 1 (July 1, 2017 - June 30, 2020)
- (2) Unit 2 (July 1, 2017 - June 30, 2020)
MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)
- (1) Unit 1 (July 1, 2017 - June 30, 2020)
- (2) Unit 2 (July 1, 2017 - June 30, 2020)
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Review of Continuing Challenges with Emergency Diesel Generator Fuel Injectors associated with Report No. 10 CFR21-0127, Rev. 0, EMD Fuel Injectors - Seized Plunger and Bushing (ML19317D093) on September 25,
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
60855 - Operation of an ISFSI Operation of an ISFSI
- (1) The inspectors evaluated the licensees activities related to long-term operation and monitoring of their independent spent fuel storage installation (ISFSI). This inspection included a detailed walkdown of the three ISFSI pads on September 22,
INSPECTION RESULTS
Observation: Continuing Challenges with Emergency Diesel Generator Fuel Injectors associated with Report No. 10 CFR21-0127, Rev. 0, EMD Fuel Injectors
- Seized Plunger and Bushing (ML19317D093)71152 The inspectors performed a review of the licensee's continuing challenges with emergency diesel generator fuel injectors associated with ESI 10 CFR Part 21 Report No. 10CFR21-0127 Rev. 0, dated October 25, 2019, to determine if prior corrective actions or newly identified conditions adverse to quality could indicate the existence of a more significant safety issue. The inspectors reviewed preventative maintenance records, procedures, corrective action program documents, and station logs.
The inspectors found that licensee preventative maintenance and corrective action activities were consistent with manufacturer recommendations and industry best practices to maintain the equipment. The inspectors determined that the licensee, in general, took reasonable actions to identify, communicate, and correct newly identified conditions adverse to quality in a timely manner with a focus on near and long term impacts upon safety functions.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 23, 2020, the inspectors presented the integrated inspection results to Mr. Doug Lawrence, Site Vice President (VP) and other members of the licensee staff.
- On September 9, 2020, the inspectors presented the Emergency Preparedness Program inspection results to Mr. Doug Lawrence, Site VP and other members of the licensee staff.
- On July 9, 2020, the inspectors presented the Radiation Safety inspection results to Mr. F. Mladen, Site VP and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
0-OP-ZZ-021
Severe Weather Preparation
Corrective Action
Documents
CR1152664
CR1152665
CR1152667
Drawings
11548-FM-084A,
SH-002
Containment Spray System
Corrective Action
Documents
Resulting from
Inspection
CR1153782
Procedures
0-FS-FP-162
Auxiliary Building Elevation 45 feet - 10 inches
0-FS-FP-224
Mechanical Equipment Room (MER 5)
0-FS-FP-225
Alternate AC Diesel Room
1-FS-FP-126
Mechanical Equipment Room Number 1
2-FS-FP-102
Unit 2 Cable Vault Tunnel
Miscellaneous
SER December
1980-IN
Safety Evaluation Report Susceptibility of Safety Related
Systems to Flooding from Failure of Non-Category I
Systems for Surry Power Station Units 1 and 2
2/18/1980
Corrective Action
Documents
CR 473593
CC Pipe 18" -CC-235 has NDE Reading of.191 inches
5/4/12
CR-1048251
1-VS-S-1B High differential Pressure
9/22/16
Corrective Action
Documents
Resulting from
Inspection
CR1153443
During review of WO38204192973 for NRC UHS Inspection,
NRC noted that no LR CR was written
8/13/20
CR1153479
Perform bathymetric survey of discharge canal area
8/14/20
Drawings
11448-CBM-071A-5
ISI Classification Boundary Drawing, Interval 5, Sht. 1 of 4
Rev 3
11448-FM -071A
Sht. 4 of 4
UNIT 1 & 2 COMPONENT COOLING, Heat Exchanger
Rev. 55
11448-FM -071A,
Sht. 1 of 4
FLOW/VALVE OPERATING NUMBERS DIAGRAM
CIRCULATING AND SERVICE WATER SYSTEM
SURRY POWER STATION UNIT 1
Rev. 89
11548-FM -071A,
Sht 1 of 3
FLOW/VALVE OPERATING NUMBERS DIAGRAM,
CIRCULATING AND SERVICE WATER SYSTEM, SURRY
Rev. 37
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
POWER STATION UNIT 2
Engineering
Changes
SU-13-00008
18" CC-229-121 and 18" CC-235-121 Repairs
7/15/13
SU-20-00148
License Renewal-Intake Canal, Oyster Larvae sampling
system Temporary Modification
Rev. 0
Engineering
Evaluations
PA-7900752
Evaluation of Operating Experience IER L3 20-3, Extreme
Environmental Conditions Lead to Ultimate Heat Sink
Challenge
7/3/20
ME-0025
NRC Generic Letter 89-13 Activities
Rev. 2
Miscellaneous
2019-SURR-Q4-SW
Surry 2019 Fourth Quarter Service Water Health Report
2/10/20
20-SURR-Q1-CW
20 First Quarter System Health Report, Circulating Water
System
4/4/20
20-Surry -Q2-SW
Surry 2020 Second Quarter System Health Report
7/29/20
CM-AA-REA-1001,
Att. 4 Tracking
Number, REA-SU-
2019-004
Sediment has built up in the intake canal
1/23/19
SDBD-SPS-SW
Surry Power Station System Design Basis Document for the
Service Water System
5/12/20
Surry UFSAR,
Revision 51.04,
Chapter 9
Surry Power Station Updated Final Safety Analysis Report
5/29/20
NDE Reports
2-NPT-CW-001 Rev
VT-2 of 96 Inch CW and SW Piping
8/10/20
Procedures
0-NSP-CC-005
CCHX TESTS USING THE TEMPORARY MONITORING
System
Rev. 7
0-OPT-SW-003
OPERATIONS PERIODIC TEST, EMERGENCY SERVICE
WATER PUMP 1-SW-P-1C
7/26/20
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
0-OPT-SW-003
OPERATIONS PERIODIC TEST, EMERGENCY SERVICE
WATER PUMP 1-SW-P-1C
8/6/20
-OSP-SW-008,
Rev 6
Recirculation Spray Heat Exchanger Acceptance Criteria -
Unit 1 B & C Header Total Flow
4/21/18
2-OSP-EG-6.1
NUMBER 2 EMERGENCY DIESEL GENERATOR LUBE
OIL AND
COOLING WATER SAMPLING
Rev. 16
CLOSED COOLING WATER CHEMISTRY PROGRAM
Rev. 24
CIRCULATING WATER AND SERVICE WATER
CONTROL PROGRAM
Rev, 3
ER-SU-5314
Generic Letter 89-13 Program
Rev. 3
Corrective Action
Rev. 36
VPAP-0811
Service Water System Inspection and Maintenance Program Rev. 6
Work Orders
204208882
Day Freq. PT: No.2, EDG Lube Oil & Cooling Water O.C-
2B
5/13/20
PM: Clean Tubes/Sheet & Eddy Current, CC Heat
Exchanger 01-CC-E-1A
2/27/20
PM: INSP/REPL FLOW ELEMENT, PM TO INSPECT
FLOW ELEMENT FOR WEAR & PROPER SIZE.
7/27/20
01-EE-EG-1-ENGINE, 1BM EDG INSPECTION, EMERG.
DIESEL GEN.ENGINE, 18 MONTH SERVICE &
INSPECTION
5/13/18
1095 DAY FREQ. PT: ISi SPT IF 96" CW LINES
7/27/20
03-EE-EG-1-ENGINE, 18 Month EDG INSPECTION
8/16/19
Component 02-EE-EG-1-ENGINE, FMFRG Diesel
Generator Engine, 18 Month Service & Inspection
5/14/20
01-CC-E-1C-HTEXCH, Annual Clean/Patch/Coat Pitting,
January /February, IAW RCE 20061372
1/23/20
Day Freq. PT Maintenance and Sampling RSHX Service
7/20/20
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Water Piping, Wet Layup - OC-22A
Engineering Surveillance Procedure, 0-NSP-CC-005,
Component Cooling Heat Exchanger Tests on 1-CC-E-1B
and 1C-CC-1D
8/5/20
Engineering Surveillance Procedure, 0-NSP-CC-005,
Component Cooling Heat Exchanger Tests on 1-CC-E-1A
and 1C-CC-1C
7/15/20
Engineering Surveillance Procedure, 0-NSP-CC-005,
Component Cooling Heat Exchanger Tests on 1-CC-E-1A
and 1C-CC-1C
7/29/20
WO. 38204212767
Procedure 1-OSP-SW-001, 28 Day Freq. PT: Maint &
Wet Layup - for 1-RS-E-1B and 1-RS-E-1C
7/20/20
71111.11Q Miscellaneous
Hurricane Response
Plan (Nuclear)
Procedures
0-AP-20.00
Main Control Room Inaccessibility
0-AP-37.01
Abnormal Environmental Conditions
0-FCA-1.00
Limiting MCR Fire
Corrective Action
Documents
CR1152664
CR1152665
CR1152667
CR1155394
CR455394
Drawings
11448-FB-47A
Fire Protection
Engineering
Evaluations
Technical Report
The Elimination of Cooling Water to Charging Pump
Mechanical Seal Coolers
08/05/1987
Miscellaneous
Standard for the Installation of Centrifugal Fire Pumps
1987
Work Orders
204222296
Miscellaneous
Surry PRA Risk
Evaluation and Risk
Mitigating Actions
for August 24, 2020
Surry PRA Risk
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Evaluation and Risk
Mitigating Actions
for July 1, 2020
Surry PRA Risk
Evaluation and Risk
Mitigating Actions
for July 16, 2020
Surry PRA Risk
Evaluation and Risk
Mitigating Actions
for July 20, 2020
Surry PRA Risk
Evaluation and Risk
Mitigating Actions
for September 16,
20
Engineering
Changes
TM-SU-20-00147
Temporary Modification for Unit 1 'B' SI Accumulator Relief
Valve
Corrective Action
Documents
Resulting from
Inspection
CR1153559
Miscellaneous
SJUL20 FS
Surry Power Station Emergency Preparedness Exercise
07/23/2020
Corrective Action
Documents
CR1128311, CR1133694, CR1134231, CR1134756,
CR1134915, CR1137219, CR1142360, CR1143108,
CR1144074, CR1147895, and CR1148395
Various
Radiation
Surveys
47' Elevation
U-2 Containment - Dose Rate survey during Upper Internals
lift
05/09/2020
Day 5 EPRI Survey
U-2 Containment
05/07/2020
Incore Sump
U-2 Containment - 2-NI-NE-13 Excore detector replacement
05/05/2020
Pressurizer
U-2 Containment - Dose Rate survey for removal of 2-RC-
SV-2551B (safety)
05/05/2020
Reactor Cavity
U-2 Containment - Initial Survey
05/04/2020
Reactor Cavity
U-2 Containment - Reactor head seal ring groove prior to
05/23/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
decon
Transfer Canal
U-2 Containment - Drop survey prior to diving
05/13/2020
Transfer Canal
U-2 Containment - Initial Survey
5/5/2020
Transfer Canal
U-2 Containment - Prior to Dive
05/13/2020
Upper Internals Lift
Rig
U-2 Containment, move from Cavity to Laydown Area
05/05/2020
Self-Assessments 7483957
Solid Radioactive Waste Control Program Review, May
2017-August 2019
09/23/2019
PA7483959
External Radiation Exposure Control Program Review 4th
11/26/2019
Calibration
Records
Complete SCBA Posi3 USB Test Result
07/18/2019
HP-1061.052
Portable Ventilation/Vacuum Cleaner Leak Test Record for
HEPA 500-25
08/01/2019
ML-CCP-099
Calibration Data Record, Electronic Micromanomenter
2/14/2017
ML-CCP-099
Calibration Data Record, Airdata Multimeter Electronic
Manometer
05/19/2017
MMR/Firehawk 4500
SCBA U2
Containment
Harness #14
Complete SCBA Posi3 USB Test Result
7/11/2019
MMR/Firehawk 4500
SCBA U2
Containment
Harness #19
Complete SCBA Posi3 USB Test Result
7/18/2019
MMR/Firehawk 4500
SCBA U2
Containment
Harness #21
Complete SCBA Posi3 USB Test Result
07/18/2019
Corrective Action
Documents
CA# 7463064,
7913048, 7885154,
7861481, and
7431534.
Corrective Action Reports # 7463064, 7913048, 7885154,
7861481, and 7431534.
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
ABAA 192260,
ABAA 192295,
ABAA 192318,
ABAA 192251 and
APAE 312186
2019 SCBA Tests
March 2019
APAD 190521,
APAD 189492,
APAD 190542,
APAD 190533 and
APAD 189490
20 SCBA Functional Tests
March 2020
FIRE PROTECTION
SAFETY SHOP /
BAUER UNICUS III
SN: 57387
Grade D Air Test
08/27/2018
INSTRUMENT A
SN: 003-77221
Grade D Air Test
09/19/2018
S/N: 003-77220,
SRF "B" Instrument
Air
Grade D Air Test
03/06/2020
S/N: 003-77221
SRF "A" Instrument
Air
Grade D Air Test
11/11/2019
S/N: 18225, Training
Center
Grade D Air Test
01/15/2020
S/N: H250, Station
Service Air
Grade D Air Test
03/26/2020
S/N:003-77221,
SRF "A" Service Air
Grade D Air Test
04/09/2020
Safety & Loss
Prevention Shop
Compressor S/N:
57387
Grade D Air Test
03/03/2020
SLP
COMPRESSOR;
Grade D Air Test
2/13/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SN: 57387
SN: 003-77221 "A"
SRF Inst. Air
Grade D Air Test
05/01/2019
SN: H250 Station
Service Air
Grade D Air Test
05/01/2019
SPS-S+LP
Shop/Safety Shop -
Compressor SN:
57387
Grade D Air Test
08/14/2019
SRF "A"
INSTRUMENT AIR
COMPRESSOR
Grade D Air Test
03/29/2018
SRF "B"
INSTRUMENT AIR
COMPRESSOR
Grade D Air Test
2/25/2019
STATION SERVICE
AIR
Grade D Air Test
04/02/2018
Station Service Air
S/N: 003-77221
Grade D Air Test
10/17/2019
STATION SERVICE
AIR / SIERRA H 250
SN: TS6819U10019
Grade D Air Test
09/24/2018
SU-ENGT-000-S-
01-0295
Auxiliary Building Filtered Exhaust Fans 1 -VS-F-58A & 58B
Thumb Wheel Settings
SURRY POWER STATION, UNIT I AND 2
2/21/2001
Procedures
0-OPT-VS-007
AUXILIARY VENTILATION FILTER FLOW TEST
Rev. 18
C-HP-1033.610
EBERLINE AIR MONITOR AMS-4 CALIBRATION AND
OPERATION
Rev. 7
C-HP-1033.620
PORTABLE AIR SAMPLERS CALIBRATION AND
OPERATION
Rev. 9
C-HP-1033.640
PORTABLE SAMPLING PUMPS CALIBRATION AND
OPERATION
Rev. 6
C-HP-1042.122
QUANTITATIVE FIT TESTING: PORTACOUNT PRO FIT
TESTING SYSTEM
Rev. 12
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
C-HP-1042.210
RESPIRATORY HAZARDS EVALUATION AND
RESPIRATORY PROTECTION SELECTION
Rev. 4
C-HP-1042.230
AIRBORNE RADIOACTIVITY EXPOSURE TRACKING
Rev. 7
HP-1033.661
RADECO AIR SAMPLER MODEL H-809C: CALIBRATION
AND OPERATION
Rev. 2
HP-1033.662
CALIBRATION AND OPERATION OF HI-Q AIR SAMPLER
MODELS
Rev. 3
HP-1061.510
PRIMARY SIDE STEAM GENERATOR VENTILATION
Rev. 4
Radiological Respiratory Protection Program
Rev. 4
Donning and Removal of Respiratory Protection Equipment
Rev. 0
Issue and Control of Respiratory Protection Equipment
Rev. 5
Inspection and Inventory of Respiratory Protection
Equipment
Rev. 6
Airborne Radioactivity Surveys
Rev. 5
ALPHA MONITORING
Rev. 5
Portable HEPA Ventilation Units
Rev. 4
Vacuum Cleaner Use and Control
Rev. 3
Contamination Enclosures: Use and Control
Rev. 0
Self-Assessments PA# 3130494
Radiological Respiratory Protection Program Review
08/09/2018
Work Orders
38103820939
Aux. Building Filter Test (0-OPT=VS-007, pages 34-57)
11/15/2017
38103841410
1-VS.FL-3A Lab Test
February
2019
38103866289
Aux. Building Filter Test
04/03/2019
203870242
1-VS-FL-3B In-Place Test
August 2019
203870250
1-VS-FL-3A In-Place Filter Test
August 2019
204200857
1-VS-FL-3B Lab Test
July 2019
Calculations
Internal Sensitivity Study for Each Make and Model of
Personnel Contamination and Portal Monitor
07/20/2016
Corrective Action
Documents
CRs 1146310,
1142330, 1136333,
1133154, 1123196,
1111633, 1137986,
1134933, 1133694
Corrective Action reports
Various
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
and 1133694
Miscellaneous
Memo to
RPCM from
CHP
Surry Unit 2 Characterization of Alpha Source Term for
S2C29
03/25/2020
SU-PROCSU-TEC-
MIRION TECH. (GDS) NVLAP 2018-2019 Certificate
undated
SU-PROCSU-TEC-
MIRION TECH. (GDS) NVLAP 2019-2020
undated
Procedures
C-HP-1031.011
EXPOSURE CONTROL RECORDS AND REPORTS
Rev. 10
C-HP-1031.023
RWP DOSIMETRY: EXPOSURE CONTROL SUPPORT
Rev. 9
C-HP-1031.024
ADMINISTRATIVE DOSE CONTROL
Rev. 5
C-HP-1031.025
DOSIMETRY REQUIREMENTS FOR SITE RESTRICTED
AREAS
Rev. 11
C-HP-1031.042
COMPUTERIZED PERSONNEL EXPOSURE
MANAGEMENT SYSTEM OPERATION
Rev. 4
C-HP-1031.060
SRD CONTROL AND PERFORMANCE CHECKS
Rev. 2
C-HP-1031.302
CALIBRATION OF ELECTRONIC DOSIMETERS
Rev. 19
HP-1031.043
PERIODIC TLD PREPARATION, EXCHANGE, AND
PROCESSING
Rev. 1
HP-1031.124
PERFORMING EFFECTIVE DOSE EQUIVALENT FROM
EXTERNAL EXPOSURE (EDEX) CALCULATIONS
Rev. 5
HP-1031.304
USE OF DMC USER SOFTWARE TO CONFIGURE, READ,
AND ISSUE ELECTRONIC DOSIMETERS
Rev. 1
HP-1041.046
APEX IN-VIVO WHOLE BODY COUNTER: OPERATION
AND PERFORMANCE CHECKS
Rev. 0
HP-1041.056
APEX IN-VIVO WHOLE BODY COUNTER: WHOLE BODY
COUNTING INDIVIDUALS
Rev. 0
HP-1041.058
WHOLE BODY COUNTING INDIVIDUALS USING THE
GEM-5
Rev. 0
HP-1041.066
APEX IN-VIVO WHOLE BODY COUNTER: CALIBRATION
Rev. 3
Internal Radiation Exposure Control Program
Rev. 2
External Radiation Exposure Control Program
Rev. 2
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Manual Skin Dose Assessment
Rev. 2
Skin Dose Assessment
Rev. 0
Effective Dose Equivalent from External Exposure (EDEX)
Rev. 6
Dosimetry Investigation and Processing
Rev. 8
Whole Body Monitoring
Rev. 2
Urine and Fecal Sampling and Analysis
Rev. 1
Internal Dose Calculation Based on Radionuclide Intake
Rev. 0
Radionuclide Intake Determination Based on Bioassay
Results
Rev. 2
Internal Dose Calculations Based on DAC-Hour Exposure
Rev. 0
Declared or Expected Pregnant Woman
Rev. 2
Personnel Contamination Monitoring and Decontamination
Rev. 12
Self-Assessments PA7483959
External Radiation Exposure Control Program Review
2/18/2019
PA7821763
Internal Radiation Exposure Control Program Review
04/13/2020
Bioassay Prog. Significant Radionuclide & WBC Action
Level Determination
2-19-2020
Calibration
Records
Quality Assurance
Report Detector 2
Daily Source Check of Detector 2
07/09/2020
Quality Assurance
Report Detector 3
Daily Source Check of Detector 3
7/9/2020
Quality Assurance
Report Detector 5
Daily QA Check Detector 5
07/08/2020
Quanta Smart Serial
- SGTC09150556
Daily Source Check of Liquid Scintillation Counter
7/98/20
Procedures
0-IPM-CC-RRM-
Vent-001
Radwaste Facility Vent Stack Effluent Monitor Calibration
Revision 9
71151
Miscellaneous
Derivation and Margin Reports for Surry Power Station Unit
& 2 Mitigating System Performance Index Performance
Indicator Emergency AC, High Pressure Injection, Heat
Removal, Residual Heat Removal, and Cooling Water
System inputs
Corrective Action
Documents
CA8067087
CR1149883
24