IP 71111.01
From kanterella
Jump to navigation
Jump to search
v
t
e
Inspection Procedure
IP 71111, Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity
NRC Inspection Procedures
- IP 71111.01
IP 37060, 10 CFR 50.69 Risk-Informed Category and Treatment of Structures, Systems, and Components
10 CFR 50.69 Risk-Informed Category and Treatment of Structures
IP 43004
IP 60853
IP 60854
(1)
IP 60855
(1) Operation of an Independent Spent Fuel Storage Installation
IP 60857, Review of 10 CFR 72.48 Evaluations
Review of 10 CFR 72.48 Evaluations
IP 60858, Away-From-Reactor Independent Spent Fuel Storage Installation Inspection Guidance
Away-From-Reactor Independent Spent Fuel Storage Installation Inspection Guidance
IP 71002, License Renewal Inspection
License Renewal Inspection
IP 71003
IP 71004
IP 71111
(27) Reactor Safety-Initiating Events
IP 71114
(7) Reactor Safety Emergency Preparedness
IP 71124
(8) Radiation Safety-Public and Occupational
IP 71130
(10) Security
IP 71150
IP 71151
IP 71152, Problem Identification and Resolution (PI&R)
Problem Identification and Resolution (PI&R)
IP 71152A
IP 71152S, Semiannual Trend Review
Semiannual Trend Review
IP 71153, Event Followup
Event Followup
IP 92702
IP 92709
IP 92722
IP 92723
IP 93800
IP 93812
IP 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs
Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs
IP 95002
IP 95003
TI 2201/004
TI 2515/177
TI 2515/183
TI 2515/191, Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication, Staffing, Multi-Unit Dose Assessment Plans
Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication
TI 2515/192
TI 2515/193, Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
TI 2515/194
TI 2515/76
TI 2800/041
IP 71111, Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity
IP 71111.01
IP 71111.02
IP 71111.04
IP 71111.05
IP 71111.05Q
IP 71111.05XT
IP 71111.06
IP 71111.07, Heat Sink Performance
IP 71111.08
IP 71111.08G
IP 71111.11, Licensed Operator Requalification Program and Licensed Operator Performance
IP 71111.12
IP 71111.13
IP 71111.15, Operability Determinations and Functionality Assessments
IP 71111.17
IP 71111.17T, Evaluations of Changes, Tests, and Experiments
IP 71111.18
IP 71111.19
IP 71111.20, Refueling and Other Outage Activities
IP 71111.21
... further results
Inspection Reports
[list of inspection reports]
Site
Start date
IR 05000413/2025002
Catawba
14 August 2025
IR 05000254/2025002
Quad Cities
14 August 2025
IR 05000321/2025002
Hatch
14 August 2025
IR 05000390/2025002
Watts Bar
13 August 2025
IR 05000220/2025002
Nine Mile Point
13 August 2025
IR 05000454/2025002
Byron
13 August 2025
IR 05000282/2025002
Prairie Island
13 August 2025
IR 05000336/2025002
Millstone
12 August 2025
IR 05000373/2025002
LaSalle
11 August 2025
IR 05000317/2025002
Calvert Cliffs
11 August 2025
Findings
[list of findings]
Quarter
Site
Title
05000416/FIN-2018002-01
2018Q2
Grand Gulf
Failure to Institute Effective Corrective Action to Preclude Repetition
05000313/FIN-2018001-01
2018Q1
Arkansas Nuclear
Failure to Establish Adequate Criteria for Flood Seal Testing
05000395/FIN-2017004-01
2017Q4
Summer
Failure to Accomplish Station Procedures for Severe Weather
05000259/FIN-2017003-01
2017Q3
Browns Ferry
Degraded EDG Flood Door Seals
05000382/FIN-2017002-01
2017Q2
Waterford
Failure to Prepare the Site for Impending Adverse Weather
05000336/FIN-2017001-01
2017Q1
Millstone
Failure to Maintain CST Temperature in Accordance with Procedural Requirements
05000390/FIN-2017001-01
2017Q1
Watts Bar
Failure to Maintain the Abnormal Operating Instruction for Tornados
05000410/FIN-2016002-01
2016Q2
Nine Mile Point
Ineffective Corrective Action Results in Water Intrusion to Battery Switchgear Room
05000461/FIN-2016002-01
2016Q2
Clinton
Material Unsecure in the Secured Material Zone
05000280/FIN-2016001-01
2016Q1
Surry
Failure to Perform a 10 CFR 50.59 Evaluation for Blocking Ventilation to Main Steam Valve Houses
Category
:
NRC Inspection Procedure
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties