IR 05000280/2020003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 31: Line 31:


Sincerely,
Sincerely,
/RA/
/RA/  
Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 05000280, 05000281 07200055 License Nos. DPR-32 and DPR-37
 
Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects  
 
Docket Nos. 05000280, 05000281  
 
07200055 License Nos. DPR-32 and DPR-37  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000280 and 05000281; 07200055 License Numbers: DPR-32 and DPR-37 Report Numbers: 05000280/2020003 and 05000281/2020003; 07200055/2020002 Enterprise Identifier: I-2020-003-0063; I-2020-002-0096 Licensee: Virginia Electric and Power Company Facility: Surry Power Station Location: Surry, VA Inspection Dates: July 01, 2020 to September 30, 2020 Inspectors: L. McKown, Senior Resident Inspector B. Towne, Resident Inspector A. Butcavage, Reactor Inspector J. Diaz-Velez, Senior Health Physicist B. Kellner, Senior Health Physicist W. Pursley, Health Physicist S. Sanchez, Senior Emergency Preparedness Inspector Approved By: Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects Enclosure
Docket Numbers:
05000280 and 05000281; 07200055  
 
License Numbers:
DPR-32 and DPR-37  
 
Report Numbers:
05000280/2020003 and 05000281/2020003; 07200055/2020002  
 
Enterprise Identifier: I-2020-003-0063; I-2020-002-0096  
 
Licensee:
Virginia Electric and Power Company  
 
Facility:
Surry Power Station  
 
Location:
Surry, VA  
 
Inspection Dates:
July 01, 2020 to September 30, 2020  
 
Inspectors:
L. McKown, Senior Resident Inspector  
 
B. Towne, Resident Inspector  
 
A. Butcavage, Reactor Inspector  
 
J. Diaz-Velez, Senior Health Physicist  
 
B. Kellner, Senior Health Physicist  
 
W. Pursley, Health Physicist  
 
S. Sanchez, Senior Emergency Preparedness Inspector  
 
Approved By:
Stewart N. Bailey, Chief
Reactor Projects Branch 4
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
Line 44: Line 90:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 64: Line 109:


==REACTOR SAFETY==
==REACTOR SAFETY==
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection==
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather associated with Hurricane Isaias on August 3, 2020.
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather associated with Hurricane Isaias on August 3, 2020.


==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
Line 78: Line 120:


==71111.05 - Fire Protection==
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)===
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
Line 88: Line 129:


===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the onsite fire brigade training and performance during an           announced fire drill in mechanical equipment room #1 on September 21, 2020.
: (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill in mechanical equipment room #1 on September 21, 2020.


==71111.06 - Flood Protection Measures==
==71111.06 - Flood Protection Measures==
===Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)===
===Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)===
The inspectors evaluated internal flooding mitigation protections in the:
The inspectors evaluated internal flooding mitigation protections in the:
: (1) Fuel Building Internal Flooding Assessment associated with Piping Tunnel Flood Level Switch Probe 112A on September 10, 2020.
: (1) Fuel Building Internal Flooding Assessment associated with Piping Tunnel Flood Level Switch Probe 112A on September 10, 2020.


===71111.07T - Heat Sink Performance Triennial Review (IP Section 03.02) ===
===71111.07T - Heat Sink Performance Triennial Review (IP Section 03.02)===
{{IP sample|IP=IP 71111.07|count=3}}
{{IP sample|IP=IP 71111.07|count=3}}
The inspector evaluated heat exchanger/sink performance based on the following samples:
The inspector evaluated heat exchanger/sink performance based on the following samples:
: (1) Section 02.02b
: (1) Section 02.02b  
          - Component Cooling Water Heat Exchanger 1-CC-E-1A
- Component Cooling Water Heat Exchanger 1-CC-E-1A  
          - Component Cooling Water Heat Exchanger 1-CC-E-1C
- Component Cooling Water Heat Exchanger 1-CC-E-1C
: (2) Section 02.02c
: (2) Section 02.02c  
          - EDG Nos. 01-EE-EG-1 and 03-EE-EG-1-Cooler Hx
- EDG Nos. 01-EE-EG-1 and 03-EE-EG-1-Cooler Hx
: (3) Section 02.02d, specifically Sections 02.02d # 5A and 02.02d # 6G were completed SW-P-1A Emergency Service Water (SW) Pump Monthly Test SW-P-1C Emergency Service Water Pump Monthly Test
: (3) Section 02.02d, specifically Sections 02.02d # 5A and 02.02d # 6G were completed SW-P-1A Emergency Service Water (SW) Pump Monthly Test SW-P-1C Emergency Service Water Pump Monthly Test  
          - Reviewed a sample of dispositions of 2017 CRs on Intake Canal
 
          - Reviewed Discharge Tunnel and Discharge Canal Maintenance Practices
- Reviewed a sample of dispositions of 2017 CRs on Intake Canal  
          - Reviewed Sample of latest flow tests from 1-OSP-SW-008, for Re-circulation Spray Hxs, 1-RS-E-1B and 1 -RS-E-1C, to confirm required SW gravity flow cooling water was achieved
 
- Reviewed Discharge Tunnel and Discharge Canal Maintenance Practices  
 
- Reviewed Sample of latest flow tests from 1-OSP-SW-008, for Re-circulation Spray Hxs, 1-RS-E-1B and 1 -RS-E-1C, to confirm required SW gravity flow cooling water was achieved


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
: (1) The inspectors observed and evaluated licensed operator performance in the control room as Tropical Storm Isaias passed over the station, on August 3, 2020.
: (1) The inspectors observed and evaluated licensed operator performance in the control room as Tropical Storm Isaias passed over the station, on August 3, 2020.


Line 119: Line 161:


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (2 Samples)===
===Maintenance Effectiveness (IP Section 03.01) (2 Samples)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
Line 130: Line 171:


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed;
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed;
: (1) Reliability challenges of Unit 1 'B' safety injection accumulator relief valve concurrent with offsite line switching for transformer #1 work and corrective maintenance on the
: (1) Reliability challenges of Unit 1 'B' safety injection accumulator relief valve concurrent with offsite line switching for transformer #1 work and corrective maintenance on the  
          'B' fire water tank level control system, July 1, 2020.
'B' fire water tank level control system, July 1, 2020.
: (2) Unit 2 elevated risk due to extended unavailability of turbine driven auxiliary feedwater train due to steam admission valve failure on July 16, 2020.
: (2) Unit 2 elevated risk due to extended unavailability of turbine driven auxiliary feedwater train due to steam admission valve failure on July 16, 2020.
: (3) Unit 1 elevated risk due to hot weather alert concurrent with #1 emergency diesel generator surveillance testing on July 20, 2020.
: (3) Unit 1 elevated risk due to hot weather alert concurrent with #1 emergency diesel generator surveillance testing on July 20, 2020.
Line 141: Line 181:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
Line 150: Line 189:


==71111.18 - Plant Modifications==
==71111.18 - Plant Modifications==
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)


Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
The inspectors evaluated the following temporary or permanent modifications:
: (1) Temporary Modification of the Unit 1, 'B' safety injection (SI) accumulator code relief path, on July 2, 2020.
: (1) Temporary Modification of the Unit 1, 'B' safety injection (SI) accumulator code relief path, on July 2, 2020.


==71111.19 - Post-Maintenance Testing==
==71111.19 - Post-Maintenance Testing==
===Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)===
===Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)===
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
: (1) Replacement of Unit 2 turbine driven auxiliary feedwater pump steam admission valve, 2-MS-PCV-202A, solenoid operator (WO38204221675) on July 16, 2020.
: (1) Replacement of Unit 2 turbine driven auxiliary feedwater pump steam admission valve, 2-MS-PCV-202A, solenoid operator (WO38204221675) on July 16, 2020.
: (2) Troubleshooting and replacement of testing subcomponents discovered failed during 1-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing (WO38204211435)on July 30, 2020.
: (2) Troubleshooting and replacement of testing subcomponents discovered failed during 1-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing (WO38204211435)on July 30, 2020.
: (3) 'C' Steam generator power operated relief valve anti-rotation rail coupling block corrective maintenance (WO38204220362) on August 10, 2020.


    (4)   #2 emergency diesel generator monthly testing following #2 fuel oil transfer pump preventive maintenance window (WO38103842633) on August 24, 2020.
(3)
'C' Steam generator power operated relief valve anti-rotation rail coupling block corrective maintenance (WO38204220362) on August 10, 2020.
 
(4)  
#2 emergency diesel generator monthly testing following #2 fuel oil transfer pump preventive maintenance window (WO38103842633) on August 24, 2020.
: (5) Replacement of the unit 1 'A' charging component cooling water pump following discovery of internal interference (WO38103722315) on September 16, 2020.
: (5) Replacement of the unit 1 'A' charging component cooling water pump following discovery of internal interference (WO38103722315) on September 16, 2020.
==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing==
 
The inspectors evaluated the following surveillance tests:  
The inspectors evaluated the following surveillance tests:


===Surveillance Tests (other) (IP Section 03.01)===
===Surveillance Tests (other) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=3}}
{{IP sample|IP=IP 71111.22|count=3}}
: (1) Unit 1, 1-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing on July 29, 2020.
: (1) Unit 1, 1-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing on July 29, 2020.
: (2) 0-OSP-AAC-001, Quarterly Test of Alternate AC Diesel Generator, on August 3, 2020.
 
(2)0-OSP-AAC-001, Quarterly Test of Alternate AC Diesel Generator, on August 3, 2020.
: (3) Unit 2, 2-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing using a new procedure based upon prior challenges at Unit 1 on August 26, 2020.
: (3) Unit 2, 2-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing using a new procedure based upon prior challenges at Unit 1 on August 26, 2020.


===Inservice Testing (IP Section 03.01) (1 Sample)===
===Inservice Testing (IP Section 03.01) (1 Sample)===
: (1) 0-OPT-SW-003, 'C' Emergency Service Water Pump, 1-SW-P-1C, IST quarterly             testing, August 19, 2020.
(1)0-OPT-SW-003, 'C' Emergency Service Water Pump, 1-SW-P-1C, IST quarterly testing, August 19, 2020.


==71114.03 - Emergency Response Organization Staffing and Augmentation System==
==71114.03 - Emergency Response Organization Staffing and Augmentation System==
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
: (1) The inspector completed the evaluation of the readiness of the emergency response organization on September 9, 2020. This was a continuation of an inspection that was performed remotely during the week of June 22, 2020, but was unable to be completed due to aspects that did not lend themselves to being performed remotely. Inspection Report 2020-002 documented the initial inspection activities.
: (1) The inspector completed the evaluation of the readiness of the emergency response organization on September 9, 2020. This was a continuation of an inspection that was performed remotely during the week of June 22, 2020, but was unable to be completed due to aspects that did not lend themselves to being performed remotely. Inspection Report 2020-002 documented the initial inspection activities.


==71114.05 - Maintenance of Emergency Preparedness==
==71114.05 - Maintenance of Emergency Preparedness==
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)===
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)===
: (1) The inspector completed the evaluation of the maintenance of the emergency preparedness program on September 9, 2020. This was a continuation of an inspection that was performed remotely during the week of June 22, 2020, but was unable to be completed due to aspects that did not lend themselves to being performed remotely. Inspection Report 2020-002 documented the initial inspection activities.
: (1) The inspector completed the evaluation of the maintenance of the emergency preparedness program on September 9, 2020. This was a continuation of an inspection that was performed remotely during the week of June 22, 2020, but was unable to be completed due to aspects that did not lend themselves to being performed remotely. Inspection Report 2020-002 documented the initial inspection activities.


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation==
===Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
===Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated a licensee emergency planning drill in the simulator and technical support center, on July 23, 2020. The drill involved the release of flammable gas within a location important to safe shutdown as well as the sequential loss of all three fission product barriers while establishing a new communication and reporting methodology.
: (1) The inspectors evaluated a licensee emergency planning drill in the simulator and technical support center, on July 23, 2020. The drill involved the release of flammable gas within a location important to safe shutdown as well as the sequential loss of all three fission product barriers while establishing a new communication and reporting methodology.


==RADIATION SAFETY==
==RADIATION SAFETY==
==71124.01 - Radiological Hazard Assessment and Exposure Controls==
==71124.01 - Radiological Hazard Assessment and Exposure Controls==
===Radiological Hazard Assessment (IP Section 03.01) (1 Sample)===
===Radiological Hazard Assessment (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.
: (1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.
Line 213: Line 249:
The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.
The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.


The inspectors also reviewed Radiation Work Planning documents including, radiological surveys, TEDE ALARA evaluation documentation, radiological briefing sheets/attendance rosters, etc. for the following Radiation Work Permits (RWPs):
The inspectors also reviewed Radiation Work Planning documents including, radiological surveys, TEDE ALARA evaluation documentation, radiological briefing sheets/attendance rosters, etc. for the following Radiation Work Permits (RWPs):  
: (1) 2020-3109, U2R29 NDE/ISI Inspections, Revision 0
 
: (2) 2020-3507, U2R29 Blind Flange Removal/Installation, Revision 0
(1)2020-3109, U2R29 NDE/ISI Inspections, Revision 0 (2)2020-3507, U2R29 Blind Flange Removal/Installation, Revision 0 (3)2020-3508, U2R29 Reactor Head Lift, Revision 0 (4)2020-3527, U2R29 Fuel Transfer System Inspection and Repair, Revision 0 (5)2020-3533, U2R29 U-2 Containment Diving Activities to Repair Fuel Transfer Equipment and/or Cables, Revision 0  
: (3) 2020-3508, U2R29 Reactor Head Lift, Revision 0
 
: (4) 2020-3527, U2R29 Fuel Transfer System Inspection and Repair, Revision 0
High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (4 Samples)  
: (5) 2020-3533, U2R29 U-2 Containment Diving Activities to Repair Fuel Transfer Equipment and/or Cables, Revision 0 High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (4 Samples)
 
The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:
The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:
: (1) Unit 1 Volume Control Tank (VCT) (Posted Locked High Radiation Area (LHRA))
: (1) Unit 1 Volume Control Tank (VCT) (Posted Locked High Radiation Area (LHRA))
: (2) Unit 2 VCT (Posted LHRA)
: (2) Unit 2 VCT (Posted LHRA)  
: (3) 6' Resin Transfer Area (Posted LHRA)
(3)6' Resin Transfer Area (Posted LHRA)
: (4) Auxiliary Building 2' Ion Exchanger Alley (LHRA)
: (4) Auxiliary Building 2' Ion Exchanger Alley (LHRA)
Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
Line 228: Line 264:


==71124.03 - In-Plant Airborne Radioactivity Control and Mitigation==
==71124.03 - In-Plant Airborne Radioactivity Control and Mitigation==
===Permanent Ventilation Systems (IP Section 03.01) (2 Samples)===
===Permanent Ventilation Systems (IP Section 03.01) (2 Samples)===
The inspectors evaluated the configuration of the following permanently installed ventilation systems:
The inspectors evaluated the configuration of the following permanently installed ventilation systems:
: (1) Unit 2 Reactor Auxiliary Building Ventilation System
: (1) Unit 2 Reactor Auxiliary Building Ventilation System
: (2) Unit 2 Fuel Handling Building Exhaust System
: (2) Unit 2 Fuel Handling Building Exhaust System  


===Temporary Ventilation Systems (IP Section 03.02) (1 Sample)===
===Temporary Ventilation Systems (IP Section 03.02) (1 Sample)===
The inspectors evaluated the configuration of the following temporary ventilation systems:
The inspectors evaluated the configuration of the following temporary ventilation systems:
: (1) High Efficiency Purifying Air Filter Unit #HV-500-25 in the Auxiliary Building Basement near the Unit 2 component cooling water pumps
: (1) High Efficiency Purifying Air Filter Unit #HV-500-25 in the Auxiliary Building Basement near the Unit 2 component cooling water pumps  


===Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)===
===Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)===
Line 245: Line 280:


==71124.04 - Occupational Dose Assessment==
==71124.04 - Occupational Dose Assessment==
===Source Term Characterization (IP Section 03.01) (1 Sample)===
===Source Term Characterization (IP Section 03.01) (1 Sample)===
: (1) To evaluate licensee performance as it pertains to radioactive source term characterization, the inspectors reviewed the licensee's annual, "Bioassay Program Significant Radionuclide & Whole Body Counting Action Level Determination,"
: (1) To evaluate licensee performance as it pertains to radioactive source term characterization, the inspectors reviewed the licensee's annual, "Bioassay Program Significant Radionuclide & Whole Body Counting Action Level Determination,"
assessment performed per procedure, 0-HSP-BSRD-001 to determine hard to detect transuranic isotope contributions in internal exposures..
assessment performed per procedure, 0-HSP-BSRD-001 to determine hard to detect transuranic isotope contributions in internal exposures..  


===External Dosimetry (IP Section 03.02) (1 Sample)===
===External Dosimetry (IP Section 03.02) (1 Sample)===
Line 262: Line 296:


==71124.05 - Radiation Monitoring Instrumentation==
==71124.05 - Radiation Monitoring Instrumentation==
===Walkdowns and Observations (IP Section 03.01) (6 Samples)===
===Walkdowns and Observations (IP Section 03.01) (6 Samples)===
The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:
The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:
Line 273: Line 306:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
The inspectors verified licensee performance indicators submittals listed below:  
MS06: Emergency AC Power Systems (IP Section 02.05) ===
 
MS06: Emergency AC Power Systems (IP Section 02.05)===
{{IP sample|IP=IP 71151|count=2}}
{{IP sample|IP=IP 71151|count=2}}
: (1) Unit 1 (July 1, 2017 - June 30, 2020)
: (1) Unit 1 (July 1, 2017 - June 30, 2020)
: (2) Unit 2 (July 1, 2017 - June 30, 2020)
: (2) Unit 2 (July 1, 2017 - June 30, 2020)  


===MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)===
===MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)===
: (1) Unit 1 (July 1, 2017 - June 30, 2020)
: (1) Unit 1 (July 1, 2017 - June 30, 2020)
: (2) Unit 2 (July 1, 2017 - June 30, 2020)
: (2) Unit 2 (July 1, 2017 - June 30, 2020)  


===MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)===
===MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)===
: (1) Unit 1 (July 1, 2017 - June 30, 2020)
: (1) Unit 1 (July 1, 2017 - June 30, 2020)
: (2) Unit 2 (July 1, 2017 - June 30, 2020)
: (2) Unit 2 (July 1, 2017 - June 30, 2020)  


===MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)===
===MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)===
: (1) Unit 1 (July 1, 2017 - June 30, 2020)
: (1) Unit 1 (July 1, 2017 - June 30, 2020)
: (2) Unit 2 (July 1, 2017 - June 30, 2020)
: (2) Unit 2 (July 1, 2017 - June 30, 2020)  


===MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)===
===MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)===
Line 297: Line 332:


==71152 - Problem Identification and Resolution==
==71152 - Problem Identification and Resolution==
===Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)===
===Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)===
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
Line 303: Line 337:


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL  


===60855 - Operation of an ISFSI Operation of an ISFSI ===
===60855 - Operation of an ISFSI Operation of an ISFSI===
{{IP sample|IP=IP 60855|count=1}}
{{IP sample|IP=IP 60855|count=1}}
: (1) The inspectors evaluated the licensees activities related to long-term operation and monitoring of their independent spent fuel storage installation (ISFSI). This inspection included a detailed walkdown of the three ISFSI pads on September 22,
: (1) The inspectors evaluated the licensees activities related to long-term operation and monitoring of their independent spent fuel storage installation (ISFSI). This inspection included a detailed walkdown of the three ISFSI pads on September 22,


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Observation: Continuing Challenges with Emergency Diesel Generator Fuel               71152 Injectors associated with Report No. 10 CFR21-0127, Rev. 0, EMD Fuel Injectors
Observation: Continuing Challenges with Emergency Diesel Generator Fuel Injectors associated with Report No. 10 CFR21-0127, Rev. 0, EMD Fuel Injectors  
- Seized Plunger and Bushing (ML19317D093)
- Seized Plunger and Bushing (ML19317D093)71152 The inspectors performed a review of the licensee's continuing challenges with emergency diesel generator fuel injectors associated with ESI 10 CFR Part 21 Report No. 10CFR21-0127 Rev. 0, dated October 25, 2019, to determine if prior corrective actions or newly identified conditions adverse to quality could indicate the existence of a more significant safety issue. The inspectors reviewed preventative maintenance records, procedures, corrective action program documents, and station logs.
The inspectors performed a review of the licensee's continuing challenges with emergency diesel generator fuel injectors associated with ESI 10 CFR Part 21 Report No. 10CFR21-0127 Rev. 0, dated October 25, 2019, to determine if prior corrective actions or newly identified conditions adverse to quality could indicate the existence of a more significant safety issue. The inspectors reviewed preventative maintenance records, procedures, corrective action program documents, and station logs.


The inspectors found that licensee preventative maintenance and corrective action activities were consistent with manufacturer recommendations and industry best practices to maintain the equipment. The inspectors determined that the licensee, in general, took reasonable actions to identify, communicate, and correct newly identified conditions adverse to quality in a timely manner with a focus on near and long term impacts upon safety functions.
The inspectors found that licensee preventative maintenance and corrective action activities were consistent with manufacturer recommendations and industry best practices to maintain the equipment. The inspectors determined that the licensee, in general, took reasonable actions to identify, communicate, and correct newly identified conditions adverse to quality in a timely manner with a focus on near and long term impacts upon safety functions.
Line 324: Line 357:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation     Description or Title                                         Revision or
Inspection
Procedure                                                                                                  Date
Procedure
71111.01   Procedures       0-OP-ZZ-021     Severe Weather Preparation                                   24
Type
71111.04   Corrective Action CR1152664
Designation
Documents        CR1152665
Description or Title
CR1152667
Revision or
Drawings         11548-FM-084A,   Containment Spray System                                      50
Date
71111.01
Procedures
0-OP-ZZ-021
Severe Weather Preparation
71111.04
Corrective Action
Documents
CR1152664  
 
CR1152665  
 
CR1152667  
 
Drawings
11548-FM-084A,
SH-002
SH-002
71111.05   Corrective Action CR1153782
Containment Spray System
71111.05
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Procedures       0-FS-FP-162     Auxiliary Building Elevation 45 feet - 10 inches             4
CR1153782
0-FS-FP-224     Mechanical Equipment Room (MER 5)                             4
 
0-FS-FP-225     Alternate AC Diesel Room                                     1
Procedures
1-FS-FP-126     Mechanical Equipment Room Number 1                           3
0-FS-FP-162
2-FS-FP-102     Unit 2 Cable Vault Tunnel                                     3
Auxiliary Building Elevation 45 feet - 10 inches
71111.06   Miscellaneous     SER December     Safety Evaluation Report Susceptibility of Safety Related     12/18/1980
0-FS-FP-224
1980-IN          Systems to Flooding from Failure of Non-Category I
Mechanical Equipment Room (MER 5)
0-FS-FP-225
Alternate AC Diesel Room
1-FS-FP-126
Mechanical Equipment Room Number 1
2-FS-FP-102
Unit 2 Cable Vault Tunnel
71111.06
Miscellaneous
SER December
1980-IN
Safety Evaluation Report Susceptibility of Safety Related
Systems to Flooding from Failure of Non-Category I
Systems for Surry Power Station Units 1 and 2
Systems for Surry Power Station Units 1 and 2
71111.07T Corrective Action CR 473593       CC Pipe 18" -CC- 235 has NDE Reading of .191 inches           5/4/12
2/18/1980
Documents        CR-1048251       1-VS-S-1B High differential Pressure                         9/22/16
71111.07T
Corrective Action CR1153443        During review of WO38204192973 for NRC UHS Inspection,        8/13/20
Corrective Action
Documents                         NRC noted that no LR CR was written
Documents
Resulting from   CR1153479        Perform bathymetric survey of discharge canal area            8/14/20
CR 473593
CC Pipe 18" -CC-235 has NDE Reading of.191 inches
5/4/12
CR-1048251
1-VS-S-1B High differential Pressure
9/22/16
Corrective Action
Documents
Resulting from
Inspection
Inspection
Drawings         11448-CBM-071A-5 ISI Classification Boundary Drawing , Interval 5, Sht. 1 of 4 Rev 3
CR1153443
11448-FM -071A   UNIT 1 & 2 COMPONENT COOLING, Heat Exchanger                 Rev. 55
During review of WO38204192973 for NRC UHS Inspection,
Sht. 4 of 4      P&ID
NRC noted that no LR CR was written
11448-FM -071A, FLOW/VALVE OPERATING NUMBERS DIAGRAM                         Rev. 89
8/13/20
Sht. 1 of 4      CIRCULATING AND SERVICE WATER SYSTEM
CR1153479
Perform bathymetric survey of discharge canal area
8/14/20
Drawings
11448-CBM-071A-5
ISI Classification Boundary Drawing, Interval 5, Sht. 1 of 4
Rev 3
11448-FM -071A
Sht. 4 of 4
UNIT 1 & 2 COMPONENT COOLING, Heat Exchanger
P&ID
Rev. 55
11448-FM -071A,
Sht. 1 of 4
FLOW/VALVE OPERATING NUMBERS DIAGRAM
CIRCULATING AND SERVICE WATER SYSTEM
SURRY POWER STATION UNIT 1
SURRY POWER STATION UNIT 1
11548-FM -071A, FLOW/VALVE OPERATING NUMBERS DIAGRAM,                         Rev. 37
Rev. 89
Sht 1 of 3      CIRCULATING AND SERVICE WATER SYSTEM, SURRY
11548-FM -071A,
Inspection Type         Designation       Description or Title                                       Revision or
Sht 1 of 3
Procedure                                                                                            Date
FLOW/VALVE OPERATING NUMBERS DIAGRAM,
CIRCULATING AND SERVICE WATER SYSTEM, SURRY
Rev. 37
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
POWER STATION UNIT 2
POWER STATION UNIT 2
Engineering   SU-13-00008       18" CC-229-121 and 18" CC-235-121 Repairs                 7/15/13
Engineering
Changes      SU-20-00148       License Renewal- Intake Canal , Oyster Larvae sampling     Rev. 0
Changes
SU-13-00008
18" CC-229-121 and 18" CC-235-121 Repairs
7/15/13
SU-20-00148
License Renewal-Intake Canal, Oyster Larvae sampling
system Temporary Modification
system Temporary Modification
Engineering   PA-7900752       Evaluation of Operating Experience IER L3 20-3, Extreme   7/3/20
Rev. 0
Evaluations                    Environmental Conditions Lead to Ultimate Heat Sink
Engineering
Evaluations
PA-7900752
Evaluation of Operating Experience IER L3 20-3, Extreme
Environmental Conditions Lead to Ultimate Heat Sink
Challenge
Challenge
ME-0025           NRC Generic Letter 89-13 Activities                       Rev. 2
7/3/20
Miscellaneous 2019-SURR-Q4-SW   Surry 2019 Fourth Quarter Service Water Health Report     2/10/20
ME-0025
20-SURR-Q1-CW   2020 First Quarter System Health Report, Circulating Water 4/4/20
NRC Generic Letter 89-13 Activities
Rev. 2
Miscellaneous
2019-SURR-Q4-SW
Surry 2019 Fourth Quarter Service Water Health Report
2/10/20
20-SURR-Q1-CW
20 First Quarter System Health Report, Circulating Water
System
System
20-Surry -Q2-SW Surry 2020 Second Quarter System Health Report             7/29/20
4/4/20
CM-AA-REA-1001,   Sediment has built up in the intake canal                  1/23/19
20-Surry -Q2-SW  
 
Surry 2020 Second Quarter System Health Report
7/29/20
CM-AA-REA-1001,
Att. 4 Tracking
Att. 4 Tracking
Number, REA-SU-
Number, REA-SU-
2019-004
2019-004
SDBD-SPS-SW       Surry Power Station System Design Basis Document for the   5/12/20
Sediment has built up in the intake canal
1/23/19
SDBD-SPS-SW
Surry Power Station System Design Basis Document for the
Service Water System
Service Water System
Surry UFSAR,      Surry Power Station Updated Final Safety Analysis Report  5/29/20
5/12/20
Surry UFSAR,
Revision 51.04,
Revision 51.04,
Chapter 9
Chapter 9
NDE Reports   2-NPT-CW-001 Rev VT-2 of 96 Inch CW and SW Piping                           8/10/20
Surry Power Station Updated Final Safety Analysis Report
Procedures   0-NSP-CC-005     CCHX TESTS USING THE TEMPORARY MONITORING                 Rev. 7
5/29/20
NDE Reports
2-NPT-CW-001 Rev
VT-2 of 96 Inch CW and SW Piping
8/10/20
Procedures
0-NSP-CC-005
CCHX TESTS USING THE TEMPORARY MONITORING
System
System
0-OPT-SW-003     OPERATIONS PERIODIC TEST, EMERGENCY SERVICE               7/26/20
Rev. 7
0-OPT-SW-003
OPERATIONS PERIODIC TEST, EMERGENCY SERVICE
WATER PUMP 1-SW-P-1C
WATER PUMP 1-SW-P-1C
Inspection Type       Designation   Description or Title                                     Revision or
7/26/20
Procedure                                                                                      Date
 
0-OPT-SW-003   OPERATIONS PERIODIC TEST, EMERGENCY SERVICE             8/6/20
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
0-OPT-SW-003
OPERATIONS PERIODIC TEST, EMERGENCY SERVICE
WATER PUMP 1-SW-P-1C
WATER PUMP 1-SW-P-1C
  -OSP-SW-008, Recirculation Spray Heat Exchanger Acceptance Criteria - 4/21/18
8/6/20
Rev 6          Unit 1 B & C Header Total Flow
  -OSP-SW-008,
2-OSP-EG-6.1   NUMBER 2 EMERGENCY DIESEL GENERATOR LUBE                 Rev. 16
Rev 6
Recirculation Spray Heat Exchanger Acceptance Criteria -
Unit 1 B & C Header Total Flow
4/21/18
2-OSP-EG-6.1
NUMBER 2 EMERGENCY DIESEL GENERATOR LUBE
OIL AND
OIL AND
COOLING WATER SAMPLING
COOLING WATER SAMPLING
CH-93.400     CLOSED COOLING WATER CHEMISTRY PROGRAM                   Rev. 24
Rev. 16
CH-93.500     CIRCULATING WATER AND SERVICE WATER                     Rev, 3
CH-93.400  
 
CLOSED COOLING WATER CHEMISTRY PROGRAM
Rev. 24
CH-93.500
CIRCULATING WATER AND SERVICE WATER
CONTROL PROGRAM
CONTROL PROGRAM
ER-SU-5314     Generic Letter 89-13 Program                             Rev. 3
Rev, 3
PI-AA-200     Corrective Action                                       Rev. 36
ER-SU-5314
VPAP-0811     Service Water System Inspection and Maintenance Program Rev. 6
Generic Letter 89-13 Program
Work Orders 38204208882    28 Day Freq. PT: No.2, EDG Lube Oil & Cooling Water O.C- 5/13/20
Rev. 3
PI-AA-200
Corrective Action
Rev. 36
VPAP-0811
Service Water System Inspection and Maintenance Program Rev. 6
Work Orders
204208882
Day Freq. PT: No.2, EDG Lube Oil & Cooling Water O.C-
2B
2B
WO 38102944964 PM: Clean Tubes/Sheet & Eddy Current, CC Heat           2/27/20
5/13/20
WO 38102944964
PM: Clean Tubes/Sheet & Eddy Current, CC Heat
Exchanger 01-CC-E-1A
Exchanger 01-CC-E-1A
WO 38103528077 PM: INSP/REPL FLOW ELEMENT, PM TO INSPECT               7/27/20
2/27/20
FLOW ELEMENT FOR WEAR & PROPER SIZ
WO 38103528077
: [[contact::E.
PM: INSP/REPL FLOW ELEMENT, PM TO INSPECT
WO 38103788590 01-EE-EG-1-ENGINE]], 1BM EDG INSPECTION, EMERG.           5/13/18
FLOW ELEMENT FOR WEAR & PROPER SIZE.
7/27/20
WO 38103788590
01-EE-EG-1-ENGINE, 1BM EDG INSPECTION, EMERG.
DIESEL GEN.ENGINE, 18 MONTH SERVICE &
DIESEL GEN.ENGINE, 18 MONTH SERVICE &
INSPECTION
INSPECTION
WO 38103813495 1095 DAY FREQ. PT: ISi SPT IF 96" CW LINES               7/27/20
5/13/18
WO 38204179151 03-EE-EG-1-ENGINE, 18 Month EDG INSPECTION               8/16/19
WO 38103813495
WO 38204190446 Component 02-EE-EG-1-ENGINE, FMFRG Diesel               5/14/20
1095 DAY FREQ. PT: ISi SPT IF 96" CW LINES
7/27/20
WO 38204179151
03-EE-EG-1-ENGINE, 18 Month EDG INSPECTION
8/16/19
WO 38204190446
Component 02-EE-EG-1-ENGINE, FMFRG Diesel
Generator Engine, 18 Month Service & Inspection
Generator Engine, 18 Month Service & Inspection
WO 38204192973 01-CC-E-1C-HTEXCH, Annual Clean/Patch/Coat Pitting,     1/23/20
5/14/20
WO 38204192973
01-CC-E-1C-HTEXCH, Annual Clean/Patch/Coat Pitting,
January /February, IAW RCE 20061372
January /February, IAW RCE 20061372
WO 38204212767 28 Day Freq. PT Maintenance and Sampling RSHX Service   7/20/20
1/23/20
Inspection Type             Designation         Description or Title                                   Revision or
WO 38204212767
Procedure                                                                                                Date
Day Freq. PT Maintenance and Sampling RSHX Service
7/20/20  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Water Piping, Wet Layup - OC-22A
Water Piping, Wet Layup - OC-22A
WO 38204214474     Engineering Surveillance Procedure, 0-NSP-CC-005,       8/5/20
WO 38204214474
Component Cooling Heat Exchanger Tests on 1- CC-E-1B
Engineering Surveillance Procedure, 0-NSP-CC-005,
Component Cooling Heat Exchanger Tests on 1-CC-E-1B
and 1C-CC-1D
and 1C-CC-1D
WO 38204214489     Engineering Surveillance Procedure, 0-NSP-CC-005,       7/15/20
8/5/20
Component Cooling Heat Exchanger Tests on 1- CC-E-1A
WO 38204214489
Engineering Surveillance Procedure, 0-NSP-CC-005,
Component Cooling Heat Exchanger Tests on 1-CC-E-1A
and 1C-CC-1C
and 1C-CC-1C
WO 38204214490     Engineering Surveillance Procedure, 0-NSP-CC-005,       7/29/20
7/15/20
Component Cooling Heat Exchanger Tests on 1- CC-E-1A
WO 38204214490
Engineering Surveillance Procedure, 0-NSP-CC-005,
Component Cooling Heat Exchanger Tests on 1-CC-E-1A
and 1C-CC-1C
and 1C-CC-1C
W
7/29/20
: [[contact::O. 38204212767     Procedure 1-OSP-SW-001]], 28 Day Freq. PT: Maint &       7/20/20
WO. 38204212767
Samp, RSHX SW Piping in , '
Procedure 1-OSP-SW-001, 28 Day Freq. PT: Maint &
Samp, RSHX SW Piping in, '
Wet Layup - for 1-RS-E-1B and 1-RS-E-1C
Wet Layup - for 1-RS-E-1B and 1-RS-E-1C
71111.11Q Miscellaneous     Hurricane Response                                                         13
7/20/20
Plan (Nuclear)
71111.11Q Miscellaneous
Procedures       0-AP-20.00         Main Control Room Inaccessibility                       21
Hurricane Response
0-AP-37.01         Abnormal Environmental Conditions                       75
Plan (Nuclear)  
0-FCA-1.00         Limiting MCR Fire                                       56
 
71111.12   Corrective Action CR1152664
Procedures
Documents        CR1152665
0-AP-20.00
CR1152667
Main Control Room Inaccessibility
CR1155394
0-AP-37.01
CR455394
Abnormal Environmental Conditions
Drawings         11448-FB-47A       Fire Protection                                         34
0-FCA-1.00
Engineering       Technical Report   The Elimination of Cooling Water to Charging Pump       08/05/1987
Limiting MCR Fire
Evaluations      SE-0001            Mechanical Seal Coolers
71111.12
Miscellaneous    NFPA 20             Standard for the Installation of Centrifugal Fire Pumps 1987
Corrective Action
Work Orders       38204222296
Documents
71111.13   Miscellaneous     Surry PRA Risk
CR1152664  
 
CR1152665  
 
CR1152667  
 
CR1155394  
 
CR455394  
 
Drawings
11448-FB-47A
Fire Protection
Engineering
Evaluations
Technical Report
SE-0001
The Elimination of Cooling Water to Charging Pump
Mechanical Seal Coolers
08/05/1987
Miscellaneous
NFPA 20
Standard for the Installation of Centrifugal Fire Pumps
1987
Work Orders
204222296
 
71111.13
Miscellaneous
Surry PRA Risk
Evaluation and Risk
Evaluation and Risk
Mitigating Actions
Mitigating Actions
for August 24, 2020
for August 24, 2020  
Surry PRA Risk
 
Inspection Type             Designation         Description or Title                                       Revision or
Surry PRA Risk  
Procedure                                                                                                    Date
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Evaluation and Risk
Evaluation and Risk
Mitigating Actions
Mitigating Actions
Line 462: Line 680:
Evaluation and Risk
Evaluation and Risk
Mitigating Actions
Mitigating Actions
for July 16, 2020
for July 16, 2020  
 
Surry PRA Risk
Surry PRA Risk
Evaluation and Risk
Evaluation and Risk
Mitigating Actions
Mitigating Actions
for July 20, 2020
for July 20, 2020  
 
Surry PRA Risk
Surry PRA Risk
Evaluation and Risk
Evaluation and Risk
Mitigating Actions
Mitigating Actions
for September 16,
for September 16,
20
20  
71111.18   Engineering       TM-SU-20-00147     Temporary Modification for Unit 1 'B' SI Accumulator Relief 0
 
Changes                              Valve
71111.18
71114.06   Corrective Action CR1153559
Engineering
Changes
TM-SU-20-00147
Temporary Modification for Unit 1 'B' SI Accumulator Relief
Valve
71114.06
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Miscellaneous     SJUL20 FS           Surry Power Station Emergency Preparedness Exercise         07/23/2020
CR1153559
71124.01   Corrective Action                     CR1128311, CR1133694, CR1134231, CR1134756,                 Various
 
Documents                            CR1134915, CR1137219, CR1142360, CR1143108,
Miscellaneous
SJUL20 FS
Surry Power Station Emergency Preparedness Exercise
07/23/2020
71124.01
Corrective Action
Documents
CR1128311, CR1133694, CR1134231, CR1134756,
CR1134915, CR1137219, CR1142360, CR1143108,
CR1144074, CR1147895, and CR1148395
CR1144074, CR1147895, and CR1148395
Radiation         47' Elevation       U-2 Containment - Dose Rate survey during Upper Internals   05/09/2020
Various
Surveys                              lift
Radiation
Day 5 EPRI Survey   U-2 Containment                                             05/07/2020
Surveys
Incore Sump         U-2 Containment - 2-NI-NE-13 Excore detector replacement   05/05/2020
47' Elevation
Pressurizer         U-2 Containment - Dose Rate survey for removal of 2-RC-     05/05/2020
U-2 Containment - Dose Rate survey during Upper Internals
lift
05/09/2020
Day 5 EPRI Survey
U-2 Containment
05/07/2020
Incore Sump
U-2 Containment - 2-NI-NE-13 Excore detector replacement
05/05/2020
Pressurizer
U-2 Containment - Dose Rate survey for removal of 2-RC-
SV-2551B (safety)
SV-2551B (safety)
Reactor Cavity     U-2 Containment - Initial Survey                           05/04/2020
05/05/2020
Reactor Cavity     U-2 Containment - Reactor head seal ring groove prior to   05/23/2020
Reactor Cavity
Inspection Type             Designation         Description or Title                                     Revision or
U-2 Containment - Initial Survey
Procedure                                                                                                  Date
05/04/2020
Reactor Cavity
U-2 Containment - Reactor head seal ring groove prior to
05/23/2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
decon
decon
Transfer Canal       U-2 Containment - Drop survey prior to diving           05/13/2020
Transfer Canal
Transfer Canal       U-2 Containment - Initial Survey                         5/5/2020
U-2 Containment - Drop survey prior to diving
Transfer Canal       U-2 Containment - Prior to Dive                         05/13/2020
05/13/2020
Upper Internals Lift U-2 Containment, move from Cavity to Laydown Area        05/05/2020
Transfer Canal
U-2 Containment - Initial Survey
5/5/2020
Transfer Canal
U-2 Containment - Prior to Dive
05/13/2020
Upper Internals Lift
Rig
Rig
Self-Assessments 7483957             Solid Radioactive Waste Control Program Review, May     09/23/2019
U-2 Containment, move from Cavity to Laydown Area
05/05/2020
Self-Assessments 7483957
Solid Radioactive Waste Control Program Review, May
2017-August 2019
2017-August 2019
PA7483959           External Radiation Exposure Control Program Review 4th   11/26/2019
09/23/2019
PA7483959
External Radiation Exposure Control Program Review 4th
QTR 2017 - 3rd QTR 2019
QTR 2017 - 3rd QTR 2019
71124.03   Calibration                           Complete SCBA Posi3 USB Test Result                     07/18/2019
11/26/2019
Records          HP-1061.052         Portable Ventilation/Vacuum Cleaner Leak Test Record for 08/01/2019
71124.03
Calibration
Records
Complete SCBA Posi3 USB Test Result
07/18/2019
HP-1061.052
Portable Ventilation/Vacuum Cleaner Leak Test Record for
HEPA 500-25
HEPA 500-25
ML-CCP-099           Calibration Data Record, Electronic Micromanomenter     02/14/2017
08/01/2019
ML-CCP-099           Calibration Data Record, Airdata Multimeter Electronic   05/19/2017
ML-CCP-099
Calibration Data Record, Electronic Micromanomenter
2/14/2017
ML-CCP-099
Calibration Data Record, Airdata Multimeter Electronic
Manometer
Manometer
MMR/Firehawk 4500 Complete SCBA Posi3 USB Test Result                          7/11/2019
05/19/2017
MMR/Firehawk 4500
SCBA U2
SCBA U2
Containment
Containment
Harness #14
Harness #14
MMR/Firehawk 4500 Complete SCBA Posi3 USB Test Result                         7/18/2019
Complete SCBA Posi3 USB Test Result
7/11/2019
MMR/Firehawk 4500
SCBA U2
SCBA U2
Containment
Containment
Harness #19
Harness #19
MMR/Firehawk 4500 Complete SCBA Posi3 USB Test Result                         07/18/2019
Complete SCBA Posi3 USB Test Result
7/18/2019
MMR/Firehawk 4500
SCBA U2
SCBA U2
Containment
Containment
Harness #21
Harness #21
Corrective Action                     Corrective Action Reports # 7463064, 7913048, 7885154,
Complete SCBA Posi3 USB Test Result
Documents         CA# 7463064,         7861481, and 7431534.
07/18/2019
Corrective Action
Documents
CA# 7463064,
7913048, 7885154,
7913048, 7885154,
7861481, and
7861481, and
7431534.
7431534.
Inspection Type         Designation         Description or Title       Revision or
Corrective Action Reports # 7463064, 7913048, 7885154,
Procedure                                                                Date
7861481, and 7431534.
Miscellaneous ABAA 192260,         2019 SCBA Tests            March 2019
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
ABAA 192260,
ABAA 192295,
ABAA 192295,
ABAA 192318,
ABAA 192318,
ABAA 192251 and
ABAA 192251 and
APAE 312186
APAE 312186
APAD 190521,         2020 SCBA Functional Tests March 2020
2019 SCBA Tests
March 2019
APAD 190521,
APAD 189492,
APAD 189492,
APAD 190542,
APAD 190542,
APAD 190533 and
APAD 190533 and
APAD 189490
APAD 189490
FIRE PROTECTION     Grade D Air Test          08/27/2018
20 SCBA Functional Tests
March 2020
FIRE PROTECTION
SAFETY SHOP /
SAFETY SHOP /
BAUER UNICUS III
BAUER UNICUS III
SN: 57387
SN: 57387
INSTRUMENT A        Grade D Air Test           09/19/2018
Grade D Air Test
08/27/2018
INSTRUMENT A
SN: 003-77221
SN: 003-77221
S/N: 003-77220,     Grade D Air Test          03/06/2020
Grade D Air Test
09/19/2018
S/N: 003-77220,
SRF "B" Instrument
SRF "B" Instrument
Air
Air
S/N: 003-77221       Grade D Air Test          11/11/2019
Grade D Air Test
03/06/2020
S/N: 003-77221
SRF "A" Instrument
SRF "A" Instrument
Air
Air
S/N: 18225, Training Grade D Air Test          01/15/2020
Grade D Air Test
11/11/2019
S/N: 18225, Training
Center
Center
S/N: H250, Station   Grade D Air Test          03/26/2020
Grade D Air Test
01/15/2020
S/N: H250, Station
Service Air
Service Air
S/N:003-77221,       Grade D Air Test          04/09/2020
Grade D Air Test
03/26/2020
S/N:003-77221,
SRF "A" Service Air
SRF "A" Service Air
Safety & Loss        Grade D Air Test           03/03/2020
Grade D Air Test
04/09/2020
Safety & Loss
Prevention Shop
Prevention Shop
Compressor S/N:
Compressor S/N:
57387
57387
SLP                  Grade D Air Test           02/13/2019
Grade D Air Test
03/03/2020
SLP
COMPRESSOR;
COMPRESSOR;
Inspection Type       Designation         Description or Title                                       Revision or
Grade D Air Test
Procedure                                                                                            Date
2/13/2019
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SN: 57387
SN: 57387
SN: 003-77221 "A"   Grade D Air Test                                          05/01/2019
SN: 003-77221 "A"
SRF Inst. Air
SRF Inst. Air
SN: H250 Station    Grade D Air Test                                           05/01/2019
Grade D Air Test
05/01/2019
SN: H250 Station
Service Air
Service Air
SPS-S+LP            Grade D Air Test                                           08/14/2019
Grade D Air Test
05/01/2019
SPS-S+LP
Shop/Safety Shop -
Shop/Safety Shop -
Compressor SN:
Compressor SN:
57387
57387
SRF "A"            Grade D Air Test                                           03/29/2018
Grade D Air Test
08/14/2019
SRF "A"
INSTRUMENT AIR
INSTRUMENT AIR
COMPRESSOR
COMPRESSOR
SRF "B"            Grade D Air Test                                           02/25/2019
Grade D Air Test
03/29/2018
SRF "B"
INSTRUMENT AIR
INSTRUMENT AIR
COMPRESSOR
COMPRESSOR
STATION SERVICE    Grade D Air Test                                           04/02/2018
Grade D Air Test
2/25/2019
STATION SERVICE
AIR
AIR
Station Service Air Grade D Air Test                                           10/17/2019
Grade D Air Test
04/02/2018
Station Service Air
S/N: 003-77221
S/N: 003-77221
STATION SERVICE    Grade D Air Test                                           09/24/2018
Grade D Air Test
10/17/2019
STATION SERVICE
AIR / SIERRA H 250
AIR / SIERRA H 250
SN: TS6819U10019
SN: TS6819U10019
SU-ENGT-000-S-     Auxiliary Building Filtered Exhaust Fans 1 -VS-F-58A & 58B 12/21/2001
Grade D Air Test
01-0295            Thumb Wheel Settings
09/24/2018
SU-ENGT-000-S-
01-0295
Auxiliary Building Filtered Exhaust Fans 1 -VS-F-58A & 58B
Thumb Wheel Settings
SURRY POWER STATION, UNIT I AND 2
SURRY POWER STATION, UNIT I AND 2
Procedures 0-OPT-VS-007       AUXILIARY VENTILATION FILTER FLOW TEST                     Rev. 18
2/21/2001
C-HP-1033.610       EBERLINE AIR MONITOR AMS-4 CALIBRATION AND                 Rev. 7
Procedures
0-OPT-VS-007
AUXILIARY VENTILATION FILTER FLOW TEST
Rev. 18
C-HP-1033.610
EBERLINE AIR MONITOR AMS-4 CALIBRATION AND
OPERATION
OPERATION
C-HP-1033.620       PORTABLE AIR SAMPLERS CALIBRATION AND                     Rev. 9
Rev. 7
C-HP-1033.620
PORTABLE AIR SAMPLERS CALIBRATION AND
OPERATION
OPERATION
C-HP-1033.640       PORTABLE SAMPLING PUMPS CALIBRATION AND                   Rev. 6
Rev. 9
C-HP-1033.640
PORTABLE SAMPLING PUMPS CALIBRATION AND
OPERATION
OPERATION
C-HP-1042.122       QUANTITATIVE FIT TESTING: PORTACOUNT PRO FIT               Rev. 12
Rev. 6
C-HP-1042.122
QUANTITATIVE FIT TESTING: PORTACOUNT PRO FIT
TESTING SYSTEM
TESTING SYSTEM
Inspection Type             Designation       Description or Title                                   Revision or
Rev. 12
Procedure                                                                                              Date
 
C-HP-1042.210     RESPIRATORY HAZARDS EVALUATION AND                     Rev. 4
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
C-HP-1042.210
RESPIRATORY HAZARDS EVALUATION AND
RESPIRATORY PROTECTION SELECTION
RESPIRATORY PROTECTION SELECTION
C-HP-1042.230     AIRBORNE RADIOACTIVITY EXPOSURE TRACKING               Rev. 7
Rev. 4
HP-1033.661       RADECO AIR SAMPLER MODEL H-809C: CALIBRATION           Rev. 2
C-HP-1042.230
AIRBORNE RADIOACTIVITY EXPOSURE TRACKING
Rev. 7
HP-1033.661
RADECO AIR SAMPLER MODEL H-809C: CALIBRATION
AND OPERATION
AND OPERATION
HP-1033.662       CALIBRATION AND OPERATION OF HI-Q AIR SAMPLER           Rev. 3
Rev. 2
HP-1033.662
CALIBRATION AND OPERATION OF HI-Q AIR SAMPLER
MODELS
MODELS
HP-1061.510       PRIMARY SIDE STEAM GENERATOR VENTILATION               Rev. 4
Rev. 3
RP-AA-110         Radiological Respiratory Protection Program             Rev. 4
HP-1061.510
RP-AA-160         Donning and Removal of Respiratory Protection Equipment Rev. 0
PRIMARY SIDE STEAM GENERATOR VENTILATION
RP-AA-162         Issue and Control of Respiratory Protection Equipment   Rev. 5
Rev. 4
RP-AA-163         Inspection and Inventory of Respiratory Protection     Rev. 6
RP-AA-110
Radiological Respiratory Protection Program
Rev. 4
RP-AA-160
Donning and Removal of Respiratory Protection Equipment
Rev. 0
RP-AA-162
Issue and Control of Respiratory Protection Equipment
Rev. 5
RP-AA-163
Inspection and Inventory of Respiratory Protection
Equipment
Equipment
RP-AA-224         Airborne Radioactivity Surveys                         Rev. 5
Rev. 6
RP-AA-226         ALPHA MONITORING                                       Rev. 5
RP-AA-224
RP-AA-243         Portable HEPA Ventilation Units                         Rev. 4
Airborne Radioactivity Surveys
RP-AA-244         Vacuum Cleaner Use and Control                         Rev. 3
Rev. 5
RP-AA-274-2002     Contamination Enclosures: Use and Control               Rev. 0
RP-AA-226
Self-Assessments PA# 3130494       Radiological Respiratory Protection Program Review     08/09/2018
ALPHA MONITORING
Work Orders       38103820939       Aux. Building Filter Test (0-OPT=VS-007, pages 34-57)   11/15/2017
Rev. 5
38103841410       1-VS.FL-3A Lab Test                                     February
RP-AA-243
Portable HEPA Ventilation Units
Rev. 4
RP-AA-244
Vacuum Cleaner Use and Control
Rev. 3
RP-AA-274-2002
Contamination Enclosures: Use and Control
Rev. 0
Self-Assessments PA# 3130494
Radiological Respiratory Protection Program Review
08/09/2018
Work Orders
38103820939
Aux. Building Filter Test (0-OPT=VS-007, pages 34-57)
11/15/2017
38103841410
1-VS.FL-3A Lab Test
February
2019
2019
38103866289       Aux. Building Filter Test                               04/03/2019
38103866289
203870242       1-VS-FL-3B In-Place Test                               August 2019
Aux. Building Filter Test
203870250       1-VS-FL-3A In-Place Filter Test                         August 2019
04/03/2019
204200857       1-VS-FL-3B Lab Test                                     July 2019
203870242
71124.04   Calculations     RP-AA-151         Internal Sensitivity Study for Each Make and Model of   07/20/2016
1-VS-FL-3B In-Place Test
August 2019
203870250
1-VS-FL-3A In-Place Filter Test
August 2019
204200857
1-VS-FL-3B Lab Test
July 2019
71124.04
Calculations
RP-AA-151
Internal Sensitivity Study for Each Make and Model of
Personnel Contamination and Portal Monitor
Personnel Contamination and Portal Monitor
Corrective Action                   Corrective Action reports                              Various
07/20/2016
Documents         CRs 1146310,
Corrective Action
1142330, 1136333 ,
Documents
CRs 1146310,
1142330, 1136333,
1133154, 1123196,
1133154, 1123196,
1111633, 1137986,
1111633, 1137986,
1134933, 1133694
1134933, 1133694
Inspection Type         Designation       Description or Title                                   Revision or
Corrective Action reports
Procedure                                                                                          Date
Various
and 1133694
 
Miscellaneous Memo to  
Inspection
: [[contact::W. Terry]], Surry Unit 2 Characterization of Alpha Source Term for 03/25/2020
Procedure
Type
Designation
Description or Title
Revision or
Date
and 1133694  
 
Miscellaneous
Memo to  
: [[contact::W. Terry]],
RPCM from  
RPCM from  
: [[contact::B. Hilt]], S2C29
: [[contact::B. Hilt]],
CHP
CHP
SU-PROCSU-TEC-     MIRION TECH. (GDS) NVLAP 2018-2019 Certificate        undated
Surry Unit 2 Characterization of Alpha Source Term for
S2C29
03/25/2020
SU-PROCSU-TEC-
RP-AA-150
RP-AA-150
SU-PROCSU-TEC-    MIRION TECH. (GDS) NVLAP 2019-2020                    undated
MIRION TECH. (GDS) NVLAP 2018-2019 Certificate
undated
SU-PROCSU-TEC-
RP-AA-150
RP-AA-150
Procedures   C-HP-1031.011     EXPOSURE CONTROL RECORDS AND REPORTS                   Rev. 10
MIRION TECH. (GDS) NVLAP 2019-2020
C-HP-1031.023     RWP DOSIMETRY: EXPOSURE CONTROL SUPPORT               Rev. 9
undated
C-HP-1031.024     ADMINISTRATIVE DOSE CONTROL                           Rev. 5
Procedures
C-HP-1031.025     DOSIMETRY REQUIREMENTS FOR SITE RESTRICTED             Rev. 11
C-HP-1031.011
EXPOSURE CONTROL RECORDS AND REPORTS
Rev. 10
C-HP-1031.023
RWP DOSIMETRY: EXPOSURE CONTROL SUPPORT
Rev. 9
C-HP-1031.024
ADMINISTRATIVE DOSE CONTROL
Rev. 5
C-HP-1031.025
DOSIMETRY REQUIREMENTS FOR SITE RESTRICTED
AREAS
AREAS
C-HP-1031.042     COMPUTERIZED PERSONNEL EXPOSURE                       Rev. 4
Rev. 11
C-HP-1031.042
COMPUTERIZED PERSONNEL EXPOSURE
MANAGEMENT SYSTEM OPERATION
MANAGEMENT SYSTEM OPERATION
C-HP-1031.060     SRD CONTROL AND PERFORMANCE CHECKS                     Rev. 2
Rev. 4
C-HP-1031.302     CALIBRATION OF ELECTRONIC DOSIMETERS                   Rev. 19
C-HP-1031.060
HP-1031.043       PERIODIC TLD PREPARATION, EXCHANGE, AND               Rev. 1
SRD CONTROL AND PERFORMANCE CHECKS
Rev. 2
C-HP-1031.302
CALIBRATION OF ELECTRONIC DOSIMETERS
Rev. 19
HP-1031.043
PERIODIC TLD PREPARATION, EXCHANGE, AND
PROCESSING
PROCESSING
HP-1031.124       PERFORMING EFFECTIVE DOSE EQUIVALENT FROM             Rev. 5
Rev. 1
HP-1031.124
PERFORMING EFFECTIVE DOSE EQUIVALENT FROM
EXTERNAL EXPOSURE (EDEX) CALCULATIONS
EXTERNAL EXPOSURE (EDEX) CALCULATIONS
HP-1031.304       USE OF DMC USER SOFTWARE TO CONFIGURE, READ,           Rev. 1
Rev. 5
HP-1031.304
USE OF DMC USER SOFTWARE TO CONFIGURE, READ,
AND ISSUE ELECTRONIC DOSIMETERS
AND ISSUE ELECTRONIC DOSIMETERS
HP-1041.046       APEX IN-VIVO WHOLE BODY COUNTER: OPERATION             Rev. 0
Rev. 1
HP-1041.046
APEX IN-VIVO WHOLE BODY COUNTER: OPERATION
AND PERFORMANCE CHECKS
AND PERFORMANCE CHECKS
HP-1041.056       APEX IN-VIVO WHOLE BODY COUNTER: WHOLE BODY           Rev. 0
Rev. 0
HP-1041.056
APEX IN-VIVO WHOLE BODY COUNTER: WHOLE BODY
COUNTING INDIVIDUALS
COUNTING INDIVIDUALS
HP-1041.058       WHOLE BODY COUNTING INDIVIDUALS USING THE             Rev. 0
Rev. 0
HP-1041.058
WHOLE BODY COUNTING INDIVIDUALS USING THE
GEM-5
GEM-5
HP-1041.066       APEX IN-VIVO WHOLE BODY COUNTER: CALIBRATION           Rev. 3
Rev. 0
RP-AA-104         Internal Radiation Exposure Control Program           Rev. 2
HP-1041.066
RP-AA-105         External Radiation Exposure Control Program           Rev. 2
APEX IN-VIVO WHOLE BODY COUNTER: CALIBRATION
Inspection Type             Designation         Description or Title                                       Revision or
Rev. 3
Procedure                                                                                                  Date
RP-AA-104
RP-AA-121           Manual Skin Dose Assessment                               Rev. 2
Internal Radiation Exposure Control Program
RP-AA-122           Skin Dose Assessment                                       Rev. 0
Rev. 2
RP-AA-123           Effective Dose Equivalent from External Exposure (EDEX)   Rev. 6
RP-AA-105
RP-AA-124           Dosimetry Investigation and Processing                     Rev. 8
External Radiation Exposure Control Program
RP-AA-131           Whole Body Monitoring                                     Rev. 2
Rev. 2  
RP-AA-132           Urine and Fecal Sampling and Analysis                     Rev. 1
 
RP-AA-133           Internal Dose Calculation Based on Radionuclide Intake     Rev. 0
Inspection
RP-AA-134           Radionuclide Intake Determination Based on Bioassay       Rev. 2
Procedure
Type
Designation
Description or Title
Revision or
Date
RP-AA-121
Manual Skin Dose Assessment
Rev. 2
RP-AA-122
Skin Dose Assessment
Rev. 0
RP-AA-123
Effective Dose Equivalent from External Exposure (EDEX)
Rev. 6
RP-AA-124
Dosimetry Investigation and Processing
Rev. 8
RP-AA-131
Whole Body Monitoring
Rev. 2
RP-AA-132
Urine and Fecal Sampling and Analysis
Rev. 1
RP-AA-133
Internal Dose Calculation Based on Radionuclide Intake
Rev. 0
RP-AA-134
Radionuclide Intake Determination Based on Bioassay
Results
Results
RP-AA-136           Internal Dose Calculations Based on DAC-Hour Exposure     Rev. 0
Rev. 2
RP-AA-138           Declared or Expected Pregnant Woman                       Rev. 2
RP-AA-136
RP-AA-230           Personnel Contamination Monitoring and Decontamination     Rev. 12
Internal Dose Calculations Based on DAC-Hour Exposure
Self-Assessments PA7483959           External Radiation Exposure Control Program Review         12/18/2019
Rev. 0
PA7821763           Internal Radiation Exposure Control Program Review         04/13/2020
RP-AA-138
Work               Bioassay Prog. Significant Radionuclide & WBC Action       2-19-2020
Declared or Expected Pregnant Woman
Order#30204199796 Level Determination
Rev. 2
71124.05   Calibration       Quality Assurance   Daily Source Check of Detector 2                           07/09/2020
RP-AA-230
Records          Report Detector 2
Personnel Contamination Monitoring and Decontamination
Quality Assurance   Daily Source Check of Detector 3                          7/9/2020
Rev. 12
Self-Assessments PA7483959
External Radiation Exposure Control Program Review
2/18/2019
PA7821763
Internal Radiation Exposure Control Program Review
04/13/2020
Work
Order#30204199796
Bioassay Prog. Significant Radionuclide & WBC Action
Level Determination
2-19-2020
71124.05
Calibration
Records
Quality Assurance
Report Detector 2
Daily Source Check of Detector 2
07/09/2020
Quality Assurance
Report Detector 3
Report Detector 3
Quality Assurance  Daily QA Check Detector 5                                  07/08/2020
Daily Source Check of Detector 3
7/9/2020
Quality Assurance
Report Detector 5
Report Detector 5
Quanta Smart Serial Daily Source Check of Liquid Scintillation Counter         7/98/20
Daily QA Check Detector 5
                            #SGTC09150556
07/08/2020
Procedures        0-IPM-CC-RRM-       Radwaste Facility Vent Stack Effluent Monitor Calibration  Revision 9
Quanta Smart Serial  
#SGTC09150556
Daily Source Check of Liquid Scintillation Counter
7/98/20
Procedures
0-IPM-CC-RRM-
Vent-001
Vent-001
71151     Miscellaneous                         Derivation and Margin Reports for Surry Power Station Unit
Radwaste Facility Vent Stack Effluent Monitor Calibration
Revision 9
71151
Miscellaneous
Derivation and Margin Reports for Surry Power Station Unit  
  & 2 Mitigating System Performance Index Performance
  & 2 Mitigating System Performance Index Performance
Indicator Emergency AC, High Pressure Injection, Heat
Indicator Emergency AC, High Pressure Injection, Heat
Removal, Residual Heat Removal, and Cooling Water
Removal, Residual Heat Removal, and Cooling Water
System inputs
System inputs
71152     Corrective Action CA8067087
71152
Documents        CR1149883
Corrective Action
Documents
CA8067087  
 
CR1149883  
 
24
24
}}
}}

Latest revision as of 13:51, 29 November 2024

Integrated Inspection Report 05000280/2020003, 05000281/2020003; and 07200055/2020002
ML20313A000
Person / Time
Site: Surry, 07200055  Dominion icon.png
Issue date: 11/06/2020
From: Stewart Bailey
NRC/RGN-II/DRP/RPB4
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
IR 2020002, IR 2020003
Download: ML20313A000 (26)


Text

November 6, 2020

SUBJECT:

SURRY POWER STATION - INTEGRATED INSPECTION REPORT 05000280/2020003 AND 05000281/2020003; AND 07200055/2020002

Dear Mr. Stoddard:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station. On October 23, 2020, the NRC inspectors discussed the results of this inspection with Mr. Doug Lawrence, Surry Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos. 05000280, 05000281

07200055 License Nos. DPR-32 and DPR-37

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000280 and 05000281; 07200055

License Numbers:

DPR-32 and DPR-37

Report Numbers:

05000280/2020003 and 05000281/2020003; 07200055/2020002

Enterprise Identifier: I-2020-003-0063; I-2020-002-0096

Licensee:

Virginia Electric and Power Company

Facility:

Surry Power Station

Location:

Surry, VA

Inspection Dates:

July 01, 2020 to September 30, 2020

Inspectors:

L. McKown, Senior Resident Inspector

B. Towne, Resident Inspector

A. Butcavage, Reactor Inspector

J. Diaz-Velez, Senior Health Physicist

B. Kellner, Senior Health Physicist

W. Pursley, Health Physicist

S. Sanchez, Senior Emergency Preparedness Inspector

Approved By:

Stewart N. Bailey, Chief

Reactor Projects Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Surry Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 operated at or near rated thermal power for the entire inspection period.

Unit 2 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted.

As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather associated with Hurricane Isaias on August 3, 2020.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 Containment Spray Train 'A' on July 7, 2020.
(2) Unit 2 Atmospheric Power Operated Relief Valve Actuation trains on July 21, 2020.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1, Auxiliary Building 45 foot -10 inch elevation on July 7, 2020.
(2) Station Blackout Alternate AC diesel generator on August 3, 2020.
(3) Unit 2, Cable Tunnel on August 19, 2020.
(4) Unit 1, Mechanical Equipment Room #1 on September 21, 2020.
(5) Unit 2, Mechanical Equipment Room #5 on September 28, 2020.

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill in mechanical equipment room #1 on September 21, 2020.

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Fuel Building Internal Flooding Assessment associated with Piping Tunnel Flood Level Switch Probe 112A on September 10, 2020.

71111.07T - Heat Sink Performance Triennial Review (IP Section 03.02)

The inspector evaluated heat exchanger/sink performance based on the following samples:

(1) Section 02.02b

- Component Cooling Water Heat Exchanger 1-CC-E-1A

- Component Cooling Water Heat Exchanger 1-CC-E-1C

(2) Section 02.02c

- EDG Nos. 01-EE-EG-1 and 03-EE-EG-1-Cooler Hx

(3) Section 02.02d, specifically Sections 02.02d # 5A and 02.02d # 6G were completed SW-P-1A Emergency Service Water (SW) Pump Monthly Test SW-P-1C Emergency Service Water Pump Monthly Test

- Reviewed a sample of dispositions of 2017 CRs on Intake Canal

- Reviewed Discharge Tunnel and Discharge Canal Maintenance Practices

- Reviewed Sample of latest flow tests from 1-OSP-SW-008, for Re-circulation Spray Hxs, 1-RS-E-1B and 1 -RS-E-1C, to confirm required SW gravity flow cooling water was achieved

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room as Tropical Storm Isaias passed over the station, on August 3, 2020.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator training in the simulator associated with control rod malfunctions and adverse control room conditions requiring evacuation and alternate plant shutdown on September 24, 2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Steam generator power operated relief valve logic controllers following multiple spurious operation on August 6, 2020.
(2) Motor driven fire pump relief valve upon discovery that the valve persistently lifts during pump run on August 28, 2020.

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1) Failure and safety classification of charging pump component cooling water pumps on September 29, 2020.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed;

(1) Reliability challenges of Unit 1 'B' safety injection accumulator relief valve concurrent with offsite line switching for transformer #1 work and corrective maintenance on the

'B' fire water tank level control system, July 1, 2020.

(2) Unit 2 elevated risk due to extended unavailability of turbine driven auxiliary feedwater train due to steam admission valve failure on July 16, 2020.
(3) Unit 1 elevated risk due to hot weather alert concurrent with #1 emergency diesel generator surveillance testing on July 20, 2020.
(4) Units 1 and 2 risk during multiple concurrently scheduled risk-significant activities including Unit 2 containment entry, Unit 1 annunciator modification, Unit 2 Hi Hi consequence limiting safeguard testing using a modified procedure on August 24, 2020.
(5) Unit 1 risk associated with emergent 531 Suffolk 500kV line switching due to fire during 'A' charging cooling water pump extended out of service window on September 16, 2020.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) CR1149697, functionality of the Unit 1, 'B' safety injection accumulator following multiple lifts of the tank relief valve on July 1, 2020.
(2) CR1151619, 2-MS-PCV-202A, the Unit 2 turbine driven auxiliary feedwater pump, 'A' steam admission valve failure to close on July 15, 2020.
(3) CR1147101, failure of the 'D' control room chiller local control switch on July 28, 2020.
(4) CR1156323, challenges with alternate AC diesel (station blackout) generator starting air on September 28, 2020.

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Temporary Modification of the Unit 1, 'B' safety injection (SI) accumulator code relief path, on July 2, 2020.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Replacement of Unit 2 turbine driven auxiliary feedwater pump steam admission valve, 2-MS-PCV-202A, solenoid operator (WO38204221675) on July 16, 2020.
(2) Troubleshooting and replacement of testing subcomponents discovered failed during 1-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing (WO38204211435)on July 30, 2020.

(3)

'C' Steam generator power operated relief valve anti-rotation rail coupling block corrective maintenance (WO38204220362) on August 10, 2020.

(4)

  1. 2 emergency diesel generator monthly testing following #2 fuel oil transfer pump preventive maintenance window (WO38103842633) on August 24, 2020.
(5) Replacement of the unit 1 'A' charging component cooling water pump following discovery of internal interference (WO38103722315) on September 16, 2020.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Unit 1, 1-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing on July 29, 2020.

(2)0-OSP-AAC-001, Quarterly Test of Alternate AC Diesel Generator, on August 3, 2020.

(3) Unit 2, 2-PT-8.5, Hi Hi Consequence Limiting Safeguard Logic Testing using a new procedure based upon prior challenges at Unit 1 on August 26, 2020.

Inservice Testing (IP Section 03.01) (1 Sample)

(1)0-OPT-SW-003, 'C' Emergency Service Water Pump, 1-SW-P-1C, IST quarterly testing, August 19, 2020.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspector completed the evaluation of the readiness of the emergency response organization on September 9, 2020. This was a continuation of an inspection that was performed remotely during the week of June 22, 2020, but was unable to be completed due to aspects that did not lend themselves to being performed remotely. Inspection Report 2020-002 documented the initial inspection activities.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspector completed the evaluation of the maintenance of the emergency preparedness program on September 9, 2020. This was a continuation of an inspection that was performed remotely during the week of June 22, 2020, but was unable to be completed due to aspects that did not lend themselves to being performed remotely. Inspection Report 2020-002 documented the initial inspection activities.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated a licensee emergency planning drill in the simulator and technical support center, on July 23, 2020. The drill involved the release of flammable gas within a location important to safe shutdown as well as the sequential loss of all three fission product barriers while establishing a new communication and reporting methodology.

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated radiological protection-related instructions to plant workers.

Contamination and Radioactive Material Control (IP Section 03.03) (3 Samples)

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material.

(1) Observed licensee surveys of personnel and equipment from a remote Radiologically Controlled Area (RCA) at the Independent Spent Fuel Storage Installation (ISFSI).
(2) Observed workers exiting the primary RCA exit point during normal plant operations.
(3) Observed workers exiting the auxiliary building and entering outdoor RCA (yard)using hand and foot monitors during normal operation.

Radiological Hazards Control and Work Coverage (IP Section 03.04) (5 Samples)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

The inspectors also reviewed Radiation Work Planning documents including, radiological surveys, TEDE ALARA evaluation documentation, radiological briefing sheets/attendance rosters, etc. for the following Radiation Work Permits (RWPs):

(1)2020-3109, U2R29 NDE/ISI Inspections, Revision 0 (2)2020-3507, U2R29 Blind Flange Removal/Installation, Revision 0 (3)2020-3508, U2R29 Reactor Head Lift, Revision 0 (4)2020-3527, U2R29 Fuel Transfer System Inspection and Repair, Revision 0 (5)2020-3533, U2R29 U-2 Containment Diving Activities to Repair Fuel Transfer Equipment and/or Cables, Revision 0

High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (4 Samples)

The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:

(1) Unit 1 Volume Control Tank (VCT) (Posted Locked High Radiation Area (LHRA))
(2) Unit 2 VCT (Posted LHRA)

(3)6' Resin Transfer Area (Posted LHRA)

(4) Auxiliary Building 2' Ion Exchanger Alley (LHRA)

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)

(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (2 Samples)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Unit 2 Reactor Auxiliary Building Ventilation System
(2) Unit 2 Fuel Handling Building Exhaust System

Temporary Ventilation Systems (IP Section 03.02) (1 Sample)

The inspectors evaluated the configuration of the following temporary ventilation systems:

(1) High Efficiency Purifying Air Filter Unit #HV-500-25 in the Auxiliary Building Basement near the Unit 2 component cooling water pumps

Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed routine maintenance records for respiratory protection devices including powered air purifying respirators staged at the respirator issue point inside the RCA.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses by requesting a functional test of SCBA Unit #s 19 and 20 staged at the Unit 2 Reactor Building Personnel Access.

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) To evaluate licensee performance as it pertains to radioactive source term characterization, the inspectors reviewed the licensee's annual, "Bioassay Program Significant Radionuclide & Whole Body Counting Action Level Determination,"

assessment performed per procedure, 0-HSP-BSRD-001 to determine hard to detect transuranic isotope contributions in internal exposures..

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors reviewed licensee methods for determining individual exposures when dosimetry equipment fails, reviewed passive monitoring storage and control methods and verified the licensee dosimeter processor maintained its NAVLAP certification current for 2018, 2019 and to date in 2020 to evaluate licensee performance as it pertains to external dosimetry that is used to assign occupational dose.

Internal Dosimetry (IP Section 03.03) (1 Sample)

The inspectors evaluated the following internal dose assessments for actual internal exposures:

(1) Potential internal exposure event that occurred during diving in the Unit 2 transfer cavity May 13, 2020. The potential exposure required the licensee to perform in-vivo analysis (whole body count) and in-vitro analysis (urine sample) for a diver (PID# 46709).

Special Dosimetric Situations (IP Section 03.04) (1 Sample)

The inspectors evaluated the following special dosimetric situations:

(1) There were no examples where workers were assigned SDE from distinct or dispersed beta emitters during the inspection period. The licensee does not employ the use of EDEX to determine dose from multiple compartments and there were no declared pregnant worker records reviewed.

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (6 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:

(1) ARMs in the Auxiliary Building, Spent Fuel Pool and the Surry Radwaste Facility.
(2) Portable ion chambers stored ready for use' at the RCA exit Instrument Issue Point and the Instrumentation Calibration Laboratory.
(3) Personnel contamination monitors in use at the RCA exit.
(4) Small Article Monitors at the radiological controlled area exit.
(5) Continuous Air Monitors at various locations in the auxiliary building
(6) Germanium Detectors in the radiochemistry laboratory.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) Unit 1 (July 1, 2017 - June 30, 2020)
(2) Unit 2 (July 1, 2017 - June 30, 2020)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (July 1, 2017 - June 30, 2020)
(2) Unit 2 (July 1, 2017 - June 30, 2020)

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1) Unit 1 (July 1, 2017 - June 30, 2020)
(2) Unit 2 (July 1, 2017 - June 30, 2020)

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 (July 1, 2017 - June 30, 2020)
(2) Unit 2 (July 1, 2017 - June 30, 2020)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (July 1, 2017 - June 30, 2020)
(2) Unit 2 (July 1, 2017 - June 30, 2020)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Review of Continuing Challenges with Emergency Diesel Generator Fuel Injectors associated with Report No. 10 CFR21-0127, Rev. 0, EMD Fuel Injectors - Seized Plunger and Bushing (ML19317D093) on September 25,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

60855 - Operation of an ISFSI Operation of an ISFSI

(1) The inspectors evaluated the licensees activities related to long-term operation and monitoring of their independent spent fuel storage installation (ISFSI). This inspection included a detailed walkdown of the three ISFSI pads on September 22,

INSPECTION RESULTS

Observation: Continuing Challenges with Emergency Diesel Generator Fuel Injectors associated with Report No. 10 CFR21-0127, Rev. 0, EMD Fuel Injectors

- Seized Plunger and Bushing (ML19317D093)71152 The inspectors performed a review of the licensee's continuing challenges with emergency diesel generator fuel injectors associated with ESI 10 CFR Part 21 Report No. 10CFR21-0127 Rev. 0, dated October 25, 2019, to determine if prior corrective actions or newly identified conditions adverse to quality could indicate the existence of a more significant safety issue. The inspectors reviewed preventative maintenance records, procedures, corrective action program documents, and station logs.

The inspectors found that licensee preventative maintenance and corrective action activities were consistent with manufacturer recommendations and industry best practices to maintain the equipment. The inspectors determined that the licensee, in general, took reasonable actions to identify, communicate, and correct newly identified conditions adverse to quality in a timely manner with a focus on near and long term impacts upon safety functions.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 23, 2020, the inspectors presented the integrated inspection results to Mr. Doug Lawrence, Site Vice President (VP) and other members of the licensee staff.
  • On September 9, 2020, the inspectors presented the Emergency Preparedness Program inspection results to Mr. Doug Lawrence, Site VP and other members of the licensee staff.
  • On July 9, 2020, the inspectors presented the Radiation Safety inspection results to Mr. F. Mladen, Site VP and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

0-OP-ZZ-021

Severe Weather Preparation

71111.04

Corrective Action

Documents

CR1152664

CR1152665

CR1152667

Drawings

11548-FM-084A,

SH-002

Containment Spray System

71111.05

Corrective Action

Documents

Resulting from

Inspection

CR1153782

Procedures

0-FS-FP-162

Auxiliary Building Elevation 45 feet - 10 inches

0-FS-FP-224

Mechanical Equipment Room (MER 5)

0-FS-FP-225

Alternate AC Diesel Room

1-FS-FP-126

Mechanical Equipment Room Number 1

2-FS-FP-102

Unit 2 Cable Vault Tunnel

71111.06

Miscellaneous

SER December

1980-IN

Safety Evaluation Report Susceptibility of Safety Related

Systems to Flooding from Failure of Non-Category I

Systems for Surry Power Station Units 1 and 2

2/18/1980

71111.07T

Corrective Action

Documents

CR 473593

CC Pipe 18" -CC-235 has NDE Reading of.191 inches

5/4/12

CR-1048251

1-VS-S-1B High differential Pressure

9/22/16

Corrective Action

Documents

Resulting from

Inspection

CR1153443

During review of WO38204192973 for NRC UHS Inspection,

NRC noted that no LR CR was written

8/13/20

CR1153479

Perform bathymetric survey of discharge canal area

8/14/20

Drawings

11448-CBM-071A-5

ISI Classification Boundary Drawing, Interval 5, Sht. 1 of 4

Rev 3

11448-FM -071A

Sht. 4 of 4

UNIT 1 & 2 COMPONENT COOLING, Heat Exchanger

P&ID

Rev. 55

11448-FM -071A,

Sht. 1 of 4

FLOW/VALVE OPERATING NUMBERS DIAGRAM

CIRCULATING AND SERVICE WATER SYSTEM

SURRY POWER STATION UNIT 1

Rev. 89

11548-FM -071A,

Sht 1 of 3

FLOW/VALVE OPERATING NUMBERS DIAGRAM,

CIRCULATING AND SERVICE WATER SYSTEM, SURRY

Rev. 37

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

POWER STATION UNIT 2

Engineering

Changes

SU-13-00008

18" CC-229-121 and 18" CC-235-121 Repairs

7/15/13

SU-20-00148

License Renewal-Intake Canal, Oyster Larvae sampling

system Temporary Modification

Rev. 0

Engineering

Evaluations

PA-7900752

Evaluation of Operating Experience IER L3 20-3, Extreme

Environmental Conditions Lead to Ultimate Heat Sink

Challenge

7/3/20

ME-0025

NRC Generic Letter 89-13 Activities

Rev. 2

Miscellaneous

2019-SURR-Q4-SW

Surry 2019 Fourth Quarter Service Water Health Report

2/10/20

20-SURR-Q1-CW

20 First Quarter System Health Report, Circulating Water

System

4/4/20

20-Surry -Q2-SW

Surry 2020 Second Quarter System Health Report

7/29/20

CM-AA-REA-1001,

Att. 4 Tracking

Number, REA-SU-

2019-004

Sediment has built up in the intake canal

1/23/19

SDBD-SPS-SW

Surry Power Station System Design Basis Document for the

Service Water System

5/12/20

Surry UFSAR,

Revision 51.04,

Chapter 9

Surry Power Station Updated Final Safety Analysis Report

5/29/20

NDE Reports

2-NPT-CW-001 Rev

VT-2 of 96 Inch CW and SW Piping

8/10/20

Procedures

0-NSP-CC-005

CCHX TESTS USING THE TEMPORARY MONITORING

System

Rev. 7

0-OPT-SW-003

OPERATIONS PERIODIC TEST, EMERGENCY SERVICE

WATER PUMP 1-SW-P-1C

7/26/20

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0-OPT-SW-003

OPERATIONS PERIODIC TEST, EMERGENCY SERVICE

WATER PUMP 1-SW-P-1C

8/6/20

-OSP-SW-008,

Rev 6

Recirculation Spray Heat Exchanger Acceptance Criteria -

Unit 1 B & C Header Total Flow

4/21/18

2-OSP-EG-6.1

NUMBER 2 EMERGENCY DIESEL GENERATOR LUBE

OIL AND

COOLING WATER SAMPLING

Rev. 16

CH-93.400

CLOSED COOLING WATER CHEMISTRY PROGRAM

Rev. 24

CH-93.500

CIRCULATING WATER AND SERVICE WATER

CONTROL PROGRAM

Rev, 3

ER-SU-5314

Generic Letter 89-13 Program

Rev. 3

PI-AA-200

Corrective Action

Rev. 36

VPAP-0811

Service Water System Inspection and Maintenance Program Rev. 6

Work Orders

204208882

Day Freq. PT: No.2, EDG Lube Oil & Cooling Water O.C-

2B

5/13/20

WO 38102944964

PM: Clean Tubes/Sheet & Eddy Current, CC Heat

Exchanger 01-CC-E-1A

2/27/20

WO 38103528077

PM: INSP/REPL FLOW ELEMENT, PM TO INSPECT

FLOW ELEMENT FOR WEAR & PROPER SIZE.

7/27/20

WO 38103788590

01-EE-EG-1-ENGINE, 1BM EDG INSPECTION, EMERG.

DIESEL GEN.ENGINE, 18 MONTH SERVICE &

INSPECTION

5/13/18

WO 38103813495

1095 DAY FREQ. PT: ISi SPT IF 96" CW LINES

7/27/20

WO 38204179151

03-EE-EG-1-ENGINE, 18 Month EDG INSPECTION

8/16/19

WO 38204190446

Component 02-EE-EG-1-ENGINE, FMFRG Diesel

Generator Engine, 18 Month Service & Inspection

5/14/20

WO 38204192973

01-CC-E-1C-HTEXCH, Annual Clean/Patch/Coat Pitting,

January /February, IAW RCE 20061372

1/23/20

WO 38204212767

Day Freq. PT Maintenance and Sampling RSHX Service

7/20/20

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Water Piping, Wet Layup - OC-22A

WO 38204214474

Engineering Surveillance Procedure, 0-NSP-CC-005,

Component Cooling Heat Exchanger Tests on 1-CC-E-1B

and 1C-CC-1D

8/5/20

WO 38204214489

Engineering Surveillance Procedure, 0-NSP-CC-005,

Component Cooling Heat Exchanger Tests on 1-CC-E-1A

and 1C-CC-1C

7/15/20

WO 38204214490

Engineering Surveillance Procedure, 0-NSP-CC-005,

Component Cooling Heat Exchanger Tests on 1-CC-E-1A

and 1C-CC-1C

7/29/20

WO. 38204212767

Procedure 1-OSP-SW-001, 28 Day Freq. PT: Maint &

Samp, RSHX SW Piping in, '

Wet Layup - for 1-RS-E-1B and 1-RS-E-1C

7/20/20

71111.11Q Miscellaneous

Hurricane Response

Plan (Nuclear)

Procedures

0-AP-20.00

Main Control Room Inaccessibility

0-AP-37.01

Abnormal Environmental Conditions

0-FCA-1.00

Limiting MCR Fire

71111.12

Corrective Action

Documents

CR1152664

CR1152665

CR1152667

CR1155394

CR455394

Drawings

11448-FB-47A

Fire Protection

Engineering

Evaluations

Technical Report

SE-0001

The Elimination of Cooling Water to Charging Pump

Mechanical Seal Coolers

08/05/1987

Miscellaneous

NFPA 20

Standard for the Installation of Centrifugal Fire Pumps

1987

Work Orders

204222296

71111.13

Miscellaneous

Surry PRA Risk

Evaluation and Risk

Mitigating Actions

for August 24, 2020

Surry PRA Risk

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Evaluation and Risk

Mitigating Actions

for July 1, 2020

Surry PRA Risk

Evaluation and Risk

Mitigating Actions

for July 16, 2020

Surry PRA Risk

Evaluation and Risk

Mitigating Actions

for July 20, 2020

Surry PRA Risk

Evaluation and Risk

Mitigating Actions

for September 16,

20

71111.18

Engineering

Changes

TM-SU-20-00147

Temporary Modification for Unit 1 'B' SI Accumulator Relief

Valve

71114.06

Corrective Action

Documents

Resulting from

Inspection

CR1153559

Miscellaneous

SJUL20 FS

Surry Power Station Emergency Preparedness Exercise

07/23/2020

71124.01

Corrective Action

Documents

CR1128311, CR1133694, CR1134231, CR1134756,

CR1134915, CR1137219, CR1142360, CR1143108,

CR1144074, CR1147895, and CR1148395

Various

Radiation

Surveys

47' Elevation

U-2 Containment - Dose Rate survey during Upper Internals

lift

05/09/2020

Day 5 EPRI Survey

U-2 Containment

05/07/2020

Incore Sump

U-2 Containment - 2-NI-NE-13 Excore detector replacement

05/05/2020

Pressurizer

U-2 Containment - Dose Rate survey for removal of 2-RC-

SV-2551B (safety)

05/05/2020

Reactor Cavity

U-2 Containment - Initial Survey

05/04/2020

Reactor Cavity

U-2 Containment - Reactor head seal ring groove prior to

05/23/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

decon

Transfer Canal

U-2 Containment - Drop survey prior to diving

05/13/2020

Transfer Canal

U-2 Containment - Initial Survey

5/5/2020

Transfer Canal

U-2 Containment - Prior to Dive

05/13/2020

Upper Internals Lift

Rig

U-2 Containment, move from Cavity to Laydown Area

05/05/2020

Self-Assessments 7483957

Solid Radioactive Waste Control Program Review, May

2017-August 2019

09/23/2019

PA7483959

External Radiation Exposure Control Program Review 4th

QTR 2017 - 3rd QTR 2019

11/26/2019

71124.03

Calibration

Records

Complete SCBA Posi3 USB Test Result

07/18/2019

HP-1061.052

Portable Ventilation/Vacuum Cleaner Leak Test Record for

HEPA 500-25

08/01/2019

ML-CCP-099

Calibration Data Record, Electronic Micromanomenter

2/14/2017

ML-CCP-099

Calibration Data Record, Airdata Multimeter Electronic

Manometer

05/19/2017

MMR/Firehawk 4500

SCBA U2

Containment

Harness #14

Complete SCBA Posi3 USB Test Result

7/11/2019

MMR/Firehawk 4500

SCBA U2

Containment

Harness #19

Complete SCBA Posi3 USB Test Result

7/18/2019

MMR/Firehawk 4500

SCBA U2

Containment

Harness #21

Complete SCBA Posi3 USB Test Result

07/18/2019

Corrective Action

Documents

CA# 7463064,

7913048, 7885154,

7861481, and

7431534.

Corrective Action Reports # 7463064, 7913048, 7885154,

7861481, and 7431534.

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Miscellaneous

ABAA 192260,

ABAA 192295,

ABAA 192318,

ABAA 192251 and

APAE 312186

2019 SCBA Tests

March 2019

APAD 190521,

APAD 189492,

APAD 190542,

APAD 190533 and

APAD 189490

20 SCBA Functional Tests

March 2020

FIRE PROTECTION

SAFETY SHOP /

BAUER UNICUS III

SN: 57387

Grade D Air Test

08/27/2018

INSTRUMENT A

SN: 003-77221

Grade D Air Test

09/19/2018

S/N: 003-77220,

SRF "B" Instrument

Air

Grade D Air Test

03/06/2020

S/N: 003-77221

SRF "A" Instrument

Air

Grade D Air Test

11/11/2019

S/N: 18225, Training

Center

Grade D Air Test

01/15/2020

S/N: H250, Station

Service Air

Grade D Air Test

03/26/2020

S/N:003-77221,

SRF "A" Service Air

Grade D Air Test

04/09/2020

Safety & Loss

Prevention Shop

Compressor S/N:

57387

Grade D Air Test

03/03/2020

SLP

COMPRESSOR;

Grade D Air Test

2/13/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SN: 57387

SN: 003-77221 "A"

SRF Inst. Air

Grade D Air Test

05/01/2019

SN: H250 Station

Service Air

Grade D Air Test

05/01/2019

SPS-S+LP

Shop/Safety Shop -

Compressor SN:

57387

Grade D Air Test

08/14/2019

SRF "A"

INSTRUMENT AIR

COMPRESSOR

Grade D Air Test

03/29/2018

SRF "B"

INSTRUMENT AIR

COMPRESSOR

Grade D Air Test

2/25/2019

STATION SERVICE

AIR

Grade D Air Test

04/02/2018

Station Service Air

S/N: 003-77221

Grade D Air Test

10/17/2019

STATION SERVICE

AIR / SIERRA H 250

SN: TS6819U10019

Grade D Air Test

09/24/2018

SU-ENGT-000-S-

01-0295

Auxiliary Building Filtered Exhaust Fans 1 -VS-F-58A & 58B

Thumb Wheel Settings

SURRY POWER STATION, UNIT I AND 2

2/21/2001

Procedures

0-OPT-VS-007

AUXILIARY VENTILATION FILTER FLOW TEST

Rev. 18

C-HP-1033.610

EBERLINE AIR MONITOR AMS-4 CALIBRATION AND

OPERATION

Rev. 7

C-HP-1033.620

PORTABLE AIR SAMPLERS CALIBRATION AND

OPERATION

Rev. 9

C-HP-1033.640

PORTABLE SAMPLING PUMPS CALIBRATION AND

OPERATION

Rev. 6

C-HP-1042.122

QUANTITATIVE FIT TESTING: PORTACOUNT PRO FIT

TESTING SYSTEM

Rev. 12

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

C-HP-1042.210

RESPIRATORY HAZARDS EVALUATION AND

RESPIRATORY PROTECTION SELECTION

Rev. 4

C-HP-1042.230

AIRBORNE RADIOACTIVITY EXPOSURE TRACKING

Rev. 7

HP-1033.661

RADECO AIR SAMPLER MODEL H-809C: CALIBRATION

AND OPERATION

Rev. 2

HP-1033.662

CALIBRATION AND OPERATION OF HI-Q AIR SAMPLER

MODELS

Rev. 3

HP-1061.510

PRIMARY SIDE STEAM GENERATOR VENTILATION

Rev. 4

RP-AA-110

Radiological Respiratory Protection Program

Rev. 4

RP-AA-160

Donning and Removal of Respiratory Protection Equipment

Rev. 0

RP-AA-162

Issue and Control of Respiratory Protection Equipment

Rev. 5

RP-AA-163

Inspection and Inventory of Respiratory Protection

Equipment

Rev. 6

RP-AA-224

Airborne Radioactivity Surveys

Rev. 5

RP-AA-226

ALPHA MONITORING

Rev. 5

RP-AA-243

Portable HEPA Ventilation Units

Rev. 4

RP-AA-244

Vacuum Cleaner Use and Control

Rev. 3

RP-AA-274-2002

Contamination Enclosures: Use and Control

Rev. 0

Self-Assessments PA# 3130494

Radiological Respiratory Protection Program Review

08/09/2018

Work Orders

38103820939

Aux. Building Filter Test (0-OPT=VS-007, pages 34-57)

11/15/2017

38103841410

1-VS.FL-3A Lab Test

February

2019

38103866289

Aux. Building Filter Test

04/03/2019

203870242

1-VS-FL-3B In-Place Test

August 2019

203870250

1-VS-FL-3A In-Place Filter Test

August 2019

204200857

1-VS-FL-3B Lab Test

July 2019

71124.04

Calculations

RP-AA-151

Internal Sensitivity Study for Each Make and Model of

Personnel Contamination and Portal Monitor

07/20/2016

Corrective Action

Documents

CRs 1146310,

1142330, 1136333,

1133154, 1123196,

1111633, 1137986,

1134933, 1133694

Corrective Action reports

Various

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

and 1133694

Miscellaneous

Memo to

W. Terry,

RPCM from

B. Hilt,

CHP

Surry Unit 2 Characterization of Alpha Source Term for

S2C29

03/25/2020

SU-PROCSU-TEC-

RP-AA-150

MIRION TECH. (GDS) NVLAP 2018-2019 Certificate

undated

SU-PROCSU-TEC-

RP-AA-150

MIRION TECH. (GDS) NVLAP 2019-2020

undated

Procedures

C-HP-1031.011

EXPOSURE CONTROL RECORDS AND REPORTS

Rev. 10

C-HP-1031.023

RWP DOSIMETRY: EXPOSURE CONTROL SUPPORT

Rev. 9

C-HP-1031.024

ADMINISTRATIVE DOSE CONTROL

Rev. 5

C-HP-1031.025

DOSIMETRY REQUIREMENTS FOR SITE RESTRICTED

AREAS

Rev. 11

C-HP-1031.042

COMPUTERIZED PERSONNEL EXPOSURE

MANAGEMENT SYSTEM OPERATION

Rev. 4

C-HP-1031.060

SRD CONTROL AND PERFORMANCE CHECKS

Rev. 2

C-HP-1031.302

CALIBRATION OF ELECTRONIC DOSIMETERS

Rev. 19

HP-1031.043

PERIODIC TLD PREPARATION, EXCHANGE, AND

PROCESSING

Rev. 1

HP-1031.124

PERFORMING EFFECTIVE DOSE EQUIVALENT FROM

EXTERNAL EXPOSURE (EDEX) CALCULATIONS

Rev. 5

HP-1031.304

USE OF DMC USER SOFTWARE TO CONFIGURE, READ,

AND ISSUE ELECTRONIC DOSIMETERS

Rev. 1

HP-1041.046

APEX IN-VIVO WHOLE BODY COUNTER: OPERATION

AND PERFORMANCE CHECKS

Rev. 0

HP-1041.056

APEX IN-VIVO WHOLE BODY COUNTER: WHOLE BODY

COUNTING INDIVIDUALS

Rev. 0

HP-1041.058

WHOLE BODY COUNTING INDIVIDUALS USING THE

GEM-5

Rev. 0

HP-1041.066

APEX IN-VIVO WHOLE BODY COUNTER: CALIBRATION

Rev. 3

RP-AA-104

Internal Radiation Exposure Control Program

Rev. 2

RP-AA-105

External Radiation Exposure Control Program

Rev. 2

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

RP-AA-121

Manual Skin Dose Assessment

Rev. 2

RP-AA-122

Skin Dose Assessment

Rev. 0

RP-AA-123

Effective Dose Equivalent from External Exposure (EDEX)

Rev. 6

RP-AA-124

Dosimetry Investigation and Processing

Rev. 8

RP-AA-131

Whole Body Monitoring

Rev. 2

RP-AA-132

Urine and Fecal Sampling and Analysis

Rev. 1

RP-AA-133

Internal Dose Calculation Based on Radionuclide Intake

Rev. 0

RP-AA-134

Radionuclide Intake Determination Based on Bioassay

Results

Rev. 2

RP-AA-136

Internal Dose Calculations Based on DAC-Hour Exposure

Rev. 0

RP-AA-138

Declared or Expected Pregnant Woman

Rev. 2

RP-AA-230

Personnel Contamination Monitoring and Decontamination

Rev. 12

Self-Assessments PA7483959

External Radiation Exposure Control Program Review

2/18/2019

PA7821763

Internal Radiation Exposure Control Program Review

04/13/2020

Work Order#30204199796

Bioassay Prog. Significant Radionuclide & WBC Action

Level Determination

2-19-2020

71124.05

Calibration

Records

Quality Assurance

Report Detector 2

Daily Source Check of Detector 2

07/09/2020

Quality Assurance

Report Detector 3

Daily Source Check of Detector 3

7/9/2020

Quality Assurance

Report Detector 5

Daily QA Check Detector 5

07/08/2020

Quanta Smart Serial

  1. SGTC09150556

Daily Source Check of Liquid Scintillation Counter

7/98/20

Procedures

0-IPM-CC-RRM-

Vent-001

Radwaste Facility Vent Stack Effluent Monitor Calibration

Revision 9

71151

Miscellaneous

Derivation and Margin Reports for Surry Power Station Unit

& 2 Mitigating System Performance Index Performance

Indicator Emergency AC, High Pressure Injection, Heat

Removal, Residual Heat Removal, and Cooling Water

System inputs

71152

Corrective Action

Documents

CA8067087

CR1149883

24