{{#Wiki_filter:WBN2Public Resource From:                       Poole, Justin Sent:                       Friday, April 08, 2011 4:04 PM To:                         Crouch, William D Cc:                         Clark, Mark Steven; Hilmes, Steven A; WBN2HearingFile Resource
{{#Wiki_filter:1 WBN2Public Resource From:
Poole, Justin Sent:
Friday, April 08, 2011 4:04 PM To:
Crouch, William D Cc:
Clark, Mark Steven; Hilmes, Steven A; WBN2HearingFile Resource


==Subject:==
==Subject:==
FW: Updated OI List Attachments:               20110408 Open Item List Master NRC Update 04-08-11.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Darbali, Samir Sent: Friday, April 08, 2011 4:03 PM To: DeJesus, Jonathan; Poole, Justin Cc: Rahn, David
FW: Updated OI List Attachments:
20110408 Open Item List Master NRC Update 04-08-11.docx JustinC.Poole ProjectManager NRR/DORL/LPWB U.S.NuclearRegulatoryCommission (301)4152048 email:Justin.Poole@nrc.gov From: Darbali, Samir Sent: Friday, April 08, 2011 4:03 PM To: DeJesus, Jonathan; Poole, Justin Cc: Rahn, David  


==Subject:==
==Subject:==
Updated OI List
Updated OI List
: Justin, Attached is the updated Open Items list to be sent to TVA.
: Justin, Attached is the updated Open Items list to be sent to TVA.
: Thanks, Samir Samir Darbali Electronics Engineer NRR/DE/EICB Room: O9D11 3014151360 1
: Thanks, Samir SamirDarbali ElectronicsEngineer NRR/DE/EICB Room:O9D11 3014151360


Hearing Identifier:   Watts_Bar_2_Operating_LA_Public Email Number:         300 Mail Envelope Properties     (19D990B45D535548840D1118C451C74D7F6E4FC1D9)
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
300 Mail Envelope Properties (19D990B45D535548840D1118C451C74D7F6E4FC1D9)  


==Subject:==
==Subject:==
FW: Updated OI List Sent Date:             4/8/2011 4:03:42 PM Received Date:         4/8/2011 4:03:46 PM From:                 Poole, Justin Created By:           Justin.Poole@nrc.gov Recipients:
FW: Updated OI List Sent Date:
4/8/2011 4:03:42 PM Received Date:
4/8/2011 4:03:46 PM From:
Poole, Justin Created By:
Justin.Poole@nrc.gov Recipients:  
"Clark, Mark Steven" <msclark0@tva.gov>
"Clark, Mark Steven" <msclark0@tva.gov>
Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>
Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>
Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                         Size                 Date & Time MESSAGE                       504                   4/8/2011 4:03:46 PM 20110408 Open Item List Master NRC Update 04-08-11.docx                 493388 Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 504 4/8/2011 4:03:46 PM 20110408 Open Item List Master NRC Update 04-08-11.docx 493388 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                             radEB3ED.docx                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR          NRC No.                                                                          Issue                                                    TVA Response(s)                        Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date   RAI Resp. Date                   Comments Sec.      Sec.          POC                                                                                                                                              Y/N B         (
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B
1.
(
001    All      All                A       The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency         12/15/2009 Presentation Slides                                 Y      Closed                       Closed               EICB RAI           3/12/2010         NNC 11/19/09: The FSAR contains B         (
A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides
2.
: 1.
002    All      All                A       Are there I&C components and systems that have changed to a           12/15/2009 Presentation Slides                                 Y       Closed                       Closed               EICB RAI           3/12/2010         NNC 11/19/09: The FSAR contains B         (
Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 002 All All B
3.
(
003    All      All                A        Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides                                       Y       Closed                       Closed               EICB RAI           3/12/2010         NNC 11/19/09: The FSAR contains
A Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides
( ( ( (        B 004     All     All                         Please identify the information that will be submitted for each       Responder: Webb       1/13/10 Public Meeting             4. Y       Closed                       Closed               EICB RAI           January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005   7.1.3.                               By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb                                             5. Y       Closed                       Closed               EICB RAI           TVA Letter dated 006                                         Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3-1 By letter dated February 5, 2010: TVA provided the Unit 2       6. Y       Closed                       Closed               EICB RAI           TVA Letter dated NNC: WCAP-12096 Rev. 7 D D D D 007   7.1.3.                               The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7.           Y       Closed                       Closed               EICB RAI           TVA Letter dated TVA to provide Rev. 8 of the Unit 1
: 2.
(        ( ( ( (
Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 003 All All B
008    7.3                                  There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8.       Y       Closed                       Closed               EICB RAI           TVA Letter dated a a a a        (
(
009   7.3.2   5.6,                         Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9.         Y       Closed                       Closed               EICB RAI           3/12/10, G        G G G G 010     7.3     7.3                         The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10.           Y       Closed                       Closed               EICB RAI           3/12/10, 011   7.3.2   5.6,                         NUREG-0847 Supplement No. 2 Section 7.3.2 includes an                 TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11.           Closed                       Closed               EICB RAI           ML101680598, A
A Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides
Y 012     7.4     7.4                         The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 12.           Y       Closed                       Closed               EICB RAI           TVA Letter dated 013   7.1.3.                               Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not           TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 13. Y       Closed                       Closed               EICB RAI           TVA Letter dated TS have been docketed.
: 3.
(        (    B 014    All     All                         Provide the justification for any hardware and software changes       Date: 4/27/10                                             14. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 015                                         Verify that the refurbishment of the power range nuclear             Date: 4/27/10                                             15. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 016                                         Identify the precedents in license amendment requests (LARs), if     Date: 4/27/10                                             16. Y         Closed                       Closed               NRC Meeting       TVA Letter dated
Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 004 All All B
(  D        D (
(
017   7.3.1   7.3.1,                       Identify precedents in LARs, if any, for the solid state protection   Date: 4/27/10                                             17. Y         Closed                       Closed               NRC Meeting       TVA Letter dated
A Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting
(  ( ( ( (    (
: 4.
018                                          Identify any changes made to any instrumentation and control         Date: 4/27/10                                             18. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 019                                         Verify that the containment purge isolation radiation monitor is the Date: 4/27/10                                             19. Y         Closed                       Closed               NRC Meeting       TVA Letter dated C  a        a C  (
Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005 7.1.3.
020                                          Provide environmental qualification information pursuant to Section Date: 4/27/10                                               20. Y         Closed                       Closed               NRC Meeting       TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
(
G  G G G G    G 021             7.3                         For the Foxboro Spec 200 platform, identify any changes in           Date: 5/25/10                                             21. Y         Closed                       Closed               NRC Meeting       TVA Letter dated The resolution of this item will be A
G By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb
022   7.3.2   5.6,                         Verify the auxiliary feedwater control refurbishment results in a like- Date: 4/27/10                                           22. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 023                                         Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                               23. Y         Closed                       Closed               NRC Meeting       TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
: 5.
024                                         Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a         24. Y         Closed                       Closed               NRC Meeting       N/A - Request for NNC 4/30/10: Carte to address
Y Closed Closed EICB RAI TVA Letter dated 006
( ( (  (  (  (
(
025   7.5.2   7.5.1                       For the containment radiation high radiation monitor, verify that the Date: 4/27/10                                             25. Y         Closed                       Closed               NRC Meeting       ML101230248, 026                                         Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                               26. Y         Closed                       Closed               NRC Meeting       TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
G Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3-1 By {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}}: TVA provided the Unit 2
(      (  (  (
: 6.
027   7.7.1.                               For Foxboro I/A provide information regarding safety/non-safety-     Date: 4/27/10                                             27. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 028                                         For the turbine control AEH system, verify that the refurbishment     Responder: Mark Scansen                                   28. Y         Closed                       Closed               NRC Meeting       TVA Letter dated C C C  C  C  S 029                                          For the rod control system, verify that the refurbishment results in a Date: 4/27/10                                           29. Y         Closed                       Closed               NRC Meeting       TVA Letter dated G       G  G  G 030                                          Regarding the refurbishment of I&C equipment, identify any           Responder: Clark                                         30. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 031                                         For the rod position indication system (CERPI), provide information Date: 4/27/10                                               31. Y         Closed                       Closed               NRC Meeting       TVA Letter dated CERPI is non-safety related.
Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.
i 032                                         For the process computer, need to consider cyber security issues     Date: 4/27/10                                             32. Y         Closed                       Closed               NRC Meeting       TVA Letter dated EICB will no longer consider cyber 033                                         For the loose parts monitoring system, provide information           Date: 4/27/10                                             33. Y         Closed                       Closed               NRC Meeting       TVA Letter dated The loose parts monitoring system is 034                                         2/4/2010                                                             Responder: TVA                                           34. Y         Closed                       Closed               N/A               TVA Letter dated 034.                       (                    Chapter 7.1 - Introduction                                                                                                   35. Y         Closed                       Closed               N/A               N/A
(
(     a 034.                      D                    Chapter 7.2 - Reactor Trip System                                                                                           36. Y         Closed                       Closed               N/A               N/A M  ( r 034. 7.3     7.3       a                   Chapter 7.3 - ESFAS                                                                                                         37. Y         Closed                       Closed               N/A               N/A a  G g 034. 7.5.1. 7.5.2                           Chapter 7.5 - Instrumentation Systems Important to Safety                                                                   38. Y         Closed                       Closed               N/A               N/A               Closed 034. 7.5.1. 7.5.2                           Chapter 7.6 - All Other Systems Required for Safety                                                                          39. Y        Closed                        Closed              N/A                N/A                Closed r
G The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7.
Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008 7.3
(
G There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8.
Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6,
(
D a
Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9.
Y Closed Closed EICB RAI 3/12/10, 010 7.3 7.3
(
D a
The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10. Y Closed Closed EICB RAI 3/12/10, 011 7.3.2 5.6,
(
D a
NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11. Y Closed Closed EICB RAI ML101680598, 012 7.4 7.4
(
D a
The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.
(
G Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.
014 All All B
(
A Provide the justification for any hardware and software changes Date: 4/27/10
: 14. Y Closed Closed NRC Meeting TVA Letter dated 015
(
G Verify that the refurbishment of the power range nuclear Date: 4/27/10
: 15. Y Closed Closed NRC Meeting TVA Letter dated 016
(
C Identify the precedents in license amendment requests (LARs), if Date: 4/27/10
: 16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1,
(
D a
Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10
: 17. Y Closed Closed NRC Meeting TVA Letter dated 018
(
G Identify any changes made to any instrumentation and control Date: 4/27/10
: 18. Y Closed Closed NRC Meeting TVA Letter dated 019
(
G Verify that the containment purge isolation radiation monitor is the Date: 4/27/10
: 19. Y Closed Closed NRC Meeting TVA Letter dated 020
(
G Provide environmental qualification information pursuant to Section Date: 4/27/10
: 20. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
021 7.3
(
G For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10
: 21. Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be 022 7.3.2 5.6,
(
D a
Verify the auxiliary feedwater control refurbishment results in a like-Date: 4/27/10
: 22. Y Closed Closed NRC Meeting TVA Letter dated 023
(
G Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10
: 23. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
024
(
C Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a
: 24. Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address 025 7.5.2 7.5.1
(
S i
For the containment radiation high radiation monitor, verify that the Date: 4/27/10
: 25. Y Closed Closed NRC Meeting ML101230248, 026
(
G Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10
: 26. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
027 7.7.1.
(
C For Foxboro I/A provide information regarding safety/non-safety-Date: 4/27/10
: 27. Y Closed Closed NRC Meeting TVA Letter dated 028
(
G For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen
: 28. Y Closed Closed NRC Meeting TVA Letter dated 029
(
C For the rod control system, verify that the refurbishment results in a Date: 4/27/10
: 29. Y Closed Closed NRC Meeting TVA Letter dated 030
(
G Regarding the refurbishment of I&C equipment, identify any Responder: Clark
: 30. Y Closed Closed NRC Meeting TVA Letter dated 031
(
C For the rod position indication system (CERPI), provide information Date: 4/27/10
: 31. Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.
032
(
C For the process computer, need to consider cyber security issues Date: 4/27/10
: 32. Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber 033
(
C For the loose parts monitoring system, provide information Date: 4/27/10
: 33. Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is 034
(
G 2/4/2010 Responder: TVA
: 34. Y Closed Closed N/A TVA Letter dated 034.
a r
g Chapter 7.1 - Introduction
: 35. Y Closed Closed N/A N/A 034.
(
G Chapter 7.2 - Reactor Trip System
: 36. Y Closed Closed N/A N/A 034.
7.3 7.3
(
D a
Chapter 7.3 - ESFAS
: 37. Y Closed Closed N/A N/A 034.
7.5.1.
7.5.2
(
M a
Chapter 7.5 - Instrumentation Systems Important to Safety
: 38. Y Closed Closed N/A N/A Closed 034.
7.5.1.
7.5.2 r
c u
c u
034.                                           Chapter 7.7 Control Systems                                                                                                 40. Y         Closed                       Closed               N/A               N/A n
Chapter 7.6 - All Other Systems Required for Safety
g h
: 39. Y Closed Closed N/A N/A Closed 034.
                        /
n g
035                        (                2/18/2010                                                             Responder: Clark                                         41. Y         Closed                       Closed               RAI No. 1         TVA Letter dated LIC-110 Section 6.2.2 states: Design
h
( (
/
M 036   7.5.2   7.5.1       C S            February 18, 2010                                                     Date: 5/25/10                                             42. Y         Closed                       Closed               NRC Meeting                           NNC: Unit 2 FSAR Section 7.5.1, Post a
Chapter 7.7 Control Systems
i 037   7.5.1. 7.5.2                       2/18/2010                                                             Responder: Clark                 Date: 5/25/10           43. Y         Closed                       Closed               N/A               TVA Letter dated FSAR Amendment 100 provides
: 40. Y Closed Closed N/A N/A 035
(
S i
2/18/2010 Responder: Clark
: 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design 036 7.5.2 7.5.1
(
C February 18, 2010 Date: 5/25/10
: 42. Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post 037 7.5.1.
7.5.2
(
M a
2/18/2010 Responder: Clark Date: 5/25/10
: 43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 radEB3ED.docx                                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR        NRC No.                                                                    Issue                                                    TVA Response(s)                            Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date     RAI Resp. Date                 Comments Sec.      Sec.      POC                                                                                                                                                Y/N 038   7.5.1. 7.5.2       (             2/18/2010                                                         Responder: Clark           Date: 5/25/10                     44. Y         Closed                         Closed                     EICB RAI           TVA Letter dated The slides presented at the December 039                   ( ( M              January 13, 2010                                                 Responder: Clark                     Date: 5/25/10             45. Y         Closed                         Closed                     EICB RAI           FSAR amendment The equation for the calculation of the G G a 040                                      January 13, 2010                                                 Responder: Clark                     Date: 5/25/10             46. Y         Closed                         Closed                     EICB RAI EICB RAI FSAR amendment The equation for the calculation of the 041   7.5.2   7.5.1                     2/19/2010                                                        Responder: WEC                                                1. N        Open                            Open-NRC Review            NRC Meeting        TVA Letter dated See also Open Item Nos. 226 & 270.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.
EICB (Carte)
7.5.2
Summary NRC        6/18/10 Please provide the following Westinghouse documents:             Items (1) and (2) were docketed by TVA letter dated April 8,                Pending Submittal of the Test  Due 3/29/11                Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements           2010.                                                                        Summary Report due 3/29/11                                ML093560019, Item  TVA Letter dated Specification"                                                                                                                                                                 NNC 1/27/11: Issues      No. 11              10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design                 Item (3) will be addressed by Revision 2 of the Licensing                    Final Response included in      with the STP were Specification"                                                   Technical Report. Due 12/3/10                                                letter dated 12/3/10            discussed in the weekly (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g"                                                                                                                         public meetings.
(
Please provide the following Westinghouse documents or pointers   Item (4) will be addressed by Westinghouse developing a                      Partial Response is included in Westinghouse to:
M a
to where the material was reviewed and approved in the CQ TR or   WBN2 Specific Test Plan to compensate for the fact that the                  letter dated 10/5/10.            (1) perfrom STP self SPM:                                                             NRC disapproved WNA-PT-00058-GEN during the original                        The SysRS and SRS                assessment., and (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q       Common Q review. Due 12/7/10                                                incorporate requirements from (2) Augment Test Safety systems"                                                                                                                               many other documents by          Summary report to (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test               Item (5) Procedures that are listed in the SPM compliance                   reference.                      provide missing test Procedure"                                                        table in the Licensing Technical Report revision 1 supersede                                                 plan information that test procedure WNA-TP-00357-GEN.Due 10/22/10                           NNC 8/25/10: (3) An earlier version of this report was      NNC 2/3/11: At next For Item 3, Attachment 19 contains the Westinghouse                         docketed for the Common Q        audit compare &
2/18/2010 Responder: Clark Date: 5/25/10
document Post-Accident Monitoring System (PAMS)                             topical report; therefore, there discuss:
: 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039
Licensing Technical Report, WNA-LI-00058-WBT, Revision                     should be no problem to docket (1) WNA-PT-00058-2, dated December 2010. Attachment 20 contains the                           this version. (4) Per            GEN Rev. 0 Westinghouse Application for Withholding for the Post-                      ML091560352, the testing        (2) WNA-PT-00138-Accident Monitoring System (PAMS) Licensing Technical                       process document does not        WBT Rev. 0 Report, WNA-LI-00058-WBT, Revision 2, dated December                       address the test plan            (3) AP1000 STP 2010.                                                                        requirements of the SPM.
(
Please provide a test plan that For Item 4, Attachment 9 contains the Westinghouse                           implements the requirements of document Nuclear Automation Watts Bar 2 NSSS                               the SPM.
G January 13, 2010 Responder: Clark Date: 5/25/10
Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
: 45. Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the 040
(
G January 13, 2010 Responder: Clark Date: 5/25/10
: 46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents:
(1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM:
(4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA {{letter dated|date=April 8, 2010|text=letter dated April 8, 2010}}.
Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10 Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10 For Item 3, Attachment 19 contains the Westinghouse document Post-Accident Monitoring System (PAMS)
Licensing Technical Report, WNA-LI-00058-WBT, Revision 2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the Post-Accident Monitoring System (PAMS) Licensing Technical Report, WNA-LI-00058-WBT, Revision 2, dated December 2010.
For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
(1) WEC presented the results of the self assessment to the NRC on February 2, 2011.
(1) WEC presented the results of the self assessment to the NRC on February 2, 2011.
(2) By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with the STP. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
(2) By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with the STP. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
B        (
: 1.
: 47. Y 042   All     All             A       February 25, 2010: Telecom                                       Date: 5/25/10                                                               Closed                         Closed                     EICB RAI           TVA Letter dated The drawing provided did not have the 043   7.5.2   7.5.1   CB (C                 2/19/2010                                                         Responder: WEC                                                 2. N       Open                           Open-NRC Review           EICB RAI           TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 art                                                                                              Date: 5/25/10                                                                                                              ML102910002        2/5/10          compliance matrix was docketed on: (1)
N Open Pending Submittal of the Test Summary Report due 3/29/11 Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.
The SysRS and SRS incorporate requirements from many other documents by reference.
NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there should be no problem to docket this version. (4) Per ML091560352, the testing process document does not address the test plan requirements of the SPM.
Please provide a test plan that implements the requirements of the SPM.
Open-NRC Review Due 3/29/11 NNC 1/27/11: Issues with the STP were discussed in the weekly public meetings.
Westinghouse to:
(1) perfrom STP self assessment., and (2) Augment Test Summary report to provide missing test plan information NNC 2/3/11: At next audit compare &
discuss:
(1) WNA-PT-00058-GEN Rev. 0 (2) WNA-PT-00138-WBT Rev. 0 (3) AP1000 STP NRC Meeting Summary NRC Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.
042 All All B
(
A February 25, 2010: Telecom Date: 5/25/10
: 47. Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the 043 7.5.2 7.5.1 CB (C
art 2/19/2010 Responder: WEC Date: 5/25/10
: 2.
N Open Open-NRC Review EICB RAI ML102910002 TVA Letter dated 2/5/10 NNC 8/25/10: A CQ PAMS ISG6 compliance matrix was docketed on: (1)  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                       radEB3ED.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                                    Issue                                                        TVA Response(s)                      Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                        Y/N The PAMS ISG6 compliance matrix supplied as Enclosure 1 to                                                                                     Pending Submittal of Revision 3 Due 3/29/11                Item No. 2                        February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information The PAMS ISG6 compliance matrix supplied as Enclosure 1                  of the Licensing Technical                                                    TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: to TVA letter dated February 5, 2010 is a first draft of the              Report due 3/29/11.                NNC 2/2/11: Issues                        5/12/10          expressed issued with all of these information needed.                                                                                          with Common Q TR &                                        compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a                                                                               Revised response included in SPM compliance were                              TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not         By letter dated April 8, 2010 TVA provided the PAMS                      letter dated 12/22/10.              discussed in the weekly                  6/18/10          evaluation.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}} is a first draft of the information needed. The shortcomings of the first three lines in the matrix are:
approved in the associated SE. Westinghouse stated that this was Licensing Technical Report provided additional information.                                                      public meetings.
Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed and approved.
the program and it could now be reviewed. The NRC stated that                                                                                 Response is included in letter Westinghouse to                                TVA Letter dated NNC 11/23/10: WNA-LI-00058-WT-P TVA should identified what they believe was previously reviewed Attachment 3 contains the revised Common Q PAMS ISG-6                          dated 10/5/10.                      perform Common Q TR                      10/5/10          Rev. 1 Section 7 does not include the and approved.                                                         Compliance Matrix, dated June 11, 2010, that addresses                                                      & SPM compliance self                                      RSED documents, and it should. Table these items (Reference 13).                                              Revised compliance matrix is        assessment; his will be                                    6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS,                                                                                 unacceptable.                      discussed in detail on                                    RSED RTMs.
Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.
but provided no justification. The NRC asked for justification since By letter Dated June 18, 2010 (see Attachment 3) TVA                                                          the next audit.
Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.
SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as           provided a table, "Watts Bar 2 - Common Q PAMS ISG-6                    NNC 8/12/10: It is not quite being SRP acceptance criteria for PAMS.                               Compliance Matrix."                                                      enough to provide all of the documents requested. There Line 3: TVA identified that the Design report for computer integrity It is TVAs understanding that this comment is focused on                are two possible routes to was completed as part of the common Q topical report. The NRC         the fact that there are documents that NRC has requested                review that the NRC can noted that this report is applicable for a system in a plant, and the that are currently listed as being available for audit at the            undertake: (1) follow ISG6, and CQ topical report did no specifically address this PAMS system at     Westinghouse offices. For those Common Q PAMS                           (2) follow the CQ SPM. The Watts Bar Unit 2.                                                     documents that are TVA deliverable documents from                       TVA response that was Westinghouse, TVA has agreed to provide those to NRC.                   originally pursued was to follow NRC then concluded that TVA should go through and provide a          Westinghouse documents that are not deliverable to TVA will             ISG6, but some of the more complete and thorough compliance matrix.                        be available for audit as stated above. Requirements                     compliance items for ISG6 were Traceability Matrix issues will be tracked under NRC RAI                 addressed by referencing the Matrix Items 142 (Software Requirements Specification) and               SPM. The NRC approved the 145 (System Design Specification). Commercial Item                       CQ TR and associated SPM; it Dedication issues will be tracked under NRC RAI Matrix                   may be more appropriate to Item 138. This item is considered closed.                               review the WBN2 PAMS application to for adherence to TVA Response to Follow-up NRC Request:                                   the SPM that to ISG6. In either path chosen, the applicant WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring                 should provide documents and a System (PAMS) Licensing Technical Report submitted in                   justification for the acceptability TVA Letter to NRC dated December 3, 2010, (Reference 1)                 of any deviation from the path contains the following changes to address the NRC                       chosen. For example, it requests:                                                               appears that the Westinghouse's CDIs are (1) While RSEDs are not specifically mentioned, Section 7               commercial grade dedication has been revised to be applicable to both hardware and           plans, but Westinghouse software which includes the RSEDs.                               maintains that they are (2) Table 6-1 item 15 reference added for WNA-VR-00280-                 commercial grade dedication WBT (RESD)                                                       reports; this apparent deviation should be justified or explained.
NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix.
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}} is a first draft of the information needed.
By {{letter dated|date=April 8, 2010|text=letter dated April 8, 2010}} TVA provided the PAMS Licensing Technical Report provided additional information.
contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).
By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."
It is TVAs understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC.
Westinghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and software which includes the RSEDs.
(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD)
TVA Response to Second Follow-up NRC Request:
TVA Response to Second Follow-up NRC Request:
The NRC audited the Westinghouse commercial item dedication process for both hardware and software during the week of February 28 to March 4, 2011. The audif found the processes acceptable. Westinghouse and TVA previously agreed to provide additional information to address this item in Revision 3 of the Licensing Technical Report.
The NRC audited the Westinghouse commercial item dedication process for both hardware and software during the week of February 28 to March 4, 2011. The audif found the processes acceptable. Westinghouse and TVA previously agreed to provide additional information to address this item in Revision 3 of the Licensing Technical Report.
Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).
contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary). contains WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Attachment 3 contains WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical
Revised response included in letter dated 12/22/10.
Response is included in letter dated 10/5/10.
Revised compliance matrix is unacceptable.
NNC 8/12/10: It is not quite enough to provide all of the documents requested. There are two possible routes to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.
Due 3/29/11 NNC 2/2/11: Issues with Common Q TR &
SPM compliance were discussed in the weekly public meetings.
Westinghouse to perform Common Q TR
& SPM compliance self assessment; his will be discussed in detail on the next audit.
Item No. 2 TVA Letter dated 5/12/10 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 February, 5 12010, (2) March 12, 2010,
& (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.
NNC 11/23/10: WNA-LI-00058-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radEB3ED.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                  Issue                                                    TVA Response(s)                            Acceptable       Status/ Current Actions       Resolution Path         RAI No. & Date     RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                  Y/N Report, Revision 3 dated March 2011 (non-proprietary).
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Report, Revision 3 dated March 2011 (non-proprietary). contains CWA-11-311, Application for Withholding Proprietary Information from Public Disclosure, WNA-LI-00058-WBT-P, Revision 3 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post-Accident Monitoring System (PAMS) Licensing Technical Report, dated March 14, 2011.
Attachment 4 contains CWA-11-311, Application for Withholding Proprietary Information from Public Disclosure, WNA-LI-00058-WBT-P, Revision 3 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post-Accident Monitoring System (PAMS) Licensing Technical Report, dated March 14, 2011.
044 7.5.2 7.5.1
( ( ( ( ( ( (
(
044  7.5.2   7.5.1                     February 25, 2010                                               Date: 5/25/10                                                   48. Y         Closed                       Closed                   EICB RAI           TVA Letter dated 045                                    February 25, 2010                                               Date: 5/25/10                                                   49. Y         Closed                       Closed                   EICB RAI           TVA Letter dated
C February 25, 2010 Date: 5/25/10
: 48. Y Closed Closed EICB RAI TVA Letter dated 045
(
C February 25, 2010 Date: 5/25/10
: 49. Y Closed Closed EICB RAI TVA Letter dated 046
(
C February 25, 2010 Date: 5/25/10
: 50. Y Closed Closed N/A - Request for N/A 047 7.5.2 7.5.1
(
C 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10
: 51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1
(
C April 8, 2010 Date: 5/25/10
: 52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1
(
C 4/8/2010 Responder: WEC Date: 5/25/10
: 53. Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1
(
C 4/8/2010 Responder: WEC Date: 5/25/10
: 54. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains 051
(
G April 15, 2010 Date: 5/25/10
: 55. Y Closed Closed N/A N/A Review addressed by another Open 052 7.5.2 7.5.1
(
S i
April 19, 2010 Date: 5/25/10
: 56. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1
(
S i
April 19, 2010 Date: 5/25/10
: 57. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1
(
S i
4/19/2010 Responder: Slifer/Clark Date: 5/25/10
: 58. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1
(
S i
4/19/2010 Responder: Slifer/Clark Date: 5/25/10
: 59. Y Closed Closed RAI No. 15 TVA Letter dated 056
(
S i
April 19, 2010 Date: 5/25/10
: 60. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring 057 7.5.2 7.5.1
(
S i
4/19/2010 Responder: TVA I&C Staff Date: 5/25/10
: 61. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5
(
(
046                                    February 25, 2010                                                Date: 5/25/10                                                  50. Y        Closed                        Closed                    N/A - Request for  N/A C C C C C C C 047  7.5.2  7.5.1                    4/8/2010                                                        Responder: WEC/Hilmes              Date: 5/25/10                51. Y        Closed                        Closed                    EICB RAI            TVA Letter dated 048  7.5.2  7.5.1                    April 8, 2010                                                   Date: 5/25/10                                                   52. Y        Closed                        Closed                    EICB RAI            TVA Letter dated G
S i
049  7.5.2  7.5.1                    4/8/2010                                                        Responder: WEC            Date: 5/25/10                        53. Y         Closed                       Closed                   EICB RAI           TVA Letter dated 050  7.5.2   7.5.1                     4/8/2010                                                        Responder: WEC                  Date: 5/25/10                  54. N        Closed                        Closed                    EICB RAI            TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains 051                                    April 15, 2010                                                  Date: 5/25/10                                                  55. Y        Closed                        Closed                    N/A                N/A                Review addressed by another Open
April 19, 2010 Date: 5/25/10
: 62. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1
(
(
052  7.5.2  7.5.1                    April 19, 2010                                                   Date: 5/25/10                                                  56. Y         Closed                       Closed                   RAI No. 12 S
S i
i
April 19, 2010 Date:
: 63. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1
(
(
053  7.5.2  7.5.1                    April 19, 2010                                                   Date: 5/25/10                                                   57. Y         Closed                       Closed                   RAI No. 13 S
C April 19, 2010 Date: 5/25/10
i
: 64. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1
(
(
054  7.5.2  7.5.1                    4/19/2010                                                       Responder: Slifer/Clark            Date: 5/25/10               58. Y         Closed                       Closed                   RAI No. 14          TVA Letter dated S
C April 19, 2010 Date: 5/25/10
i
: 65. Y Closed Closed N/A N/A Addressed by Open Item No. 48 062 7.5.2 7.5.1
(
(
055  7.5.2  7.5.1                    4/19/2010                                                       Responder: Slifer/Clark            Date: 5/25/10               59. Y         Closed                       Closed                   RAI No. 15          TVA Letter dated S
C April 19, 2010 Date: 5/25/10
i
: 66. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1
(
(
056                                    April 19, 2010                                                   Date: 5/25/10                                                   60. Y         Closed                       Closed                   RAI No. 16          TVA Letter dated Sorrento Radiation Monitoring S
C April 19, 2010 Date: 5/25/10
i
: 67. Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1
(
(
057  7.5.2  7.5.1                    4/19/2010                                                       Responder: TVA I&C Staff                Date: 5/25/10          61. Y         Closed                       Closed                   RAI No. 17          TVA Letter dated S
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: Webb Date: 4/8/2010
i
: 68. Y Closed Closed N/A - No question TVA Letter dated 065 7.5.2 7.5.1
(
(
058  7.5.0    7.5                      April 19, 2010                                                  Date: 5/25/10                                                  62. Y        Closed                        Closed                    RAI No. 18          TVA Letter dated S
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
i
: 69. Y Closed Closed N/A - No question TVA Letter dated 066 7.5.2 7.5.1
( ( ( ( ( ( ( (
(
059  7.5.2  7.5.1                    April 19, 2010                                                  Date:                                                          63. Y        Closed                        Closed                    RAI No. 19          TVA Letter dated 060  7.5.2  7.5.1                    April 19, 2010                                                  Date: 5/25/10                                                  64. Y        Closed                        Closed                    N/A                N/A                Addressed by Open Item No. 47 061  7.5.2  7.5.1                    April 19, 2010                                                  Date: 5/25/10                                                  65. Y        Closed                        Closed                    N/A                N/A                Addressed by Open Item No. 48 C C C C C C C S 062  7.5.2  7.5.1                    April 19, 2010                                                  Date: 5/25/10                                                  66. Y        Closed                        Closed                    N/A                N/A                Addressed by Open Item No. 49 063  7.5.2  7.5.1                    April 19, 2010                                                  Date: 5/25/10                                                  67. Y        Closed                        Closed                    N/A                N/A                Addressed by Open Item No. 50 i
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
064  7.5.2  7.5.1                    By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb  Date: 4/8/2010                            68. Y        Closed                        Closed                    N/A - No question  TVA Letter dated 065  7.5.2  7.5.1                    By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC         Date: 5/25/10                       69. Y         Closed                       Closed                   N/A - No question   TVA Letter dated 066   7.5.2   7.5.1                     By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC               Date: 5/25/10                 70. Y         Closed                       Closed                   N/A - No question   TVA Letter dated 067   7.5.2   7.5.1                     By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10            3. N        Open                          Open-NRC Review          N/A - No question TVA Letter dated EICB (Carte) date for the "Commercial Grade Dedication Instructions for AI687,                                                                                                           Due: 3/29/11            was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September         The following status is from the revised WB2 Common Q                     Pending Submittal of Revision 3                        was opened to track 28, 2010.                                                          PAMS ISG-6 Compliance Matrix submitted in response to                     of the Licensing Technical                            comm8ittment Item 43:                                                                   Report due 3/29/11.              NNC 2/2/11: Section 7 made by applicant.
: 70. Y Closed Closed N/A - No question TVA Letter dated 067 7.5.2 7.5.1 EICB (Carte)
of the WBN2 PAMS
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.
: a. AI687, AI688 - Scheduled for September 28, 2010                           Response included in letter      LTR should be updated dated 12/22/10.                  to include:
Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: b. Upgraded PC node box and flat panel displays - Per                                                         (1) non-proprietary Westinghouse letter WBT-D-2024 (Reference 7), these items                     This item is addressed in Rev. 2 description of are available for audit at the Westinghouse Rockville office.                 of the Licensing Technical      commercial grade Report                          dedication, and
: a. AI687, AI688 - Scheduled for September 28, 2010
: c. Power supplies - Per Westinghouse letter WBT-D-2035                                                         (2) Software example (Reference 12), these items are available for audit at the Westinghouse Rockville office.                                                                             Commercial grade dedication will also be To be addressed during 9/20-9/21 audit                                                                     addressed at the next audit.
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
TVA Response to Follow-up NRC Request:
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:
: 3.
N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Response included in letter dated 12/22/10.
This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review Due: 3/29/11 NNC 2/2/11: Section 7 of the WBN2 PAMS LTR should be updated to include:
(1) non-proprietary description of commercial grade dedication, and (2) Software example Commercial grade dedication will also be addressed at the next audit.
N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
TVA Letter dated 6/18/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radEB3ED.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                            Acceptable       Status/ Current Actions         Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                                Y/N WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
TVA Response to Follow-up NRC Request dated 2/2/11:
TVA Response to Follow-up NRC Request dated 2/2/11:
The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)
The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)
Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.
Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.
068   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10            4. N        Open                            Open-NRC Review          N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688,                                                                                                                                             was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was         The following status is from the revised WB2 Common Q                     Response included in letter      NNC 2/2/11:            was opened to track September 28, 2010.                                                PAMS ISG-6 Compliance Matrix submitted in response to                     dated 12/22/10.                  Commercial grade        comm8ittment Item 43:                                                                                                   dedication will be      made by applicant.
068 7.5.2 7.5.1 EICB (Carte)
addressed at the next
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.
: a. AI687, AI688 - Scheduled for September 28, 2010                           This item is addressed in Rev. 2 audit. Summary of the Licensing Technical      reports for AI687 &
Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: b. Upgraded PC node box - Per Westinghouse letter WBT-                       Report                          AI688 were docketed D-2024 (Reference 7), this item is available for audit at the                                                 one month late.
: a. AI687, AI688 - Scheduled for September 28, 2010
Westinghouse Rockville office.
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
Line 166: Line 417:
(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -
(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -
Instrumentation and Controls Staff Information
Instrumentation and Controls Staff Information
: 4.
N Open Response included in letter dated 12/22/10.
This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review NNC 2/2/11:
Commercial grade dedication will be addressed at the next audit. Summary reports for AI687 &
AI688 were docketed one month late.
N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
TVA Letter dated 6/18/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                 radEB3ED.docx                                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                      Issue                                                  TVA Response(s)                          Acceptable     Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                    Y/N Requests, (Reference 5):
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Requests, (Reference 5):
: a. EQ-EV-62-WBT, Revision 0, Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)
: a.
EQ-EV-62-WBT, Revision 0, Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)
Requirements, dated September 10, 2010
Requirements, dated September 10, 2010
: b. EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &
: b.
EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &
AI688 Modules for use in Common Q PAMS, dated September 10, 2010
AI688 Modules for use in Common Q PAMS, dated September 10, 2010
: c. CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: c.
: a. CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction
CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: a.
: a. CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction
CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction
: b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
: b.
: a. CDI- 4057, Revision 4, Commercial Dedication Instruction
LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: b. EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter
: a.
: c. Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit
CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction
: d. EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter Assemblies 069   7.5.2   7.5.1   CB (C   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC           Date: 5/25/10                 5. N       Open                         Open-NRC Review     N/A - No question   N/A art  date for the "Watts Bar 2 PAMS Specific FAT Report" was October                                                                                                          Due 3/29/11          was asked. Item
: b.
LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
: a.
CDI-4057, Revision 4, Commercial Dedication Instruction
: b.
EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter
: c.
Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit
: d.
EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter Assemblies 069 7.5.2 7.5.1 CB (C
art By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October Responder: WEC Date: 5/25/10
: 5.
N Open Open-NRC Review Due 3/29/11 N/A - No question was asked. Item N/A


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radEB3ED.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                          Acceptable       Status/ Current Actions           Resolution Path         RAI No. & Date       RAI Resp. Date                   Comments Sec. Sec. POC                                                                                                                                                      Y/N 2010.                                                           Attachment 1 contains non-proprietary WNA-TR-02451-                                Pending Submittal of the Test                              was opened to track WBT, Revision 0, Test Summary Report for the Post                                Summary Report due 3/29/11        NNC 2/3/11: The          comm8ittment As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be Accident Monitoring System, dated March 2011.                                                                      current due dated        made by applicant.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 2010.
submitted. Instead a non-proprietary PAMS Test Summary Report                                                                                     Awaiting for document to be      above is 4 months will be submitted.                                                                                                                                 docketed by TVA.                  later than planned.
As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be submitted. Instead a non-proprietary PAMS Test Summary Report will be submitted. contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
( ( ( (
Pending Submittal of the Test Summary Report due 3/29/11 Awaiting for document to be docketed by TVA.
070  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10                  71. N        Closed                            Closed                    N/A - No question    TVA Letter dated NNC 11/23/10: The dues date in this 071  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC              Date: 5/25/10                      72. N        Closed                            Closed                    N/A - No question    N/A                NNC 11/23/10: The dues date in this C C C C 072  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10                  73. Y        Closed                            Closed                    N/A - No question    N/A 073  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10                  74. N        Closed                            Closed                    N/A - No question    N/A 074  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10                  6.      N        Open                              Open-NRC Review    N/A - No question N/A                          Rev. 4 will be available for the NRC EICB (Carte) date for the Post FAT IV&V Phase Summary Report was                                                                                                                                                      was asked. Item                                audit on 2/28/11. This document will not November 30, 2010.                                                  Attachment 1 contains WNA-VR-00283-WBT-P, IV&V                                Response in letter dated March Due TBD                was opened to track                            be submitted. Rev. 5 will be submitted Summary Report for the Post Accident Monitoring System,                       16, 2011                                             commitment made                                after resolution of the datastorm display Revision 4, dated March 2011 (proprietary). Attachment 2                                                      NNC 2/3/11: At least 3 by applicant.                                  issue.
NNC 2/3/11: The current due dated above is 4 months later than planned.
contains WNA-VR-00283-WBT-NP, IV&V Summary Report                                                            months later than for the Post Accident Monitoring System, Revision 4, dated                                                  planned.
was opened to track comm8ittment made by applicant.
March 2011 (non-proprietary). Attachment 3 contains CWA-11-3121, Application for Withholding Proprietary Information from Public Disclosure, WNA-VR-00283-WBT-P, Revision 4 Nuclear Automation IV&V Summary Report for the Post Accident Monitoring System" (Proprietary), dated March 3, 2011.
070 7.5.2 7.5.1
( ( (
075  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10                    75. N        Closed                            Closed                    N/A - No question    N/A
( (
076  7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark                  Date: 5/25/10                  76. Y        Closed                            Closed                    N/A - No question    N/A C C C 077  7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                      Date: 5/25/10              77. Y        Closed                            Closed                    N/A - No question    TVA Letter dated G G 078                                  4/26/2010                                                              Responder: Clark                Date: 5/25/10              78. Y        Closed                            Closed                    EICB RAI              TVA Letter dated 079                                  4/26/2010                                                              Responder: Clark                  Date: 5/25/10            79. Y        Closed                            Closed                    EICB RAI              TVA Letter dated Reviewed under Item 154
(
(
080                                  4/26/2010                                                               Responder: WEC                                               80. Y        Closed                           Closed                   RAI No. 2             TVA Letter dated S
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
i 081  7.5.2   7.5.1                   5/6/2010                                                               Responder: Merten/WEC                                        7. N       Open                             Open-NRC Review           EICB RAI             TVA Letter dated NNC 1/5/11: See Also Open Item No.
: 71. N Closed Closed N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this 071 7.5.2 7.5.1
EICB (Carte)
(
ML102910002          6/18/10          86 and 202.
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.             The codes and standards documents listed in Section 7 of                  ML101600092 Item No.1: There Due 2/25/11                    Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards           the Common Q PAMS Licensing Technical Report are the                      are three sets of regulatory applicable to the Common Q PAMS. This list contains references         documents that the Common Q platform was licensed to                      criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example:         when the NRC approved the original topical report and                      Q application (e.g. WBN2          requested information.
: 72. N Closed Closed N/A - No question N/A NNC 11/23/10: The dues date in this 072 7.5.2 7.5.1
(1) RG 1.29 - September 1978 vs. March 2007                             issued the approved SER. The WBN Unit 2 Common Q                          PAMS):
(
(2) RG 1.53 - June 1973 vs. November 2003                               PAMS is designed in accordance with the approved                          (a) Common Q platform              NNC 2/3/11: The (a) IEEE 379-1994 vs. -2000                                             Common Q topical report and approved SER and the codes                    components - Common Q TR above due date has (3) RG 1.75 - September 1975 vs. February 2005                         and standards on which the SER was based. Since the                        (b) Application Development        been missed by at (a) IEEE 384-1992 vs. -1992                                             current versions referenced are not applicable to WBN Unit                Processes - Common Q SPM least 2 months.
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
(4) RG 1.100 - June 1988 vs. September 2009                             2, there is no basis for a comparison review.                              (c) Application Specific - current Please provide new (a) IEEE 344-1987 vs. -2004                                                                                                                       regulatory criteria                due date.
: 73. Y Closed Closed N/A - No question N/A 073 7.5.2 7.5.1
(5) RG 1.152 - January 1996 vs. January 2006                           Bechtel to develop a matrix and work with Westinghouse to                  The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003                                       provide justification.                                                    and associated appendices (6) RG 1.168 - September 1997 vs. February 2004                                                                                                   primarily addressed (a) and (b).
(
(a) IEEE 1012-1986 vs. -1998                                           TVA Response to Follow-up NRC Request:                                    The Common Q SER states:
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991                                         Attachment 4 contains the results of the TVA analysis of                  Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses         standards and regulatory guides applicable to the Common                  Monitoring Systems, provides 323-1974)                                                               Q PAMS. Based on the results of the analysis, the Common                  the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review,"       Q PAMS design meets the applicable requirements and is                    conceptual design approach for states: "Design features and administrative programs that are           acceptable.                                                                upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the                                                                                   based on Common Q current staff positions." Please identify all differences between the                                                                             components (page 58, Section versions referenced and the current staff positions. Please provide                                                                               4.4.1.1, Description)On the
: 74. N Closed Closed N/A - No question N/A 074 7.5.2 7.5.1 EICB (Carte)
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010.
Responder: WEC Date: 5/25/10 contains WNA-VR-00283-WBT-P, IV&V Summary Report for the Post Accident Monitoring System, Revision 4, dated March 2011 (proprietary). Attachment 2 contains WNA-VR-00283-WBT-NP, IV&V Summary Report for the Post Accident Monitoring System, Revision 4, dated March 2011 (non-proprietary). Attachment 3 contains CWA-11-3121, Application for Withholding Proprietary Information from Public Disclosure, WNA-VR-00283-WBT-P, Revision 4 Nuclear Automation IV&V Summary Report for the Post Accident Monitoring System" (Proprietary), dated March 3, 2011.
: 6.
N Open Response in {{letter dated|date=March 16, 2011|text=letter dated March 16, 2011}} Open-NRC Review Due TBD NNC 2/3/11: At least 3 months later than planned.
N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A Rev. 4 will be available for the NRC audit on 2/28/11. This document will not be submitted. Rev. 5 will be submitted after resolution of the datastorm display issue.
075 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 75. N Closed Closed N/A - No question N/A 076 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: Clark Date: 5/25/10
: 76. Y Closed Closed N/A - No question N/A 077 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 77. Y Closed Closed N/A - No question TVA Letter dated 078
(
G 4/26/2010 Responder: Clark Date: 5/25/10
: 78. Y Closed Closed EICB RAI TVA Letter dated 079
(
G 4/26/2010 Responder: Clark Date: 5/25/10
: 79. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080
(
S i
4/26/2010 Responder: WEC
: 80. Y Closed Closed RAI No. 2 TVA Letter dated 081 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)
However, LIC-110, "Watts Bar Unit 2 License Application Review,"
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
Bechtel to develop a matrix and work with Westinghouse to provide justification.
TVA Response to Follow-up NRC Request:
contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design meets the applicable requirements and is acceptable.
: 7.
N Open ML101600092 Item No.1: There are three sets of regulatory criteria that relate to a Common Q application (e.g. WBN2 PAMS):
(a) Common Q platform components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b).
The Common Q SER states:
Appendix 1, Post Accident Monitoring Systems, provides the functional requirements and conceptual design approach for upgrading an existing PAMS based on Common Q components (page 58, Section 4.4.1.1, Description)On the Open-NRC Review Due 2/25/11 TVA to provide requested information.
NNC 2/3/11: The above due date has been missed by at least 2 months.
Please provide new due date.
EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10 NNC 1/5/11: See Also Open Item No.
86 and 202.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radEB3ED.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                            Acceptable       Status/ Current Actions         Resolution Path   RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                        Y/N a justification for the acceptability PAMS with respect to these                                                                                     basis of the above review, the differences.                                                                                                                                          staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments a justification for the acceptability PAMS with respect to these differences.
basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
The NRC did not approve the proposed PAMS design.
The NRC did not approve the proposed PAMS design.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Line 220: Line 540:
603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.
603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.
Awaiting TVA Response.
Awaiting TVA Response.
( ( ( (
082 7.5.2 7.5.1
082   7.5.2   7.5.1                   5/6/2010                                                                 Responder: WEC                       Date: 6/18/10             81. N         Closed                           Closed               EICB RAI         TVA Letter dated NNC 11/18/10: See also Open Item No.
(
083   7.5.2   7.5.1                   May 6, 2010                                                             Date: 6/18/10                                                 82. Y         Closed                           Closed               EICB RAI         TVA Letter dated C C C C 084   7.5.2   7.5.1                   May 6, 2010                                                             Date: 6/18/10                                                 83. Y         Closed                           Closed               EICB RAI         TVA Letter dated 085   7.5.2   7.5.1                   5/6/2010                                                                 Responder: WEC                                                 84. N         Closed                           Closed               EICB RAI 086   7.5.2   7.5.1                   5/6/2010                                                                Responder: WEC                    Date: 5/24/10              8. N        Open                              Open-NRC Review      EICB RAI          TVA Letter dated NNC 1/6/11: See Also Open Item No.81 EICB (Carte)
C 5/6/2010 Responder: WEC Date: 6/18/10
ML102910002      6/18/10          & 202 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.               The regulatory documents listed in the Common Q PAMS                        TVA to address with item OI      Due 2/25/11          Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the   Licensing Technical Report are the documents that the                        81.
: 81. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.
Common Q PAMS. This list contains references to old revisions of         Common Q platform was licensed to when the NRC                                                                NNC 2/3/11: The several regulatory documents, for example:                               approved the original topical report and issued the approved                                                  above due date has (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1                         SER. The WBN Unit 2 Common Q PAMS is designed in                                                              been missed by at (ML083310185)                                                           accordance with the approved Common Q topical report and                                                      least 2 months.
083 7.5.2 7.5.1
However, LIC-110, "Watts Bar Unit 2 License Application Review,"         approved SER and the regulatory documents on which the                                                        Please provide new states: "Design features and administrative programs that are           SER was based. Since the current versions referenced are                                                      due date.
(
unique to Unit 2 should then be reviewed in accordance with the         not applicable to WBN Unit 2, there is no basis for a
C May 6, 2010 Date: 6/18/10
: 82. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1
(
C May 6, 2010 Date: 6/18/10
: 83. Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1
(
C 5/6/2010 Responder: WEC
: 84. N Closed Closed EICB RAI 086 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185)
However, LIC-110, "Watts Bar Unit 2 License Application Review,"
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the Responder: WEC Date: 5/24/10 The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a
: 8.
N Open TVA to address with item OI
: 81.
Open-NRC Review Due 2/25/11 NNC 2/3/11: The above due date has been missed by at least 2 months.
Please provide new due date.
EICB RAI ML102910002 Item No. 14 TVA Letter dated 6/18/10 NNC 1/6/11: See Also Open Item No.81
& 202


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radEB3ED.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR      NRC No.                                                                      Issue                                                      TVA Response(s)                            Acceptable       Status/ Current Actions       Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec.      Sec.      POC                                                                                                                                                      Y/N current staff positions." Please identify all differences between the comparison review.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these     Rev 0 of the Licensing Technical Report references Rev. 1 of differences.                                                          ISG4 TVA Response to Follow-up NRC Request:
comparison review.
Rev 0 of the Licensing Technical Report references Rev. 1 of ISG4 TVA Response to Follow-up NRC Request:
The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.
The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.
087 7.5.2 7.5.1
(
S i
May 6, 2010 Date: 5/24/10
: 85. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1
(
S i
May 6, 2010 Date: 5/24/10
: 86. Y Closed Closed RAI No. 21 TVA Letter dated 089
(
C 5/6/2010 Responder: Clark
: 87. Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that 090
(
C 5/6/2010 Responder: Clark Date: 5/25/10
: 88. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4
(
D a
May 20, 2010 Date: 5/25/10
: 89. Y Closed Closed EICB RAI No.1 TVA Letter dated 092 DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.
Responder: Hilmes This item will close when we are no longer using this document as a communications tool.
: 1.
Y Open Due SER Issue Open-TVA/Oversight Due: SER Issue Continuous review as items are added 093
(
G May 20, 2010 Date: 5/25/10
: 90. Y Closed Closed N/A N/A Will be reviewed under item 154 094
(
G 5/20/2010 Responder: Clark Date: 5/25/10
: 91. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1, XX
(
D a
May 20, 2010 Date:
: 92. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX
(
D a
5/20/2010 Responder:
: 93. Y Closed Closed EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4
(
D a
May 20, 2010 Date:
: 94. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4
(
D a
May 25, 2010 Date:
: 95. Y Closed Closed EICB RAI No.5 TVA Letter dated 099
(
(
087  7.5.2    7.5.1                      May 6, 2010                                                         Date: 5/24/10                                                    85. Y        Closed                        Closed              RAI No. 20          TVA Letter dated S
B a
i 088  7.5.2    7.5.1  (                  May 6, 2010                                                        Date: 5/24/10                                                    86. Y        Closed                        Closed              RAI No. 21          TVA Letter dated 089                    D ( ( (            5/6/2010                                                            Responder: Clark                                                87. Y         Closed                         Closed               EICB RAI            TVA Letter dated NNC: Docketed response states that 090                    a C C S            5/6/2010                                                            Responder: Clark                  Date: 5/25/10                  88. Y        Closed                         Closed              EICB RAI            TVA Letter dated i
April 12, 2010 Date:
091    7.4      7.4                      May 20, 2010                                                        Date: 5/25/10                                                    89. Y        Closed                        Closed              EICB RAI No.1      TVA Letter dated 092                                      5/20/2010                                                          Responder: Hilmes                                                1. Y        Open                          Open-TVA/Oversight                                          Continuous review as items are added DORL                                                                                                                                                              Due SER Issue (Poole)        TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this                                                            Due: SER Issue are proprietary.                                                document as a communications tool.
: 96. Y Closed Closed Closed to Item 129 100
( ( ( (
(
093                                      May 20, 2010                                                        Date: 5/25/10                                                    90. Y        Closed                        Closed              N/A                N/A                Will be reviewed under item 154 094                                      5/20/2010                                                           Responder: Clark                  Date: 5/25/10                  91. Y        Closed                        Closed              N/A                N/A                Information was found in FSAR 095  7.8.1,    XX    D D D D            May 20, 2010                                                        Date:                                                            92. Y        Closed                        Closed              EICB RAI No. 2      TVA Letter dated 096  7.7.5    XX            ( (        5/20/2010                                                          Responder:                                                      93. Y        Closed                        Closed              EICB RAI No.3      TVA Letter dated a a a a G G 097  7.4.2    7.4                      May 20, 2010                                                        Date:                                                            94. Y        Closed                        Closed              EICB RAI No.4      TVA Letter dated 098  7.4.2    7.4                      May 25, 2010                                                        Date:                                                            95. Y        Closed                        Closed              EICB RAI No.5      TVA Letter dated 099                    ( (              April 12, 2010                                                      Date:                                                            96. Y        Closed                        Closed                                                      Closed to Item 129 C B a                                                                                                                                                    97. Y 100                                      5/20/2010                                                          Responder: WEC                                                                Closed                         Closed               N/A - No question   N/A 101                                       4/12/2010                                                           Responder: Slifer                                                9. Y        Open                          Open-NRC Review      N/A                                    TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000,         The documents, and affidavits for withholding for the listed                        Documents provided in letter  Due 10/14/10                                                potential this will slip to 7/14.
C 5/20/2010 Responder: WEC
Containment High Range Post Accident Radiation Monitor         documents were submitted to the NRC on TVA letter to the                            dated 07/15/10 documents will be provided by June 30, 2010.                  NRC dated July 15, 2010.                                                                                          Confirm receipt.
: 97. Y Closed Closed N/A - No question N/A 101 DORL (Poole) 4/12/2010 The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.
: 1. V&V Report 04508006A
: 1. V&V Report 04508006A
: 2. System Description 04508100-1TM
: 2. System Description 04508100-1TM
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR 102                    ( (                May 24, 2010                                                       Date: 5/24/10                                                    98. Y         Closed                        Closed              N/A                TVA Letter dated Request for schedule not information.
: 4. Functional Testing Report 04507007-1TR Responder: Slifer The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
103    7.4      7.4    D D (              5/27/2010                                                          Responder: Ayala              Date: 5/27/10                     99. Y        Closed                        Closed              EICB RAI No.1      TVA Letter dated Submittal date is based on current a a C 104    7.4      7.4                      5/27/2010                                                          Responder: Merten              Date: 5/27/10                    100. Y        Closed                        Closed              EICB RAI No.1      TVA Letter dated Submittal date is based on current
: 9.
Y Open Documents provided in letter dated 07/15/10 Open-NRC Review Due 10/14/10 Confirm receipt.
N/A TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.
102
(
(
105                        G              April 29, 2010                                                     Date:                                                           101. Y       Closed                         Closed               N/A                 N/A              Will be reviewed under item 154.
C May 24, 2010 Date: 5/24/10
106                                      May 6, 2010                                                         Date: 5/25/10                                                   102. Y       Closed                         Closed               RAI No. 9          TVA Letter dated
: 98. Y Closed Closed N/A TVA Letter dated Request for schedule not information.
103 7.4 7.4
(
D a
5/27/2010 Responder: Ayala Date: 5/27/10
: 99. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4
(
D a
5/27/2010 Responder: Merten Date: 5/27/10 100. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105
(
G April 29, 2010 Date:
101. Y Closed Closed N/A N/A Will be reviewed under item 154.
106
(
(
S i
S i
107                       ( (            May 6, 2010                                                         Date: 5/28/10                                                   103. Y       Closed                         Closed               RAI No. 22         TVA Letter dated G S i                                                                                                                                                  104. Y 108                                      May 6, 2010                                                         Date: 5/25/10                                                                 Closed                         Closed               N/A                 N/A               Will be reviewed under OI#154
May 6, 2010 Date: 5/25/10 102. Y Closed Closed RAI No. 9 TVA Letter dated 107
(
S i
May 6, 2010 Date: 5/28/10 103. Y Closed Closed RAI No. 22 TVA Letter dated 108
(
G May 6, 2010 Date: 5/25/10 104. Y Closed Closed N/A N/A Will be reviewed under OI#154  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radEB3ED.docx                                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR            NRC No.                                                                            Issue                                                    TVA Response(s)                        Acceptable       Status/ Current Actions       Resolution Path       RAI No. & Date       RAI Resp. Date                 Comments Sec.      Sec.          POC                                                                                                                                              Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 109.
(                (
109.                                              5/6/2010                                                        Responder: N/A                                            105. Y        Closed                          Closed                  N/A                  N/A                Duplicate of another open Item.
109. 7.8      XX                              5/6/2010                                                        Responder: N/A                                            106. Y        Closed                          Closed                  N/A                  N/A 110                                              May 6, 2010                                                      Date:                                                      107. Y        Closed                          Closed                  N/A                  N/A              Information was found.
111                                              May 6, 2010                                                      Date: 5/28/10                                              108. Y        Closed                          Closed                  N/A                  TVA Letter dated Request to help find, not a request for D    (      (  D (
112                                              June 1, 2010                                                    Date:                                                      109. Y        Closed                          Closed                  N/A                  N/A                Information was received
( (  ( ( (  (
113                                              6/1/2010                                                        Responder: Clark                                          110. Y        Closed                          Closed                  EICB RAI              TVA Letter dated a    C      C  a C 114    7.2      7.2                            6/1/2010                                                        Responder: WEC                                            111. Y        Close                          Closed                  EICB RAI              TVA Letter dated 115                                              2/25/2010                                                        Responder: Clark                                          112. Y        Closed                          Closed                  EICB RAI              TVA Letter dated G G  G G G  G 116                                              6/3/2010                                                        Responder: WEC                                            113. Y        Closed                          Closed                  EICB RAI              TVA Letter dated Letter sent to Westinghouse requesting 117    7.1      7.1                            6/3/2010                                                        Responder: Hilmes                                          114. Y        Closed                          Closed                  EICB RAI              TVA Letter dated 118    7.4      7.4                            6/8/2010                                                        Responder: Merten                                          115. Y        Closed                          Closed                  EICB RAI No.1        TVA Letter dated Submittal date is based on current
( ( ( (
119                                              June 10, 2010                                                    Date:                                                      116. Y        Closed                          Closed                  RAI No. 23            TVA Letter dated 120                                              5/6/2010                                                        Responder: Hilmes/Merten/Costley                          117. Y        Closed                          Closed                  EICB RAI              TVA Letter dated 121                                              5/6/2010                                                        Responder: Webb/Webber                                    118. Y        Closed                          Closed                  EICB RAI              TVA Letter dated D D D D ( ( ( (
122                                              June 14, 2010                                                    Date:                                                      119. Y        Closed                          Closed                  N/A - Request for    N/A
( (
123    7.7.3    7.4.1,                          6/14/2010                                                        Responder:                                                120. Y        Closed                          Closed                  ML101720589,          TVA Letter dated a a a a C C C S 124    7.7.5      XX                              6/14/2010                                                        Responder:                                                121. Y        Closed                          Closed                  ML101720589, Item TVA Letter dated G G 125    7.7.8    7.7.1.12                          6/14/2010                                                        Responder:                                                122. Y        Closed                          Closed                  ML101720589, Item TVA Letter dated 126    7.8      7.8                            June 14, 2010                                                    Date:                                                      123. Y        Closed                          Closed                  ML101720589, Item TVA Letter dated i
127    7.2      7.2                            6/16/2010                                                        Responder: WEC/Clark                                      124. Y        Closed                          Closed                  EICB RAI              TVA Letter dated 128    7.2      7.2                            6/18/2010                                                        Responder: WEC Drake /TVA Craig                            125. Y        Closed                          Closed                  EICB RAI              TVA Letter dated Track through SE open item
(
(
129                            P                6/12/2010                                                       Responder: WEC                                            126. Y       Closed                         Closed                 N/A                   TVA Letter dated
C 5/6/2010 Responder: N/A 105. Y Closed Closed N/A N/A Duplicate of another open Item.
109.
7.8 XX
(
(
130                            P                6/28/2010                                                       Responder: Clark                                          127. Y       Closed                         Closed                 N/A                   TVA Letter dated
D a
5/6/2010 Responder: N/A 106. Y Closed Closed N/A N/A 110
(
(
131                            P                6/28/2010                                                       Responder: Clark                                          128. Y       Closed                         Closed                 N/A                   TVA Letter dated
G May 6, 2010 Date:
107. Y Closed Closed N/A N/A Information was found.
111
(
(
132                            P                6/28/2010                                                        Responder: Clark                                          129. Y       Closed                         Closed                 N/A                   TVA Letter dated
C May 6, 2010 Date: 5/28/10 108. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112
(
(
133                             P                 6/28/2010                                                       Responder: Clark                                           130. Y       Closed                         Closed                                       TVA Letter dated
G June 1, 2010 Date:
( (
109. Y Closed Closed N/A N/A Information was received 113
134                                              6/28/2010                                                       Responder: Clark                                           131. Y       Closed                         Closed                                       TVA Letter dated 135   7.3.1     7.3.1                           6/30/2010                                                       Responder: Clark                                           132. Y       Closed                         Closed                 RAI not necessary TVA Letter dated
(
( D D (
G 6/1/2010 Responder: Clark 110. Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2
136   7.3.2,   7.4, 5.6,                         6/30/2010                                                       Responder: Clark                                           133. Y       Closed                         Closed                 RAI not necessary TVA Letter dated C a a P 137                                              Several WBN2 PAMS documents contain a table titled, Document Responder: WEC                                               134. Y       Closed                         Closed                 ML101650255, Item TVA Letter dated 138                                               By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC                                            10. N      Open                            Open-NRC Review        ML101650255, Item                        See also No. 82.
(
EICB (Carte) certain PAMS documentation has been completed.                                                                                                                                                   No. 2 This item is used to track all Commercial Grade                        Pending Submittal of Revision 3 NNC 2/2/11:
G 6/1/2010 Responder: WEC 111. Y Close Closed EICB RAI TVA Letter dated 115
(a) The draft ISG6 states that a commercial grade dedication plan Dedication issues.                                                      of the Licensing Technical      Commercial grade should be provided with an application for a Tier 2 review.                                                                               Report due 3/29/11.            dedication will be
(
: a. WNA-LI-00058-WT-P, Revision 2, Post-Accident                                                        addressed at the next By letter dated February 5, 2010, TVA stated that the commercial     Monitoring System (PAMS) Licensing Technical Report                Revised response included in audit.
C 2/25/2010 Responder: Clark 112. Y Closed Closed EICB RAI TVA Letter dated 116
grade dedication plan was included in the Common Q Topical           submitted in TVA Letter to NRC dated December 3,                    letter dated 12/22/10 Report Section 11, Commercial Grade Dedication Program.             2010, (Reference 1) contains the following changes to                                              NNC 2/17/11: The Section 11 includes a description of the Common Q Commercial         address the NRC request:                                            TVA agreed to include a        description of the Grade Dedication Program, and states: A detailed review plan is                                                                         description of the generic      commercial grade developed for each Common Q hardware or software component           Section 7, Commercial Grade Dedication Process has               Westinghouse hardware          dedication process in that requires commercial grade dedication.                          been revised to describe the general commercial grade               commercial grade dedication    the CQ PAMS LTR dedication process for both hardware and software and               process in the PAMS licensing Rev. 2 should be Please provide the commercial grade dedication plans for each        uses a description of the AI687 dedication process as               technical report. (see          updated to include a Common Q hardware or software component that has not been            an example of how the process is applied.                           ML102920031 Item No 1)         non-proprietary previously reviewed and approved by the NRC.                                                                                                                              description and to
(
G 6/3/2010 Responder: WEC 113. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting 117 7.1 7.1
(
G 6/3/2010 Responder: Hilmes 114. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4
(
D a
6/8/2010 Responder: Merten 115. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 119
(
S i
June 10, 2010 Date:
116. Y Closed Closed RAI No. 23 TVA Letter dated 120
(
C 5/6/2010 Responder: Hilmes/Merten/Costley 117. Y Closed Closed EICB RAI TVA Letter dated 121
(
C 5/6/2010 Responder: Webb/Webber 118. Y Closed Closed EICB RAI TVA Letter dated 122
(
C June 14, 2010 Date:
119. Y Closed Closed N/A - Request for N/A 123 7.7.3 7.4.1,
(
D a
6/14/2010 Responder:
120. Y Closed Closed ML101720589, TVA Letter dated 124 7.7.5 XX
(
D a
6/14/2010 Responder:
121. Y Closed Closed ML101720589, Item TVA Letter dated 125 7.7.8 7.7.1.12
(
D a
6/14/2010 Responder:
122. Y Closed Closed ML101720589, Item TVA Letter dated 126 7.8 7.8
(
D a
June 14, 2010 Date:
123. Y Closed Closed ML101720589, Item TVA Letter dated 127 7.2 7.2
(
G 6/16/2010 Responder: WEC/Clark 124. Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2
(
G 6/18/2010 Responder: WEC Drake /TVA Craig 125. Y Closed Closed EICB RAI TVA Letter dated Track through SE open item 129
(
P 6/12/2010 Responder: WEC 126. Y Closed Closed N/A TVA Letter dated 130
(
P 6/28/2010 Responder: Clark 127. Y Closed Closed N/A TVA Letter dated 131
(
P 6/28/2010 Responder: Clark 128. Y Closed Closed N/A TVA Letter dated 132
(
P 6/28/2010 Responder: Clark 129. Y Closed Closed N/A TVA Letter dated 133
(
P 6/28/2010 Responder: Clark 130. Y Closed Closed TVA Letter dated 134
(
P 6/28/2010 Responder: Clark 131. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1
(
D a
6/30/2010 Responder: Clark 132. Y Closed Closed RAI not necessary TVA Letter dated 136 7.3.2, 7.4, 5.6,
(
D a
6/30/2010 Responder: Clark 133. Y Closed Closed RAI not necessary TVA Letter dated 137
(
C Several WBN2 PAMS documents contain a table titled, Document Responder: WEC 134. Y Closed Closed ML101650255, Item TVA Letter dated 138 EICB (Carte)
By {{letter dated|date=February 3, 2010|text=letter dated February 3, 2010}}, Westinghouse informed TVA that certain PAMS documentation has been completed.
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
By {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}}, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, Commercial Grade Dedication Program.
Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication.
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.
Responder: WEC This item is used to track all Commercial Grade Dedication issues.
: a.
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:
Section 7, Commercial Grade Dedication Process has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
: 10. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10 TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 1)
Open-NRC Review NNC 2/2/11:
Commercial grade dedication will be addressed at the next audit.
NNC 2/17/11: The description of the commercial grade dedication process in the CQ PAMS LTR Rev. 2 should be updated to include a non-proprietary description and to ML101650255, Item No. 2 See also No. 82.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radEB3ED.docx                                                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                        TVA Response(s)                              Acceptable       Status/ Current Actions           Resolution Path         RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                        Y/N As listed in Table 6-3. Westinghouse Watts Bar 2                          TVA agreed to include (in the    include a software (b) The draft ISG6 states that a commercial grade dedication report       Common Q PAMS Documents at Westinghouse                                    PAMS licensing technical report) example.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.
should be provided within 12 months of requested approval for a           Rockville Office, the following commercial grade                          an evaluation of WBN2 critical Tier 2 review.                                                             dedication documents are available for NRC audit at the                    characteristics for commercial Westinghouse Rockville office: (list included in letter)                  Westinghouse hardware (i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade                                                                                         components against the generic Dedication Report for the QNX Operating System for Common Q           b. It is TVAs understanding that the submittal of the                       critical characteristics. (see Applications.                                                            documents listed in (b.i) and (b.ii) is no longer required.               ML102920031 Item No 2)
(i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications.
Rather, it was agreed, that the inclusion of a description (ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial                  of the commercial grade dedication process in revision                     TVA agreed to include a Dedication Report for QNX 4.25G for Common Q Applications.                2 of the Post-Accident Monitoring System (PAMS)                           description of the generic Licensing Technical Report, WNA-LI-00058-WT-P,                             Westinghouse software would be sufficient to address this request.                               commercial grade dedication process in the PAMS licensing TVA Response to Follow-up NRC Request:                                         technical report. (see ML102920031 Item No 3)
(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications.
The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-                       TVA agreed to include (in the Accident Monitoring System (PAMS) Licensing Technical                           PAMS licensing technical report)
As listed in Table 6-3. Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the Westinghouse Rockville office: (list included in letter)
Report, Revision 3 dated March 2011 (non-proprietary)                         an evaluation of WBN2 critical Section 7. The software example is included in Attachment                       characteristics for commercial 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System                         software components against (PAMS) Licensing Technical Report, Revision 3, dated                           the generic critical March 2011 (proprietary) Section 7.                                             characteristics. (see ML102920031 Item No 4)
: b.
( ( (
It is TVAs understanding that the submittal of the documents listed in (b.i) and (b.ii) is no longer required.
139                                 The WBN2 PAMS System Requirements Specification (WBN2                 Responder: WEC                                                     135. Y       Closed                             Closed                   ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 140                                 The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)           Responder: Clark                                                   136. N       Closed                             Closed                   ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements C C C 141                                  Deleted by DORL                                                       Date:                                                             137. Y       Closed                             Closed                   ML101650255, Item                   WBN2 PAMS System Requirements 142                                 The applicable regulatory guidance for reviewing the WBN2 PAMS Responder: WEC                                                11.            N        Open                              Open-NRC Review          ML101650255, Item                    WBN2 PAMS System Requirements EICB (Carte)
Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)
SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172                                                                                                                                                     No. 6                                Specification and BTP 7-14 Section B.3.3.1, Requirements Activities - Software This item is used to track all traceability issues with the                                                            Due 2/25/11 (document Requirements Specifications. IEEE 830-1994 Section 4.3.8,           Software Requirements Specification (SRS).                                      Revised response included in      submittals)                                                  TVA docketed WNA-DS-01617-WBT Traceable, states: A [requirements specification] is traceable of                                                                                 letter dated 02/25/11                                                                            Rev. 1, RRAS Watts Bar 2 NSSS the origin of each of its requirements is clear                                                                                                                                       NNC 2/2/11: Updated                                          Completion Program I&C Projects Post Response included in letter        Specifications and                                            Accident Monitoring System- System
Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.
: 1. How did TVA ensure the traceability of each requirement in       TVA Response to 1:                                                             dated 12/22/10                    RTMs to be provided by                                        Requirements Specification, dated the WBN2 PAMS SysRS.                                            Traceability of requirements for the WBN Unit 2 Common Q                                                           TVA                                                          December 2009.
TVA Response to Follow-up NRC Request:
PAMS is ensured by:                                                             TVA/Westinghouse agreed to
The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)
: a. Preparation of the TVA Contract Compliance Matrix                           include the V&V evaluation of Tracability to be contained in WNA-LI-00058-WBT-P, Revision 2, Post-                       their reusable software element addressed during the Accident Monitoring System (PAMS) Licensing                               development process in the      next audit.
Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.
Technical Report submitted in TVA Letter to NRC                           V&V design phase summary dated December 3, 2010 (Reference 1).                                     report. This evaluation would
TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)
: b. Engineering review/comment/status of each revision                         include an evaluation against of:                                                                       the development process
TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 3)
: i. WNA-DS-01617-WBT, Post Accident                                 requirements. This evaluation Monitoring System - System Requirements                           would also include an evaluation Specification                                                   of how the WBN2 specific ii. WNA-DS-01667-WBT, Post Accident                                 requirements were addressed Monitoring System - System Design                                 by the reusable software Specification (hardware)                                         elements. (see ML102920031 iii. WNA-SD-00239-WBT, Software Requirements                         Item No 5)
TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) include a software example.
Specification for the Post Accident Monitoring System (software)
139
(
C The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC 135. Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 140
(
C The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)
Responder: Clark 136. N Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 141
(
C Deleted by DORL Date:
137. Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements 142 EICB (Carte)
The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - Software Requirements Specifications. IEEE 830-1994 Section 4.3.8, Traceable, states: A [requirements specification] is traceable of the origin of each of its requirements is clear
: 1.
How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
: 2.
Explain the source(s) of the requirements present in the Post Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS).
TVA Response to 1:
Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by:
: a.
Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: b. Engineering review/comment/status of each revision of:
: i.
WNA-DS-01617-WBT, Post Accident Monitoring System - System Requirements Specification ii.
WNA-DS-01667-WBT, Post Accident Monitoring System - System Design Specification (hardware) iii.
WNA-SD-00239-WBT, Software Requirements Specification for the Post Accident Monitoring System (software)
TVA Response to 2:
TVA Response to 2:
: 2. Explain the source(s) of the requirements present in the Post   As documented in the RTM, some software requirements
As documented in the RTM, some software requirements
: 11. N Open Revised response included in letter dated 02/25/11 Response included in letter dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5)
Open-NRC Review Due 2/25/11 (document submittals)
NNC 2/2/11: Updated Specifications and RTMs to be provided by TVA Tracability to be addressed during the next audit.
ML101650255, Item No. 6 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                 radEB3ED.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                                  Issue                                                      TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                                                      Y/N Accident Monitoring Systems Software Requirements             are taken from generic documents. The decision to include Specification. To clarify, many documents have requirements     generic software requirements was to reduce the overall that are incorporated by reference into the SRS, but what       scope for Common Q features that are unchanged across served to direct the author to include those various           projects. Westinghouse reviewed the generic PAMS documents in the SRS or, if the requirement is based on the     requirements and included those requirements that were System Requirements Specification, what directed the author     applicable to WBN Unit 2 PAMS.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Accident Monitoring Systems Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
to include the requirement there?
: 3.
Clarify whether the unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
Does the same apply to documents referenced by the SRS?
Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
: 4.
Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these sources or documents?
: 5.
References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.
These references are used in the body of the SRS, for example:
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal
= TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
are taken from generic documents. The decision to include generic software requirements was to reduce the overall scope for Common Q features that are unchanged across projects. Westinghouse reviewed the generic PAMS requirements and included those requirements that were applicable to WBN Unit 2 PAMS.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 3. Clarify whether the unnumbered paragraphs in the Post          TVA Response to 3:
TVA Response to 3:
Accident Monitoring Systems Software Requirements              Unnumbered paragraphs in the Post Accident Monitoring Specification, such as in the section headings, or are all such Systems Software Requirements Specification, such as in sections simply considered to be informative?                  the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly Does the same apply to documents referenced by the SRS?        numbered.
Unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly numbered.
Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by          It depends on the document type. The statement would be reference in requirement R2.3-2 in the SRS.                    true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference. However, for R2.3-2 [The PAMS software shall comply with the                the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does requirements and guidelines defined in WCAP-16096-NP-A,          not contain numbered requirements. The requirements Software Program Manual for Common Q Systems                  contained in this document are contained within the text of (reference 5).]                                                  the various sections.
It depends on the document type. The statement would be true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference. However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements. The requirements contained in this document are contained within the text of the various sections.
If any requirements are expressed in such unnumbered            Source: E-mail from Westinghouse (Matthew A. Shakun) to paragraph form instead of individually identified requirements, Bechtel (Mark S. Clark), RE: December 22 letter review, please list them, describe why they satisfy the fundamental      dated December 17, 2010 (Reference 13) requirement of unambiguity, and describe how they were verified.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 4. Are there any sources of requirements in parallel with the      TVA Response to 4:
TVA Response to 4:
Post Accident Monitoring Systems Software Requirements        The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 Specification? Meaning does the SRS contain, explicitly or      contains references to other Westinghouse software by reference, all the requirements that were used in the        requirements documents. Specifically, design phase for the application specific software, or do software design phase activities use requirements found in      00000-ICE-3238, Revision 5, Software Requirements any other source or document? If so, what are these            Specification Post Accident Monitoring System sources or documents?
The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 contains references to other Westinghouse software requirements documents. Specifically, 00000-ICE-3238, Revision 5, Software Requirements Specification Post Accident Monitoring System 00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
TVA Response to 5:
: 5. References 12, 27, 29, and 31-44 in the Post Accident          TVA Response to 5:
Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, dated December 2010 (Attachment 10).
Monitoring Systems Software Requirements Specification        Requirements for the reusable software elements (RSEDs) are various types of Reusable Software Element.            are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, These references are used in the body of the SRS, for          dated December 2010 (Attachment 10).
RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements. This document can be made available for audit  
example:
RSED traceability is contained in WNA-VR-00280-WBT, R5.3.14-2 [The Addressable Constants CRC error signal shall    Revision 2, Watts Bar 2 NSSS Completion Program I&C be TRUE when any CAL CRC's respective ERROR terminal            Projects Requirements Traceability Matrix for the Reactor
                            = TRUE (WNA-DS-00315-GEN, "Reusable Software Element            Vessel Level Indication System (RVLIS) Custom PC Document CRC for Calibration Data" [Reference 12]).]            Elements. This document can be made available for audit


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                   radEB3ED.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                                    Issue                                                      TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                                                      Y/N at the Westinghouse Rockville office.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments They are also included via tables such as found in requirement R7.1.2-1
They are also included via tables such as found in requirement R7.1.2-1                                         At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
[The Watts Bar 2 PAMS shall use the application-specific     traceability concerns with the Software Requirements type circuits and custom PC elements listed in Table 7.1-1.] Specification.
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
: 1. Westinghouse will perform a review of the Do the referenced reusable software element documents include            Requirements Traceability Matrix(RTM), using the requirements not explicitly stated in the SRS? If so what is their        issues identified at the 9/15 public meeting as a guide origin?                                                                  (documented below) and update the RTM as required.
at the Westinghouse Rockville office.
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.
: 1.
Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
TVA Response:
TVA Response:
See response to letter Item 13 (NRC Matrix Item 145).
See response to letter Item 13 (NRC Matrix Item 145).
: 2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 2.
The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
TVA Response:
TVA Response:
See response to letter Item 13 (NRC Matrix Item 145).
See response to letter Item 13 (NRC Matrix Item 145).
: 3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
: 3.
Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
TVA Response:
TVA Response:
A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.
A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 4. IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.
: 4.
IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.
TVA Response:
TVA Response:
Westinghouse has confirmed that process requirements have been removed from the SRS.
Westinghouse has confirmed that process requirements have been removed from the SRS.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
: 5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.
: 5.
IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.
TVA Response:
TVA Response:
Westinghouse confirmed that process requirements have been removed from the SRS.
Westinghouse confirmed that process requirements have been removed from the SRS.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                               radEB3ED.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                  Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg.
: 6.
Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg.
Guide 1.172 and justify any deviations.
Guide 1.172 and justify any deviations.
TVA Response:
TVA Response:
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):
Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172 has been added.
Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172 has been added.
: 7. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?
: 7.
25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?
TVA Response:
TVA Response:
The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.
The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
: 8.
Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
TVA Response:
TVA Response:
The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.
The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)
: 9. RTM item R4.2-2 protection class software set to 0.
: 9.
RTM item R4.2-2 protection class software set to 0.
Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.
Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.
TVA Response:
TVA Response:
Line 381: Line 912:
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 10. Westinghouse to improve the traceability of the tests
: 10. Westinghouse to improve the traceability of the tests  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                   radEB3ED.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                                TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                    Y/N that are performed with the function enable (FE) switch in the ENABLE position.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments that are performed with the function enable (FE) switch in the ENABLE position.
TVA Response:
TVA Response:
The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:
The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:
Line 393: Line 927:
TVA Response:
TVA Response:
Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and commitment was performed with the following results:
Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and commitment was performed with the following results:
: a. Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.
: a.
: b. SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:
Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.
: b.
SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:
: i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
: i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
: c. Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:
: c.
Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:
: i. Tables 7.2-1 Train A PAMS Data Transmitted to the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.
: i. Tables 7.2-1 Train A PAMS Data Transmitted to the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.
All other items in the SRS refer to the FE keyswitch.
All other items in the SRS refer to the FE keyswitch.
ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term enabled instead of ENABLE
ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term enabled instead of ENABLE
: d. WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference
: d.
WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference
: 12) is not consistent in use of the term FE keyswitch as noted below:
: 12) is not consistent in use of the term FE keyswitch as noted below:
: i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.
: i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.
ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch
ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch
: e. Revision 2 of the Licensing Technical Report is not
: e.
Revision 2 of the Licensing Technical Report is not  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                               radEB3ED.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                  Y/N consistent in use of the term FE keyswitch as noted below:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments consistent in use of the term FE keyswitch as noted below:
: i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)
: i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)
The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.
The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.
Line 428: Line 970:
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
TVA Response:
TVA Response:
When a Common Q PAMS requirements document
When a Common Q PAMS requirements document  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radEB3ED.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                    Y/N references a section of another document, all requirements in that section are applicable.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments references a section of another document, all requirements in that section are applicable.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
TVA Response:
TVA Response:
See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).
See response in {{letter dated|date=December 22, 2010|text=letter dated December 22, 2010}}, item 2 (NRC Matrix Item 050).
: 18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
: 18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
: a.     Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: a.
: b.     What are the SDDs?
Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: c.     PAMS is a delta document so how do we capture all the generic requirements for traceability.
: b.
What are the SDDs?
: c.
PAMS is a delta document so how do we capture all the generic requirements for traceability.
TVA Response:
TVA Response:
: a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
: a.
: b.     The SDDs developed for this project are:
There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
: i. WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii. WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software iii. WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv.       Other generic SDDs referenced by the PAMS project are:
: b.
(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5,
The SDDs developed for this project are:
: i.
WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii.
WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software iii.
WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv.
Other generic SDDs referenced by the PAMS project are:
(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5,  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radEB3ED.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                    Y/N Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions
: c. Refer to WNA-VR-00279-WBT, Revision 3.
: c.
Refer to WNA-VR-00279-WBT, Revision 3.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Line 465: Line 1,023:
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
WNA-VR-00279-WBT, Revision 4, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System is scheduled to be available for audit at the Westinghouse Rockville office February 21, 2011. The document will be available at the Westinghouse Cranberry offices to support the NRC Common Q PAMS audit.
WNA-VR-00279-WBT, Revision 4, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System is scheduled to be available for audit at the Westinghouse Rockville office February 21, 2011. The document will be available at the Westinghouse Cranberry offices to support the NRC Common Q PAMS audit.
Attachment 9 contains the proprietary version of WNA-DS-01617-WBT-P, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February 2011. Attachment 10 contains the non-proprietary version WNA-DS-01617-WBT-NP, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February, 2011. Attachment 11 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS
contains the proprietary version of WNA-DS-01617-WBT-P, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February 2011. Attachment 10 contains the non-proprietary version WNA-DS-01617-WBT-NP, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February, 2011. Attachment 11 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radEB3ED.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                            Acceptable       Status/ Current Actions     Resolution Path         RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                    Y/N Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary),
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary),
dated February 10, 2011.
dated February 10, 2011.
Attachment 12 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 13 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 14 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary), dated February 11, 2011.
2 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 13 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 14 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary), dated February 11, 2011.
Attachment 15 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 16 contains the non-proprietary version WNA-SD-00239-WBT-NP, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 17 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary), dated February 10, 2011.
5 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 16 contains the non-proprietary version WNA-SD-00239-WBT-NP, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 17 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary), dated February 10, 2011.
143                                 The WBN2 PAMS Software Requirements Specification (WBN2              Responder: WEC                                                  12. N        Open                          Open-NRC Review          ML101650255, Item                    WBN2 PAMS System Requirements EICB (Carte)
143 EICB (Carte)
PAMS SRS - ML101050202) contains a table (see page iii) titled,                                                                                                                                           No. 7                                Specification Document Traceability & Compliance, which states that the           Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.                  Response included in letter  Due 2/25/11 (document WBN2 PAMS SRS was created to support the three documents             A detailed explanation will be provided.                                    dated 12/22/10                submittals)                                                  TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1,                                                                                                                                                                                 Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document               TVA Response:                                                                                              To be addressed by                                            Completion Program I&C Projects Post describes requirements for the major software components                                                                                                                       Revision of the RTM,                                          Accident Monitoring System- System (a) and (b) The requested information is provided in the                                                  SRS, SysRS, and                                              Requirements Specification, dated (a) Please list and describe each of the major software                   following documents:                                                                                SysDS.                                                        December 2009.
The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, Overview, of the WBN2 PAMS SRS states: This document describes requirements for the major software components (a) Please list and describe each of the major software components. Please include a description of any NRC review for each of these components.
components. Please include a description of any NRC review for             i. WNA-LI-00058-WBT-P, Revision 2, Post-each of these components.                                                          Accident Monitoring System (PAMS) Licensing                                                   NNC 2/2/11: Updated Technical Report, Table 6-1, Document                                                       Specifications and (b) Please list and describe each of the other software                            Requirements which lists the software                                                       RTMs to be provided by components. Please include a description of any NRC review for                    documentation requirements for the Common Q                                                   TVA each of these components.                                                          PAMS and Section 11 TVA Contract Compliance Matrix submitted in TVA Letter to                                                 NNC 2/3/11: The (c) What other documents contain the requirements for the other                    NRC, dated December 3, 2010 (Reference 1).                                                   above due date has software components?                                                      ii. WNA-DS-01617-WBT-P, Revision 3, Post                                                         been missed by at Accident Monitoring System- System                                                           least 2 months.
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
The WBN2 PAMS System Design Specification (WBN2 PAMS                              Requirements Specification, dated December                                                   Please provide new SDS) contains a table (see page iii) titled, Document Traceability                2010 (Attachment 1)                                                                           due date.
(c) What other documents contain the requirements for the other software components?
                                    & Compliance, which states that the WBN2 PAMS SysRS was                  iii. WNA-SD-00239-WBT-P, Revision 3, Software created to support the WBN2 PAMS SysRS. Section 1.1,                              Requirements Specification for the Post Accident Purpose, of the WBN2 PAMS SDS states: The purpose of this                      Monitoring System, dated December 2010 document is to define the hardware design requirements                          (Attachment 7) iv.     WNA-VR-00279-WBT, Revision 3, Watts Bar 2 (c) Do the WBN2 PAMS SRS and SDS, together, implement all of                      NSSS Completion Program I&C Projects the requirements in the WBN2 PAMS SysRS?                                          Requirements Traceability Matrix for the Post
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability
& Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.
A detailed explanation will be provided.
TVA Response:
(a) and (b) The requested information is provided in the following documents:
: i.
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Table 6-1, Document Requirements which lists the software documentation requirements for the Common Q PAMS and Section 11 TVA Contract Compliance Matrix submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
ii.
WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010 (Attachment 1) iii.
WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010 (Attachment 7) iv.
WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post
: 12. N Open Response included in letter dated 12/22/10 Open-NRC Review Due 2/25/11 (document submittals)
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
NNC 2/2/11: Updated Specifications and RTMs to be provided by TVA NNC 2/3/11: The above due date has been missed by at least 2 months.
Please provide new due date.
ML101650255, Item No. 7 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radEB3ED.docx                                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                            Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                  Y/N Accident Monitoring System (available for NRC (e) Please briefly describe all of the documents that implement                 audit at the Westinghouse Rockville office) the WBN2 PAMS SysRS.                                                        To the best of TVAs knowledge, no prior NRC review of the software components has been performed.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.
Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)
To the best of TVAs knowledge, no prior NRC review of the software components has been performed.
(c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
(c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
(d) No. Please see Item (e) below.
(d) No. Please see Item (e) below.
(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:
(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:
: i.     WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii.     WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
: i.
WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii.
WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
See Response to item 3 (Item number 142) 144                                 The WBN2 PAMS Software Requirements Specification (WBN2            Responder: WEC                                                  13. N        Open                            Open-NRC Review            ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)
See Response to item 3 (Item number 142) 144 EICB (Carte)
PAMS SRS) contains a table (see page iii) titled, Document                                                                                                                                                 No. 8            10/5/10          Specification Traceability & Compliance, which states that the WBN2 PAMS     (a) The purpose of NABU-DP-00014-GEN document is to                            Pending Submittal of Revision 3 Due 3/29/11 SRS was created to support the three documents identified (two ofdefine the process for system level design, software design                    of the Licensing Technical                                                                      By letter dated April 8, 2010 these documents have been provided on the docket).               and implementation, and hardware design and                                    Report due 3/29/11.            Responses to items a                                           (ML10101050203), TVA docketed implementation for Common Q safety system development.                                                         and e provided.                                                 WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014-GEN This document supplements the Common Q SPM, WCAP-                                                                                                                               "RRAS Watts Bar 2 NSSS Completion Revision 2, Design Process for Common Q Safety Systems).      16096-NP-A. The scope of NABU-DP-00014-GEN includes                             Revised response included in    NNC 11/18/10:                                                  Program I&C Projects, Software the design and implementation processes for the application                     letter dated 12/22/10          (1) Items b-d closed to                                        Requirements Specification for the Post (b) Please describe the flow of information between these three  development. For a fuller description of the design process                                                     other Open Item nos.                                            Accident Monitoring System, dated documents.                                                      described in NABU-DP-00014-GEN please refer to the                             Response provided in letter    (2) The point of these                                          February 2010 (ML101050202).
The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).
Design Process for AP1000 Common Q Safety Systems,                             dated 10/5/10                  questions was to (c) Does the PAMS SRS implement the requirements in these        WCAP-15927 on the AP1000 docket. Since this is a                                                               understand how the three documents?                                                Westinghouse process document that is not specifically                         NRC Review and WEC to          origin of the referenced in the SRS, it will be removed in the next revision                 complete response.             requirements in the (d) Please describe if and how these three documents are used in of the document.                                                                                               requirements the development of the PAMS Software Design Description.                                                                                         b-d to be addressed at public   specifications were (b) - Closed to items 142 and 145                                              meeting and audit. Will require documented. TVA (e) Do the WBN2 V&V activities include verification that the                                                                                     information to be docketed. stated that the origin of requirements of these three documents have been incorporated      (c) - Closed 142                                                                                              the requirements would into the WBN2 PAMS SRS.                                                                                                                                                          be demonstrated in (d) - Closed to Item 142                                                                                      Rev. 2 of the CQ PAMS LTR.
(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems).
(b) Please describe the flow of information between these three documents.
(c) Does the PAMS SRS implement the requirements in these three documents?
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.
(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.
Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design and implementation, and hardware design and implementation for Common Q safety system development.
This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.
(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142
: 13. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10 Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.
b-d to be addressed at public meeting and audit. Will require information to be docketed.
Open-NRC Review Due 3/29/11 Responses to items a and e provided.
NNC 11/18/10:
(1) Items b-d closed to other Open Item nos.
(2) The point of these questions was to understand how the origin of the requirements in the requirements specifications were documented. TVA stated that the origin of the requirements would be demonstrated in Rev. 2 of the CQ PAMS LTR.
ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By {{letter dated|date=April 8, 2010|text=letter dated April 8, 2010}} (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, dated February 2010 (ML101050202).  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                         radEB3ED.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                          Issue                                                      TVA Response(s)                          Acceptable       Status/ Current Actions     Resolution Path         RAI No. & Date   RAI Resp. Date             Comments Sec. Sec. POC                                                                                                                                              Y/N (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document                                                           NNC 2/3/11: CQ Traceability & Compliance table on page iii. This table has                                             PAMS LTR Rev. 2 three entries; Design Process for Common Q Safety                                                       Section 11 & 12 do not Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar                                                     adequately 2 NSSS Completion Program I&C Projects Post Accident                                                     demonstrate the origin Monitoring System - System Requirements Specification                                                   of requirements in (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2                                                         SysRS. TVA to NSSS Completion Program I&C Projects Post Accident                                                       describe how to Monitoring System - System Design Specification (WNA-                                                   address concern.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
DS-01667-WBT, Rev. 1).
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V-770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
Line 506: Line 1,107:
Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.
Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.
TVA Response to Second Follow-up NRC Request:
TVA Response to Second Follow-up NRC Request:
Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification was added to the Licensing Technical Report Revision 3 to address this concern.
Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification was added to the Licensing Technical Report Revision 3 to address this concern. contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).
Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).
NNC 2/3/11: CQ PAMS LTR Rev. 2 Section 11 & 12 do not adequately demonstrate the origin of requirements in SysRS. TVA to describe how to address concern.
145                           The WBN2 PAMS System Design Specification (WBN2 PAMS                 Responder: WEC                                                14. N        Open                          Open-NRC Review          ML101650255, Item                    WBN2 PAMS System Design EICB    SDS) contains a table (see page iii) titled, Document Traceability                                                                                                                                     No. 9                                Specification (Carte)  & Compliance, which states that the WBN2 PAMS SDS was               (1) The review and update of the RTM is complete. The                     Response included in letter  Due 2/25/11 created to support the WBN2 PAMS SysRS.                                  revised RTM can be made available for NRC audit at                     dated 12/22/10                                                                             TVA docketed WNA-DS-01667-WBT
145 EICB (Carte)
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability  
& Compliance, which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at
: 14. N Open Response included in letter dated 12/22/10 Open-NRC Review Due 2/25/11 ML101650255, Item No. 9 WBN2 PAMS System Design Specification TVA docketed WNA-DS-01667-WBT  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                         radEB3ED.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                          Issue                                                    TVA Response(s)                        Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                          Y/N the Westinghouse office in Rockville.                                                                  To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware                                                                                       During the September 20-21,        Revision of the RTM,                                        Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS?                                 (2) Please see letter Item 10 (NRC Matrix Item 142, sub                  2010 audit at Westinghouse, it      SRS, SysRS, and                                            Accident Monitoring System- System item 13).                                                            was acknowledged that              SysDS.                                                      Design Specification, dated December (b) Please briefly describe all of the documents that implement the                                                                           TVA/Westinghouse had                                                                            2009.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?
hardware requirements of the WBN2 PAMS SysRS.                         (3) Please see letter Item 10 (NRC Matrix Item 142, sub                  previously (in September 15, item 12).                                                            2010 public meeting) stated:
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.
This item is used to track all traceability issues with the System Design Specification (SDS).                               (4) Section 11 TVA Contract Compliance Matrix was                          TVA would provide the RSED added to WNA-LI-00058-WBT-P, Revision 2, Post-                          RTM. (see ML102920031 Item At the September 15 public meeting in Rockville, the following       Accident Monitoring System (PAMS) Licensing                              No 6) actions were agreed to. These items partially address the             Technical Report submitted in TVA Letter to NRC traceability concerns with the System Design Specification.           dated December 3, 2010, (Reference 1).                                  TVA would revise and resubmit This item will be updated with the results of the September 20                                                                                 the PAMS RTM to address all and 21 Commercial Grade Dedication and SDS RTM audit.             (5) WNA-VR-00283-WBT, Revision 1, IV&V Summary                              types of issues identified in the Report for the Post Accident Monitoring System,                        public meeting. (see
This item is used to track all traceability issues with the System Design Specification (SDS).
: 1. Westinghouse will perform completed a review of the               submitted in TVA to NRC letter dated December 3,                        ML102920031 Item No 7)
At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification.
Requirements Traceability Matrix(RT), using the issues           2010 (Reference 1) includes the Requirements and identified at the 9/15 public meeting as a guide (documented     Design phase reviews.                                                    TVA would revise and resubmit below) and update the RTM as required.                                                                                                   the Software Verification and (6) Per Westinghouse letter WBT-D-2268 NRC Access to                        Validation phase summary
This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.
: 2. Some hardware requirements are contained in the SRS               Common Q Documents at the Westinghouse Rockville                        report for the requirements instead of the System Design Specification (SDS). These will     Office dated August 16, 2010 (Reference 9) System                      phase to document the be removed from the SRS and incorporated into the next           Requirements Specification for the Common Q Generic                      completion of the requirements revision of the SDS.                                             Flat Panel Display, 00000-ICE-30155, Revision 9 is                      phase review. (see available for audit at the Westinghouse Rockville office.                ML102920031 Item No 8)
: 1.
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the            The generic AC160 specifications are contained in the revisions reviewed by V&V. Have these been addressed?           documents listed below. The documents are available Yes. The next revisions of the SDS and SRS address these         for NRC audit at the Westinghouse Rockville office in issues.                                                          accordance with the letter number referenced. List is contained in letter.
Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS           (7) A schedule was developed and is reviewed weekly by design meets the contract requirements.                          Westinghouse and TVA project management.
: 2.
: 5. The next issue of the IV&V report will include the           (8) The revised document submittal schedule was Requirements phase review of the RTM and a partial review       included as item 3 NRC Request (Matrix Item Number for the Design phase.                                            142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.
Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.                                              (9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
: 3.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team. Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated
25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?
: 8. The flow of information is from the SysRS to the SDS        December 8, 2010 (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a TVA Response to Follow-up NRC Request:
Yes. The next revisions of the SDS and SRS address these issues.
good write up of how the process works.
: 4.
TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 5.
The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6.
Westinghouse to provide the generic AC160 and flat panel specifications.
: 7.
Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8.
The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
the Westinghouse office in Rockville.
(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).
(3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).
(4) Section 11 TVA Contract Compliance Matrix was added to WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).
(5) WNA-VR-00283-WBT, Revision 1, IV&V Summary Report for the Post Accident Monitoring System, submitted in TVA to NRC {{letter dated|date=December 3, 2010|text=letter dated December 3, 2010}} (Reference 1) includes the Requirements and Design phase reviews.
(6) Per Westinghouse letter WBT-D-2268 NRC Access to Common Q Documents at the Westinghouse Rockville Office dated August 16, 2010 (Reference 9) System Requirements Specification for the Common Q Generic Flat Panel Display, 00000-ICE-30155, Revision 9 is available for audit at the Westinghouse Rockville office.
The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.
(7) A schedule was developed and is reviewed weekly by Westinghouse and TVA project management.
(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.
(9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 TVA Response to Follow-up NRC Request:
See Response to item 3 (Item number 142)
See Response to item 3 (Item number 142)
( ( (
During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:
146                         6/17/2010                                                             Responder:                                                 138. Y       Closed                             Closed                 ML101650255, Item                   PAMS System Requirements
TVA would provide the RSED RTM. (see ML102920031 Item No 6)
( (
TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see ML102920031 Item No 7)
147                          6/17/2010                                                             Responder:                                                 139. Y       Closed                             Closed                 ML101650255, Item                   PAMS System Requirements C C C 148                          6/17/2010                                                             Responder:                                                 140. Y       Closed                             Closed                 ML101650255, Item                   PAMS System Requirements G G 149   7.2     7.2           FSAR Section 7.1.1.2(2), Overtemperature delta T and                 Responder: Tindell                                         141. Y       Close                               Closed                 ML101720589, Item TVA Letter dated 150   7.2     7.2           Many of the changes were based on the Westinghouse document Responder: Clark                                                     142. Y       Close                               Closed                 ML101720589, Item TVA Letter dated
TVA would revise and resubmit the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8)
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Design Specification, dated December 2009.
146
(
C 6/17/2010 Responder:
138. Y Closed Closed ML101650255, Item PAMS System Requirements 147
(
C 6/17/2010 Responder:
139. Y Closed Closed ML101650255, Item PAMS System Requirements 148
(
C 6/17/2010 Responder:
140. Y Closed Closed ML101650255, Item PAMS System Requirements 149 7.2 7.2
(
G FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell 141. Y Close Closed ML101720589, Item TVA Letter dated 150 7.2 7.2
(
G Many of the changes were based on the Westinghouse document Responder: Clark 142. Y Close Closed ML101720589, Item TVA Letter dated  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                                       radEB3ED.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR              NRC No.                                                                                        Issue                                                      TVA Response(s)                      Acceptable       Status/ Current Actions       Resolution Path         RAI No. & Date     RAI Resp. Date               Comments Sec.     Sec.             POC                                                                                                                                                          Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 151 7.2 7.2
( ( ( ( ( ( ( ( ( ( ( ( (
(
151    7.2      7.2                                        Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark                                                 143. Y       Close                         Closed                   ML101720589, Item TVA Letter dated 152   7.2     7.2                                         Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR         Responder: Merten/Clark                                   144. Y       Close                         Closed                   ML101720589, Item TVA Letter dated 153   7.2     7.2                                         FSAR section 7.2.1.1.7 added the reference to FSAR section           Responder: Craig/Webb                                     145. Y       Close                         Closed                   ML101720589, Item TVA Letter dated 154   7.2     7.2                                         FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS         Responder: Craig/Webb                                     146. Y       Closed                         Closed                   ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155   7.2     7.2                                         Summary of FSAR change document section 7.2 states that             Date:                                                     147. Y       Closed                         Closed                   ML101720589, Item 156   7.2     7.2                                         FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-     Responder: WEC                                             148. Y       Closed                         Closed                   ML101720589, Item TVA Letter dated Response on hold pending 157   7.2     7.2                                         FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell                                           149. Y       Close                         Closed                   ML101720589, Item TVA Letter dated G G G G G G G G G G G G G 158    7.2     7.2                                        FSAR section 7.2.2.1.1, paragraph six was changed to state that     Responder: Tindell                                         150. Y       Closed                         Closed                   ML101720589, Item TVA Letter dated 159   7.2     7.2                                         FSAR section 7.2.2.1.2 discusses reactor coolant flow               Responder: Craig                                           151. Y       Close                         Closed                   ML101720589, Item TVA Letter dated 160   7.2     7.2                                         FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell                                             152. Y       Close                         Closed                   ML101720589, Item TVA Letter dated 161   7.2     7.2                                         FSAR section 7.2.2.3 states that changes to the control function     Responder: Clark                                           153. Y       Closed                         Closed                   ML101720589, Item TVA Letter dated 162   7.2     7.2                                         FSAR section 7.2.2.2(14) states that bypass of a protection         Responder: Tindell                                         154. Y       Closed                         Closed                   ML101720589, Item TVA Letter dated 163   7.2     7.2                                         Deleted by DORL                                                     Date:                                                     155. Y       Closed                         Closed                   ML101720589, Item 164   7.2     7.2                                         FSAR section 7.2.2.2(20) has been revised to include the plant       Responder: Perkins                                         156. Y       Closed                         Closed                   ML101720589, Item TVA Letter dated Item No. 8 sent to DORL a
G Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark 143. Y Close Closed ML101720589, Item TVA Letter dated 152 7.2 7.2
165   7.2     7.2                                         FSAR section 7.2.2.3.2, last paragraph of this section has been     Responder: Clark                                           157. Y       Closed                         Closed                   ML101720589, Item TVA Letter dated 166   7.2     7.2                                         Changes to FSAR section 7.2.2.2(20) are justified based on the       Responder: Clark                                           158. Y       Closed                         Closed                   ML101720589, Item TVA Letter dated
(
( (
G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark 144. Y Close Closed ML101720589, Item TVA Letter dated 153 7.2 7.2
167   7.2     7.2                                         FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark                                             159. Y       Close                         Closed                   ML101720589, Item TVA Letter dated 168   7.2     7.2                                         FSAR table 7.2-4, item 9 deleted loss of offsite power to station   Responder: Clark                                           160. Y       Close                         Closed                   ML101720589, Item TVA Letter dated
(
( ( ( (                            r 169                                                        6/18/2010                                                           Responder: Clark                                           161. Y       Closed                         Closed 170                                                         6/17/2010                                                           Responder: Clark                                           162. Y       Closed                         Closed M M ( ( ( ( ( ( ( ( ( ( ( (
G FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb 145. Y Close Closed ML101720589, Item TVA Letter dated 154 7.2 7.2
171   7.2     7.2                                         6/17/2010                                                           Responder: Craig                                           163. Y       Closed                         Closed                   EICB RAI           TVA Letter dated Closed to SE Open Item 172                                                         6/17/2010                                                           Responder: Craig                                           164. Y       Closed                         Closed                   EICB RAI 173   7.1     7.1                                         6/17/2010                                                           Responder: Craig/Webb/Powers                               165. Y       Closed                         Closed                   EICB RAI C C C C                            g 174                                                         6/28/2010                                                           Responder: Hilmes/Craig                                   166. Y       Closed                         Closed                   EICB RAI 175                                                         June 28, 2010                                                       Responder:                                                 167. Y       Closed                         Closed                   EICB RAI a a G G G G G G G G G G G G 176    7.1     7.1                                        6/28/2010                                                           Responder: Craig/Webb                                     168. Y       Closed                         Closed                   EICB RAI 177   7.5.2. 7.5.1                                       7/15/2010                                                           Responder: Clark                                           169. Y       Closed                         Closed                   N/A                 TVA Letter dated RAI not required l
(
178  7.5.2. 7.5.1                                       7/15/2010                                                           Responder: Clark                                           170. Y       Closed                         Closed                   N/A                 TVA Letter dated RAI not required 179                                                         An emphasis is placed on traceability in System Requirements         Responder: WEC                                             171. Y       Closed                         Closed                   N/A - Closed to     NA 180                                                         The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC                                                 172. Y       Closed                         Closed                   N/A - Closed to     NA 181                                                         An emphasis is placed on traceability in System Requirements         Responder: WEC                                             173. Y       Closed                         Closed                   N/A - Closed to     NA 182                                                         Characteristics that the SRP states that a Software Requirements Responder: WEC                                                 174. Y       Closed                         Closed                   N/A - Closed to     NA 183                                                         7/15/2010                                                           Responder: WEC                                            15. Y        Open                          Open-NRC Review          EICB RAI        TVA Letter dated EICB (Carte)
G FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb 146. Y Closed Closed ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155 7.2 7.2
ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements        The generic Software Requirements Specification applies                Pending Submittal of Revision 3 Due 3/29/11              No. 9            Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993,     except as modified by the WBN Unit 2 System Requirements                of the Licensing Technical                                                No. 4 and even more so given the modifications to the standard listed in   Specification.                                                         Report due 3/29/11.            NNC 11/18/10: The Regulatory Guide 1.172, which breaks with typical NRC use of the                                                                                                             point behind this open word should to say Each identifiable requirement in an SRS must   TVA Response to Follow-up NRC Request:                                                                  item was that TVA must be traceable backwards to the system requirements and the design                                                                             Revised response included in demonstrate that the bases or regulatory requirements that is satisfies                 Please see the response to RAI item 12 in letter dated                  letter dated 12/22/10.          origin of each 12/22/10, NRC Matrix Item 144.                                                                          requirement in the On page 1-2 of the Post Accident Monitoring Systems Software                                                                                                                WEC requirements Requirements Specification in the background section, is the   TVA Response to Second Follow-up NRC Request:                               Response provided in letter     specification is known sentence Those sections of the above references that require                                                                                dated 10/21/10                 and documented. TVA modification from the generic PAMS are defined in the document This item was addressed by updating the Contract                                                            stated that this
(
G Summary of FSAR change document section 7.2 states that Date:
147. Y Closed Closed ML101720589, Item 156 7.2 7.2
(
G FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-Responder: WEC 148. Y Closed Closed ML101720589, Item TVA Letter dated Response on hold pending 157 7.2 7.2
(
G FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell 149. Y Close Closed ML101720589, Item TVA Letter dated 158 7.2 7.2
(
G FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell 150. Y Closed Closed ML101720589, Item TVA Letter dated 159 7.2 7.2
(
G FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig 151. Y Close Closed ML101720589, Item TVA Letter dated 160 7.2 7.2
(
G FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell 152. Y Close Closed ML101720589, Item TVA Letter dated 161 7.2 7.2
(
G FSAR section 7.2.2.3 states that changes to the control function Responder: Clark 153. Y Closed Closed ML101720589, Item TVA Letter dated 162 7.2 7.2
(
G FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell 154. Y Closed Closed ML101720589, Item TVA Letter dated 163 7.2 7.2
(
G Deleted by DORL Date:
155. Y Closed Closed ML101720589, Item 164 7.2 7.2 a
r g
l FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins 156. Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2
(
G FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark 157. Y Closed Closed ML101720589, Item TVA Letter dated 166 7.2 7.2
(
G Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark 158. Y Closed Closed ML101720589, Item TVA Letter dated 167 7.2 7.2
(
G FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark 159. Y Close Closed ML101720589, Item TVA Letter dated 168 7.2 7.2
(
G FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark 160. Y Close Closed ML101720589, Item TVA Letter dated 169
(
G 6/18/2010 Responder: Clark 161. Y Closed Closed 170
(
G 6/17/2010 Responder: Clark 162. Y Closed Closed 171 7.2 7.2
(
G 6/17/2010 Responder: Craig 163. Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item 172
(
G 6/17/2010 Responder: Craig 164. Y Closed Closed EICB RAI 173 7.1 7.1
(
G 6/17/2010 Responder: Craig/Webb/Powers 165. Y Closed Closed EICB RAI 174
(
G 6/28/2010 Responder: Hilmes/Craig 166. Y Closed Closed EICB RAI 175
(
G June 28, 2010 Responder:
167. Y Closed Closed EICB RAI 176 7.1 7.1
(
G 6/28/2010 Responder: Craig/Webb 168. Y Closed Closed EICB RAI 177 7.5.2.
7.5.1
(
M a
7/15/2010 Responder: Clark 169. Y Closed Closed N/A TVA Letter dated RAI not required 178 7.5.2.
7.5.1
(
M a
7/15/2010 Responder: Clark 170. Y Closed Closed N/A TVA Letter dated RAI not required 179
(
C An emphasis is placed on traceability in System Requirements Responder: WEC 171. Y Closed Closed N/A - Closed to NA 180
(
C The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC 172. Y Closed Closed N/A - Closed to NA 181
(
C An emphasis is placed on traceability in System Requirements Responder: WEC 173. Y Closed Closed N/A - Closed to NA 182
(
C Characteristics that the SRP states that a Software Requirements Responder: WEC 174. Y Closed Closed N/A - Closed to NA 183 EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies On page 1-2 of the Post Accident Monitoring Systems Software Requirements Specification in the background section, is the sentence Those sections of the above references that require modification from the generic PAMS are defined in the document Responder: WEC The generic Software Requirements Specification applies except as modified by the WBN Unit 2 System Requirements Specification.
TVA Response to Follow-up NRC Request:
Please see the response to RAI item 12 in letter dated 12/22/10, NRC Matrix Item 144.
TVA Response to Second Follow-up NRC Request:
This item was addressed by updating the Contract
: 15. Y Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10.
Response provided in letter dated 10/21/10 Open-NRC Review Due 3/29/11 NNC 11/18/10: The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Item No. 4


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radEB3ED.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR      NRC No.                                                                        Issue                                                      TVA Response(s)                        Acceptable       Status/ Current Actions     Resolution Path         RAI No. & Date       RAI Resp. Date               Comments Sec.      Sec.      POC                                                                                                                                                  Y/N referring purely to the changes from WNA-DS-01617-WBT Post           Compliance Matrix and adding Section 13, Origin Tracing of                                              information would be in Accident Monitoring System-System Requirements Specification         WBN2 PAMS System Requirements Specification to the                                                      CQ PAMS LTR Rev. 2.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments referring purely to the changes from WNA-DS-01617-WBT Post Accident Monitoring System-System Requirements Specification or is it saying that there are additional changes beyond those and that the SRS defines them?
or is it saying that there are additional changes beyond those and   Licensing Technical Report Revision 3 to address this that the SRS defines them?                                            concern. Attachment 2 contains WNA-LI-00058-WBT-P,                                                     NNC 2/3/11: CQ PMS Post-Accident Monitoring System (PAMS) Licensing                                                       LTR Rev. 2 Sections 11 If there are additional changes, what is their origin?                Technical Report, Revision 3, dated March 2011                                                         & 12 do not prove this (proprietary).                                                                                          information. TVA to proive a plan to address requested information.
If there are additional changes, what is their origin?
Compliance Matrix and adding Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification to the Licensing Technical Report Revision 3 to address this concern. Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).
information would be in CQ PAMS LTR Rev. 2.
NNC 2/3/11: CQ PMS LTR Rev. 2 Sections 11
& 12 do not prove this information. TVA to proive a plan to address requested information.
184
(
(
184                        C               7/15/2010                                                             Responder: WEC                                               175. Y       Closed                       Closed                   N/A - Closed to       N/A 185                                       7/15/2010                                                             Responder: WEC                                              16. N        Open                          Open-NRC Review        EICB RAI EICB (Carte)
C 7/15/2010 Responder: WEC 175. Y Closed Closed N/A - Closed to N/A 185 EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.
ML102980066 Item An emphasis is placed on the traceability of requirements in         Steve Clark to look at how to combine traceability items.                Response included in letter  NNC 11/18/10: (1)The No. 17 Software Requirements Specifications in the SRP, in the                                                                                         dated 12/22/10.              point behind this open unmodified IEEE std 830-1993, and even more so given the             Was addressed to during the 9/15 meeting and 9/20 - 9/21                                                item was that TVA must modifications to the standard listed in Regulatory Guide 1.172,       audit.                                                                                                  demonstrate that the which breaks with typical NRC use of the word should to say                                                                                                                 origin of each Each identifiable requirement in an SRS must be traceable       TVA Response to Follow-up NRC Request:                                                                      requirement in the backwards to the system requirements and the design bases or       (1) See NRC Matrix Item 144                                                                                WEC requirements regulatory requirements that is satisfies Also the NRC considers (2) There is no RTM for development of the individual                                                      specification is known that the SRS is the complete set of requirements used for the         reusable software elements. As listed in item 15 of                                                    and documented. TVA design of the software, whether it is contained within one document   Table 6-1 Document Requirements of WNA-LI-00058-                                                    stated that this or many. In order to evaluate an SRS against the guidance in the       WT-P, Revision 2, Post-Accident Monitoring System                                                    information would be in SRP the staff needs access to all the requirements.                    (PAMS) Licensing Technical Report submitted in TVA                                                    CQ PAMS LTR Rev. 2.
References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.
Letter to NRC, dated December 3, 2010, a RTM for                                                      (2) TVA also said it References 12, 27, 29, and 31-44 in the Post Accident Monitoring       implementation of the RSEDs (WNA-VR-00280-WBT)                                                        would provide a RTM Systems Software Requirements Specification are various types of     for the WBN Unit 2 Common Q PAMS has been                                                              for the RSED Reusable Software Element.                                         developed. This document is available for NRC audit at the Westinghouse Rockville office.                                                                    NNC 2/3/11: To be These references are used in the body of the SRS, for example:                                                                                                               addressed during next audit.
These references are used in the body of the SRS, for example:
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
186   7.7.8   7.7.1.12     (             7/15/2010                                                             Responder: Perkins/Clark                                     176. Y       Closed                       Closed                   EICB RAI No.6         TVA Letter dated 187                     ( ( D              By letter dated June 18, 2010, TVA docketed responses to NRC         Responder: Merten                                           177. N       Closed                       Closed                   ML101970033, Item TVA Letter dated Are these connections already C C a 188                                       By letter dated June 30, 2010, TVA docketed, Tennessee Valley        Responder: Clark                                            178. Y      Closed                        Closed                    ML101970033, Item TVA Letter dated
Responder: WEC Steve Clark to look at how to combine traceability items.
Was addressed to during the 9/15 meeting and 9/20 - 9/21 audit.
TVA Response to Follow-up NRC Request:
(1) See NRC Matrix Item 144 (2) There is no RTM for development of the individual reusable software elements. As listed in item 15 of Table 6-1 Document Requirements of WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC, dated December 3, 2010, a RTM for implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been developed. This document is available for NRC audit at the Westinghouse Rockville office.
: 16. N Open Response included in letter dated 12/22/10.
Open-NRC Review NNC 11/18/10: (1)The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.
(2) TVA also said it would provide a RTM for the RSED NNC 2/3/11: To be addressed during next audit.
EICB RAI ML102980066 Item No. 17 186 7.7.8 7.7.1.12
(
D a
7/15/2010 Responder: Perkins/Clark 176. Y Closed Closed EICB RAI No.6 TVA Letter dated 187
(
C By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}}, TVA docketed responses to NRC Responder: Merten 177. N Closed Closed ML101970033, Item TVA Letter dated Are these connections already 188
(
(
189             7.6.7                     7/20/2010                                                             Responder: Clark                                             179. Y       Closed                       Closed                   RAI No. 3             TVA Letter dated S
C By {{letter dated|date=June 30, 2010|text=letter dated June 30, 2010}}, TVA docketed, Tennessee Valley Responder: Clark 178. Y Closed Closed ML101970033, Item TVA Letter dated 189 7.6.7
i 190   7.9               ( (              FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981           Responder: Clark                                             180. Y       Closed                       Closed                   RAI No. 4             TVA Letter dated Closed to OI-331.
(
( (
S i
191   7.9               M M              NUREG-0800 Chapter 7, Section 7.9, "Data Communication               Responder: Jimmie Perkins                                   181. Y       Closed                       Closed                   ML10197016, Item TVA Letter dated C S 192   7.5.1. 7.5.2     a a              The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section             Responder: Clark                                             182. Y       Closed                       Closed                   Item No. 1 sent to     TVA Letter dated EICB RAI ML1028618855 sent to i
7/20/2010 Responder: Clark 179. Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9
193   7.5.1. 7.5.2                     The WBU2 FSAR, Section 7.5.2, Plant Computer System,               Responder: Clark                                             183. Y       Closed                       Closed                   Item No. 2 sent to     TVA Letter dated EICB RAI ML1028618855 sent to
(
S i
FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark 180. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.
191 7.9
(
C NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins 181. Y Closed Closed ML10197016, Item TVA Letter dated 192 7.5.1.
7.5.2
(
M a
The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark 182. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.
7.5.2
(
M a
The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark 183. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radEB3ED.docx                                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR      NRC No.                                                                    Issue                                                          TVA Response(s)                        Acceptable       Status/ Current Actions           Resolution Path     RAI No. & Date       RAI Resp. Date               Comments Sec.      Sec.      POC                                                                                                                                                    Y/N 194   7.5.1. 7.5.2.1   ( ( (          The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display                Responder: Costley/Norman                                    184. Y      Closed                            Closed                Item No. 3 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 195  7.5.1. 7.5.2.2  M M M          Bypassed and Inoperable Status Indication (BISI)                        Responder: Costley/Norman                                    185. Y      Closed                            Closed                Item No. 4 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a a 196  7.5.1. 7.5.2.2                  Bypassed and Inoperable Status Indication (BISI)                        Responder: Costley/Norman                                    186. Y      Closed                            Closed                Item No. 5 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 197                      ( (            Open Item 197 was never issued.                                                                                                      187. Y      Closed                            Closed 198  7.5.1. 7.5.2.2  M M X          SRP Section 7.5, Subsection III, Review Procedures states:            Responder: Costley/Norman                                    188. Y      Closed                            Closed                Item No. 6 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a 199  7.5.1. 7.5.2.3                  The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman                                                189. Y      Closed                            Closed                Item No. 7 sent to    TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200    7.2                              7/21/2010                                                              Responder: Clark                                              190. Y      Closed                            Closed                EICB RAI              TVA Letter dated
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 194 7.5.1.
7.5.2.1
(
(
201  7.7.1. 7.7.11    C              7/21/2010                                                              Responder: Webb                                              191. Y       Closed                             Closed               EICB RAI               TVA Letter dated 202  7.5.2                             7/22/2010                                                               Responder: WEC                                                17. N        Open                              Open-NRC Review      EICB RAI         TVA Letter dated NNC 1/5/11: See Also Open Item No.
M a
EICB (Carte)
The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman 184. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.
ML102980066 Item 10/5/10          81 and 86.
7.5.2.2
The letter (ML0003740165) which transmitted the Safety                 Revision 1 of the Licensing Technical Report will provide                  Pending Submittal of Revision 3 Due 2/25/11 &            No. 4 Evaluation for the Common Q topical report to Westinghouse             more detailed information on the changes to the platform.                  of the Licensing Technical          3/29/11 stated: "Should our criteria or regulations change so that our                                                                                     Report due 3/29/11.
(
conclusions as to the acceptability of the report are invalidated, CE                                                                                                             to provide information Nuclear Power and/or the applicant referencing the topical report       Rev. 2 of the Licensing Technical Report will include the                  Response included in letter    requested.
M a
will be expected to revise and resubmit their respective               applicability of guidance.                                                dated 12/22/10 documentation, or submit justification for continued applicability of                                                                                                             Due TBD the topical report without revision of the respective documentation."   TVA Response to Follow-up NRC Request:                                    Partial Response provided in Question No 81 identified many criteria changes; please revise the     WNA-LI-00058-WBT-P, Revision 2, Post-Accident                             letter dated 10/5/10 respective documentation or submit justification for continued          Monitoring System (PAMS) Licensing Technical Report applicability of the topical report.                                    (LTR) submitted in TVA Letter to NRC dated December 3,                     NNC 1/5/11: Summary provided 2010, contains the following change to address the NRC                     in Licensing Technical Report request:                                                                   R2 has been reviewed and found to be unacceptable.
Bypassed and Inoperable Status Indication (BISI)
Section 9, Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-                 LTR Section 9 evaluates the 1998 and Regulatory Guide 1.172 to show the origin of the                 compliance of the SRS to IEEE requirements has been added.                                               830-1998. There are two issues with this evaluation:
Responder: Costley/Norman 185. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.
The descriptions and commitments in the Topical Report                     (1) IEEE 830-1998 is not the (TR) still apply. The LTR provides compliance evidence to                 current SRP acceptance criteria.
7.5.2.2
the new ISG-04 criteria. The statement in the SE means that               IEEE 830-1998 has not been the TR can be evaluated against later NRC criteria when it                 formally endorsed by a appears.                                                                  regulatory guide.
(
(2) Westinghouse committed to Source: E-mail from Westinghouse (Matthew A. Shakun) to                   evaluate the SRS against 830 Bechtel (Mark S. Clark), RE: December 22 letter review,                   when the NRC identified several dated December 17, 2010                                                   inconsistencies.
M a
Partial TVA Response to Follow-up NRC Request:                             Yes ISG-4 is one new criteria, and an evaluation against it has Attachment 4 contains the results of the TVA analysis of                   been provided.
Bypassed and Inoperable Status Indication (BISI)
standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common                   In addition, LTR Rev. 2 Section Q PAMS design is acceptable.                                               13 states: The applicable NRC regulatory guides, IEEE and The final response is pending submittal of the Licensing                   EPRI industry standards fo the Technical Report Revision 3 scheduled for March 29, 2011.                 common Q PAMS are shown below. Compliance to these TVA Response to Follow-up NRC Request:                             codes and standards are stated in Section 4 of Reference 1.
Responder: Costley/Norman 186. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 X
(1) As discussed on page 9-1 of the Licensing Technical                   Reference 1 is the common Q Report (Attachment 2) a comparison of IEEE 830-1993                   topical report.
Open Item 197 was never issued.
and IEEE 830-1998 was performed and it was determined that the 1998 version enveloped all the
187. Y Closed Closed 198 7.5.1.
7.5.2.2
(
M a
SRP Section 7.5, Subsection III, Review Procedures states:
Responder: Costley/Norman 188. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.
7.5.2.3
(
M a
The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman 189. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Responder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.
7.7.11
(
C 7/21/2010 Responder: Webb 191. Y Closed Closed EICB RAI TVA Letter dated 202 7.5.2 EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."
Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.
Rev. 2 of the Licensing Technical Report will include the applicability of guidance.
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report (LTR) submitted in TVA Letter to NRC dated December 3, 2010, contains the following change to address the NRC request:
Section 9, Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-1998 and Regulatory Guide 1.172 to show the origin of the requirements has been added.
The descriptions and commitments in the Topical Report (TR) still apply. The LTR provides compliance evidence to the new ISG-04 criteria. The statement in the SE means that the TR can be evaluated against later NRC criteria when it appears.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 Partial TVA Response to Follow-up NRC Request:
contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.
The final response is pending submittal of the Licensing Technical Report Revision 3 scheduled for March 29, 2011.
TVA Response to Follow-up NRC Request:
(1) As discussed on page 9-1 of the Licensing Technical Report (Attachment 2) a comparison of IEEE 830-1993 and IEEE 830-1998 was performed and it was determined that the 1998 version enveloped all the
: 17. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Response included in letter dated 12/22/10 Partial Response provided in letter dated 10/5/10 NNC 1/5/11: Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.
LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluation:
(1) IEEE 830-1998 is not the current SRP acceptance criteria.
IEEE 830-1998 has not been formally endorsed by a regulatory guide.
(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.
Yes ISG-4 is one new criteria, and an evaluation against it has been provided.
In addition, LTR Rev. 2 Section 13 states: The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown below. Compliance to these codes and standards are stated in Section 4 of Reference 1.
Reference 1 is the common Q topical report.
Open-NRC Review Due 2/25/11 &
3/29/11 to provide information requested.
Due TBD EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 NNC 1/5/11: See Also Open Item No.
81 and 86.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radEB3ED.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR        NRC No.                                                                      Issue                                                    TVA Response(s)                          Acceptable       Status/ Current Actions       Resolution Path         RAI No. & Date     RAI Resp. Date                 Comments Sec.      Sec.      POC                                                                                                                                                  Y/N requirements of the 1993 version which is endorsed by Regulatory Guide 1.172. Therefore the use of IEEE 830-1998 is acceptable.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments requirements of the 1993 version which is endorsed by Regulatory Guide 1.172. Therefore the use of IEEE 830-1998 is acceptable.
(2) Table 9.1 IEEE Std 830-1998 Compliance of the Licensing Technical Report (Attachment 2) evaluates the Software Requirements Specification against the requirements of IEEE 830-1998.
(2) Table 9.1 IEEE Std 830-1998 Compliance of the Licensing Technical Report (Attachment 2) evaluates the Software Requirements Specification against the requirements of IEEE 830-1998.
(3) See TVA to NRC letter Watts Bar Nuclear Plant (WBN)
(3) See TVA to NRC letter Watts Bar Nuclear Plant (WBN)
Unit 2 - Instrumentation And Controls Staff Information Requests, dated February 25, 2011 Attachment 4 Common Q PAMS Regulatory Guide and IEEE Standard Analysis.
Unit 2 - Instrumentation And Controls Staff Information Requests, dated February 25, 2011 Attachment 4 Common Q PAMS Regulatory Guide and IEEE Standard Analysis.
(4) This section of the Licensing Technical Report (Attachment 2) has been relocated to section 15. The comment has been addressed by adding Reference 40 to TVA to NRC letter dated February 25, 2011, Attachment 4 which is the Common Q PAMS Regulatory Guide and IEEE Standard Analysis.
(4) This section of the Licensing Technical Report (Attachment 2) has been relocated to section 15. The comment has been addressed by adding Reference 40 to TVA to NRC {{letter dated|date=February 25, 2011|text=letter dated February 25, 2011}}, which is the Common Q PAMS Regulatory Guide and IEEE Standard Analysis.
( ( (  (  ( (
203 7.5.1.
203   7.5.1. 7.5.2                       7/26/2010                                                         Responder: Clark                                               192. Y       Closed                         Closed                     EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL 204   7.5.1. 7.5.2                       7/26/2010                                                         Responder: Costley/Norman                                       193. Y       Closed                         Closed                     EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL
7.5.2
(      (
(
205                                        7/26/2010                                                         Responder: Clark                                               194. Y       Closed                         Closed                     EICB RAI           TVA Letter dated Question B related to prior NRC M M M  M ( M M 206   7.5.1. 7.5.2                       7/27/2010                                                         Responder: Clark                                               195. Y       Closed                         Closed                     EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL 207                                       July 27, 2010                                                     Date:                                                           196. Y       Closed                         Closed C      C 208   7.5.2. 7.5.1                       7/27/2010                                                         Responder: Clark                                               197. Y       Closed                         Closed                     EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL a a a  a G a a 209   7.5.2. 7.5.1                       7/27/2010                                                         Responder: Clark                                               198. Y       Closed                         Closed                     EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL 210   7.5.2. 7.5.1                       7/27/2010                                                         Responder: Clark                                               199. Y       Closed                         Closed                     EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL 211   7.5.1.                               7/27/2010                                                         Responder: Clark                                               200. Y       Closed                         Closed                     EICB RAI           TVA Letter dated Relates to SE Sections:
M a
212   7.5.2                               7/27/2010                                                         Responder: WEC                                                  18. N        Open                          Open-NRC Review            EICB RAI EICB (Carte)
7/26/2010 Responder: Clark 192. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated             Application specific requirements for testing. This cannot be                Partial Response included in                              No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system       addressed in a topical report. Evaluation of how the                        letter dated 03/16/11 design specification and software requirements specification       hardware meets the regulatory requirements.
7.5.2
contain information to address the "Design Report on Computer                                                                                   Final response due 3/29/11 Integrity, Test and Calibration..." The staff has reviewed these   WEC to provide the information and determine where the documents, and it is not clear how this is the case.              information will be located.
(
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.       IEEE-603 1991:
M a
(2) Please describe how the information provided demonstrates           5.5 System Integrity. The safety systems shall be                                                      NNC 2/17/2011: IEEE conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.                   designed to accomplish their safety functions under the                                               603 Clause 5.5 full range of applicable conditions enumerated in the                                                 basically states that design basis.                                                                                         conditions identified in IEEE 603 Clauses 4.7 TVA Response: The applicable conditions and                                                         & 4.8 must be Common Q PAMS system compliance are contained in                                                   addressed in the WNA-LI-00058-WBT-P, Rev. 2, Post-Accident                                                         design. Energy supply Monitoring System (PAMS) Licensing Technical                                                       conditions have not Report submitted in TVA Letter to NRC dated                                                       been identified, or December 3, 2010, Section 11, Contract Compliance                                                 explicitly addressed.
7/26/2010 Responder: Costley/Norman 193. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205
Matrix items:
(
G 7/26/2010 Responder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.
7.5.2
(
M a
7/27/2010 Responder: Clark 195. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207
(
C July 27, 2010 Date:
196. Y Closed Closed 208 7.5.2.
7.5.1
(
M a
7/27/2010 Responder: Clark 197. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.
7.5.1
(
M a
7/27/2010 Responder: Clark 198. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.
7.5.1
(
M a
7/27/2010 Responder: Clark 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.
(
C 7/27/2010 Responder: Clark 200. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:
212 7.5.2 EICB (Carte) 7/27/2010 By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}} (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these documents, and it is not clear how this is the case.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
Responder: WEC Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.
WEC to provide the information and determine where the information will be located.
IEEE-603 1991:
5.5 System Integrity. The safety systems shall be designed to accomplish their safety functions under the full range of applicable conditions enumerated in the design basis.
TVA Response: The applicable conditions and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Section 11, Contract Compliance Matrix items:
87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI
87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI
: 18. N Open Partial Response included in letter dated 03/16/11 Final response due 3/29/11 Open-NRC Review NNC 2/17/2011: IEEE 603 Clause 5.5 basically states that conditions identified in IEEE 603 Clauses 4.7
& 4.8 must be addressed in the design. Energy supply conditions have not been identified, or explicitly addressed.
EICB RAI ML102980066 Item No. 10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                   radEB3ED.docx                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                                TVA Response(s)                        Acceptable Status/ Current Actions     Resolution Path       RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                    Y/N 300, 301 and 302 Environmental Seismic qualification of the equipment to meet the design basis requirements                                                                                 NNC 2/18/11: Clause 5.7 is acceptably 5.7 Capability for Test and Calibration. Capability for                                     addressed.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 300, 301 and 302 Environmental Seismic qualification of the equipment to meet the design basis requirements 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.
testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.
The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:
The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:
(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),
(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),
(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.
(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:
202 self test 350 Maintenance Bypass                                                                     NNC 2/18/2011: WNA-351 Loop Tuning Parameters,                                                                AR-00189-WBT Rev. 0 Table 5-2 shows a 400 and 401 3.7.2 Testing, Calibration, and MTTR of 7.2 hours. It Verification is not clear how this 402, 403 and 404, 3.7.3 Channel Bypass or satisfies the Removal from Operation contractual item No.
202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.
TVA Response: The requirements for repair and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:
179 Mean time to repair 202 self test 398 3.7 Maintenance 399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration NNC 2/18/11: Clause 5.7 is acceptably addressed.
NNC 2/18/2011: WNA-AR-00189-WBT Rev. 0 Table 5-2 shows a MTTR of 7.2 hours. It is not clear how this satisfies the contractual item No.
179.
179.
5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, The Contract repair, and adjustment of malfunctioning equipment.
The Contract Compliance Matrix Item 179 in Revision 3 of the LTR has been revised to show this item as a deviaition and to reflect TVAs acceptance of the 7.2 hour MTTR value. Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS)
Compliance Matrix Item 179 in Revision 3 of the TVA Response: The requirements for repair and LTR has been revised Common Q PAMS system compliance are contained in to show this item as a WNA-LI-00058-WBT-P, Rev. 2, Post-Accident deviaition and to reflect Monitoring System (PAMS) Licensing Technical TVAs acceptance of Report Section 11, TVA Contract Compliance Matrix the 7.2 hour MTTR items:
Licensing Technical Report, Revision 3, dated March 2011  
value. Attachment 2 179 Mean time to repair                                                                    contains WNA-LI-202 self test                                                                              00058-WBT-P, Post-398 3.7 Maintenance                                                                        Accident Monitoring 399 3.7.1 Troubleshooting                                                                  System (PAMS)
Licensing Technical 6.5 Capability for Testing and Calibration                                                  Report, Revision 3, dated March 2011


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radEB3ED.docx                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                            Acceptable Status/ Current Actions     Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                      Y/N 6.5.1 Means shall be provided for checking, with a high                                       (proprietary).
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.
degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.
This may be accomplished in various ways; for example:
This may be accomplished in various ways; for example:
(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.
(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.
Line 636: Line 1,467:
10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:
10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:
Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.
Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.
(proprietary).


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                             radEB3ED.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                        TVA Response(s)                          Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                Y/N If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.
TVA Response: Common Q PAMS system reliability and failure modes are described in:
TVA Response: Common Q PAMS system reliability and failure modes are described in:
WNA-AR-00180-WBT, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.
WNA-AR-00180-WBT, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.
Line 648: Line 1,483:
V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.
V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:
202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification
202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                           radEB3ED.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                          TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                Y/N 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.
Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.
Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.
The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.
The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.
Line 667: Line 1,505:
Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.
Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.
When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:
When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:
a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS)
a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c)
Licensing Technical Report Section 11 TVA Contract
Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS)
Licensing Technical Report Section 11 TVA Contract  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                   radEB3ED.docx                                                                                     Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                          Issue                                                  TVA Response(s)                          Acceptable       Status/ Current Actions       Resolution Path   RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                        Y/N Compliance Matrix items:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Compliance Matrix items:
107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.
107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.
TVA Response: No response required.
TVA Response: No response required.
Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (a) Energy Supply conditions are specified in WNA-DS-01617-WBT-P, System Requirements Specification Rev.
Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (a) Energy Supply conditions are specified in WNA-DS-01617-WBT-P, System Requirements Specification Rev.
4, Requirement 4.1-1 which requires 120Vac +/-10% and 60+/-3Hz. Power to the Common Q PAMS is provided from the 120Vac vital power system. Per WBN Unit 2 FSAR section 8.3.1.1 the vital 120 volt ac system specifications are 120Vac +/-2% and 60+/-0.5Hz. Based on this, the power provided meets the system requirements.
4, Requirement 4.1-1 which requires 120Vac +/-10% and 60+/-3Hz. Power to the Common Q PAMS is provided from the 120Vac vital power system. Per WBN Unit 2 FSAR section 8.3.1.1 the vital 120 volt ac system specifications are 120Vac +/-2% and 60+/-0.5Hz. Based on this, the power provided meets the system requirements.
Electromagnetic compatibility, seismic and environmental qualification of the equipment to meet the design basis requirements is documented in EQ-QR                                                                                                   WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (Proprietary)
Electromagnetic compatibility, seismic and environmental qualification of the equipment to meet the design basis requirements is documented in EQ-QR WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (Proprietary)
(Attachment 4). Attachment 5 contains EQ-QR                                                                                                   WBT-NP, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (non-proprietary). Attachment 6 contains CWA-11-3118, Application for Withholding Proprietary Information from Public Disclosure, EQ-QR-68-WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS), (Proprietary), dated February 28, 2011.
(Attachment 4). Attachment 5 contains EQ-QR WBT-NP, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (non-proprietary). Attachment 6 contains CWA-11-3118, Application for Withholding Proprietary Information from Public Disclosure, EQ-QR-68-WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS), (Proprietary), dated February 28, 2011.
(b) The Contract Compliance Matrix Item 179 in Revision 3 of the Licensing Technical Report will be revised to show this item as a deviation and to reflect TVAs acceptance of the 7.2 hour MTTR value. WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.
(b) The Contract Compliance Matrix Item 179 in Revision 3 of the Licensing Technical Report will be revised to show this item as a deviation and to reflect TVAs acceptance of the 7.2 hour MTTR value. WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.
213   7.5.2                     7/27/2010                                                     Responder: WEC                                                19. N        Open                          Open-NRC Review      EICB RAI EICB                                                                                                                                                                                                  ML102980066 Item (Carte)  By letter dated June 18, 2010 (ML101940236) TVA stated         Conformance with IEEE 603 is documented in the revised                      Pending Submittal of Revision 3 Due 3/29/11        No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system   Common Q PAMS Licensing Technical Report and the                           of the Licensing Technical design specification and software requirements specification  Common Q PAMS System Design Specification.                                 Report due 3/29/11.             NNC 2/3/11: The
213 7.5.2 EICB (Carte) 7/27/2010 By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}} (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.
: 19. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Open-NRC Review Due 3/29/11 NNC 2/3/11: The EICB RAI ML102980066 Item No. 18


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         radEB3ED.docx                                                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR            NRC No.                                                                            Issue                                                      TVA Response(s)                        Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date       RAI Resp. Date               Comments Sec.      Sec.          POC                                                                                                                                                  Y/N contain information to address the "Theory of Operation                                                                                                                       identified Description." The staff has reviewed these documents, and it is not Attachment 1 contains the proprietary version of                        Response is included in letter  documentation does clear how this is the case. The docketed material does not appear Westinghouse document Tennessee Valley Authority                          dated 10/25/10                  not include the design to contain the design basis information that is required to evaluate (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring                                                bases. Please provide compliance with the Clause of IEEE 603.                             System (PAMS), Licensing Technical Report, Revision 1,                  NNC to review and revise this    schedule for providing (1) Please provide the design basis (as described in IEEE 604       WNA-LI-00058-WBT-P, Dated October 2010                                question after LTR R2 is        the requested Clause 4) of the Common Q PAMS.                                                                                                              received.                        information.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.
(2) Please provide a regulatory evaluation of how the PAMs           Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory Westinghouse document Nuclear Automation Watts Bar 2 of operation.                                                       NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents DS-01667-WBT, Rev. 2 dated September 2010.
(1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS.
identified demonstrate compliance with this clause?
(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation.
For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?
contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 contains the proprietary version of Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Rev. 2 dated September 2010.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The Regulatory Guide 1.97 classification of the Common Q PAMS variables is documented in TVA Design Criteria WB-DC-30-7 Post Accident Monitoring Instrumentation which was submitted as Attachment 5 on TVA to NRC letter Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation And Controls Staff Information Requests dated June 18, 2010 (Reference 1)
The Regulatory Guide 1.97 classification of the Common Q PAMS variables is documented in TVA Design Criteria WB-DC-30-7 Post Accident Monitoring Instrumentation which was submitted as Attachment 5 on TVA to NRC letter Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation And Controls Staff Information Requests dated June 18, 2010 (Reference 1)
Line 694: Line 1,543:
The Common Q PAMS indications are used to support operator response to events described in chapter 15 of the WBN Unit 2 FSAR such as:
The Common Q PAMS indications are used to support operator response to events described in chapter 15 of the WBN Unit 2 FSAR such as:
RCCA/RCCA Bank dropped/misaligned Steam Generator Tube Rupture Inadvertent Loading of a Fuel Assembly Into an Improper Position Loss of Shutdown Power Major Reactor Coolant System Pipe Ruptures (Loss Of Coolant Accident)
RCCA/RCCA Bank dropped/misaligned Steam Generator Tube Rupture Inadvertent Loading of a Fuel Assembly Into an Improper Position Loss of Shutdown Power Major Reactor Coolant System Pipe Ruptures (Loss Of Coolant Accident)
Major Secondary System Pipe Rupture
Major Secondary System Pipe Rupture Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is received.
identified documentation does not include the design bases. Please provide schedule for providing the requested information.
214
(
C 7/27/2010 Responder: WEC 201. Y Closed Closed EICB RAI TVA Letter dated 215
(
(
214                          C                  7/27/2010                                                          Responder: WEC                                              201. Y      Closed                          Closed                  EICB RAI              TVA Letter dated
P 7/29/2010 Responder: WEC 202. Y Closed Closed 216 7.5.1.
(    (        (
7.5.2
215                                              7/29/2010                                                         Responder: WEC                                               202. Y       Closed                           Closed 216   7.5.1. 7.5.2                             7/29/2010                                                         Responder: Clark                                             203. Y       Closed                           Closed                   EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL 217                                             7/6/2010                                                           Responder: Clark                                             204. Y       Close                           Closed                   EICB RAI             TVA Letter dated
(
(                    (
M a
218                                              7/6/2010                                                           Responder: Clark                                             205. Y       Closed                           Closed                   EICB RAI             TVA Letter dated 219                                             8/4/2010                                                           Responder: TVA Licensing                                     206. Y       Closed                           Closed                   EICB RAI
7/29/2010 Responder: Clark 203. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217
(   ( M ( ( M ( ( ( ( M 220                                              8/4/2010                                                           Responder: Ayala                                             207. Y       Closed                           Closed                   EICB RAI             TVA Letter dated 221   7.7.1. 7.7.1.3                           8/4/2010                                                           Responder: Trelease                                         208. Y       Closed                           Closed                   EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL C                    P 222                                             8/4/2010                                                           Responder: Clark                                             209. Y       Close                           Closed                   EICB RAI             TVA Letter dated 223                                             8/4/2010                                                           Responder: Clark                                             210. Y       Closed                           Closed                   EICB RAI G  G a G G a G G G G a 224   7.5.1. 7.5.2                             8/4/2010                                                           Responder: Norman (TVA CEG)                                 211. Y       Closed                           Closed                   EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL 225                                             8/4/2010                                                           Responder: Scansen                                           212. Y       Close                           Closed                   EICB RAI             TVA Letter dated 226                                             8/4/2010                                                           Responder: TVA Licensing                                     213. Y       Closed                           Closed                   N/A - Information     TVA Letter dated See also Open Item Nos. 41 & 270.
(
227                                             8/4/2010                                                           Responder: Clark                                             214. Y       Close                           Closed                   EICB RAI             TVA Letter dated
G 7/6/2010 Responder: Clark 204. Y Close Closed EICB RAI TVA Letter dated 218
(
G 7/6/2010 Responder: Clark 205. Y Closed Closed EICB RAI TVA Letter dated 219
(
G 8/4/2010 Responder: TVA Licensing 206. Y Closed Closed EICB RAI 220
(
G 8/4/2010 Responder: Ayala 207. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.
7.7.1.3
(
M a
8/4/2010 Responder: Trelease 208. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222
(
G 8/4/2010 Responder: Clark 209. Y Close Closed EICB RAI TVA Letter dated 223
(
G 8/4/2010 Responder: Clark 210. Y Closed Closed EICB RAI 224 7.5.1.
7.5.2
(
M a
8/4/2010 Responder: Norman (TVA CEG) 211. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225
(
G 8/4/2010 Responder: Scansen 212. Y Close Closed EICB RAI TVA Letter dated 226
(
C 8/4/2010 Responder: TVA Licensing 213. Y Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.
227
(
G 8/4/2010 Responder: Clark 214. Y Close Closed EICB RAI TVA Letter dated  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radEB3ED.docx                                                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable       Status/ Current Actions           Resolution Path         RAI No. & Date     RAI Resp. Date                   Comments Sec. Sec. POC                                                                                                                                                  Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 228
( ( (
(
228                                  8/4/2010                                                           Responder: Clark                                               215. Y       Closed                           Closed                     EICB RAI           TVA Letter dated 229                 (               8/4/2010                                                           Responder: Clark                                               216. Y       Closed                           Closed                     EICB RAI           TVA Letter dated C C C                                                                                                                                            217. Y G
C 8/4/2010 Responder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated 229
230                                  8/4/2010                                                           Responder: Webb                                                             Closed                           Closed                     EICB RAI           TVA Letter dated 231                                   8/4/2010                                                           Responder: Clark                                               218. Y       Closed                           Closed                     EICB RAI           TVA Letter dated
(
( ( (    ( ( (
C 8/4/2010 Responder: Clark 216. Y Closed Closed EICB RAI TVA Letter dated 230
232                                  8/4/2010                                                           Responder: Clark                                               219. Y       Closed                           Closed                     RAI No. 5           TVA Letter dated 233                                   8/4/2010                                                           Responder: Clark                                               220. Y       Closed                           Closed                     EICB RAI           TVA Letter dated
(
(      ( (
C 8/4/2010 Responder: Webb 217. Y Closed Closed EICB RAI TVA Letter dated 231
234                                  8/4/2010                                                           Responder:                                                     221. Y       Closed                           Closed                     N/A - Duplicate     N/A C C C    C C S 235                                   8/4/2010                                                           Responder: TVA Licensing                                       222. Y       Closed                           Closed                     N/A                 N/A 236                                   8/4/2010                                                           Responder: Clark                                               223. Y       Close                             Closed                     EICB RAI           TVA Letter dated G      G G 237                                   8/4/2010                                                           Responder: Clark                                               224. Y       Closed                           Closed                     EICB RAI           TVA Letter dated i
(
238                                  8/4/2010                                                           Responder: Webb/Hilmes                                         225. Y       Closed                           Closed                     N/A - Duplicate     N/A 239                                   8/4/2010                                                           Responder: Hilmes                                             226. Y       Closed                           Closed                     N/A - Meeting       N/A 240                                   8/4/2010                                                           Responder: Clark                                               227. Y       Close                             Closed                     Ml102910008         TVA Letter dated 241                 (   (            8/4/2010                                                           Responder: Davies                                             228. Y       Closed                           Closed                     RAI No. 10         TVA Letter dated
G 8/4/2010 Responder: Clark 218. Y Closed Closed EICB RAI TVA Letter dated 232
(
S i
8/4/2010 Responder: Clark 219. Y Closed Closed RAI No. 5 TVA Letter dated 233
(
C 8/4/2010 Responder: Clark 220. Y Closed Closed EICB RAI TVA Letter dated 234
(
C 8/4/2010 Responder:
221. Y Closed Closed N/A - Duplicate N/A 235
(
G 8/4/2010 Responder: TVA Licensing 222. Y Closed Closed N/A N/A 236
(
G 8/4/2010 Responder: Clark 223. Y Close Closed EICB RAI TVA Letter dated 237
(
C 8/4/2010 Responder: Clark 224. Y Closed Closed EICB RAI TVA Letter dated 238
(
C 8/4/2010 Responder: Webb/Hilmes 225. Y Closed Closed N/A - Duplicate N/A 239
(
C 8/4/2010 Responder: Hilmes 226. Y Closed Closed N/A - Meeting N/A 240
(
G 8/4/2010 Responder: Clark 227. Y Close Closed Ml102910008 TVA Letter dated 241
(
S i
8/4/2010 Responder: Davies 228. Y Closed Closed RAI No. 10 TVA Letter dated 242
(
G 8/4/2010 Responder: Hilmes 229. Y Close Closed EICB RAI TVA Letter dated 243
(
(
242                  C   S            8/4/2010                                                            Responder: Hilmes                                              229. Y      Close                            Closed                    EICB RAI            TVA Letter dated G
C 8/3/2010 Responder: WEC 230. Y Closed Closed N/A - Closed to N/A 244 EICB (Carte) 8/3/2010 Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processes or additional project specific information for the...SCMP...shall be specified in the PQP.
i 243                                  8/3/2010                                                           Responder: WEC                                                 230. Y       Closed                           Closed                     N/A - Closed to     N/A 244                                   8/3/2010                                                           Responder: WEC                                                20. N        Open                              Open-NRC Review    EICB RAI        Response is                  LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202) contains many process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.
ML102980066 Item provided in letter            "Safety Evaluation" states: "the Section 8.2.2 of the Common Q SPM (ML050350234) states that         The process related requirements have been removed from                    Revised response is included in Due 2/25/11 Document No. 14          dated 10/25/10.              information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed   revision 2 of the Software Requirements Specification (SRS).                letter dated 12/22/10          revisions                                                          be docketed correspondence."
Please explain how the above meets the intent of the approved SPM.
using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS       Attachment 3 of letter dated 10/25/10 contains the                          Response is provided in letter    NNC 2/2/11: Issues                                                LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing   proprietary version of Westinghouse document Nuclear                      dated 10/25/10.                  with Common Q TR &                                                analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any   Automation, Watts Bar 2 NSSS Completion Program, I&C                                                          SPM compliance were                                              requested should include technical alternatives to the SPM processes or additional project specific   Projects, Software Requirements Specification for the Post                  NNC 11/18/10: SysRS Rev. 2        discussed in the weekly                                          information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP.       Accident Monitoring System, WNA-SD-00239-WBT,                              also contains process            public meetings.                                                  the NRC staff to make an independent Revision 2, Dated September 2010.                                          requirements that are more        Westinghouse to                                                  assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS                                                                                     appropriately incorporated into  perform Common Q TR                                              of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements,                                                                                   process documentation.            & SPM compliance self                                            requirements and the protection of for example all seventeen requirements in Section 2.3.2,     TVA Response to Follow-up NRC Request:                                                                             assessment; this will be                                          public health and safety."
Responder: WEC The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).
                                      "Configuration Control," address process requirements for    As shown is the listed documents, process related                                                                   discussed in detail on configuration control.                                        requirements have been deleted from the SRS and SysRS in                                                           the next audit.
of letter dated 10/25/10 contains the proprietary version of Westinghouse document Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, Dated September 2010.
Revision 3:
TVA Response to Follow-up NRC Request:
Please explain how the above meets the intent of the approved SPM.                                                          Attachment 1 contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.
As shown is the listed documents, process related requirements have been deleted from the SRS and SysRS in Revision 3:
Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010.
contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.
contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The documents discussed in Item 3 have been revised to address compliance with the Topical Report (TR) and the
The documents discussed in Item 3 have been revised to address compliance with the Topical Report (TR) and the
: 20. N Open Revised response is included in letter dated 12/22/10 Response is provided in letter dated 10/25/10.
NNC 11/18/10: SysRS Rev. 2 also contains process requirements that are more appropriately incorporated into process documentation.
Open-NRC Review Due 2/25/11 Document revisions NNC 2/2/11: Issues with Common Q TR &
SPM compliance were discussed in the weekly public meetings.
Westinghouse to perform Common Q TR
& SPM compliance self assessment; this will be discussed in detail on the next audit.
EICB RAI ML102980066 Item No. 14 Response is provided in letter dated 10/25/10.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radEB3ED.docx                                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                          Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date     RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                Y/N Software Program Manual (SPM).
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Software Program Manual (SPM).
245                                 8/3/2010                                                           Responder: WEC                                                21. N        Open                              Open-NRC Review          EICB RAI                              LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
245 EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).
ML102980066 Item                      "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the       Relates to the commitment to provide the test plan and the                  Pending Submittal of the Test    Due 3/29/11              No. 119                              information relied upon in the SE must required test documentation for systems developed using the       SPM compliance matrix                                                      Summary Report due 3/29/11                                                                        be docketed correspondence."
Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix contains the Westinghouse document Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010.
Common Q SPM. Please provide sufficient information for the                                                                                                                     NNC 2/2/11: Issues NRC staff to independently assess whether the test plan for WBN2   Attachment 9 contains the Westinghouse document Post                      Response included in letter      with the Common Q TR                                            LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1).           Accident Monitoring System Test Plan, WNA-PT-00138-                       dated 12/3/10                    & SPM were discussed                                            analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10                                                           in the weekly public                                            requested should include technical contains the Westinghouse Application for Withholding for                   Common Q PAMS Test                meetings.                                                      information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT-                   Summary Report scheduled to      Westinghouse to                                                the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010.                                 be submitted March 29, 2011.      perform Common Q TR                                            assessment regarding the acceptability
TVA Response to Follow-up NRC Request:
                                                                                                                                                                                                                    & SPM compliance self                                          of the proposal in terms of regulatory TVA Response to Follow-up NRC Request:                                                                       assessment                                                      requirements and the protection of public health and safety."
The results of the self assessment were reviewed by Westinghouse with the NRC on February 2, 2011 and were further reviewed by TVA during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011.
The results of the self assessment were reviewed by Westinghouse with the NRC on February 2, 2011 and were further reviewed by TVA during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011.
Corrections to WNA-TR-02451-WBT, Test Summary Report for the Post Accident Monitoring System and the self assessment were made as a result of the TVA review to ensure this comment was fully addressed.
Corrections to WNA-TR-02451-WBT, Test Summary Report for the Post Accident Monitoring System and the self assessment were made as a result of the TVA review to ensure this comment was fully addressed.
By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
246                                8/3/2010                                                          Responder: WEC                                                22. N        Open                              Open-NRC Review           EICB RAI         Response is          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
: 21. N Open Pending Submittal of the Test Summary Report due 3/29/11 Response included in letter dated 12/3/10 Common Q PAMS Test Summary Report scheduled to be submitted March 29, 2011.
ML102980066 Item provided in letter  "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM           As agreed ISG6 does not apply to the Common Q PAMS                          Pending Submittal of Revision 3  Due 3/29/11              No. 15          dated 10/25/10      information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be       platform. The information required to address this question                of the Licensing Technical                                                                        be docketed correspondence."
Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR
developed. Many other section of the SPM identify that this PQP   concerning the PQP and SPM has been added to                                Report due 3/29/11. PQP          NNC 2/2/11: Issues should contain information required by ISG6. Please provide the   compliance matrix in revision 1 of the Licensing Technical                  provided for audit the week of    with the Common Q TR                                            LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced,       Report.                                                                    2/28/11.                          & SPM implementation                                            analysis that supports the change please describe the documentation produced and provide the                                                                                                                       were discussed in the                                          requested should include technical information that the SPM states should be in the PQP.             Attachment 1 of letter dated 10/25/10 contains the                         Response is provided in letter    weekly public meetings.                                        information in sufficient detail to enable proprietary version of Westinghouse document Tennessee                     dated 10/25/10                    Westinghouse to                                                the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-                                                       perform Common Q TR                                            assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical                     NNC 11/18/10: PQP has not        & SPM compliance self                                          of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October                       been provided and CQ PAMS        assessment                                                      requirements and the protection of 2010                                                                       LTR Rev. 1 does not contain                                                                      public health and safety."
& SPM were discussed in the weekly public meetings.
comparable information.
Westinghouse to perform Common Q TR
TVA Response to Follow-up NRC Request:
& SPM compliance self assessment EICB RAI ML102980066 Item No. 119 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
246 EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.
Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.
of letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 TVA Response to Follow-up NRC Request:
The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.
The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.
The Westinghouse Watts Bar Unit 2 NSSS Completion I&C Projects Project Quality Plan, WNA-PQ-00220-WBT, Revision 1 is available for NRC audit at the Westinghouse Rockville Office and was available for review during the NRC Common Q PAMS audit during the week of February 28 to
The Westinghouse Watts Bar Unit 2 NSSS Completion I&C Projects Project Quality Plan, WNA-PQ-00220-WBT, Revision 1 is available for NRC audit at the Westinghouse Rockville Office and was available for review during the NRC Common Q PAMS audit during the week of February 28 to
: 22. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11. PQP provided for audit the week of 2/28/11.
Response is provided in letter dated 10/25/10 NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain comparable information.
Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR
& SPM implementation were discussed in the weekly public meetings.
Westinghouse to perform Common Q TR
& SPM compliance self assessment EICB RAI ML102980066 Item No. 15 Response is provided in letter dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radEB3ED.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable       Status/ Current Actions         Resolution Path       RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                    Y/N March 4, 2011. During the audit, the Westinghouse Quality Assurance in process audit of the Common Q PAMS project was reviewed by the NRC inspector with no issues identified.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments March 4, 2011. During the audit, the Westinghouse Quality Assurance in process audit of the Common Q PAMS project was reviewed by the NRC inspector with no issues identified.
( ( (
247
247                                  8/8/2010                                                             Responder: WEC                                                 231. Y       Closed                           Closed                 EICB RAI         Response is       LIC-101 Rev. 3 Appendix B Section 4, 248                                 8/8/2010                                                             Responder: WEC                                                 232. Y       Closed                           Closed                                   Response is       LIC-101 Rev. 3 Appendix B Section 4, C C C 249                                  8/8/2010                                                             Responder: WEC                                                 233. Y       Closed                           Closed                                                     LIC-101 Rev. 3 Appendix B Section 4, 250                                 8/8/2010                                                             Responder: WEC                                                23. N        Open                              Open-NRC Review                                            LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
(
                                                                                                                                                                                                                                                                                    "Safety Evaluation" states: "the The SPM describes the software and documents that will be           Westinghouse develops Software Release Reports/Records                      Revised response included in      NNC 2/2/11: To be                                          information relied upon in the SE must created and placed under configuration control. The SCMP (e.g.,     and a Configuration Management Release Report. Describe                    letter dated 12/22/10            addressed during the                                        be docketed correspondence."
C 8/8/2010 Responder: WEC 231. Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, 248
SPM Section 6, Software Configuration Management Plan)             the documents and when they will be produced. Summarize                                                      next audit.
(
describes the implementation tasks that are to be carried out. The   guidance on how to produce these records, focus on project                  Response included in letter                                                                  LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the     specific requirements in SPM etc.                                          dated 10/25/10.                                                                              analysis that supports the change tasks in the SCMP have been carried out in their entirety.                                                                                                                                                                                     requested should include technical Documentation should exist that shows that the configuration         TVA Response to Follow-up NRC Request:                                                                                                                                    information in sufficient detail to enable management tasks for that activity group have been successfully                                                                                                                                                                               the NRC staff to make an independent accomplished. Please provide information that shows that the CM     The following documentation shows that the configuration                                                                                                                  assessment regarding the acceptability tasks have been successfully accomplished for each life cycle       management tasks for that activity group have been                                                                                                                       of the proposal in terms of regulatory activity group.                                                      successfully accomplished.                                                                                                                                               requirements and the protection of public health and safety."
C 8/8/2010 Responder: WEC 232. Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, 249
: 1. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
(
: a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
C 8/8/2010 Responder: WEC 233. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, 250 EICB (Carte) 8/8/2010 The SPM describes the software and documents that will be created and placed under configuration control. The SCMP (e.g.,
: b. Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
SPM Section 6, Software Configuration Management Plan) describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.
: 2. WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.
251                                  8/8/2010                                                            Responder: WEC                                                24. N       Open                             Open-NRC Review                                             LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.
                                                                                                                                                                                                                                                                                    "Safety Evaluation" states: "the The SPM describes the software testing and documents that will be   The software testing performed and documents created are                    Pending Submittal of the Test    Due 3/29/11                                                information relied upon in the SE must created. The SPM also describes the testing tasks that are to be     addressed by the SPM Compliance matrix contained in                        Summary Report due 3/29/11                                                                    be docketed correspondence."
TVA Response to Follow-up NRC Request:
carried out. The acceptance criterion for software test             Revision 1 of the Licensing Technical Report.                                                                NNC 2/2/11: Issues implementation is that the tasks in the SPM have been carried out                                                                               Revised response included in      with the Common Q TR                                        LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that       Attachment 1 of the letter dated 10/25/10 contains the                     letter dated 12/22/10            & SPM were discussed                                        analysis that supports the change testing been successfully accomplished.                              Proprietary version of Westinghouses document titled:                                                       in the weekly public                                        requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2                         Partial response is provided in  meetings.                                                  information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS),                             letter dated 10/25/10            Westinghouse to                                            the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058-                                                         perform Common Q TR                                        assessment regarding the acceptability WBT-P, Dated October 2010                                                                                   & SPM compliance self                                      of the proposal in terms of regulatory assessment                                                  requirements and the protection of TVA Response to Follow-up NRC Request:                                                                                                                                   public health and safety."
The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished.
: 1.
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
: a.
Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
: b.
Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
: 2.
WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
: 23. N Open Revised response included in letter dated 12/22/10 Response included in letter dated 10/25/10.
Open-NRC Review NNC 2/2/11: To be addressed during the next audit.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
251 EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.
Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix contained in Revision 1 of the Licensing Technical Report.
of the letter dated 10/25/10 contains the Proprietary version of Westinghouses document titled:
Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS),
Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 TVA Response to Follow-up NRC Request:
Please see the response to RAI item 21 in letter dated
Please see the response to RAI item 21 in letter dated
: 24. N Open Pending Submittal of the Test Summary Report due 3/29/11 Revised response included in letter dated 12/22/10 Partial response is provided in letter dated 10/25/10 Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR
& SPM were discussed in the weekly public meetings.
Westinghouse to perform Common Q TR
& SPM compliance self assessment LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radEB3ED.docx                                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                        Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                              Y/N 12/22/10, NRC Matrix Item 250.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 12/22/10, NRC Matrix Item 250.
TVA Response to second Follow-up NRC Request:
TVA Response to second Follow-up NRC Request:
The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.
The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.
By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
252                                 8/8/2010                                                         Responder: WEC                                                25. N        Open                          Open-NRC Review                                          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
252 EICB (Carte) 8/8/2010 The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.
                                                                                                                                                                                                                                                                        "Safety Evaluation" states: "the The SPM contain requirements for software requirements           Explain response to AP1000 audit report.                                  Response included in letter  Due 2/25/11 (document                                    information relied upon in the SE must traceability analysis and associated documentation (see Section   RTM docketed NRC awaiting V&V evaluation of RTM.                          dated 12/22/10                submittals)                                              be docketed correspondence."
Responder: WEC Explain response to AP1000 audit report.
5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability     The following responses are based on WBN Unit 2 Common                     Read ML091560352              NNC 2/2/11: Updated                                      LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished.                      Q PAMS traceability:                                                                                     RTMs and                                                  analysis that supports the change specifications to be                                      requested should include technical Software requirements traceability analysis is described in                                             provided.                                                information in sufficient detail to enable the following documents:                                                                                                                                           the NRC staff to make an independent Requirements                                              assessment regarding the acceptability
RTM docketed NRC awaiting V&V evaluation of RTM.
: 1. WNA-LI-00058-WBT-P, Revision 2, Post-Accident                                                     traceability to be                                        of the proposal in terms of regulatory Monitoring System (PAMS) Licensing Technical                                                       addressed during he                                      requirements and the protection of Report submitted in TVA Letter to NRC dated                                                       next audit.                                              public health and safety."
The following responses are based on WBN Unit 2 Common Q PAMS traceability:
December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix
Software requirements traceability analysis is described in the following documents:
: 2. WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)
: 1.
: 3. WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix
: 2.
WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)
: 3.
WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.
The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:
The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:
: 1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 1.
The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 25. N Open Response included in letter dated 12/22/10 Read ML091560352 Open-NRC Review Due 2/25/11 (document submittals)
NNC 2/2/11: Updated RTMs and specifications to be provided.
Requirements traceability to be addressed during he next audit.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                   radEB3ED.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR        NRC No.                                                                    Issue                      TVA Response(s)                          Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec.      Sec.      POC                                                                                                                Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 2.
: 3. The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010.
The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
Attachment 11 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.
: 3.
The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010. 1 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
See Response to item 3 (Matrix Item Number 142)
See Response to item 3 (Matrix Item Number 142) 253
( ( ( ( ( ( ( ( ( ( ( ( ( ( ( (
(
253                                                        8/8/2010           Responder: Clark                                             234. Y       Closed                       Closed                                   TVA Letter dated Related to Open Item no. 83.
C 8/8/2010 Responder: Clark 234. Y Closed Closed TVA Letter dated Related to Open Item no. 83.
254                                                       8/10/2010           Responder: WEC                                               235. Y       Closed                       Closed               N/A - Request to     TVA Letter dated 255                                                       8/10/2010           Responder: WEC                                               236. Y       Closed                       Closed               N/A - Request to     TVA Letter dated 256                                                       8/10/2010           Responder: WEC                                               237. Y       Closed                       Closed               N/A - Request to     TVA Letter dated 257                                                       8/10/2010           Responder: WEC                                               238. Y       Closed                       Closed               N/A - Request to     N/A 258                                                       8/10/2010           Responder: WEC                                               239. Y       Closed                       Closed               N/A - Request to     N/A 259                                                       8/10/2010           Responder: WEC                                               240. Y       Closed                       Closed               N/A - Request to     TVA Letter dated 260                                                       8/10/2010           Responder: WEC                                               241. Y       Closed                       Closed               N/A - Request to     N/A C C C C C C C C C C C C C C C C 261                                                        8/10/2010           Responder: WEC                                               242. Y       Closed                       Closed               N/A - Closed to     TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
254
262                                                       8/10/2010           Responder: WEC                                               243. Y       Closed                       Closed               N/A - Request to     N/A 263                                                       8/11/2010           Responder: WEC                                               244. Y       Closed                       Closed               ML101650255, Item 264                                                       8/11/2010           Responder: WEC                                               245. Y       Closed                       Closed               ML101650255, Item 265                                                       8/11/2010           Responder: WEC                                               246. Y       Closed                       Closed               ML101650255, Item 266                                                       8/11/2010           Responder: Webb/Webber                                       247. Y       Closed                       Closed                                   TVA Letter dated 267                                                       8/11/2010           Responder: WEC                                               248. Y       Closed                       Closed 268                                                       8/19/2010           Responder: WEC                                               249. N       Closed                       Closed
(
( ( (
C 8/10/2010 Responder: WEC 235. Y Closed Closed N/A - Request to TVA Letter dated 255
269                                                        8/20/2010           Responder: NRC                                               250. Y       Closed                       Closed               N/A                 N/A
(
( ( (
C 8/10/2010 Responder: WEC 236. Y Closed Closed N/A - Request to TVA Letter dated 256
270                                                        8/23/2010           Responder: Clark                                             251. Y       Closed                       Closed                                                       See also Open Item Nod. 41 & 245.
(
M M M 271                                                       8/23/2010           Responder: WEC                                               252. Y       Closed                       Closed               N/A - Closed to     NA C C P 272   7.5.2. 7.5.1                                     8/26/2010           Responder: Clark                                             253. Y       Closed                       Closed               EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL a a a 273   7.5.2. 7.5.1                                     8/26/2010           Responder: Clark                                             254. Y       Closed                       Closed               EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL 274. 7.5.2. 7.5.1                                     8/26/2010           Responder: Clark                                             255. Y       Closed                       Closed               EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL
C 8/10/2010 Responder: WEC 237. Y Closed Closed N/A - Request to TVA Letter dated 257
(
C 8/10/2010 Responder: WEC 238. Y Closed Closed N/A - Request to N/A 258
(
C 8/10/2010 Responder: WEC 239. Y Closed Closed N/A - Request to N/A 259
(
C 8/10/2010 Responder: WEC 240. Y Closed Closed N/A - Request to TVA Letter dated 260
(
C 8/10/2010 Responder: WEC 241. Y Closed Closed N/A - Request to N/A 261
(
C 8/10/2010 Responder: WEC 242. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
262
(
C 8/10/2010 Responder: WEC 243. Y Closed Closed N/A - Request to N/A 263
(
C 8/11/2010 Responder: WEC 244. Y Closed Closed ML101650255, Item 264
(
C 8/11/2010 Responder: WEC 245. Y Closed Closed ML101650255, Item 265
(
C 8/11/2010 Responder: WEC 246. Y Closed Closed ML101650255, Item 266
(
C 8/11/2010 Responder: Webb/Webber 247. Y Closed Closed TVA Letter dated 267
(
C 8/11/2010 Responder: WEC 248. Y Closed Closed 268
(
C 8/19/2010 Responder: WEC 249. N Closed Closed 269
(
P 8/20/2010 Responder: NRC 250. Y Closed Closed N/A N/A 270
(
C 8/23/2010 Responder: Clark 251. Y Closed Closed See also Open Item Nod. 41 & 245.
271
(
C 8/23/2010 Responder: WEC 252. Y Closed Closed N/A - Closed to NA 272 7.5.2.
7.5.1
(
M a
8/26/2010 Responder: Clark 253. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.
7.5.1
(
M a
8/26/2010 Responder: Clark 254. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.
7.5.2.
7.5.1
(
M a
8/26/2010 Responder: Clark 255. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radEB3ED.docx                                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR            NRC No.                                                                            Issue                                                    TVA Response(s)                    Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date                   Comments Sec.       Sec.           POC                                                                                                                                            Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 274.
(
S i
8/26/2010 Responder: Stockton 256. Y Closed Closed RAI No. 6 TVA Letter dated 275
(
S i
8/27/2010 Responder: Clark 257. Y Closed Closed Not Required N/A 276 7.6 7.6
(
(
274.                                              8/26/2010                                                        Responder: Stockton                                      256. Y      Closed                        Closed              RAI No. 6          TVA Letter dated S
G 8/27/2010 Responder: Webb 258. Y Closed Closed EICB RAI TVA Letter dated 277 7.6 7.6.3
i
( ( ( ( (
275                                              8/27/2010                                                        Responder: Clark                                        257. Y      Closed                        Closed              Not Required        N/A 276    7.6      7.6                            8/27/2010                                                         Responder: Webb                                         258. Y       Closed                       Closed               EICB RAI           TVA Letter dated 277     7.6      7.6.3                            8/27/2010                                                        Responder: Clark                                        259. Y      Close                        Closed              EICB RAI            TVA Letter dated 278    7.6      7.6.6                            8/27/2010                                                        Responder: Trelease                                      260. Y      Close                        Closed              EICB RAI            TVA Letter dated D D D D D              (
279    7.6     7.6.6                            8/27/2010                                                        Responder: Mather                                        261. Y      Close                        Closed              EICB RAI            TVA Letter dated 280    7.6      7.6.6                            8/27/2010                                                        Responder: Trelease                                      262. Y      Closed                        Closed              EICB RAI            TVA Letter dated
(          ( ( ( ( ( ( (
281    7.6      7.6.8                            8/27/2010                                                        Responder: Webb                                          263.        Closed                        Closed              EICB RAI            TVA Letter dated a a a a a              S 282    7.6      7.6.9                            8/27/2010                                                        Responder: Trelease                                      264. Y      Close                        Closed              EICB RAI            TVA Letter dated 283    7.7.5      XX                              8/27/2010                                                        Responder: Clark                                        265. Y      Closed                        Closed              EICB RAI No.13      TVA Letter dated This item is a follow-up question to item G          G G G G G G G 284    7.7.3    7.4.1                            8/27/2010                                                        Responder: Webber                                        266. Y      Closed                        Closed              EICB RAI No.14      TVA Letter dated This item is a follow-up question to item 285    7.3.3      7.3                            8/27/2010                                                        Responder: McNeil                                        267. Y      Closed                        Closed              EICB RAI No.15      TVA Letter dated This item is a follow-up question to item i
286    7.7.3   9.3.4.2.4                        8/27/2010                                                        Responder: Webber                                        268. Y      Closed                        Closed              EICB RAI No.16      TVA Letter dated 287    7.3      7.3-1                            8/27/2010                                                        Responder: Elton                                        269. Y      Closed                        Closed              ML102390538, Item Response 288    7.3                                      9/2/2010                                                          Responder: McNeil                                        270. Y      Closed                        Closed              EICB RAI
( ( ( ( (
289                                              9/2/2010                                                          Responder: Faulkner                                      271. Y      Closed                        Closed              RAI No. 24          TVA Letter dated 290              7.7                            9/7/2010                                                          Responder: Clark                                        272. Y      Closed                        Closed              N/A                N/A                This item is a duplicate of item 291.
(
(
291              7.7                            9/7/2010                                                         Responder: Clark                                         273. Y      Closed                        Closed                                  TVA Letter dated
G 8/27/2010 Responder: Clark 259. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6
( D D D D D    ( ( (
292    7.2.5      7.2                            9/7/2010                                                          Responder: Craig                                        274. Y      Closed                        Closed              EICB RAI            TVA Letter dated M (
293    7.7.4    7.2.2.3.5                        9/8/2010                                                          Responder: Craig                                        275. Y       Closed                        Closed               EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL 294    7.3    7.3.1.1.1                        9/9/2010                                                          Responder: Elton                                        276. Y      Closed                        Closed              ML102390538, Item Response C a a a a a    C C S 295    7.3    7.3.1.1.2                        9/9/2010                                                          Responder: Elton                                        277. Y      Closed                        Closed              ML102390538, Item Response a G 296    7.3    7.3.1.2.1                        9/9/2010                                                          Responder: Elton                                        278. Y      Closed                        Closed              ML102390538, Item Response i
297    7.3    7.3.1.2.2                        9/9/2010                                                          Responder: Elton                                        279. Y      Closed                        Closed              ML102390538, Item Response 298    7.3      XX                              9/9/2010                                                          Responder: Clark                                        280. Y      Closed                        Closed              ML102390538, Item Response 299                                              Provide Common Q Software Requirements Specification Post        Attachment 41 of the 10/5 letter contains the Common Q  281. Y      Closed                        Closed                                  TVA Letter dated
(
(
300                                              Need Radiation Monitoring System Description/Design Criteria      Responder: Temples/Mather                                282. Y      Closed                        Closed              RAI No. 25          TVA Letter S
G 8/27/2010 Responder: Trelease 260. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6
i
(
( (
G 8/27/2010 Responder: Mather 261. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6
301                                              1.TVA is requested to address the consequences of software        Responder: WEC/Davies/Clark                              283. Y       Closed                       Closed              RAI No. 11          TVA Letter dated Note 1:
(
302    7.5.2. 7.5.1                            09/17/2010                                                       Responder: Tindell                                      284. Y       Closed                        Closed               EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL
G 8/27/2010 Responder: Trelease 262. Y Closed Closed EICB RAI TVA Letter dated 281 7.6 7.6.8
( ( ( (
(
303    7.5.2. 7.5.1                            09/17/2010                                                       Responder: Tindell                                      285. Y       Closed                       Closed               EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL 304    7.5.2. 7.5.1                            09/17/2010                                                       Responder: Tindell                                      286. Y      Closed                       Closed               EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL D D                      (
G 8/27/2010 Responder: Webb 263.
305    7.5.2. 7.5.1                            09/17/2010                                                       Responder: Tindell                                      287. Y       Closed                       Closed              EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL 306    7.1      7.1                            FSAR amendment 100, page 7.1-12 provides the definition of        Responder: Hilmes                                        288. Y      Closed                        Closed              EICB RAI            TVA Letter dated
Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9
(     ( ( ( ( ( ( ( M M M M 307    7.1      7.1                            (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of  Responder: Hilmes                                        289. Y       Closed                       Closed               EICB RAI           TVA Letter dated 308    7.1      7.1                            (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of  Responder: Hilmes                                        290. Y      Closed                        Closed              EICB RAI            TVA Letter dated a a                      S 309    7.1    7.1.2.1.9                        (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint        Responder: Hilmes                                        291. Y       Closed                       Closed               EICB RAI           TVA Letter dated 310    7.1    7.1.2.1.9                                                                                                                                                    292. Y G    G G G G G G G a a a a (1) FSAR amendment 100, Page 7.1-14, TVA setpoint                Responder: Hilmes                                                    Closed                        Closed              EICB RAI            TVA Letter dated 311    7.1      7.1                            Both Westinghouse and TVA setpoint methodology do not have        Responder: Hilmes                                        293. Y       Closed                       Closed               EICB RAI           TVA Letter dated i
(
312              7.0                            By letter dated September 10,2010, TVA provided the summary      Responder: Stockton                                      294. Y      Close                        Closed              EICB RAI            TVA Letter dated 313    7.7.8    7.7.1.12                          EDCR 52408 (installation of AMSAC in Unit 2) states that Design  Responder: Ayala                                        295. Y       Closed                       Closed               EICB RAI No.18      TVA Letter dated 314    7.3       7.3                             The following 50.59 changes were listed in the March 12 RAI      Responder: Stockton                                      296. Y       Closed                       Closed               EICB RAI No. 19    TVA Letter dated Related to OI 10 315    7.5.3     7.5.3                            IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations)                    297. Y      Close                        Closed              EICB RAI            TVA Letter dated 316    7.5.2. 7.5                            TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather                                    298. Y       Closed                       Closed               RAI No. 26
G 8/27/2010 Responder: Trelease 264. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX
(
D a
8/27/2010 Responder: Clark 265. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item 284 7.7.3 7.4.1
(
D a
8/27/2010 Responder: Webber 266. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item 285 7.3.3 7.3
(
D a
8/27/2010 Responder: McNeil 267. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item 286 7.7.3 9.3.4.2.4
(
D a
8/27/2010 Responder: Webber 268. Y Closed Closed EICB RAI No.16 TVA Letter dated 287 7.3 7.3-1
(
D a
8/27/2010 Responder: Elton 269. Y Closed Closed ML102390538, Item Response 288 7.3
(
G 9/2/2010 Responder: McNeil 270. Y Closed Closed EICB RAI 289
(
(
S i
S i
9/2/2010 Responder: Faulkner 271. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7
(
C 9/7/2010 Responder: Clark 272. Y Closed Closed N/A N/A This item is a duplicate of item 291.
291 7.7
(
C 9/7/2010 Responder: Clark 273. Y Closed Closed TVA Letter dated 292 7.2.5 7.2
(
G 9/7/2010 Responder: Craig 274. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.5
(
M a
9/8/2010 Responder: Craig 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.1
(
D a
9/9/2010 Responder: Elton 276. Y Closed Closed ML102390538, Item Response 295 7.3 7.3.1.1.2
(
D a
9/9/2010 Responder: Elton 277. Y Closed Closed ML102390538, Item Response 296 7.3 7.3.1.2.1
(
D a
9/9/2010 Responder: Elton 278. Y Closed Closed ML102390538, Item Response 297 7.3 7.3.1.2.2
(
D a
9/9/2010 Responder: Elton 279. Y Closed Closed ML102390538, Item Response 298 7.3 XX
(
D a
9/9/2010 Responder: Clark 280. Y Closed Closed ML102390538, Item Response 299
(
C Provide Common Q Software Requirements Specification Post 1 of the 10/5 letter contains the Common Q 281. Y Closed Closed TVA Letter dated 300
(
S i
Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather 282. Y Closed Closed RAI No. 25 TVA Letter 301
(
S i
1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark 283. Y Closed Closed RAI No. 11 TVA Letter dated Note 1:
302 7.5.2.
7.5.1
(
M a
09/17/2010 Responder: Tindell 284. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.
7.5.1
(
M a
09/17/2010 Responder: Tindell 285. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.
7.5.1
(
M a
09/17/2010 Responder: Tindell 286. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.
7.5.1
(
M a
09/17/2010 Responder: Tindell 287. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1
(
G FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes 288. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1
(
G (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes 289. Y Closed Closed EICB RAI TVA Letter dated 308 7.1 7.1
(
G (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes 290. Y Closed Closed EICB RAI TVA Letter dated 309 7.1 7.1.2.1.9
(
G (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes 291. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1.9
(
G (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes 292. Y Closed Closed EICB RAI TVA Letter dated 311 7.1 7.1
(
G Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes 293. Y Closed Closed EICB RAI TVA Letter dated 312 7.0
(
G By {{letter dated|date=September 10, 2010|text=letter dated September 10,2010}}, TVA provided the summary Responder: Stockton 294. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12
(
D a
EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala 295. Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3
(
D a
The following 50.59 changes were listed in the March 12 RAI Responder: Stockton 296. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3
(
G IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) 297. Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.
7.5
(
S i
TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather 298. Y Closed Closed RAI No. 26


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radEB3ED.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                          Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                    Y/N 3                             range monitors for WBN2.                                                                                                                                                                                 ML102980005 Please clarify the following:                                   The Sequoyah RM-1000 v1.1 Software Verification Report                             Response provided in letter    Response acceptable 10/26/2010 RM-1000 v1.1 Software Verification Report 04508006 (Sequoyah) 04508006 and RM-1000 v1.2 Software Verification Report                               dated 10/21/10                  per TVA letter of RM-1000 v1.2 Software Verification Report 04508006 (Sequoyah) 04508006 are applicable to WBN Unit 2.                                                                              10/21/10, Enclosure 1, RM-1000 System Verification Test Results (Sequoyah)                                                                                                                                Item 26.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 3
The RM-1000 System Verification Test Results report is not These documents were prepared for the Sequoyah plant. IS the applicable to WBN Unit 2. This document was for the non-version provided applicable to WBN2? Please confirm and explain safety related software and was superseded by the if these documents are applicable to WBN 2 as provided or with  04508006 v1.1 and v1.2 reports for the safety-related differences?                                                    software.
range monitors for WBN2.
Please clarify the following:
RM-1000 v1.1 Software Verification Report 04508006 (Sequoyah)
RM-1000 v1.2 Software Verification Report 04508006 (Sequoyah)
RM-1000 System Verification Test Results (Sequoyah)
These documents were prepared for the Sequoyah plant. IS the version provided applicable to WBN2? Please confirm and explain if these documents are applicable to WBN 2 as provided or with differences?
The Sequoyah RM-1000 v1.1 Software Verification Report 04508006 and RM-1000 v1.2 Software Verification Report 04508006 are applicable to WBN Unit 2.
The RM-1000 System Verification Test Results report is not applicable to WBN Unit 2. This document was for the non-safety related software and was superseded by the 04508006 v1.1 and v1.2 reports for the safety-related software.
Response provided in letter dated 10/21/10 Response acceptable per TVA letter of 10/21/10, Enclosure 1, Item 26.
ML102980005 10/26/2010 317 7.5.2.
7.5
(
(
317  7.5.2. 7.5                  TVA has provided a proprietary and a non-proprietary version of       Responder: Temples                                             299. Y       Closed                         Closed                     RAI No. 27         TVA Letter dated S
S i
i 318   7.5.2. 7.5                   TVA has provided the following documents for RM-1000                 Responder: Temples                                              26. N        Open                            Open-NRC Review            RAI No. 28        TVA Letter dated 3                            equipment qualification:                                                                                                                                                                                     ML102980005        10/29/10, Encl 1 Revised response is included in Due 2/25/11                10/26/2010        Item 34, and TVA (i)     Qualification Test Report for RM-1000 Processor Module                                                                                     letter dated 12/22/10.                                                        letter 11/24/10, and Current-To-Frequency Converter 04508905-QR               (i)     Applicable to WBN Unit 2. 04508905-1QR is                                                           Response update                              Att. 2.
TVA has provided a proprietary and a non-proprietary version of Responder: Temples 299. Y Closed Closed RAI No. 27 TVA Letter dated 318 7.5.2.
(January 2001)                                                        applicable only in regards to the RM-1000, with the                 Note check 04508905-1QR or required. It is clear that (ii)    Qualification Test Report Supplement, RM-1000 Upgrades                exception of re-qualification of certain RM-1000                     QR. Staff version is QR only. 04508903-2SP and -
3 7.5 EICB (Singh)
04508905-1SP (June 2006)                                              equipment differences covered in the -1SP report.                                                    3SP are not applicable.
TVA has provided the following documents for RM-1000 equipment qualification:
(iii)  Qualification Test Report Supplement, RM-1000 Upgrades                The Current-to-Frequency (I-F) converter module                     Response is included in letter The response for 04508905-2SP (June 2008)                                              qualifications in the base report and the -1SP report               dated 10/29/10                  applicability of (iv)    Qualification Test Report Supplement, RM-1000 Upgrades                are not applicable to the RM-1000s, and will be used                                                 04508905-QR and -
(i)
04508905-3SP (May 2008)                                              later as references in the WBN Unit 2 specific                                                       1SP to RM-1000 and IF qualification reports.                                                                              converter is not clear.
Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001)
Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then        (ii)   Applicable to WBN Unit 2.                                                                           Check page numbers of please clarify what those are.                                                                                                                                                    Appendix F (iii)   Not applicable to WBN Unit 2 (missing/duplicate Supplement 3 was issued one month prior to supplement 2.              (iv)   Not applicable to WBN Unit 2                                                                         pages).
(ii)
Please explain the reason for the same.                                                                                                                                            Check applicability of The 04508905-3SP report was prepared for another TVA                                                         Appendix C to RM1000 plant, as a monitor system-level report, where the system                                                   instead of RM2300?
Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006)
included equipment mostly based on the base report                                                           See items 336 and 337.
(iii)
EICB (Singh) equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP                                                   All equipment document review/release process resulted in the release                                                     qualification reports time difference.                                                                                             including supplements 2SP and 3SP have TVA Response to Follow-up NRC Request:                                                                       been reviewed as vendor drawings for NOTE: The response for the current to frequency (I to F)                                                     WBN-2. Please explain converter in item 1 below is a reversal of the                                                         the reason for response previously provided in TVA to NRC letter                                                     applicability of one dated October 29, 2010 (Reference 22). General                                                         report and not the Atomics Electronic Systems Inc. (GA-ESI) notified                                                     other.
Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008)
TVA of this change on December 8, 2010 (Reference 20).                                                                                       Further all TVA/Bechtel reviews seems to be (1) The applicability of the qualification reports from GA-                                                 dispositioned as Code ESI e-mail dated December 10, 2010 (Reference 19) is                                                   4, Review not required.
(iv)
as follows:                                                                                             Work may proceed.
Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)
The applicable reports
Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then please clarify what those are.
: a. 04508905-QR Qualification Test Report for RM-                                                 should have been 1000 Processor Module and Current-to-                                                           reviewed prior to Frequency Converter is applicable to the WBN                                                   dispositioning them.
Supplement 3 was issued one month prior to supplement 2.
Unit 2 RM-1000 and I to F converter modules.                                                   Please explain the apparent lack of review
Please explain the reason for the same.
: b. 04508905-1SP Supplement to Qualification Test                                                 of WBN-2 applicable
Responder: Temples (i)
Applicable to WBN Unit 2. 04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report.
The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.
(ii)
Applicable to WBN Unit 2.
(iii)
Not applicable to WBN Unit 2 (iv)
Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release time difference.
TVA Response to Follow-up NRC Request:
NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC {{letter dated|date=October 29, 2010|text=letter dated October 29, 2010}} (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).
(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19) is as follows:
: a.
04508905-QR Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.
: b.
04508905-1SP Supplement to Qualification Test
: 26. N Open Revised response is included in letter dated 12/22/10.
Note check 04508905-1QR or QR. Staff version is QR only.
Response is included in letter dated 10/29/10 Open-NRC Review Due 2/25/11 Response update required. It is clear that 04508903-2SP and -
3SP are not applicable.
The response for applicability of 04508905-QR and -
1SP to RM-1000 and IF converter is not clear.
Check page numbers of Appendix F (missing/duplicate pages).
Check applicability of Appendix C to RM1000 instead of RM2300?
See items 336 and 337.
All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.
Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, Review not required.
Work may proceed.
The applicable reports should have been reviewed prior to dispositioning them.
Please explain the apparent lack of review of WBN-2 applicable RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10, Encl 1 Item 34, and TVA letter 11/24/10, Att. 2.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radEB3ED.docx                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                        Acceptable Status/ Current Actions     Resolution Path       RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                  Y/N Report for RM-1000 Processor Module and                                                 documents. Was Current-to-Frequency Converter is applicable to                                       appropriate review the WBN Unit 2 RM-1000 module.                                                         guidance used?
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Report for RM-1000 Processor Module and Current-to-Frequency Converter is applicable to the WBN Unit 2 RM-1000 module.
: c. 04508905-1SP is not applicable to the WBN Unit                                         Further update required 2 I to F converter module.
: c.
Provide model
04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.
: d. 04508905-2SP Qualification Test Report                                                 number/part number for Supplement, I-F Converter Upgrades is                                                 the RM-1000 and I/F applicable to the WBN Unit 2 I to F converter                                           converter used for module.                                                                                 WBN-2. This information is needed GA-ESI provided two other reports required to support                                       to verify that the model qualification of the containment high range radiation                                       or part number used is monitors. The report descriptions are from GA-ESI e-                                         the equipment that has mail on December 8, 2010 (Reference 20). The                                                 been qualified for WBN-reports are:                                                                                 2.
: d.
: e. GA-ESI report 04038903-QSR, Qualification Provide qualification Summary Report for Watts Bar Nuclear Plant Unit reports 04038903-QSR 2 Replacement Radiation Monitors: The report is and 04038903-7SP by the principle report and the starting point for all the dues date of the radiation monitors provided as part of the 1/22/11.
04508905-2SP Qualification Test Report Supplement, I-F Converter Upgrades is applicable to the WBN Unit 2 I to F converter module.
replacement contract. The report describes each monitor; referenced to the technical manual for Submit a copy of any the physical and functional description and lists other relevant reviewed the major components of the monitor system.
GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are:
versions of the Report section 3 identifies the TVA Watts Bar Unit qualification reports.
: e.
2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements Submit copies of the for each monitor. In section 4 a brief description reviewed reports for of GA-ESI generic qualification programs for all 04508905-QR, radiation monitoring equipment in each of the four 04508905-1SP, above areas is provided. The qualification basis 04508905-2SP.
GA-ESI report 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors: The report is the principle report and the starting point for all the radiation monitors provided as part of the replacement contract. The report describes each monitor; referenced to the technical manual for the physical and functional description and lists the major components of the monitor system.
for each monitor is provided in a separate supplement to the principle report and is identified Clarification of in section 5.
Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified in section 5.
applicability of existing
: f.
: f. GA-ESI report 04038903-7SP, Qualification                                             reports is acceptable.
GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -
Basis for 04034101-001 (2-RE-90-271, -272, -
273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]: GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.
273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]: GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.
(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010
(2) This is addressed by response to RAI Question 336 in TVA to NRC {{letter dated|date=November 24, 2010|text=letter dated November 24, 2010}} documents. Was appropriate review guidance used?
Further update required Provide model number/part number for the RM-1000 and I/F converter used for WBN-2. This information is needed to verify that the model or part number used is the equipment that has been qualified for WBN-
: 2.
Provide qualification reports 04038903-QSR and 04038903-7SP by the dues date of 1/22/11.
Submit a copy of any other relevant reviewed versions of the qualification reports.
Submit copies of the reviewed reports for 04508905-QR, 04508905-1SP, 04508905-2SP.
Clarification of applicability of existing reports is acceptable.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radEB3ED.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                                TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                    Y/N (Reference 8)
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (Reference 8)
(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(3) This is addressed by response to RAI Question 337 in TVA to NRC {{letter dated|date=November 24, 2010|text=letter dated November 24, 2010}} (Reference 8)
(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades is not applicable to WBN Unit 2 (Reference 19).
(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades is not applicable to WBN Unit 2 (Reference 19).
Please see Item 1, above, for applicability of the other reports.
Please see Item 1, above, for applicability of the other reports.
(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.
(5) TVA provided the proprietary versions of the reports by {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} (Reference 10). By {{letter dated|date=July 15, 2010|text=letter dated July 15, 2010}} (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.
04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.
04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.
(6) See item 5.
(6) See item 5.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The following documents are the qualification documents associated with the RM-1000 radiation monitors:
The following documents are the qualification documents associated with the RM-1000 radiation monitors: contains the approved proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade.
Attachment 5 contains the approved proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade.
contains the approved proprietary version of General Atomics Electronic Systems 04508905-2SP, Qualification Test Report Supplement, I-F Converter Upgrades.
Attachment 6 contains the approved proprietary version of General Atomics Electronic Systems 04508905-2SP, Qualification Test Report Supplement, I-F Converter Upgrades.
contains the approved proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274).
Attachment 7 contains the approved proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274).
contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. In order to meet the NRC submittal schedule, the engineering review of this document was limited to the RM-1000. The document has been accepted for the RM-1000 monitors. Engineering approval will not occur until full review for all covered monitors is complete.
Attachment 8 contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. In order to meet the NRC submittal schedule, the engineering review of this document was limited to the RM-1000. The document has been accepted for the RM-1000 monitors. Engineering approval will not occur until full review for all covered monitors is complete.
3 contains the approved proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter.  
Attachment 23 contains the approved proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radEB3ED.docx                                                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR      NRC No.                                                                    Issue                                                      TVA Response(s)                            Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date   RAI Resp. Date                   Comments Sec.      Sec. POC                                                                                                                                                      Y/N 319   7.5.2. 7.5                     TVA provided System Verification Test Results 04507007-1TR           Responder: Temples                                              300. Y      Closed                          Closed              RAI No. 29              TVA Letter dated 3                                (July 1999) for Sequoyah to support test verification. However, the                                                                                                                 -Response Acceptable ML102980005            10/29/10 document states (page v) that it is not applicable for high range     See TVA letter to the NRC dated October 21, 2010, item 26                     Response is included in letter                        10/26/2010              Enclosure 1 Item monitors with an action noted for fixing a problem with the high      (RAI Matrix Item 316) for non-applicability of 04507007-1TR.                 dated 10/29/10                                                                No. 35 EICB (Singh) range RM-1000 monitors on page vi. TVA to respond to the              The recorded anomaly was later resolved through the                                                           Due 10/31/10 following clarifications:                                            verification of software version 1.2, reported in RM-1000 v1.2 Software Verification Report 04508006.                                                                        Response acceptable.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 319 7.5.2.
Has the anomaly noted on page vi been resolved for the high                                                                                                                          TVA to issue letter and range monitors?                                                      The high range verification documents are the Sequoyah                                                         confirm stated (future)
3 7.5 EICB (Singh)
RM-1000 v1.1 Software Verification Report 04508006 and                                                         dates Provide the high range verification document for WBN2.                RM-1000 v1.2 Software Verification Report 04508006.
TVA provided System Verification Test Results 04507007-1TR (July 1999) for Sequoyah to support test verification. However, the document states (page v) that it is not applicable for high range monitors with an action noted for fixing a problem with the high range RM-1000 monitors on page vi. TVA to respond to the following clarifications:
E 320                      I             Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY                 Responder: Clark                                                 301. Y       Closed                           Closed                   N/A               N/A                 Duplicate of item 156 321                       ( E           For the purposes of measuring reactor coolant flow for Reactor       Responder: Clark                                                 302. Y       Closed                           Closed                   N/A               N/A                 Duplicate of OI# 157 C I 322           7.7.1.11                 Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark                                                       303. Y       Closed                           Closed 323                                     WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1                                                  27. Y        Open                            Open-TVA                                    TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An                                                                                                                                                                     10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to                          Due 3/29/11                      Due:                                        Enclosure 1 Item to the NRC by November 15, 2010                                       Revision 2 Change Analysis.                                                                                                                                 No. 36 Revised Response is included in Need to provide TVA Response to Follow-up NRC Request                                         letter dated 10/29/10          additional info on why A FSAR change will be submitted in a future FSAR                                                             Rev. 1 is acceptable for amendment to change the revision level back to 1.                            The staff is confused with the  both units.
Has the anomaly noted on page vi been resolved for the high range monitors?
response since both units have TVA Response to Second Follow-up NRC Request                                 reference leg not insulated Rev 3/10/11 2 should apply to Unit 1 also  Staff does not agree The differences between the Revision 1 and Revision 2                         and there should be no          with the statement that EICB(Garg)
Provide the high range verification document for WBN2.
WCAPs is documented in Attachment 12, WCAP 13869                             difference between Unit 1 and 2 there is no technical Revision 1 to Revision 2 Change Analysis, to TVA to NRC                                                     differences between letter dated October 29, 2010 (Reference 2). The design                                                       WCAP-13869 rev.1 and bases for the response to feedwater break inside                                                             rev2., but staff agree containment, as documented in Chapter 15 of the WBN Unit                                                     that rev1 and change 2 FSAR, is the same for WBN Unit 1. Since WBN Unit 2 is                                                       analysis could be basis required to match the WBN Unit 1 licensing basis to the                                                       for acceptance for both extent practical, the decision was made to revise the WBN                                                     Watts Bar units.
Responder: Temples See TVA letter to the NRC dated October 21, 2010, item 26 (RAI Matrix Item 316) for non-applicability of 04507007-1TR.
Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1.                                                                                                   4/6/11 TVA response is acceptable, however this item remains open until TVA makes changes to FSAR.
The recorded anomaly was later resolved through the verification of software version 1.2, reported in RM-1000 v1.2 Software Verification Report 04508006.
324                     B B              Per the NRC reviewer, the BISI calculation is not required to be                                                                       304. Y       Closed                           Closed
The high range verification documents are the Sequoyah RM-1000 v1.1 Software Verification Report 04508006 and RM-1000 v1.2 Software Verification Report 04508006.
300. Y Closed Response is included in letter dated 10/29/10 Closed
-Response Acceptable Due 10/31/10 Response acceptable.
TVA to issue letter and confirm stated (future) dates RAI No. 29 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 35 320 E
I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark 301. Y Closed Closed N/A N/A Duplicate of item 156 321 E
I For the purposes of measuring reactor coolant flow for Reactor Responder: Clark 302. Y Closed Closed N/A N/A Duplicate of OI# 157 322 7.7.1.11
(
C Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark 303. Y Closed Closed 323 EICB(Garg)
WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and their acceptability will be submitted to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
TVA Response to Follow-up NRC Request A FSAR change will be submitted in a future FSAR amendment to change the revision level back to 1.
TVA Response to Second Follow-up NRC Request The differences between the Revision 1 and Revision 2 WCAPs is documented in Attachment 12, WCAP 13869 Revision 1 to Revision 2 Change Analysis, to TVA to NRC {{letter dated|date=October 29, 2010|text=letter dated October 29, 2010}} (Reference 2). The design bases for the response to feedwater break inside containment, as documented in Chapter 15 of the WBN Unit 2 FSAR, is the same for WBN Unit 1. Since WBN Unit 2 is required to match the WBN Unit 1 licensing basis to the extent practical, the decision was made to revise the WBN Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1.
: 27. Y Open Due 3/29/11 Revised Response is included in letter dated 10/29/10 The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA Due:
Need to provide additional info on why Rev. 1 is acceptable for both units.
3/10/11 Staff does not agree with the statement that there is no technical differences between WCAP-13869 rev.1 and rev2., but staff agree that rev1 and change analysis could be basis for acceptance for both Watts Bar units.
4/6/11 TVA response is acceptable, however this item remains open until TVA makes changes to FSAR.
TVA Letter dated 10/29/10 Item No. 36 324
(
M a
Per the NRC reviewer, the BISI calculation is not required to be 304. Y Closed Closed 325 B
(
G The Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson 305. Y Closed Closed Closed to open item ?
326 B
(
G TVA uses double-sided methodology for as-found and as-left Responder: Webb 306. Y Closed Closed TVA Letter dated 327 DORL (Poole) 6 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.
Responder: Webber In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
: 28. Y Open Response Included in letter dated 11/24/10 Open-NRC Review Due 11/24/10 328 7.5.2.
7.5
(
S i
Provide the model number for the four containment high range Responder: Temples 307. Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7
(
(
( (
S i
325                        M            The Unit 2 loops in service for Unit 1 that are scheduled to be      Responder: TVA Startup Olson                                    305. Y       Closed                          Closed                                                           Closed to open item ?
Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark 308. Y Closed Closed RAI No. 1 TVA Letter dated 330 7.3 7.3
G G a
326                                      TVA uses double-sided methodology for as-found and as-left            Responder: Webb                                                  306. Y      Closed                          Closed                                      TVA Letter dated 327                                      Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber                                                28.        Y        Open                            Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is                          Response Included in letter      Due 11/24/10 31, 2011.                                                        no proprietary information contained in the 08F802403-SC-                        dated 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
(
(
328  7.5.2. 7.5                    Provide the model number for the four containment high range          Responder: Temples                                              307. Y      Closed                          Closed                    RAI No. 30        TVA Letter dated S
D a
i
Related to Item 298 Responder: Hilmes/Faulkner 309. Y Closed Closed EICB RAI No.20 Item 7, TVA letter  
(                                                                                                                                                      308. Y 329  7.6.1    7.6.7  D (              Section 7.6.7 of the FSAR (Amendment 100) states that, The          Responder: Clark                                                              Closed                          Closed                    RAI No. 1          TVA Letter dated a S i                                                                                                                                                    309. Y 330    7.3      7.3                    Related to Item 298                                                   Responder: Hilmes/Faulkner                                                   Closed                           Closed                   EICB RAI No.20     Item 7, TVA letter


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 radEB3ED.docx                                                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR      NRC No.                                                                  Issue                                                      TVA Response(s)                          Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date       RAI Resp. Date                 Comments Sec.      Sec. POC                                                                                                                                                  Y/N 331   7.6.1   7.6.7   (               As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark                                 310. Y       Closed                         Closed                     RAI No. 8             TVA Letter dated Follow-up of OI-190.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 331 7.6.1 7.6.7
( (
(
332   7.5.2. 7.5.1   D    (         10/26/2010                                                                                                                         311. Y       Closed                         Closed                     ML103000105 Item TBD                   EICB RAI ML103000105 sent to DORL M M 333   7.5.2. 7.5.1   a     S          10/27/2010                                                                                                                         312. Y       Closed                         Closed                     ML103000105 Item TBD                   EICB RAI ML103000105 sent to DORL a a i
S i
334     7       7                       FSAR Figure 7A-3 Mechanical Flow and Control Diagram               Responder: Stockton                                           313. Y       Closed                         Closed                     RAI not required. N/A               RAI not required because the figure is 335   7.6.1   7.6.7                   LPMS: Reference to OI-331, sub item 2.                             Responder: WEC                                                29. Y        Open                            Open-NRC Review        The report                                We need to confirm when MEEB when addresses this open                        they will complete their review of the Provide analysis, test, or combined analysis and test for normal   TVA has reviewed the information provided by                                Partial Response included in    Submit qual report by item, however, the                          seismic qualification report.
As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark 310. Y Closed Closed RAI No. 8 TVA Letter dated Follow-up of OI-190.
operating radiation, temperature, and humidity environment per     Westinghouse describing how the Loose Part Monitoring                      letter dated 12/22/10          3/11/11 as stated in    maximum Rx regulatory position C.1.g of RG 1.133. As an alternate TVA may     System (LPMS) sensor is qualified for normal operating                                                      TVA letter of 12/22/10, Containment confirm that the required equipment has been qualified for the     conditions provided in Westinghouse letter WBT-D-2782,                      As of 3/24/2011:                Encl 1, Item 28.        Temperature is not environments stated in RG 1.133, position C.1.g and that TVA has   dated December 17, 2010 (Reference 11) as addressed in                     The staff reviewed the                                  addressed within reviewed the test report and found it acceptable.                  regulatory position C.1.g of Reg. Guide 1.133 and found it                 proprietary version of EQ-EV- Due 12/22/10              the report and the acceptable. The qualification information on the softline                   71-WBT-P, Revision 1,                                  staff needs this cable and charge converter/preamplifier is being assembled                 Environmental Evaluation and                          information to and will be submitted by March 11, 2011.                                   Operating History of the                                approved the Westinghouse DMIMS-DX                                  maximum Preamplifier and Softline Cable                        temperature Partial Response included in TVA to NRC letter dated                       Used at Watts Bar 2 dated                             qualification of 70o December 22, 2010 (Reference 1).                                           February 2011 (Proprietary).                            C for the preamplifier cable Attachment 18 contains the proprietary version of EQ-EV                                                                         (Microdot WBT-P, Revision 1, Environmental Evaluation and                                                                                   Connector) end.
332 7.5.2.
EICB (Singh)
7.5.1
Operating History of the Westinghouse DMIMS-DX                                                                                     TVA stated that Preamplifier and Softline Cable Used at Watts Bar 2 dated                                                                         they will provide the February 2011 (Proprietary). Attachment 19 contains the                                                                             Containment non-proprietary version EQ-EV-71-WBT-NP, Revision 1,                                                                               maximum temp.
(
Environmental Evaluation and Operating History of the                                                                              and reference the Westinghouse DMIMS-DX Preamplifier and Softline Cable                                                                               environmental Used at Watts Bar 2, dated February 2011. Attachment 20                                                                           report which this contains the Application for Withholding Proprietary                                                                               data is taken from Information from Public Disclosure, EQ-EV-71-WBT-P,                                                                                in their next letter, Revision 1, Environmental Evaluation and Operating History                                                                         which is expected of the Westinghouse DMIMS-DX Preamplifier and Softline                                                                             on Tuesday Cable Used at Watts Bar 2, (Proprietary) dated February 18,                                                                       3/29/2011.
M a
2011.
10/26/2010 311. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.
7.5.1
(
M a
10/27/2010 312. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 334 7
7
(
D a
FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton 313. Y Closed Closed RAI not required.
N/A RAI not required because the figure is 335 7.6.1 7.6.7 EICB (Singh)
LPMS: Reference to OI-331, sub item 2.
Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
Responder: WEC TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled and will be submitted by March 11, 2011.
Partial Response included in TVA to NRC {{letter dated|date=December 22, 2010|text=letter dated December 22, 2010}} (Reference 1).
8 contains the proprietary version of EQ-EV WBT-P, Revision 1, Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2 dated February 2011 (Proprietary). Attachment 19 contains the non-proprietary version EQ-EV-71-WBT-NP, Revision 1, Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2, dated February 2011. Attachment 20 contains the Application for Withholding Proprietary Information from Public Disclosure, EQ-EV-71-WBT-P, Revision 1, Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2, (Proprietary) dated February 18, 2011.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The maximum WBN Unit 2 containment upper compartment normal operating temperature of 110 &deg;F (43.3 &deg;C) is shown on TVA environmental drawing 2-47E235-41 Revision 0.
The maximum WBN Unit 2 containment upper compartment normal operating temperature of 110 &deg;F (43.3 &deg;C) is shown on TVA environmental drawing 2-47E235-41 Revision 0.
The maximum WBN Unit 2 containment lower compartment normal operating temperature of 150 &deg;F ( 65.6 &deg;C) is shown on TVA environmental drawing 2-47E235-42 Revision 0.
The maximum WBN Unit 2 containment lower compartment normal operating temperature of 150 &deg;F ( 65.6 &deg;C) is shown on TVA environmental drawing 2-47E235-42 Revision 0.
: 29. Y Open Partial Response included in letter dated 12/22/10 As of 3/24/2011:
The staff reviewed the proprietary version of EQ-EV-71-WBT-P, Revision 1, Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2 dated February 2011 (Proprietary).
Open-NRC Review Submit qual report by 3/11/11 as stated in TVA letter of 12/22/10, Encl 1, Item 28.
Due 12/22/10 The report addresses this open item, however, the maximum Rx Containment Temperature is not addressed within the report and the staff needs this information to approved the maximum temperature qualification of 70o C for the preamplifier cable (Microdot Connector) end.
TVA stated that they will provide the Containment maximum temp.
and reference the environmental report which this data is taken from in their next letter, which is expected on Tuesday 3/29/2011.
We need to confirm when MEEB when they will complete their review of the seismic qualification report.
336 7.5.2.
7.5
(
(
336  7.5.2. 7.5                    Re: RM-1000 Report 04508905-QR                                     Responder: GA                                                 314. Y       Closed                         Closed S
S i
i
Re: RM-1000 Report 04508905-QR Responder: GA 314. Y Closed Closed 337 7.5.2.
7.5
(
(
337  7.5.2. 7.5                    Re: RM-1000 Report 04508905-QR                                     Responder: GA                                                 315. Y       Closed                         Closed S
S i
i
Re: RM-1000 Report 04508905-QR Responder: GA 315. Y Closed Closed 338 7.5.2.
7.5
(
(
338  7.5.2. 7.5                    In page 3-15 and appendix B of Qualification Test Report           04508905-QR, Qualification Test Report for RM-1000           316. Y       Closed                         Closed                     RAI #4 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 S
S i
i
In page 3-15 and appendix B of Qualification Test Report 04508905-QR, Qualification Test Report for RM-1000 316. Y Closed Closed RAI #4 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 339 7.5.2.
7.5
(
(
339  7.5.2. 7.5                    In the Qualification Test Report 04508905-QR, the licensee         As agreed to with the reviewer, Attachment 1 contains the     317. Y       Closed                         Closed                     RAI #5 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 S
S i
i 340   7.5.2. 7.5                     Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA                                              2. N        Open                            Open-TVA/Bechtel 3                              (page 3-8) of the Qualification Test Report 04508905-QR. In                                                                                     Due 4/22/11 EICB (Singh) addition, please provide the standards or the guidance documents The following responses are based on e-mail: GA-ESI to                                                        Provide the qual reports used as the source for ENV 50140, ENV 55011 Class A, and EN Bechtel, dated December 8, 2010 (Reference 20),                                     Response included in letter    by 1/28/11 per TVA 55022 Class B.                                                                                                                                  dated 12/22/10.                letter of 12/22/10.
In the Qualification Test Report 04508905-QR, the licensee As agreed to with the reviewer, Attachment 1 contains the 317. Y Closed Closed RAI #5 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 340 7.5.2.
(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-                                                   Due: 2/25/11
3 7.5 EICB (Singh)
Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.
Responder: GA The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20),
(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-
: 2.
N Open Due 4/22/11 Response included in letter dated 12/22/10.
Open-TVA/Bechtel Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.
Due: 2/25/11  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                               radEB3ED.docx                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                      Acceptable Status/ Current Actions     Resolution Path     RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                  Y/N ESI report 04508905-QR. The independent laboratory                                         Clarification Needed:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.
report, with curves, is part of GA-ESI report 04509050.                                   Per 2/25/11 response Subsequent to issuing GA-ESI report 04508905-QR                                           TVA document SS-additional EMC testing was performed in accordance                                         E18.14.01, Rev. 3 is with TVA specific requirements. The results of the                                         the source document subsequent EMC testing are reported in GA-ESI report                                       for all testing. Please 04038800. GA-ESI report 04038800 includes the test                                         provide this document curves and the report is used as the basis for EMC                                         for staff review. In qualification of the Upper and Lower Inside                                               addition British Containment Post Accident Radiation Monitors (2-RE-                                       Standards (e.g. ENV 90-271 through -274). The results of the testing and                                       50140) have been cited the acceptability of the RM-1000 monitors for use at                                       in testing which are not WBN Unit 2 are addressed in GA-ESI report                                                 per RG 1.180, R1. TVA 04038903-7SP. This report will be submitted no later                                       to describe compliance than January 28, 2010.                                                                     of SS-E18-14.01 to RG 1.180 with justification (2) ENV 50140, EN 55011, and EN 55022 are British                                               for deviations. No test Standard Institution (BSI) publications concerning                                         curves have been equipment electromagnetic and radio frequency                                             provided in any of the performance. The standard titles are shown below:                                         reports. As a minimum
Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.
: a. ENV 50140 - Electromagnetic Compatibility -                                             TVA to provide a few Basic Immunity Standard - Radiated Radio-                                           sample test curves or Frequency Electromagnetic Field - Immunity Test                                     justify not supplying
(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:
: b. EN 55011 - Industrial, scientific and medical                                           them.
: a.
equipment - Radio-frequency disturbance characteristics - Limits and methods of                                             No EMI/RFI curves measurement                                                                         have been provided as
ENV 50140 - Electromagnetic Compatibility -
: c. EN 55022 - Information technology equipment -                                           yet. TVA to provide Radio disturbance characteristics - Limits and                                       representative curves.
Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
methods of measurement NRC review proceeding TVA Response to Follow-up NRC Request:                                                           in parallel.
: b.
The total EMI/RFI testing of the RM-1000 and current-to-                                         NRC current review frequency converter is documented in the following reports:                                     guidance is based on compliance with RG Attachment 5 contains the proprietary version of                                           1.180 or equal with General Atomics Electronic Systems 04508905-1SP,                                           justification for Qualification Test Report Supplement, RM-1000                                             variations. TVA is Upgrade. See sections 5.1.1, 5.1.2 and 5.1.4 for                                           requested to provide EMI/RFI.                                                                                   the roadmap for Attachment 7 contains the proprietary version of                                           compliance to RG General Atomics Electronic Systems 04038903-7SP,                                           1.180 with justifications Qualification Basis for 04034101 (2-RE-90-271, 272,                                       for any deviations.
EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
273 & 274). See section 5 for EMC qualification basis.                                     Simply following TVA Attachment 8 contains the proprietary version of                                           standard specification General Atomics Electronic Systems 04038903-QSR,                                           SS E18.14.01, Rev. 3 is Qualification Summary Report for Watts Bar Nuclear                                         not sufficient.
: c.
Plant Unit 2 Replacement Radiation Monitors. See section 3.4 for electromagnetic compatibility qualification requirements.
EN 55022 - Information technology equipment -
Attachment 23 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter. See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.
Radio disturbance characteristics - Limits and methods of measurement TVA Response to Follow-up NRC Request:
Attachments 7 and 8 document the EMI/RFI testing specific
The total EMI/RFI testing of the RM-1000 and current-to-frequency converter is documented in the following reports:
contains the proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade. See sections 5.1.1, 5.1.2 and 5.1.4 for EMI/RFI.
contains the proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274). See section 5 for EMC qualification basis.
contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. See section 3.4 for electromagnetic compatibility qualification requirements.
3 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter. See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.
Attachments 7 and 8 document the EMI/RFI testing specific Clarification Needed:
Per 2/25/11 response TVA document SS-E18.14.01, Rev. 3 is the source document for all testing. Please provide this document for staff review. In addition British Standards (e.g. ENV 50140) have been cited in testing which are not per RG 1.180, R1. TVA to describe compliance of SS-E18-14.01 to RG 1.180 with justification for deviations. No test curves have been provided in any of the reports. As a minimum TVA to provide a few sample test curves or justify not supplying them.
No EMI/RFI curves have been provided as yet. TVA to provide representative curves.
NRC review proceeding in parallel.
NRC current review guidance is based on compliance with RG 1.180 or equal with justification for variations. TVA is requested to provide the roadmap for compliance to RG 1.180 with justifications for any deviations.
Simply following TVA standard specification SS E18.14.01, Rev. 3 is not sufficient.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radEB3ED.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                            Acceptable       Status/ Current Actions           Resolution Path     RAI No. & Date   RAI Resp. Date                 Comments Sec.      Sec. POC                                                                                                                                                  Y/N to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.
TVA Response to Second Follow-up NRC Request:
TVA Response to Second Follow-up NRC Request:
GA-ESI qualification report 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)
GA-ESI qualification report 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)
Revision C dated February 22, 2011(Proprietary), submitted on TVA to NRC letter dated February 25, 2011 (Reference 2), section 5.1 states:
Revision C dated February 22, 2011(Proprietary), submitted on TVA to NRC {{letter dated|date=February 25, 2011|text=letter dated February 25, 2011}} (Reference 2), section 5.1 states:
GA-ESI has performed the tests on a 2 channel RM-1000 radiation monitoring system the configuration of which is shown in GA-ESI drawing 04509000 System Installation Configuration, RFI/EMI Test, RM-1000 the results of which are issued in GA-ESI report 04038800, RM-1000 EMC Test Report, TVA and 04509050, RM-1000 EMC Test Report.
GA-ESI has performed the tests on a 2 channel RM-1000 radiation monitoring system the configuration of which is shown in GA-ESI drawing 04509000 System Installation Configuration, RFI/EMI Test, RM-1000 the results of which are issued in GA-ESI report 04038800, RM-1000 EMC Test Report, TVA and 04509050, RM-1000 EMC Test Report.
The equipment tested used an RM-1000 microprocessor radiation monitor Display/Control NIM Bin Assembly, an I-F Converter, line filter, and an RD-23 detector. The monitor system being qualified is the same as the monitor system tested and includes ECO-17656 modifications to ensure EMC compliance.
The equipment tested used an RM-1000 microprocessor radiation monitor Display/Control NIM Bin Assembly, an I-F Converter, line filter, and an RD-23 detector. The monitor system being qualified is the same as the monitor system tested and includes ECO-17656 modifications to ensure EMC compliance.
The 04509050, RM-1000 EMC Test Report was approved by TVA for Sequoyah. The report contains the requested EMI test curves. As a result, it was not resubmitted for the WBN Unit 2 monitors. Attachment 1 contains the TVA approved proprietary version of GA-ESI report 04509050, RM-1000 EMC Test Report. The non-proprietary version and affidavit for withholding will be submitted within two weeks of receipt from GA-ESI.
The 04509050, RM-1000 EMC Test Report was approved by TVA for Sequoyah. The report contains the requested EMI test curves. As a result, it was not resubmitted for the WBN Unit 2 monitors. Attachment 1 contains the TVA approved proprietary version of GA-ESI report 04509050, RM-1000 EMC Test Report. The non-proprietary version and affidavit for withholding will be submitted within two weeks of receipt from GA-ESI.
GA-ESI qualification report 04038903-7SP, section 5, provides a detailed discussion of the test results in GA-ESi report 04509050.
GA-ESI qualification report 04038903-7SP, section 5, provides a detailed discussion of the test results in GA-ESi report 04509050.
341 7.5.2.
7.5
(
(
341  7.5.2. 7.5                FSAR Tables 3.10 list seismically qualified equipment. However, A review of WBN Unit 2 FSAR amendment 102 chapters                   318. Y       Closed                             Closed               RAI #1 letter dated FSAR amend 103 S
S i
i
FSAR Tables 3.10 list seismically qualified equipment. However, A review of WBN Unit 2 FSAR amendment 102 chapters 318. Y Closed Closed RAI #1 letter dated FSAR amend 103 342 7.5.2.
7.5
(
(
342  7.5.2. 7.5                Please confirm that RM-1000 monitors and the associated             The RM-1000 containment high range radiation monitors are 319.       Y       Closed                             Closed S
S i
i
Please confirm that RM-1000 monitors and the associated The RM-1000 containment high range radiation monitors are 319. Y Closed Closed 343 7.5.2.
7.5
(
(
343  7.5.2. 7.5                Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3           (1) The cause of the difference between the RRS and TRS 320.         Y       Closed                             Closed S
S i
i 344   7.6.6     ?                   Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout.         (a) In accordance with0PDP-6, Locked Valve/Breaker            30. Y        Close                              Close                                                    Close based on TVA letter dated There is no section in FSAR which provides discussion on this           Program, Revision 1 (Attachment 25), valves locked by                                                                                                                  3/29/11 subject. SE section discusses compliance with PSB-18. Provide           design are shown on design output documents (flow                        Due 3/29/11 a discussion which can be used by the staff to determine similar         diagrams, system descriptions, etc.). As documented in conclusion as Unit 1 and if the design is similar to Unit 1 then         0PDP-6, valves are locked for multiple reasons. It is                     ICSB-18 provides guidance on make a statement to that effect. Also provide the list of the            anticipated that many of the valves that were locked to                   application of the single failure valves where power lockout during normal reactor operation is            provide positive isolation between Unit 1 and Unit 2 will                 criterion to manually controlled utilized for valves whose inadvertent operation could affect plant      not be locked when Unit 2 becomes operational and will                   electrically operated valves..
Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 320. Y Closed Closed 344 7.6.6  
Eicg(Garg) safety.                                                                  be removed from the locked valve program. At the                         According to this BTP, same time, Unit 1 valves locked for                                       electrically operated valves How do we meet the PSB?                                                  operational/Appendix R/Single Failure criteria will result               includes MOV, SOV and those in the corresponding Unit 2 valves being locked.                         valves operated indirectly by an electrical device, e.g.an air (b) The list of valves locked by design is contained in 0-PI-                 operated valves whose air OPS-17.0, 18 Month Locked Valve Verification,                           supply is controlled by an Revision 44 (Attachment 21). Valves locked out by                         electrical solenoid valves.
?
opening the associated circuit breaker are listed in 0-PI-               FSAR Section 7.6.6 addresses OPS-17.1, 18 Month Locked Breaker Verification,                         only MOVs. If TVA has done an
Eicg(Garg)
Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout.
There is no section in FSAR which provides discussion on this subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar conclusion as Unit 1 and if the design is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where power lockout during normal reactor operation is utilized for valves whose inadvertent operation could affect plant safety.
How do we meet the PSB?
(a) In accordance with0PDP-6, Locked Valve/Breaker Program, Revision 1 (Attachment 25), valves locked by design are shown on design output documents (flow diagrams, system descriptions, etc.). As documented in 0PDP-6, valves are locked for multiple reasons. It is anticipated that many of the valves that were locked to provide positive isolation between Unit 1 and Unit 2 will not be locked when Unit 2 becomes operational and will be removed from the locked valve program. At the same time, Unit 1 valves locked for operational/Appendix R/Single Failure criteria will result in the corresponding Unit 2 valves being locked.
(b) The list of valves locked by design is contained in 0-PI-OPS-17.0, 18 Month Locked Valve Verification, Revision 44 (Attachment 21). Valves locked out by opening the associated circuit breaker are listed in 0-PI-OPS-17.1, 18 Month Locked Breaker Verification,
: 30. Y Close Due 3/29/11 ICSB-18 provides guidance on application of the single failure criterion to manually controlled electrically operated valves..
According to this BTP, electrically operated valves includes MOV, SOV and those valves operated indirectly by an electrical device, e.g.an air operated valves whose air supply is controlled by an electrical solenoid valves.
FSAR Section 7.6.6 addresses only MOVs. If TVA has done an Close Close based on TVA letter dated 3/29/11


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                   radEB3ED.docx                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                                TVA Response(s)                          Acceptable     Status/ Current Actions     Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                        Y/N Revision 14 (Attachment 24).                                             analysis to demonstrate compliance with the guidance of TVA Response to Follow Up NRC Question                                       this BTP for Unit 1 and this analysis does not change for SER Supplement 0, Section 8.3.1.8 states:                                     Unit 2 for other valves than TVA shouls make a statement to that 8.3.1.8 Application of the Single Failure Criterion to Manually               effect. If there are changes to Controlled Electrically Operated Valves - page 8-9                           the analysis then justify those changes based on this BTP.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Revision 14 (Attachment 24).
With regard to safety-related manually controlled, electrically operated valves, the staff asked the applicant to provide (1) an evaluation of all safety-related fluid systems to identify all such valves whose failure (that is, failure to operate on demand or undesired spurious operation) could result in the loss of capability to perform a system safety function (2) a description of the means provided to meet the single-failure criterion in safety-related fluid systems where it is identified that a single failure, as defined above, would result in the loss of capability to perform the system safety function In response, the applicant identified 17 such valves and documented in Section 7.6.6 of the FSAR that the design for these valves consists of modified control circuits. The modified circuit utilizes redundant contacts which are wired before and after each opening and closing coil. Based on its review of the information provided by the applicant, the staff concluded that the above provisions are in accordance with BTP ICSB 18 of SRP Appendix 8-A, with the exception of redundant valve position indication.
TVA Response to Follow Up NRC Question SER Supplement 0, Section 8.3.1.8 states:
8.3.1.8 Application of the Single Failure Criterion to Manually Controlled Electrically Operated Valves - page 8-9 With regard to safety-related manually controlled, electrically operated valves, the staff asked the applicant to provide (1) an evaluation of all safety-related fluid systems to identify all such valves whose failure (that is, failure to operate on demand or undesired spurious operation) could result in the loss of capability to perform a system safety function (2) a description of the means provided to meet the single-failure criterion in safety-related fluid systems where it is identified that a single failure, as defined above, would result in the loss of capability to perform the system safety function In response, the applicant identified 17 such valves and documented in Section 7.6.6 of the FSAR that the design for these valves consists of modified control circuits. The modified circuit utilizes redundant contacts which are wired before and after each opening and closing coil. Based on its review of the information provided by the applicant, the staff concluded that the above provisions are in accordance with BTP ICSB 18 of SRP Appendix 8-A, with the exception of redundant valve position indication.
Subsequently, the applicant stated that the method of locking out power with the required redundant instrumentation is shown on electrical drawing 45W760-63-2 Based on this drawing, the staff concludes that the design meets the staff's position and is acceptable.
Subsequently, the applicant stated that the method of locking out power with the required redundant instrumentation is shown on electrical drawing 45W760-63-2 Based on this drawing, the staff concludes that the design meets the staff's position and is acceptable.
SER Supplement 5 states:
SER Supplement 5 states:
6.3.2       Evaluation, Page 6-3, Supplement 5 In the SER, the staff stated that the applicant will lock out power from certain valves in the emergency core cooling system (ECCS) whose misalignment might affect ECCS effectiveness. Some of these valves would be required to operate following a LOCA, and the manual restoration of power would add to post-accident operational complexity.
6.3.2 Evaluation, Page 6-3, Supplement 5 In the SER, the staff stated that the applicant will lock out power from certain valves in the emergency core cooling system (ECCS) whose misalignment might affect ECCS effectiveness. Some of these valves would be required to operate following a LOCA, and the manual restoration of power would add to post-accident operational complexity.
By letters dated September 15, 1982, and April 10, 1985, the applicant stated Watts Bar would use modified control circuits for these valves to ensure that no single failure would be able to energize the opening or closing coils of the valve operators. The design uses redundant contacts that are wired before and after each opening and closing coil. In addition, clear protective covers will be attached to the main control board over each respective control switch to prevent inadvertent actuation. As discussed in SER Sections 7.6.4
By letters dated September 15, 1982, and April 10, 1985, the applicant stated Watts Bar would use modified control circuits for these valves to ensure that no single failure would be able to energize the opening or closing coils of the valve operators. The design uses redundant contacts that are wired before and after each opening and closing coil. In addition, clear protective covers will be attached to the main control board over each respective control switch to prevent inadvertent actuation. As discussed in SER Sections 7.6.4 analysis to demonstrate compliance with the guidance of this BTP for Unit 1 and this analysis does not change for Unit 2 for other valves than TVA shouls make a statement to that effect. If there are changes to the analysis then justify those changes based on this BTP.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radEB3ED.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                            Acceptable       Status/ Current Actions     Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                        Y/N and 8.3.1.8, the staff found this design acceptable.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and 8.3.1.8, the staff found this design acceptable.
Accordingly, power will not be locked out from the following valves during operation:
Accordingly, power will not be locked out from the following valves during operation:
(1)       hot-leg injection line valves (2)       valves from residual heat removal (RHR) discharge to safety injection (SI) and charging pump suction (3)       RHR suction valves from containment sump (4)       RHR discharge valves (5)       SI pump suction valve from refueling water storage tank (6)       SI miniflow valve In addition, the applicant evaluated other valves that may be used for SI miniflow, RHR to SI cross-connect, and SI injection, but for which the consequences of single failure would be acceptable. Power will also not be locked out from these valves. This revision is acceptable to the staff. This review was tracked under TAC 63630.
(1) hot-leg injection line valves (2) valves from residual heat removal (RHR) discharge to safety injection (SI) and charging pump suction (3)
RHR suction valves from containment sump (4)
RHR discharge valves (5)
SI pump suction valve from refueling water storage tank (6)
SI miniflow valve In addition, the applicant evaluated other valves that may be used for SI miniflow, RHR to SI cross-connect, and SI injection, but for which the consequences of single failure would be acceptable. Power will also not be locked out from these valves. This revision is acceptable to the staff. This review was tracked under TAC 63630.
The design of WBN Unit 2 mirrors the design WBN Unit 1.
The design of WBN Unit 2 mirrors the design WBN Unit 1.
As a result, the locked valves for PSB-18 are the same for WBN Unit 2 as for WBN Unit 1 and the list in the Unit 2 FSAR Section 7.6.6 is accurate for Unit 2.
As a result, the locked valves for PSB-18 are the same for WBN Unit 2 as for WBN Unit 1 and the list in the Unit 2 FSAR Section 7.6.6 is accurate for Unit 2.
345   7.5.2. 7.5                   Provide the normal temperatures and expected periods of high/low     RM-1000 in a NIM Bin was Tested at 39&deg;F for 72 Hrs and 31.            Y        Closed                        Closed                                    Response 3                            temperature excursions to assess aging requirements. TVA to          Tested at 131&deg;F for 72 Hrs per Section 4.2.6 of 04508905-                                                                                               provided by TVA further clarify if 86&#xba;F for 40 years was used as the qualification    QR. This is stated in document 04038903-7SP, Section 2.1.                                                     Due: 2/25/11                              letter dated requirement for aging tests. This has been stated in some of the      The ambient temperature used for aging was 86&deg;F(30&deg;C).                                                                                                   3/31/2011 in Item subsections under section 4.2 of the 04508905-QR report but the      The NIM Bin has perforated holes in top and bottom covers                                                     Clarification Required:                    # 17.
345 7.5.2.
rationale for using 86&#xba;F (includes an internal temperature rise of    and has an average internal temperature rise of                                                               Regulatory Guide1.209 18&#xba;F) for 40 years has not been justified in the 04508905-QR          approximately 18 &deg;F due to natural air convection. So the                                                     endorses with the report or the supplement reports. TVA to provide the rationale for    average internal temperature used for aging was 104&deg;F                                                         exceptions IEEE 323-this acceptance criteria for WBN-2.                                  (40&deg;C)                                                                                                       2003. One of these exceptions is that the Check on verification of the 40 year life of the rad monitors. How is In accordance with Attachment 8, 04038903-QSR,                                                               documentation this explained.                                                      Qualification Summary Report for Watts Bar Nuclear Plant                                                     applicable to EICB (Singh)
3 7.5 EICB (Singh)
Unit 2 Replacement Radiation Monitors Section 3.2, the                                                       qualification in a mild aging is to an ambient equivalent condition of 104&deg;F which is                                                 environment should be based on an 86&deg;F average ambient temperature of the                                                          consistent with the environment and an enclosure temperature rise of 18&deg;F.                                                       guidance given in IEEE Std 1205-2000, Table D.8 shows that the upper                                                           Section 7.2 for the bounding temperature is 104&deg;F for all plant areas except the                                                 harsh environment.
Provide the normal temperatures and expected periods of high/low temperature excursions to assess aging requirements. TVA to further clarify if 86&#xba;F for 40 years was used as the qualification requirement for aging tests. This has been stated in some of the subsections under section 4.2 of the 04508905-QR report but the rationale for using 86&#xba;F (includes an internal temperature rise of 18&#xba;F) for 40 years has not been justified in the 04508905-QR report or the supplement reports. TVA to provide the rationale for this acceptance criteria for WBN-2.
reactor building. The intent in qualifying the part for 40 years is to identify each components failure mechanisms and to                                                     TVA has provided determine whether 40 years1 of aging has a significant effect                                                 synopsis of test of these failure mechanisms.                                                                                 information in support of environmental 1The design life goal for most Class 1E equipment is 40                                                     qualification in the years, but for most electronic assemblies 20 years, or less, is                                               2/25/2011 letter. TVA more realistic. Because of rapidly changing technologies,                                                     to describe compliance replacement components sometimes become unavailable in                                                       to the guidance of a relatively short period of time.                                                                           Section 7.2 of IEEE
Check on verification of the 40 year life of the rad monitors. How is this explained.
RM-1000 in a NIM Bin was Tested at 39&deg;F for 72 Hrs and Tested at 131&deg;F for 72 Hrs per Section 4.2.6 of 04508905-QR. This is stated in document 04038903-7SP, Section 2.1.
The ambient temperature used for aging was 86&deg;F(30&deg;C).
The NIM Bin has perforated holes in top and bottom covers and has an average internal temperature rise of approximately 18 &deg;F due to natural air convection. So the average internal temperature used for aging was 104&deg;F (40&deg;C)
In accordance with Attachment 8, 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors Section 3.2, the aging is to an ambient equivalent condition of 104&deg;F which is based on an 86&deg;F average ambient temperature of the environment and an enclosure temperature rise of 18&deg;F.
IEEE Std 1205-2000, Table D.8 shows that the upper bounding temperature is 104&deg;F for all plant areas except the reactor building. The intent in qualifying the part for 40 years is to identify each components failure mechanisms and to determine whether 40 years1 of aging has a significant effect of these failure mechanisms.
1The design life goal for most Class 1E equipment is 40 years, but for most electronic assemblies 20 years, or less, is more realistic. Because of rapidly changing technologies, replacement components sometimes become unavailable in a relatively short period of time.
: 31. Y Closed Closed Due: 2/25/11 Clarification Required:
Regulatory Guide1.209 endorses with the exceptions IEEE 323-2003. One of these exceptions is that the documentation applicable to qualification in a mild environment should be consistent with the guidance given in Section 7.2 for the harsh environment.
TVA has provided synopsis of test information in support of environmental qualification in the 2/25/2011 letter. TVA to describe compliance to the guidance of Section 7.2 of IEEE  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radEB3ED.docx                                                                                           Open Items to be Resolved for SER Approval
===Response===
provided by TVA letter dated 3/31/2011 in Item
# 17.
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                            Acceptable       Status/ Current Actions       Resolution Path         RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                  Y/N 323.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
(1) After review, GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -
Please explain the (1) After review, GA-ESI report 04038903-7SP,                                                             basis for stating that the Qualification Basis for 04034101-001 (2-RE-90-271, -                                                 radiation monitors are 272, -273 & -274), submitted on TVA to NRC letter                                                     qualified for 40 years.
272, -273 & -274), submitted on TVA to NRC {{letter dated|date=February 25, 2011|text=letter dated February 25, 2011}} (Reference 3) follows the applicable guidance of Reg. Guide 1.209 for IEEE 323 section 7.2 documentation. The information is either contained in or referenced in the report. The documents are part of the GA-ESI permanent records and the appropriate GA-ESI records are part of the permanent TVA WBN Unit 2 quality records.
dated February 25, 2011 (Reference 3) follows the                                                     Please note that applicable guidance of Reg. Guide 1.209 for IEEE 323                                                   qualification section 7.2 documentation. The information is either                                                   requirements of the contained in or referenced in the report. The                                                         computer based I&C documents are part of the GA-ESI permanent records                                                     equipment needs to and the appropriate GA-ESI records are part of the                                                     follow the guidance in permanent TVA WBN Unit 2 quality records.                                                              RG 1.209.
(2) The following IEEE 323 section 7.2 documentation requirements for equipment located in a harsh environment are not applicable for equipment located in a mild environment:
(2) The following IEEE 323 section 7.2 documentation requirements for equipment located in a harsh environment are not applicable for equipment located in a mild environment:
: k. Aging mechanisms are not required by Reg. Guide 1.209
: k.
: l. Qualified life determination is not required by Reg.
Aging mechanisms are not required by Reg. Guide 1.209
: l.
Qualified life determination is not required by Reg.
Guide 1.209
Guide 1.209
: m. Age conditioning test results are not required by Reg. Guide 1.209 The remaining documentation requirements are applicable in whole or in part to the RM-1000 radiation monitors. As described in item 1 above, GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273 & -274), either contains or references the required documentation.
: m. Age conditioning test results are not required by Reg. Guide 1.209 The remaining documentation requirements are applicable in whole or in part to the RM-1000 radiation monitors. As described in item 1 above, GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273 & -274), either contains or references the required documentation.
(3) As stated in Regulatory Guide 1.209, there is no need to establish a qualified life. This is addressed in the next to the last sentence of the second paragraph on page 2 which states: In addition, because of ready accessibility for monitoring and maintenance in mild environments, the need to establish a qualified life does not apply. It is further discussed in the last paragraph on page 6 which states: This guide does not intend to imply that a qualified life should be established for I&C systems in mild environments. Therefore, for the purposes of this guide, qualification is a validation of design to demonstrate that a safety-related computer-based I&C system is capable of performing its safety function under the specified environmental and operational stresses.
(3) As stated in Regulatory Guide 1.209, there is no need to establish a qualified life. This is addressed in the next to the last sentence of the second paragraph on page 2 which states: In addition, because of ready accessibility for monitoring and maintenance in mild environments, the need to establish a qualified life does not apply. It is further discussed in the last paragraph on page 6 which states: This guide does not intend to imply that a qualified life should be established for I&C systems in mild environments. Therefore, for the purposes of this guide, qualification is a validation of design to demonstrate that a safety-related computer-based I&C system is capable of performing its safety function under the specified environmental and operational stresses.
346   7.5.2. 7.5                   TVA has previously stated in response to open item 319 that RM-    Document 04507007-1TR is the RM-1000 System                3.      N        Open                          Open-TVA/Bechtel 3                            1000 System Verification Test Results report, 04507007-1TR is not   Verification Test Results. 04038903-QSR, Qualification                      Due 4/22/11 applicable to WBN-2. However, TVA has not provided a WBN-2         Summary Report for Watts Bar Nuclear Plant Unit 2                                                          Due: 2/25/11 EICB (Singh) specific test results report. Please identify and provide the       Replacement Radiation Monitors (Attachment 8) and and appropriate test results reports to complete the review.            04038903-7SP, Qualification Basis for 04034101 (2-RE                                                 The proposed response 271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit                                                 appears to be 2 equipment specific qualification reports.                                                               conflicting with the proposed response for OI-351 regarding not submitting the
323.
Please explain the basis for stating that the radiation monitors are qualified for 40 years.
Please note that qualification requirements of the computer based I&C equipment needs to follow the guidance in RG 1.209.
346 7.5.2.
3 7.5 EICB (Singh)
TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 specific test results report. Please identify and provide the appropriate test results reports to complete the review.
Document 04507007-1TR is the RM-1000 System Verification Test Results. 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors (Attachment 8) and and 04038903-7SP, Qualification Basis for 04034101 (2-RE 271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit 2 equipment specific qualification reports.
: 3.
N Open Due 4/22/11 Open-TVA/Bechtel Due: 2/25/11 The proposed response appears to be conflicting with the proposed response for OI-351 regarding not submitting the  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radEB3ED.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                          Acceptable       Status/ Current Actions     Resolution Path         RAI No. & Date     RAI Resp. Date               Comments Sec.      Sec. POC                                                                                                                                                      Y/N 04508905-QR report.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 04508905-QR report.
TVA to re-assess proposed response for both OIs.
TVA to re-assess proposed response for both OIs.
TVA to re-evaluate previous responses to OI-316 and OI-319 which have conflicting responses regarding the applicability of 04507007-1TR.
TVA to re-evaluate previous responses to OI-316 and OI-319 which have conflicting responses regarding the applicability of 04507007-1TR.
347 7.5.2.
7.5
(
(
347  7.5.2. 7.5                  Qualification report 04508905-1SP does not address EMI/RFI             Qualification report 04038903-7SP, Qualification Basis for     321. Y       Closed                       Closed S
S i
i
Qualification report 04508905-1SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 321. Y Closed Closed 348 7.5.2.
7.5
(
(
348  7.5.2. 7.5                  Qualification report 04508905-2SP does not address EMI/RFI             Qualification report 04038903-7SP, Qualification Basis for     322. Y       Closed                       Closed S
S i
i 349   7.5.2. 7.5                   Radiation testing was not considered in any of the test reports as     The design criteria provides the criteria for determining what 4. Y        Open                          Open-TVA/Licensing 3                            all the equipment has been assumed to be located in nuclear           is a mild environment at WBN Unit 2. Calculation power plant areas with mild environments and radiation dosages         WBNAPS4004 Summary of Mild Environment Conditions for                                                    Due: 2/25/11 less than 1 x 103 rads for total integrated dose (TID). However,       Watts Bar Nuclear Plant provides the actual values for each the radiation monitors and the I/F converters are located in the      area of the plant. In accordance with Table 1, the Control                                                TVA to provide the main control room which is defined as mild environment. For           Room has a 40 year maximum TID of 3.5x102 RAD and a                                                        assessment document WBN-2 mild environment is defined as room or building zone             maximum integrated accident dose of 710.5 RAD for a                                                        or a summary of the where (1) the temperature, pressure, or relative humidity resulting   maximum TID of 1060.5 RAD.                                                                                document with the from the direct effects of a design basis event (DBE) (e.g.,                                                                                                                     reference to the temperature rise due to steam release) are no more severe than         The accident dose of 710.5 RAD is the dose for a 100 day                                                  appropriate those which would occur during an abnormal plant operational           LOCA at the surface of the HEPA filter in the Mechanical                                                  document/documents.
Qualification report 04508905-2SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 322. Y Closed Closed 349 7.5.2.
condition, (2) the temperature will not exceed 130&#xba;F due to indirect   Equipment Room. This is documented in TVA calculation effects of a DBE, (3) the event radiation dose is less than or equal   WBNTSR-005, Dose Due to the Control Building                                                              February 25, 2011 EICB (Singh) to 1 x 104 rads, and (4) the total event plus the 40 year TID (total   Emergency Air Cleanup Filters Revision 3. However, on                                                    response is acceptable.
3 7.5 EICB (Singh)
integrated dose) is less than or equal to 5 x 104 rads (reference     page 25 of WBNTSR-005, the shine from this source into the                                                Item will be tracked as WB-DC-40-54). TVA to address lack of radiation qualification for       control room is negligible and is not considered in the dose                                               a confirmatory item in WBN-2.                                                                calculation for the control room.                                                                         the SE. TVA to provide calculation or summary Calculation WBNAPS3-126, EQ Dose in the U1/U2 Auxiliary                                                   of calculation when Instrument Rooms and the Computer Room in the Control                                                     complete.
Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 103 rads for total integrated dose (TID). However, the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE) (e.g.,
Building Revision 0 documents the environmental qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x103 RAD. Calculation WBNAPS3-126, will be revised to include the control room by July 1, 2011. Since the control room TID has been determined to be less than 1x103 RAD, radiation qualification of the RM-1000.
temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130&#xba;F due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 104 rads, and (4) the total event plus the 40 year TID (total integrated dose) is less than or equal to 5 x 104 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2.
The design criteria provides the criteria for determining what is a mild environment at WBN Unit 2. Calculation WBNAPS4004 Summary of Mild Environment Conditions for Watts Bar Nuclear Plant provides the actual values for each area of the plant. In accordance with Table 1, the Control Room has a 40 year maximum TID of 3.5x102 RAD and a maximum integrated accident dose of 710.5 RAD for a maximum TID of 1060.5 RAD.
The accident dose of 710.5 RAD is the dose for a 100 day LOCA at the surface of the HEPA filter in the Mechanical Equipment Room. This is documented in TVA calculation WBNTSR-005, Dose Due to the Control Building Emergency Air Cleanup Filters Revision 3. However, on page 25 of WBNTSR-005, the shine from this source into the control room is negligible and is not considered in the dose calculation for the control room.
Calculation WBNAPS3-126, EQ Dose in the U1/U2 Auxiliary Instrument Rooms and the Computer Room in the Control Building Revision 0 documents the environmental qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x103 RAD. Calculation WBNAPS3-126, will be revised to include the control room by July 1, 2011. Since the control room TID has been determined to be less than 1x103 RAD, radiation qualification of the RM-1000.
: 4.
Y Open Open-TVA/Licensing Due: 2/25/11 TVA to provide the assessment document or a summary of the document with the reference to the appropriate document/documents.
February 25, 2011 response is acceptable.
Item will be tracked as a confirmatory item in the SE. TVA to provide calculation or summary of calculation when complete.
350 7.5.2.
7.5
(
(
350  7.5.2. 7.5                  The seismic required response spectra (RRS) is shown in Figures The RM-1000 was seismically tested in a NIM Bin and the               323. Y       Closed                       Closed                   RAI # 9, letter     FSAR amend 103 Note: Item to be added to Section 3.10 S
S i
i
The seismic required response spectra (RRS) is shown in Figures The RM-1000 was seismically tested in a NIM Bin and the 323. Y Closed Closed RAI # 9, letter FSAR amend 103 Note: Item to be added to Section 3.10 351 7.5.2.
7.5
(
(
351  7.5.2. 7.5                  The replacement schedule for the components that have a               The replacement schedules stated in 04508905-1SP,             324. Y       Closed                       Closed S
S i
i
The replacement schedule for the components that have a The replacement schedules stated in 04508905-1SP, 324. Y Closed Closed 352 7.5.2.
7.5
(
(
352  7.5.2. 7.5                  Please clarify how many RM-1000 radiation monitors are being           The total number of RM-1000 units procured under MR           325. Y       Closed                       Closed S
S i
i 353   7.5.2. 7.5                   Please provide a summary of the [manufacturers] commercial           GA-ESI submitted their commercial grade dedication            5. N        Open                          Open-TVA/Bechtel 3                            dedication plan for radiation monitors with references to the         procedure (OP-7.3-240, Safety-Related Commercial Grade                      Due 4/22/11 guidance document that it follows. Also please include different       Item Parts Acceptance, Revision H) to engineering for                                                    TVA to note that staff EICB (Singh) facets (e.g. receiving, inspection, testing etc.) of the plan.         review. Engineering review of the procedure found that the                                                 has written a safety procedure, Section 5, did not require multiple dedication                                                 evaluation and methods for complex CGI or CGI used in digital safety                                                     accepted EPRI TR-systems. As a result, it was determined that the GA-ESI                                                   106439 (1996) as an program did not meet the requirements of NUREG-800,                                                       acceptable method of Section 7.0A, Revision 5.                                                                                 addressing commercial dedication. EPRI NP-
Please clarify how many RM-1000 radiation monitors are being The total number of RM-1000 units procured under MR 325. Y Closed Closed 353 7.5.2.
3 7.5 EICB (Singh)
Please provide a summary of the [manufacturers] commercial dedication plan for radiation monitors with references to the guidance document that it follows. Also please include different facets (e.g. receiving, inspection, testing etc.) of the plan.
GA-ESI submitted their commercial grade dedication procedure (OP-7.3-240, Safety-Related Commercial Grade Item Parts Acceptance, Revision H) to engineering for review. Engineering review of the procedure found that the procedure, Section 5, did not require multiple dedication methods for complex CGI or CGI used in digital safety systems. As a result, it was determined that the GA-ESI program did not meet the requirements of NUREG-800, Section 7.0A, Revision 5.
: 5.
N Open Due 4/22/11 Open-TVA/Bechtel TVA to note that staff has written a safety evaluation and accepted EPRI TR-106439 (1996) as an acceptable method of addressing commercial dedication. EPRI NP-


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radEB3ED.docx                                                                                     Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                Issue                                                  TVA Response(s)                          Acceptable       Status/ Current Actions     Resolution Path       RAI No. & Date   RAI Resp. Date                 Comments Sec.      Sec. POC                                                                                                                                              Y/N A discussion with GA-ESI found that while not required by                                                 5652 must be used in procedure, GA-ESI does perform vendor surveys as required                                                 conjunction with the by Method 2 of NP-5652. The surveys are done based on                                                     additional guidance in prudent business practices. Based on this discussion, GA-                                                 EPRI TR-106439 for ESI agreed to review the CGI used in the WBN Unit 2 digital                                               commercial dedication safety-related monitors to determine if they had been                                                     processes e.g. EPRI dedicated by more than one method.                                                                       NP-6404, EPRI TR-102260, GL 89-02, and The review of the CGI used in the WBN Unit 2 digital safety-                                             GL-91-05 per Section related monitors determined that all CGI had been dedicated                                               3.3 of EPRI TR-using Method 1 of EPRI guideline NP-5652. However, in the                                                 106439.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments A discussion with GA-ESI found that while not required by procedure, GA-ESI does perform vendor surveys as required by Method 2 of NP-5652. The surveys are done based on prudent business practices. Based on this discussion, GA-ESI agreed to review the CGI used in the WBN Unit 2 digital safety-related monitors to determine if they had been dedicated by more than one method.
sample of items reviewed, there were CGI that were dedicated using a single method. Based on the results of the engineering procedure review and the results of the GA-ESI CGI review, Service Request 346896 was initiated to document the condition and to place the monitors in Conditional Release status.
The review of the CGI used in the WBN Unit 2 digital safety-related monitors determined that all CGI had been dedicated using Method 1 of EPRI guideline NP-5652. However, in the sample of items reviewed, there were CGI that were dedicated using a single method. Based on the results of the engineering procedure review and the results of the GA-ESI CGI review, Service Request 346896 was initiated to document the condition and to place the monitors in Conditional Release status.
Based on the results of the previous reviews, GA-ESI agreed to the following plan of action to resolve the CGD issue:
Based on the results of the previous reviews, GA-ESI agreed to the following plan of action to resolve the CGD issue:
: 1. GA-ESI shall revise its commercial grade dedication procedure (OP-7.3-240) to require multiple dedication methods be utilized for complex commercial grade items and commercial grade items for digital safety class systems. The evidence that this has been completed will be provided to TVA by April 15, 2011.
: 1.
GA-ESI shall revise its commercial grade dedication procedure (OP-7.3-240) to require multiple dedication methods be utilized for complex commercial grade items and commercial grade items for digital safety class systems. The evidence that this has been completed will be provided to TVA by April 15, 2011.
Specifically, Method 1 and at least one additional method from the list below will be used to ensure that the CGD procedure complies with the current SRP.
Specifically, Method 1 and at least one additional method from the list below will be used to ensure that the CGD procedure complies with the current SRP.
Method 1 - Special Tests and Inspections Method 2 - Commercial Grade Survey of Supplier Method 3 - Source Verification Method 4 - Acceptable Supplier/Item Performance Record
Method 1 - Special Tests and Inspections Method 2 - Commercial Grade Survey of Supplier Method 3 - Source Verification Method 4 - Acceptable Supplier/Item Performance Record
: 2. GA-ESI shall take actions consistent with the revised operating procedure to address the CGls used in the WBN Unit 2 safety-related digital monitors. Evidence that those actions have been completed will be provided no later than September 1, 2011.
: 2.
GA-ESI shall take actions consistent with the revised operating procedure to address the CGls used in the WBN Unit 2 safety-related digital monitors. Evidence that those actions have been completed will be provided no later than September 1, 2011.
Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:
Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:
GA-ESI procedure OP-7.3-240 revision: April 30, 2011 Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 354   7.5.2. 7.5                   RG 1.180 endorsed the guidance of IEEE-1050-1996 with           (1) The WBN Unit 2 grounding system design is in         32.      Y        Closed                        Closed                                                    The grounding specification used by EICB (Singh) 3                            clarifications regarding Instrumentation and Control Equipment      accordance with WB-DC-30-32, Revision 3, Design                       Due 3/29/11                                                                              TVA does not meet IEEE 1050-1996 Grounding to minimize the effects of EMI/RFI and power surge        Criteria For Grounding (Attachment 5). I&C equipment                                                                                                           and therefore additional steps must be related effects on the safety-related I&C systems. (1)TVA to        grounding is described in Section 2.2.3C.1 I&C                                                                                                                 taken to assure that the radiation describe the grounding of the I&C equipment and (2)to state          Grounding System (page 15). The design is based on                                                                                                             monitors are not susceptible to EMI/RFI whether or not it follows the guidance of IEEE Std 1050-1996.        IEEE 80-1986 IEEE Guide for Safety in AC Substation                                                                                                             interference when portable radio
GA-ESI procedure OP-7.3-240 revision: April 30, 2011 Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 5652 must be used in conjunction with the additional guidance in EPRI TR-106439 for commercial dedication processes e.g. EPRI NP-6404, EPRI TR-102260, GL 89-02, and GL-91-05 per Section 3.3 of EPRI TR-106439.
354 7.5.2.
3 7.5 EICB (Singh)
RG 1.180 endorsed the guidance of IEEE-1050-1996 with clarifications regarding Instrumentation and Control Equipment Grounding to minimize the effects of EMI/RFI and power surge related effects on the safety-related I&C systems. (1)TVA to describe the grounding of the I&C equipment and (2)to state whether or not it follows the guidance of IEEE Std 1050-1996.
(1) The WBN Unit 2 grounding system design is in accordance with WB-DC-30-32, Revision 3, Design Criteria For Grounding (Attachment 5). I&C equipment grounding is described in Section 2.2.3C.1 I&C Grounding System (page 15). The design is based on IEEE 80-1986 IEEE Guide for Safety in AC Substation
: 32. Y Closed Due 3/29/11 Closed The grounding specification used by TVA does not meet IEEE 1050-1996 and therefore additional steps must be taken to assure that the radiation monitors are not susceptible to EMI/RFI interference when portable radio  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radEB3ED.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                    Issue                                                          TVA Response(s)                            Acceptable       Status/ Current Actions       Resolution Path       RAI No. & Date   RAI Resp. Date                   Comments Sec.      Sec. POC                                                                                                                                                          Y/N Grounding.                                                                                                                                                              devices are sued in the control room.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Grounding.
TVA has agreed to do the survey after (2) The design of the WBN grounding system predates                                                                                                                           the radiation monitors are installed.
(2) The design of the WBN grounding system predates IEEE 1050. As a result WBN Units 1 and 2 do not follow the guidance of IEEE 1050 or Regulatory Guide 1.180.
IEEE 1050. As a result WBN Units 1 and 2 do not follow the guidance of IEEE 1050 or Regulatory Guide                                                                                                                     Will be tracked for survey committment 1.180.                                                                                                                                                                    under OI-355.
devices are sued in the control room.
355   7.5.2. 7.5                   Staff has not found the stated exclusion zone for EMI/RFI               Cautions and distance limitations for WBN Unit 1 legacy          6. Y        Open                          Open-TVA/Bechtel 3                              interfering devices (e.g. hand-held radio devices) in the submitted     equipment are documented in TVA procedure TI-134,                              Due 4/22/11 documents. TVA to provide the distance for the exclusion zones if       Revision 0, Control of Portable Two-Way Radios,                                                            TVA to provide not provided already. If it is already a submitted information then     (Attachment 7) Appendix B. Where WBN Unit 2 uses the                                                         commitment that an please point the source of the information.                              same legacy equipment, the same cautions and distance                                                       EMI/RFI survey will be limitations apply.                                                                                           conducted after the installation of the New equipment is procured and tested to TVA Standard                                                         equipment to confirm Specification SS E18.14.01, Revision 3, Electromagnetic                                                     the non-susceptibility Interference (EMI) Testing Requirements for Electronic                                                       when using portable Devices (Attachment 6). The TVA specification is                                                           radio-frequency conservative with respect to Regulatory Guide 1.180,                                                         sources such as hand-Revision 1. The specification requires that equipment not be                                                 held radios or other susceptible to external interference or create external                                                     authorized devices that EICB (Singh) interference. New equipment is either tested by the                                                          may be used in the manufacturer or tested in the TVA EMI test facility to ensure                                               control room.
TVA has agreed to do the survey after the radiation monitors are installed.
it meets the specification. If issues are found, the equipment                                               Summary of the results is modified and installation documents are revised to                                                       to be submitted to NRC eliminate the issue(s). This is true for the RM-1000 radiation                                               to close this item.
Will be tracked for survey committment under OI-355.
monitors which were tested prior to installation in Browns                                                 Survey results are to be Ferry at 10v/meter (Browns Ferry High Range Radiation                                                       available for audit by Monitor dated December 8, 2006). Based on this, no                                                           NRC.
355 7.5.2.
exclusion zone for radio use is required for the RM-1000 radiation monitors in WBN Unit 2.
3 7.5 EICB (Singh)
Staff has not found the stated exclusion zone for EMI/RFI interfering devices (e.g. hand-held radio devices) in the submitted documents. TVA to provide the distance for the exclusion zones if not provided already. If it is already a submitted information then please point the source of the information.
Cautions and distance limitations for WBN Unit 1 legacy equipment are documented in TVA procedure TI-134, Revision 0, Control of Portable Two-Way Radios, (Attachment 7) Appendix B. Where WBN Unit 2 uses the same legacy equipment, the same cautions and distance limitations apply.
New equipment is procured and tested to TVA Standard Specification SS E18.14.01, Revision 3, Electromagnetic Interference (EMI) Testing Requirements for Electronic Devices (Attachment 6). The TVA specification is conservative with respect to Regulatory Guide 1.180, Revision 1. The specification requires that equipment not be susceptible to external interference or create external interference. New equipment is either tested by the manufacturer or tested in the TVA EMI test facility to ensure it meets the specification. If issues are found, the equipment is modified and installation documents are revised to eliminate the issue(s). This is true for the RM-1000 radiation monitors which were tested prior to installation in Browns Ferry at 10v/meter (Browns Ferry High Range Radiation Monitor dated December 8, 2006). Based on this, no exclusion zone for radio use is required for the RM-1000 radiation monitors in WBN Unit 2.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
TVA will perform an EMI survey of the containment high range radiation monitors after installation in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being completed.
TVA will perform an EMI survey of the containment high range radiation monitors after installation in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being completed.
356   7.5.2. 7.5                   The attachment number refers to your February 25, 2011 letter.           The loss of the RM-3 output (current to frequency (I/F)        33. Y        Closed                        Closed                                      Closed by TVA 3                              RM-1000 Qualification Test Report 04508905-QR (Attachment 23);           converter output) was determined to be a result of a defect in                                                                                          letter of 3/31/11.
: 6.
page 4-27 in Table 4-22 shows that RM-3 output failed during the         the shaker table (described in section 4.3.6 page 4-23) which OBE and SSE tests. The justification for failure of this RM-3 output     exposed the test articles to unexpected high Gs. This is not explained in the report or any of the appendices in the report. caused a failure in the RM-1000 high voltage power supply Please provide the resolution for this failure. Please note that a      output. The RM-1000 used in the I/F converter test setup similar failure was reported in the test in Table 4-21 which was        (as shown in Figure 2-6 on page 2-9) was not included in the EICB (Singh) resolved in Appendix F, Closed Nonconforming Material Reports.          equipment set being qualified. Rather it was being used as a piece of test equipment to power the I/F converter and provide outputs to monitor I/F converter performance during the test. The resolution was to retest the I/F converter using a functional RM-1000 module at a later time (December).
Y Open Due 4/22/11 Open-TVA/Bechtel TVA to provide commitment that an EMI/RFI survey will be conducted after the installation of the equipment to confirm the non-susceptibility when using portable radio-frequency sources such as hand-held radios or other authorized devices that may be used in the control room.
Summary of the results to be submitted to NRC to close this item.
Survey results are to be available for audit by NRC.
356 7.5.2.
3 7.5 EICB (Singh)
The attachment number refers to your {{letter dated|date=February 25, 2011|text=February 25, 2011 letter}}.
RM-1000 Qualification Test Report 04508905-QR (Attachment 23);
page 4-27 in Table 4-22 shows that RM-3 output failed during the OBE and SSE tests. The justification for failure of this RM-3 output is not explained in the report or any of the appendices in the report.
Please provide the resolution for this failure. Please note that a similar failure was reported in the test in Table 4-21 which was resolved in Appendix F, Closed Nonconforming Material Reports.
The loss of the RM-3 output (current to frequency (I/F) converter output) was determined to be a result of a defect in the shaker table (described in section 4.3.6 page 4-23) which exposed the test articles to unexpected high Gs. This caused a failure in the RM-1000 high voltage power supply output. The RM-1000 used in the I/F converter test setup (as shown in Figure 2-6 on page 2-9) was not included in the equipment set being qualified. Rather it was being used as a piece of test equipment to power the I/F converter and provide outputs to monitor I/F converter performance during the test. The resolution was to retest the I/F converter using a functional RM-1000 module at a later time (December).
The balance of the components (non-failed) were tested to completion during the original testing runs in the November time frame.
The balance of the components (non-failed) were tested to completion during the original testing runs in the November time frame.
357   7.5.2. 7.5                   In Attachment 5, Qualification Test Report Supplement, RM-1000           Attachment 8 contains GA-ESI qualification report          34.      N                                      Open-NRC Review EICB 3              (Sing h)            (04508905-1SP), Attachment 6, Qualification Test Report                 04508903-1TR Seismic Qualification Test Results RM-1000 Supplement, I-F Converter Upgrade (04508905-2SP), and                   and Current-to Frequency (I/F) Converter original release,
: 33. Y Closed Closed Closed by TVA letter of 3/31/11.
357 7.5.2.
3 7.5 EICB (Sing h)
In Attachment 5, Qualification Test Report Supplement, RM-1000 (04508905-1SP), Attachment 6, Qualification Test Report Supplement, I-F Converter Upgrade (04508905-2SP), and contains GA-ESI qualification report 04508903-1TR Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter original release,
: 34. N Open-NRC Review


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radEB3ED.docx                                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                    Issue                                                        TVA Response(s)                            Acceptable       Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                          Y/N Attachment 23, Qualification Test Report for RM-1000 Processor dated April 1999.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 3, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), the applicant made a statement that the results for these tests are provided in SE document 04508903-1TR. Please provide SE document 04508903-1TR for the staff to review. IF this report has been submitted earlier then please advise us the letter number and date by which it was submitted.
Module and Current-To-Frequency Converter (04508905-QR), the applicant made a statement that the results for these tests are provided in SE document 04508903-1TR. Please provide SE document 04508903-1TR for the staff to review. IF this report has been submitted earlier then please advise us the letter number and date by which it was submitted.
dated April 1999.
358   7.5.2. 7.5                   The attachment numbers refer to your February 25, 2011 letter. In       NOTE: This response was inadvertently included in the 7.              N      Open                          Open-TVA/Bechtel 3                              Attachment 2, Wyle Test Report 41991 Safety Shutdown                   letter dated 3/31/11. Please disregard. A revised                              Due 4/22/11 Earthquake (SSE) Test Response Spectra (TRS) Plots all five (5)         response will be included in the next response letter.
358 7.5.2.
pages, in Attachment 5, General Atomics Electronic Systems 04508905-1SP, page 5-5, Figure 5-2, and in Attachment 23,               The purpose of the 04508905-1SP, page 5-5, Figure 5-2 Qualification Test Report for RM-1000 Processor Module and               and Figure 5-1 on the previous page was to support the Current-To-Frequency Converter (04508905-QR), page 4-25,               assertion that the Display Module from the RM2000 is EICB (Singh)
3 7.5 EICB (Singh)
Figure 4-5 X-Axis SSE Test Response Spectra (TRS) versus                 qualified as used in the RM1000 That graph has the RRS Required Response Spectra (RRS), it shows that the TRS were             plotted at 16 g, if it is re-plotted at 15 g (per CEB-SS-5.10 below the RRS at various frequency (5% Damping). Please provide          Rev. 3, Figure 3.1), then it meets your requirements and the an explanation regarding why this is acceptable.                        TRS does not drop below the RRS.
The attachment numbers refer to your {{letter dated|date=February 25, 2011|text=February 25, 2011 letter}}. In, Wyle Test Report 41991 Safety Shutdown Earthquake (SSE) Test Response Spectra (TRS) Plots all five (5) pages, in Attachment 5, General Atomics Electronic Systems 04508905-1SP, page 5-5, Figure 5-2, and in Attachment 23, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), page 4-25, Figure 4-5 X-Axis SSE Test Response Spectra (TRS) versus Required Response Spectra (RRS), it shows that the TRS were below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.
NOTE: This response was inadvertently included in the letter dated 3/31/11. Please disregard. A revised response will be included in the next response letter.
The purpose of the 04508905-1SP, page 5-5, Figure 5-2 and Figure 5-1 on the previous page was to support the assertion that the Display Module from the RM2000 is qualified as used in the RM1000 That graph has the RRS plotted at 16 g, if it is re-plotted at 15 g (per CEB-SS-5.10 Rev. 3, Figure 3.1), then it meets your requirements and the TRS does not drop below the RRS.
In the document 04508905-QR Figure 4-5 on page 4-25 is the TRS for the first test performed. See page 4-38 of the same document for the second TRS graph which was performed on December 4 1998. Again the retest was required because of the failed I/F converter output previously mentioned.
In the document 04508905-QR Figure 4-5 on page 4-25 is the TRS for the first test performed. See page 4-38 of the same document for the second TRS graph which was performed on December 4 1998. Again the retest was required because of the failed I/F converter output previously mentioned.
359   7.7.1.                           Was the CERPI system developed under a 10 CFR 50 Appendix B CERPI is a non-safety related system. Therefore, 10 CFR                       8.            Open                          Open-TVA/WEC 1              EICB          compliant program?                                          50 Appendix B is not applicable.                                                           Due 4/22/11 (Carte) 360                                    In order for staff to review the acceptability of the Incore                                                                             9.            Open                          Open-TVA/WEC Instrumentation System (IIS):                                                                                                                           Due 4/22/11 (a) Provide a brief system description of IIS and its regulatory compliance (i) In your discussion include the discussion of WINCISE and BEACON system which are part of the IIS.
: 7.
N Open Due 4/22/11 Open-TVA/Bechtel 359 7.7.1.
1 EICB (Carte)
Was the CERPI system developed under a 10 CFR 50 Appendix B compliant program?
CERPI is a non-safety related system. Therefore, 10 CFR 50 Appendix B is not applicable.
: 8.
Open Due 4/22/11 Open-TVA/WEC 360 EICB (Garg)
In order for staff to review the acceptability of the Incore Instrumentation System (IIS):
(a) Provide a brief system description of IIS and its regulatory compliance (i) In your discussion include the discussion of WINCISE and BEACON system which are part of the IIS.
(ii) Also provide the differences between the system used at WBN Unit vs. at Unit 2, e.g. Movable vs. fixed IIS.
(ii) Also provide the differences between the system used at WBN Unit vs. at Unit 2, e.g. Movable vs. fixed IIS.
(iii) For WINCISE provide the basis for acceptance.
(iii) For WINCISE provide the basis for acceptance.
EICB (Garg)
(b) If this system has been accepted by the staff previously at some other plant then provide the reference to that SE.
(b) If this system has been accepted by the staff previously at some other plant then provide the reference to that SE.
(c) If this has not been evaluated by the staff previously, then provide the effect of CCF of this system and its effect on safety system or chapter 15 analysis.
(c) If this has not been evaluated by the staff previously, then provide the effect of CCF of this system and its effect on safety system or chapter 15 analysis.
Line 1,098: Line 2,447:
(ii) I believe that this system was accepted at WBN Unit 1. If that is the case then provide the reference to that review.
(ii) I believe that this system was accepted at WBN Unit 1. If that is the case then provide the reference to that review.
(iii) Also provide any differences of this system to the one at WBN Unit 1 system.
(iii) Also provide any differences of this system to the one at WBN Unit 1 system.
361   7.7.1.                           Was the Foxboro IA system developed under a 10 CFR 50                   Foxboro I/A is a non-safety related system. Therefore, 10       10.          Open                          Open-TVA/Bechtel 1              EICB          Appendix B compliant program?                                            CFR 50 Appendix B is not applicable.                                           Due 4/22/11 (Carte)
: 9.
Open Due 4/22/11 Open-TVA/WEC 361 7.7.1.
1 EICB (Carte)
Was the Foxboro IA system developed under a 10 CFR 50 Appendix B compliant program?
Foxboro I/A is a non-safety related system. Therefore, 10 CFR 50 Appendix B is not applicable.
: 10.
Open Due 4/22/11 Open-TVA/Bechtel


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                       radEB3ED.docx                                                                     Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                        Issue                            TVA Response(s)            Acceptable     Status/ Current Actions   Resolution Path   RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                  Y/N 362   7.6.1   7.6.7                             OI #331 requested TVA to provide information                                           11.          Open-TVA regarding how the Loose Parts Monitoring System (LPMS) in-containment components (e.g.,
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 362 7.6.1 7.6.7 EICB ( Kemper & Singh)
Accelerometer ( including the integral insulated hardline cable), Softline cable, and Remote Charge Preamplifiers) were qualified for vibration as addressed in regulatory position C.1.g of RG 1.133, Rev. 1. TVA responded by stating that TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as EICB ( Kemper & Singh) addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. Vibration qualification is not applicable to the softline cable. Due to the installation location (junction boxes mounted to the shield or fan room walls) and previous seismic qualification, vibration qualification of the charge converter/preamplifier is not required. This completes the response to this item.
OI #331 requested TVA to provide information regarding how the Loose Parts Monitoring System (LPMS) in-containment components (e.g.,
Accelerometer ( including the integral insulated hardline cable), Softline cable, and Remote Charge Preamplifiers) were qualified for vibration as addressed in regulatory position C.1.g of RG 1.133, Rev. 1. TVA responded by stating that TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. Vibration qualification is not applicable to the softline cable. Due to the installation location (junction boxes mounted to the shield or fan room walls) and previous seismic qualification, vibration qualification of the charge converter/preamplifier is not required. This completes the response to this item.
However, the staff still desires further clarification on this response. Specifically, please provide a documented basis that demonstrates the LPMS in-containment equipment is qualified for normal operating conditions (e.g., test results compared to the equipment qualification specification), including vibration qualification. Also, provide justification for why vibration qualification if the Remote Charge Preamplifier is not required.
However, the staff still desires further clarification on this response. Specifically, please provide a documented basis that demonstrates the LPMS in-containment equipment is qualified for normal operating conditions (e.g., test results compared to the equipment qualification specification), including vibration qualification. Also, provide justification for why vibration qualification if the Remote Charge Preamplifier is not required.
363   7.5.1. 7.5.2                             OI#199 requested TVA to provide information                                           12.
: 11.
1.3                                      concerning how TVA plans to meet regulatory criteria and                                      for Quality (10 CFR 50.55a(a)(1)) associated with the 7.9.1                                      Technical Support Center and Nuclear Data Link. TVA responded in Letter Dated October 5, 2010, Item 63; however, TVAs response does not address the quality aspects of these system features. A similar question had been asked for Quality Criteria adherence for the EICB (Rahn and Mossman)
Open-TVA 363 7.5.1.
SPDS and the BISI functions of the Integrated Computer System. In response to that request (same letter) TVA provided a description of TVA procedures, BISI software development procedures, and various management measures that will be taken to assure high quality in the design, operation, and maintenance of the SPDS and BISI functions of the ICS. Since the TSC and Nuclear Data Link information originates in the SPDS function of the ICS, are there any aspects of the quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are applicable to the data communications features?
1.3 and 7.9.1 7.5.2 EICB (Rahn and Mossman)
OI#199 requested TVA to provide information concerning how TVA plans to meet regulatory criteria for Quality (10 CFR 50.55a(a)(1)) associated with the Technical Support Center and Nuclear Data Link. TVA responded in Letter Dated October 5, 2010, Item 63; however, TVAs response does not address the quality aspects of these system features. A similar question had been asked for Quality Criteria adherence for the SPDS and the BISI functions of the Integrated Computer System. In response to that request (same letter) TVA provided a description of TVA procedures, BISI software development procedures, and various management measures that will be taken to assure high quality in the design, operation, and maintenance of the SPDS and BISI functions of the ICS. Since the TSC and Nuclear Data Link information originates in the SPDS function of the ICS, are there any aspects of the quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are applicable to the data communications features?
Specifically, what is the scope of TVA Procedure SPP-2.6 Computer Software Control? How does it apply
Specifically, what is the scope of TVA Procedure SPP-2.6 Computer Software Control? How does it apply
: 12.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                     radEB3ED.docx                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                              Issue                    TVA Response(s)          Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                    Y/N to the ICS functions of a) SPDS, b) BISI, and c) TSC and NDL functions? Wouldnt there be aspects of the quality procedures that apply to the development, maintenance, and operations of the software needed to support the data communications features. Also, what quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to ensure that these features will be reliable and available when needed?}}
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments to the ICS functions of a) SPDS, b) BISI, and c) TSC and NDL functions? Wouldnt there be aspects of the quality procedures that apply to the development, maintenance, and operations of the software needed to support the data communications features. Also, what quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to ensure that these features will be reliable and available when needed?}}

Latest revision as of 07:09, 13 January 2025

OL - FW: Updated OI List
ML111050009
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/08/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML111050009 (56)


Text

1 WBN2Public Resource From:

Poole, Justin Sent:

Friday, April 08, 2011 4:04 PM To:

Crouch, William D Cc:

Clark, Mark Steven; Hilmes, Steven A; WBN2HearingFile Resource

Subject:

FW: Updated OI List Attachments:

20110408 Open Item List Master NRC Update 04-08-11.docx JustinC.Poole ProjectManager NRR/DORL/LPWB U.S.NuclearRegulatoryCommission (301)4152048 email:Justin.Poole@nrc.gov From: Darbali, Samir Sent: Friday, April 08, 2011 4:03 PM To: DeJesus, Jonathan; Poole, Justin Cc: Rahn, David

Subject:

Updated OI List

Justin, Attached is the updated Open Items list to be sent to TVA.
Thanks, Samir SamirDarbali ElectronicsEngineer NRR/DE/EICB Room:O9D11 3014151360

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

300 Mail Envelope Properties (19D990B45D535548840D1118C451C74D7F6E4FC1D9)

Subject:

FW: Updated OI List Sent Date:

4/8/2011 4:03:42 PM Received Date:

4/8/2011 4:03:46 PM From:

Poole, Justin Created By:

Justin.Poole@nrc.gov Recipients:

"Clark, Mark Steven" <msclark0@tva.gov>

Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>

Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 504 4/8/2011 4:03:46 PM 20110408 Open Item List Master NRC Update 04-08-11.docx 493388 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B

(

A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides

1.

Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 002 All All B

(

A Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides

2.

Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 003 All All B

(

A Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides

3.

Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 004 All All B

(

A Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting

4.

Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005 7.1.3.

(

G By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb

5.

Y Closed Closed EICB RAI TVA Letter dated 006

(

G Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3-1 By letter dated February 5, 2010: TVA provided the Unit 2

6.

Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.

(

G The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7.

Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008 7.3

(

G There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8.

Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6,

(

D a

Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9.

Y Closed Closed EICB RAI 3/12/10, 010 7.3 7.3

(

D a

The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10. Y Closed Closed EICB RAI 3/12/10, 011 7.3.2 5.6,

(

D a

NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11. Y Closed Closed EICB RAI ML101680598, 012 7.4 7.4

(

D a

The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.

(

G Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.

014 All All B

(

A Provide the justification for any hardware and software changes Date: 4/27/10

14. Y Closed Closed NRC Meeting TVA Letter dated 015

(

G Verify that the refurbishment of the power range nuclear Date: 4/27/10

15. Y Closed Closed NRC Meeting TVA Letter dated 016

(

C Identify the precedents in license amendment requests (LARs), if Date: 4/27/10

16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1,

(

D a

Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10

17. Y Closed Closed NRC Meeting TVA Letter dated 018

(

G Identify any changes made to any instrumentation and control Date: 4/27/10

18. Y Closed Closed NRC Meeting TVA Letter dated 019

(

G Verify that the containment purge isolation radiation monitor is the Date: 4/27/10

19. Y Closed Closed NRC Meeting TVA Letter dated 020

(

G Provide environmental qualification information pursuant to Section Date: 4/27/10

20. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

021 7.3

(

G For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10

21. Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be 022 7.3.2 5.6,

(

D a

Verify the auxiliary feedwater control refurbishment results in a like-Date: 4/27/10

22. Y Closed Closed NRC Meeting TVA Letter dated 023

(

G Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10

23. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

024

(

C Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a

24. Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address 025 7.5.2 7.5.1

(

S i

For the containment radiation high radiation monitor, verify that the Date: 4/27/10

25. Y Closed Closed NRC Meeting ML101230248, 026

(

G Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10

26. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

027 7.7.1.

(

C For Foxboro I/A provide information regarding safety/non-safety-Date: 4/27/10

27. Y Closed Closed NRC Meeting TVA Letter dated 028

(

G For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen

28. Y Closed Closed NRC Meeting TVA Letter dated 029

(

C For the rod control system, verify that the refurbishment results in a Date: 4/27/10

29. Y Closed Closed NRC Meeting TVA Letter dated 030

(

G Regarding the refurbishment of I&C equipment, identify any Responder: Clark

30. Y Closed Closed NRC Meeting TVA Letter dated 031

(

C For the rod position indication system (CERPI), provide information Date: 4/27/10

31. Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.

032

(

C For the process computer, need to consider cyber security issues Date: 4/27/10

32. Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber 033

(

C For the loose parts monitoring system, provide information Date: 4/27/10

33. Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is 034

(

G 2/4/2010 Responder: TVA

34. Y Closed Closed N/A TVA Letter dated 034.

a r

g Chapter 7.1 - Introduction

35. Y Closed Closed N/A N/A 034.

(

G Chapter 7.2 - Reactor Trip System

36. Y Closed Closed N/A N/A 034.

7.3 7.3

(

D a

Chapter 7.3 - ESFAS

37. Y Closed Closed N/A N/A 034.

7.5.1.

7.5.2

(

M a

Chapter 7.5 - Instrumentation Systems Important to Safety

38. Y Closed Closed N/A N/A Closed 034.

7.5.1.

7.5.2 r

c u

Chapter 7.6 - All Other Systems Required for Safety

39. Y Closed Closed N/A N/A Closed 034.

n g

h

/

Chapter 7.7 Control Systems

40. Y Closed Closed N/A N/A 035

(

S i

2/18/2010 Responder: Clark

41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design 036 7.5.2 7.5.1

(

C February 18, 2010 Date: 5/25/10

42. Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post 037 7.5.1.

7.5.2

(

M a

2/18/2010 Responder: Clark Date: 5/25/10

43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.

7.5.2

(

M a

2/18/2010 Responder: Clark Date: 5/25/10

44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039

(

G January 13, 2010 Responder: Clark Date: 5/25/10

45. Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the 040

(

G January 13, 2010 Responder: Clark Date: 5/25/10

46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents:

(1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM:

(4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA letter dated April 8, 2010.

Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10 Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10 For Item 3, Attachment 19 contains the Westinghouse document Post-Accident Monitoring System (PAMS)

Licensing Technical Report, WNA-LI-00058-WBT, Revision 2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the Post-Accident Monitoring System (PAMS) Licensing Technical Report, WNA-LI-00058-WBT, Revision 2, dated December 2010.

For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.

TVA Response to Follow-up NRC Request:

(1) WEC presented the results of the self assessment to the NRC on February 2, 2011.

(2) By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with the STP. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

1.

N Open Pending Submittal of the Test Summary Report due 3/29/11 Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.

The SysRS and SRS incorporate requirements from many other documents by reference.

NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there should be no problem to docket this version. (4) Per ML091560352, the testing process document does not address the test plan requirements of the SPM.

Please provide a test plan that implements the requirements of the SPM.

Open-NRC Review Due 3/29/11 NNC 1/27/11: Issues with the STP were discussed in the weekly public meetings.

Westinghouse to:

(1) perfrom STP self assessment., and (2) Augment Test Summary report to provide missing test plan information NNC 2/3/11: At next audit compare &

discuss:

(1) WNA-PT-00058-GEN Rev. 0 (2) WNA-PT-00138-WBT Rev. 0 (3) AP1000 STP NRC Meeting Summary NRC Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.

042 All All B

(

A February 25, 2010: Telecom Date: 5/25/10

47. Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the 043 7.5.2 7.5.1 CB (C

art 2/19/2010 Responder: WEC Date: 5/25/10

2.

N Open Open-NRC Review EICB RAI ML102910002 TVA Letter dated 2/5/10 NNC 8/25/10: A CQ PAMS ISG6 compliance matrix was docketed on: (1)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed. The shortcomings of the first three lines in the matrix are:

Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed and approved.

Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.

Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.

NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix.

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed.

By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.

contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).

By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."

It is TVAs understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC.

Westinghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.

TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:

(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and software which includes the RSEDs.

(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD)

TVA Response to Second Follow-up NRC Request:

The NRC audited the Westinghouse commercial item dedication process for both hardware and software during the week of February 28 to March 4, 2011. The audif found the processes acceptable. Westinghouse and TVA previously agreed to provide additional information to address this item in Revision 3 of the Licensing Technical Report.

contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary). contains WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10.

Response is included in letter dated 10/5/10.

Revised compliance matrix is unacceptable.

NNC 8/12/10: It is not quite enough to provide all of the documents requested. There are two possible routes to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.

Due 3/29/11 NNC 2/2/11: Issues with Common Q TR &

SPM compliance were discussed in the weekly public meetings.

Westinghouse to perform Common Q TR

& SPM compliance self assessment; his will be discussed in detail on the next audit.

Item No. 2 TVA Letter dated 5/12/10 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 February, 5 12010, (2) March 12, 2010,

& (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.

NNC 11/23/10: WNA-LI-00058-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Report, Revision 3 dated March 2011 (non-proprietary). contains CWA-11-311, Application for Withholding Proprietary Information from Public Disclosure, WNA-LI-00058-WBT-P, Revision 3 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post-Accident Monitoring System (PAMS) Licensing Technical Report, dated March 14, 2011.

044 7.5.2 7.5.1

(

C February 25, 2010 Date: 5/25/10

48. Y Closed Closed EICB RAI TVA Letter dated 045

(

C February 25, 2010 Date: 5/25/10

49. Y Closed Closed EICB RAI TVA Letter dated 046

(

C February 25, 2010 Date: 5/25/10

50. Y Closed Closed N/A - Request for N/A 047 7.5.2 7.5.1

(

C 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10

51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1

(

C April 8, 2010 Date: 5/25/10

52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1

(

C 4/8/2010 Responder: WEC Date: 5/25/10

53. Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1

(

C 4/8/2010 Responder: WEC Date: 5/25/10

54. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains 051

(

G April 15, 2010 Date: 5/25/10

55. Y Closed Closed N/A N/A Review addressed by another Open 052 7.5.2 7.5.1

(

S i

April 19, 2010 Date: 5/25/10

56. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1

(

S i

April 19, 2010 Date: 5/25/10

57. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1

(

S i

4/19/2010 Responder: Slifer/Clark Date: 5/25/10

58. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1

(

S i

4/19/2010 Responder: Slifer/Clark Date: 5/25/10

59. Y Closed Closed RAI No. 15 TVA Letter dated 056

(

S i

April 19, 2010 Date: 5/25/10

60. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring 057 7.5.2 7.5.1

(

S i

4/19/2010 Responder: TVA I&C Staff Date: 5/25/10

61. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5

(

S i

April 19, 2010 Date: 5/25/10

62. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1

(

S i

April 19, 2010 Date:

63. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10

64. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10

65. Y Closed Closed N/A N/A Addressed by Open Item No. 48 062 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10

66. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10

67. Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb Date: 4/8/2010

68. Y Closed Closed N/A - No question TVA Letter dated 065 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

69. Y Closed Closed N/A - No question TVA Letter dated 066 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

70. Y Closed Closed N/A - No question TVA Letter dated 067 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.

Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

3.

N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Response included in letter dated 12/22/10.

This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review Due: 3/29/11 NNC 2/2/11: Section 7 of the WBN2 PAMS LTR should be updated to include:

(1) non-proprietary description of commercial grade dedication, and (2) Software example Commercial grade dedication will also be addressed at the next audit.

N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

TVA Letter dated 6/18/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

TVA Response to Follow-up NRC Request dated 2/2/11:

The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)

Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.

068 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.

Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.

The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:

(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -

Instrumentation and Controls Staff Information

4.

N Open Response included in letter dated 12/22/10.

This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review NNC 2/2/11:

Commercial grade dedication will be addressed at the next audit. Summary reports for AI687 &

AI688 were docketed one month late.

N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

TVA Letter dated 6/18/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Requests, (Reference 5):

a.

EQ-EV-62-WBT, Revision 0, Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)

Requirements, dated September 10, 2010

b.

EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &

AI688 Modules for use in Common Q PAMS, dated September 10, 2010

c.

CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:

a.

CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction

b.

LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:

a.

CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction

b.

LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:

a.

CDI-4057, Revision 4, Commercial Dedication Instruction

b.

EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter

c.

Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit

d.

EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter Assemblies 069 7.5.2 7.5.1 CB (C

art By letter dated March 12, 2010 TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October Responder: WEC Date: 5/25/10

5.

N Open Open-NRC Review Due 3/29/11 N/A - No question was asked. Item N/A

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 2010.

As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be submitted. Instead a non-proprietary PAMS Test Summary Report will be submitted. contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

Pending Submittal of the Test Summary Report due 3/29/11 Awaiting for document to be docketed by TVA.

NNC 2/3/11: The current due dated above is 4 months later than planned.

was opened to track comm8ittment made by applicant.

070 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

71. N Closed Closed N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this 071 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

72. N Closed Closed N/A - No question N/A NNC 11/23/10: The dues date in this 072 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

73. Y Closed Closed N/A - No question N/A 073 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

74. N Closed Closed N/A - No question N/A 074 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010.

Responder: WEC Date: 5/25/10 contains WNA-VR-00283-WBT-P, IV&V Summary Report for the Post Accident Monitoring System, Revision 4, dated March 2011 (proprietary). Attachment 2 contains WNA-VR-00283-WBT-NP, IV&V Summary Report for the Post Accident Monitoring System, Revision 4, dated March 2011 (non-proprietary). Attachment 3 contains CWA-11-3121, Application for Withholding Proprietary Information from Public Disclosure, WNA-VR-00283-WBT-P, Revision 4 Nuclear Automation IV&V Summary Report for the Post Accident Monitoring System" (Proprietary), dated March 3, 2011.

6.

N Open Response in letter dated March 16, 2011 Open-NRC Review Due TBD NNC 2/3/11: At least 3 months later than planned.

N/A - No question was asked. Item was opened to track commitment made by applicant.

N/A Rev. 4 will be available for the NRC audit on 2/28/11. This document will not be submitted. Rev. 5 will be submitted after resolution of the datastorm display issue.

075 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

75. N Closed Closed N/A - No question N/A 076 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark Date: 5/25/10

76. Y Closed Closed N/A - No question N/A 077 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

77. Y Closed Closed N/A - No question TVA Letter dated 078

(

G 4/26/2010 Responder: Clark Date: 5/25/10

78. Y Closed Closed EICB RAI TVA Letter dated 079

(

G 4/26/2010 Responder: Clark Date: 5/25/10

79. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080

(

S i

4/26/2010 Responder: WEC

80. Y Closed Closed RAI No. 2 TVA Letter dated 081 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.

0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:

(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)

However, LIC-110, "Watts Bar Unit 2 License Application Review,"

states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.

Bechtel to develop a matrix and work with Westinghouse to provide justification.

TVA Response to Follow-up NRC Request:

contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design meets the applicable requirements and is acceptable.

7.

N Open ML101600092 Item No.1: There are three sets of regulatory criteria that relate to a Common Q application (e.g. WBN2 PAMS):

(a) Common Q platform components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b).

The Common Q SER states:

Appendix 1, Post Accident Monitoring Systems, provides the functional requirements and conceptual design approach for upgrading an existing PAMS based on Common Q components (page 58, Section 4.4.1.1, Description)On the Open-NRC Review Due 2/25/11 TVA to provide requested information.

NNC 2/3/11: The above due date has been missed by at least 2 months.

Please provide new due date.

EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10 NNC 1/5/11: See Also Open Item No.

86 and 202.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments a justification for the acceptability PAMS with respect to these differences.

basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the proposed PAMS design.

Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.

603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

082 7.5.2 7.5.1

(

C 5/6/2010 Responder: WEC Date: 6/18/10

81. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.

083 7.5.2 7.5.1

(

C May 6, 2010 Date: 6/18/10

82. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1

(

C May 6, 2010 Date: 6/18/10

83. Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1

(

C 5/6/2010 Responder: WEC

84. N Closed Closed EICB RAI 086 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.

0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:

(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185)

However, LIC-110, "Watts Bar Unit 2 License Application Review,"

states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the Responder: WEC Date: 5/24/10 The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a

8.

N Open TVA to address with item OI

81.

Open-NRC Review Due 2/25/11 NNC 2/3/11: The above due date has been missed by at least 2 months.

Please provide new due date.

EICB RAI ML102910002 Item No. 14 TVA Letter dated 6/18/10 NNC 1/6/11: See Also Open Item No.81

& 202

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.

comparison review.

Rev 0 of the Licensing Technical Report references Rev. 1 of ISG4 TVA Response to Follow-up NRC Request:

The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.

087 7.5.2 7.5.1

(

S i

May 6, 2010 Date: 5/24/10

85. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1

(

S i

May 6, 2010 Date: 5/24/10

86. Y Closed Closed RAI No. 21 TVA Letter dated 089

(

C 5/6/2010 Responder: Clark

87. Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that 090

(

C 5/6/2010 Responder: Clark Date: 5/25/10

88. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4

(

D a

May 20, 2010 Date: 5/25/10

89. Y Closed Closed EICB RAI No.1 TVA Letter dated 092 DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.

Responder: Hilmes This item will close when we are no longer using this document as a communications tool.

1.

Y Open Due SER Issue Open-TVA/Oversight Due: SER Issue Continuous review as items are added 093

(

G May 20, 2010 Date: 5/25/10

90. Y Closed Closed N/A N/A Will be reviewed under item 154 094

(

G 5/20/2010 Responder: Clark Date: 5/25/10

91. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1, XX

(

D a

May 20, 2010 Date:

92. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX

(

D a

5/20/2010 Responder:

93. Y Closed Closed EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4

(

D a

May 20, 2010 Date:

94. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4

(

D a

May 25, 2010 Date:

95. Y Closed Closed EICB RAI No.5 TVA Letter dated 099

(

B a

April 12, 2010 Date:

96. Y Closed Closed Closed to Item 129 100

(

C 5/20/2010 Responder: WEC

97. Y Closed Closed N/A - No question N/A 101 DORL (Poole) 4/12/2010 The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.
1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR Responder: Slifer The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
9.

Y Open Documents provided in letter dated 07/15/10 Open-NRC Review Due 10/14/10 Confirm receipt.

N/A TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.

102

(

C May 24, 2010 Date: 5/24/10

98. Y Closed Closed N/A TVA Letter dated Request for schedule not information.

103 7.4 7.4

(

D a

5/27/2010 Responder: Ayala Date: 5/27/10

99. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4

(

D a

5/27/2010 Responder: Merten Date: 5/27/10 100. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105

(

G April 29, 2010 Date:

101. Y Closed Closed N/A N/A Will be reviewed under item 154.

106

(

S i

May 6, 2010 Date: 5/25/10 102. Y Closed Closed RAI No. 9 TVA Letter dated 107

(

S i

May 6, 2010 Date: 5/28/10 103. Y Closed Closed RAI No. 22 TVA Letter dated 108

(

G May 6, 2010 Date: 5/25/10 104. Y Closed Closed N/A N/A Will be reviewed under OI#154

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 109.

(

C 5/6/2010 Responder: N/A 105. Y Closed Closed N/A N/A Duplicate of another open Item.

109.

7.8 XX

(

D a

5/6/2010 Responder: N/A 106. Y Closed Closed N/A N/A 110

(

G May 6, 2010 Date:

107. Y Closed Closed N/A N/A Information was found.

111

(

C May 6, 2010 Date: 5/28/10 108. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112

(

G June 1, 2010 Date:

109. Y Closed Closed N/A N/A Information was received 113

(

G 6/1/2010 Responder: Clark 110. Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2

(

G 6/1/2010 Responder: WEC 111. Y Close Closed EICB RAI TVA Letter dated 115

(

C 2/25/2010 Responder: Clark 112. Y Closed Closed EICB RAI TVA Letter dated 116

(

G 6/3/2010 Responder: WEC 113. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting 117 7.1 7.1

(

G 6/3/2010 Responder: Hilmes 114. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4

(

D a

6/8/2010 Responder: Merten 115. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 119

(

S i

June 10, 2010 Date:

116. Y Closed Closed RAI No. 23 TVA Letter dated 120

(

C 5/6/2010 Responder: Hilmes/Merten/Costley 117. Y Closed Closed EICB RAI TVA Letter dated 121

(

C 5/6/2010 Responder: Webb/Webber 118. Y Closed Closed EICB RAI TVA Letter dated 122

(

C June 14, 2010 Date:

119. Y Closed Closed N/A - Request for N/A 123 7.7.3 7.4.1,

(

D a

6/14/2010 Responder:

120. Y Closed Closed ML101720589, TVA Letter dated 124 7.7.5 XX

(

D a

6/14/2010 Responder:

121. Y Closed Closed ML101720589, Item TVA Letter dated 125 7.7.8 7.7.1.12

(

D a

6/14/2010 Responder:

122. Y Closed Closed ML101720589, Item TVA Letter dated 126 7.8 7.8

(

D a

June 14, 2010 Date:

123. Y Closed Closed ML101720589, Item TVA Letter dated 127 7.2 7.2

(

G 6/16/2010 Responder: WEC/Clark 124. Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2

(

G 6/18/2010 Responder: WEC Drake /TVA Craig 125. Y Closed Closed EICB RAI TVA Letter dated Track through SE open item 129

(

P 6/12/2010 Responder: WEC 126. Y Closed Closed N/A TVA Letter dated 130

(

P 6/28/2010 Responder: Clark 127. Y Closed Closed N/A TVA Letter dated 131

(

P 6/28/2010 Responder: Clark 128. Y Closed Closed N/A TVA Letter dated 132

(

P 6/28/2010 Responder: Clark 129. Y Closed Closed N/A TVA Letter dated 133

(

P 6/28/2010 Responder: Clark 130. Y Closed Closed TVA Letter dated 134

(

P 6/28/2010 Responder: Clark 131. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1

(

D a

6/30/2010 Responder: Clark 132. Y Closed Closed RAI not necessary TVA Letter dated 136 7.3.2, 7.4, 5.6,

(

D a

6/30/2010 Responder: Clark 133. Y Closed Closed RAI not necessary TVA Letter dated 137

(

C Several WBN2 PAMS documents contain a table titled, Document Responder: WEC 134. Y Closed Closed ML101650255, Item TVA Letter dated 138 EICB (Carte)

By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.

(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.

By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, Commercial Grade Dedication Program.

Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication.

Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.

Responder: WEC This item is used to track all Commercial Grade Dedication issues.

a.

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:

Section 7, Commercial Grade Dedication Process has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

10. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10 TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 1)

Open-NRC Review NNC 2/2/11:

Commercial grade dedication will be addressed at the next audit.

NNC 2/17/11: The description of the commercial grade dedication process in the CQ PAMS LTR Rev. 2 should be updated to include a non-proprietary description and to ML101650255, Item No. 2 See also No. 82.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.

(i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications.

(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications.

As listed in Table 6-3. Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the Westinghouse Rockville office: (list included in letter)

b.

It is TVAs understanding that the submittal of the documents listed in (b.i) and (b.ii) is no longer required.

Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)

Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.

TVA Response to Follow-up NRC Request:

The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)

Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.

TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)

TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 3)

TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) include a software example.

139

(

C The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC 135. Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 140

(

C The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)

Responder: Clark 136. N Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 141

(

C Deleted by DORL Date:

137. Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements 142 EICB (Carte)

The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - Software Requirements Specifications. IEEE 830-1994 Section 4.3.8, Traceable, states: A [requirements specification] is traceable of the origin of each of its requirements is clear

1.

How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.

2.

Explain the source(s) of the requirements present in the Post Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS).

TVA Response to 1:

Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by:

a.

Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

b. Engineering review/comment/status of each revision of:
i.

WNA-DS-01617-WBT, Post Accident Monitoring System - System Requirements Specification ii.

WNA-DS-01667-WBT, Post Accident Monitoring System - System Design Specification (hardware) iii.

WNA-SD-00239-WBT, Software Requirements Specification for the Post Accident Monitoring System (software)

TVA Response to 2:

As documented in the RTM, some software requirements

11. N Open Revised response included in letter dated 02/25/11 Response included in letter dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5)

Open-NRC Review Due 2/25/11 (document submittals)

NNC 2/2/11: Updated Specifications and RTMs to be provided by TVA Tracability to be addressed during the next audit.

ML101650255, Item No. 6 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Accident Monitoring Systems Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?

3.

Clarify whether the unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?

Does the same apply to documents referenced by the SRS?

Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.

R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.

4.

Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these sources or documents?

5.

References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.

These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal

= TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

are taken from generic documents. The decision to include generic software requirements was to reduce the overall scope for Common Q features that are unchanged across projects. Westinghouse reviewed the generic PAMS requirements and included those requirements that were applicable to WBN Unit 2 PAMS.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to 3:

Unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly numbered.

It depends on the document type. The statement would be true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference. However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements. The requirements contained in this document are contained within the text of the various sections.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to 4:

The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 contains references to other Westinghouse software requirements documents. Specifically, 00000-ICE-3238, Revision 5, Software Requirements Specification Post Accident Monitoring System 00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to 5:

Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, dated December 2010 (Attachment 10).

RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements. This document can be made available for audit

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

at the Westinghouse Rockville office.

At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.

1.

Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

2.

The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

3.

Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.

TVA Response:

A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

4.

IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.

TVA Response:

Westinghouse has confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

5.

IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.

TVA Response:

Westinghouse confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

6.

Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg.

Guide 1.172 and justify any deviations.

TVA Response:

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):

Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172 has been added.

7.

25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?

TVA Response:

The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

8.

Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.

TVA Response:

The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)

9.

RTM item R4.2-2 protection class software set to 0.

Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.

TVA Response:

Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

10. Westinghouse to improve the traceability of the tests

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments that are performed with the function enable (FE) switch in the ENABLE position.

TVA Response:

The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:

6.2 Manually Initiated Testing, 7.2.23 Annunciator Test Display, 7.2.25 Saturation Margin Test Display, and 7.2.26 Analog Output Test Display.

11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position.

TVA Response:

Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and commitment was performed with the following results:

a.

Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.

b.

SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:

i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
c.

Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:

i. Tables 7.2-1 Train A PAMS Data Transmitted to the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.

All other items in the SRS refer to the FE keyswitch.

ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term enabled instead of ENABLE

d.

WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference

12) is not consistent in use of the term FE keyswitch as noted below:
i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.

ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch

e.

Revision 2 of the Licensing Technical Report is not

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments consistent in use of the term FE keyswitch as noted below:

i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)

The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.

12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.

Need a good write up of how the process works.

TVA Response:

See response to letter item 13 (NRC Matrix Item 145).

13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:

The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).

14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.

TVA Response:

The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, TVA Contract Compliance Matrix.

15. Westinghouse to add the Software Design Descriptions to the RTM TVA Response:

The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.

TVA Response:

When a Common Q PAMS requirements document

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments references a section of another document, all requirements in that section are applicable.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.

TVA Response:

See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).

18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
a.

Is the SDD a standalone document or will it incorporate the generic SDD by reference?

b.

What are the SDDs?

c.

PAMS is a delta document so how do we capture all the generic requirements for traceability.

TVA Response:

a.

There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.

b.

The SDDs developed for this project are:

i.

WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii.

WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software iii.

WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv.

Other generic SDDs referenced by the PAMS project are:

(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions

c.

Refer to WNA-VR-00279-WBT, Revision 3.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

19. For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.

TVA Response:

Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.

Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in the SPM requirements for software module development.

WCAP-15927 is on the AP1000 docket.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to Follow-up NRC Request:

WNA-VR-00279-WBT, Revision 4, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System is scheduled to be available for audit at the Westinghouse Rockville office February 21, 2011. The document will be available at the Westinghouse Cranberry offices to support the NRC Common Q PAMS audit.

contains the proprietary version of WNA-DS-01617-WBT-P, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February 2011. Attachment 10 contains the non-proprietary version WNA-DS-01617-WBT-NP, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February, 2011. Attachment 11 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary),

dated February 10, 2011.

2 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 13 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 14 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary), dated February 11, 2011.

5 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 16 contains the non-proprietary version WNA-SD-00239-WBT-NP, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 17 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary), dated February 10, 2011.

143 EICB (Carte)

The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, Overview, of the WBN2 PAMS SRS states: This document describes requirements for the major software components (a) Please list and describe each of the major software components. Please include a description of any NRC review for each of these components.

(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.

(c) What other documents contain the requirements for the other software components?

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability

& Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?

Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.

A detailed explanation will be provided.

TVA Response:

(a) and (b) The requested information is provided in the following documents:

i.

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Table 6-1, Document Requirements which lists the software documentation requirements for the Common Q PAMS and Section 11 TVA Contract Compliance Matrix submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

ii.

WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010 (Attachment 1) iii.

WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010 (Attachment 7) iv.

WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post

12. N Open Response included in letter dated 12/22/10 Open-NRC Review Due 2/25/11 (document submittals)

To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

NNC 2/2/11: Updated Specifications and RTMs to be provided by TVA NNC 2/3/11: The above due date has been missed by at least 2 months.

Please provide new due date.

ML101650255, Item No. 7 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.

Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)

To the best of TVAs knowledge, no prior NRC review of the software components has been performed.

(c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

(d) No. Please see Item (e) below.

(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:

i.

WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii.

WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to Follow-up NRC Request:

See Response to item 3 (Item number 142) 144 EICB (Carte)

The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).

(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems).

(b) Please describe the flow of information between these three documents.

(c) Does the PAMS SRS implement the requirements in these three documents?

(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.

(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.

Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design and implementation, and hardware design and implementation for Common Q safety system development.

This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.

(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142

13. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10 Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.

b-d to be addressed at public meeting and audit. Will require information to be docketed.

Open-NRC Review Due 3/29/11 Responses to items a and e provided.

NNC 11/18/10:

(1) Items b-d closed to other Open Item nos.

(2) The point of these questions was to understand how the origin of the requirements in the requirements specifications were documented. TVA stated that the origin of the requirements would be demonstrated in Rev. 2 of the CQ PAMS LTR.

ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, dated February 2010 (ML101050202).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V-770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

TVA Response to Follow-up NRC Request:

(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems, is available for NRC audit at the Westinghouse Rockville office.

(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.

TVA Response to Second Follow-up NRC Request:

Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification was added to the Licensing Technical Report Revision 3 to address this concern. contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).

NNC 2/3/11: CQ PAMS LTR Rev. 2 Section 11 & 12 do not adequately demonstrate the origin of requirements in SysRS. TVA to describe how to address concern.

145 EICB (Carte)

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability

& Compliance, which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.

Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at

14. N Open Response included in letter dated 12/22/10 Open-NRC Review Due 2/25/11 ML101650255, Item No. 9 WBN2 PAMS System Design Specification TVA docketed WNA-DS-01667-WBT

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?

(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.

This item is used to track all traceability issues with the System Design Specification (SDS).

At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification.

This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.

1.

Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.

2.

Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.

3.

25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?

Yes. The next revisions of the SDS and SRS address these issues.

4.

TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.

5.

The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.

6.

Westinghouse to provide the generic AC160 and flat panel specifications.

7.

Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.

8.

The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.

the Westinghouse office in Rockville.

(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).

(3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).

(4) Section 11 TVA Contract Compliance Matrix was added to WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).

(5) WNA-VR-00283-WBT, Revision 1, IV&V Summary Report for the Post Accident Monitoring System, submitted in TVA to NRC letter dated December 3, 2010 (Reference 1) includes the Requirements and Design phase reviews.

(6) Per Westinghouse letter WBT-D-2268 NRC Access to Common Q Documents at the Westinghouse Rockville Office dated August 16, 2010 (Reference 9) System Requirements Specification for the Common Q Generic Flat Panel Display, 00000-ICE-30155, Revision 9 is available for audit at the Westinghouse Rockville office.

The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.

(7) A schedule was developed and is reviewed weekly by Westinghouse and TVA project management.

(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.

(9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 TVA Response to Follow-up NRC Request:

See Response to item 3 (Item number 142)

During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:

TVA would provide the RSED RTM. (see ML102920031 Item No 6)

TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see ML102920031 Item No 7)

TVA would revise and resubmit the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8)

To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Design Specification, dated December 2009.

146

(

C 6/17/2010 Responder:

138. Y Closed Closed ML101650255, Item PAMS System Requirements 147

(

C 6/17/2010 Responder:

139. Y Closed Closed ML101650255, Item PAMS System Requirements 148

(

C 6/17/2010 Responder:

140. Y Closed Closed ML101650255, Item PAMS System Requirements 149 7.2 7.2

(

G FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell 141. Y Close Closed ML101720589, Item TVA Letter dated 150 7.2 7.2

(

G Many of the changes were based on the Westinghouse document Responder: Clark 142. Y Close Closed ML101720589, Item TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 151 7.2 7.2

(

G Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark 143. Y Close Closed ML101720589, Item TVA Letter dated 152 7.2 7.2

(

G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark 144. Y Close Closed ML101720589, Item TVA Letter dated 153 7.2 7.2

(

G FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb 145. Y Close Closed ML101720589, Item TVA Letter dated 154 7.2 7.2

(

G FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb 146. Y Closed Closed ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155 7.2 7.2

(

G Summary of FSAR change document section 7.2 states that Date:

147. Y Closed Closed ML101720589, Item 156 7.2 7.2

(

G FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-Responder: WEC 148. Y Closed Closed ML101720589, Item TVA Letter dated Response on hold pending 157 7.2 7.2

(

G FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell 149. Y Close Closed ML101720589, Item TVA Letter dated 158 7.2 7.2

(

G FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell 150. Y Closed Closed ML101720589, Item TVA Letter dated 159 7.2 7.2

(

G FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig 151. Y Close Closed ML101720589, Item TVA Letter dated 160 7.2 7.2

(

G FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell 152. Y Close Closed ML101720589, Item TVA Letter dated 161 7.2 7.2

(

G FSAR section 7.2.2.3 states that changes to the control function Responder: Clark 153. Y Closed Closed ML101720589, Item TVA Letter dated 162 7.2 7.2

(

G FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell 154. Y Closed Closed ML101720589, Item TVA Letter dated 163 7.2 7.2

(

G Deleted by DORL Date:

155. Y Closed Closed ML101720589, Item 164 7.2 7.2 a

r g

l FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins 156. Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2

(

G FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark 157. Y Closed Closed ML101720589, Item TVA Letter dated 166 7.2 7.2

(

G Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark 158. Y Closed Closed ML101720589, Item TVA Letter dated 167 7.2 7.2

(

G FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark 159. Y Close Closed ML101720589, Item TVA Letter dated 168 7.2 7.2

(

G FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark 160. Y Close Closed ML101720589, Item TVA Letter dated 169

(

G 6/18/2010 Responder: Clark 161. Y Closed Closed 170

(

G 6/17/2010 Responder: Clark 162. Y Closed Closed 171 7.2 7.2

(

G 6/17/2010 Responder: Craig 163. Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item 172

(

G 6/17/2010 Responder: Craig 164. Y Closed Closed EICB RAI 173 7.1 7.1

(

G 6/17/2010 Responder: Craig/Webb/Powers 165. Y Closed Closed EICB RAI 174

(

G 6/28/2010 Responder: Hilmes/Craig 166. Y Closed Closed EICB RAI 175

(

G June 28, 2010 Responder:

167. Y Closed Closed EICB RAI 176 7.1 7.1

(

G 6/28/2010 Responder: Craig/Webb 168. Y Closed Closed EICB RAI 177 7.5.2.

7.5.1

(

M a

7/15/2010 Responder: Clark 169. Y Closed Closed N/A TVA Letter dated RAI not required 178 7.5.2.

7.5.1

(

M a

7/15/2010 Responder: Clark 170. Y Closed Closed N/A TVA Letter dated RAI not required 179

(

C An emphasis is placed on traceability in System Requirements Responder: WEC 171. Y Closed Closed N/A - Closed to NA 180

(

C The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC 172. Y Closed Closed N/A - Closed to NA 181

(

C An emphasis is placed on traceability in System Requirements Responder: WEC 173. Y Closed Closed N/A - Closed to NA 182

(

C Characteristics that the SRP states that a Software Requirements Responder: WEC 174. Y Closed Closed N/A - Closed to NA 183 EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies On page 1-2 of the Post Accident Monitoring Systems Software Requirements Specification in the background section, is the sentence Those sections of the above references that require modification from the generic PAMS are defined in the document Responder: WEC The generic Software Requirements Specification applies except as modified by the WBN Unit 2 System Requirements Specification.

TVA Response to Follow-up NRC Request:

Please see the response to RAI item 12 in letter dated 12/22/10, NRC Matrix Item 144.

TVA Response to Second Follow-up NRC Request:

This item was addressed by updating the Contract

15. Y Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10.

Response provided in letter dated 10/21/10 Open-NRC Review Due 3/29/11 NNC 11/18/10: The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Item No. 4

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments referring purely to the changes from WNA-DS-01617-WBT Post Accident Monitoring System-System Requirements Specification or is it saying that there are additional changes beyond those and that the SRS defines them?

If there are additional changes, what is their origin?

Compliance Matrix and adding Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification to the Licensing Technical Report Revision 3 to address this concern. Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).

information would be in CQ PAMS LTR Rev. 2.

NNC 2/3/11: CQ PMS LTR Rev. 2 Sections 11

& 12 do not prove this information. TVA to proive a plan to address requested information.

184

(

C 7/15/2010 Responder: WEC 175. Y Closed Closed N/A - Closed to N/A 185 EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.

References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.

These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

Responder: WEC Steve Clark to look at how to combine traceability items.

Was addressed to during the 9/15 meeting and 9/20 - 9/21 audit.

TVA Response to Follow-up NRC Request:

(1) See NRC Matrix Item 144 (2) There is no RTM for development of the individual reusable software elements. As listed in item 15 of Table 6-1 Document Requirements of WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC, dated December 3, 2010, a RTM for implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been developed. This document is available for NRC audit at the Westinghouse Rockville office.

16. N Open Response included in letter dated 12/22/10.

Open-NRC Review NNC 11/18/10: (1)The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.

(2) TVA also said it would provide a RTM for the RSED NNC 2/3/11: To be addressed during next audit.

EICB RAI ML102980066 Item No. 17 186 7.7.8 7.7.1.12

(

D a

7/15/2010 Responder: Perkins/Clark 176. Y Closed Closed EICB RAI No.6 TVA Letter dated 187

(

C By letter dated June 18, 2010, TVA docketed responses to NRC Responder: Merten 177. N Closed Closed ML101970033, Item TVA Letter dated Are these connections already 188

(

C By letter dated June 30, 2010, TVA docketed, Tennessee Valley Responder: Clark 178. Y Closed Closed ML101970033, Item TVA Letter dated 189 7.6.7

(

S i

7/20/2010 Responder: Clark 179. Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9

(

S i

FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark 180. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

191 7.9

(

C NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins 181. Y Closed Closed ML10197016, Item TVA Letter dated 192 7.5.1.

7.5.2

(

M a

The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark 182. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.

7.5.2

(

M a

The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark 183. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 194 7.5.1.

7.5.2.1

(

M a

The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman 184. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.

7.5.2.2

(

M a

Bypassed and Inoperable Status Indication (BISI)

Responder: Costley/Norman 185. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.

7.5.2.2

(

M a

Bypassed and Inoperable Status Indication (BISI)

Responder: Costley/Norman 186. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 X

Open Item 197 was never issued.

187. Y Closed Closed 198 7.5.1.

7.5.2.2

(

M a

SRP Section 7.5, Subsection III, Review Procedures states:

Responder: Costley/Norman 188. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.

7.5.2.3

(

M a

The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman 189. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Responder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.

7.7.11

(

C 7/21/2010 Responder: Webb 191. Y Closed Closed EICB RAI TVA Letter dated 202 7.5.2 EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."

Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.

Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.

Rev. 2 of the Licensing Technical Report will include the applicability of guidance.

TVA Response to Follow-up NRC Request:

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report (LTR) submitted in TVA Letter to NRC dated December 3, 2010, contains the following change to address the NRC request:

Section 9, Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-1998 and Regulatory Guide 1.172 to show the origin of the requirements has been added.

The descriptions and commitments in the Topical Report (TR) still apply. The LTR provides compliance evidence to the new ISG-04 criteria. The statement in the SE means that the TR can be evaluated against later NRC criteria when it appears.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 Partial TVA Response to Follow-up NRC Request:

contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.

The final response is pending submittal of the Licensing Technical Report Revision 3 scheduled for March 29, 2011.

TVA Response to Follow-up NRC Request:

(1) As discussed on page 9-1 of the Licensing Technical Report (Attachment 2) a comparison of IEEE 830-1993 and IEEE 830-1998 was performed and it was determined that the 1998 version enveloped all the

17. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Response included in letter dated 12/22/10 Partial Response provided in letter dated 10/5/10 NNC 1/5/11: Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.

LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluation:

(1) IEEE 830-1998 is not the current SRP acceptance criteria.

IEEE 830-1998 has not been formally endorsed by a regulatory guide.

(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.

Yes ISG-4 is one new criteria, and an evaluation against it has been provided.

In addition, LTR Rev. 2 Section 13 states: The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown below. Compliance to these codes and standards are stated in Section 4 of Reference 1.

Reference 1 is the common Q topical report.

Open-NRC Review Due 2/25/11 &

3/29/11 to provide information requested.

Due TBD EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 NNC 1/5/11: See Also Open Item No.

81 and 86.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments requirements of the 1993 version which is endorsed by Regulatory Guide 1.172. Therefore the use of IEEE 830-1998 is acceptable.

(2) Table 9.1 IEEE Std 830-1998 Compliance of the Licensing Technical Report (Attachment 2) evaluates the Software Requirements Specification against the requirements of IEEE 830-1998.

(3) See TVA to NRC letter Watts Bar Nuclear Plant (WBN)

Unit 2 - Instrumentation And Controls Staff Information Requests, dated February 25, 2011 Attachment 4 Common Q PAMS Regulatory Guide and IEEE Standard Analysis.

(4) This section of the Licensing Technical Report (Attachment 2) has been relocated to section 15. The comment has been addressed by adding Reference 40 to TVA to NRC letter dated February 25, 2011, which is the Common Q PAMS Regulatory Guide and IEEE Standard Analysis.

203 7.5.1.

7.5.2

(

M a

7/26/2010 Responder: Clark 192. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.

7.5.2

(

M a

7/26/2010 Responder: Costley/Norman 193. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205

(

G 7/26/2010 Responder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.

7.5.2

(

M a

7/27/2010 Responder: Clark 195. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207

(

C July 27, 2010 Date:

196. Y Closed Closed 208 7.5.2.

7.5.1

(

M a

7/27/2010 Responder: Clark 197. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.

7.5.1

(

M a

7/27/2010 Responder: Clark 198. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.

7.5.1

(

M a

7/27/2010 Responder: Clark 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.

(

C 7/27/2010 Responder: Clark 200. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

212 7.5.2 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these documents, and it is not clear how this is the case.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.

(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.

Responder: WEC Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.

WEC to provide the information and determine where the information will be located.

IEEE-603 1991:

5.5 System Integrity. The safety systems shall be designed to accomplish their safety functions under the full range of applicable conditions enumerated in the design basis.

TVA Response: The applicable conditions and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Section 11, Contract Compliance Matrix items:

87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI

18. N Open Partial Response included in letter dated 03/16/11 Final response due 3/29/11 Open-NRC Review NNC 2/17/2011: IEEE 603 Clause 5.5 basically states that conditions identified in IEEE 603 Clauses 4.7

& 4.8 must be addressed in the design. Energy supply conditions have not been identified, or explicitly addressed.

EICB RAI ML102980066 Item No. 10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 300, 301 and 302 Environmental Seismic qualification of the equipment to meet the design basis requirements 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.

The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:

(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),

(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.

TVA Response: The requirements for repair and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:

179 Mean time to repair 202 self test 398 3.7 Maintenance 399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration NNC 2/18/11: Clause 5.7 is acceptably addressed.

NNC 2/18/2011: WNA-AR-00189-WBT Rev. 0 Table 5-2 shows a MTTR of 7.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. It is not clear how this satisfies the contractual item No.

179.

The Contract Compliance Matrix Item 179 in Revision 3 of the LTR has been revised to show this item as a deviaition and to reflect TVAs acceptance of the 7.2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MTTR value. Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS)

Licensing Technical Report, Revision 3, dated March 2011

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.

This may be accomplished in various ways; for example:

(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.

6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period:

(1) Checking the operational availability of sensors by use of the methods described in 6.5.1.

(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.

TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:

Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.

(proprietary).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.

TVA Response: Common Q PAMS system reliability and failure modes are described in:

WNA-AR-00180-WBT, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.

5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change).

V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data.

V&V, configuration management, and QA shall be required when the test and calibration function is inherent to the computer that is part of the safety system.

V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.

Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.

The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.

If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:

Memory functionality and integrity tests (e.g.,

PROM checksum and RAM tests)

Computer system instruction set (e.g., calculation tests)

Computer peripheral hardware tests (e.g.,

watchdog timers and keyboards)

Computer architecture support hardware (e.g.,

address lines and shared memory interfaces)

Communication link diagnostics (e.g., CRC checks)

Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.

When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:

a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c)

Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report Section 11 TVA Contract

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Compliance Matrix items:

107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.

TVA Response: No response required.

Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (a) Energy Supply conditions are specified in WNA-DS-01617-WBT-P, System Requirements Specification Rev.

4, Requirement 4.1-1 which requires 120Vac +/-10% and 60+/-3Hz. Power to the Common Q PAMS is provided from the 120Vac vital power system. Per WBN Unit 2 FSAR section 8.3.1.1 the vital 120 volt ac system specifications are 120Vac +/-2% and 60+/-0.5Hz. Based on this, the power provided meets the system requirements.

Electromagnetic compatibility, seismic and environmental qualification of the equipment to meet the design basis requirements is documented in EQ-QR WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (Proprietary)

(Attachment 4). Attachment 5 contains EQ-QR WBT-NP, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (non-proprietary). Attachment 6 contains CWA-11-3118, Application for Withholding Proprietary Information from Public Disclosure, EQ-QR-68-WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS), (Proprietary), dated February 28, 2011.

(b) The Contract Compliance Matrix Item 179 in Revision 3 of the Licensing Technical Report will be revised to show this item as a deviation and to reflect TVAs acceptance of the 7.2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MTTR value. WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.

213 7.5.2 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.

19. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Open-NRC Review Due 3/29/11 NNC 2/3/11: The EICB RAI ML102980066 Item No. 18

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.

(1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS.

(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation.

For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?

contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 contains the proprietary version of Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Rev. 2 dated September 2010.

TVA Response to Follow-up NRC Request:

The Regulatory Guide 1.97 classification of the Common Q PAMS variables is documented in TVA Design Criteria WB-DC-30-7 Post Accident Monitoring Instrumentation which was submitted as Attachment 5 on TVA to NRC letter Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation And Controls Staff Information Requests dated June 18, 2010 (Reference 1)

The hardware design bases for the Common Q PAMS is described in the WBN Unit 2 FSAR section 7.5.1.8 Post Accident Monitoring System (PAMS).

The Common Q PAMS indications are used to support operator response to events described in chapter 15 of the WBN Unit 2 FSAR such as:

RCCA/RCCA Bank dropped/misaligned Steam Generator Tube Rupture Inadvertent Loading of a Fuel Assembly Into an Improper Position Loss of Shutdown Power Major Reactor Coolant System Pipe Ruptures (Loss Of Coolant Accident)

Major Secondary System Pipe Rupture Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is received.

identified documentation does not include the design bases. Please provide schedule for providing the requested information.

214

(

C 7/27/2010 Responder: WEC 201. Y Closed Closed EICB RAI TVA Letter dated 215

(

P 7/29/2010 Responder: WEC 202. Y Closed Closed 216 7.5.1.

7.5.2

(

M a

7/29/2010 Responder: Clark 203. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217

(

G 7/6/2010 Responder: Clark 204. Y Close Closed EICB RAI TVA Letter dated 218

(

G 7/6/2010 Responder: Clark 205. Y Closed Closed EICB RAI TVA Letter dated 219

(

G 8/4/2010 Responder: TVA Licensing 206. Y Closed Closed EICB RAI 220

(

G 8/4/2010 Responder: Ayala 207. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.

7.7.1.3

(

M a

8/4/2010 Responder: Trelease 208. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222

(

G 8/4/2010 Responder: Clark 209. Y Close Closed EICB RAI TVA Letter dated 223

(

G 8/4/2010 Responder: Clark 210. Y Closed Closed EICB RAI 224 7.5.1.

7.5.2

(

M a

8/4/2010 Responder: Norman (TVA CEG) 211. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225

(

G 8/4/2010 Responder: Scansen 212. Y Close Closed EICB RAI TVA Letter dated 226

(

C 8/4/2010 Responder: TVA Licensing 213. Y Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.

227

(

G 8/4/2010 Responder: Clark 214. Y Close Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 228

(

C 8/4/2010 Responder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated 229

(

C 8/4/2010 Responder: Clark 216. Y Closed Closed EICB RAI TVA Letter dated 230

(

C 8/4/2010 Responder: Webb 217. Y Closed Closed EICB RAI TVA Letter dated 231

(

G 8/4/2010 Responder: Clark 218. Y Closed Closed EICB RAI TVA Letter dated 232

(

S i

8/4/2010 Responder: Clark 219. Y Closed Closed RAI No. 5 TVA Letter dated 233

(

C 8/4/2010 Responder: Clark 220. Y Closed Closed EICB RAI TVA Letter dated 234

(

C 8/4/2010 Responder:

221. Y Closed Closed N/A - Duplicate N/A 235

(

G 8/4/2010 Responder: TVA Licensing 222. Y Closed Closed N/A N/A 236

(

G 8/4/2010 Responder: Clark 223. Y Close Closed EICB RAI TVA Letter dated 237

(

C 8/4/2010 Responder: Clark 224. Y Closed Closed EICB RAI TVA Letter dated 238

(

C 8/4/2010 Responder: Webb/Hilmes 225. Y Closed Closed N/A - Duplicate N/A 239

(

C 8/4/2010 Responder: Hilmes 226. Y Closed Closed N/A - Meeting N/A 240

(

G 8/4/2010 Responder: Clark 227. Y Close Closed Ml102910008 TVA Letter dated 241

(

S i

8/4/2010 Responder: Davies 228. Y Closed Closed RAI No. 10 TVA Letter dated 242

(

G 8/4/2010 Responder: Hilmes 229. Y Close Closed EICB RAI TVA Letter dated 243

(

C 8/3/2010 Responder: WEC 230. Y Closed Closed N/A - Closed to N/A 244 EICB (Carte) 8/3/2010 Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processes or additional project specific information for the...SCMP...shall be specified in the PQP.

Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202) contains many process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.

Please explain how the above meets the intent of the approved SPM.

Responder: WEC The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).

of letter dated 10/25/10 contains the proprietary version of Westinghouse document Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, Dated September 2010.

TVA Response to Follow-up NRC Request:

As shown is the listed documents, process related requirements have been deleted from the SRS and SysRS in Revision 3:

contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.

contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

TVA Response to Follow-up NRC Request:

The documents discussed in Item 3 have been revised to address compliance with the Topical Report (TR) and the

20. N Open Revised response is included in letter dated 12/22/10 Response is provided in letter dated 10/25/10.

NNC 11/18/10: SysRS Rev. 2 also contains process requirements that are more appropriately incorporated into process documentation.

Open-NRC Review Due 2/25/11 Document revisions NNC 2/2/11: Issues with Common Q TR &

SPM compliance were discussed in the weekly public meetings.

Westinghouse to perform Common Q TR

& SPM compliance self assessment; this will be discussed in detail on the next audit.

EICB RAI ML102980066 Item No. 14 Response is provided in letter dated 10/25/10.

LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Software Program Manual (SPM).

245 EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).

Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix contains the Westinghouse document Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010.

TVA Response to Follow-up NRC Request:

The results of the self assessment were reviewed by Westinghouse with the NRC on February 2, 2011 and were further reviewed by TVA during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011.

Corrections to WNA-TR-02451-WBT, Test Summary Report for the Post Accident Monitoring System and the self assessment were made as a result of the TVA review to ensure this comment was fully addressed.

By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

21. N Open Pending Submittal of the Test Summary Report due 3/29/11 Response included in letter dated 12/3/10 Common Q PAMS Test Summary Report scheduled to be submitted March 29, 2011.

Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR

& SPM were discussed in the weekly public meetings.

Westinghouse to perform Common Q TR

& SPM compliance self assessment EICB RAI ML102980066 Item No. 119 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

246 EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.

Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.

of letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 TVA Response to Follow-up NRC Request:

The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.

The Westinghouse Watts Bar Unit 2 NSSS Completion I&C Projects Project Quality Plan, WNA-PQ-00220-WBT, Revision 1 is available for NRC audit at the Westinghouse Rockville Office and was available for review during the NRC Common Q PAMS audit during the week of February 28 to

22. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11. PQP provided for audit the week of 2/28/11.

Response is provided in letter dated 10/25/10 NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain comparable information.

Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR

& SPM implementation were discussed in the weekly public meetings.

Westinghouse to perform Common Q TR

& SPM compliance self assessment EICB RAI ML102980066 Item No. 15 Response is provided in letter dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments March 4, 2011. During the audit, the Westinghouse Quality Assurance in process audit of the Common Q PAMS project was reviewed by the NRC inspector with no issues identified.

247

(

C 8/8/2010 Responder: WEC 231. Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, 248

(

C 8/8/2010 Responder: WEC 232. Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, 249

(

C 8/8/2010 Responder: WEC 233. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, 250 EICB (Carte) 8/8/2010 The SPM describes the software and documents that will be created and placed under configuration control. The SCMP (e.g.,

SPM Section 6, Software Configuration Management Plan) describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.

Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.

Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.

TVA Response to Follow-up NRC Request:

The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished.

1.

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:

a.

Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.

b.

Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.

2.

WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

23. N Open Revised response included in letter dated 12/22/10 Response included in letter dated 10/25/10.

Open-NRC Review NNC 2/2/11: To be addressed during the next audit.

LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

251 EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.

Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix contained in Revision 1 of the Licensing Technical Report.

of the letter dated 10/25/10 contains the Proprietary version of Westinghouses document titled:

Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS),

Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 TVA Response to Follow-up NRC Request:

Please see the response to RAI item 21 in letter dated

24. N Open Pending Submittal of the Test Summary Report due 3/29/11 Revised response included in letter dated 12/22/10 Partial response is provided in letter dated 10/25/10 Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR

& SPM were discussed in the weekly public meetings.

Westinghouse to perform Common Q TR

& SPM compliance self assessment LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 12/22/10, NRC Matrix Item 250.

TVA Response to second Follow-up NRC Request:

The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.

By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

252 EICB (Carte) 8/8/2010 The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.

Responder: WEC Explain response to AP1000 audit report.

RTM docketed NRC awaiting V&V evaluation of RTM.

The following responses are based on WBN Unit 2 Common Q PAMS traceability:

Software requirements traceability analysis is described in the following documents:

1.

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix

2.

WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)

3.

WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.

The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:

1.

The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

25. N Open Response included in letter dated 12/22/10 Read ML091560352 Open-NRC Review Due 2/25/11 (document submittals)

NNC 2/2/11: Updated RTMs and specifications to be provided.

Requirements traceability to be addressed during he next audit.

LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

2.

The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

3.

The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010. 1 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.

TVA Response to Follow-up NRC Request:

See Response to item 3 (Matrix Item Number 142) 253

(

C 8/8/2010 Responder: Clark 234. Y Closed Closed TVA Letter dated Related to Open Item no. 83.

254

(

C 8/10/2010 Responder: WEC 235. Y Closed Closed N/A - Request to TVA Letter dated 255

(

C 8/10/2010 Responder: WEC 236. Y Closed Closed N/A - Request to TVA Letter dated 256

(

C 8/10/2010 Responder: WEC 237. Y Closed Closed N/A - Request to TVA Letter dated 257

(

C 8/10/2010 Responder: WEC 238. Y Closed Closed N/A - Request to N/A 258

(

C 8/10/2010 Responder: WEC 239. Y Closed Closed N/A - Request to N/A 259

(

C 8/10/2010 Responder: WEC 240. Y Closed Closed N/A - Request to TVA Letter dated 260

(

C 8/10/2010 Responder: WEC 241. Y Closed Closed N/A - Request to N/A 261

(

C 8/10/2010 Responder: WEC 242. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

262

(

C 8/10/2010 Responder: WEC 243. Y Closed Closed N/A - Request to N/A 263

(

C 8/11/2010 Responder: WEC 244. Y Closed Closed ML101650255, Item 264

(

C 8/11/2010 Responder: WEC 245. Y Closed Closed ML101650255, Item 265

(

C 8/11/2010 Responder: WEC 246. Y Closed Closed ML101650255, Item 266

(

C 8/11/2010 Responder: Webb/Webber 247. Y Closed Closed TVA Letter dated 267

(

C 8/11/2010 Responder: WEC 248. Y Closed Closed 268

(

C 8/19/2010 Responder: WEC 249. N Closed Closed 269

(

P 8/20/2010 Responder: NRC 250. Y Closed Closed N/A N/A 270

(

C 8/23/2010 Responder: Clark 251. Y Closed Closed See also Open Item Nod. 41 & 245.

271

(

C 8/23/2010 Responder: WEC 252. Y Closed Closed N/A - Closed to NA 272 7.5.2.

7.5.1

(

M a

8/26/2010 Responder: Clark 253. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.

7.5.1

(

M a

8/26/2010 Responder: Clark 254. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.

7.5.2.

7.5.1

(

M a

8/26/2010 Responder: Clark 255. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 274.

(

S i

8/26/2010 Responder: Stockton 256. Y Closed Closed RAI No. 6 TVA Letter dated 275

(

S i

8/27/2010 Responder: Clark 257. Y Closed Closed Not Required N/A 276 7.6 7.6

(

G 8/27/2010 Responder: Webb 258. Y Closed Closed EICB RAI TVA Letter dated 277 7.6 7.6.3

(

G 8/27/2010 Responder: Clark 259. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6

(

G 8/27/2010 Responder: Trelease 260. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6

(

G 8/27/2010 Responder: Mather 261. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6

(

G 8/27/2010 Responder: Trelease 262. Y Closed Closed EICB RAI TVA Letter dated 281 7.6 7.6.8

(

G 8/27/2010 Responder: Webb 263.

Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9

(

G 8/27/2010 Responder: Trelease 264. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX

(

D a

8/27/2010 Responder: Clark 265. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item 284 7.7.3 7.4.1

(

D a

8/27/2010 Responder: Webber 266. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item 285 7.3.3 7.3

(

D a

8/27/2010 Responder: McNeil 267. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item 286 7.7.3 9.3.4.2.4

(

D a

8/27/2010 Responder: Webber 268. Y Closed Closed EICB RAI No.16 TVA Letter dated 287 7.3 7.3-1

(

D a

8/27/2010 Responder: Elton 269. Y Closed Closed ML102390538, Item Response 288 7.3

(

G 9/2/2010 Responder: McNeil 270. Y Closed Closed EICB RAI 289

(

S i

9/2/2010 Responder: Faulkner 271. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7

(

C 9/7/2010 Responder: Clark 272. Y Closed Closed N/A N/A This item is a duplicate of item 291.

291 7.7

(

C 9/7/2010 Responder: Clark 273. Y Closed Closed TVA Letter dated 292 7.2.5 7.2

(

G 9/7/2010 Responder: Craig 274. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.5

(

M a

9/8/2010 Responder: Craig 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.1

(

D a

9/9/2010 Responder: Elton 276. Y Closed Closed ML102390538, Item Response 295 7.3 7.3.1.1.2

(

D a

9/9/2010 Responder: Elton 277. Y Closed Closed ML102390538, Item Response 296 7.3 7.3.1.2.1

(

D a

9/9/2010 Responder: Elton 278. Y Closed Closed ML102390538, Item Response 297 7.3 7.3.1.2.2

(

D a

9/9/2010 Responder: Elton 279. Y Closed Closed ML102390538, Item Response 298 7.3 XX

(

D a

9/9/2010 Responder: Clark 280. Y Closed Closed ML102390538, Item Response 299

(

C Provide Common Q Software Requirements Specification Post 1 of the 10/5 letter contains the Common Q 281. Y Closed Closed TVA Letter dated 300

(

S i

Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather 282. Y Closed Closed RAI No. 25 TVA Letter 301

(

S i

1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark 283. Y Closed Closed RAI No. 11 TVA Letter dated Note 1:

302 7.5.2.

7.5.1

(

M a

09/17/2010 Responder: Tindell 284. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.

7.5.1

(

M a

09/17/2010 Responder: Tindell 285. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.

7.5.1

(

M a

09/17/2010 Responder: Tindell 286. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.

7.5.1

(

M a

09/17/2010 Responder: Tindell 287. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1

(

G FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes 288. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1

(

G (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes 289. Y Closed Closed EICB RAI TVA Letter dated 308 7.1 7.1

(

G (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes 290. Y Closed Closed EICB RAI TVA Letter dated 309 7.1 7.1.2.1.9

(

G (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes 291. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1.9

(

G (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes 292. Y Closed Closed EICB RAI TVA Letter dated 311 7.1 7.1

(

G Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes 293. Y Closed Closed EICB RAI TVA Letter dated 312 7.0

(

G By letter dated September 10,2010, TVA provided the summary Responder: Stockton 294. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12

(

D a

EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala 295. Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3

(

D a

The following 50.59 changes were listed in the March 12 RAI Responder: Stockton 296. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3

(

G IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) 297. Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.

7.5

(

S i

TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather 298. Y Closed Closed RAI No. 26

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 3

range monitors for WBN2.

Please clarify the following:

RM-1000 v1.1 Software Verification Report 04508006 (Sequoyah)

RM-1000 v1.2 Software Verification Report 04508006 (Sequoyah)

RM-1000 System Verification Test Results (Sequoyah)

These documents were prepared for the Sequoyah plant. IS the version provided applicable to WBN2? Please confirm and explain if these documents are applicable to WBN 2 as provided or with differences?

The Sequoyah RM-1000 v1.1 Software Verification Report 04508006 and RM-1000 v1.2 Software Verification Report 04508006 are applicable to WBN Unit 2.

The RM-1000 System Verification Test Results report is not applicable to WBN Unit 2. This document was for the non-safety related software and was superseded by the 04508006 v1.1 and v1.2 reports for the safety-related software.

Response provided in letter dated 10/21/10 Response acceptable per TVA letter of 10/21/10, Enclosure 1, Item 26.

ML102980005 10/26/2010 317 7.5.2.

7.5

(

S i

TVA has provided a proprietary and a non-proprietary version of Responder: Temples 299. Y Closed Closed RAI No. 27 TVA Letter dated 318 7.5.2.

3 7.5 EICB (Singh)

TVA has provided the following documents for RM-1000 equipment qualification:

(i)

Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001)

(ii)

Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006)

(iii)

Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008)

(iv)

Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)

Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then please clarify what those are.

Supplement 3 was issued one month prior to supplement 2.

Please explain the reason for the same.

Responder: Temples (i)

Applicable to WBN Unit 2. 04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report.

The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.

(ii)

Applicable to WBN Unit 2.

(iii)

Not applicable to WBN Unit 2 (iv)

Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release time difference.

TVA Response to Follow-up NRC Request:

NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC letter dated October 29, 2010 (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).

(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19) is as follows:

a.

04508905-QR Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.

b.

04508905-1SP Supplement to Qualification Test

26. N Open Revised response is included in letter dated 12/22/10.

Note check 04508905-1QR or QR. Staff version is QR only.

Response is included in letter dated 10/29/10 Open-NRC Review Due 2/25/11 Response update required. It is clear that 04508903-2SP and -

3SP are not applicable.

The response for applicability of 04508905-QR and -

1SP to RM-1000 and IF converter is not clear.

Check page numbers of Appendix F (missing/duplicate pages).

Check applicability of Appendix C to RM1000 instead of RM2300?

See items 336 and 337.

All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.

Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, Review not required.

Work may proceed.

The applicable reports should have been reviewed prior to dispositioning them.

Please explain the apparent lack of review of WBN-2 applicable RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10, Encl 1 Item 34, and TVA letter 11/24/10, Att. 2.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Report for RM-1000 Processor Module and Current-to-Frequency Converter is applicable to the WBN Unit 2 RM-1000 module.

c.

04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.

d.

04508905-2SP Qualification Test Report Supplement, I-F Converter Upgrades is applicable to the WBN Unit 2 I to F converter module.

GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are:

e.

GA-ESI report 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors: The report is the principle report and the starting point for all the radiation monitors provided as part of the replacement contract. The report describes each monitor; referenced to the technical manual for the physical and functional description and lists the major components of the monitor system.

Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified in section 5.

f.

GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -

273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]: GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.

(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 documents. Was appropriate review guidance used?

Further update required Provide model number/part number for the RM-1000 and I/F converter used for WBN-2. This information is needed to verify that the model or part number used is the equipment that has been qualified for WBN-

2.

Provide qualification reports 04038903-QSR and 04038903-7SP by the dues date of 1/22/11.

Submit a copy of any other relevant reviewed versions of the qualification reports.

Submit copies of the reviewed reports for 04508905-QR, 04508905-1SP, 04508905-2SP.

Clarification of applicability of existing reports is acceptable.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (Reference 8)

(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades is not applicable to WBN Unit 2 (Reference 19).

Please see Item 1, above, for applicability of the other reports.

(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.

04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.

(6) See item 5.

TVA Response to Follow-up NRC Request:

The following documents are the qualification documents associated with the RM-1000 radiation monitors: contains the approved proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade.

contains the approved proprietary version of General Atomics Electronic Systems 04508905-2SP, Qualification Test Report Supplement, I-F Converter Upgrades.

contains the approved proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274).

contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. In order to meet the NRC submittal schedule, the engineering review of this document was limited to the RM-1000. The document has been accepted for the RM-1000 monitors. Engineering approval will not occur until full review for all covered monitors is complete.

3 contains the approved proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 319 7.5.2.

3 7.5 EICB (Singh)

TVA provided System Verification Test Results 04507007-1TR (July 1999) for Sequoyah to support test verification. However, the document states (page v) that it is not applicable for high range monitors with an action noted for fixing a problem with the high range RM-1000 monitors on page vi. TVA to respond to the following clarifications:

Has the anomaly noted on page vi been resolved for the high range monitors?

Provide the high range verification document for WBN2.

Responder: Temples See TVA letter to the NRC dated October 21, 2010, item 26 (RAI Matrix Item 316) for non-applicability of 04507007-1TR.

The recorded anomaly was later resolved through the verification of software version 1.2, reported in RM-1000 v1.2 Software Verification Report 04508006.

The high range verification documents are the Sequoyah RM-1000 v1.1 Software Verification Report 04508006 and RM-1000 v1.2 Software Verification Report 04508006.

300. Y Closed Response is included in letter dated 10/29/10 Closed

-Response Acceptable Due 10/31/10 Response acceptable.

TVA to issue letter and confirm stated (future) dates RAI No. 29 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 35 320 E

I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark 301. Y Closed Closed N/A N/A Duplicate of item 156 321 E

I For the purposes of measuring reactor coolant flow for Reactor Responder: Clark 302. Y Closed Closed N/A N/A Duplicate of OI# 157 322 7.7.1.11

(

C Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark 303. Y Closed Closed 323 EICB(Garg)

WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and their acceptability will be submitted to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.

TVA Response to Follow-up NRC Request A FSAR change will be submitted in a future FSAR amendment to change the revision level back to 1.

TVA Response to Second Follow-up NRC Request The differences between the Revision 1 and Revision 2 WCAPs is documented in Attachment 12, WCAP 13869 Revision 1 to Revision 2 Change Analysis, to TVA to NRC letter dated October 29, 2010 (Reference 2). The design bases for the response to feedwater break inside containment, as documented in Chapter 15 of the WBN Unit 2 FSAR, is the same for WBN Unit 1. Since WBN Unit 2 is required to match the WBN Unit 1 licensing basis to the extent practical, the decision was made to revise the WBN Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1.

27. Y Open Due 3/29/11 Revised Response is included in letter dated 10/29/10 The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA Due:

Need to provide additional info on why Rev. 1 is acceptable for both units.

3/10/11 Staff does not agree with the statement that there is no technical differences between WCAP-13869 rev.1 and rev2., but staff agree that rev1 and change analysis could be basis for acceptance for both Watts Bar units.

4/6/11 TVA response is acceptable, however this item remains open until TVA makes changes to FSAR.

TVA Letter dated 10/29/10 Item No. 36 324

(

M a

Per the NRC reviewer, the BISI calculation is not required to be 304. Y Closed Closed 325 B

(

G The Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson 305. Y Closed Closed Closed to open item ?

326 B

(

G TVA uses double-sided methodology for as-found and as-left Responder: Webb 306. Y Closed Closed TVA Letter dated 327 DORL (Poole) 6 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.

Responder: Webber In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

28. Y Open Response Included in letter dated 11/24/10 Open-NRC Review Due 11/24/10 328 7.5.2.

7.5

(

S i

Provide the model number for the four containment high range Responder: Temples 307. Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7

(

S i

Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark 308. Y Closed Closed RAI No. 1 TVA Letter dated 330 7.3 7.3

(

D a

Related to Item 298 Responder: Hilmes/Faulkner 309. Y Closed Closed EICB RAI No.20 Item 7, TVA letter

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 331 7.6.1 7.6.7

(

S i

As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark 310. Y Closed Closed RAI No. 8 TVA Letter dated Follow-up of OI-190.

332 7.5.2.

7.5.1

(

M a

10/26/2010 311. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.

7.5.1

(

M a

10/27/2010 312. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 334 7

7

(

D a

FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton 313. Y Closed Closed RAI not required.

N/A RAI not required because the figure is 335 7.6.1 7.6.7 EICB (Singh)

LPMS: Reference to OI-331, sub item 2.

Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.

Responder: WEC TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled and will be submitted by March 11, 2011.

Partial Response included in TVA to NRC letter dated December 22, 2010 (Reference 1).

8 contains the proprietary version of EQ-EV WBT-P, Revision 1, Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2 dated February 2011 (Proprietary). Attachment 19 contains the non-proprietary version EQ-EV-71-WBT-NP, Revision 1, Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2, dated February 2011. Attachment 20 contains the Application for Withholding Proprietary Information from Public Disclosure, EQ-EV-71-WBT-P, Revision 1, Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2, (Proprietary) dated February 18, 2011.

TVA Response to Follow-up NRC Request:

The maximum WBN Unit 2 containment upper compartment normal operating temperature of 110 °F (43.3 °C) is shown on TVA environmental drawing 2-47E235-41 Revision 0.

The maximum WBN Unit 2 containment lower compartment normal operating temperature of 150 °F ( 65.6 °C) is shown on TVA environmental drawing 2-47E235-42 Revision 0.

29. Y Open Partial Response included in letter dated 12/22/10 As of 3/24/2011:

The staff reviewed the proprietary version of EQ-EV-71-WBT-P, Revision 1, Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2 dated February 2011 (Proprietary).

Open-NRC Review Submit qual report by 3/11/11 as stated in TVA letter of 12/22/10, Encl 1, Item 28.

Due 12/22/10 The report addresses this open item, however, the maximum Rx Containment Temperature is not addressed within the report and the staff needs this information to approved the maximum temperature qualification of 70o C for the preamplifier cable (Microdot Connector) end.

TVA stated that they will provide the Containment maximum temp.

and reference the environmental report which this data is taken from in their next letter, which is expected on Tuesday 3/29/2011.

We need to confirm when MEEB when they will complete their review of the seismic qualification report.

336 7.5.2.

7.5

(

S i

Re: RM-1000 Report 04508905-QR Responder: GA 314. Y Closed Closed 337 7.5.2.

7.5

(

S i

Re: RM-1000 Report 04508905-QR Responder: GA 315. Y Closed Closed 338 7.5.2.

7.5

(

S i

In page 3-15 and appendix B of Qualification Test Report 04508905-QR, Qualification Test Report for RM-1000 316. Y Closed Closed RAI #4 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 339 7.5.2.

7.5

(

S i

In the Qualification Test Report 04508905-QR, the licensee As agreed to with the reviewer, Attachment 1 contains the 317. Y Closed Closed RAI #5 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 340 7.5.2.

3 7.5 EICB (Singh)

Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.

Responder: GA The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20),

(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-

2.

N Open Due 4/22/11 Response included in letter dated 12/22/10.

Open-TVA/Bechtel Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.

Due: 2/25/11

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.

Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.

(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:

a.

ENV 50140 - Electromagnetic Compatibility -

Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test

b.

EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement

c.

EN 55022 - Information technology equipment -

Radio disturbance characteristics - Limits and methods of measurement TVA Response to Follow-up NRC Request:

The total EMI/RFI testing of the RM-1000 and current-to-frequency converter is documented in the following reports:

contains the proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade. See sections 5.1.1, 5.1.2 and 5.1.4 for EMI/RFI.

contains the proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274). See section 5 for EMC qualification basis.

contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. See section 3.4 for electromagnetic compatibility qualification requirements.

3 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter. See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.

Attachments 7 and 8 document the EMI/RFI testing specific Clarification Needed:

Per 2/25/11 response TVA document SS-E18.14.01, Rev. 3 is the source document for all testing. Please provide this document for staff review. In addition British Standards (e.g. ENV 50140) have been cited in testing which are not per RG 1.180, R1. TVA to describe compliance of SS-E18-14.01 to RG 1.180 with justification for deviations. No test curves have been provided in any of the reports. As a minimum TVA to provide a few sample test curves or justify not supplying them.

No EMI/RFI curves have been provided as yet. TVA to provide representative curves.

NRC review proceeding in parallel.

NRC current review guidance is based on compliance with RG 1.180 or equal with justification for variations. TVA is requested to provide the roadmap for compliance to RG 1.180 with justifications for any deviations.

Simply following TVA standard specification SS E18.14.01, Rev. 3 is not sufficient.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.

TVA Response to Second Follow-up NRC Request:

GA-ESI qualification report 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)

Revision C dated February 22, 2011(Proprietary), submitted on TVA to NRC letter dated February 25, 2011 (Reference 2), section 5.1 states:

GA-ESI has performed the tests on a 2 channel RM-1000 radiation monitoring system the configuration of which is shown in GA-ESI drawing 04509000 System Installation Configuration, RFI/EMI Test, RM-1000 the results of which are issued in GA-ESI report 04038800, RM-1000 EMC Test Report, TVA and 04509050, RM-1000 EMC Test Report.

The equipment tested used an RM-1000 microprocessor radiation monitor Display/Control NIM Bin Assembly, an I-F Converter, line filter, and an RD-23 detector. The monitor system being qualified is the same as the monitor system tested and includes ECO-17656 modifications to ensure EMC compliance.

The 04509050, RM-1000 EMC Test Report was approved by TVA for Sequoyah. The report contains the requested EMI test curves. As a result, it was not resubmitted for the WBN Unit 2 monitors. Attachment 1 contains the TVA approved proprietary version of GA-ESI report 04509050, RM-1000 EMC Test Report. The non-proprietary version and affidavit for withholding will be submitted within two weeks of receipt from GA-ESI.

GA-ESI qualification report 04038903-7SP, section 5, provides a detailed discussion of the test results in GA-ESi report 04509050.

341 7.5.2.

7.5

(

S i

FSAR Tables 3.10 list seismically qualified equipment. However, A review of WBN Unit 2 FSAR amendment 102 chapters 318. Y Closed Closed RAI #1 letter dated FSAR amend 103 342 7.5.2.

7.5

(

S i

Please confirm that RM-1000 monitors and the associated The RM-1000 containment high range radiation monitors are 319. Y Closed Closed 343 7.5.2.

7.5

(

S i

Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 320. Y Closed Closed 344 7.6.6

?

Eicg(Garg)

Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout.

There is no section in FSAR which provides discussion on this subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar conclusion as Unit 1 and if the design is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where power lockout during normal reactor operation is utilized for valves whose inadvertent operation could affect plant safety.

How do we meet the PSB?

(a) In accordance with0PDP-6, Locked Valve/Breaker Program, Revision 1 (Attachment 25), valves locked by design are shown on design output documents (flow diagrams, system descriptions, etc.). As documented in 0PDP-6, valves are locked for multiple reasons. It is anticipated that many of the valves that were locked to provide positive isolation between Unit 1 and Unit 2 will not be locked when Unit 2 becomes operational and will be removed from the locked valve program. At the same time, Unit 1 valves locked for operational/Appendix R/Single Failure criteria will result in the corresponding Unit 2 valves being locked.

(b) The list of valves locked by design is contained in 0-PI-OPS-17.0, 18 Month Locked Valve Verification, Revision 44 (Attachment 21). Valves locked out by opening the associated circuit breaker are listed in 0-PI-OPS-17.1, 18 Month Locked Breaker Verification,

30. Y Close Due 3/29/11 ICSB-18 provides guidance on application of the single failure criterion to manually controlled electrically operated valves..

According to this BTP, electrically operated valves includes MOV, SOV and those valves operated indirectly by an electrical device, e.g.an air operated valves whose air supply is controlled by an electrical solenoid valves.

FSAR Section 7.6.6 addresses only MOVs. If TVA has done an Close Close based on TVA letter dated 3/29/11

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Revision 14 (Attachment 24).

TVA Response to Follow Up NRC Question SER Supplement 0, Section 8.3.1.8 states:

8.3.1.8 Application of the Single Failure Criterion to Manually Controlled Electrically Operated Valves - page 8-9 With regard to safety-related manually controlled, electrically operated valves, the staff asked the applicant to provide (1) an evaluation of all safety-related fluid systems to identify all such valves whose failure (that is, failure to operate on demand or undesired spurious operation) could result in the loss of capability to perform a system safety function (2) a description of the means provided to meet the single-failure criterion in safety-related fluid systems where it is identified that a single failure, as defined above, would result in the loss of capability to perform the system safety function In response, the applicant identified 17 such valves and documented in Section 7.6.6 of the FSAR that the design for these valves consists of modified control circuits. The modified circuit utilizes redundant contacts which are wired before and after each opening and closing coil. Based on its review of the information provided by the applicant, the staff concluded that the above provisions are in accordance with BTP ICSB 18 of SRP Appendix 8-A, with the exception of redundant valve position indication.

Subsequently, the applicant stated that the method of locking out power with the required redundant instrumentation is shown on electrical drawing 45W760-63-2 Based on this drawing, the staff concludes that the design meets the staff's position and is acceptable.

SER Supplement 5 states:

6.3.2 Evaluation, Page 6-3, Supplement 5 In the SER, the staff stated that the applicant will lock out power from certain valves in the emergency core cooling system (ECCS) whose misalignment might affect ECCS effectiveness. Some of these valves would be required to operate following a LOCA, and the manual restoration of power would add to post-accident operational complexity.

By letters dated September 15, 1982, and April 10, 1985, the applicant stated Watts Bar would use modified control circuits for these valves to ensure that no single failure would be able to energize the opening or closing coils of the valve operators. The design uses redundant contacts that are wired before and after each opening and closing coil. In addition, clear protective covers will be attached to the main control board over each respective control switch to prevent inadvertent actuation. As discussed in SER Sections 7.6.4 analysis to demonstrate compliance with the guidance of this BTP for Unit 1 and this analysis does not change for Unit 2 for other valves than TVA shouls make a statement to that effect. If there are changes to the analysis then justify those changes based on this BTP.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and 8.3.1.8, the staff found this design acceptable.

Accordingly, power will not be locked out from the following valves during operation:

(1) hot-leg injection line valves (2) valves from residual heat removal (RHR) discharge to safety injection (SI) and charging pump suction (3)

RHR suction valves from containment sump (4)

RHR discharge valves (5)

SI pump suction valve from refueling water storage tank (6)

SI miniflow valve In addition, the applicant evaluated other valves that may be used for SI miniflow, RHR to SI cross-connect, and SI injection, but for which the consequences of single failure would be acceptable. Power will also not be locked out from these valves. This revision is acceptable to the staff. This review was tracked under TAC 63630.

The design of WBN Unit 2 mirrors the design WBN Unit 1.

As a result, the locked valves for PSB-18 are the same for WBN Unit 2 as for WBN Unit 1 and the list in the Unit 2 FSAR Section 7.6.6 is accurate for Unit 2.

345 7.5.2.

3 7.5 EICB (Singh)

Provide the normal temperatures and expected periods of high/low temperature excursions to assess aging requirements. TVA to further clarify if 86ºF for 40 years was used as the qualification requirement for aging tests. This has been stated in some of the subsections under section 4.2 of the 04508905-QR report but the rationale for using 86ºF (includes an internal temperature rise of 18ºF) for 40 years has not been justified in the 04508905-QR report or the supplement reports. TVA to provide the rationale for this acceptance criteria for WBN-2.

Check on verification of the 40 year life of the rad monitors. How is this explained.

RM-1000 in a NIM Bin was Tested at 39°F for 72 Hrs and Tested at 131°F for 72 Hrs per Section 4.2.6 of 04508905-QR. This is stated in document 04038903-7SP, Section 2.1.

The ambient temperature used for aging was 86°F(30°C).

The NIM Bin has perforated holes in top and bottom covers and has an average internal temperature rise of approximately 18 °F due to natural air convection. So the average internal temperature used for aging was 104°F (40°C)

In accordance with Attachment 8, 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors Section 3.2, the aging is to an ambient equivalent condition of 104°F which is based on an 86°F average ambient temperature of the environment and an enclosure temperature rise of 18°F.

IEEE Std 1205-2000, Table D.8 shows that the upper bounding temperature is 104°F for all plant areas except the reactor building. The intent in qualifying the part for 40 years is to identify each components failure mechanisms and to determine whether 40 years1 of aging has a significant effect of these failure mechanisms.

1The design life goal for most Class 1E equipment is 40 years, but for most electronic assemblies 20 years, or less, is more realistic. Because of rapidly changing technologies, replacement components sometimes become unavailable in a relatively short period of time.

31. Y Closed Closed Due: 2/25/11 Clarification Required:

Regulatory Guide1.209 endorses with the exceptions IEEE 323-2003. One of these exceptions is that the documentation applicable to qualification in a mild environment should be consistent with the guidance given in Section 7.2 for the harsh environment.

TVA has provided synopsis of test information in support of environmental qualification in the 2/25/2011 letter. TVA to describe compliance to the guidance of Section 7.2 of IEEE

Response

provided by TVA letter dated 3/31/2011 in Item

  1. 17.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:

(1) After review, GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -

272, -273 & -274), submitted on TVA to NRC letter dated February 25, 2011 (Reference 3) follows the applicable guidance of Reg. Guide 1.209 for IEEE 323 section 7.2 documentation. The information is either contained in or referenced in the report. The documents are part of the GA-ESI permanent records and the appropriate GA-ESI records are part of the permanent TVA WBN Unit 2 quality records.

(2) The following IEEE 323 section 7.2 documentation requirements for equipment located in a harsh environment are not applicable for equipment located in a mild environment:

k.

Aging mechanisms are not required by Reg. Guide 1.209

l.

Qualified life determination is not required by Reg.

Guide 1.209

m. Age conditioning test results are not required by Reg. Guide 1.209 The remaining documentation requirements are applicable in whole or in part to the RM-1000 radiation monitors. As described in item 1 above, GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273 & -274), either contains or references the required documentation.

(3) As stated in Regulatory Guide 1.209, there is no need to establish a qualified life. This is addressed in the next to the last sentence of the second paragraph on page 2 which states: In addition, because of ready accessibility for monitoring and maintenance in mild environments, the need to establish a qualified life does not apply. It is further discussed in the last paragraph on page 6 which states: This guide does not intend to imply that a qualified life should be established for I&C systems in mild environments. Therefore, for the purposes of this guide, qualification is a validation of design to demonstrate that a safety-related computer-based I&C system is capable of performing its safety function under the specified environmental and operational stresses.

323.

Please explain the basis for stating that the radiation monitors are qualified for 40 years.

Please note that qualification requirements of the computer based I&C equipment needs to follow the guidance in RG 1.209.

346 7.5.2.

3 7.5 EICB (Singh)

TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 specific test results report. Please identify and provide the appropriate test results reports to complete the review.

Document 04507007-1TR is the RM-1000 System Verification Test Results. 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors (Attachment 8) and and 04038903-7SP, Qualification Basis for 04034101 (2-RE 271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit 2 equipment specific qualification reports.

3.

N Open Due 4/22/11 Open-TVA/Bechtel Due: 2/25/11 The proposed response appears to be conflicting with the proposed response for OI-351 regarding not submitting the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 04508905-QR report.

TVA to re-assess proposed response for both OIs.

TVA to re-evaluate previous responses to OI-316 and OI-319 which have conflicting responses regarding the applicability of 04507007-1TR.

347 7.5.2.

7.5

(

S i

Qualification report 04508905-1SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 321. Y Closed Closed 348 7.5.2.

7.5

(

S i

Qualification report 04508905-2SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 322. Y Closed Closed 349 7.5.2.

3 7.5 EICB (Singh)

Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 103 rads for total integrated dose (TID). However, the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE) (e.g.,

temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130ºF due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 104 rads, and (4) the total event plus the 40 year TID (total integrated dose) is less than or equal to 5 x 104 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2.

The design criteria provides the criteria for determining what is a mild environment at WBN Unit 2. Calculation WBNAPS4004 Summary of Mild Environment Conditions for Watts Bar Nuclear Plant provides the actual values for each area of the plant. In accordance with Table 1, the Control Room has a 40 year maximum TID of 3.5x102 RAD and a maximum integrated accident dose of 710.5 RAD for a maximum TID of 1060.5 RAD.

The accident dose of 710.5 RAD is the dose for a 100 day LOCA at the surface of the HEPA filter in the Mechanical Equipment Room. This is documented in TVA calculation WBNTSR-005, Dose Due to the Control Building Emergency Air Cleanup Filters Revision 3. However, on page 25 of WBNTSR-005, the shine from this source into the control room is negligible and is not considered in the dose calculation for the control room.

Calculation WBNAPS3-126, EQ Dose in the U1/U2 Auxiliary Instrument Rooms and the Computer Room in the Control Building Revision 0 documents the environmental qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x103 RAD. Calculation WBNAPS3-126, will be revised to include the control room by July 1, 2011. Since the control room TID has been determined to be less than 1x103 RAD, radiation qualification of the RM-1000.

4.

Y Open Open-TVA/Licensing Due: 2/25/11 TVA to provide the assessment document or a summary of the document with the reference to the appropriate document/documents.

February 25, 2011 response is acceptable.

Item will be tracked as a confirmatory item in the SE. TVA to provide calculation or summary of calculation when complete.

350 7.5.2.

7.5

(

S i

The seismic required response spectra (RRS) is shown in Figures The RM-1000 was seismically tested in a NIM Bin and the 323. Y Closed Closed RAI # 9, letter FSAR amend 103 Note: Item to be added to Section 3.10 351 7.5.2.

7.5

(

S i

The replacement schedule for the components that have a The replacement schedules stated in 04508905-1SP, 324. Y Closed Closed 352 7.5.2.

7.5

(

S i

Please clarify how many RM-1000 radiation monitors are being The total number of RM-1000 units procured under MR 325. Y Closed Closed 353 7.5.2.

3 7.5 EICB (Singh)

Please provide a summary of the [manufacturers] commercial dedication plan for radiation monitors with references to the guidance document that it follows. Also please include different facets (e.g. receiving, inspection, testing etc.) of the plan.

GA-ESI submitted their commercial grade dedication procedure (OP-7.3-240, Safety-Related Commercial Grade Item Parts Acceptance, Revision H) to engineering for review. Engineering review of the procedure found that the procedure, Section 5, did not require multiple dedication methods for complex CGI or CGI used in digital safety systems. As a result, it was determined that the GA-ESI program did not meet the requirements of NUREG-800, Section 7.0A, Revision 5.

5.

N Open Due 4/22/11 Open-TVA/Bechtel TVA to note that staff has written a safety evaluation and accepted EPRI TR-106439 (1996) as an acceptable method of addressing commercial dedication. EPRI NP-

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments A discussion with GA-ESI found that while not required by procedure, GA-ESI does perform vendor surveys as required by Method 2 of NP-5652. The surveys are done based on prudent business practices. Based on this discussion, GA-ESI agreed to review the CGI used in the WBN Unit 2 digital safety-related monitors to determine if they had been dedicated by more than one method.

The review of the CGI used in the WBN Unit 2 digital safety-related monitors determined that all CGI had been dedicated using Method 1 of EPRI guideline NP-5652. However, in the sample of items reviewed, there were CGI that were dedicated using a single method. Based on the results of the engineering procedure review and the results of the GA-ESI CGI review, Service Request 346896 was initiated to document the condition and to place the monitors in Conditional Release status.

Based on the results of the previous reviews, GA-ESI agreed to the following plan of action to resolve the CGD issue:

1.

GA-ESI shall revise its commercial grade dedication procedure (OP-7.3-240) to require multiple dedication methods be utilized for complex commercial grade items and commercial grade items for digital safety class systems. The evidence that this has been completed will be provided to TVA by April 15, 2011.

Specifically, Method 1 and at least one additional method from the list below will be used to ensure that the CGD procedure complies with the current SRP.

Method 1 - Special Tests and Inspections Method 2 - Commercial Grade Survey of Supplier Method 3 - Source Verification Method 4 - Acceptable Supplier/Item Performance Record

2.

GA-ESI shall take actions consistent with the revised operating procedure to address the CGls used in the WBN Unit 2 safety-related digital monitors. Evidence that those actions have been completed will be provided no later than September 1, 2011.

Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:

GA-ESI procedure OP-7.3-240 revision: April 30, 2011 Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 5652 must be used in conjunction with the additional guidance in EPRI TR-106439 for commercial dedication processes e.g. EPRI NP-6404, EPRI TR-102260, GL 89-02, and GL-91-05 per Section 3.3 of EPRI TR-106439.

354 7.5.2.

3 7.5 EICB (Singh)

RG 1.180 endorsed the guidance of IEEE-1050-1996 with clarifications regarding Instrumentation and Control Equipment Grounding to minimize the effects of EMI/RFI and power surge related effects on the safety-related I&C systems. (1)TVA to describe the grounding of the I&C equipment and (2)to state whether or not it follows the guidance of IEEE Std 1050-1996.

(1) The WBN Unit 2 grounding system design is in accordance with WB-DC-30-32, Revision 3, Design Criteria For Grounding (Attachment 5). I&C equipment grounding is described in Section 2.2.3C.1 I&C Grounding System (page 15). The design is based on IEEE 80-1986 IEEE Guide for Safety in AC Substation

32. Y Closed Due 3/29/11 Closed The grounding specification used by TVA does not meet IEEE 1050-1996 and therefore additional steps must be taken to assure that the radiation monitors are not susceptible to EMI/RFI interference when portable radio

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Grounding.

(2) The design of the WBN grounding system predates IEEE 1050. As a result WBN Units 1 and 2 do not follow the guidance of IEEE 1050 or Regulatory Guide 1.180.

devices are sued in the control room.

TVA has agreed to do the survey after the radiation monitors are installed.

Will be tracked for survey committment under OI-355.

355 7.5.2.

3 7.5 EICB (Singh)

Staff has not found the stated exclusion zone for EMI/RFI interfering devices (e.g. hand-held radio devices) in the submitted documents. TVA to provide the distance for the exclusion zones if not provided already. If it is already a submitted information then please point the source of the information.

Cautions and distance limitations for WBN Unit 1 legacy equipment are documented in TVA procedure TI-134, Revision 0, Control of Portable Two-Way Radios, (Attachment 7) Appendix B. Where WBN Unit 2 uses the same legacy equipment, the same cautions and distance limitations apply.

New equipment is procured and tested to TVA Standard Specification SS E18.14.01, Revision 3, Electromagnetic Interference (EMI) Testing Requirements for Electronic Devices (Attachment 6). The TVA specification is conservative with respect to Regulatory Guide 1.180, Revision 1. The specification requires that equipment not be susceptible to external interference or create external interference. New equipment is either tested by the manufacturer or tested in the TVA EMI test facility to ensure it meets the specification. If issues are found, the equipment is modified and installation documents are revised to eliminate the issue(s). This is true for the RM-1000 radiation monitors which were tested prior to installation in Browns Ferry at 10v/meter (Browns Ferry High Range Radiation Monitor dated December 8, 2006). Based on this, no exclusion zone for radio use is required for the RM-1000 radiation monitors in WBN Unit 2.

TVA Response to Follow-up NRC Request:

TVA will perform an EMI survey of the containment high range radiation monitors after installation in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being completed.

6.

Y Open Due 4/22/11 Open-TVA/Bechtel TVA to provide commitment that an EMI/RFI survey will be conducted after the installation of the equipment to confirm the non-susceptibility when using portable radio-frequency sources such as hand-held radios or other authorized devices that may be used in the control room.

Summary of the results to be submitted to NRC to close this item.

Survey results are to be available for audit by NRC.

356 7.5.2.

3 7.5 EICB (Singh)

The attachment number refers to your February 25, 2011 letter.

RM-1000 Qualification Test Report 04508905-QR (Attachment 23);

page 4-27 in Table 4-22 shows that RM-3 output failed during the OBE and SSE tests. The justification for failure of this RM-3 output is not explained in the report or any of the appendices in the report.

Please provide the resolution for this failure. Please note that a similar failure was reported in the test in Table 4-21 which was resolved in Appendix F, Closed Nonconforming Material Reports.

The loss of the RM-3 output (current to frequency (I/F) converter output) was determined to be a result of a defect in the shaker table (described in section 4.3.6 page 4-23) which exposed the test articles to unexpected high Gs. This caused a failure in the RM-1000 high voltage power supply output. The RM-1000 used in the I/F converter test setup (as shown in Figure 2-6 on page 2-9) was not included in the equipment set being qualified. Rather it was being used as a piece of test equipment to power the I/F converter and provide outputs to monitor I/F converter performance during the test. The resolution was to retest the I/F converter using a functional RM-1000 module at a later time (December).

The balance of the components (non-failed) were tested to completion during the original testing runs in the November time frame.

33. Y Closed Closed Closed by TVA letter of 3/31/11.

357 7.5.2.

3 7.5 EICB (Sing h)

In Attachment 5, Qualification Test Report Supplement, RM-1000 (04508905-1SP), Attachment 6, Qualification Test Report Supplement, I-F Converter Upgrade (04508905-2SP), and contains GA-ESI qualification report 04508903-1TR Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter original release,

34. N Open-NRC Review

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 3, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), the applicant made a statement that the results for these tests are provided in SE document 04508903-1TR. Please provide SE document 04508903-1TR for the staff to review. IF this report has been submitted earlier then please advise us the letter number and date by which it was submitted.

dated April 1999.

358 7.5.2.

3 7.5 EICB (Singh)

The attachment numbers refer to your February 25, 2011 letter. In, Wyle Test Report 41991 Safety Shutdown Earthquake (SSE) Test Response Spectra (TRS) Plots all five (5) pages, in Attachment 5, General Atomics Electronic Systems 04508905-1SP, page 5-5, Figure 5-2, and in Attachment 23, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), page 4-25, Figure 4-5 X-Axis SSE Test Response Spectra (TRS) versus Required Response Spectra (RRS), it shows that the TRS were below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.

NOTE: This response was inadvertently included in the letter dated 3/31/11. Please disregard. A revised response will be included in the next response letter.

The purpose of the 04508905-1SP, page 5-5, Figure 5-2 and Figure 5-1 on the previous page was to support the assertion that the Display Module from the RM2000 is qualified as used in the RM1000 That graph has the RRS plotted at 16 g, if it is re-plotted at 15 g (per CEB-SS-5.10 Rev. 3, Figure 3.1), then it meets your requirements and the TRS does not drop below the RRS.

In the document 04508905-QR Figure 4-5 on page 4-25 is the TRS for the first test performed. See page 4-38 of the same document for the second TRS graph which was performed on December 4 1998. Again the retest was required because of the failed I/F converter output previously mentioned.

7.

N Open Due 4/22/11 Open-TVA/Bechtel 359 7.7.1.

1 EICB (Carte)

Was the CERPI system developed under a 10 CFR 50 Appendix B compliant program?

CERPI is a non-safety related system. Therefore, 10 CFR 50 Appendix B is not applicable.

8.

Open Due 4/22/11 Open-TVA/WEC 360 EICB (Garg)

In order for staff to review the acceptability of the Incore Instrumentation System (IIS):

(a) Provide a brief system description of IIS and its regulatory compliance (i) In your discussion include the discussion of WINCISE and BEACON system which are part of the IIS.

(ii) Also provide the differences between the system used at WBN Unit vs. at Unit 2, e.g. Movable vs. fixed IIS.

(iii) For WINCISE provide the basis for acceptance.

(b) If this system has been accepted by the staff previously at some other plant then provide the reference to that SE.

(c) If this has not been evaluated by the staff previously, then provide the effect of CCF of this system and its effect on safety system or chapter 15 analysis.

(d) Does this have any interconnection with safety system?

(e) For BEACON provide:

(i) The acceptability of this system.

(ii) I believe that this system was accepted at WBN Unit 1. If that is the case then provide the reference to that review.

(iii) Also provide any differences of this system to the one at WBN Unit 1 system.

9.

Open Due 4/22/11 Open-TVA/WEC 361 7.7.1.

1 EICB (Carte)

Was the Foxboro IA system developed under a 10 CFR 50 Appendix B compliant program?

Foxboro I/A is a non-safety related system. Therefore, 10 CFR 50 Appendix B is not applicable.

10.

Open Due 4/22/11 Open-TVA/Bechtel

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 362 7.6.1 7.6.7 EICB ( Kemper & Singh)

OI #331 requested TVA to provide information regarding how the Loose Parts Monitoring System (LPMS) in-containment components (e.g.,

Accelerometer ( including the integral insulated hardline cable), Softline cable, and Remote Charge Preamplifiers) were qualified for vibration as addressed in regulatory position C.1.g of RG 1.133, Rev. 1. TVA responded by stating that TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. Vibration qualification is not applicable to the softline cable. Due to the installation location (junction boxes mounted to the shield or fan room walls) and previous seismic qualification, vibration qualification of the charge converter/preamplifier is not required. This completes the response to this item.

However, the staff still desires further clarification on this response. Specifically, please provide a documented basis that demonstrates the LPMS in-containment equipment is qualified for normal operating conditions (e.g., test results compared to the equipment qualification specification), including vibration qualification. Also, provide justification for why vibration qualification if the Remote Charge Preamplifier is not required.

11.

Open-TVA 363 7.5.1.

1.3 and 7.9.1 7.5.2 EICB (Rahn and Mossman)

OI#199 requested TVA to provide information concerning how TVA plans to meet regulatory criteria for Quality (10 CFR 50.55a(a)(1)) associated with the Technical Support Center and Nuclear Data Link. TVA responded in Letter Dated October 5, 2010, Item 63; however, TVAs response does not address the quality aspects of these system features. A similar question had been asked for Quality Criteria adherence for the SPDS and the BISI functions of the Integrated Computer System. In response to that request (same letter) TVA provided a description of TVA procedures, BISI software development procedures, and various management measures that will be taken to assure high quality in the design, operation, and maintenance of the SPDS and BISI functions of the ICS. Since the TSC and Nuclear Data Link information originates in the SPDS function of the ICS, are there any aspects of the quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are applicable to the data communications features?

Specifically, what is the scope of TVA Procedure SPP-2.6 Computer Software Control? How does it apply

12.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEB3ED.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments to the ICS functions of a) SPDS, b) BISI, and c) TSC and NDL functions? Wouldnt there be aspects of the quality procedures that apply to the development, maintenance, and operations of the software needed to support the data communications features. Also, what quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to ensure that these features will be reliable and available when needed?