Letter Sequence Supplement |
|---|
TAC:ME2731, Clarify Application of Setpoint Methodology for LSSS Functions (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information, ML101050203, ML102240630, ML102290358, ML102290360, ML102290361, ML102290362, ML102290363, ML102290364, ML102290365, ML102290366, ML102290367, ML102290368, ML102290383, ML102290384, ML102290385, ML102290386, ML102290387, ML102290388, ML102290389, ML102290390, ML102290391, ML102290392, ML102290403, ML102290404, ML102290405, ML102290406, ML102290407, ML102290408, ML102290409, ML102290410, ML102290411, ML102290414, ML102290439, ML102290440, ML102290441, ML102290442, ML102290443, ML102290444, ML102290445, ML102290446, ML102290447, ML102290448, ML102290458, ML102290459, ML102290460, ML102290461, ML102290462, ML102290463, ML102290464... further results
|
MONTHYEARML0933702752009-11-24024 November 2009 Final Safety Analysis Report, Amendment 95, Cover Letter Project stage: Request ML12192A3682009-12-0909 December 2009 Tennessee Department of Health Public Health Assessment 2009 Project stage: Request ML1001916862010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 8 - Electric Power Through 8E-12 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1002204742010-02-0505 February 2010 IP 37002, Construction Refurbishment Process - Watts Bar Unit 2 Project stage: Request ML1005500072010-03-11011 March 2010 Request for Additional Information Related to Licensees Final Safety Analysis Report Amendment 95 Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: RAI ML1007100112010-03-12012 March 2010 OL - List of Documents for Docketing Referenced on Page 5 of the Site Audit Trip Report Project stage: Request ML1010502032010-04-0808 April 2010 Additional Information Regarding Final Safety Analysis Report, Chapter 7, Instrumentation and Controls Review - Requested Common Q Proprietary Documents Project stage: Other ML1010405732010-04-0909 April 2010 Response to NRC Request for Additional Information Regarding Licensees Final Safety Analysis Report (FSAR) Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Response to RAI ML1011701022010-04-27027 April 2010 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals Project stage: Request ML1011303512010-05-0505 May 2010 Request for Withholding Information from Public Disclosure (Tac No. ME2731) Project stage: Withholding Request Acceptance ML1016102902010-05-27027 May 2010 Transmittal of Amendment 99 to Final Safety Analysis Report (FSAR) Project stage: Request ML1016203602010-06-17017 June 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Complete Status of TVA Hydrology Issues Including the Flooding Effects on the TVA Operating Nuclear Plants Project stage: Request ML1014500842010-06-23023 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Reactor Systems, Nuclear Performance and Code Review, Ansd Plant Systems Project stage: RAI ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1017903992010-06-28028 June 2010 Request for Additional Information (RAI) Regarding Licensees Final Safety Analysis Report Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Request ML1016200062010-06-29029 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review (Tac No. ME2731) Project stage: RAI ML1015304742010-07-0202 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Mechanical and Civil Engineering Systems Project stage: RAI ML1016000262010-07-0808 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report, Amendment Related to Quality and Vendor Branch Review Project stage: RAI ML1015303542010-07-12012 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Electrical Engineering Systems Project stage: RAI ML1018001562010-07-15015 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 8, Electric Power Project stage: RAI ML1020202812010-07-30030 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 3.11 Project stage: RAI ML1023003322010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-9 (Dwg No. 1-47W611-67-5, R10) Project stage: Other ML1022904662010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-3 (Dwg No. 1-47W845-3, R23) Project stage: Other ML1023003332010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 (Dwg No. 1-47W610-67-1, R27) Project stage: Other ML1023003342010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 Sh a (Dwg No. 1-47W610-67-1A, R16) Project stage: Other ML1023003352010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 (Dwg No. 1-47W610-67-2, R15) Project stage: Other ML1023003432010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 Sh a (Dwg No. 1-47W610-67-3A, R7) Project stage: Other ML1023003442010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-13 (Dwg No. 1-47W610-67-4, R17) Project stage: Other ML1023003452010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 Sh a (Dwg No. 1-47W610-67-2A, R8) Project stage: Other ML1023003462010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 (Dwg No. 1-47W610-67-3, R12) Project stage: Other ML1023003472010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5, R14) Project stage: Other ML1023003482010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5A, R2) Project stage: Other ML1023003492010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-16 (Dwg No. 1-47W859-4, R23) Project stage: Other ML1023003502010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-17 (Dwg No. 1-47W859-3, R18) Project stage: Other ML1023003512010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-18 (Dwg No. 1-47W859-2, R36) Project stage: Other ML1023003522010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-19 (Dwg No. 1-47W859-1, R47) Project stage: Other ML1023003602010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-23 (Dwg No. 1-47W611-70-1, R9) Project stage: Other ML1023003612010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-20 (Dwg No. 1-47W610-70-1, R23) Project stage: Other ML1023003622010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21 (Dwg No. 1-47W610-70-2, R29) Project stage: Other ML1023003632010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21A (Dwg No. 1-47W610-70-2A, R15) Project stage: Other ML1023003642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-22 (Dwg No. 1-47W610-70-3, R17) Project stage: Other ML1023003652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-24 (Dwg No. 1-47W611-70-2, R11) Project stage: Other ML1023003672010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25 (Dwg No. 1-47W611-70-3, R4) Project stage: Other ML1023003682010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25A (Dwg No. 1-47W611-70-4, R4) Project stage: Other ML1023003692010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-1 (Dwg No. 1-47W610-32-1, R15) Project stage: Other ML1023003702010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-2 (Dwg No. 1-47W610-32-2, R19) Project stage: Other ML1023003732010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-6 (Dwg No. 1-47W848-1, R24) Project stage: Other ML1022903682010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-14B (Dwg No. 1-45W760-82-1, R17) Project stage: Other ML1022903652010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-7 (Dwg No. 1-45W760-211-9, R16) Project stage: Other 2010-05-05
[Table View] |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 October 24, 2011 10 CFR 50.34 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391
Subject:
Watts Bar Nuclear Plant (WBN) Unit 2 - Safety Evaluation Report Supplement 23 (SSER23) - Response to NRC Required Action Item 71
References:
- 1.
TVA letter dated June 28, 2010, 'Watts Bar Nuclear Plant (WBN) Unit 2 -
Request for Additional Information (RAI) Regarding Licensee's Final Safety Analysis Report Amendment Related to Section 4.2.2, 'Reactor Vessel Internal Components' (TAC No. ME2731)"
- 2.
TVA letter to NRC dated April 21, 2011, 'Watts Bar Nuclear Plant (WBN)
Unit 2 - Withdrawal of a Previous Commitment"
- 3.
Westinghouse Electric Company letter dated October 14, 2011, 'Watts Bar Unit 2 Reactor Internals Clevis Bolts Information for Response to U. S. NRC," (Letter number LTR-RIDA-1 1247, Rev. 1)
Open Item 71 from Appendix HH of SSER23 reads as follows:
"By letter dated April 21, 2011 (ADAMS Accession No. ML111110513, TVA withdrew its commitment to replace the Unit 2 clevis insert bolts. TVA should provide further justification for the decision to not replace the bolts to the NRC staff. (SSER23, Section 3.9.5, PG 3-2/3)"
In Reference 1, TVA committed to replace, prior to Unit 2 operation, the current Unit 2 clevis insert bolts with a design which uses X-750 alloy with a high temperature heat (HTH) treatment, rolled threads, and a larger radius on the undercut of the cap screw head.
U.S. Nuclear Regulatory Commission Page 2 October 24, 2011 By letter dated April 21, 2011 (Reference 2), TVA withdrew its commitment to replace the Unit 2 clevis insert bolts.
Additional justification for this commitment withdrawal (i.e., to not replace the bolts) is provided in the Enclosure; Westinghouse Electric Company provided this information to TVA via Reference 3.
There are no new commitments in this letter.
If you should have any questions, please call Gordon Arent at (423) 365-2004.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 241 day of October, 2011.
Respectfully, David Stinson Watts Bar Unit 2 Vice President
Enclosure:
Information Relative to Clevis Insert Bolt Failures cc (Enclosure):
U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 e
Westinghouse Non-Proprietary Class 3 Enclosure Information Relative to Clevis Insert Bolt Failures To date, D. C. Cook Unit 1 is the only occurrence of such indications of a bolt failure found during inspection. Within the past five years, Westinghouse has performed inspections, has received positive feedback from, or has reviewed videos from past inspections at the following plants and has found no indications of clevis insert bolt failures:
Ginna (Spring 2011)
D.C. Cook Unit 2 (Fall 2010)
McGuire Unit 1 (Spring 2010)
Surry Unit 1 (Fall 2010)
Seabrook Unit 1 (Fall 2009)
Indian Point Unit 2 (Spring 2006)
Indian Point Unit 3 (Spring 2009)
Farley Unit 2 (Spring 2010)
Furthermore, Westinghouse records indicate that the following additional Westinghouse plants in the U.S. would have conducted a 10-year in-service inspection (ISI) in the past 5 years from which there have been no reports on clevis insert bolt failures:
South Texas Unit 1 (Fall 2009)
South Texas Unit 2 (Spring 2010)
North Anna Unit 1 (Spring 2009)
North Anna Unit 2 (Spring 2010)
Comanche Peak Unit 2 (Fall 2009)
Point Beach Unit 1 (Fall 2008)
Point Beach Unit 2 (Spring 2008)
Braidwood Unit 1 (Fall 2007)
Braidwood Unit 2 (Spring 2008)
Farley Unit 1 (Fall 2007)
Vogtle Unit 1 (Fall 2006)
Vogtle Unit 2 (Spring 2007)
It should be pointed out that all Westinghouse plants, with the possible exception of Sizewell B, use a heat treatment of X-750 similar to that used at Cook Unit 1 for the clevis insert bolts, which is a lower temperature heat treatment than the high temperature heat treatment (HTH condition). Also, from a review of pictures, it appears the locking bar was impacted by the bolt head due to some type of movement. It has been hypothesized that the wear of the lock bar is caused by flow-induced vibration of a loose bolt head against a lock bar, which has relatively lower hardness. It is postulated that the head fractured from the bolt shank prior to the start of this wear mechanism.