Final Safety Analysis Report, Amendment 95, Cover Letter
ML093370275
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/24/2009
From: Bajestani M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML093370275 (22)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 November 24, 2009 10 CFR 50.4(b)(6) 10 CFR 50.34(b) 10 CFR 2.390(d)(1)

.U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 95

1. TVA letter to the NRC dated August 27, 2009, "Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report Amendment 94"

References:

2. NRC letter to TVA dated August 14, 2009, "Watts Bar Nuclear Plant Unit 2 -

Confirmation of Schedule for Submission of Information to Support Operating License Application Review" This letter transmits WBN Unit 2 FSAR Amendment 95 (A95), which reflects changes made since the issuance of Amendment 94 on August 27, 2009 (Reference 1). This Unit 2 amendment incorporates changes resulting from TVA's ongoing design/reverification effort in support of completing the WBN Unit 2 design basis. This letter also responds to NRC's letter dated August 14, 2009 (Reference 2), requesting TVA to verify the schedule for providing information amending the FSAR. Specifically, NRC requested TVA to verify the schedule dates for submitting amendments on specific Safety Evaluation Report (SER) sections listed in the enclosure to NRC's August 14 letter. Enclosure 1 contains TVA's updated schedule dates for submitting amendments for the FSAR sections listed in NRC's letter. SER Section 12.7.1, "Plant Shielding," that corresponds to FSAR Section 12.3 was scheduled to be incorporated into this amendment but was not completed due to outstanding calculation issues. This section has been rescheduled to January 2010. FSAR Section 12.3 was the only section listed in the NRC August 14 letter that was scheduled to be submitted with FSAR A95 that TVA did not complete the design/verification review. contains a "Summary Listing" of the location and corresponding Unit 2 FSAR change package numbers associated with the A95 changes. This is a listing of FSAR sections in which TVA has completed its design/reverification review and determined that design-related activities are complete, the verbiage is consistent with the Unit 1 Updated FSAR (UFSAR), as appropriate, and the section is ready for NRC review.

AD573 Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 November 24,2009 FSAR A95 is contained on the enclosed Optical Storage Media (OSM #1) (Attachment 1).

The FSAR contains security-related information identified by the designation "Security-Related Information - Withhold Under 10CFR2.390.

TVA hereby requests this information be withheld from public disclosure in accordance with the provisions of 10CFR2.390. A redacted version of the FSAR is contained on OSM #2 (Attachment 2), which is suitable for public disclosure. contains a listing of the FSAR pages that have been redacted. Enclosure 4 lists the files and file sizes on the security-related OSM (OSM #1), and Enclosure 5 lists the files and file sizes on the publicly available 'OSM (OSM #2).

Additionally, at the request of NRC/NRR, TVA is planning to expedite submittal of FSAR A96 that provides the rest of Section 7.0 on or about December 15, 2009. WBN is currently developing Unit 1 UFSAR Amendment 8.. TVA plans to incorporate any impacts from this UFSAR Amendment into Unit 2 A97, scheduled for January 2010.

This letter does not close any "Generic Communications" or contain any new commitments. If you have any questions, please contact me at (423) 365-2351.

I declare under the penalty of perjury that the foregoing is true and correct. Executed on November 24, 2009.

Sincerely, Masoud Ba;J_

tani Watts Bar it 2 Vice President

Enclosures:

1. TVA's Schedule for Specified Topic Items and Corresponding Sections of the FSAR
2. List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes"
3. Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95, "Summary of Redacted Pages"
4. List of files and file sizes on the security-related OSM (OSM #1)
5. List of files and file sizes on the publicly available OSM (OSM #2)

Attachments:

1. OSM #1: WBNP Unit 2 FSAR Amendment 95 - Security-Related Information - Withhold Under 10CFR2.390
2. OSM #2: WBNP Unit 2 FSAR Amendment 95 - Public Version cc: See page 3

U.S. Nuclear Regulatory Commission Page 3 November 24, 2009 cc (w/enclosures):

U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title Schedulec Section Section Submittal I_

Date 1.50 Summary Of Principal Review Matters 1.9.0 License Conditions 2.4.6 Ultimate Heat Sink 9.2.5 Ultimate Heat Sink A95 Nov 2009 3.0.0 Design Of Struct, Comp, 3.0.0 Design Of Struct, Comp, Title Equip, & Sys Equip, & Sys Section Only 3.1.0 Introduction 3.1.1 Introduction A94 Aug 2009 3.1.1 Conformance W/Gen Design 3.1 Conformance w/NRC Gen A94 Criteria Design Criteria Aug 2009 3.1.2 Conformance W/Indust Codes &

3.2.3 Code Cases And Code A95 Std Editions And Addenda Nov 2009 3.2.0 Class Of Struct, Sys, & Comp 3.2 Class Of Struct, Sys, & Comp A95 Nov 2009 3.2.1 Seismic Classifications 3.2.1 Seismic Classifications A95 Nov 2009 3.2.2 Sys Quality Group Classifications 3.2.2 Sys Quality Group A95 Classifications Nov 2009 3.5.0 Missile Protection 3.5 Missile Protection A95 Nov 2009 3.5.1 Missile Selection & Description 3.5.2 Struct, Sys, Comp To Be Protected 3.5.3 Barrier Design Structures 3.6.0 Protect Against Effects 3.6 Protection Against Dynamic A95 Pipe Rupture Effects Associated With The Nov 2009 3.6.1 Plant Design Protect From Postulated Rupture Of Piping Pipe Fail 3.6.2 Determine Brk Location Pipe Ruptures 3.6.3 Leak Before Break Eval Proced 3.10.0 Seismic & Dynamic Qual 3.10 Seismic Design Of Category I A95 Of Equip Instrumentation And Nov 2009 Electrical Equipment 4.0.0 Reactor 4.0 Reactor Title Section Only 4.1.0 Introduction 4.1 Summary Description A95 Nov 2009 4.2.0 Fuel System Design 4.2 Mechanical Design A95 Nov 2009 4.2.1 Description 4.2.2 Thermal Performance 4.2.3 Mechanical Performance

ENCLOSURE 1 Schedule for Snecified Tonic Items and Corresnondina Sections of the FSAR TVA'S S TV.Ion chedule r.......

To ems and.

. r

  • i Sections..........A.

SERI SER Title FSAR FSAR Title Schedule Section Section Submita I

I

.I I IDate 4.2.4 Surveillance 4.2.5 Fuel Design Considerations 4.3.0 Nuclear Design 4.3 Nuclear Design A95 Nov 2009 4.3.1 Design Basis 4.3.2 Design Description 4.3.3 Analytical Methods 4.3.4 Summary Of Evaluation Findings 4.4.0 Thermal Hydraulic Design 4.4 Thermal And Hydraulic A95 Design Nov 2009 4.4.1 Performance In Safety Criteria 4.4.1 Design Basis A95 Nov 2009 5.3.7 Thermal And Hydraulic A95 Characteristics Summary Nov 2009 Table 4.4.2 Design Basis 4.4.1 Design Basis A95 Nov 2009 4.4.3 Thermal Hydraulic Design Methodology 4.4.4 Operating Abnormalities 4.4.2 Thermal Hydraulic Design-A95 4.4.6 Thermal Hydraulic Comparison Description Nov 2009 4.4.7 N-1 Loop Operation 5.3.5 Load Following Characteristics A95 Nov 2009 4.4.9 Summary & Conclusion 4.4.3 Evaluation A95 Nov 2009 4.6.0 Functional Design Of 4.3.1 Nuclear Design -

A95 Reactivity Sys Design Bases Nov 2009 5.2.1 Compliance W/Codes & Code 3.2 Classification Of Structures, A95 Cases Systems, And Components Nov 2009 5.4.2 Steam Generators 5.5.2 Steam Generators A95 Nov 2009 5.5.4 Steam Outlet Flow Restrictor A94 (Steam Generator)

Aug 2009 5.4.4 Pressurizer Relief Tank 5.5.11 Pressurizer Relief Tank A95 Nov 2009 6.2.5 Combustible Gas 6.2.5 Combustible Gas Control A95 Control Systems In Containment Nov 2009 6.2.7 Fracture Prevention 3.1.2 WBNP Conformance A94 Containment with GDCs Aug 2009 6.3.0 Emergency Core Cooling 6.3 Emergency Core Cooling A95 System System Nov 2009

ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR f SERT1 SER Title FSAR FSAR Title Scheduled Section Section Submittal Date 6.3.1

System Design

6.3.2 Evaluation 6.3.3 Testing 6.3.4 Performance Evaluation 6.3.5 Conclusions 6.6.0 Inservice Inspect Of 6.6 Inservice Inspection Of ASME A95 Class 2 & 3 Comp Code Class 2 And 3 Nov 2009 Components Inspection Intervals 7.3.0 Engineered Safety 7.3 Engineered Safety Features A95 Features System Actuation System Nov 2009 7.3.1

System Description

5.5.5 Main Steam Line A94 Isolation System Aug 2009 5.6 Reactor Vessel Head A95 Vent System Nov 2009 7.3.2 Containment Sump Level 5.6 Reactor Vessel Head A95 Measurement Vent System Nov 2009 6.3 Emergency Core A95 Cooling System Nov 2009 7.3.3 Aux Feedwater Initiation 7.3 Engineered Safety Features A95

& Control Actuation System Nov 2009 7.3.4 Failure Modes & Effects Analysis 7.3.5 IE Bulletin 80-06 7.3.6 Conclusions 7.4.0 Systems Required For 7.4 Systems Required For A95 Safe Shutdown Safe Shutdown Nov 2009 7.4.1

System Description

7.4.2 Safe Shutdown From Aux Control Room 7.4.3 Conclusions 7.7.3 Volume Control Tank LvI Control Sys 8.1.0 General 8.1 Electric Power - Introduction A95 Nov 2009 8.2.1 Compliance With 3.1.2 WBNP Conformance A94 GDC5 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.2.2 Compliance With 3.1.2 WBNP Conformance A94 GDC 17 with GDCs Aug 2009

ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title Schedule Section Section Submittal I _

I I

Date 8.1 Electric Power - Introduction A95 Nov 2009 8.2.3 Compliance With 3.1.2 WBNP Conformance A94 GDC 18 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.2.4 Evaluation Findings 8.3.0 Onsite Power Systems 8.1 Electric Power - Introduction A95 Nov 2009 8.3 Onsite (Standby) Power A95 System Nov 2009 8.3.1 Onsite AC Pwr Sys Compliance 3.1.2 WBNP Conformance A94 w/GDC 17 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.3.2 Onsite DC Sys Compliance With 3.1.2 WBNP Conformance A94 GDC 17 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.3.3 Evaluation Findings 8.3 Onsite (Standby) Power A95 Systems Nov 2009 8.4.0 Station Blackout 8.1 Electric Power - Introduction A95 Nov 2009 9.1.1 New Fuel Storage 9.1.1 New Fuel Storage A95 Nov 2009 9.1.2 Spent Fuel Storage 9.1.2 Spent Fuel Storage A94 Aug 2009 9.2.0 Water Systems 9.2 Water Systems A95 Nov 2009 9.2.1 ERCW & RCWS 9.2.1 Essential Raw Cooling Water A95 Sys (ERCW)

Nov 2009 9.2.8 Raw Cooling Water A95 Sys(RCWS)

Nov 2009 9.2.2 Component Cooling System 9.2.2 Component Cooling System A95 Nov 2009 9.2.3 Demineralized Water Makeup 9.2.3 Demineralized Water Makeup A95 System System Nov 2009 9.2.4 Potable & Sanitary 9.2.4 Potable And SanitaryWater A94 Water Systems Systems Aug 2009 9.2.5 Ultimate Heat Sink 9.2.5 Ultimate Heat Sink A95 I

Nov 2009 9.2.6 Condensate Storage 9.2.6 Condensate Storage A95 Facilities Facilities Nov 2009 9.3.3 Equip & Floor Drainage 9.3.3 Equip & Floor Drainage A95 System System Nov 2009 9.4.4 Turbine Building Area Vent Sys 9.4.4 Turbine Building Area Vent Sys A94 Aug 2009

ENCLOSURE 1 Schedule for Snecified Tonic Items and Corresnondina Sections of the FSAR TVA'S f

r.......

To i r n and...

Co resn Sections of th SER SER Title FSAR FSAR Title Scheduled S iSection Submittal 1 _Date 9.5.2 Communications System 9.5.2 Plant Communications A95 System Nov 2009 9.5.3 Lighting Systems 9.5.3 Lighting Systems A94 Aug 2009 9.5.4 Emerg Diesel Gen Fuel Oil 9.5.4 Diesel Gen Fuel Oil Storage A95 Storage And Transfer Sys Nov 2009 9.5.5 Emerg Diesel Gen Cooling 9.5.5 Diesel Gen Cooling Water Sy,,

A95 Water Sys Nov 2009 9.5.6 Emerg Diesel Gen 9.5.6 Diesel Gen Starting Sys A95 Starting Sys Nov 2009 9.5.8 Emerg Diesel Gen Intake &

9.5.8 Diesel Gen Combustion Air A94 Exhaust Sys Intake And Exhaust Sys Aug 2009 10.1.0 Summary Description 10.1 Summary Description A95 Nov 2009 10.2.0 Turbine Generator 10.2 Turbine Generator A95 Nov 2009 10.2.1 Turbine Generator Design 10.2.2 Turbine Disc Integrity 10.3.0 Main Steam Supply System 10.3 Main Steam Supply System A95 10.3.1 Main Steam Supply Sys Include Nov 2009 Valves 10.3.2 Main Steam Supply Sys 10.3.3 Steam & Feedwater Sys Materials 10.3.4 Secondary Water Chamistry 10.4.1 Main Condenser 10.4.1 Main Condenser A95 Nov 2009 10.4.2 Main Condenser Evacuation Sys 10.4.2 Main Condenser Evacuation A95 System Nov 2009 10.4.4 Turbine Bypass System 10.4.4 Turbine Bypass System A95 Nov 2009 11.0.0 Radioactive Waste Management 11.1 Source Term A95 Nov 2009 11.6 Offsite Radiological A95 Monitoring Program Nov 2009 11.1 Summary Description 11.2.0 Liquid Waste Management 9.3.7 Boron Recycle System A95 Nov 2009 11.2 Liquid Waste Systems A95 Nov 2009

ENCLOSURE 1 TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title ISchedule¢ Section Section Submittal I I

Date 11.2.8 Dilution Factors A95 Nov 2009 11.2.9 Estimated Doses From A95 Radionuclides In Nov 2009 Liquid Effluents 11.3.0 Gaseous Waste Management 11.3 Gaseous Waste Systems A95 Nov 2009 11.4.0 Solid Waste Management 11.5 Solid Waste Management A95 System Nov 2009 11.5.0 Process & Effluent Radiological 11.4 Process And Effluent A95 Mon Radiological Monitoring And Nov 2009 Sampling System 11.6.0 Evaluation Findings 11.7.0 NUREG-0737 Items 11.7.1 Wide Range Noble Gas & Iodine 11.7.2 Primary Coolant Outside Containment 12.0.0 Radiation Protection Radiation Protection Title 12.0 Section Only 12.1 General 12.2.0 Assuring That Occup Radiation 12.1 Assuring That Occupational A94 Expose Radiation Exposures Are As Aug 2009 Low As Reasonably Achievable (ALARA) 12.3.0 Radiation Sources 12.2 Radiation Sources A95 Nov 2009 12.4.0 Radiation Protect 12.3 Radiation Protection A97 Design Features Design Features Jan 2010 12.5.0 Dose Assessment 12.4 Dose Assessment A95 I_

Nov 2009 12.6.0 Health Physics Program 12.5 Radiological Control A95 (Radcon) Program Nov 2009 12.7.0 NUREG-0737 Items A95 Nov 2009 12.7.1 Plant Shielding 12.3 Radiation Protection A97 Design Features Jan 2010 12.7.2 High Range Incontainment Monitor 12.7.3 Inplant Radioiodine Monitor 13.1.0 Org Structure Of The Applicant 13.1 Org Structure Of A95 13.1.1 Management & Technical Org The Applicant Nov 2009 13.1.2 Corp Org & Tech Support 13.1.3 Plant Staff Organization 13.1 Org Structure Of A95 The Applicant Nov 2009 13.4 Onsite Review A95 Nov 2009

ENCLOSURE 1 TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title Scheduled Section Section Submittal I

I Date 13.2.0 Training 13.2 Training Programs A95 13.2.1 Licensed Operator Training Nov 2009 Program 13.2.2 Training For Nonlicensed Personnel 13.3.0 Emergency Preparedness 13.3 Emergency Planning A95 Evaluation Nov 2009 13.3.1 Introduction 13.3.2 Evaluations Of The Emergency Plan 13.3.3 Conclusion 13.4.0 Review & Audit 13.4 Review And Audit A95 Nov 2009 15.3.6 Anticipated Transient Without 4.3 Reactors - Nuclear Design A95 Scram Nov 2009

  • - No equivalent FSAR section exists for this SER section.

ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item Change NoI Section Section Title Package Number

1.

1.5 Requirements for Further 2-95-13 Technical Information

2.

1.9 Nuclear Performance Plan 2-95-27 Geology, Seismology, and

3.

2.5 Geotechnical Engineering 2-95-30 Summary of Foundation Conditions Classification of

4.

3.2 Structures, Systems And 2-95-42 Components

5.

3.5 Missile Protection 2-95-69 Protection Against Dynamic Effects

6.

3.6 Associated With 2-95-12 Postulated Rupture Of Piping Seismic Design of 2-95-66

7.

3.10 Category I Instrumentation 2-95-34 And Electrical Equipment

8.

4.1 Summary Description 2-95-40

9.

4.2.1 Mechanical Design 2-95-56

10.

4.2.2 Mechanical Design 2-95-51

11.

4.2.3 Reactivity Control System 2-95-54 Tritium Producing

12.

4.2.4 Burnable Absorber Rod -

2-95-52 Tritium Production Core

13.

4.3 Nuclear Design 2-95-49

14.

4.4 Thermal and Hydraulic 2-95-53 Design

15.

5.3 Thermal Hydraulic System 2-95-07 Design 2-95_07

16.

5.5.2 Steam Generator 2-95-36

17.

5.5.10 Pressurizer 2-95-01

18.

5.5.11 Pressurizer Relief Tank 2-95-17

19.

5.5.12 Valves 2-95-02

20.

5.5.14 Component Supports 2-95-11

21.

5.6 Instrumentation 2-95-59 Application

22.

6.2.5 Combustible Gas Control 2-95-48 in Containment

23.

6.2.5A Hydrogen Mitigation 2-95-48 System

24.

6.3 Emergency Core Cooling 2-95-45 System Inservice Inspection of

25.

6.6 ASME Code Class 2 and 3 2-95-20 Components

ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item Change No.

Section Section Title Package Number

26.

7.3 Engineered Safety 2-95-63 Features Actuation System

27.

7.4 Systems Required for Safe 2-95-09 Shutdown

28.

8.1 Electric Power -

2-95-58 28._

81Introduction

29.

8.3 Onsite (Standby) Power 2-95-55 System

30.

9.1.1 New Fuel Storage 2-95-03

31.

9.2.1 Essential Raw Cooling 2-95-57 Water

32.

9.2.2 Component Cooling 2-95-65 System

33.

9.2.3 Demineralized Water 2-95-04 Makeup System

34.

9.2.5 Ultimate Heat Sink 2-95-05

35.

9.2.6 Condensate Storage 2-95-31 Facilities

36.

9.2.7 Refueling Water Storage 2-95-33 Tank

37.

9.2.8 Raw Cooling Water 2-95-10 System

38.

9.3.3 Equipment and Floor Drainage System 2-95-06

39.

9.3.5 Failed Fuel Detection 2-95-18 System

40.

9.3.7 Boron Recycle System 2-95-50 Post Accident Sampling

41.

9.4.9 Facility (PASF) 2-95-29 Environmental Control System

42.

9.5.2 Plant Communication 2-95-37 System Diesel Generator Fuel Oil

43.

9.5.4 Storage And Transfer 2-95-26 System

44.

9.5.5 Diesel Generator Cooling 2-95-08 Water

45.

9.5.6 Diesel Generator 2-95-43 Starting Air

46.

10.1 Summary Description 2-95-67

47.

10.2 Turbine Generator 2-95-70

48.

10.3 Main Steam Supply 2-95-35 System

49.

10.4.1 Main Condenser 2-95-71

ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item Change No.

Section Section Title Package Number Main Condenser

50.

10.4.2 ManCnesr2-95-44 Evacuation System

51.

10.4.4 Turbine Bypass System 2-95-46

52.

11.1 Source Terms 2-95-19

53.

11.2 Liquid Waste Systems 2-95-62

54.

11.3 Gaseous Waste Systems 2-95-25 Process and Effluent

55.

11.4 Radiological Monitoring 2-95-47 and Sampling System

56.

11.5 Solid Waste Management 2-95-38

57.

11.6 Offsite Radiological 2-95-24 Monitoring Program

58.

12.2 Radiation Sources 2-95-39

59.

12.4 Dose Assessment 2-95-61

60.

12.5 Radiological Control 2-95-60 (RadCon) Program

61.

13.1 Organizational Structure of 2-95-21

61. __13.1 Applicant 2-95_21
62.

13.2 Training Programs 2-95-22

63.

13.3 Emergency Planning 2-95-23

64.

13.4 Review and Audit 2-95-25

65.

13.6 Plant Records 2-95-16

66.

13.7 Security 2-95-15 Specific Information to be

67.

14.1 Included in Preliminary 2-95-14 SAR

ENCLOSURE3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)

Section No.

Figure No.;

Basis For Redaction 1

1.2-15 1.2 1.2-1 Security Related, 10CFR2.390(d)(1) 1 1.2-16 1.2 1.2-2 Security Related, 10CFR2.390(d)(1) 1 1.2-17 1.2 1.2-3 Security Related, 10CFR2.390(d)(1) 1 1.2-18 1.2 1.2-4 Security Related, 10CFR2.390(d)(1) 1 1.2-19 1.2 1.2-5 Security Related, 10CFR2.390(d)(1) 1 1.2-20 1.2 1.2-6 Security Related, 10CFR2.390(d)(1) 1 1.2-21 1.2 1.2-7 Security Related, 10CFR2.390(d)(1) 1 1.2-22 1.2 1.2-8 Security Related, 10CFR2.390(d)(1) 1 1.2-23 1.2 1.2-9 Security Related, 10CFR2.390(d)(1) 1 1.2-24 1.2 1.2-10, Security Related, 10CFR2.390(d)(1) 1 1.2-25 1.2 1.2-11 Security Related, 10CFR2.390(d)(1) 1 1.2-26 1.2 1.2-12 Security Related, 10CFR2.390(d)(1) 1 1.2-27 1.2 1.2-13 Security Related, IOCFR2.390(d)(1) 1 1.2-28 1.2 1.2-14 Security Related, 10CFR2.390(d)(1) 1 1.2-29 1.2 1.2-15 Security Related, 10CFR2.390(d)(1) 2 2.2-7 2.2 2.2-1 Security Related, 10CFR2.390(d)(1) 2 2.2-8 2.2 22-2 Security Related, 10CFR2.390(d)(1) 2 2.4-90 2.4 2.4-2 Security Related, 10CFR2.390(d)(1) 2 2.4-91 2.4 2.4-3 Security Related, 10CFR2.390(d)(1) 2 2.4-92 2.4 2.4-3a Security Related, 10CFR2.390(d)(1) 2 2.4-93 2.4 2.4-4 Security Related, 10CFR2.390(d)(1) 2 2.4-94 2.4 2.4-5 Security Related, 10CFR2.390(d)(1) 2 2.4-95 2.4 2.4-6 Security Related, 10CFR2.390(d)(1) 2 2.4-96 2.4 2.4-7 Security Related, IOCFR2.390(d)(1) 2 2.4-97 2.4 2.4-8 Security Related, 10CFR2.390(d)(1) 2 2.4-98 2.4 2.4-9 Security Related, 10CFR2.390(d)(1) 2 2.4-99 2.4 2.4-10 Security Related, 10CFR2.390(d)(1) 2 2.4-100 2.4 2.4-11 Security Related, 10CFR2.390(d)(1) 2 2.4-101 2.4 2.4-12 Security Related, 10CFR2.390(d)(1) 2 2.4-102 2.4 2.4-13 Security Related, 10CFR2.390(d)(1) 2 2.4-103 2.4 2.4-14 Security Related, 10CFR2.390(d)(1) 2 2.4-131 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)

Sheet 1 2

2.4-132 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)

Sheet 2 2

2.4-134 2.4 2.4-40b Security Related, 10CFR2.390(d)(1) 2 2.4-135 2.4 2.4-40c Security Related, 10CFR2.390(d)(1) 2 2.4-136 2.4 2.4-40d-1 Security Related, 10CFR2.390(d)(1) 2 2.4-141 2.4 2.4-40f Security Related, 10CFR2.390(d)(1)

Sheet 1 2

2.4-144 2.4 2.4-40g Security Related, 10CFR2.390(d)(1)

Sheet 1 2

2.4-201 2.4 2.4-76 Security Related, 10CFR2.390(d)(1) 2 2.4-204 2.4 2.4-79 Security Related, 10CFR2.390(d)(1) 2 2.4-207 2.4 2.4-82 Security Related, 10CFR2.390(d)(1) 2 2.4-208 2.4 2.4-83 Security Related, 10CFR2.390(d)(1) 2 2.4-213 2.4 2.4-88 Security Related, 10CFR2.390(d)(1)

ENCLOSURE 3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)

Section No.

Figure No.

Basis For Redaction 2

2.4-214 2.4 2.4-89 Security Related, 10CFR2.390(d)(1) 2 2.4-215 2.4 2.4-90 Security Related, 10CFR2.390(d)(1) 2 2.4-223 2.4 2.4-98 Security Related, 10CFR2.390(d)(1) 2 2.5-473 2.5 2.5-185 Security Related, 10CFR2.390(d)(1) 2 2.5-474 2.5 2.5-185a Security Related, 10CFR2.390(d)(1) 2 2.5-515 2.5 2.5-225 Security Related, 10CFR2.390(d)(1) 2 2.5-516 2.5 2.5-226 Security Related, 10CFR2.390(d)(1) 2 2.5-577 2.5 2.5-226a Security Related, 10CFR2.390(d)(1) 2 2.5-577 2.5 2.5-273 Security Related, 10CFR2.390(d)(1) 2 2.5-692 2.5 2.5-358 Security Related, 10CFR2.390(d)(1) 2 2.5-936 2.5 2.5-592 Security Related, 10CFR2.390(d)(1) 3 3.5-53 3.5 3.5-3 Security Related, 10CFR2.390(d)(1) 3 3.5-54 3.5 3.5-4 Security Related, 10CFR2.390(d)(1) 3 3.6-73 3.6 3.6-21 Security Related, 10CFR2.390(d)(1) 3 3.6-74 3.6 3.6-22 Security Related, 10CFR2.390(d)(1) 3 3.6-75 3.6' 3.6-23 Security Related, 10CFR2.390(d)(1) 3 3.6-76 3.6 3.6-24 Security Related, 10CFR2.390(d)(1) 3 3.7-217 3.7 3.7-39 Security Related, 10CFR2.390(d)(1) 3 3.7-218 3.7 3.7-40

.Security Related, 10CFR2.390(d)(1) 3 3.7-219 3.7 3.7-41 Security Related, 10CFR2.390(d)(1) 3 3.7-222 3.7 3.7-44 Security Related, 10CFR2.390(d)(1) 3 3.8.3-62 3.8.3 3.8.3-6 Security Related, 10CFR2.390(d)(1) 3 3.8.3-63 3.8.3 3.8.3-7 Security Related, 10CFR2.390(d)(1) 3 3.8.4-88 3.8.4.

3.8.4-2 Security Related, 10CFR2.390(d)(1) 3 3.8.4-89 3.8.4 3.8.4-3 Security Related, 10CFR2.390(d)(1) 3 3.8.4-90 3.8.4 3.8.4-4 Security Related, 10CFR2.390(d)(1) 3 3.8.4-91 3.8.4 3.8.4-5 Security Related, 10CFR2.390(d)(1) 3 3.8.4-92 3.8.4 3.8.4-6 Security Related, 10CFR2.390(d)(1) 3 3.8.4-95 3.8.4 3.8.4-9 Security Related, 10CFR2.390(d)(1) 3 3.8.4-103 3.8.4 3.8.4-17 Security Related, 10CFR2.390(d)(1) 3 3.8.4-104 3.8.4 3.8.4-18 Security Related, 10CFR2.390(d)(1) 3 3.8.4-105 3.8.4 3.8.4-19 Security Related, 10CFR2.390(d)(1) 3 3.8.4-106 3.8.4 3.8.4-20 Security Related, 10CFR2.390(d)(1) 3 3.8.4-110 3.8.4 3.8.4-24 Security Related, 10CFR2.390(d)(1) 3 3.8.4-114 3.8.4 3.8.4-28 Security Related, 10CFR2.390(d)(1) 3 3.8.4-121 3.8.4 3.8.4-35 Security Related, 10CFR2.390(d)(1) 3 3.8.4-122 3.8.4 3.8.4-36 Security Related, 10CFR2.390(d)(1) 3 3.8.4-123 3.8.4 3.8.4-36a Security Related, 10CFR2.390(d)(1) 3 3.8.4-126 3.8.4 3.8.4-37 Security Related, 10CFR2.390(d)(1) 3 3.8.4-143 3.8.4 3.8.4-50 Security Related, 10CFR2.390(d)(1) 3 3.8.4-144 3.8.4 3.8.4-51 Security Related, 10CFR2.390(d)(1) 3 3.8.6-19 3.8.6 3.8.6-7 Security Related, 10CFR2.390(d)(1) 6 6.2.2-14 6.2.2 6.2.2-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-64 6.2.3 6.2.3-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-65 6.2.3 6.2.3-5 Security Related, 10CFR2.390(d)(1) 6 6.2.3-66 6.2.3 6.2.3-6 Security Related, 10CFR2.390(d)(1) 6 6.2.3-67 6.2.3 6.2.3-7 Security Related, 10CFR2.390(d)(1)

ENCLOSURE3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)

Section No.

Figure No.

Basis For Redaction 6

6.2.3-68 6.2.3 6.2.3-8 Security Related, 10CFR2.390(d)(1) 6 6.2.3-69 6.2.3 6.2.3-9 Security Related, 10CFR2.390(d)(1) 6 6.2.3-70 6.2.3 6.2.3-10 Security Related, 10CFR2.390(d)(1) 6 6.2.3-79 6.2.3 6.2.3-18 Security Related, 10CFR2.390(d)(1) 6 6.2.3-80 6.2.3 6.2.3-19 Security Related, 10CFR2.390(d)(1) 8 8.1-23 8.1 8.1-1 Security Related, 10CFR2.390(d)(1) 8 8.2-13 8.2 Security Related, 10CFR2.390(d)(1) and 8.2-14 8

8.2-30 8.2 8.2-3 Security Related, 10CFR2.390(d)(1) 8 8.2-31 8.2 8.2-4 Security Related, 10CFR2.390(d)(1) 8 8.2-44 8.2 8.2-11 Security Related, 10CFR2.390(d)(1) 8 8.3-99 8.3 8.3-1 Security Related, 10CFR2.390(d)(1) 8 8.3-101 8.3 8.3-2 Security Related, 10CFR2.390(d)(1) 8 8.3-102 8.3 8.3-3 Security Related, 10CFR2.390(d)(1) 8 8.3-104 8.3 8.3-4b Security Related, 10CFR2.390(d)(1) 8 8.3-207 8.3 8.3-46 Security Related, 10CFR2.390(d)(1) 8 8.3-220 8.3 8.3-59 Security Related, 10CFR2.390(d)(1) 9 9.2-208 9.2 9.2-40 Security Related, 10CFR2.390(d)(1) 9 9.4-286 9.4 9.4-21 Security Related, 10CFR2.390(d)(1) 9 9.4-290 9.4 9.4-22c Security Related, 10CFR2.390(d)(1) 9 9.4-291 9.4 9.4-23 Security Related, 10CFR2.390(d)(1) 9 9.4-292 9.4 9.4-24 Security Related, 10CFR2.390(d)(1) 12 12.3-41 12.3 12.3-1 Security Related, 10CFR2.390(d)(1) 12 12.3-42 12.3 12.3-2 Security Related, 10CFR2.390(d)(1) 12 12.3-43 12.3 12.3-3 Security Related, 10CFR2.390(d)(1) 12 12.3-44 12.3 12.3-4 Security Related, 10CFR2.390(d)(1) 12 12.3-45 12.3 12.3-5 Security Related, 10CFR2.390(d)(1) 12 12.3-46 12.3 12.3-6 Security Related, 10CFR2.390(d)(1) 12 12.3-47 12.3 12.3-7 Security Related, 10CFR2.390(d)(1) 12 12.3-48 12.3 12.3-8 Security Related, 10CFR2.390(d)(1) 12 12.3-49 12.3 12.3-9 Security Related, 10CFR2.390(d)(1) 12 12.3-50 12.3 12.3-10 Security Related, 10CFR2.390(d)(1) 12 12.3-51 12.3 12.3-11 Security Related, 10CFR2.390(d)(1) 12 12.3-52 12.3 12.3-12 Security Related, 10CFR2.390(d)(1) 12 12.3-53 12.3 12.3-13 Security Related, 10CFR2.390(d)(1) 12 12.3-54 12.3 12.3-14 Security Related, 10CFR2.390(d)(1) 12 12.3-55 12.3 12.3-15 Security Related, 10CFR2.390(d)(1) 12 12.3-56 12.3 12.3-16 Security Related, 10CFR2.390(d)(1) 12 12.3-57 12.3 12.3-17 Security Related, 10CFR2.390(d)(1) 12 12.3-58 12.3 12.3-18 Security Related, 10CFR2.390(d)(1) 12 12.3-59 12.3 12.3-19 Security Related, 10CFR2.390(d)(1) 12 12.4-7 12.4 12.4-1 Security Related, 10CFR2.390(d)(1)

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name File Size - Bytes TVAWBN-2_FSARFiles 001 TVA WBFSAR TOC.pdf 537,926 002WTVAWBFSARLEP.pdf 753,751 003_TVA WB FSAR Section 1.pdf 4,564,354 004 TVA WB FSAR Section 2 A.pdf 10,885,919 005WTVAWBFSARSection_2_B.pdf 21,212,923 006 TVAWBFSARSection_2_C.pdf 2,073,213 007WTVAWBFSARSection 2_D.pdf 31,335,862 008WTVAWBFSARSection_2_E.pdf 47,242,160 009 TVA WB FSAR Section 3 A.pdf 2,619,007 010 TVA WB FSAR Section_3_B.pdf 7,035,003 01 W-VA WB FSARSection_3_C.pdf 30,018,925 012WTVA WB FSAR Section 3 D.pdf 5,904,997 013 TVA WB FSAR Section 4.pdf 17,555,736 014 TVA WB FSAR Section 5.pdf 11,025,985 015WTVAWBFSAR Section 6 A.pdf 18,485,393 016 TVA_WBFSARSection_6_B.pdf 7,501,726 017 TVA WB_ SARSection_7.pdf 8,372,586 018_-VAWBFSAR Section 8.pdf 30,122,186 019 TVAWBFSARSection 9 A.pdf 23,136,998 020WTVA WB FSAR Section 9_B.pdf 20,715,421 021 WTVAWBFSARSectionI 0.pdf 13,416,943 022WTVAWBFSARSectionI 1.pdf 3,927,239 023 TVA WB FSAR Section 12.pdf 7,025,098 024WTVAWBFSARSectionI 3.pdf 463,723 025 TVA WBFSARSection_ 14.pdf 1,396,432 026WTVA WB FSAR Section 15.pdf 14,869,229 Page 1 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name File Size - Bytes 027 TVA WBFSAR Section 16.pdf 161,788 028 TVA WB FSAR Section 17.pdf 163,900 Total 342,524,423 TVAWBN-2_Oversized_FSARFigures 001_TVA WB FSAR Figure 2.5 3.pdf 1,757,743 002_TVA WBFSAR Figure 2.5 11.pdf 1,689,538 003 TVA WBFSAR Figure 2.5 71.pdf 2,263,087 004_TVA WB FSAR Figure 2.5 222.pdf 909,429 005_--VAWBFSARFigure 2.5 281 1.pdf 2,155,627 006_TVA WB FSARFigure 2.5 281_2.pdf 2,117,562 007 TVA WB FSAR Figure 2.5 549_1.pdf 3,600,807 008-TVAWBFSAR Figure 2.5 549 2.pdf 3,989,180 009-TVA WBFSARFigure 2.5 549_3.pdf 2,863,719 010_TVAWBFSAR Figure 2.5 549 4.pdf 2,809,599 011_TVAWBFSAR Figure 2.5 550.pdf 1,803,985 012-TVA WBFSARFigure 2.5 551.pdf 1,996,869 013 TVA WB FSAR Figure 2.5 554 1.pdf 3,081,060 014 TVA WB FSAR Figure_2.5_554 2.pdf 1,996,707 015_TVAWBFSARFigure 2.5 555.pdf 1,993,312 016_TVAWBFSAR Figure 2.5_556.pdf 2,998,087 017_TVA WB FSAR Figure 2.5_571_1.pdf

'844,484 018-TVA WBFSAR Figure 2.5 571 2.pdf 3,128,329 019_TVAWBFSAR Figure_2.5_571 _3.pdf 3,284,555 020-TVAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021 TVA WBFSAR Figure 2.5 572.pdf 2,196,945 022 WVA WB FSAR Figure 2.5 573.pdf 2,013,286 Page 2 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name File Size - Bytes 023_TVAWBFSARFigure 2.5 576_1.pdf 3,238,525 024_TVA WBFSAR Figure 2.5 576 2.pdf 2,151,750 025-TVA WB FSAR Figure 2.5 577.pdf 2,207,622 026_TVAWBFSAR Figure 2.5 578.pdf 2,080,032 027-TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028 TVA WBFSAR Figure 2.5 583.pdf 2,487,346 029_TVAWBFSAR Figure 2.5 588.pdf 2,528,515 030-TVA WB_FSAR Figure 2.5 589.pdf 2,480,438 031_TVAWBFSAR Figure 2.5 594.pdf 13,054,127 032_TVAWBFSAR Figure 2.5 595.pdf 2,323,267 033_TVA WBFSAR Figure 2.5_596.pdf 5,732,107 034_TVA WB FSAR Figure 2.5 597.pdf 1,287,336 035 TVA WBFSAR Figure 2.5 602.pdf 5,549,537 036_TVA WBFSAR Figure 2.5 603.pdf 4,830,835 037_TVA WB FSAR Figure 2.5 604.pdf 6,392,279 038-TVAWBFSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVAWBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf 2,899,519 Total 2,899,519 Page 3 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSARAmendment 95 List of Files on Publicly Available OSM File Name File Size - Bytes TVA WBN-2 FSARFilesREDACTED 001 TVA WBFSARTOC.pdf 537,926 002_TVA WBFSARLEP.pdf 753,751 003 TVA WB FSAR Section 1. pdf 1,069,968 004 TVA WBFSAR Section 2_A.pdf 10,548,551 005WTVA WB FSAR Section 2_B.pdf 15,820,719 006 TVA WB FSAR Section 2_C.pdf 2,073,197 007_-VAWBFSAR Section 2_D.pdf 31,335,862 008 WVA WB FSAR Section 2_E.pdf 46,018,892 009 TVA WB FSAR Section 3_A.pdf 2,334,359 010WTVAWBFSARSection_3_B.pdf 5,740,215 011 TVA WB FSAR Section 3_C.pdf 25,401,100 012WTVA WB FSAR Section 3_D.pdf 5,643,654 013_-VAWBFSARSection_4.pdf 17,555,718 014 TVA WB FSAR Section 5.pdf 11,025,982 015 TVA WBFSAR Section 6_A.pdf 13,987,035 016_-VAWBFSARSection_6_B.pdf 7,501,726 017 TVA WB FSAR Section_7.pdf 8,372,586 018_WVA_WBFSARSection_8.pdf 27,528,640 019WTVA WB FSAR Section_9_A.pdf 22,901,163 020 TVA WB FSARSection 9_B.pdf 13,866,916 021 TVA WBFSAR Section 10.pdf 13,416,930 022_-VA WB FSAR SectionI 1.pdf 3,927,216 023 WVA WB FSAR Section 12.pdf 1,980,681 024 WVA WB FSAR Section 13.pdf 463,726 025WTVA WB FSAR Section_14.pdf 1,386,504 026 TVA WBFSAR Section 15.pdf 14,869,229 027_-VA WB FSAR Section 16.pdf 161,788 Page 1 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 List of Files on Publicly Available OSM File Name File Size - Bytes 028 TVA WB FSAR Section 17.pdf 163,900 Total 306,387,934 TVAWBN-2_Oversized_FSARFigures 001 -VA WBFSARFigure 2.5_3.pdf 1,757,743 002_TVA WBFSARFigure 2.5 11.pdf 1,689,538 003 TVA WB FSAR Figure 2.5 71.pdf 2,263,087 004-TVAWBFSAR Figure 2.5 222.pdf 909,429 005-TVAWBFSAR Figure 2.5 281 1.pdf 2,155,627 006-TVAWBFSARFigure 2.5 281 2.pdf 2,117,562 007-TVAWBFSARFigure 2.5_549 l.pdf 3,600,807 008_-VA WBFSAR Figure 2.5 549 2.pdf 3,989,180 009-TVAWBFSAR Figure 2.5 549 3.pdf 2,863,719 010 TVA WB FSAR Figure 2.5 549 4.pdf 2,809,599 011_-VAWBFSARFigure 2.5 550.pdf 1,803,985 012_-VAWBFSARFigure 2.5 551.pdf 1,996,869 013-TVA WB FSAR Figure 2.5 554 1.pdf 3,081,060 014_-VA WB FSAR Figure 2.5 554 2.pdf 1,996,707 015_WVA WB FSAR Figure_2.5 555.pdf 1,993,312 016 TVA WB FSAR Figure 2.5 556.pdf 2,998,087 017WTVA WB FSARFigure 2.5 571 1.pdf 844,484 018_-VA WBFSAR Figure 2.5 571 2.pdf 3,128,329 019_-VAWB FSAR Figure 2.5 571_3.pdf 3,284,555 020_-VAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021_-VAWBFSAR Figure 2.5 572.pdf 2,196,945 022_-VAWBFSARFigure 2.5 573.pdf 2,013,286 023 WVA WBFSARFigure 2.5_576 l.pdf 3,238,525 024_WAWBFSAR Figure 2.5 576 2.pdf 2,151,750 Page 2 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 List of Files on Publicly Available OSM File Name File Size - Bytes 025_TVAWBFSARFigure 2.5 577.pdf 2,207,622 026_TVA WB FSAR Figure_2.5_578.pdf 2,080,032 027-TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028_TVAWBFSARFigure 2.5_583.pdf 2,487,346 029_TVAWBFSAR Figure_2.5 588.pdf 2,528,515 030_TVA WBFSAR Figure 2.5 589.pdf 2,480,438 031 WTVAWBFSARFigure 2.5 594.pdf 13,054,127 032 TVA WBFSAR Figure 2.5 595.pdf 2,323,267 033WTVAWBFSAR Figure 2.5 596.pdf 5,732,107 034_TVAWBFSAR Figure 2.5 597.pdf 1,287,336 035WTVAWBFSAR Figure 2.5 602.pdf 5,549,537 036_TVA WBFSAR Figure 2.5 603.pdf 4,830,835 037_TVAWBFSAR Figure 2.5 604.pdf 6,392,279 038WTVA WBFSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA WBN-2_OversizedFSARTable 001W-VA WB FSARTable_6.2.4-1.pdf 2,899,519 Total 2,899,519 Page 3 of 3