Letter Sequence Other |
|---|
TAC:M95298, Implement 10 CFR 50, Appendix J, Option B, TSTF-45, TSTF-17 (Open) TAC:M95299, Implement 10 CFR 50, Appendix J, Option B, TSTF-45, TSTF-17 (Open) |
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML20151Y172, ML20151Y235, ML20195K191, ML20199E417, ML20199J107, ML20204E179, ML20205B616, ML20205M674, ML20216B753, ML20216B957, ML20217B718, ML20217E628, ML20217E973, ML20236M023, ML20236M874, ML20237A261, ML20248L685, ML20248L705, ML20249C577
|
MONTHYEARML20198K1961997-10-16016 October 1997 Notification of 971030 Meeting W/Util in Rockville,Md to Discuss Matters Re Proposed Improved TSs for Catawba & McGuire Project stage: Meeting ML20199E4171997-11-14014 November 1997 Forwards from NRC to Nuclear Energy Inst Re Hb Robinson Improved STS Conversion License Amend,For Info & Consiideration in Efforts to Convert to Improved STS Project stage: Other ML20199J3121998-01-30030 January 1998 Forwards RAI on Section 3.6 Containment Sys.Response Requested within 45 Days Project stage: RAI ML20216B7531998-03-0909 March 1998 Responds to 980116 RAI Related to Sections 3.1 & 3.2 of Proposed Improved TS Submitted on 970527.Provided in Encls 1 & 2 Are Responses to Comments on Sections W/Changes to Improved Ts.Encl 3 Contains Suppl Changes Project stage: Other ML20216B9571998-03-0909 March 1998 Responds to 980116 RAI Related to Sections 3.1 & 3.2 of Proposed Improved TSs Submitted by Duke Energy on 970527. Provided in Encls 1 & 2 Are Responses to Comments on Sections W/Changes to Improved TS Project stage: Other ML20217B7181998-03-20020 March 1998 Forwards Responses to Comments on Section 3.6 of Proposed Improved TS (ITS) Submitted by Util on 970527,retyped Pages for ITS 3.6 Specs & Bases & Changes to ITS 5.5.2 Project stage: Other ML20217E6281998-04-20020 April 1998 Forwards Responses to Comments on Section 1.0,2.0,3.0 & 4.0 of Proposed Improved Tech Specs Submitted by Duke Energy on 970527.Changes Denoted by Rev Bars to Facilitate Staff Review Project stage: Other ML20217E9731998-04-20020 April 1998 Provides Responses to Comments on Sections 1.0,2.0,3.0 & 4.0.Changes Denoted by Rev Bars to Facilitate Staff Review Project stage: Other ML20217L0491998-04-28028 April 1998 Forwards Request for Addl Info Re Proposed Improved Standard TS Project stage: RAI ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations Project stage: Meeting ML20248E7911998-06-0101 June 1998 Summary of 980518 Meeting W/Duke Energy Corp Re Technical Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Meeting Participants Encl Project stage: Meeting ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations Project stage: Meeting ML20248L6851998-06-0303 June 1998 Forwards Suppl 4 to Improved TS Pages,In Response to NRC 980415 & 28 Ltrs Requesting Addl Info Re Util 970527 Submittal.Revs Listed Project stage: Other ML20248L7051998-06-0303 June 1998 Forwards Responses & Improved Tech Specs Pages to 980415 & 28 RAIs Re Sections 3.5,3.7,5.0,3.3.1,3.8 & 3.9.Changes Denoted by Rev Bars to Facilitate Staff Review.Revised Attachment 6 to Licensee 970527 Submittal,Encl Project stage: Other ML20249C5771998-06-24024 June 1998 Forwards Suppl 5 to Improved Tech Specs,In Response to 980415,28,0514 & 22 RAIs Re Util 970527 Submittal.Revs Listed Project stage: Other ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations Project stage: Meeting ML20249C7711998-06-29029 June 1998 Summary of 980617 & 18 Meetings W/Duke Energy Corp Re Technical Matters Related to Proposed Improved TSs for Catawba & McGuire Nuclear Stations.List of Meeting Attendees Encl Project stage: Meeting ML20236M0231998-07-0707 July 1998 Forwards Suppl 6 to Improved Tech Specs,In Response to 980706 RAI Re Util 970527 Submittal.Changes Denoted by Rev Bars to Facilitate Staff Review Project stage: Other ML20236M8741998-07-0707 July 1998 Forwards Responses to NRC 980707 RAIs Re Proposed Improved Tech Specs Submitted by Util on 970527 Project stage: Other ML20236P1761998-07-13013 July 1998 Summary of 980709-10 Meeting W/Util Re Technical Matters Related to Proposed Improved TS for Catawba & McGuire Nuclear Stations.List of Meeting Participants Encl Project stage: Meeting ML20236U0921998-07-21021 July 1998 Forwards Suppl 7 to Improved Tech Specs,In Response to Addl Items Identified at 980617,18,0709 & 10 Meeting.Resolution of All Open Items & Addl Clarifications Are Included in Encl Project stage: Meeting ML20236U0841998-07-21021 July 1998 Forwards Suppl 7 to Improved Tech Specs,In Response to Addl Items Identified During 980617,18,0709 & 10 Meetings. Resolution of All Open Items & Addl Clarifications Are Included in Encl Project stage: Meeting ML20237A0381998-08-0505 August 1998 Requests That Approved Improved TS (ITS) Be Issued in Single Combined Volume as Discussed in Meeting W/Nrc on 980710. Combined ITS Versions of Pages Where Differences Between Two Units Are Noted & Changes Necessary to ITS Section 3.0,encl Project stage: Meeting ML20237A0281998-08-0505 August 1998 Requests That Approved Improved TS (ITS) Be Issued in Single Combined Volume as Discussed in Meeting W/Nrc on 980710. Combined ITS Versions of Pages Where Differences Between Two Units Are Noted & Changes Necessary to Its,Section 3.0,encl Project stage: Meeting ML20237A2611998-08-11011 August 1998 Notice of Consideration of Issuance of Amend to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Revise Ts,Deleting Surveillance Requirement 4.8.1.1.2.i.2 Project stage: Other ML20151T9411998-09-0808 September 1998 Submits Markup of Draft SE W/Annotated Comments.Encl 2 of Ltr Provides Changes Necessary to ITS Submittal,As Amended to Resolve Open Items Identified within Draft SE & Items Identified by Util.Encl 4 Provides Final Proposed TS Project stage: Draft Other ML20151U3361998-09-0808 September 1998 Forwards Markup of Draft SE W/Annotated Comments.Encl 2 Provides Changes Necessary to Improved Tech Specs Submittal, as Amended to Resolve Open Items Identified within Draft SE & Items Identified by Util.Final Proposed TS Encl Project stage: Draft Other ML20151Y1721998-09-15015 September 1998 Provides Rev to Proposed License Condition as Required to Address Scheduling of New or Revised Surveillance Requirements.Changes Necessary to Improved Ts,To Resolve Items Identified by Util During Review,Encl Project stage: Other ML20151Y2351998-09-15015 September 1998 Provides Rev to Proposed License Condition as Requested to Address Scheduling of New or Revised Surveillance Requirements.Encl 2 of Ltr Provides Changes Necessary to Improved TS Submittal,As Amended to Resolve Items Project stage: Other ML20195K1911998-11-20020 November 1998 Forwards Correction of Error on TS Page for Catawba Nuclear Station,Units 1 & 2.Page 3.6.17-3,which Contains Requirements on Containment Valve Injection Water Sys,Should Have Been Numbered Page 3.6.17-1 Instead Project stage: Other ML20199J1071999-01-21021 January 1999 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 Project stage: Other ML20204E1791999-03-18018 March 1999 Reflects 990318 Telcon Re License Bases Record Change for License Amend Submittals ,approved as Amends 184 & 166,respectively for Licenses NPF-9 & NPF-17.TS Pages Encl Project stage: Other ML20205B6161999-03-23023 March 1999 Provides Addl Info & Correction to Typo in Re License Bases Record Change Re License Amend Submittals ,approved as FOL NPF-9 & NPF-17,amends 184 & 166, respectively.Marked-up TS Pages,Encl Project stage: Other ML20205M6741999-04-13013 April 1999 Discusses 980318 Telcon of Licensing Bases Record Change Re Duke Energy Corp License Amend Request, & Staff Approval in Form of TS Amends 184 & 166,dtd 980930.Forwards Revised Pp to SE of 980930 Project stage: Other 1998-06-25
[Table View] |
Text
e.
p 4-Duke Power Company A Ekke Ewy Cenepny EC07H wwww 526 South Church Street PO. Ilox 1006 Charlotte, NC 28201-1006 M. S. Takman hecutiw We hident (7M)382-2200 omct Nudrar Generation (7M) 382-4360 nx April 20, 1998 U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Attention:
Document Control Desk
Subject:
Catawba Nuclear Station Docket Numbers 50-413, and -414 Improved Technical Specifications, Supplement 3 TAC Nos. M95298 and M95299 By letter dated March 27, 1998, the NRC transmitted a L
request for additional information related to Sections 1.0, 2.0, 3.0, and 4.0 of the proposed Improved Technical Specifications (ITS) submitted by Duke Energy May 27, 1997. of this letter provides responses to the comments on this section.
Immediately following each staff comment (or group of comments) are changes to the ITS submittal necessary to resolve the staff's comment and supplement the initial ITS submittal.
Changes are denoted by revision bars to facilitate staff review.
1 i
Attachments 5 and 6 of the initial ITS submittal identified changes to the current license which were in addition to changes solely necessary to convert to the improved technical specification format.
Upon discussion with the j
staff, the proposed change to the definition of Dose Equivalent Iodine-131 is being withdrawn from consideration at this time.
The revised pages are provided in Enclosure 2 along with revised Attachments 5 and 6 which include removal of this item and identifies additional beyond scope changes I
included in ITS Supplements 1 and 2.
The pages provided in Enclosures 1 and 2 in this response replace the corresponding pages in the May 27, 1997 submittal, Supplement 1 provided March 9, 1998, and Supplement 2 provided March 20, 1998.
In accordance with Duke administrative procedures and the Quality Assurance Program Topical Report, this response to 9804280017 980420
\\
PDR ADOCK 05000413
\\9 0s P
PDR
'\\
$v-
s U.
S. Nuclear Regulatory Commission April 20, 1998 Page 2 the request for information has been discussed with representatives of the Catawba Plant Operations Review Committee and the Nuclear Safety Review Board and determined to be within the scope of the original review.
Pursuant to 10 CFR 50.91(b) (1), a copy of this amendment has been provided to the appropriate State of South Carolina officials.
If any additional information is needed, please call Lee A.
Keller at 704-382-5826.
Very truly yours,
\\. 3
M.
S. Tuckran Enclosures xc:
w/ enclosures Mr.
L. A.
Reyes Administrator, Region II U.
S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, GA 30303 Mr.
P.
S. Tam U.
S. Nuclear Regulatory Commission Mail Stop O-14 H25 Washington, DC 20555 Mr.
D.
J.
Roberts Senior Resident Inspector Catawba Nuclear Station Max Batavia, Chief Bureau of Radiological Health S.
C.
Department of Health & Environmental Control 2600 Bull Street Columbia, SC 29207 l
4 U.
S. Nuclear Regulatory Commission April 20, 1998 Page 3 M.
S. Tuckman, being duly sworn, states that he is Executive Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission revisions to the Facility Operating Licenses of Catawba Nuclear Station; and that all the statements and matters set forth herein are true and correct
)
to the best of his knowledge.
X. S. fik M.
S. Tuckman, Executive Vice President Subscribed and sworn to before me this 20Y day of Mr> Al i 1998 i
L Nota'ry hublic My Commission Expires:
Saa
- 22. zei
s.
l l
i ENCLOSURE 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION SECTIONS 1.0, 2.0, 3.0, and 4.0 l
l l
C Catawba and McGuire Improved TS Review Comments Section 1.0, Use and Application 1.0-01 JFD 5 Definition of Channel Calibration Definition of Channel Operational Test (COT)
Definition of Trip Actuating Device Operational Test (TADOT)
The ITS definitions of Channel Calibration, COT, and TADOT omit " display" from the list ofitems encompassed by these surveillances. Although this is consistent with the CTS definitions, the display should be included. For example, the post-I accident monitoring instrumentation channels are display only; the proposed definitions would not seem to apply to those instruments. Comment: Revise the two definitions to adopt the word " display" consistent with the STS. Also note that the proposed definitions, if accepted, may require other changes in Section 3.3 and associated Bases.
DEC Response:
)
i The CTS definition is revised to include required displays within the scope of CHANNEL CALIBRATION. The majority of CTS channels which require a calibration are those that perform trip or actuation functions. For those channels, a display is not required to perform the required function, and the display is not required to be calibrated to meet the requirements for OPERABILITY of the channel. However, CTS 4.3.3.6 requires a calibration of the post accident monitoring channels. These required channels are the display portions of the instrument loop only, therefore, the inclusion of required displays within the ITS definition of CHANNEL CALIBRATION is an administrative clarification consistent with current requirements and practices.
The COT and TADOT demonstrate the functional ability of actuation devices which change state in response to a change in a monitored parameter, e.g.
interlocks, bistables, and or alarms. A display provides indication only information and performs no " actuation" function, therefore, the inclusion of displays within these tests is inappropriate and inconsistent with current technical specifications and current practice. Displays which are required operable by Technical Specifications (e.g. post accident monitoring indicators) are calibrated to ensure their functional ability to display required information.
i The NUREG specifications related to displays or indicators are those associated l
with Post Accident Monitoring and Remote Shutdown. These specifications do not require the performance of a COT. A TADOT is specified by the NUREG for reactor trip breaker indication, but was not adopted by the ITS because it is not part of the current requirements and an indication performs no " actuation" function. Therefore, there are no ITS Bases revisions required by maintaining the current license basis definitions of COT and TADOT.
mc3_cr_1.0 1
April 20,1998