ML20151X119

From kanterella
Jump to navigation Jump to search
Transmits Suppl Draft Rept to AEC, Adequacy of Structural Criteria for Diablo Canyon Site Nuclear Plant, for ACRS Review
ML20151X119
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 09/15/1967
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Palladino N
Advisory Committee on Reactor Safeguards
Shared Package
ML20151W779 List:
References
FOIA-88-156 NUDOCS 8808250229
Download: ML20151X119 (1)


Text

T '

g..

C UNITED STATES V

ATOMIC ENERGY COMMISSION l

l-wAsmNGTON. D C.

205 4 September 15, 1967 Docket No. 50-275 Mr. Nunzio Palladino Chairran, Advisory Committee on Reactor Safeguards U. S. Atonic Energy Commission Washington, D. C.

Dear Mr. Palladino:

Transmitted for the review of the Cor:nittee are eighteen copies of the following:

PACITIC GAS AND ELECTRIC COMPANY (Diablo Canyon Site Nuclear Plant)

Draft Report to ASC Regulatory Staff concerning the adequacy of the structural criteria for the Diablo Canyon Site Nuclear Plant, by Newmark and Hall, dated Septe=ber 7,1967.

3:5LIEl"2IC.:

Su;;1.4 C

RIS-2 Reading R. 5. Boyd Sincerely yours, li. Steele s

Peter A. Morris, Director Division of Reactor Licensing Enclosures :

As stated above OFFKt >

I.

-~~

- ~ - - - - - - - - - - -

usteel**b SURN4WE >

-. ~.. -

DATT >

nirm ac sia me.. e-m

..........m....->..

i+-wei-

  • u 8"

-( 6 i

8800250229 800721 PDR FOIA MCMILLAG8-156 PDR