Responds to Re NRC 801024 Order Modifying OL Re Environ Qualification of safety-related Equipment.Review Identified All Items Previously Noted in 800403,0814,1031 & 810130 Response to IE Bulletin 79-01B
ML20003E420
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/27/1981
From: Crouse R
TOLEDO EDISON CO.
To: Novak T
Office of Nuclear Reactor Regulation
References
707, IEB-79-01B, IEB-79-1B, TAC-42508, NUDOCS 8104030432
Download: ML20003E420 (2)


Text

s

.a TOLEDO EE)lEIC)PJ Docket No. 50-346 License No. NPF-3 Acamo P CCASE

a. %

%c ear Serial No. 707 wisi nsaaai March 27, 1981 Director of Nuclear Reactor Regulation Attention:

Mr. Thomas M. Novak, Assistant Director Division of Licensing United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Novak:

This is in response to your letter dated March 16, 1981 relating to the October 24,1980 NRC Order of Modification of License Concerning the Environmental Qualification of Safety-Related Electrical Equipment at the Davis-Besse Nuclear Power Station, Unit No. 1 (DB-1).

You requested a review of the identified deficiencies and their ramifications to provide you an overall finding regarding continued safe operation of the Davis-Besse facility.

Toledo Edison has completed the review of the NRC staff's Equipment Evaluation Report.

No items were identified that were cet previously documented in our submittals to IE Bulletin 79-OlB of April 3, August 14, October 31, 1980 and January 30, 1981. None of the NRC defined deficien-cies has alt. red our overall finding supporting the continued safe oper-ation of Davis-Besse.

Toledo Edison's documented responses demonstrate the ability to bring the plant to, and maintain the plant in a sefe shutdown condition following the loss of coolant, or a high energy line break, using equipment that is qualified to perform its safety related function in any harsh environment that may result.

Revision 4 to Toledo Edison's response to IE Bulletin 79-015 is under

. preparation at this time. This revision will eliminate many of the identified deficiencies.

Very truly yours,

.b C

/9

/

RPC:TJM: lab k

cc: DB-1 NRC Resident Inspector THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MACISON AVENUE TOLEDO. CHIO 43652

-810 4 0 3 OfJ.2 Q

4 7-SUBMITTAL IN RESPONSE TO NRC LETTER DATED MARCH 16, 1981 FOR THE DAVIS-BESSE NUCLEAR POWER STATION UNIT 1 FACILITY OPERATING LICENSE NPF-3 This response is. filed in accordance with 10CFR 50.54(f). This letter

- respond's to an NRC request relating to the environmental qualification of Class IE equipment at the Davis-Besse. Nuclear Power Station, Unit 1.

by Director, Nuclear Engineering and Construction for R. P.'Crouse Vice President, Nuclear Sworn to and subscribed before me this twenty seventh day of March, 1981.