MAR 21 1980 MEMORANDUM FOR:
R. Minogue Director, 50 W. Dircks, Director, NHSS H. Denton, Director, NRR R. Budnitz, Director, RES V. Stello, Director, IE J. Fouchard, Director, OPA D. Donoghue. Director, ADM H. Shapar, Director, OELD J. Shea, Director, IP G. Wayne Kerr, Acting Director, SP FROM:
Carl Michelson. Director Office for Analysis and Evaluation of Operational Data
SUBJECT:
DRAFT 3 0F THE TMI ACTION PLAN As requested by W. J. Dircks' :nemo, dated March 12, 1930, enclosed are the task schedules for the Action Plan items for which AE00 is the lead office.
Carl Hichelson, Directer Office for Analysis and Evaluation of Operational Data
Enclosure:
As stated cc w/ enclosure:
R. Mattson Distribution:
-Central File AEOD Reading File AE00 Chron. File FHebdon, AE00 CJHeltemes, AE00 CMichelson, AEOD g.
, f AEOD.[,),
.].
cr rect ).
" 00 J
l su n sauc k.FHL an.:gt..CJH emes.
.Cilichel.sdo.
8 S O 4 0 P 0 9. 3 2..
ca r c )... al..l80 L 3/ /.60
,. 3/Y /8.0 sac renu na m6 sac.i o.no c 2.s. mve nwc a an.s risc or rice : n,.2sv.2ss y
AT T ACFC'.f::I1 OFFICE:
AEOD TASK SCHEIRJLE DATE: March 18, 1930 ldentify any Cccpletion dates tvithin initiate Action each task (for t,oth f,RC and licensee Priority List an.1,, A t l e Icad Office actions) that should t;e changed 1
Croup I:
Decision Group A: Action Item Alre Jy Approved I.A.2.1 Imed i a t e 13pgrade of k0 & SkO Qualifications NRR I.E.1 Office fer Analysis & Evaluation of Operational Data AECa ClOber 1979
_Jone I.E.2 Office Pro L in Analysis & Dishem. of Opera. Exper.
EDO I.E.3 Operating Experience Data Analysis II.B.6 Risk heduc. for Degrajed/ Melted Cores at High Popu. Sites II.C.1 Initial Integrated kelia. Fvaluation Prcer4m (IREP)
II.C.3 Systems 11.t e r a c t ion in h e l t a t,111 t v Engineering II.E.2.2 henearch on The Em-rgency Core Cooling Svatem b
II.E.4.4 M G E of Containa.cnt II.H.1 TM1-2 Safey Ex-mination II.K.2 Concission Orders on B&W Plants I'
III.B.2 lu.plement at ten of NkC & FDIA kespan. In 1ocal Emer Prepar.
Decisten Ctaup b: Action Item To Be Approved By Approval Of Action Pla;l 1.A.2.3 Plant Drills I.A.
Initial Simulator i n.p rov eme n t 1.D.1 Cgtrol Room Design Revleu I.D.2 Saf et y Par 4 mete r Console NRR
CFFICE:
AEOD ATTAOcEt;I I TAsx snacutr DATE: brch 18, 980 Priority List anJ Title Identify any completion dates within teaa ottice Initiate Action each task ( f or t,oth f.RC and licensee utions) that should be chanced Decision Croup B:
(Cont'd)
I.D.4 Control koom Design Standard 50 I.E.4 Coordination of Programm for Analysis of Opera. Emper.
- 1 f4 '.OD October 1979 rione II.E.3.2 Svstems Reliability in Dec ay heat kemoval fM II.K.3 M 1 Recom. of B.50 TF on $m.-Break LOCA's k tfFA's Decision Croup C:
Separate Conmission Decision kequirrJ 1.A.2.c 1.on.-Term Upgradine, in Trainty g. rating Perssonnel SD I.B.l.1 Organizatton & Man.syement lonr-Term Ittprovement_s_ _
I4 "
1.C.9 long-Term Program Plan For Oper at ling ProceJurcs h%
SRt1DiT1tF-t1TanTle JunF-198t"tv 1.E.6 Reporting Requirements in Analysis of Opera. EFper.
AE D ClOber 1979 read ".lanuarv 1981" (This is to II.J.3.1 xanagement organirs. 6 statring for Design 6 construe.
fiPR Correct a typographical error.)
I[.A.1 Aness Current}v Operating krattors I;FR
.