UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ELEMENT REPORT NO. 21300 "ELECTRICAL TESTING ANO PLANNING" TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 2 1.0 'NTROOUCTION The issues in this element report were derived from two employee concerns which cited deficiencies or inadequacies in engineering participation in the preoperational test program of the plant systems.

The two concerns identified in the element report were identified for the Watts Bar Nuclear Plant.

TVA considered these concerns sufficiently broad however, to apply them to all four TVA nuclear p'lants.

This SER only addresses these concerns for the Browns Ferry Nuclear (BFN) Plant, Unit 2.

2.0 EVALUATION 2.1

~Back round t

The specific findings identified by TVA for BFN are as follows:

o En ineerin rocedures and site standard ractices relati 9

9 P

P ng to the pre-operational test program are not fully adequate to ensure incorporation of a11 design requirements including procedural requirements for the processing of preoperational test documents and, in some instances, not followed.

This has resulted in discrepancies in test results packages.

o There were no documented acceptance criteria in the initial TVA-prefix test scoping documents and preoperational test instructions.

o FSAR commitments were not fully reflected in the acceptance criteria of the test documents.

2.2 Corrective Action o

Test results packages were found to have procedural inconsistencies and/or deficiencies.

Engineering review of test results was not adequate because some test packages were approved with open exceptions and no documentation was available to identify the closure of these exceptions.

TVA addressed the concern of system testing in the Nuclear Performance

Plan, Volume 3, Special Programs III, Section 8.

TVA stated that " The operability of the Browns Ferry Nuclear Plant (BFN) plant systems and their capability to perform their safety functions are under scrutiny due to prolonged plant shut-down and extensive modifications.

BFN will conduct a Restart Test Program

. 9006210235 90053i PDR ADQCK 05000259 P

PNU

N$ H

~<~" H ~I 4h

(RTP) to ensure that plant systems are capable of meeting their safe shutdown requirements."

The staff has reviewed the RTP and documented their finding in the Safety Evaluation Report on TVA BFN Performance

Plan, NUREG-1232, Vol. 3.

The staff concluded that on the basis of their review that continued implementation of the BFN RTP, as currently constructed, will ensure proper verification of the functional integrity of the safety systems at BFN Unit 2.

3. 0 CONCLUSION TVA has developed an extensive review to re-verify plant design.

As a result of this review a major restart test program has been developed to resolve employee concerns regarding the quality of testing/review performed during the initial preoperational test and retest programs.