05000344/LER-1981-008, Forwards LER 81-008/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 81-008/03L-0.Detailed Event Analysis Encl
ML20004C032
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/18/1981
From: Yundt C
PORTLAND GENERAL ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20004C033 List:
References
CPY-394-81, NUDOCS 8106010451
Download: ML20004C032 (3)


LER-1981-008, Forwards LER 81-008/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3441981008R00 - NRC Website

text

.

/'

7 r~, g / J;s./

~

.r: 1:n,c umyr.

n:

e

~-

r

,i' '

)

s

'

  • t.}

May 18, 1981 n;;

m.

CPY-394-81 4*[A

(

c

/4

/.

- g Mr. R. H. Engelken, Director 3 '[f -q 7

O 4

Nuclear Regulatory Commission, Region V 1990 North California Blvd.

'l

  • ki Walnut Creek, CA 94596

' 'Q3fs x

Dear Sir:

In accordance with the Trojan Plant Operating License, Appendix A, US hTC Technical Specifications, Paragraph 6.9.1.7, attached is Licensee Event Report No. 81-08, concerning a situation where the Technical Specification for containment isolation valves was not satisfied due to an inoperable valve.

Sincerely, sM C. P. Yundt General Manager CP fatPS:na Attachments c:

LER Distribution 4

/'N

~7

.x CN nGLgdD%^

MAY 2 91931 4 H.

}sssmmv m f)j scmum N

5

/t

%D 41 e

U 0

9 l'95 \\

8106001 % \\

S SHl4

2 n

}

~ 9.

Corrective Action

All water damage to the operator was repaired and the motor was replaced.

The circuit was checked and the valve was successfully tested and returned to operation. Further overhaul of the operator will be done during the 4

1981 Refueling Outage.

An engineering evaluation will be made to determine if the location of the valve should be changed.

Administrative controls have been established to prevent flooding of the of the containment recirculation sump in the future.