Hurricane David
Jump to navigation
Jump to search
31 August 1978
- See also: Hurricane
Scrams (0)
General
| Start date | Site | Title | |
|---|---|---|---|
| ML24177A020 | 31 July 2024 | Accident Sequence Precursor (ASP) Program Summary Description, Revision 2 | |
| L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report | 12 October 2021 | Saint Lucie | Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report |
| ML21081A038 | 22 March 2021 | Probabilistic Risk Assessment (PRA) Lessons from Storms and Floods | |
| ML20049G020 | 24 February 2020 | ASP Program Summary Description (Revision 1) | |
| ML18135A109 | 20 June 2018 | Qualitative PRA Insights from Operational Events | |
| ML20214M104 | 5 September 1986 | Perry | Transcript of 860905 Meeting in Washington,Dc Re Full Power OL for Plant.Pp 1-112 |
| ML20137L968 | 26 November 1985 | Harris | Identifies Various Exhibits Which Applicant,Nrc & FEMA Have Agreed May Be Admitted to Record & Exhibits Not Agreed to |
| ML20209G198 | 9 September 1985 | Transcript of 850909 Public Meeting in Washington,Dc Re Earthquakes & Emergency Planning.Pp 1-97 | |
| ML20112C401 | 10 September 1984 | Harris | Intervenor Exhibit I-JOINT-24,consisting of Attachment I-16 Listing of Offline Outages at Brunswick & Robinson Nuclear Units for 1978-83 |
| ML20092E231 | 3 May 1984 | Catawba | Applicant Exhibit A-EP-13,consisting of 840416 Testimony of Je Neves,Jt Pugh,J Gregory,Pr Lunsford,Wm Mcswain, Be Phillips,Lw Broome,D Johnson & P Needham Re Emergency Planning Contention 3 |
| ML20084F916 | 1 May 1984 | Harris | Answers to Joint Intervenors Interrogatories & Request for Production of Documents to Applicants on Joint Contention I (First Set).Certificate of Svc Encl.Related Correspondence |
| ML17214A368 | 28 April 1983 | Saint Lucie | Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept |
| ML20134A715 | 12 February 1982 | 05000000 | Paper Entitled Flexible Control Tools Promote Success, Presented at American Assoc of Const Engineers 820212-13 Winter Symposium in Miami,Fl |
| ML19115A331 | 31 October 1981 | Saint Lucie | NUREG-0843, Safety Evaluation Report Related to the Operation of St. Lucie Plant, Unit 2. |
| ML17209B090 | 16 May 1981 | Saint Lucie | First Round Safety Questions for FSAR Re Hydrologic Data & Effect on Plant Design,Flood Protection & Monitoring of Beach Dunes & Mangrove Areas |
| L-80-279, Submits Info Requested in NRC Re up-to-date Const Completion Schedules.Facility Will Be Ready for Fuel Loading in Nov 1982.Three Oversize Photographs & Supporting Documentation Encl | 26 August 1980 | Saint Lucie | Submits Info Requested in NRC Re up-to-date Const Completion Schedules.Facility Will Be Ready for Fuel Loading in Nov 1982.Three Oversize Photographs & Supporting Documentation Encl |
| IR 05000389/1980003 | 24 April 1980 | Saint Lucie | IE Insp Rept 50-389/80-03 on 800402-04.No Noncompliance Noted.Major Areas Inspected:Const Progress,Inspector Followup,Licensee Identified Items & IE Bulletins 79-02, 79-25 & 79-28 |
| L-80-102, Forwards General Info Section of Application for OL | 24 March 1980 | Saint Lucie | Forwards General Info Section of Application for OL |
| ML18082A343 | 25 February 1980 | Salem | Annual Financial Rept 1979 |
| 05000335/LER-1979-028-01, In Cold Shutdown During Hurricane,Cable Fell Into Startup Transformer B.Ac Electrical Sys B de-energized & Diesel Generator Failed to Start.Caused by Delay in B Diesel Binding | 11 February 1980 | Saint Lucie | In Cold Shutdown During Hurricane,Cable Fell Into Startup Transformer B.Ac Electrical Sys B de-energized & Diesel Generator Failed to Start.Caused by Delay in B Diesel Binding |
| ML17208A445 | 8 February 1980 | Saint Lucie Turkey Point | Annual Financial Rept 1979 |
| ML19262C632 | 6 February 1980 | Weekly Info Rept for Wk Ending 800201 | |
| ML17208A313 | 1 February 1980 | Saint Lucie | Forwards Final Const Deficiency Rept Re Hurricane David Damage |
| ML17208A315 | 1 February 1980 | Saint Lucie | Final Const Deficiency Rept:On 790903,Chicago Bridge & Iron Guyed Derrick Collapsed During Hurricane David,Damaging Reactor Auxiliary & Concrete Shield Bldgs.Caused by Inadequate Securing.New Derrick Will Be Erected 800107 |
| IR 05000389/1980001 | 24 January 1980 | Saint Lucie | IE Insp Rept 50-389/80-01 on 800108-11.Noncompliance Noted: Failure to Perform & Record QA Indoctrination for Manual Employees as Required by SQP-9 & SQP-19 |
| IR 05000335/1979032 | 3 January 1980 | Saint Lucie | IE Insp Rept 50-335/79-32 on 791210-13.No Noncompliance Noted.Major Areas Inspected:Previously Identified Noncompliance & Open Items,Ie Bulletins,Circulars & Notices |
| ML17207A721 | 7 December 1979 | Saint Lucie | Advises That Mh Hodder & Tj Anderson,Counsel & co-counsel for Intervenors,Will Take Part in 791211 Visit to Util Sys Control Ctr |
| L-79-341, Supplements 791004 Interim Deficiency Re Derrick Collapse During Hurricane.Manufacturer Design Review Recommends Actions to Secure Replacement Derrick,Including Raising Boom & Removing Spreader Beam | 7 December 1979 | Saint Lucie | Supplements 791004 Interim Deficiency Re Derrick Collapse During Hurricane.Manufacturer Design Review Recommends Actions to Secure Replacement Derrick,Including Raising Boom & Removing Spreader Beam |
| ML17207A675 | 7 December 1979 | Saint Lucie | Response to Intervenor Interrogatories.Lists sys-wide & Offsite Power Disturbances Occurring within Past 10 Yrs. States Reasoning for Not Interconnecting W/Ga Power Co. Certificate of Svc Encl |
| ML17207A678 | 27 November 1979 | Saint Lucie | First Set of Interrogatories.Requests Info Re sys-wide Power Failures,Offsite Power Failures,Failure to Provide Intertie W/Ga Power Corp,Test Results & Performance Records. Certificate of Svc Encl |
| ML17207A654 | 31 October 1979 | Saint Lucie | IE Insp Rept 50-389/79-18 on 791009-12.Noncompliance Noted: Failure to Procure Protective Coating Matls as safety- Related Items & Failure to Initiate Nonconformance Rept & Place Discrepant Matl in Hold Area |
| ML14175B097 | 16 October 1979 | Robinson | IE Insp Rept 50-261/79-20 on 790904-05.No Noncompliance Noted.Major Areas Inspected:Followup of Licensee Response to Hurricane David |
| ML17208A595 | 6 October 1979 | Saint Lucie Turkey Point | Monthly Operating Repts for Sept 1979 |
| IR 05000324/1979030 | 5 October 1979 | Brunswick | IE Insp Repts 50-324/79-30 & 50-325/79-31 on 790904-07.No Noncompliance Noted.Major Areas Inspected:Plant Operations & Activities During Hurricane David & Followup on IE Bulletins & Circulars |
| L-79-283, Forwards Interim Deficiency Rept Re Damage of Reactor Auxiliary & Shield Bldgs Resulting from 790903 Derrick Collapse During Hurricane David | 4 October 1979 | Saint Lucie | Forwards Interim Deficiency Rept Re Damage of Reactor Auxiliary & Shield Bldgs Resulting from 790903 Derrick Collapse During Hurricane David |
| ML17207A498 | 4 October 1979 | Saint Lucie | Interim Deficiency Rept Re Damage to Reactor Auxiliary & Shield Bldgs from 790903 Derrick Collapse During Hurricane David.Forwards Six Drawings Detailing Storm Damage.Available in Central Files |
| IR 05000335/1979024 | 27 September 1979 | Saint Lucie | IE Insp Rept 50-335/79-24 on 790902-03 & 10-13.No Noncompliance Noted.Major Areas Inspected:Plant Operations & Activities Subsequent to Hurricane David |
| IR 05000250/1979028 | 27 September 1979 | Turkey Point | IE Insp Repts 50-250/79-28 & 50-251/79-28 on 790902-03.No Noncompliance Noted.Major Areas Inspected:Followup of Licensee Actions Re Hurricane David |
| ML19212A431 | 25 September 1979 | Weekly Info Rept for Week Ending 790921 | |
| ML18136A251 | 24 September 1979 | Surry | IE Insp Repts 50-280/79-55 & 50-281/79-73 on 790820-0907. Noncompliance Noted:Two Welders Grinding & Welding Elbow in Feedwater Line W/O Respiratory Protection |
| IR 05000389/1979015 | 19 September 1979 | Saint Lucie | IE Insp Rept 50-389/79-15 on 790905-06.No Noncompliance Noted.Major Areas Inspected:Damage Inflicted by Hurricane David on safety-related Structures & Equipment & Licensee Action on Previous Insp Findings |
| ML17338B142 | 19 September 1979 | Saint Lucie Turkey Point | Delays Response to Contention on Temporary Storage of Six Steam Generators Until Final Design Details Are Available. Postpones Final Statement on Ability of Dunes to Provide Erosion Protection Until Review of Beach Survey Results |
| IR 05000302/1979037 | 17 September 1979 | Crystal River | IE Insp Rept 50-302/79-37 on 790902-04.No Noncompliance Noted.Major Areas Inspected:Licensee Actions Re Hurricane David |
| ML20196K480 | 14 September 1979 | Transcript of 790914 Meeting in Silver Spring,Md in Matter of Advisory Committee on Nuclear Power Plant Const During Adjudication.Pp 1-90 | |
| ML19275A233 | 12 September 1979 | Weekly Info Rept for Week Ending 790907 | |
| ML19253B328 | 5 September 1979 | Saint Lucie | PNO-79-393:on 790902,due to Passage of Hurricane David,Crane Struck Offsite Power Supply Line.Offsite Power to a Startup Transformer Retained,While Power to B Was Lost.Power to Transformer B Restored |
| ML19256C702 | 31 August 1979 | Saint Lucie Turkey Point Crystal River Farley | PNO-79-387:Region 3 Hurricane Watch Initiated on 790831. Licensees Report That Emergency Power Sources Are Operable. Monitor of Licensee Emergency Backup Power Status, Operational Status & Hurricane Alert Procedures Underway |
| L-78-288, Advises That FSAR & Environ Rept Submittal Date Revised to Mar 1980 Due to Reduction in Const Schedule | 31 August 1978 | Saint Lucie 05000000 | Advises That FSAR & Environ Rept Submittal Date Revised to Mar 1980 Due to Reduction in Const Schedule |