Hurricane David

From kanterella
Jump to navigation Jump to search

31 August 1978

See also: Hurricane

Scrams (0)

General

 Start dateSiteTitle
ML24177A02031 July 2024Accident Sequence Precursor (ASP) Program Summary Description, Revision 2
L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report12 October 2021Saint LucieSubsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report
ML21081A03822 March 2021Probabilistic Risk Assessment (PRA) Lessons from Storms and Floods
ML20049G02024 February 2020ASP Program Summary Description (Revision 1)
ML18135A10920 June 2018Qualitative PRA Insights from Operational Events
ML20214M1045 September 1986PerryTranscript of 860905 Meeting in Washington,Dc Re Full Power OL for Plant.Pp 1-112
ML20137L96826 November 1985HarrisIdentifies Various Exhibits Which Applicant,Nrc & FEMA Have Agreed May Be Admitted to Record & Exhibits Not Agreed to
ML20209G1989 September 1985Transcript of 850909 Public Meeting in Washington,Dc Re Earthquakes & Emergency Planning.Pp 1-97
ML20112C40110 September 1984HarrisIntervenor Exhibit I-JOINT-24,consisting of Attachment I-16 Listing of Offline Outages at Brunswick & Robinson Nuclear Units for 1978-83
ML20092E2313 May 1984CatawbaApplicant Exhibit A-EP-13,consisting of 840416 Testimony of Je Neves,Jt Pugh,J Gregory,Pr Lunsford,Wm Mcswain, Be Phillips,Lw Broome,D Johnson & P Needham Re Emergency Planning Contention 3
ML20084F9161 May 1984HarrisAnswers to Joint Intervenors Interrogatories & Request for Production of Documents to Applicants on Joint Contention I (First Set).Certificate of Svc Encl.Related Correspondence
ML17214A36828 April 1983Saint LucieReactor Containment Bldg Integrated Leakage Rate Test, Final Rept
ML20134A71512 February 198205000000Paper Entitled Flexible Control Tools Promote Success, Presented at American Assoc of Const Engineers 820212-13 Winter Symposium in Miami,Fl
ML19115A33131 October 1981Saint LucieNUREG-0843, Safety Evaluation Report Related to the Operation of St. Lucie Plant, Unit 2.
ML17209B09016 May 1981Saint LucieFirst Round Safety Questions for FSAR Re Hydrologic Data & Effect on Plant Design,Flood Protection & Monitoring of Beach Dunes & Mangrove Areas
L-80-279, Submits Info Requested in NRC Re up-to-date Const Completion Schedules.Facility Will Be Ready for Fuel Loading in Nov 1982.Three Oversize Photographs & Supporting Documentation Encl26 August 1980Saint LucieSubmits Info Requested in NRC Re up-to-date Const Completion Schedules.Facility Will Be Ready for Fuel Loading in Nov 1982.Three Oversize Photographs & Supporting Documentation Encl
IR 05000389/198000324 April 1980Saint LucieIE Insp Rept 50-389/80-03 on 800402-04.No Noncompliance Noted.Major Areas Inspected:Const Progress,Inspector Followup,Licensee Identified Items & IE Bulletins 79-02, 79-25 & 79-28
L-80-102, Forwards General Info Section of Application for OL24 March 1980Saint LucieForwards General Info Section of Application for OL
ML18082A34325 February 1980SalemAnnual Financial Rept 1979
05000335/LER-1979-028-01, In Cold Shutdown During Hurricane,Cable Fell Into Startup Transformer B.Ac Electrical Sys B de-energized & Diesel Generator Failed to Start.Caused by Delay in B Diesel Binding11 February 1980Saint LucieIn Cold Shutdown During Hurricane,Cable Fell Into Startup Transformer B.Ac Electrical Sys B de-energized & Diesel Generator Failed to Start.Caused by Delay in B Diesel Binding
ML17208A4458 February 1980Saint Lucie
Turkey Point
Annual Financial Rept 1979
ML19262C6326 February 1980Weekly Info Rept for Wk Ending 800201
ML17208A3131 February 1980Saint LucieForwards Final Const Deficiency Rept Re Hurricane David Damage
ML17208A3151 February 1980Saint LucieFinal Const Deficiency Rept:On 790903,Chicago Bridge & Iron Guyed Derrick Collapsed During Hurricane David,Damaging Reactor Auxiliary & Concrete Shield Bldgs.Caused by Inadequate Securing.New Derrick Will Be Erected 800107
IR 05000389/198000124 January 1980Saint LucieIE Insp Rept 50-389/80-01 on 800108-11.Noncompliance Noted: Failure to Perform & Record QA Indoctrination for Manual Employees as Required by SQP-9 & SQP-19
IR 05000335/19790323 January 1980Saint LucieIE Insp Rept 50-335/79-32 on 791210-13.No Noncompliance Noted.Major Areas Inspected:Previously Identified Noncompliance & Open Items,Ie Bulletins,Circulars & Notices
ML17207A7217 December 1979Saint LucieAdvises That Mh Hodder & Tj Anderson,Counsel & co-counsel for Intervenors,Will Take Part in 791211 Visit to Util Sys Control Ctr
L-79-341, Supplements 791004 Interim Deficiency Re Derrick Collapse During Hurricane.Manufacturer Design Review Recommends Actions to Secure Replacement Derrick,Including Raising Boom & Removing Spreader Beam7 December 1979Saint LucieSupplements 791004 Interim Deficiency Re Derrick Collapse During Hurricane.Manufacturer Design Review Recommends Actions to Secure Replacement Derrick,Including Raising Boom & Removing Spreader Beam
ML17207A6757 December 1979Saint LucieResponse to Intervenor Interrogatories.Lists sys-wide & Offsite Power Disturbances Occurring within Past 10 Yrs. States Reasoning for Not Interconnecting W/Ga Power Co. Certificate of Svc Encl
ML17207A67827 November 1979Saint LucieFirst Set of Interrogatories.Requests Info Re sys-wide Power Failures,Offsite Power Failures,Failure to Provide Intertie W/Ga Power Corp,Test Results & Performance Records. Certificate of Svc Encl
ML17207A65431 October 1979Saint LucieIE Insp Rept 50-389/79-18 on 791009-12.Noncompliance Noted: Failure to Procure Protective Coating Matls as safety- Related Items & Failure to Initiate Nonconformance Rept & Place Discrepant Matl in Hold Area
ML14175B09716 October 1979RobinsonIE Insp Rept 50-261/79-20 on 790904-05.No Noncompliance Noted.Major Areas Inspected:Followup of Licensee Response to Hurricane David
ML17208A5956 October 1979Saint Lucie
Turkey Point
Monthly Operating Repts for Sept 1979
IR 05000324/19790305 October 1979BrunswickIE Insp Repts 50-324/79-30 & 50-325/79-31 on 790904-07.No Noncompliance Noted.Major Areas Inspected:Plant Operations & Activities During Hurricane David & Followup on IE Bulletins & Circulars
L-79-283, Forwards Interim Deficiency Rept Re Damage of Reactor Auxiliary & Shield Bldgs Resulting from 790903 Derrick Collapse During Hurricane David4 October 1979Saint LucieForwards Interim Deficiency Rept Re Damage of Reactor Auxiliary & Shield Bldgs Resulting from 790903 Derrick Collapse During Hurricane David
ML17207A4984 October 1979Saint LucieInterim Deficiency Rept Re Damage to Reactor Auxiliary & Shield Bldgs from 790903 Derrick Collapse During Hurricane David.Forwards Six Drawings Detailing Storm Damage.Available in Central Files
IR 05000335/197902427 September 1979Saint LucieIE Insp Rept 50-335/79-24 on 790902-03 & 10-13.No Noncompliance Noted.Major Areas Inspected:Plant Operations & Activities Subsequent to Hurricane David
IR 05000250/197902827 September 1979Turkey PointIE Insp Repts 50-250/79-28 & 50-251/79-28 on 790902-03.No Noncompliance Noted.Major Areas Inspected:Followup of Licensee Actions Re Hurricane David
ML19212A43125 September 1979Weekly Info Rept for Week Ending 790921
ML18136A25124 September 1979SurryIE Insp Repts 50-280/79-55 & 50-281/79-73 on 790820-0907. Noncompliance Noted:Two Welders Grinding & Welding Elbow in Feedwater Line W/O Respiratory Protection
IR 05000389/197901519 September 1979Saint LucieIE Insp Rept 50-389/79-15 on 790905-06.No Noncompliance Noted.Major Areas Inspected:Damage Inflicted by Hurricane David on safety-related Structures & Equipment & Licensee Action on Previous Insp Findings
ML17338B14219 September 1979Saint Lucie
Turkey Point
Delays Response to Contention on Temporary Storage of Six Steam Generators Until Final Design Details Are Available. Postpones Final Statement on Ability of Dunes to Provide Erosion Protection Until Review of Beach Survey Results
IR 05000302/197903717 September 1979Crystal RiverIE Insp Rept 50-302/79-37 on 790902-04.No Noncompliance Noted.Major Areas Inspected:Licensee Actions Re Hurricane David
ML20196K48014 September 1979Transcript of 790914 Meeting in Silver Spring,Md in Matter of Advisory Committee on Nuclear Power Plant Const During Adjudication.Pp 1-90
ML19275A23312 September 1979Weekly Info Rept for Week Ending 790907
ML19253B3285 September 1979Saint LuciePNO-79-393:on 790902,due to Passage of Hurricane David,Crane Struck Offsite Power Supply Line.Offsite Power to a Startup Transformer Retained,While Power to B Was Lost.Power to Transformer B Restored
ML19256C70231 August 1979Saint Lucie
Turkey Point
Crystal River
Farley
PNO-79-387:Region 3 Hurricane Watch Initiated on 790831. Licensees Report That Emergency Power Sources Are Operable. Monitor of Licensee Emergency Backup Power Status, Operational Status & Hurricane Alert Procedures Underway
L-78-288, Advises That FSAR & Environ Rept Submittal Date Revised to Mar 1980 Due to Reduction in Const Schedule31 August 1978Saint Lucie
05000000
Advises That FSAR & Environ Rept Submittal Date Revised to Mar 1980 Due to Reduction in Const Schedule