, -16 gg Commercial operating dates:
n Robinson 2 - March 7,1971 7. c... [ ffIiC#WIY bSf0A CF Brunswick 1 - March 18,1977
' 2,(,
to IPI'9'hE*I Brunswick 2 - November 3,1975 (t/ffgg)
Following is a list of off-line outages at each',o'f the' Blungi,c); and Robinson nuclear units for the years 1978 through 1983. Included on;this list is a designation of the outage type. The key to this list is as follows:
F = Forced S = Scheduled / Maintenance SP = Scheduled / Planned A Forced Outage is defined as the occurrence of a component failure, or other condition, which requires that the unit be removed from service immediately or up to and including the very next weekend. A Maintenance Outage is the removal of a unit from service to perform work on specific components which could have been postponed past the very next weekend. This is work done to prevent a potential forced outage and which could not be postponed from season to season. The Planned Outage is the removal of a unit from service for inspection and/or general overhaul of one or more major equipment groups. This is work which is usually scheduled wellin advance.
4 sectua stoutatsst seemissies nectet se. FO-4 d*#
atticieise,s. 7 T - 2t/ _
la the matter of,MdL44tdevvML M/
litNTittID Staff-RECElVID Applicast-V
. R!hCTED _
laterv ener _.
Cearg strt _
Centratter_
.,,er gegerter _
8501110176 840910 PDR ADOCK 05000400 0
BRUNSWICK UNIT 1 0FF-LINE OUTAGES 1977*
Date/ Time Date/ Time Hrs./ Min.
Off On Type Duration Reason
- 1. 03/18:1045 03/19:0643 F
19:58 Rx scram - during a pres-sure regulator failure test at 95% Rx power on APRM Hi flux level.
- 2. 04/01:2203 04/05: 1521 M
89:18 Rx scram - the Rx scrammed during startup test #27/8.2-load reject test at full power.
- 3. 04/06:1457 04/08:0622 F
39:25 Rx scram - control operator reset recire pump run back too quickly causing the Rx to scrau on Rx Hi flux level.
- 4. 04/27:1141 07/07:0541 F
2,242:00 Rx scram - generator ground caused turbine trip and Rx scram.
[
~. 07/07:0644 07/07i0707 F
- 23 Relay maintenance personnel tripped generator pri.
lockout relay which removed generator from
.the grid.
- 6. 07/08:0005 07/08:0022 M
- 17 Generator was removed from grid to perform overspeed trip test on turbine.
~7. 07/08:0045 07/08:2237 F
21:52 Generator was removed from grid in order to degas and rebalance the rotor.
- 8. 07/17:1059 07/18:1627 F
29:28 Generator was removed from the grid due to high drywell leakage through the floor drain.
- 9. 07/22:2045 07/25:0402 F
55:17 Manual Rx shutdown - unit was manually scrammed to investi-gate drywell floor drain leak -
age.
' Commercial' Operation - March 18.
SYSTM7-Q-1 d
+
BRUNSWICK UNIT 1 f
0FF-LINE OUTAGES 1977*
Date/ Time Date/ Time Mrs./ Min.
Off On Type Duration Reason
- 40. 07/28:1112 08/10:1140 F
312:28 Scram - operator error while performing PT 2.1.22 (pri.
Containment isolation system steam line).
- 11. 08/12:2242 08/13:1715 F
18:33 Main turbine trip and generator was separated from grid to clean a ground on #6 lift pump piping.
- 12. 08/14: 1520 08/15:0243 F
11:23 Reduced power in order to clear a ground on #6 lift pump piping.
- 13. 08/28:2125 08/29:112S F
14:03 Power was reduced due to a steam leak in turbine building.
- 14. 09/16:0953 09/17:0419 F
18:26 Rx scram - operator error caused condensate booster
(
pump low suction a*nd Rx scrammed low water level.
- 15. 09/30:2229 10/06:0650 M
128:31 Rx scram - startup test #25 MSIV full closure at full
' power.
- 16. 10/08:0631 10/08:2049 F
14:18 Generator was removed from grid to clean A-S & A-N waterboxes.
- 17. 10/14:1736 10/16:2238 F
53:02 Shutdown due to high drywell leakage through floor drains.
- 18. 10/29:0109 10/30:1319 M
37:10 Rx shutdown to repair steam leaks on valve and repair main generator auto. voltage regu-lator.
- 19. 11/13:0037 11/26:2141 F
333:04 Rx scram while performing PT 1.3.2 recirc pump seals failed, replaced both recire pumps.
12/04:2045 F
45:04 Unit shutdown to repair (20.12/02:2341 reactor feedwater pump 1A.
SYSTM7-Q-2
+
BRUNSWICK UNIT 1
.(
OFF-LINE OUTAGES 1977*
Date/ Time Date/ Time Mrs./Hin.
Off On Type Duration Reason
- 21. 12/16:0645 12/17:1129 F
28:44 Rx scram during.ECCS test, power lost to Unit #1 EHC system, loss of E2 bus; blown fuse.
- 22. 12/21:1102 12/23:0723 F
44:21 Rx scram - operator was reducing power with recirculation pumps low water level caused scram.
- 23. 12/31:2316 12/31:2400 M
- 44 The drywell was de-inerted to make an entry to add oil to 1A recirc pump.
(
SYSTM7-Q 3
BRUNSWICK UNIT 2
('
OFF-LINE OUTAGES 1977 Date/ Time Date/ Time Hrs./ Min Off On Tyge Duration Reason
- 1. 01/02:0500 01/02:1934 F
18:44 Rx Scram while performing PT 40.25 (Turbine control valve test).
- 2. 01/07:1255 01/08:1148 F
22:53 Rx Scram - Technician error while performing PT 1.1.4 caused a Group I isolation and scram.
- 3. 02/02:2354 02/06:0132 F
73:38 Manual shutdown to repair a burned drywell drain pump motor.
- 4. 02/14:0825 02/17:1858 F
82:31 Rx Scram - off line at 544 MWe when high exhaust hood temp.
was received.
- 5. 02/23:1448' 02/24:0807 F
17:19 Rx Scram - B Feedwater pump
-(-
operating at-minimum speed.
tripped - A F.W. pump was
- 6. 04/05:2259 04/07:0138 F
26:39 Rx Scram - Loss of instrument' air caused loss of condensate booster pump supply pressure.
- 7. 04/15:2150 05/06:2210 M
503:20 Rx Scram - Shutdown for routine maintenance and modi-
'fication of 2A recirc.~ pump.
- 8. 05/07:1132 05/08:1349 F
26:17 Rx Scram - FW pump and booster L
pump trip, causing low water level and Rx Scram.
i-
- 9. 05/21:2209'
.05/22:1653 F
18:44 Rx Scram - Operator error while performing P.T. 40.2.5 control valve test.
i:
- 10. 05/31:0936-06/02:0304 F
41:28 lbc Scram. Mechanic error while cleaning EHC duplex. oil.
filters.
- 11. 06/02i2127 06/03:0547
.F 8:20~
Rx Scram - Spurious upscale on.
2C Radiation monitor caused by_
man climbing on cable tray.
(
SYSTM7-Q-4; L_
BRUNSWICK UNIT 2 0FF-LINE OUTAGES 1977 Date/ Time Date/ Time Hrs./ Min Off On Type Duration Reason
- 12. 06/14:2324 06/15:2328 F
24:04 Rx Scram caused by heater drain deaerator level oscillation.
- 13. 07/11:0202 07/12:0330 F
25:28 Scram - Loss of lube water to CW pumps due to shells in lube water lines.
- 14. 07/15:1038 07/18:1455 F
76:17 Rx Scram - A spurious signal (Hi turbine exhaust temp.) caused a turbine trip.
- 15. 07/19:2047 07/20:0605 M
9:18 Generator was removed to investigate reason for trip on 7/15.
- 16. 07/31:1347 08/01:1026 F
19:14 Scram - Technician error while performing P.T. 2.1.26
(
(Main steam line low pressure).
- 7. 08/15
- 1114 08/17:0235 F
39:21 Rx Scram - I&C error while performing P.T. 3.1.5.
18; 08/17:0435 08/21:1525 F
106:50 Generator was removed due to High Chlorides in the main condenser.
19.'09/04:0610 09/05:0720 F
25:10 Rx Scram - The generator auto.
voltage regulator out of service due to loss of turbine building cooling.
~
- 20. 09/08:2047 09/09:1018 F
13:31 Rx Scram - Rx Feedwater pump control oscillation caused Rx to Scram.
- 21. 09/10:0105 12/26:1717 P
2585:12 Manual Scram - shutdown for a 54-day refueling and maintenance outage.
- 22. 12/26:2359 12/31:2400 F
120:01 To correct steam leak on the MS Bypas. valves and problems with HPCI system speed control.
k SYSTM7-Q-5
(,.
ROBINSON UNIT 2 0FF-LINE OUTAGES 1977 Date/ Time Date/ Time Mrs./ Min.
Off On Type Duration Reason
- 1. 01/11:1701 01/11:2015 F
3:14 Manual reactor trip following loss of MCC-6.
- 2. 01/24: 1826 01/24:2220 F
3:54 Reactor trip due to Hi pres-surizer press.
- 3. 01/25:1148 01/25:1508 F
3:20 Turbine trip caused by loss of "B" inverter.
.6. 02/05 02/17 F
278:62 "C" RCP high leakage.
- 5. 02/18:1814 02/20:0352 F
33:38 Inspect //2 turbine generator for insulation failure.
- 6. 03/23:1333 03/24:1930 F
29:57 E.H. Governor valve failed shut causing Rx trip.
- 7. 03/25:2310 03/27:0113 M
26:03 Repair turbine trip block.
- 8. 04/24:1924 04/30:2342 F
148:18 Loss #1 seal leakoff indica-tion on "C" RCP.
- 9. 06/17:2222 06/18:1938 M
21:16 NRC startups.
- 10. 08/17:0904 08/17:2020 F
11:16
- 3 steam generator high steam line AP safeguard trip, while testing aux feedwater pump valve V214C.
- 11. 08/23:2339 08/24:0702 F
7:23 4B F.W. heater - repair tube leaks.
- 12. 09/29:2300 09/30:0854 M
9:54-To repair tube leaks in 4B heater.
- 13. 10/05:1621 10/05:1855 F
2:34 Turbine trip - High level-"B" steam generator, loss of instrument Buss 2.
10/26:0643 11/24:2140 F
710:57 Failed packing in valve RRR-750 and failure in Bit.
=15. 12/19:1028 12/19:1247 F
2:19 Overtemp. Delta temp. trip while performing periodic
(
\\
test.
SYSTM7-Q-6'
ROBINSON LWIT 2
(-
0FF-LINE OUTAGES 197's Date/ Time Date/ Time Mrs./ Min.
Off On TyTe Duration Reason 16.!!2/19:1251 12/19:1305 F
- 14 Trip - due to #3 steam generator Hi level while recovering from a previous trip.
\\
o F
n-e-
i sysTM7.-Q-7 ~
i
BRUNSk'ICK " NIT 1 0FF-LINE OUTAGES Janueri threuch December 1978 Date/ Time Date/ Time Hrs / Min Off On Type Duration Reason l
1.
01/01:0000 01/01:042S S
4:28 High onygen level in drywell.
2.
01/13:1111 01/15:1945 F
56:37 Condenser hetsell drain line lez; 3.
01/19:246 01/:::1530 S
64:44 Steam leaks on several valves.
4 02/C4:010:
02/05:0610 S
29:05 Clean condenser.
5.
02/13:C04:
02/27:0004 F
335:::
Several switchyard breakers tri7-causing generater trip and react scram.
6.
02/ 7:1635 02/ 8:2045 S
28:10 Safety relief valve repair.
7.
03/13:1644 03/15:0735 F
38:51 Spurious signals in main steanli:
leak detectors caused reactor sc-8.
04/04:0849 04/06:1315 F
52:26 Reacter scram caused by_ reactor pressure spike.
9.
04/07:2237 04/08:0557 S
7:20 Clean strainer and replace state:
cooling filters.
10.
04/08:1301 04/09:0017 F
11:16 Loose fuse caused main stea: lini isolation valves to clese, and a=
reactor scram.
11.
04/30:1527 05/01:0655 F
15:28 Reactor scranned due to reactor feed pump trip.
12.
05/01:1502 05/03:00:3-F.
33:21 Safety relief valve repair.
13.
05/03:0618 05/03:0644 S
- 26 Turbine over' speed trip test.
14.
05/19:2153 05/24:0640 F
104:47 Reactor recirculation pu=p seals replacement.
15.
05/27:2255
'05/28:0630 5
7:35 Excessive Icaks in dryvell equir-ment drain tank.
16.
06/07:0 21 06/08:1235 F
34: 14 Master turbine trin ecused by hi.
vibration si:nal.
17.
06/09:0903 06/29:1935 F
10:27 Reactor scram caused by,turtirc-step ralve clesure.
(cont.)
BRUNSWICK UNIT 1 0FF-LINE OUTACCS Januar5 threuch December 1978 Date/ Time Date/Ti=e Hrs /::in Off On Tvee Durs:1er
_Ressen
- 18. 07/06:105 07/07:1406 F
27:14 Reacter scram initiated by Icv vater level scrce ins:runents.
19.
07/05:0316 07/05:1509 F
11:53 Reacter scr:m due to icv vater level.
20.
05/03:0C00 0S/09:0917 F
12:55 Preblems with.* aster Trip Solen:
Test resulted in turbine trip ar reactor scr30.
21.
C9/ s:2346 10/01:0:36 S
146:50 Dryvell snubber inspection.
22.
11/02:1301 11/03:0707 F
18:06 Losslof condenser vacuum.
23.
11/11:1130 11/12:1547 F
28:17 High reactor vessel cenductivity exceeded Technical Specificatien limit for operatien.
24 11/17:20!?
11/20:0128 5
52:30 Inspection of the reactor recirculation system inlet no::1.
safe-ends to the reactor vessel.
4 L
i Y
O I.
5 ti.
BRUNS'a*ICK UNIT 2 0FF-LINE OCTACES Januarv threuch December 1978 Date/Ti=e Date/Ti=e Hrs / Min Off On Tvre Duration Reasen 1.
01/01:0000 01/01:2025 F
20:25 Steam leaks on MS bypass valves.
2.
01/02:1019 01/03:08:2 F
22:03 Low reactor water level.
3.
01/06:0941 01/C9:1900 F
81:19 Reactor scrcm due to false icv reactor water indicatien.
4 01.1~:12*6 01/18:0559 F
16:43 Turbine and generator trip due t<
centrol circuit ground.
5.
01/31:'.I'5 02/01:1343 F
26:03 EHC pressure spike causing reac::
scra=.
-6.
03/05:CE21 03/06:0900 F
24:39 False low reactor water indicatic 7.
03/13:1251 03/14:1411 F
25:20 Main turbine and feed pu:p turbi:
trip.
8.
03/23:1137 03/24:0924 F
21:47 Reacter feed pump controller fail ure.
-9.
03/24:1739 03/25:0035 F
6:56 Main turbine trip due to generat:
ground signal.
10.
03/26:1710 03/26:2150 F
4:40 Main turbine trip due te generat:
ground signal.
11.
03/23:1219 03/28:1822 F
6:03 Main turbine trip.due to generat ground signal.
12.
03/29:1410 04/04: 1412 F
144:02 Main turbine trip due to generate ground signal.
13.
04/09:0807 04/09:2237 F
14:30 230 KV bus lock out causing turbf trip.
14.
05/17:2027_
05/18:1903 F
22:36 230 KV bus lock out causing turbi trip.
15.
05/23:0853 05/23:2157 F
13:04 Pressure transient en reacter ves level instruments.
'6/02:2356 06/11:2232 S
214: 26 investig:te and repair 2enere:::
16.
0 hydro en lenk.
4
+
3--
Q (cont.)
BRUNS %'ICK UNIT 2 0FF-LINE OUTAGES Januar threuch December 1978 Date/ Time Date/ Time Ers/ Min Off On Tvre Du r.s tien Reasen 17.
06/11:2032 06/22:0537 F
247:05 Excessive coolant teeperatures :-
the pu=p seal ecoling system.
18.
07/03:0052 07/C6:1353 F
85:01 Reactor scram due to hi;h. flu:-
level spike.
19.
07/IS:1:40 07/19:1250 F
21: 10 Reactor scram due to APRM ups:c!c-trip.
20.
05/.'5:203; OS/02:C6:3 S
81:49 High dryvell floor drain eakage 21.
09/06:2024 09/04: 113a S
4:3:00 High condensate conductivity.
22.
11/06:1337 11/14:1438 F
193:01 Generator lockout due to less ci excitatien.
'23.
11/30:1129 12/01:0701 F
19:32 Reactor trip due to low reacter vessel vnter level.
I e
b L
__b
ROBINSON UNIT 2 0FF-LINE OUTAGES Januarv throuch Decceber 1978 Date/ Time Date/ Time Hrs / Min Off On Tyre Durstion Reason 1.
01/13:1912 01/15:1052 7
39:40 Main steam isolatten tal re ("5:'7' failed closed.
2.
01/07:0 1C 02/01:::10 F
100:00 High vibrations on react:: ecci:-
pump.
3.
02/01:2010 04/:3:1934 SP 1941:24 Planned refueling and = air.:er.tr.:e 4
04/04: 1146 04/24: 1701 F
5:15 High turbine vibr:tiens.
5.
04/23:15C9 04/25:1S13 F
3:24 MS!'.' soler.oid coil f ailure.
6.
07/10:06:1 07/15:0045 F
114:24 High pressuri:er pressure.
7.
07/16:0605 07/17:0620 F
24: 15 Failure of "A" statien batter;.
8.
07/31:102 07/31:1551 F
5:29 Reactor coolant pump trip.
9.
08/01:1505 08/01:1947 F
4:42 Steam generator high level alarr..
- 10. 09/21:2009 09/09:1918 F
191:09 Steas generator tube leak.
11.
10/16:0746 10/16:1044 F
2:58 Steam line pressure transmitter failure.
t S
t a
4 BRUNS'w'ICK UNIT 1 0FF-LINE OUTAGES 1979 Date/ Time Date/ Time Hrs./ Min.
Off On Type Duration Reason
- 1. 01/12:2322 4/16:2317 SP 2255:55 Scheduled maintenance and re:ueling outage.
- 2. 4/17:1049 4/17:1256 S
02:07 The unit was removed from serrice to perform a planned test on the turbine overspeed devices.
- 3. 4/17:1458 4/19:1329 F
51:41 Reactor high-pressure trip due to the turbine runback.
- 4. 4/19:2300 4/19:2315 S
00:15 The unit was removed from service to repeat the electrical backup overspeed portion of the turbine overspeed trip test.
- 5. 4/20:0112 4/20:0205 S
00:53 The uait was retired to repeat the electrical turbine overspeed test.
- 6. 4/20:1148 4/20:1232 S
00:44 The unit was retired to repeat the turbine electrical backup overspeed test.
- 7. 5/01:0658 5/04:0220 F
67:22 Reactor trip due to indicated APRM upscale thermal trip signal.
- 8. 5/26:0247 6/10:1508 SP 372:21 Inspection and modification of pipe supports.
- 9. 7/18:2330 7/19:1709 F
17:39 Average Power Range Monitor flow was biased upscale, which caused a reactor trip.
- 10. 7/28:1433 7/29:0358 F
13:25 Reactor tripped on'a false low reactor water level signal.
- 11. 8/04:1558 8/05:0715 F
15:17 Reactor trip on.high neutron flux indication.
- 12. 8/09:0719 8/09:2310 F
15:51 Reactor trip on high neutron flux indication.
- 13. 8/19:1425 8/20:0224 F
11:59 Reactor transient in level instrumentt caused a reactor trip.
U
BRUNSWICK UNIT 1 (Continued) 0FF-LINE OUTAGES 1979 Date/ Time Date/ Time H r s. /.'lin.
Off On Tvpe Duration Reason
- 14. 9/08:0750 9/17:0642 S
214:52 Hydraulic snubber (shock absorber) inspection required by NRC Technical Specifications.
- 15. 10/08:0913 10/09:0326 F
18:13 Reactor trip on low water level indication.
- 16. 10/19:0051 10/2a:2124 F
140:33 The reactor tripped on a main steam line high radiation signal.
- 17. 11/05:0733 11/16:0621 F
262:48 Reactor trip due to reactor water low level.
- 18. 11/20:1330 11/29:1628 F
218:58 Reactor trip due to temporary loss of power to the emergency busses.
- 19. 12/01:2158 12/05:0504 F
79:06 To repair recirculation. pump valve leaks.
(
- 20. 12/12:0057 12/20:2356 S
214:59 Hydraulic snubber inspections, modifications required by NRC is response to the TMI incident, and recirculation pump seal work.
- 21. 12/21:0548 12/21:0755 F
02:07 To test and repair safety relief valve modifications made during the previous (December 12-20) outage.
t l
~
l t
m
BRUNSWICK UNIT 2 e(
OFF-LINE OUT.;GES 1979 Date/ Time Date/ Time Mrs./ Min.
Off On Type Duration Reason
- 1. 01/29:1135 01/30:011$
F 13:43 High steam line pressure spike.
- 2. 02/04:2052 02/05:0357 F
07:05-Recire. pump runback and reactor high pressure spike.
- 3. 03/02:2322 05/19:0715 SP 185a:53 Scheduled maintenance and refueling outage.
- 4. 05/19:1447 05/19:1557 S
01:10 The unit was removed from service to perform a planned test on the turbine overspeed trip device.
- 5. 05/21:1130 05/22:1912 F
31:42 Reactor trip.
- 6. 05/23:0717 05/23:2108 F
13:51 Reactor trip on low water level indication.
(
- 7. 05/25:1909 06/12:0612 SP 419:03 Inspection and modification of pipe supports.
- 8. 06/12:1309 06/13:0622 F
17:13 Reactor trip due to main steam isolation valve closure indication.-
- 9. 06/29:2249 07/05:0442 S
125:53 Hydraulic snubber inspection required by Technical Specifications.
- 10. 07/19:1316 07/21:0649 F
41:33 Replacement of main steam safety relief valve.
- 11. 07/31:0423 08/03:0732 F
75:09 Turbine and reactor trip on loss of condenser vacuum.
- 12. 08/31:2347 09/06:2149 5
142:02 -
Hydraulic snubber (shock absorber) inspection required by Technical Specifications.
- 13. 09/07:0449 09/08:0220 F
21:31 Steam leak in main steam line drain valve.
- 14. 09/12: 1415 09/13:1512 F
24:57 Nuclear service water leak.
- 15. 09/14i0743 09/15:0050 F
17:07 Reacto-r trip due to load reject indication.
BRl'NSWICK UNIT 2 (Continued) 0FF-LINE OUTAGES 1979 Date/ Time Date/ Time Mrs./ Min.
Off On Tm Duration Reason
.16. 09/22:0311 09/22:1523 S
12:22 Scheduled maintenance on reactor core instrumentation.
- 17. 11/19:0S52 11/21:1226 F
51:34 Reactor trip due to nuclear system false high pressure signal.
~13. 12/25:2345 Through the S
144:15 Hydraulic snubber inspecticas and end of the modifications required by the NRC year.
in response to the TMI incident.
(:
e 4
I e
C
=
r ROBINSON UNIT 2 0FF-LINE OUTAGES 1979 Date/ Time Date/ Time Hrs./ Min.
Off On Type Duration Reason
- 1. 01/06:0924 01/07:2317 F
37:53 Feedwater control malfunction..
- 2. 01/07:2320 01/03:0438 F
05:18 Feedwater control malfunction.
- 3. 02/06:132S 02/07:0032 F
11:04 A containment high pressure signal resulting in a turbine trip.
- 4. 02/21:1029 02/21:1323 F
02:54 "B" steam generator high level trip.
- 5. 04/11:2042 04/17:2400 F
147:18 "B" steam generator leakage exceeded Technical Specifications.
- 6. 04/18:0000 07/21:2221 SP 2277:21 Scheduled maintenance and refueling outage.
- 7. 07/22:1151 07/22:1922 F
07:31 To balance the turbine and to perform turbine overspeed trip test.
- 8. 07/23:1103 07/23:1825 F
07:22 Oil leaks in the turbine Electrohydraulic Control System (EHC).
- 9. 08/16:1121 08/16:1935 F
08:14 False high pressure signal which resulted in a reactor trip.
- 10. 08/16:2332 08/17:1020 F
10:48 Nuclear Instrumentation System (NIS) Overpower reactor trip.
- 11. 09/04:2255 09/05:2207 S
23:48 Threat of Hurricane David
- 12. 09/23:0318 09/23:1247 F
09:29 Reactor trip on a "High Pressurirer Pressure" indication.
- 13. 09/30:0845 10/01:0205 F
17:20 Cleanup and evaluation of an oil fire in "C" reactor coolant pump bay.
- 14. 11/02:2055 11/03:0842 S
11:47 Unit shutdown to balance turbine.
mee
J
- 'n 4
1 i-4 I.
ROBINSON UNIT 2 (Continued) f 0FF-LINE OUTAGE'S t.
1979.
(,,
l
- 15. 12/13:1555 12/13:1907 F
03:12
-Turbine trip and reactor trip 4:
due to.high water level in "A" steam generator.
j
- 16. 12/22:0324 12/22:090o F
05:42 T rbine and reactor trip during l
periodic test.
J-1 O
4 i'
j.'
1 1
j.
[
1 3
J l
t i
1 I'
t J
k I
e 4:_
3 f
4 l-i
+
f BRUNSWICK UNIT 1 0FF-LI.VE OUTAGES 1980 Date/ Time Date/ Time Mrs./ Min.
Off On Type Duration Reason
- 1. 03/23:0043 03/24:2018 F
43:35 Reactor trip due to high reactor water level.
- 2. 03/26:1545 03/2S:0723 F
39:47 Drywell leakage.
- 3. 03/31:1310 04/03:02~ 0 F
61:40 Reactor trip due to low reactor water level.
- 4. 04/05:0108 04/06:0721-F 30:13 Turbine taip.
~5. 04/06:0450 04/13:0927 F
124:37 Turbine trip.
- 6. 04/15:1231 04/17:1500 F
50:29 Turbine trip.
- 7. 04/26:2325 04/27:2009 F
19:44 Drywell leakage.
(
- 8. 05/26:1518 08/22:1400 SP 2110:42 Refueling scheduled maintenance and unscheduled regulatory tests, inspections, and analyses.
- 9. 08/25:1721 08/28:0433 F
59:12 Reactor coolant conductivity.
- 10. 09/12:1538 09/15:1430 S
70:52 Inspect a senerator bearing.
- 11. 10/14:0111 10/15:2015 F
43:04 The reactor scrammed when steam flow in main steam lines exceeded preset flow limits.
- 12. 12/28:1453 Through the S
81:07.
Snubber inspections and feedwater end of Decem-heater maintenance.
ber 1980 e
.BRUNSk'ICK UNIT 2 0FF-LINE OUTAGES 1980 Date/ Time Date/ Time Hrs./ Min.
Off On T.pe Duration Reason
- 1. 12/25:2345 01/05:1021 S
250:36 Hydraulic snubber inspections 106:21-Jan.
and modifiestions required by 144: 15-Dec.
KRC in response to TMI incident.
- 2. 01/07:2200 01/10:0254 F
51:54 Indication of safety relief valve leakage.
- 3. 02/13:0951 02/15:1S20 F
56:29 Reactor trip during periodic test.
- 4. 03/01:0244 09/17: 1205 SP 4808:21 Refueling required modifications, scheduled maintenance, and unsche-duled regulatory tests, inspections and analyses.
- 5. 09/17:1513 09/17:1524 S
00:11 To perform a turbine overspeed trip test.
- 6. 09/19:1030 09.22:0704 F
68:34 Reactor scram for which no cause could be determined.
- 7. 09/23:1438 09/26:1935 F.
76:57 Drywell floor drain leakage.in excess of Technical Specifications limits.
- 8. 10/11:1014 10/13:1625 F
54: 11 Reactor scrammed when high neutron flux in the reactor exceeded Averar Power Range Monitor (APRM) setpoir.t
- 9. 10/28:0749 10/29:0636 F
22:47 Nigh reactor water level caused a trip of the main turbine resulting in a reactor scram.
10, 11/13:0056 11/14: 1143 F
34:47 Loss of the Reactor Protection System power supply.
- 11. 11/15:1750 11/16:0603 F
12:13 The unit was taken out of service to repair a leak in the recirculatic system for the heater drain pumpa.
G
BRUNSWICK UNIT 2 (Continued) 0FF-LINE OUTAGES 1980
'Date/ Time Date/ Time Mrs./ Min.
Off On Type Duration Reason
- 12. 11/18:C724 11/19:2051 F
37:27 The reactor scrammed due to a turba.
trip.
- 13. 12/05:2258 12/13:1S57 S
187:59 The unit was taken out of service to repair tube leaks in a feed-water heater.
14, 12/1o:0956 12/19:0651 F
68:55 Reactor scram due to low condenser Vacuum.
- 15. 12/26:1026 12/30:2140 F
107:14 Reactor tripped on low water level.
(
g a
ROBINS?N UNIT 2 OFF-LINE OUTAGES 1980 Date/ Time Date/ Time Hrs./ Min.
Off On Type Duration Reason
- 1. 03/14:2357 03/28:0929 S
321:32 Steam generator tube leaks.
- 2. 04/13:2246 05/02:1551 F
448:05 Reactor coolant pump seal f ailures.
- 3. 05/17:1839 05/18:083e F
13:57 Adjustment of reactor trip setpoint
- 4. 05/22:0746 05/22:1030 F
02:42 Reactor trip.
- 5. 06/10:0007 06/10:0231 F
02:24 Reactor trip.
- 6. 06/10:1715 06/10:2204 F
04:49 Loss of condenser vacuum.
- 7. 07/07:1147 07/16:2044 F
224:57 Steam generator tube leak.
- 8. 08/08:2207 10/25:0049 SP 1850:42 Refueling and scheduled main-tenance.
- 9. 10/25:0932 10/25:1151 S
. 02:19 To perform a turbine overspeed trip test.
- 10. 10/25:1459 10/25:1323 F
03:29 Disconnected grounding strap on the generator grounding transformer.
,11. 10/25:1839 10/26:0151 F
07:12 The reactor tripped due to low water level in "B" steam generator coincident with steam flow-feedwater flow mismatch.
- 12. 10/26:0155 10/26:0421 F
03:26 High/High level in "B" steam generator.
- 13. 11/02:1538 11/02:2337 F
07:59 Reactor trip caused by low water level in "A" steam generator coincident with steam flow-feedwater flow mismatch.
- 14. 11/07:1005 11/07:1649 F
06:44 Loss of condensate and feedwater pumps.
. = _. -..
a I-ROBINSON UNIT 2 (Continued)
OFF-LINE OUTAGES 1980 t
Date/ Time Date/ Time Mrs./ Min.
Off On Type Duration Reason
.15. 11/15:2251 11/16:1724 S
18:33 High turbine vibration.
- 16. 11/27:1421 12/12:1153 F
357:32 Valve packing leak,
- 17. 12/12:2002 12/14: 1240 F
40:38 Valve packing leak.
1_ -
I
,i -
k i+
4 4
Y t
Y'
(
i-e-
c k
i ' b u
? il
. m
BRUNS'n'ICK UNIT 1 0FF-LINE OUTAGES 1981 Date/ Time.
Date/T.me Hrs./ Min.
Off On Type Duration Reason
- 1. 12/28:1453 1/6:2347 S
143:47(Jan.) Snubber inspections and feedwater Dee. incl.
224:54 heater maintenance.
- 2. 1/20:1143 1/22:042-F 40:41 Indication of low water level in the vessel tripped the reactor.
- 3. 1/30:0347 1/31:1726 F
37:39 Reactor scram due to loss of reactor feed pump "A."
- 4. 2/12:0915 2/13:0858 F
23:43 Reactor scram due to loss of condenser vacuum.
- 5. 2/24:1349 2/25:0305 F
13:16 High oxygen concentration in the dryvell.
- 6. 3/29:2153 4/9:0913 F
251:20 High pressure trip signal.
- 7. 4/17:2312 9/23:1939 ~
SP 3811:27 Scheduled annual outage.
- 8. 9/24:0255 9/25:0659 F
28:04 Turbine trip.
- 9. 10/1:1522 10/3:0621 F
38:59 Turbine trip.
s.
- 10. 10/29:1634 10/31:2137 F-53:03 Reactor tripped on low water level.
- 11. 11/14:0218 11/14:0630 S
4: 12 Unit was. removed from service to investigate abnormal resistance readings on the generator hydrogen seals.
- 12. 11/15:0041 11/19:0204 T-97:23 Failure of turbine stop valve swit.'
- 13. 12/2:0724 12/4:1750 F
58:26 Va.1ve packing leak.
./.(.
e 9
( ________ - _____
BRUNSWICK UNIT 2 0FT-LINE OL'TAGES 1981 Date/ Time Date/ Time Mrs./ Min.
Off On Type Duration Reason
- 1. 01/07:0737 01/11:0921 F
97:44 Reactor scrammed on low water level in the vessel.
- 2. 02/14:0843 02/22:0629 S
189:40 Main steam isolation valve repair.
- 3. 02/24: 1811 02/26:0150 F
31:39 High oxygen concentration in the drywell.
- 4. 02/26:0830 02/27:0638 F
22:08 Reactor scram due to large power spikes.
- 5. 02/28:1633 02/23:1846 F
2:13 To test main generator instrumenta-tion and control.
- 6. 03/05:0552 04/10:1521 F
873:29 The unit was shut down when periodic testing of accessible hydraulic snubbers indicated a (l
high failure rate.
- 7. 04/11:0322 04/11:1322 F
10:00 The unit was manually shut down to comply with Technical Specifisa-tions concerning operability of safety systems.
- 8. 04/12:1301 04/17:1819 S
125:18 The unit was manually shut down when levels of conductivity and chlorides exceeded limits prescribed by Technical Specifications.
- 9. 04/17:2126 04/18:0506 F
7:40 The unit was manually shut down when levels of conductvity exceedeit limits prescribed by Technical Specifications.
- 10. 05/03:0525 05/04:0227 F
21:02 Valve packing leak.
- 11. 05/06:0541 06/08:0704 F
793:23 Restricted water flow through restdual heat removal heat exchangers.
BRUNSWICK l' NIT 2 (Continued)
Date/ Time Date/ Time Hrs./ Min.
Off On Type Duration Reason
- 12. 06/10:1020 06/11:2352 S
37:32 Excessive temperature differential between rectreulation loops A and B 13.- 06/22:2151 06/2S:0745 F
129:54 Recirculation pump failure.
- 14. 07/02:0153 07/03:1041 F
32:48 Main steam isolation valve (MSIV) failure.
- 15. 07/11:0545 07/12:2158 F
40:13 Reactor scram on turbane trip.
- 16. 07/18:1143 07/27:2304 F
227:21 Unit removed from service to repair two MSIV's.
- 17. 08/04: 1947 08/07:1527 F
67:40 Reactor scrammed due to low condenser vacuum and turbine trip.
(
- 18. 10/23:1541 10/30:0446 F
158:05 Scheduled snubber inspection.
- 19. 11/2:1431 11/3:1601 F
25:30 Reactor tripped on high water level
- 20. 12/18:1704 12/21:0214 F
57:10 Repair valve controls.
- 21. 12/26: 1711 12/;6:2351 S
6:40 Unit was removed from service to replace a gasket on the moisture separator reheater drain tank.
l l
I m
.m
. m
.- a
r-ROBINSON UNIT 2 0FF-LINE OCTAGES 1981 Date/ Time
.Date/ Time Mrs./ Min.
Off On Type Duratton Reason
- 1. 01/24:2345 01/25:1700 F
17:15 Feedwater heater tube lean.
- 2. 01/29:0o41 02/01:1715 F
82:34 Manual shutdown due to loss of oil from the turbine Electro-Hydraulic Control System.
- 3. 02/01:1906 02'01:222?
F 03:23 Reactor trip due to a steam flow, feed flow mismatch coincident:
with low steam generator level.
- 4. 02/02:1505 02/02:1822 F
03:17 Reactor trip due to a steam flow, feed flow mismatch coincidental with low steam generator level.
- 5. 02/02:2043 02/04: 1430 F
41:47 Reactor trip due to a steam flow, feed flow mismatch coincidental with low steam generator level.
- 6. 03/22:1345 03/23:0111 F
11:26 Manual shutdown due to incorrect rod position of Rod N-9.
- 7. 04/21:1515 04/21:2041 F
05:26 Reactor trip due to a steam flow, feed flow mismatch coincidental with low steam generator level.
- 8. 04/21:2139 04/22:0614 F
08:35 The unit was taken off line to repair heater drain valves.
- 9. 05/16:0003 06/11:1704 5
641:01 Scheduled steam generator tube inspection.
- 10. 06/19:1711 06/20:0446 F
11:3'5 Manual scram when turbine load was shed.
- 11. 06/20:1049 06/20:1829 F
07:40 Instrument bus electrical spike.
- 12. 07/10:12:55 07/10:1626 F
03:31 Reactor coolant leak into containnern
- 13. 07/.30:1502 09/02:0830 F-809:28 Steam generator tube leaks.
R
ROBINSON UNIT 2 (Continued)
Date/ Time Date/ Time Hrs./ Min.
Off On Type Duration Reason
- 14. 09/25:1750 09/27:0618 F
36:28 Inoperable control rod back.
- 15. 09/23:2120 09/28:2350 S
02:28 Manual shutdown to troubleshoot and repair the manual turbine control circuitry.
- 16. 10/16:0122 10/lo:1034 F
09:12 Generator exciter cooler service water tube leaks.
- 17. 11/'.:2050 11/19:1837 S
309:47 Scheduled maintenance.
- 18. 11/20: 1655 12/3:0615 F
301:20 Steam generator tube leaks.
- 19. 12/3:0638 12/3:2310 F
16:32 Reactor tripped on high steam generator level.
l[
- 20. 12/6:0645 12/6:1746 S
11:01 Unit was retired to inspect feeuwater regulator valve.
- 21. 12/6:1751 12/6:2102 F
3:11 Reactor tripped due to a steam flow, feed flow mismatch coincident.
with low steam generator level sign.
- 22. 12/7:1426 12/7:2141 F
7:15 Reactor tripped on low-level in ste generator.
- 23. 12/16:2243 12/17:1755 F
19:12 011 leak in the Electro-Hydraulic Control (EHC) System.
r
+
BRUNS'*'IC\\' UNIT 1 0FF-LINE OUTAGES 1982 Hrs./ Min.
Date/ Time Off Date/Tirae On Tepe Duration Reason 1982 1.
02/05:2115 02/14:0721 S
202:06 Scheduled snubber inspections.
2.
02/18:1154 02/2C:2207 F
$8:13 Stuck control valve.
3.
04/19:1239 04/20:0440 F
16:01 Reactor scrammed due to loss of 125/150 V DC power.
4.
05/05:0728 05/06:0907 F
25:39 Condenser vacuum switch failure.
$5'06/01:1015 06/05:2000 F
105:45 Turbine tripped on low condenser vacuum indication.
6.
06/07:2127 06/09:1030 F
37:03 Reactor scrammed when all Main Steam Isolation Valves (MSIV) closed.
7.
06/23:0200 06/29:0947 F
31:47 Undervoltage on auxiliary power distribution system.
8.
07/10:1415 07/11:1429 F
24:14 Turbine trip resalting from defective instrument in Electro-Hydraulic Control (EHC) system.
-9.
.07/16:2224 10/17:2225 F
2232:01 Local leak rate testing.
10.
10/21:223S 10/25:2057 F
94:19 Turbine tripped during routine test, causing reactor to scram.
- 11.
12/11:0134 Rematned off SP 502:26 Refueling and scheduled through the through maintenance.
end of December December h
e k,
s
.o BRUNSWICK UNIT 2 0FF-LINE OUTAGES 1982 Hrs./ Min.
Date/ Time Off Date/ Time On Type Duration Reason 1982 1.
1/13:123o 1/15:0305 F
38:29 Reactor scram due to recirculation pump overspeed.
2.
1/:6:1638 1/17:1742 F
25:04 Reactor tripped on turbine load rejection.
3.
1/20:0852 1/28:2152 F
205:00 Reactor tripped when level switches were disturbed.
4.
02/03:1516 02/05:0320 F
36:04 Reactor scrammed on main steam line high radiation indicatio:
5.
03/13:1901 03/14:1837 F
23:36 Reactor scrammed on reactor coolant low-level indication signal.
6.
04/24:0048 10/03:1257 SP 3899:09 Refueling and scheduled maintenance.
7.
10/03:2012 10/03:2102 S
00:50 Turbine overspeed trip test.
8.
10/10:2016 10/18:0356 F
175:40 Leak in heater drain system.
9.
10/24: 1339 10/25:0510 S
15:31 The unit was removed from service to troubleshoot and repair the primary system pressure sensor, which had caused the Reactor Recirculation Pump "A" to trip.
10.
10/28:0538 12/05:1101 S
918:23 Unit was removed from service to repair Traversing Incore Probe "A."
11.
12/22:1206 12/24:0453 F
40:47 Power / load imbalance.
+
0 s
m I
w ROBINSON UNIT 2 0FF-LINE OUTAGES 1982 Hrs./ Min.
Date/ Time Off Date/ Time On Type Duration Reason 1982 1.
- 02/26:2306 08/15:1448 SP 4070:42 Refueling and scheduled maintenance.
2.
08/15:1505 08/21:0200 F
131:35 Low steam generator water level.
'3.
08/21:0313 0S/21:0912 F
06:00 High steam generator water level.
4.
08/21:0925 08/21:1726 F
08:01 High steam generator water level.
5.
. 08/22:1707 08/24:0123 S
32:16 Turbine overspeed trip test.
6.
08/25:2223 08/25:2242 S
00:14 Turbine overspeed trip test.
7.
09/05:1529 09/06:0104 F
09i35 Reactor tripped due to a steam-flow, feed flow mismatch coin --
cidental with low steam generator level signal.
8.
09/07:0413 09/07:2256 T'
18:43
' Unit was removed from service to isolate a stuck open letdown relief valve in the chemical and volume control-system.
9.
09/09:1245 09/13:0925 F
92:40 Low steam generator water level.
10.
09/21:1349:
'09/21:2117 F
07:28 Reactor tripped due to a steam-flow, feed flow mismatch coinci-dental with low steam generator
-level signal.
11.
10/22:2251 10/24:0459 5
30:08 Scheduled maintenance.
12.
11/29:1512 12/01:1733 Fi 50:21
.High sodium levels in the secondary system.
c' 13..
12/31:0227 Remained off F
21:33 Low steam generator water level.;
through the through end of December.
December n
f n_.1
Brunswick Unit 1 Off-Line Outages January Thrcuch December 1983 Date/ Time Date/ Time Mrs./ Min.
Off On Type Dttration Reasen 1.
12/11:0134 08/26:1436 SP g,6204:02 Total Refueling and 5701:36 Jan-scheduled August maintenance 502:26 Dec.
2.
08/27:0155 08/28:1514 S
37:19 Turbine overspeed trip test 3.-
08/2F:1830 08/29:0547 5
11:17 Turbine everspeed trip test 4.
~10/18:0126 11/18:0958 SP 752:32 Planned maintenanc cutage 5.
11/25:2110 11/28:0539 F
56:29 Unidentified leaks in the drywell
( i.
12/22:0810 12/25:1827 F
82:17 Reactor scram 1
k e ;
f6u-'A 9
f&
O
_ _ - _ _ _ _ _ - _ - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ^ - - - - - - - - - - - - " - - - - ^ - - - ^ - - - ^
- ~ ~ ~ ' - ~ ~ ^
~ ~ ~ ~
Brunswick Unit 2 Off-Line Outeges Januarv Throuch Decerber 1983 Date/ Time Date/ Time Mrs./ Min.
Off Gn Tvre Duration Reasen 1.
01/03:0233 01/04:0842 F
30:09 Main Steer Isolati Valve (MSIV) clost signal 2.
02/03:0233 02/15:2310 S
308:37 Scheduled maintena 3.
04/08:1S39 05/C9:1649 SP 741:10 Electrical and mechanical tie-ins to the Augrented Cff-Gas System (AC 4.
05/16:2108 05/19:0757 F
58:49 Peactor tripped on false sienal frer Pain Steam Line Rc tion Monitor 5.
06/02:1833 06/06:0035 F
54:02 Power / load ir.balan
-6..
06/20:1316 06/26:0413 F
134:57 High reactor water level 7.
07/30:1836 08/11:1837 F
288:01 High drywell ficor drain leakage 8.
'08/3152226 09/03:0516 F
54:40 High Average Power Range Monitor Sigr 9.
09/03:1534 09/04:0905 F
17:31 High drywell floor drain leakage 10.
11/02:0251 Remained off-SP
- 1437:09 Planned maintenanc.
line through-out December
'* Outage ended 01/05/84: 0725 Total duration:
1540:34
(.
B g
w
e Pcbinson Unit 2 Off-Line Outages January Threuch Decerber 1983 Date/ Time Date/ Time Hrs./ Min.
Off On Type Duration Reasen 1.
12:31:0227 01/01:1321 F
34:54 Low steam generat:
13:21 Jan.
water level 21:33 Dec.
2.
01/07:2346 01/09:0055 F
25:09 Feedwater heater tube leaks 3.
02.12:0725 02/1?:1E53 F
09:28 Excessive vibratic en "B"
cerpenent cooling water pur; 4.
03/23:1109 03/24:0555 F
18: 46 Low steam,generat:
water level S.
04/01:0642 04/02:0645 F
24:03 Feedwater heater tube leaks
(,.
04/02:1454 04/C4:1701 F
50:07 Oil leak in the Electro-Hydraulic Control (EHC) Syst 7.
04/19:2209 04/21:1205 F
37:56 Loss of Electro-Hydraulic Control (EHC) System oil pressure 8.
04/24:1728 04/25:0311-F 09:43 Inoperable Service Water Booster Pur.ps (SWEP) 9.
04/29:0105 05/28:0124 SP 696:19 Scheduled nisintena and steam generatu inspection 10.
06/22:1653 06/22:2333 F
06:40 Reactor coolant-syrter leak 11.
07/28:0446-07/29:0312 F
22:26 Volvc Icakage-in Auxiliary Feedwate:
Purp 22.
09/05:1050 09/21:0159 F
375:09
(
Steam generator tul leak 13.
11/02:0453 12/C8:1257 F
P49:04 Steem generater tui inspection
.?'.
s' Rcbinson Unit 2 (centinued)
Off-Line Ou..ges Januarv Thrcuch December 1983 Date/ Time Date/ Tire Hrs./ Min.
Off On Type Duration Reasc-a
~
14.
12/06:1415 12/06:2155 F
7: 40 Feedwater regulat:
valve inceerable 4