e gp t/oo o L y'

zq

=h

=

, -16 gg Commercial operating dates:

n Robinson 2 - March 7,1971 7. c... [ ffIiC#WIY bSf0A CF Brunswick 1 - March 18,1977

' 2,(,

to IPI'9'hE*I Brunswick 2 - November 3,1975 (t/ffgg)

Following is a list of off-line outages at each',o'f the' Blungi,c); and Robinson nuclear units for the years 1978 through 1983. Included on;this list is a designation of the outage type. The key to this list is as follows:

F = Forced S = Scheduled / Maintenance SP = Scheduled / Planned A Forced Outage is defined as the occurrence of a component failure, or other condition, which requires that the unit be removed from service immediately or up to and including the very next weekend. A Maintenance Outage is the removal of a unit from service to perform work on specific components which could have been postponed past the very next weekend. This is work done to prevent a potential forced outage and which could not be postponed from season to season. The Planned Outage is the removal of a unit from service for inspection and/or general overhaul of one or more major equipment groups. This is work which is usually scheduled wellin advance.

4 sectua stoutatsst seemissies nectet se. FO-4 d*#

atticieise,s. 7 T - 2t/ _

la the matter of,MdL44tdevvML M/

litNTittID Staff-RECElVID Applicast-V

. R!hCTED _

laterv ener _.

Cearg strt _

Centratter_

.,,er gegerter _

8501110176 840910 PDR ADOCK 05000400 0

PDR

BRUNSWICK UNIT 1 0FF-LINE OUTAGES 1977*

Date/ Time Date/ Time Hrs./ Min.

Off On Type Duration Reason

1. 03/18:1045 03/19:0643 F

19:58 Rx scram - during a pres-sure regulator failure test at 95% Rx power on APRM Hi flux level.

2. 04/01:2203 04/05: 1521 M

89:18 Rx scram - the Rx scrammed during startup test #27/8.2-load reject test at full power.

3. 04/06:1457 04/08:0622 F

39:25 Rx scram - control operator reset recire pump run back too quickly causing the Rx to scrau on Rx Hi flux level.

4. 04/27:1141 07/07:0541 F

2,242:00 Rx scram - generator ground caused turbine trip and Rx scram.

[

~. 07/07:0644 07/07i0707 F

23 Relay maintenance personnel tripped generator pri.

lockout relay which removed generator from

.the grid.

6. 07/08:0005 07/08:0022 M
17 Generator was removed from grid to perform overspeed trip test on turbine.

~7. 07/08:0045 07/08:2237 F

21:52 Generator was removed from grid in order to degas and rebalance the rotor.

8. 07/17:1059 07/18:1627 F

29:28 Generator was removed from the grid due to high drywell leakage through the floor drain.

9. 07/22:2045 07/25:0402 F

55:17 Manual Rx shutdown - unit was manually scrammed to investi-gate drywell floor drain leak -

age.

' Commercial' Operation - March 18.

SYSTM7-Q-1 d

+

BRUNSWICK UNIT 1 f

0FF-LINE OUTAGES 1977*

Date/ Time Date/ Time Mrs./ Min.

Off On Type Duration Reason

40. 07/28:1112 08/10:1140 F

312:28 Scram - operator error while performing PT 2.1.22 (pri.

Containment isolation system steam line).

11. 08/12:2242 08/13:1715 F

18:33 Main turbine trip and generator was separated from grid to clean a ground on #6 lift pump piping.

12. 08/14: 1520 08/15:0243 F

11:23 Reduced power in order to clear a ground on #6 lift pump piping.

13. 08/28:2125 08/29:112S F

14:03 Power was reduced due to a steam leak in turbine building.

14. 09/16:0953 09/17:0419 F

18:26 Rx scram - operator error caused condensate booster

(

pump low suction a*nd Rx scrammed low water level.

15. 09/30:2229 10/06:0650 M

128:31 Rx scram - startup test #25 MSIV full closure at full

' power.

16. 10/08:0631 10/08:2049 F

14:18 Generator was removed from grid to clean A-S & A-N waterboxes.

17. 10/14:1736 10/16:2238 F

53:02 Shutdown due to high drywell leakage through floor drains.

18. 10/29:0109 10/30:1319 M

37:10 Rx shutdown to repair steam leaks on valve and repair main generator auto. voltage regu-lator.

19. 11/13:0037 11/26:2141 F

333:04 Rx scram while performing PT 1.3.2 recirc pump seals failed, replaced both recire pumps.

12/04:2045 F

45:04 Unit shutdown to repair (20.12/02:2341 reactor feedwater pump 1A.

SYSTM7-Q-2

+

BRUNSWICK UNIT 1

.(

OFF-LINE OUTAGES 1977*

Date/ Time Date/ Time Mrs./Hin.

Off On Type Duration Reason

21. 12/16:0645 12/17:1129 F

28:44 Rx scram during.ECCS test, power lost to Unit #1 EHC system, loss of E2 bus; blown fuse.

22. 12/21:1102 12/23:0723 F

44:21 Rx scram - operator was reducing power with recirculation pumps low water level caused scram.

23. 12/31:2316 12/31:2400 M
44 The drywell was de-inerted to make an entry to add oil to 1A recirc pump.

(

SYSTM7-Q 3

BRUNSWICK UNIT 2

('

OFF-LINE OUTAGES 1977 Date/ Time Date/ Time Hrs./ Min Off On Tyge Duration Reason

1. 01/02:0500 01/02:1934 F

18:44 Rx Scram while performing PT 40.25 (Turbine control valve test).

2. 01/07:1255 01/08:1148 F

22:53 Rx Scram - Technician error while performing PT 1.1.4 caused a Group I isolation and scram.

3. 02/02:2354 02/06:0132 F

73:38 Manual shutdown to repair a burned drywell drain pump motor.

4. 02/14:0825 02/17:1858 F

82:31 Rx Scram - off line at 544 MWe when high exhaust hood temp.

was received.

5. 02/23:1448' 02/24:0807 F

17:19 Rx Scram - B Feedwater pump

-(-

operating at-minimum speed.

tripped - A F.W. pump was

6. 04/05:2259 04/07:0138 F

26:39 Rx Scram - Loss of instrument' air caused loss of condensate booster pump supply pressure.

7. 04/15:2150 05/06:2210 M

503:20 Rx Scram - Shutdown for routine maintenance and modi-

'fication of 2A recirc.~ pump.

8. 05/07:1132 05/08:1349 F

26:17 Rx Scram - FW pump and booster L

pump trip, causing low water level and Rx Scram.

i-

9. 05/21:2209'

.05/22:1653 F

18:44 Rx Scram - Operator error while performing P.T. 40.2.5 control valve test.

i:

10. 05/31:0936-06/02:0304 F

41:28 lbc Scram. Mechanic error while cleaning EHC duplex. oil.

filters.

11. 06/02i2127 06/03:0547

.F 8:20~

Rx Scram - Spurious upscale on.

2C Radiation monitor caused by_

man climbing on cable tray.

(

SYSTM7-Q-4; L_

BRUNSWICK UNIT 2 0FF-LINE OUTAGES 1977 Date/ Time Date/ Time Hrs./ Min Off On Type Duration Reason

12. 06/14:2324 06/15:2328 F

24:04 Rx Scram caused by heater drain deaerator level oscillation.

13. 07/11:0202 07/12:0330 F

25:28 Scram - Loss of lube water to CW pumps due to shells in lube water lines.

14. 07/15:1038 07/18:1455 F

76:17 Rx Scram - A spurious signal (Hi turbine exhaust temp.) caused a turbine trip.

15. 07/19:2047 07/20:0605 M

9:18 Generator was removed to investigate reason for trip on 7/15.

16. 07/31:1347 08/01:1026 F

19:14 Scram - Technician error while performing P.T. 2.1.26

(

(Main steam line low pressure).

7. 08/15
1114 08/17:0235 F

39:21 Rx Scram - I&C error while performing P.T. 3.1.5.

18; 08/17:0435 08/21:1525 F

106:50 Generator was removed due to High Chlorides in the main condenser.

19.'09/04:0610 09/05:0720 F

25:10 Rx Scram - The generator auto.

voltage regulator out of service due to loss of turbine building cooling.

~

20. 09/08:2047 09/09:1018 F

13:31 Rx Scram - Rx Feedwater pump control oscillation caused Rx to Scram.

21. 09/10:0105 12/26:1717 P

2585:12 Manual Scram - shutdown for a 54-day refueling and maintenance outage.

22. 12/26:2359 12/31:2400 F

120:01 To correct steam leak on the MS Bypas. valves and problems with HPCI system speed control.

k SYSTM7-Q-5

(,.

ROBINSON UNIT 2 0FF-LINE OUTAGES 1977 Date/ Time Date/ Time Mrs./ Min.

Off On Type Duration Reason

1. 01/11:1701 01/11:2015 F

3:14 Manual reactor trip following loss of MCC-6.

2. 01/24: 1826 01/24:2220 F

3:54 Reactor trip due to Hi pres-surizer press.

3. 01/25:1148 01/25:1508 F

3:20 Turbine trip caused by loss of "B" inverter.

.6. 02/05 02/17 F

278:62 "C" RCP high leakage.

5. 02/18:1814 02/20:0352 F

33:38 Inspect //2 turbine generator for insulation failure.

6. 03/23:1333 03/24:1930 F

29:57 E.H. Governor valve failed shut causing Rx trip.

7. 03/25:2310 03/27:0113 M

26:03 Repair turbine trip block.

8. 04/24:1924 04/30:2342 F

148:18 Loss #1 seal leakoff indica-tion on "C" RCP.

9. 06/17:2222 06/18:1938 M

21:16 NRC startups.

10. 08/17:0904 08/17:2020 F

11:16

  1. 3 steam generator high steam line AP safeguard trip, while testing aux feedwater pump valve V214C.
11. 08/23:2339 08/24:0702 F

7:23 4B F.W. heater - repair tube leaks.

12. 09/29:2300 09/30:0854 M

9:54-To repair tube leaks in 4B heater.

13. 10/05:1621 10/05:1855 F

2:34 Turbine trip - High level-"B" steam generator, loss of instrument Buss 2.

10/26:0643 11/24:2140 F

710:57 Failed packing in valve RRR-750 and failure in Bit.

=15. 12/19:1028 12/19:1247 F

2:19 Overtemp. Delta temp. trip while performing periodic

(

\\

test.

SYSTM7-Q-6'

ROBINSON LWIT 2

(-

0FF-LINE OUTAGES 197's Date/ Time Date/ Time Mrs./ Min.

Off On TyTe Duration Reason 16.!!2/19:1251 12/19:1305 F

14 Trip - due to #3 steam generator Hi level while recovering from a previous trip.

\\

o F

n-e-

i sysTM7.-Q-7 ~

i

BRUNSk'ICK " NIT 1 0FF-LINE OUTAGES Janueri threuch December 1978 Date/ Time Date/ Time Hrs / Min Off On Type Duration Reason l

1.

01/01:0000 01/01:042S S

4:28 High onygen level in drywell.

2.

01/13:1111 01/15:1945 F

56:37 Condenser hetsell drain line lez; 3.

01/19:246 01/:::1530 S

64:44 Steam leaks on several valves.

4 02/C4:010:

02/05:0610 S

29:05 Clean condenser.

5.

02/13:C04:

02/27:0004 F

335:::

Several switchyard breakers tri7-causing generater trip and react scram.

6.

02/ 7:1635 02/ 8:2045 S

28:10 Safety relief valve repair.

7.

03/13:1644 03/15:0735 F

38:51 Spurious signals in main steanli:

leak detectors caused reactor sc-8.

04/04:0849 04/06:1315 F

52:26 Reacter scram caused by_ reactor pressure spike.

9.

04/07:2237 04/08:0557 S

7:20 Clean strainer and replace state:

cooling filters.

10.

04/08:1301 04/09:0017 F

11:16 Loose fuse caused main stea: lini isolation valves to clese, and a=

reactor scram.

11.

04/30:1527 05/01:0655 F

15:28 Reactor scranned due to reactor feed pump trip.

12.

05/01:1502 05/03:00:3-F.

33:21 Safety relief valve repair.

13.

05/03:0618 05/03:0644 S

26 Turbine over' speed trip test.

14.

05/19:2153 05/24:0640 F

104:47 Reactor recirculation pu=p seals replacement.

15.

05/27:2255

'05/28:0630 5

7:35 Excessive Icaks in dryvell equir-ment drain tank.

16.

06/07:0 21 06/08:1235 F

34: 14 Master turbine trin ecused by hi.

vibration si:nal.

17.

06/09:0903 06/29:1935 F

10:27 Reactor scram caused by,turtirc-step ralve clesure.

(cont.)

BRUNSWICK UNIT 1 0FF-LINE OUTACCS Januar5 threuch December 1978 Date/ Time Date/Ti=e Hrs /::in Off On Tvee Durs:1er

_Ressen

18. 07/06:105 07/07:1406 F

27:14 Reacter scram initiated by Icv vater level scrce ins:runents.

19.

07/05:0316 07/05:1509 F

11:53 Reacter scr:m due to icv vater level.

20.

05/03:0C00 0S/09:0917 F

12:55 Preblems with.* aster Trip Solen:

Test resulted in turbine trip ar reactor scr30.

21.

C9/ s:2346 10/01:0:36 S

146:50 Dryvell snubber inspection.

22.

11/02:1301 11/03:0707 F

18:06 Losslof condenser vacuum.

23.

11/11:1130 11/12:1547 F

28:17 High reactor vessel cenductivity exceeded Technical Specificatien limit for operatien.

24 11/17:20!?

11/20:0128 5

52:30 Inspection of the reactor recirculation system inlet no::1.

safe-ends to the reactor vessel.

4 L

i Y

O I.

5 ti.

BRUNS'a*ICK UNIT 2 0FF-LINE OCTACES Januarv threuch December 1978 Date/Ti=e Date/Ti=e Hrs / Min Off On Tvre Duration Reasen 1.

01/01:0000 01/01:2025 F

20:25 Steam leaks on MS bypass valves.

2.

01/02:1019 01/03:08:2 F

22:03 Low reactor water level.

3.

01/06:0941 01/C9:1900 F

81:19 Reactor scrcm due to false icv reactor water indicatien.

4 01.1~:12*6 01/18:0559 F

16:43 Turbine and generator trip due t<

centrol circuit ground.

5.

01/31:'.I'5 02/01:1343 F

26:03 EHC pressure spike causing reac::

scra=.

-6.

03/05:CE21 03/06:0900 F

24:39 False low reactor water indicatic 7.

03/13:1251 03/14:1411 F

25:20 Main turbine and feed pu:p turbi:

trip.

8.

03/23:1137 03/24:0924 F

21:47 Reacter feed pump controller fail ure.

-9.

03/24:1739 03/25:0035 F

6:56 Main turbine trip due to generat:

ground signal.

10.

03/26:1710 03/26:2150 F

4:40 Main turbine trip due te generat:

ground signal.

11.

03/23:1219 03/28:1822 F

6:03 Main turbine trip.due to generat ground signal.

12.

03/29:1410 04/04: 1412 F

144:02 Main turbine trip due to generate ground signal.

13.

04/09:0807 04/09:2237 F

14:30 230 KV bus lock out causing turbf trip.

14.

05/17:2027_

05/18:1903 F

22:36 230 KV bus lock out causing turbi trip.

15.

05/23:0853 05/23:2157 F

13:04 Pressure transient en reacter ves level instruments.

'6/02:2356 06/11:2232 S

214: 26 investig:te and repair 2enere:::

16.

0 hydro en lenk.

4

+

3--

Q (cont.)

BRUNS %'ICK UNIT 2 0FF-LINE OUTAGES Januar threuch December 1978 Date/ Time Date/ Time Ers/ Min Off On Tvre Du r.s tien Reasen 17.

06/11:2032 06/22:0537 F

247:05 Excessive coolant teeperatures :-

the pu=p seal ecoling system.

18.

07/03:0052 07/C6:1353 F

85:01 Reactor scram due to hi;h. flu:-

level spike.

19.

07/IS:1:40 07/19:1250 F

21: 10 Reactor scram due to APRM ups:c!c-trip.

20.

05/.'5:203; OS/02:C6:3 S

81:49 High dryvell floor drain eakage 21.

09/06:2024 09/04: 113a S

4:3:00 High condensate conductivity.

22.

11/06:1337 11/14:1438 F

193:01 Generator lockout due to less ci excitatien.

'23.

11/30:1129 12/01:0701 F

19:32 Reactor trip due to low reacter vessel vnter level.

I e

b L

__b

ROBINSON UNIT 2 0FF-LINE OUTAGES Januarv throuch Decceber 1978 Date/ Time Date/ Time Hrs / Min Off On Tyre Durstion Reason 1.

01/13:1912 01/15:1052 7

39:40 Main steam isolatten tal re ("5:'7' failed closed.

2.

01/07:0 1C 02/01:::10 F

100:00 High vibrations on react:: ecci:-

pump.

3.

02/01:2010 04/:3:1934 SP 1941:24 Planned refueling and = air.:er.tr.:e 4

04/04: 1146 04/24: 1701 F

5:15 High turbine vibr:tiens.

5.

04/23:15C9 04/25:1S13 F

3:24 MS!'.' soler.oid coil f ailure.

6.

07/10:06:1 07/15:0045 F

114:24 High pressuri:er pressure.

7.

07/16:0605 07/17:0620 F

24: 15 Failure of "A" statien batter;.

8.

07/31:102 07/31:1551 F

5:29 Reactor coolant pump trip.

9.

08/01:1505 08/01:1947 F

4:42 Steam generator high level alarr..

10. 09/21:2009 09/09:1918 F

191:09 Steas generator tube leak.

11.

10/16:0746 10/16:1044 F

2:58 Steam line pressure transmitter failure.

t S

t a

4 BRUNS'w'ICK UNIT 1 0FF-LINE OUTAGES 1979 Date/ Time Date/ Time Hrs./ Min.

Off On Type Duration Reason

1. 01/12:2322 4/16:2317 SP 2255:55 Scheduled maintenance and re:ueling outage.
2. 4/17:1049 4/17:1256 S

02:07 The unit was removed from serrice to perform a planned test on the turbine overspeed devices.

3. 4/17:1458 4/19:1329 F

51:41 Reactor high-pressure trip due to the turbine runback.

4. 4/19:2300 4/19:2315 S

00:15 The unit was removed from service to repeat the electrical backup overspeed portion of the turbine overspeed trip test.

5. 4/20:0112 4/20:0205 S

00:53 The uait was retired to repeat the electrical turbine overspeed test.

6. 4/20:1148 4/20:1232 S

00:44 The unit was retired to repeat the turbine electrical backup overspeed test.

7. 5/01:0658 5/04:0220 F

67:22 Reactor trip due to indicated APRM upscale thermal trip signal.

8. 5/26:0247 6/10:1508 SP 372:21 Inspection and modification of pipe supports.
9. 7/18:2330 7/19:1709 F

17:39 Average Power Range Monitor flow was biased upscale, which caused a reactor trip.

10. 7/28:1433 7/29:0358 F

13:25 Reactor tripped on'a false low reactor water level signal.

11. 8/04:1558 8/05:0715 F

15:17 Reactor trip on.high neutron flux indication.

12. 8/09:0719 8/09:2310 F

15:51 Reactor trip on high neutron flux indication.

13. 8/19:1425 8/20:0224 F

11:59 Reactor transient in level instrumentt caused a reactor trip.

U

BRUNSWICK UNIT 1 (Continued) 0FF-LINE OUTAGES 1979 Date/ Time Date/ Time H r s. /.'lin.

Off On Tvpe Duration Reason

14. 9/08:0750 9/17:0642 S

214:52 Hydraulic snubber (shock absorber) inspection required by NRC Technical Specifications.

15. 10/08:0913 10/09:0326 F

18:13 Reactor trip on low water level indication.

16. 10/19:0051 10/2a:2124 F

140:33 The reactor tripped on a main steam line high radiation signal.

17. 11/05:0733 11/16:0621 F

262:48 Reactor trip due to reactor water low level.

18. 11/20:1330 11/29:1628 F

218:58 Reactor trip due to temporary loss of power to the emergency busses.

19. 12/01:2158 12/05:0504 F

79:06 To repair recirculation. pump valve leaks.

(

20. 12/12:0057 12/20:2356 S

214:59 Hydraulic snubber inspections, modifications required by NRC is response to the TMI incident, and recirculation pump seal work.

21. 12/21:0548 12/21:0755 F

02:07 To test and repair safety relief valve modifications made during the previous (December 12-20) outage.

t l

~

l t

m

BRUNSWICK UNIT 2 e(

OFF-LINE OUT.;GES 1979 Date/ Time Date/ Time Mrs./ Min.

Off On Type Duration Reason

1. 01/29:1135 01/30:011$

F 13:43 High steam line pressure spike.

2. 02/04:2052 02/05:0357 F

07:05-Recire. pump runback and reactor high pressure spike.

3. 03/02:2322 05/19:0715 SP 185a:53 Scheduled maintenance and refueling outage.
4. 05/19:1447 05/19:1557 S

01:10 The unit was removed from service to perform a planned test on the turbine overspeed trip device.

5. 05/21:1130 05/22:1912 F

31:42 Reactor trip.

6. 05/23:0717 05/23:2108 F

13:51 Reactor trip on low water level indication.

(

7. 05/25:1909 06/12:0612 SP 419:03 Inspection and modification of pipe supports.
8. 06/12:1309 06/13:0622 F

17:13 Reactor trip due to main steam isolation valve closure indication.-

9. 06/29:2249 07/05:0442 S

125:53 Hydraulic snubber inspection required by Technical Specifications.

10. 07/19:1316 07/21:0649 F

41:33 Replacement of main steam safety relief valve.

11. 07/31:0423 08/03:0732 F

75:09 Turbine and reactor trip on loss of condenser vacuum.

12. 08/31:2347 09/06:2149 5

142:02 -

Hydraulic snubber (shock absorber) inspection required by Technical Specifications.

13. 09/07:0449 09/08:0220 F

21:31 Steam leak in main steam line drain valve.

14. 09/12: 1415 09/13:1512 F

24:57 Nuclear service water leak.

15. 09/14i0743 09/15:0050 F

17:07 Reacto-r trip due to load reject indication.

BRl'NSWICK UNIT 2 (Continued) 0FF-LINE OUTAGES 1979 Date/ Time Date/ Time Mrs./ Min.

Off On Tm Duration Reason

.16. 09/22:0311 09/22:1523 S

12:22 Scheduled maintenance on reactor core instrumentation.

17. 11/19:0S52 11/21:1226 F

51:34 Reactor trip due to nuclear system false high pressure signal.

~13. 12/25:2345 Through the S

144:15 Hydraulic snubber inspecticas and end of the modifications required by the NRC year.

in response to the TMI incident.

(:

e 4

I e

C

=

r ROBINSON UNIT 2 0FF-LINE OUTAGES 1979 Date/ Time Date/ Time Hrs./ Min.

Off On Type Duration Reason

1. 01/06:0924 01/07:2317 F

37:53 Feedwater control malfunction..

2. 01/07:2320 01/03:0438 F

05:18 Feedwater control malfunction.

3. 02/06:132S 02/07:0032 F

11:04 A containment high pressure signal resulting in a turbine trip.

4. 02/21:1029 02/21:1323 F

02:54 "B" steam generator high level trip.

5. 04/11:2042 04/17:2400 F

147:18 "B" steam generator leakage exceeded Technical Specifications.

6. 04/18:0000 07/21:2221 SP 2277:21 Scheduled maintenance and refueling outage.
7. 07/22:1151 07/22:1922 F

07:31 To balance the turbine and to perform turbine overspeed trip test.

8. 07/23:1103 07/23:1825 F

07:22 Oil leaks in the turbine Electrohydraulic Control System (EHC).

9. 08/16:1121 08/16:1935 F

08:14 False high pressure signal which resulted in a reactor trip.

10. 08/16:2332 08/17:1020 F

10:48 Nuclear Instrumentation System (NIS) Overpower reactor trip.

11. 09/04:2255 09/05:2207 S

23:48 Threat of Hurricane David

12. 09/23:0318 09/23:1247 F

09:29 Reactor trip on a "High Pressurirer Pressure" indication.

13. 09/30:0845 10/01:0205 F

17:20 Cleanup and evaluation of an oil fire in "C" reactor coolant pump bay.

14. 11/02:2055 11/03:0842 S

11:47 Unit shutdown to balance turbine.

mee

J

'n 4

1 i-4 I.

ROBINSON UNIT 2 (Continued) f 0FF-LINE OUTAGE'S t.

1979.

(,,

l

15. 12/13:1555 12/13:1907 F

03:12

-Turbine trip and reactor trip 4:

due to.high water level in "A" steam generator.

j

16. 12/22:0324 12/22:090o F

05:42 T rbine and reactor trip during l

periodic test.

J-1 O

4 i'

j.'

1 1

j.

[

1 3

J l

t i

1 I'

t J

k I

e 4:_

3 f

4 l-i

+

f BRUNSWICK UNIT 1 0FF-LI.VE OUTAGES 1980 Date/ Time Date/ Time Mrs./ Min.

Off On Type Duration Reason

1. 03/23:0043 03/24:2018 F

43:35 Reactor trip due to high reactor water level.

2. 03/26:1545 03/2S:0723 F

39:47 Drywell leakage.

3. 03/31:1310 04/03:02~ 0 F

61:40 Reactor trip due to low reactor water level.

4. 04/05:0108 04/06:0721-F 30:13 Turbine taip.

~5. 04/06:0450 04/13:0927 F

124:37 Turbine trip.

6. 04/15:1231 04/17:1500 F

50:29 Turbine trip.

7. 04/26:2325 04/27:2009 F

19:44 Drywell leakage.

(

8. 05/26:1518 08/22:1400 SP 2110:42 Refueling scheduled maintenance and unscheduled regulatory tests, inspections, and analyses.
9. 08/25:1721 08/28:0433 F

59:12 Reactor coolant conductivity.

10. 09/12:1538 09/15:1430 S

70:52 Inspect a senerator bearing.

11. 10/14:0111 10/15:2015 F

43:04 The reactor scrammed when steam flow in main steam lines exceeded preset flow limits.

12. 12/28:1453 Through the S

81:07.

Snubber inspections and feedwater end of Decem-heater maintenance.

ber 1980 e

.BRUNSk'ICK UNIT 2 0FF-LINE OUTAGES 1980 Date/ Time Date/ Time Hrs./ Min.

Off On T.pe Duration Reason

1. 12/25:2345 01/05:1021 S

250:36 Hydraulic snubber inspections 106:21-Jan.

and modifiestions required by 144: 15-Dec.

KRC in response to TMI incident.

2. 01/07:2200 01/10:0254 F

51:54 Indication of safety relief valve leakage.

3. 02/13:0951 02/15:1S20 F

56:29 Reactor trip during periodic test.

4. 03/01:0244 09/17: 1205 SP 4808:21 Refueling required modifications, scheduled maintenance, and unsche-duled regulatory tests, inspections and analyses.
5. 09/17:1513 09/17:1524 S

00:11 To perform a turbine overspeed trip test.

6. 09/19:1030 09.22:0704 F

68:34 Reactor scram for which no cause could be determined.

7. 09/23:1438 09/26:1935 F.

76:57 Drywell floor drain leakage.in excess of Technical Specifications limits.

8. 10/11:1014 10/13:1625 F

54: 11 Reactor scrammed when high neutron flux in the reactor exceeded Averar Power Range Monitor (APRM) setpoir.t

9. 10/28:0749 10/29:0636 F

22:47 Nigh reactor water level caused a trip of the main turbine resulting in a reactor scram.

10, 11/13:0056 11/14: 1143 F

34:47 Loss of the Reactor Protection System power supply.

11. 11/15:1750 11/16:0603 F

12:13 The unit was taken out of service to repair a leak in the recirculatic system for the heater drain pumpa.

G

BRUNSWICK UNIT 2 (Continued) 0FF-LINE OUTAGES 1980

'Date/ Time Date/ Time Mrs./ Min.

Off On Type Duration Reason

12. 11/18:C724 11/19:2051 F

37:27 The reactor scrammed due to a turba.

trip.

13. 12/05:2258 12/13:1S57 S

187:59 The unit was taken out of service to repair tube leaks in a feed-water heater.

14, 12/1o:0956 12/19:0651 F

68:55 Reactor scram due to low condenser Vacuum.

15. 12/26:1026 12/30:2140 F

107:14 Reactor tripped on low water level.

(

g a

ROBINS?N UNIT 2 OFF-LINE OUTAGES 1980 Date/ Time Date/ Time Hrs./ Min.

Off On Type Duration Reason

1. 03/14:2357 03/28:0929 S

321:32 Steam generator tube leaks.

2. 04/13:2246 05/02:1551 F

448:05 Reactor coolant pump seal f ailures.

3. 05/17:1839 05/18:083e F

13:57 Adjustment of reactor trip setpoint

4. 05/22:0746 05/22:1030 F

02:42 Reactor trip.

5. 06/10:0007 06/10:0231 F

02:24 Reactor trip.

6. 06/10:1715 06/10:2204 F

04:49 Loss of condenser vacuum.

7. 07/07:1147 07/16:2044 F

224:57 Steam generator tube leak.

8. 08/08:2207 10/25:0049 SP 1850:42 Refueling and scheduled main-tenance.
9. 10/25:0932 10/25:1151 S

. 02:19 To perform a turbine overspeed trip test.

10. 10/25:1459 10/25:1323 F

03:29 Disconnected grounding strap on the generator grounding transformer.

,11. 10/25:1839 10/26:0151 F

07:12 The reactor tripped due to low water level in "B" steam generator coincident with steam flow-feedwater flow mismatch.

12. 10/26:0155 10/26:0421 F

03:26 High/High level in "B" steam generator.

13. 11/02:1538 11/02:2337 F

07:59 Reactor trip caused by low water level in "A" steam generator coincident with steam flow-feedwater flow mismatch.

14. 11/07:1005 11/07:1649 F

06:44 Loss of condensate and feedwater pumps.

. = _. -..

a I-ROBINSON UNIT 2 (Continued)

OFF-LINE OUTAGES 1980 t

Date/ Time Date/ Time Mrs./ Min.

Off On Type Duration Reason

.15. 11/15:2251 11/16:1724 S

18:33 High turbine vibration.

16. 11/27:1421 12/12:1153 F

357:32 Valve packing leak,

17. 12/12:2002 12/14: 1240 F

40:38 Valve packing leak.

1_ -

I

,i -

k i+

4 4

Y t

Y'

(

i-e-

c k

i ' b u

? il

. m

BRUNS'n'ICK UNIT 1 0FF-LINE OUTAGES 1981 Date/ Time.

Date/T.me Hrs./ Min.

Off On Type Duration Reason

1. 12/28:1453 1/6:2347 S

143:47(Jan.) Snubber inspections and feedwater Dee. incl.

224:54 heater maintenance.

2. 1/20:1143 1/22:042-F 40:41 Indication of low water level in the vessel tripped the reactor.
3. 1/30:0347 1/31:1726 F

37:39 Reactor scram due to loss of reactor feed pump "A."

4. 2/12:0915 2/13:0858 F

23:43 Reactor scram due to loss of condenser vacuum.

5. 2/24:1349 2/25:0305 F

13:16 High oxygen concentration in the dryvell.

6. 3/29:2153 4/9:0913 F

251:20 High pressure trip signal.

7. 4/17:2312 9/23:1939 ~

SP 3811:27 Scheduled annual outage.

8. 9/24:0255 9/25:0659 F

28:04 Turbine trip.

9. 10/1:1522 10/3:0621 F

38:59 Turbine trip.

s.

10. 10/29:1634 10/31:2137 F-53:03 Reactor tripped on low water level.
11. 11/14:0218 11/14:0630 S

4: 12 Unit was. removed from service to investigate abnormal resistance readings on the generator hydrogen seals.

12. 11/15:0041 11/19:0204 T-97:23 Failure of turbine stop valve swit.'
13. 12/2:0724 12/4:1750 F

58:26 Va.1ve packing leak.

./.(.

e 9

( ________ - _____

BRUNSWICK UNIT 2 0FT-LINE OL'TAGES 1981 Date/ Time Date/ Time Mrs./ Min.

Off On Type Duration Reason

1. 01/07:0737 01/11:0921 F

97:44 Reactor scrammed on low water level in the vessel.

2. 02/14:0843 02/22:0629 S

189:40 Main steam isolation valve repair.

3. 02/24: 1811 02/26:0150 F

31:39 High oxygen concentration in the drywell.

4. 02/26:0830 02/27:0638 F

22:08 Reactor scram due to large power spikes.

5. 02/28:1633 02/23:1846 F

2:13 To test main generator instrumenta-tion and control.

6. 03/05:0552 04/10:1521 F

873:29 The unit was shut down when periodic testing of accessible hydraulic snubbers indicated a (l

high failure rate.

7. 04/11:0322 04/11:1322 F

10:00 The unit was manually shut down to comply with Technical Specifisa-tions concerning operability of safety systems.

8. 04/12:1301 04/17:1819 S

125:18 The unit was manually shut down when levels of conductivity and chlorides exceeded limits prescribed by Technical Specifications.

9. 04/17:2126 04/18:0506 F

7:40 The unit was manually shut down when levels of conductvity exceedeit limits prescribed by Technical Specifications.

10. 05/03:0525 05/04:0227 F

21:02 Valve packing leak.

11. 05/06:0541 06/08:0704 F

793:23 Restricted water flow through restdual heat removal heat exchangers.

BRUNSWICK l' NIT 2 (Continued)

Date/ Time Date/ Time Hrs./ Min.

Off On Type Duration Reason

12. 06/10:1020 06/11:2352 S

37:32 Excessive temperature differential between rectreulation loops A and B 13.- 06/22:2151 06/2S:0745 F

129:54 Recirculation pump failure.

14. 07/02:0153 07/03:1041 F

32:48 Main steam isolation valve (MSIV) failure.

15. 07/11:0545 07/12:2158 F

40:13 Reactor scram on turbane trip.

16. 07/18:1143 07/27:2304 F

227:21 Unit removed from service to repair two MSIV's.

17. 08/04: 1947 08/07:1527 F

67:40 Reactor scrammed due to low condenser vacuum and turbine trip.

(

18. 10/23:1541 10/30:0446 F

158:05 Scheduled snubber inspection.

19. 11/2:1431 11/3:1601 F

25:30 Reactor tripped on high water level

20. 12/18:1704 12/21:0214 F

57:10 Repair valve controls.

21. 12/26: 1711 12/;6:2351 S

6:40 Unit was removed from service to replace a gasket on the moisture separator reheater drain tank.

l l

I m

.m

. m

.- a

r-ROBINSON UNIT 2 0FF-LINE OCTAGES 1981 Date/ Time

.Date/ Time Mrs./ Min.

Off On Type Duratton Reason

1. 01/24:2345 01/25:1700 F

17:15 Feedwater heater tube lean.

2. 01/29:0o41 02/01:1715 F

82:34 Manual shutdown due to loss of oil from the turbine Electro-Hydraulic Control System.

3. 02/01:1906 02'01:222?

F 03:23 Reactor trip due to a steam flow, feed flow mismatch coincident:

with low steam generator level.

4. 02/02:1505 02/02:1822 F

03:17 Reactor trip due to a steam flow, feed flow mismatch coincidental with low steam generator level.

5. 02/02:2043 02/04: 1430 F

41:47 Reactor trip due to a steam flow, feed flow mismatch coincidental with low steam generator level.

6. 03/22:1345 03/23:0111 F

11:26 Manual shutdown due to incorrect rod position of Rod N-9.

7. 04/21:1515 04/21:2041 F

05:26 Reactor trip due to a steam flow, feed flow mismatch coincidental with low steam generator level.

8. 04/21:2139 04/22:0614 F

08:35 The unit was taken off line to repair heater drain valves.

9. 05/16:0003 06/11:1704 5

641:01 Scheduled steam generator tube inspection.

10. 06/19:1711 06/20:0446 F

11:3'5 Manual scram when turbine load was shed.

11. 06/20:1049 06/20:1829 F

07:40 Instrument bus electrical spike.

12. 07/10:12:55 07/10:1626 F

03:31 Reactor coolant leak into containnern

13. 07/.30:1502 09/02:0830 F-809:28 Steam generator tube leaks.

R

ROBINSON UNIT 2 (Continued)

Date/ Time Date/ Time Hrs./ Min.

Off On Type Duration Reason

14. 09/25:1750 09/27:0618 F

36:28 Inoperable control rod back.

15. 09/23:2120 09/28:2350 S

02:28 Manual shutdown to troubleshoot and repair the manual turbine control circuitry.

16. 10/16:0122 10/lo:1034 F

09:12 Generator exciter cooler service water tube leaks.

17. 11/'.:2050 11/19:1837 S

309:47 Scheduled maintenance.

18. 11/20: 1655 12/3:0615 F

301:20 Steam generator tube leaks.

19. 12/3:0638 12/3:2310 F

16:32 Reactor tripped on high steam generator level.

l[

20. 12/6:0645 12/6:1746 S

11:01 Unit was retired to inspect feeuwater regulator valve.

21. 12/6:1751 12/6:2102 F

3:11 Reactor tripped due to a steam flow, feed flow mismatch coincident.

with low steam generator level sign.

22. 12/7:1426 12/7:2141 F

7:15 Reactor tripped on low-level in ste generator.

23. 12/16:2243 12/17:1755 F

19:12 011 leak in the Electro-Hydraulic Control (EHC) System.

r

+

BRUNS'*'IC\\' UNIT 1 0FF-LINE OUTAGES 1982 Hrs./ Min.

Date/ Time Off Date/Tirae On Tepe Duration Reason 1982 1.

02/05:2115 02/14:0721 S

202:06 Scheduled snubber inspections.

2.

02/18:1154 02/2C:2207 F

$8:13 Stuck control valve.

3.

04/19:1239 04/20:0440 F

16:01 Reactor scrammed due to loss of 125/150 V DC power.

4.

05/05:0728 05/06:0907 F

25:39 Condenser vacuum switch failure.

$5'06/01:1015 06/05:2000 F

105:45 Turbine tripped on low condenser vacuum indication.

6.

06/07:2127 06/09:1030 F

37:03 Reactor scrammed when all Main Steam Isolation Valves (MSIV) closed.

7.

06/23:0200 06/29:0947 F

31:47 Undervoltage on auxiliary power distribution system.

8.

07/10:1415 07/11:1429 F

24:14 Turbine trip resalting from defective instrument in Electro-Hydraulic Control (EHC) system.

-9.

.07/16:2224 10/17:2225 F

2232:01 Local leak rate testing.

10.

10/21:223S 10/25:2057 F

94:19 Turbine tripped during routine test, causing reactor to scram.

- 11.

12/11:0134 Rematned off SP 502:26 Refueling and scheduled through the through maintenance.

end of December December h

e k,

s

.o BRUNSWICK UNIT 2 0FF-LINE OUTAGES 1982 Hrs./ Min.

Date/ Time Off Date/ Time On Type Duration Reason 1982 1.

1/13:123o 1/15:0305 F

38:29 Reactor scram due to recirculation pump overspeed.

2.

1/:6:1638 1/17:1742 F

25:04 Reactor tripped on turbine load rejection.

3.

1/20:0852 1/28:2152 F

205:00 Reactor tripped when level switches were disturbed.

4.

02/03:1516 02/05:0320 F

36:04 Reactor scrammed on main steam line high radiation indicatio:

5.

03/13:1901 03/14:1837 F

23:36 Reactor scrammed on reactor coolant low-level indication signal.

6.

04/24:0048 10/03:1257 SP 3899:09 Refueling and scheduled maintenance.

7.

10/03:2012 10/03:2102 S

00:50 Turbine overspeed trip test.

8.

10/10:2016 10/18:0356 F

175:40 Leak in heater drain system.

9.

10/24: 1339 10/25:0510 S

15:31 The unit was removed from service to troubleshoot and repair the primary system pressure sensor, which had caused the Reactor Recirculation Pump "A" to trip.

10.

10/28:0538 12/05:1101 S

918:23 Unit was removed from service to repair Traversing Incore Probe "A."

11.

12/22:1206 12/24:0453 F

40:47 Power / load imbalance.

+

0 s

m I

w ROBINSON UNIT 2 0FF-LINE OUTAGES 1982 Hrs./ Min.

Date/ Time Off Date/ Time On Type Duration Reason 1982 1.

- 02/26:2306 08/15:1448 SP 4070:42 Refueling and scheduled maintenance.

2.

08/15:1505 08/21:0200 F

131:35 Low steam generator water level.

'3.

08/21:0313 0S/21:0912 F

06:00 High steam generator water level.

4.

08/21:0925 08/21:1726 F

08:01 High steam generator water level.

5.

. 08/22:1707 08/24:0123 S

32:16 Turbine overspeed trip test.

6.

08/25:2223 08/25:2242 S

00:14 Turbine overspeed trip test.

7.

09/05:1529 09/06:0104 F

09i35 Reactor tripped due to a steam-flow, feed flow mismatch coin --

cidental with low steam generator level signal.

8.

09/07:0413 09/07:2256 T'

18:43

' Unit was removed from service to isolate a stuck open letdown relief valve in the chemical and volume control-system.

9.

09/09:1245 09/13:0925 F

92:40 Low steam generator water level.

10.

09/21:1349:

'09/21:2117 F

07:28 Reactor tripped due to a steam-flow, feed flow mismatch coinci-dental with low steam generator

-level signal.

11.

10/22:2251 10/24:0459 5

30:08 Scheduled maintenance.

12.

11/29:1512 12/01:1733 Fi 50:21

.High sodium levels in the secondary system.

c' 13..

12/31:0227 Remained off F

21:33 Low steam generator water level.;

through the through end of December.

December n

f n_.1

Brunswick Unit 1 Off-Line Outages January Thrcuch December 1983 Date/ Time Date/ Time Mrs./ Min.

Off On Type Dttration Reasen 1.

12/11:0134 08/26:1436 SP g,6204:02 Total Refueling and 5701:36 Jan-scheduled August maintenance 502:26 Dec.

2.

08/27:0155 08/28:1514 S

37:19 Turbine overspeed trip test 3.-

08/2F:1830 08/29:0547 5

11:17 Turbine everspeed trip test 4.

~10/18:0126 11/18:0958 SP 752:32 Planned maintenanc cutage 5.

11/25:2110 11/28:0539 F

56:29 Unidentified leaks in the drywell

( i.

12/22:0810 12/25:1827 F

82:17 Reactor scram 1

k e ;

f6u-'A 9

f&

O

_ _ - _ _ _ _ _ - _ - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ^ - - - - - - - - - - - - " - - - - ^ - - - ^ - - - ^

- ~ ~ ~ ' - ~ ~ ^

~ ~ ~ ~

Brunswick Unit 2 Off-Line Outeges Januarv Throuch Decerber 1983 Date/ Time Date/ Time Mrs./ Min.

Off Gn Tvre Duration Reasen 1.

01/03:0233 01/04:0842 F

30:09 Main Steer Isolati Valve (MSIV) clost signal 2.

02/03:0233 02/15:2310 S

308:37 Scheduled maintena 3.

04/08:1S39 05/C9:1649 SP 741:10 Electrical and mechanical tie-ins to the Augrented Cff-Gas System (AC 4.

05/16:2108 05/19:0757 F

58:49 Peactor tripped on false sienal frer Pain Steam Line Rc tion Monitor 5.

06/02:1833 06/06:0035 F

54:02 Power / load ir.balan

-6..

06/20:1316 06/26:0413 F

134:57 High reactor water level 7.

07/30:1836 08/11:1837 F

288:01 High drywell ficor drain leakage 8.

'08/3152226 09/03:0516 F

54:40 High Average Power Range Monitor Sigr 9.

09/03:1534 09/04:0905 F

17:31 High drywell floor drain leakage 10.

11/02:0251 Remained off-SP

  • 1437:09 Planned maintenanc.

line through-out December

'* Outage ended 01/05/84: 0725 Total duration:

1540:34

(.

B g

w

e Pcbinson Unit 2 Off-Line Outages January Threuch Decerber 1983 Date/ Time Date/ Time Hrs./ Min.

Off On Type Duration Reasen 1.

12:31:0227 01/01:1321 F

34:54 Low steam generat:

13:21 Jan.

water level 21:33 Dec.

2.

01/07:2346 01/09:0055 F

25:09 Feedwater heater tube leaks 3.

02.12:0725 02/1?:1E53 F

09:28 Excessive vibratic en "B"

cerpenent cooling water pur; 4.

03/23:1109 03/24:0555 F

18: 46 Low steam,generat:

water level S.

04/01:0642 04/02:0645 F

24:03 Feedwater heater tube leaks

(,.

04/02:1454 04/C4:1701 F

50:07 Oil leak in the Electro-Hydraulic Control (EHC) Syst 7.

04/19:2209 04/21:1205 F

37:56 Loss of Electro-Hydraulic Control (EHC) System oil pressure 8.

04/24:1728 04/25:0311-F 09:43 Inoperable Service Water Booster Pur.ps (SWEP) 9.

04/29:0105 05/28:0124 SP 696:19 Scheduled nisintena and steam generatu inspection 10.

06/22:1653 06/22:2333 F

06:40 Reactor coolant-syrter leak 11.

07/28:0446-07/29:0312 F

22:26 Volvc Icakage-in Auxiliary Feedwate:

Purp 22.

09/05:1050 09/21:0159 F

375:09

(

Steam generator tul leak 13.

11/02:0453 12/C8:1257 F

P49:04 Steem generater tui inspection

.?'.

s' Rcbinson Unit 2 (centinued)

Off-Line Ou..ges Januarv Thrcuch December 1983 Date/ Time Date/ Tire Hrs./ Min.

Off On Type Duration Reasc-a

~

14.

12/06:1415 12/06:2155 F

7: 40 Feedwater regulat:

valve inceerable 4

r-l

?

J

(

9 f

r i

I.

i t-

+

.(

i I'

r 4

9 L_ w