{{#Wiki_filter:WBN2Public Resource From:                         Crouch, William D [wdcrouch@tva.gov]
{{#Wiki_filter:1 WBN2Public Resource From:
Sent:                         Wednesday, May 18, 2011 5:06 PM To:                           Poole, Justin; Milano, Patrick; Campbell, Stephen Cc:                           Bryan, Robert H Jr; Smith, James D; Smith, James D
Crouch, William D [wdcrouch@tva.gov]
Sent:
Wednesday, May 18, 2011 5:06 PM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen Cc:
Bryan, Robert H Jr; Smith, James D; Smith, James D


==Subject:==
==Subject:==
Commitments and SSER Open Items Attachments:                 05 OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf; Updated SSER 22-23 Open Items Plan.docx I had Tommy Elton search our commitment tracking database for commitments where we said we would submit something to NRC. The attached list resulted. It does not have the items for the last week (Tommy is behind since he is working on the Tech Spec revision) and it has some items where we have already made the submittal but have not closed the item in the database. I have someone working on cleaning these items up and documenting that they are complete.
Commitments and SSER Open Items Attachments:
I have also attached our version of SSER 22/23 Appendix HH Open Items. The due dates shown are the dates when items have been promised to be provided to TVA Licensing. In general, the date to you would be within about one week of that date. Items shown as Complete means that TVA Licensing has the input and will include the item in the next closure letter. When an item has been submitted to you I remove it from this list. When the organization is highlighted in yellow, the item is an inspection item rather than a submittal item. For these, a package will be provided to the appropriate NRC person.
05-17 - OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf; Updated SSER 22-23 Open Items Plan.docx IhadTommyEltonsearchourcommitmenttrackingdatabaseforcommitmentswherewesaidwewouldsubmit somethingtoNRC.Theattachedlistresulted.Itdoesnothavetheitemsforthelastweek(Tommyisbehindsinceheis workingontheTechSpecrevision)andithassomeitemswherewehavealreadymadethesubmittalbuthavenot closedtheiteminthedatabase.Ihavesomeoneworkingoncleaningtheseitemsupanddocumentingthattheyare complete.
In the near future we need to start statusing these lists as well as the Bucket List.
William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1


Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           386 Mail Envelope Properties       (B75BE6D61CDE4A468D264343045CAC4F08499DE4)
IhavealsoattachedourversionofSSER22/23AppendixHHOpenItems.Theduedatesshownarethedateswhen itemshavebeenpromisedtobeprovidedtoTVALicensing.Ingeneral,thedatetoyouwouldbewithinaboutoneweek ofthatdate.ItemsshownasCompletemeansthatTVALicensinghastheinputandwillincludetheiteminthenext closureletter.WhenanitemhasbeensubmittedtoyouIremoveitfromthislist.Whentheorganizationishighlighted inyellow,theitemisaninspectionitemratherthanasubmittalitem.Forthese,apackagewillbeprovidedtothe appropriateNRCperson.
 
InthenearfutureweneedtostartstatusingtheselistsaswellastheBucketList.
 
William D. (Bill) Crouch (423)3652004WBN (256)7777676Cell
 
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
386 Mail Envelope Properties (B75BE6D61CDE4A468D264343045CAC4F08499DE4)  


==Subject:==
==Subject:==
Commitments and SSER Open Items Sent Date:               5/18/2011 5:05:52 PM Received Date:           5/18/2011 5:06:16 PM From:                   Crouch, William D Created By:             wdcrouch@tva.gov Recipients:
Commitments and SSER Open Items Sent Date:
5/18/2011 5:05:52 PM Received Date:
5/18/2011 5:06:16 PM From:
Crouch, William D Created By:
wdcrouch@tva.gov Recipients:  
"Bryan, Robert H Jr" <rhbryan@tva.gov>
"Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Line 34: Line 48:
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                           Size                 Date & Time MESSAGE                         1258                 5/18/2011 5:06:16 PM 05 OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf                         192905 Updated SSER 22-23 Open Items Plan.docx                     32428 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 1258 5/18/2011 5:06:16 PM 05-17 - OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf 192905 Updated SSER 22-23 Open Items Plan.docx 32428 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


OPEN COMMITMENTS (ON MAXIMO) - NRR SUBMITTAL REQUIRED DUE DATE       PKG IPS                                              /        REC'D /
OPEN COMMITMENTS (ON MAXIMO) - NRR SUBMITTAL REQUIRED MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                   REQUIRED ACTION Engineering -      111027893   IPEE                                /                    Prior to fuel load, a final report will be submitted following certain validation activities as described Civil                          ----------------------------  PRIOR to                  in the IPEEE Design Report (Enclosure 1).
REQUIRED ACTION DUE DATE  
NRR                            fuel load
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
111027893 Prior to fuel load, a final report will be submitted following certain validation activities as described in the IPEEE Design Report (Enclosure 1).
[Item 1 of Enclosure 2 of letter T02 100430 002]
[Item 1 of Enclosure 2 of letter T02 100430 002]
Engineering -       112145148   RAI Response - SSER22                                    NRC will be notified when the physical work has been completed for DCNs 53421 and 54636.
/
Electrical                      Open Items                                              (response to action item 33)
PRIOR to fuel load Engineering -
NRR                                                      [Item 2. of Enclosure 4 of letter T02 110406 004]
Civil IPEE NRR 112145148 NRC will be notified when the physical work has been completed for DCNs 53421 and 54636.
Engineering - I    111900262  RAI Response - I and C      01/31/2011                  The OM interface, however, creates an additional digital communications path to a non-safety-and C                          ----------------------------                            related system. During the design review, TVA commented that the path needed to be eliminated NRR                                                      or isolated. The final determination was made to eliminate the path. Westinghouse will eliminate the description of this path from the associated documentation by January 31, 2011 [Letter Item 18].
(response to action item 33)
[Item 2. of Enclosure 4 of letter T02 110406 004]
Engineering -
Electrical RAI Response - SSER22 Open Items NRR 111900262 The OM interface, however, creates an additional digital communications path to a non-safety-related system. During the design review, TVA commented that the path needed to be eliminated or isolated. The final determination was made to eliminate the path. Westinghouse will eliminate the description of this path from the associated documentation by January 31, 2011 [Letter Item 18].
[Item 22 of Enclosure 4 of letter T02 101005 001]
[Item 22 of Enclosure 4 of letter T02 101005 001]
Engineering - I     111901446  RAI Response - I and C                                   The Common Q PAMS document discrepancies identified in TVA letter to NRC dated December and C                          ----------------------------                            22, 2010, Attachment 15, will be corrected in the next revision of the identified documents. TVA NRR                                                      will submit the revised documents within two weeks of receipt from Westinghouse.
01/31/2011 Engineering - I and C RAI Response - I and C NRR 111901446 The Common Q PAMS document discrepancies identified in TVA letter to NRC dated December 22, 2010, Attachment 15, will be corrected in the next revision of the identified documents. TVA will submit the revised documents within two weeks of receipt from Westinghouse.
(Item 5. of Enclosure 4 of T02 101222 006)
(Item 5. of Enclosure 4 of T02 101222 006)
Engineering - I     112116781   FSAR RAI                                                Attachment 8 contains the proprietary version of the GA-ESI qualification report 04508903-1TR, and C                          -------------                                            Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter, original NRR                                                      release, dated April 1999. TVA will submit the nonproprietary version of this GA-ESI qualification report and its affidavit for withholding information from public disclosure within two weeks of receipt from the vendor.
Engineering - I and C RAI Response - I and C NRR 112116781 contains the proprietary version of the GA-ESI qualification report 04508903-1TR, Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter, original release, dated April 1999. TVA will submit the nonproprietary version of this GA-ESI qualification report and its affidavit for withholding information from public disclosure within two weeks of receipt from the vendor.
(Enclosure 4 of letter T02 110331 005)
(Enclosure 4 of letter T02 110331 005)
Engineering - I     112177792  FSAR RAI                                                 TVA Engineering reviewed and approved proprietary versions of GA-ESI documents 04507007-and C                          ----------------------------                            1TR, 04508005 and 04508006 and these documents will be submitted within two weeks of receipt NRR                                                      from GA-ESI.
Engineering - I and C FSAR RAI NRR 112177792 TVA Engineering reviewed and approved proprietary versions of GA-ESI documents 04507007-1TR, 04508005 and 04508006 and these documents will be submitted within two weeks of receipt from GA-ESI.
(Letter Item #2 [OI-346])
(Letter Item #2 [OI-346])
[Item 4. of Enclosure 4 of letter T02 110415 001]
[Item 4. of Enclosure 4 of letter T02 110415 001]
Engineering - I     111334414   RAI Response - FSAR          11/30/2010                  A non-proprietary version of and an affidavit for withholding for 16690-QTR, Revision 0 will be and C                          ----------------------------                            submitted to the NRC by November 30, 2010.
Engineering - I and C FSAR RAI NRR 111334414 A non-proprietary version of and an affidavit for withholding for 16690-QTR, Revision 0 will be submitted to the NRC by November 30, 2010.
NRR
[Item 6. of Enclosure 2 of letter T02 100731 001]
[Item 6. of Enclosure 2 of letter T02 100731 001]
Page 1 of 19                                                             * = Date Final Closure Package received by / closed by Licensing.                                               05/17/2011
11/30/2010 Engineering - I and C RAI Response - FSAR NRR Page 1 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                               REQUIRED ACTION Engineering - I    111620753   RAI Response - I and C      11/30/2010                Item (4) will be addressed by Westinghouse developing a WBN Unit 2 Common Q PAMS Specific and C                          ----------------------------                            Test Plan to compensate for the fact that NRC disapproved WNA-PT-00058-GEN during the NRR                                                    original Common Q review. TVA will submit the test plan document to NRC by November 30, 2010. NRC RAI Matrix Item 245 tracks the commitment to develop and submit the WBN Unit 2 Specific Test Plan [Letter Item 8].
REQUIRED ACTION DUE DATE  
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
111620753 Item (4) will be addressed by Westinghouse developing a WBN Unit 2 Common Q PAMS Specific Test Plan to compensate for the fact that NRC disapproved WNA-PT-00058-GEN during the original Common Q review. TVA will submit the test plan document to NRC by November 30, 2010. NRC RAI Matrix Item 245 tracks the commitment to develop and submit the WBN Unit 2 Specific Test Plan [Letter Item 8].
[Item 4. of Enclosure 4 of letter T02 101005 001]
[Item 4. of Enclosure 4 of letter T02 101005 001]
Engineering - I     111620928  RAI Response - I and C       04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
11/30/2010 Engineering - I and C RAI Response - I and C NRR 111620928 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2 dated August 2010.
Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2 dated August 2010.
[Item 1.f. of Enclosure 2 of T02 101026 011]
[Item 1.f. of Enclosure 2 of T02 101026 011]
Engineering - I     111331649  RAI Response - I and C       03/11/2011                Hardware details will be provided when the hardware drawings are updated to the as-built and C                          ----------------------------                            configuration. Westinghouse currently shows this activity to complete September 15, 2010. TVA NRR                                                    will submit a hardware listing by October 1, 2010, two weeks after TVA receipt from Westinghouse.       (RAI Item Number 14 [Matrix Item 120])
04/29/2011 Engineering - I and C RAI Response - I and C NRR 111331649 Hardware details will be provided when the hardware drawings are updated to the as-built configuration. Westinghouse currently shows this activity to complete September 15, 2010. TVA will submit a hardware listing by October 1, 2010, two weeks after TVA receipt from Westinghouse. (RAI Item Number 14 [Matrix Item 120])
[Item 5. from Enclosure 2 of letter T02 100730 002) 10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 03/11/2011.
[Item 5. from Enclosure 2 of letter T02 100730 002) 10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 03/11/2011.
Engineering - I     112250471   RAI                                                    The Westinghouse qualification report for the IITAs has not been completed. The proprietary and and C                          -----                                                  non-proprietary versions and the affidavit for withholding will be submitted within two weeks of NRR                                                    receipt from Westinghouse. (Letter Item #14/375 [Item 3])
03/11/2011 Engineering - I and C RAI Response - I and C NRR 112250471 The Westinghouse qualification report for the IITAs has not been completed. The proprietary and non-proprietary versions and the affidavit for withholding will be submitted within two weeks of receipt from Westinghouse. (Letter Item #14/375 [Item 3])
[Item 7 of Enclosure 4 of letter T02 110506 002]
[Item 7 of Enclosure 4 of letter T02 110506 002]
Engineering - I     112177783   FSAR RAI                                                The non-proprietary version of GA-ESI report 04509050, RM-1000 EMC Test Report and affidavit and C                          ----------------------------                            for withholding will be submitted within two weeks of receipt from GA-ESI. (Letter Item #1 [OI-340])
Engineering - I and C RAI NRR 112177783 The non-proprietary version of GA-ESI report 04509050, RM-1000 EMC Test Report and affidavit for withholding will be submitted within two weeks of receipt from GA-ESI. (Letter Item #1 [OI-340])
NRR
[Item 3. of Enclosure 4 of letter T02 110415 001]
[Item 3. of Enclosure 4 of letter T02 110415 001]
Engineering - I    111620935  RAI Response - I and C       04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
Engineering - I and C FSAR RAI NRR 111620935 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.
Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.
[Item 1.g. of Enclosure 2 of T02 101026 011]
[Item 1.g. of Enclosure 2 of T02 101026 011]
Page 2 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
04/29/2011 Engineering - I and C RAI Response - I and C NRR Page 2 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                 REQUIRED ACTION Engineering - I    10174938   Eagle-21 Process                    /                    The last part of item 4 of enclosure 2 of the reference reads "TVA will submit the results of this and C                          Protection System            PRIOR to                  survey to the NRC. The submittal will include a description of the methodologies and test
REQUIRED ACTION DUE DATE  
                                ----------------------------  fuel load                equipment that were used to perform the survey, a comparison between on-site and factory NRR                                                      EMI/RFI test results, and an assessment of the margin between the measured EMI/RFI spectrum and a conservative threshold above which EMI/RFI problems could occur."
/
Engineering - I     111334372   RAI Response - FSAR          01/14/2011                  The qualification for PAMS Cabinet and Components and Main Control Room Components will and C                          ----------------------------                            be submitted to the NRC by January 14, 2011.
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
NRR
CLOSED*
10174938 The last part of item 4 of enclosure 2 of the reference reads "TVA will submit the results of this survey to the NRC. The submittal will include a description of the methodologies and test equipment that were used to perform the survey, a comparison between on-site and factory EMI/RFI test results, and an assessment of the margin between the measured EMI/RFI spectrum and a conservative threshold above which EMI/RFI problems could occur."
/
PRIOR to fuel load Engineering - I and C Eagle-21 Process Protection System NRR 111334372 The qualification for PAMS Cabinet and Components and Main Control Room Components will be submitted to the NRC by January 14, 2011.
[Item 3. of Enclosure 2 of letter T02 100731 001]
[Item 3. of Enclosure 2 of letter T02 100731 001]
Engineering - I     112177753   FSAR RAI                                                TVA will perform an EMI survey of the containment high range radiation monitors after they are and C                          ----------------------------                            installed in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being NRR                                                      completed. (Letter Item #4 [OI-355])
01/14/2011 Engineering - I and C RAI Response - FSAR NRR 112177753 TVA will perform an EMI survey of the containment high range radiation monitors after they are installed in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being completed. (Letter Item #4 [OI-355])
[Item 1. of Enclosure 4 of letter T02 110415 001]
[Item 1. of Enclosure 4 of letter T02 110415 001]
Engineering - I     112177768  FSAR RAI                     04/30/2011                  Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in and C                          ----------------------------                            the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:
Engineering - I and C FSAR RAI NRR 112177768 Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:
NRR GA-ESI procedure OP-7.3-240 revision: April 30, 2011 (Letter Item #3 [OI-353])
GA-ESI procedure OP-7.3-240 revision: April 30, 2011 (Letter Item #3 [OI-353])
[Item 2. - first part of Enclosure 4 of letter T02 110415 001]
[Item 2. - first part of Enclosure 4 of letter T02 110415 001]
Engineering - I    111620882  RAI Response - I and C       04/29/2011                  By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                      be provided to NRC.
04/30/2011 Engineering - I and C FSAR RAI NRR 111620882 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Demarcated proprietary and nonproprietary versions of Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, dated October 2010.
Demarcated proprietary and nonproprietary versions of Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, dated October 2010.
[Item 1.a. of Enclosure 2 of T02 101026 011]
[Item 1.a. of Enclosure 2 of T02 101026 011]
Engineering - I     111620889  RAI Response - I and C       04/29/2011                  By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                      be provided to NRC.
04/29/2011 Engineering - I and C RAI Response - I and C NRR 111620889 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Demarcated proprietary and nonproprietary versions of Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.
Demarcated proprietary and nonproprietary versions of Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.
[Item 1.b. of Enclosure 2 of T02 101026 011]
[Item 1.b. of Enclosure 2 of T02 101026 011]
Page 3 of 19                                                             * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
04/29/2011 Engineering - I and C RAI Response - I and C NRR Page 3 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                 REQUIRED ACTION Engineering - I    111620770   RAI Response - I and C      12/07/2010                Revision 2 of the Common Q PAMS Licensing Technical Report will include the applicability of and C                          ----------------------------                            the guidance in the Common Q PAMS Topical Report. Revision 1 [sic 2] of the Licensing NRR                                                    Technical Report will be submitted to NRC by December 7, 2010 [Letter Item 66].
REQUIRED ACTION DUE DATE  
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
111620770 Revision 2 of the Common Q PAMS Licensing Technical Report will include the applicability of the guidance in the Common Q PAMS Topical Report. Revision 1 [sic 2] of the Licensing Technical Report will be submitted to NRC by December 7, 2010 [Letter Item 66].
[Item 14. of Enclosure 4 of letter T02 101005 001]
[Item 14. of Enclosure 4 of letter T02 101005 001]
Engineering - I     111620967  RAI Response - I and C       04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
12/07/2010 Engineering - I and C RAI Response - I and C NRR 111620967 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.
Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.
[Item 1.k. of Enclosure 2 of T02 101026 011]
[Item 1.k. of Enclosure 2 of T02 101026 011]
Engineering - I     111900179  RAI Response - I and C       10/29/2010                The scope of NABU-DP-00014-GEN includes the design and implementation processes for the and C                          ----------------------------                            application development. For a more detailed description of the design process described in NRR                                                    NABU-DP-00014-GEN, please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document. The next revision of the SRS will be submitted to NRC by October 29, 2010 [Letter Item 31(a)].
04/29/2011 Engineering - I and C RAI Response - I and C NRR 111900179 The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a more detailed description of the design process described in NABU-DP-00014-GEN, please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document. The next revision of the SRS will be submitted to NRC by October 29, 2010 [Letter Item 31(a)].
[Item 17. of Enclosure 4 of letter T02 101005 001]
[Item 17. of Enclosure 4 of letter T02 101005 001]
Engineering - I     111620959  RAI Response - I and C       04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
10/29/2010 Engineering - I and C RAI Response - I and C NRR 111620959 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2, dated August 2010.
Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2, dated August 2010.
[Item 1.j. of Enclosure 2 of T02 101026 011]
[Item 1.j. of Enclosure 2 of T02 101026 011]
Engineering - I     111092634  RAI Response - I AND C       12/03/2010                The report on the final resolution of the Eagle 21 Rack 2 RTD input issue will be provided no later and C                          ----------------------------                            than December 3, 2010. This item has been added to the Licensee Open Items to be Resolved NRR                                                    for SER Approval List, as Item 128.
04/29/2011 Engineering - I and C RAI Response - I and C NRR 111092634 The report on the final resolution of the Eagle 21 Rack 2 RTD input issue will be provided no later than December 3, 2010. This item has been added to the Licensee Open Items to be Resolved for SER Approval List, as Item 128.
[Item 6. of Enclosure 2 of letter T02 100621 001]
[Item 6. of Enclosure 2 of letter T02 100621 001]
Engineering - I     111620761  RAI Response - I and C       02/14/2011                The scope of the WBN BISI indications are based on engineering calculation WBPEVAR8807025 and C                          ----------------------------                            Rev. 7 (Attachment 10). This calculation has not been updated for Unit 2. The calculation does NRR                                                    include Common and Unit 2 equipment required to support Unit 1 operation. The calculation will be submitted to NRC by February 14, 2011 [Letter Item 62F].
12/03/2010 Engineering - I and C RAI Response - I AND C NRR 111620761 The scope of the WBN BISI indications are based on engineering calculation WBPEVAR8807025 Rev. 7 (Attachment 10). This calculation has not been updated for Unit 2. The calculation does include Common and Unit 2 equipment required to support Unit 1 operation. The calculation will be submitted to NRC by February 14, 2011 [Letter Item 62F].
[Item 11. of Enclosure 4 of letter T02 101005 001]
[Item 11. of Enclosure 4 of letter T02 101005 001]
Page 4 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                           05/17/2011
02/14/2011 Engineering - I and C RAI Response - I and C NRR Page 4 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                               REQUIRED ACTION Engineering - I    112043571   FSAR RAIs                                              The General Atomics Electronics Systems Inc. (GA-ESI) affidavits for withholding and non-and C                          ----------------------------                            proprietary versions of attachments 5, 6, 7, 8 and 23 will be submitted within two weeks of receipt NRR                                                    from GA-ESI. [Cover Letter]
REQUIRED ACTION DUE DATE  
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
112043571 The General Atomics Electronics Systems Inc. (GA-ESI) affidavits for withholding and non-proprietary versions of attachments 5, 6, 7, 8 and 23 will be submitted within two weeks of receipt from GA-ESI. [Cover Letter]
[Item 2. of Enclosure 4 of letter T02 110225 004]
[Item 2. of Enclosure 4 of letter T02 110225 004]
Engineering - I    111620949  RAI Response - I and C       04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
Engineering - I and C FSAR RAIs NRR 111620949 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Demarcated proprietary and nonproprietary versions of Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), CNEQT-10-44, Revision 0, dated September 28, 2010
Demarcated proprietary and nonproprietary versions of Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), CNEQT-10-44, Revision 0, dated September 28, 2010
[Item 1.h of Enclosure 2 of T02 101026 011]
[Item 1.h of Enclosure 2 of T02 101026 011]
Engineering - I     111901406  RAI Response - I and C       01/28/2011                The RM-1000 qualification reports 04038903-QSR and 04038903-7SP will be submitted no later and C                          ----------------------------                            than January 28, 2011.
04/29/2011 Engineering - I and C RAI Response - I and C NRR 111901406 The RM-1000 qualification reports 04038903-QSR and 04038903-7SP will be submitted no later than January 28, 2011.
NRR (Item 4. of Enclosure 4 of T02 101222 006)
(Item 4. of Enclosure 4 of T02 101222 006) 01/28/2011 Engineering - I and C RAI Response - I and C NRR 112058497 WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.
Engineering - I     112058497   FSAR RAI                    03/29/2011                WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, and C                          ----------------------------                            Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.
03/29/2011 Engineering - I and C FSAR RAI NRR 10175684 Item 4 of Enclosure 1 of the Reference reads "Provide system description and information on QA provisions for the Unit 2 Radiation Monitoring System on or before October 31, 2009."
NRR Engineering - I     10175684   Regulatory Framework        10/31/2009                Item 4 of Enclosure 1 of the Reference reads "Provide system description and information on QA and C                          ----------------------------                            provisions for the Unit 2 Radiation Monitoring System on or before October 31, 2009."
10/31/2009 Engineering - I and C Regulatory Framework NRR 111620955 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
NRR Engineering - I    111620955  RAI Response - I and C       04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
Affidavit for withholding for Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.
Affidavit for withholding for Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.
[Item 1.i. of Enclosure 2 of T02 101026 011]
[Item 1.i. of Enclosure 2 of T02 101026 011]
Engineering - I     111901209  RAI Response - I and C                                 FSAR Chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a and C                          ----------------------------                            future FSAR amendment.
04/29/2011 Engineering - I and C RAI Response - I and C NRR 111901209 FSAR Chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a future FSAR amendment.
NRR (Item 3. of Enclosure 4 of T02 101222 006)
(Item 3. of Enclosure 4 of T02 101222 006)
Page 5 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
Engineering - I and C RAI Response - I and C NRR Page 5 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                               REQUIRED ACTION Engineering - I    112177804   FSAR RAI                                                An affidavit for withholding Westinghouse document NO-WBT-002, Westinghouse Incore and C                          ----------------------------                            Information Surveillance & Engineering (WINCISE') System Technical Manual, Section 2, NRR                                                    Hardware Description, will submitted within two weeks of receipt from Westinghouse.
REQUIRED ACTION DUE DATE  
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
112177804 An affidavit for withholding Westinghouse document NO-WBT-002, Westinghouse Incore Information Surveillance & Engineering (WINCISE') System Technical Manual, Section 2, Hardware Description, will submitted within two weeks of receipt from Westinghouse.
(Letter Item #7 [OI-360])
(Letter Item #7 [OI-360])
[Item 5. of Enclosure 4 of letter T02 110415 001]
[Item 5. of Enclosure 4 of letter T02 110415 001]
Engineering - I    111620764  RAI Response - I and C       04/08/2011                Attachment 41 contains the proprietary version of the Common Q Software Requirements and C                          ----------------------------                            Specification Post Accident Monitoring System 00000-ICE-3238 Rev. 5 and the affidavit for NRR                                                    withholding. The nonproprietary version will be submitted to NRC by April 8, 2011 [Letter Item 96].
Engineering - I and C FSAR RAI NRR 111620764 1 contains the proprietary version of the Common Q Software Requirements Specification Post Accident Monitoring System 00000-ICE-3238 Rev. 5 and the affidavit for withholding. The nonproprietary version will be submitted to NRC by April 8, 2011 [Letter Item 96].
[Item 16. of Enclosure 4 of letter T02 101005 001]
[Item 16. of Enclosure 4 of letter T02 101005 001]
Engineering - I     112177773   FSAR RAI                    09/15/2011                Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in and C                          ----------------------------                            the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:
04/08/2011 Engineering - I and C RAI Response - I and C NRR 112177773 Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:
NRR Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 (Letter Item #3 [OI-353])
Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 (Letter Item #3 [OI-353])
[Item 2. - last part of Enclosure 4 of letter T02 110415 001]
[Item 2. - last part of Enclosure 4 of letter T02 110415 001]
Engineering - I     111902413   RAI Response - FSAR                                    The nonproprietary version of Enclosure 4 and the applications for withholding will be provided and C                          ----------------------------                            two weeks after receipt from Westinghouse.
09/15/2011 Engineering - I and C FSAR RAI NRR 111902413 The nonproprietary version of Enclosure 4 and the applications for withholding will be provided two weeks after receipt from Westinghouse.
NRR
[RAI 15.0.0 - 1.b]
[RAI 15.0.0 - 1.b]
[Item 14. of Enclosure 6 of letter T02 101210 001]
[Item 14. of Enclosure 6 of letter T02 101210 001]
Engineering - I     111620766  RAI Response - I and C      02/11/2011                The next IV&V report will include the Design Phase Requirements Traceability Matrix. The and C                          ----------------------------                            Design Phase IV&V Report will be submitted to NRC by February 11, 2011 [Letter Item 15].
Engineering - I and C RAI Response - FSAR NRR 111620766 The next IV&V report will include the Design Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011 [Letter Item 15].
NRR
[Item 20. of Enclosure 4 of letter T02 101005 001]
[Item 20. of Enclosure 4 of letter T02 101005 001]
Engineering - I     111620901  RAI Response - I and C       04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
02/11/2011 Engineering - I and C RAI Response - I and C NRR 111620901 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Demarcated proprietary and nonproprietary versions of Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules to the Watts Bar Unit 2 (WBT)
Demarcated proprietary and nonproprietary versions of Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules to the Watts Bar Unit 2 (WBT)
Requirements (EQ-EV-62-WBT, Revision 0), dated September 10, 2010.
Requirements (EQ-EV-62-WBT, Revision 0), dated September 10, 2010.
[Item 1.d. of Enclosure 2 of T02 101026 011]
[Item 1.d. of Enclosure 2 of T02 101026 011]
Page 6 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
04/29/2011 Engineering - I and C RAI Response - I and C NRR Page 6 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                 REQUIRED ACTION Engineering - I    111620894   RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
REQUIRED ACTION DUE DATE  
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
111620894 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Demarcated proprietary and nonproprietary versions of AI687 and AI688 for use in Common Q PAMS EMC Test Report and Installation Limitations, (EQ-QR GEN, Revision 0), dated September 10, 2010.
Demarcated proprietary and nonproprietary versions of AI687 and AI688 for use in Common Q PAMS EMC Test Report and Installation Limitations, (EQ-QR GEN, Revision 0), dated September 10, 2010.
[Item 1.c. of Enclosure 2 of T02 101026 011]
[Item 1.c. of Enclosure 2 of T02 101026 011]
Engineering - I     111331664  RAI Response - I and C       02/25/2011                Westinghouse is scheduled to issue the FAT report to TVA on October 22, 2010. TVA will submit and C                          ----------------------------                            this report by November 8, 2010, two weeks after receipt from Westinghouse.         (RAI Item NRR                                                    Number 14 [Matrix Item 120]
04/29/2011 Engineering - I and C RAI Response - I and C NRR 111331664 Westinghouse is scheduled to issue the FAT report to TVA on October 22, 2010. TVA will submit this report by November 8, 2010, two weeks after receipt from Westinghouse. (RAI Item Number 14 [Matrix Item 120]
[Item 6. from Enclosure 2 of letter T02 100730 002) 10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 02/25/2011.
[Item 6. from Enclosure 2 of letter T02 100730 002) 10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 02/25/2011.
Engineering - I     111621260  RAI Response - I and C       04/29/2011                (Letter Item 9) - This item will be corrected by a design change based on the following:
02/25/2011 Engineering - I and C RAI Response - I and C NRR 111621260 (Letter Item 9) - This item will be corrected by a design change based on the following:
and C                          ----------------------------
The Unit 1/Unit 2 Eagle 21 configuration has a sufficient number of spare Narrow Range (NR) and Wide Range (WR) RTD inputs available on the installed ERI-01 and ERI-02 boards to wire these spare inputs to the active channels. The spare input will provide the parallel resistance to resolve the problem. The WR RTD inputs provide the same input impedance as the NR RTD inputs. Jumpers will be installed at the Eagle 21 termination frame to provide a parallel connection from each existing NR RTD input to an existing spare input, thus simulating the hardware connection for shared RTDs. Therefore, as configured, the Rack 2 Loop Calculation Processor (LCP) will provide the correct temperature calculation for the NR RTDs. The design change will be issued by April 29, 2011.
NRR                                                    The Unit 1/Unit 2 Eagle 21 configuration has a sufficient number of spare Narrow Range (NR) and Wide Range (WR) RTD inputs available on the installed ERI-01 and ERI-02 boards to wire these spare inputs to the active channels. The spare input will provide the parallel resistance to resolve the problem. The WR RTD inputs provide the same input impedance as the NR RTD inputs. Jumpers will be installed at the Eagle 21 termination frame to provide a parallel connection from each existing NR RTD input to an existing spare input, thus simulating the hardware connection for shared RTDs. Therefore, as configured, the Rack 2 Loop Calculation Processor (LCP) will provide the correct temperature calculation for the NR RTDs. The design change will be issued by April 29, 2011.
(first part of Item 5. of Enclosure 4 of letter T02 101029 002) 04/29/2011 Engineering - I and C RAI Response - I and C NRR 111334376 A non-proprietary version of and an affidavit for withholding for EQ-EV-39-WBT, Revision 1 will be submitted to the NRC by November 30, 2010.
(first part of Item 5. of Enclosure 4 of letter T02 101029 002)
Engineering - I     111334376  RAI Response - FSAR          11/30/2010                A non-proprietary version of and an affidavit for withholding for EQ-EV-39-WBT, Revision 1 will be and C                          ----------------------------                            submitted to the NRC by November 30, 2010.
NRR
[Item 4. of Enclosure 2 of letter T02 100731 001]
[Item 4. of Enclosure 2 of letter T02 100731 001]
Engineering - I     111620922  RAI Response - I and C      04/29/2011                By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as and C                          ----------------------------                            the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will NRR                                                    be provided to NRC.
11/30/2010 Engineering - I and C RAI Response - FSAR NRR 111620922 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.
Demarcated proprietary and nonproprietary versions of Environmental and Seismic Test Report, AI687 & AI688 Modules for use in Common Q PAMS, (EQLR-171, Revision 0), dated September 10, 2010.
Demarcated proprietary and nonproprietary versions of Environmental and Seismic Test Report, AI687 & AI688 Modules for use in Common Q PAMS, (EQLR-171, Revision 0), dated September 10, 2010.
[Item 1.e. of Enclosure 2 of T02 101026 011]
[Item 1.e. of Enclosure 2 of T02 101026 011]
Page 7 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
04/29/2011 Engineering - I and C RAI Response - I and C NRR Page 7 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                 REQUIRED ACTION Engineering - I    112249893   FSAR RAI                                                Part III, Sections 2.3 and 3.4.3 provide qualitative statements regarding the need to control RCS and C                          --------------                                          pressure to maintain sub-cooling margin such that natural circulation would not be adversely NRR                                                      affected by large bubble formation in the reactor vessel. Both statements convey the desired information, but for consistency Section 3.4.3 will be revised to say minimize void formation rather than prevent void formation and thereby be consistent with Section 2.3. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.     (Letter Item
REQUIRED ACTION DUE DATE  
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
112249893 Part III, Sections 2.3 and 3.4.3 provide qualitative statements regarding the need to control RCS pressure to maintain sub-cooling margin such that natural circulation would not be adversely affected by large bubble formation in the reactor vessel. Both statements convey the desired information, but for consistency Section 3.4.3 will be revised to say minimize void formation rather than prevent void formation and thereby be consistent with Section 2.3. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item
: 33. [NRC Question RAI FPR III-7])
: 33. [NRC Question RAI FPR III-7])
(Item 8. of Enclosure 2. of letter T02 110506 001)
(Item 8. of Enclosure 2. of letter T02 110506 001)
Engineering - I     111334367   RAI Response - FSAR          11/30/2010                  The analysis for Panels 2-L-11A and 2-L-11B will be submitted to the NRC by November 30, and C                          ----------------------------                            2010.
Engineering - I and C FSAR RAI NRR 111334367 The analysis for Panels 2-L-11A and 2-L-11B will be submitted to the NRC by November 30, 2010.
NRR
[Item 2. of Enclosure 2 of letter T02 100731 001]
[Item 2. of Enclosure 2 of letter T02 100731 001]
Engineering - I     112249887   FSAR RAI                                                It is TVAs position that only qualified personnel are allowed and required to make the decisions and C                          --------------                                          as to which of the three conditions apply to each individual circumstance. Only Sections 14.8.1.a NRR                                                      and 14.8.1.b apply to ERFBS and radiant energy shields. Section 14.8.1.c does not apply to ERFBS configurations. Section 14.8.1.c will be clarified to denote that it does not apply to ERFBS and radiant energy shields. (Letter Item 27. [NRC Question RAI FPR II-36])
11/30/2010 Engineering - I and C RAI Response - FSAR NRR 112249887 It is TVAs position that only qualified personnel are allowed and required to make the decisions as to which of the three conditions apply to each individual circumstance. Only Sections 14.8.1.a and 14.8.1.b apply to ERFBS and radiant energy shields. Section 14.8.1.c does not apply to ERFBS configurations. Section 14.8.1.c will be clarified to denote that it does not apply to ERFBS and radiant energy shields. (Letter Item 27. [NRC Question RAI FPR II-36])
(Item 7. of Enclosure 2. of letter T02 110506 001)
(Item 7. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112249875  FSAR RAI                           /                    The referenced conflicts and inconsistencies between Part II, Section 14.2 Water Supply and and C                          --------------                PRIOR to                  the Fire Pump Inoperability and Compensatory Actions Table has been reviewed and Section NRR                            fuel load                14.2 and the Table has been revised to reflect consistency between the two parts. The revised table is included as Attachment 2 to this letter and will be incorporated into the FPR as part of the As-Constructed update of the FPR prior to Unit 2 initial fuel load. (Letter Item 24. [NRC Question (RAI FPR II-34)])
Engineering - I and C FSAR RAI NRR 112249875 The referenced conflicts and inconsistencies between Part II, Section 14.2 Water Supply and the Fire Pump Inoperability and Compensatory Actions Table has been reviewed and Section 14.2 and the Table has been revised to reflect consistency between the two parts. The revised table is included as Attachment 2 to this letter and will be incorporated into the FPR as part of the As-Constructed update of the FPR prior to Unit 2 initial fuel load. (Letter Item 24. [NRC Question (RAI FPR II-34)])
(Item 6. of Enclosure 2. of letter T02 110506 001)
(Item 6. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112249865  FSAR RAI                                                 A review of the HVAC configuration control drawings (47A381 series, 47W866 series, and and C                          --------------                                          47W920 series) has been performed to determine the correct identification number and fire NRR                                                      resistance rating of the damper. The correct damper number is 1-ISD-31-2516 and correct fire rating of the damper is 3 hours. A review of the damper information contained in Table 14.8.2 against the Damper tables provided in Part VI has also been completed. The information in the tables (Table 14.8.2 and Part VI Damper tables) has been verified and the discrepancies corrected. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.       (Letter Item 9. [NRC Question RAI FPR II-19])
/
PRIOR to fuel load Engineering - I and C FSAR RAI NRR 112249865 A review of the HVAC configuration control drawings (47A381 series, 47W866 series, and 47W920 series) has been performed to determine the correct identification number and fire resistance rating of the damper. The correct damper number is 1-ISD-31-2516 and correct fire rating of the damper is 3 hours. A review of the damper information contained in Table 14.8.2 against the Damper tables provided in Part VI has also been completed. The information in the tables (Table 14.8.2 and Part VI Damper tables) has been verified and the discrepancies corrected. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 9. [NRC Question RAI FPR II-19])
(Item 5. of Enclosure 2. of letter T02 110506 001)
(Item 5. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112249861  FSAR RAI                                                 Part II and Part VI were corrected to show the damper (2-ISD-31-3872) is in the fire barrier and C                          --------------                                          separating rooms 713.0-A29 (not 737-A9) and 737.0-A8. These changes will be incorporated into NRR                                                      the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 8. [NRC Question RAI FPR II-18])
Engineering - I and C FSAR RAI NRR 112249861 Part II and Part VI were corrected to show the damper (2-ISD-31-3872) is in the fire barrier separating rooms 713.0-A29 (not 737-A9) and 737.0-A8. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 8. [NRC Question RAI FPR II-18])
(Item 4. of Enclosure 2. of letter T02 110506 001)
(Item 4. of Enclosure 2. of letter T02 110506 001)
Page 8 of 19                                                             * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
Engineering - I and C FSAR RAI NRR Page 8 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE     PKG IPS                                    /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE MILESTONE  CLOSED*                                                 REQUIRED ACTION Engineering - I    112249919   FSAR RAI                                    TVAs response to Letter Item 42 [NRC Question RAI FPR V-3] states:
REQUIRED ACTION DUE DATE  
and C                          --------------
/
NRR                                          [1] Part IV, Section 3.3 is incorrect. The second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
112249919 TVAs response to Letter Item 42 [NRC Question RAI FPR V-3] states:
[1] Part IV, Section 3.3 is incorrect. The second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
[2] A review of the FPR revealed three other places where the discussion concerns both units:
[2] A review of the FPR revealed three other places where the discussion concerns both units:
: 1. Table 14.3, item 14.3.c should read: Unit 1 and 2 Containment Purge Air Exhaust Filters,
: 1. Table 14.3, item 14.3.c should read: Unit 1 and 2 Containment Purge Air Exhaust Filters,
: 2. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
: 2. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
: 3. Part III, section 4.7 is incorrect. The third paragraph should read: The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
: 3. Part III, section 4.7 is incorrect. The third paragraph should read: The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.
These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.
(Item 10. of Enclosure 2. of letter T02 110506 001)
(Item 10. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112249855  FSAR RAI                                     Table 14.1 contains detectors that are for protection of components and areas required for fire and C                          --------------                              safe shutdown. The detection zone 413 contains the detectors provided for the Motor Driven NRR                                          Main Feedwater Pump located in the Turbine Building. The Motor Driven Main Feedwater Pump is not required for fire safe shutdown; therefore, this line item for zone 413 is deleted from Table 14.1. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 6. [NRC Question RAI FPR II-16])
Engineering - I and C FSAR RAI NRR 112249855 Table 14.1 contains detectors that are for protection of components and areas required for fire safe shutdown. The detection zone 413 contains the detectors provided for the Motor Driven Main Feedwater Pump located in the Turbine Building. The Motor Driven Main Feedwater Pump is not required for fire safe shutdown; therefore, this line item for zone 413 is deleted from Table 14.1. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 6. [NRC Question RAI FPR II-16])
(Item 3. of Enclosure 2. of letter T02 110506 001)
(Item 3. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112249904  FSAR RAI                                     TVAs response to Letter Item 39 [NRC Question RAI FPR III-13] states:
Engineering - I and C FSAR RAI NRR 112249904 TVAs response to Letter Item 39 [NRC Question RAI FPR III-13] states:
and C                          --------------
[1] Part III, Section 4.7 is incorrect and the third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
NRR                                          [1] Part III, Section 4.7 is incorrect and the third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
[2] A review of the FPR revealed three other places where the discussion concerns both units:
[2] A review of the FPR revealed three other places where the discussion concerns both units:
: 1. Table 14.3, item 14.3.c should read: Unit 1 and 2 Containment Purge Air Exhaust Filters,
: 1. Table 14.3, item 14.3.c should read: Unit 1 and 2 Containment Purge Air Exhaust Filters,
: 2. Part IV, Section 3.3, second sentence should read: The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
: 2. Part IV, Section 3.3, second sentence should read: The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
: 3. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
: 3. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.
These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.
(Item 9. of Enclosure 2. of letter T02 110506 001)
(Item 9. of Enclosure 2. of letter T02 110506 001)
Page 9 of 19                                                 * = Date Final Closure Package received by / closed by Licensing.                                           05/17/2011
Engineering - I and C FSAR RAI NRR Page 9 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                                    /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #              SOURCE                MILESTONE    CLOSED*                                                 REQUIRED ACTION Engineering - I      112249845   FSAR RAI                                                    For dual unit operation, CCS Pump 2B-B will be returned to its Unit 2 functional role and will be and C                            --------------                                              included in the Technical Specification Bases Section 3.7.7. (Letter Item 4. [NRC Question RAI NRR                                                          FPR II-14])
REQUIRED ACTION DUE DATE  
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
112249845 For dual unit operation, CCS Pump 2B-B will be returned to its Unit 2 functional role and will be included in the Technical Specification Bases Section 3.7.7. (Letter Item 4. [NRC Question RAI FPR II-14])
(Item 2. of Enclosure 2. of letter T02 110506 001)
(Item 2. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112249817    FSAR RAI                                                     TVAs response to Letter Item 3. [NRC Question RAI FPR II-13] states:
Engineering - I and C FSAR RAI NRR 112249817 TVAs response to Letter Item 3. [NRC Question RAI FPR II-13] states:
and C                            --------------
[1] Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
NRR                                                          [1] Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
[2] A review of the FPR revealed three other places where the discussion concerns both units:
[2] A review of the FPR revealed three other places where the discussion concerns both units:
: 1. Table 14.3, item 14.3.c should read Unit 1 and 2 Containment Purge Air Exhaust Filters, .
: 1. Table 14.3, item 14.3.c should read Unit 1 and 2 Containment Purge Air Exhaust Filters,.
: 2. Part III, Section 4.7, third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
: 2. Part III, Section 4.7, third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
: 3. Part IV, Section 3.3, second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
: 3. Part IV, Section 3.3, second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.
These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.
(Item 1. of Enclosure 2. of letter T02 110506 001)
(Item 1. of Enclosure 2. of letter T02 110506 001)
Engineering - I      111621250    RAI Response - I and C                                       (Letter Item 8) - Attachment 4 contains excerpts of EDCR 55385 (i.e., draft Scope, Intent, and and C                            ----------------------------                                Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks NRR                                                          after issuance of the EDCR.
Engineering - I and C FSAR RAI NRR 111621250 (Letter Item 8) - Attachment 4 contains excerpts of EDCR 55385 (i.e., draft Scope, Intent, and Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.
(Item 4. of Enclosure 4 of letter T02 101029 002)
(Item 4. of Enclosure 4 of letter T02 101029 002)
Engineering - I     111900989    RAI Response - I and C           03/11/2011                The qualification information on the LPMS softline cable and charge converter/preamplifier will be and C                            ----------------------------                                submitted by March 11, 2011.
Engineering - I and C RAI Response - I and C NRR 111900989 The qualification information on the LPMS softline cable and charge converter/preamplifier will be submitted by March 11, 2011.
NRR (Item 1. of Enclosure 4 of T02 101222 006)
(Item 1. of Enclosure 4 of T02 101222 006) 03/11/2011 Engineering - I and C RAI Response - I and C NRR 111334387 A non-proprietary version of and an affidavit for withholding for TR-1136 will be submitted to the NRC by December 17, 2010.
Engineering - I     111334387    RAI Response - FSAR              12/17/2010                A non-proprietary version of and an affidavit for withholding for TR-1136 will be submitted to the and C                            ----------------------------                                NRC by December 17, 2010.
NRR
[Item 5. of Enclosure 2 of letter T02 100731 001]
[Item 5. of Enclosure 2 of letter T02 100731 001]
Engineering - I 166  NCO840165002 Control Room Design                    /                    Submit photographs of control panels 120 days after receipt of an operating license.
12/17/2010 Engineering - I and C RAI Response - FSAR NRR NCO840165002 Submit photographs of control panels 120 days after receipt of an operating license.
and C                             Review SP                           AFTER
/
                                  --------------------------------- LICENSED Generic Communications:
AFTER LICENSED Engineering - I and C Control Room Design Review SP Generic Communications:
NUREG-0737, I.D.1 Regulatory Framework NRR Page 10 of 19                                                                 * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
NUREG-0737, I.D.1 Regulatory Framework NRR 166 Page 10 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                 REQUIRED ACTION Engineering - I    112043595   FSAR RAIs                                              A FSAR change will be submitted in a future FSAR amendment to change the revision level for and C                          ----------------------------                            WCAP-13869 from 2 back to 1. [Item 11, (Matrix Item 323)]
REQUIRED ACTION DUE DATE  
NRR
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
112043595 A FSAR change will be submitted in a future FSAR amendment to change the revision level for WCAP-13869 from 2 back to 1. [Item 11, (Matrix Item 323)]
[Item 4. of Enclosure 4 of letter T02 110225 004]
[Item 4. of Enclosure 4 of letter T02 110225 004]
Engineering - I    111621236  RAI Response - I and C                                 (Letter Item 4) - Attachment 1 contains excerpts of EDCR 52321 (i.e., draft Scope, Intent, and and C                          ----------------------------                            Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks NRR                                                    after issuance of the EDCR.
Engineering - I and C FSAR RAIs NRR 111621236 (Letter Item 4) - Attachment 1 contains excerpts of EDCR 52321 (i.e., draft Scope, Intent, and Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.
(Item 1. of Enclosure 4 of letter T02 101029 002)
(Item 1. of Enclosure 4 of letter T02 101029 002)
Engineering - I     111334419  RAI Response - FSAR          11/15/2010                A corrected proprietary version of, a non-proprietary version of, and an affidavit for withholding for and C                          ----------------------------                            Thermo Fisher Scientific Qualification Report No. 864, Rev. 0 will be submitted to the NRC by NRR                                                    November 15, 2010.
Engineering - I and C RAI Response - I and C NRR 111334419 A corrected proprietary version of, a non-proprietary version of, and an affidavit for withholding for Thermo Fisher Scientific Qualification Report No. 864, Rev. 0 will be submitted to the NRC by November 15, 2010.
[Item 7. of Enclosure 2 of letter T02 100731 001]
[Item 7. of Enclosure 2 of letter T02 100731 001]
Engineering - I     111360873   FSAR - A100                                            A revision to the WBN Unit 2 Technical Specifications will be provided via separate letter to and C                          ----------------------------                            provide consistency with the setpoint methodology changes provided in A100 and Technical NRR                                                    Specification Tracking Form 493.
11/15/2010 Engineering - I and C RAI Response - FSAR NRR 111360873 A revision to the WBN Unit 2 Technical Specifications will be provided via separate letter to provide consistency with the setpoint methodology changes provided in A100 and Technical Specification Tracking Form 493.
[Item 1. of Enclosure 5 of letter T02 100901 002]
[Item 1. of Enclosure 5 of letter T02 100901 002]
Engineering - I    111903557  RAI Response - I and C                                 The nonproprietary versions of Westinghouse documents Post Accident Monitoring System and C                          ----------------------------                            (PAMS) Test Plan (Attachment 9), PAMS Channel Integration Test/Factory Acceptance Test NRR                                                    (Attachment 12), IV&V Summary Reports for PAMS (Attachments 14 and 16), and PAMS Licensing Technical Report (Attachment 19) will be provided upon issuance of the final proprietary documents.
Engineering - I and C FSAR - A100 NRR 111903557 The nonproprietary versions of Westinghouse documents Post Accident Monitoring System (PAMS) Test Plan (Attachment 9), PAMS Channel Integration Test/Factory Acceptance Test (Attachment 12), IV&V Summary Reports for PAMS (Attachments 14 and 16), and PAMS Licensing Technical Report (Attachment 19) will be provided upon issuance of the final proprietary documents.
(Enclosure 3 of letter T02 101203 001)
(Enclosure 3 of letter T02 101203 001)
Engineering - I     112250468   RAI                                                    The non-proprietary version of Westinghouse report DAR-ME-09-10, Revision 0, Qualification and C                          -----                                                  Summary Report for the WINCISE Cable and Connector Upgrade at Watts Bar Unit 2 and the NRR                                                    affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.
Engineering - I and C RAI Response - I and C NRR 112250468 The non-proprietary version of Westinghouse report DAR-ME-09-10, Revision 0, Qualification Summary Report for the WINCISE Cable and Connector Upgrade at Watts Bar Unit 2 and the affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.
(Letter Item #14/375 [Item 3])
(Letter Item #14/375 [Item 3])
[Item 6 of Enclosure 4 of letter T02 110506 002]
[Item 6 of Enclosure 4 of letter T02 110506 002]
Engineering - I     112250459   RAI                                                    Common Q PAMS is designed in accordance with RG 1.168, Revision 1, IEEE 1012-1998 and and C                          -----                                                  IEEE 1020-1997. These references will be added to FSAR Table 7.1-1. (Letter Item #11/370)
Engineering - I and C RAI NRR 112250459 Common Q PAMS is designed in accordance with RG 1.168, Revision 1, IEEE 1012-1998 and IEEE 1020-1997. These references will be added to FSAR Table 7.1-1. (Letter Item #11/370)
NRR
[Item 5 of Enclosure 4 of letter T02 110506 002]
[Item 5 of Enclosure 4 of letter T02 110506 002]
Engineering - I    111621243  RAI Response - I and C                                 (Letter Item 5) - Attachment 2 contains excerpts of EDCR 52351 (i.e., draft Scope, Intent and Unit and C                          ----------------------------                            Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after NRR                                                    issuance of the EDCR.
Engineering - I and C RAI NRR 111621243 (Letter Item 5) - Attachment 2 contains excerpts of EDCR 52351 (i.e., draft Scope, Intent and Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.
(Item 2. of Enclosure 4 of letter T02 101029 002)
(Item 2. of Enclosure 4 of letter T02 101029 002)
Page 11 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                           05/17/2011
Engineering - I and C RAI Response - I and C NRR Page 11 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                               REQUIRED ACTION Engineering - I    111901163   RAI Response - I and C                                  The discrepancies identified in the Contract Compliance Matrix of WNA-LI-00058-WBT-P, and C                          ----------------------------                            Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, will be NRR                                                    corrected in Revision 3 of the document.
REQUIRED ACTION DUE DATE  
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
111901163 The discrepancies identified in the Contract Compliance Matrix of WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, will be corrected in Revision 3 of the document.
(Item 2. of Enclosure 4 of T02 101222 006)
(Item 2. of Enclosure 4 of T02 101222 006)
Engineering - I     112249939   FSAR RAI                                                As described in Enclosure 2 to TVA letter to NRC dated March 31, 2011, most of WBN Unit 2 and C                          --------------                                          operator manual actions are preventative rather than reactive. That is, they are driven by NRR                                                    procedure rather than reacting to changing plant conditions as indicated by instrumentation and alarms. While there are some actions that are taken in response to the fire itself (de-energize electrical board that is on fire), most WBN Unit 2 actions are in response to tripping the reactor.
Engineering - I and C RAI Response - I and C NRR 112249939 As described in Enclosure 2 to TVA letter to NRC dated March 31, 2011, most of WBN Unit 2 operator manual actions are preventative rather than reactive. That is, they are driven by procedure rather than reacting to changing plant conditions as indicated by instrumentation and alarms. While there are some actions that are taken in response to the fire itself (de-energize electrical board that is on fire), most WBN Unit 2 actions are in response to tripping the reactor.
This clarification of T=0 is being included in the ongoing revision of Part V Section 2 which will be included in the next FPR revision.     (Letter Item 43 [NRC Question RAI FPR V-11])
This clarification of T=0 is being included in the ongoing revision of Part V Section 2 which will be included in the next FPR revision. (Letter Item 43 [NRC Question RAI FPR V-11])
(Item 11. of Enclosure 2. of letter T02 110506 001)
(Item 11. of Enclosure 2. of letter T02 110506 001)
Engineering - I     112250458   RAI                                                    The Common Q PAMS will meet the cyber security requirements for the WBN Unit 2 Nuclear and C                          -----                                                  Security Program as mandated by 10 CFR 73.54 via WBN Unit 2 Procedure 25402-3DP-G04G-NRR                                                    00508, Cyber Security Program. (Letter Item #10/368)
Engineering - I and C FSAR RAI NRR 112250458 The Common Q PAMS will meet the cyber security requirements for the WBN Unit 2 Nuclear Security Program as mandated by 10 CFR 73.54 via WBN Unit 2 Procedure 25402-3DP-G04G-00508, Cyber Security Program. (Letter Item #10/368)
[Item 4 of Enclosure 4 of letter T02 110506 002]
[Item 4 of Enclosure 4 of letter T02 110506 002]
Engineering - I     112250453   RAI                                                    The Common Q PAMS and RM-1000 radiation monitors comply with IEEE 344-2004 and with RG and C                          -----                                                  1.100 Revision 3 with the exception of testing above 30Hz. Table 7.1-1 will be updated to reflect NRR                                                    conformance. (Letter Item #8/366)
Engineering - I and C RAI NRR 112250453 The Common Q PAMS and RM-1000 radiation monitors comply with IEEE 344-2004 and with RG 1.100 Revision 3 with the exception of testing above 30Hz. Table 7.1-1 will be updated to reflect conformance. (Letter Item #8/366)
[Item 3 of Enclosure 4 of letter T02 110506 002]
[Item 3 of Enclosure 4 of letter T02 110506 002]
Engineering - I     112250445   RAI                                                    FSAR Table 7.1-1 will be updated to reference IEEE Std 603-1991 for the Common Q PAMS.
Engineering - I and C RAI NRR 112250445 FSAR Table 7.1-1 will be updated to reference IEEE Std 603-1991 for the Common Q PAMS.
and C                          -----                                                  (Letter Item #6/34 [Item 2])
(Letter Item #6/34 [Item 2])
NRR
[Item 2 of Enclosure 4 of letter T02 110506 002]
[Item 2 of Enclosure 4 of letter T02 110506 002]
Engineering - I     112250439   RAI                                                    The non-proprietary version of Westinghouse document WBT DMIMS-DX' Seismic Evaluation and C                          -----                                                  of the Digital Metal Impact Monitoring System (DMIMS-DX') for Watts Bar Unit 2, EQ-QR                                 NRR                                                    WBT, Revision 0 and affidavit for withholding will be submitted within two weeks of receipt from Westinghouse. (Letter Item #4/362 [Item 1])
Engineering - I and C RAI NRR 112250439 The non-proprietary version of Westinghouse document WBT DMIMS-DX' Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DX') for Watts Bar Unit 2, EQ-QR WBT, Revision 0 and affidavit for withholding will be submitted within two weeks of receipt from Westinghouse. (Letter Item #4/362 [Item 1])
[Item 1 of Enclosure 4 of letter T02 110506 002]
[Item 1 of Enclosure 4 of letter T02 110506 002]
Engineering -       112145180   RAI Response - SSER22                                  Amendment 104 to the Unit 2 FSAR will revise Table 3.2-2 to note that TVA Class G and H piping Mechanical                      Open Items                                              within the SGB System exists downstream of the safety-related containment isolation valves.
Engineering - I and C RAI NRR 112145180 Amendment 104 to the Unit 2 FSAR will revise Table 3.2-2 to note that TVA Class G and H piping within the SGB System exists downstream of the safety-related containment isolation valves.
                                ----------------------------                            (response to action item 36)
(response to action item 36)
NRR
[Item 3. of Enclosure 4 of letter T02 110406 004]
[Item 3. of Enclosure 4 of letter T02 110406 004]
Engineering -       112068570   FSAR RAI                    04/29/2011                Response to RAI FPR V-2 will be provided by April 29, 2011.       [RAI FPR V-2]
Engineering -
Mechanical                      ----------------------------
Mechanical RAI Response - SSER22 Open Items NRR 112068570 Response to RAI FPR V-2 will be provided by April 29, 2011. [RAI FPR V-2]
NRR                                                    [Item 8. of Enclosure 2 of letter T02 110316 004]
[Item 8. of Enclosure 2 of letter T02 110316 004]
Page 12 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
04/29/2011 Engineering -
Mechanical FSAR RAI NRR Page 12 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE         PKG IPS                                                    /        REC'D /
MAXIMO #
RESPONSIBLE    #    MAXIMO #              SOURCE              MILESTONE      CLOSED*                                               REQUIRED ACTION Engineering -      111334428   RAI Response - FSAR                                          Once the date for issuance of an operating license becomes more certain, TVA will update the Mechanical                      ----------------------------                                  sentence regarding the Code of Record in accordance with 10 CFR 50.55a(f)(4)(i).
REQUIRED ACTION DUE DATE  
NRR
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
111334428 Once the date for issuance of an operating license becomes more certain, TVA will update the sentence regarding the Code of Record in accordance with 10 CFR 50.55a(f)(4)(i).
[Item 9. of Enclosure 2 of letter T02 100731 001]
[Item 9. of Enclosure 2 of letter T02 100731 001]
Engineering -     112068464   FSAR RAI                          04/29/2011                  The as-designed Fire Protection Report (FPR) will be provided by March 16, 2011 except for Mechanical                      ----------------------------                                  Part V, which will be provided by April 29, 2011. [RAI FPR General - 2 Item A]
Engineering -
NRR
Mechanical RAI Response - FSAR NRR 112068464 The as-designed Fire Protection Report (FPR) will be provided by March 16, 2011 except for Part V, which will be provided by April 29, 2011. [RAI FPR General - 2 Item A]
[Item 1. of Enclosure 2 of letter T02 110316 004]
[Item 1. of Enclosure 2 of letter T02 110316 004]
This tracks the portion due 04/29/2011.
This tracks the portion due 04/29/2011.
Engineering -     112068520    FSAR RAI                         03/16/2011                  Attachment 2 contains Figures II-1A thru II-26A, which are the as-designed installed fire detection Mechanical                      ----------------------------                                  and suppression system drawings. These drawings will be annotated to reflect changes made to NRR                                                          the figures and provided to NRC by March 16, 2011. [RAI FPR General-4]
04/29/2011 Engineering -
Mechanical FSAR RAI NRR 112068520 contains Figures II-1A thru II-26A, which are the as-designed installed fire detection and suppression system drawings. These drawings will be annotated to reflect changes made to the figures and provided to NRC by March 16, 2011. [RAI FPR General-4]
[Item 5. of Enclosure 2 of letter T02 110316 004]
[Item 5. of Enclosure 2 of letter T02 110316 004]
Engineering -     112046729    FSAR RAI                                                     FSAR section 12.3.2.2 will be revised to list any applicable additional areas addressed by the Mechanical                      ----------------------------                                  mission dose calculations. (Question 30.1.b)
03/16/2011 Engineering -
NRR
Mechanical FSAR RAI NRR 112046729 FSAR section 12.3.2.2 will be revised to list any applicable additional areas addressed by the mission dose calculations. (Question 30.1.b)
[Item 8. of Enclosure 4 of letter T02 110225 002]
[Item 8. of Enclosure 4 of letter T02 110225 002]
Engineering -     112236712    FSAR RAI                                                     A future amendment to the Unit 2 FSAR will incorporate the Inadvertent ECCS Actuation analysis.
Engineering -
Mechanical                      ----------------------------
Mechanical FSAR RAI NRR 112236712 A future amendment to the Unit 2 FSAR will incorporate the Inadvertent ECCS Actuation analysis.
NRR                                                          [Item 1. of Enclosure 3 of letter T02 110429 003]
[Item 1. of Enclosure 3 of letter T02 110429 003]
Engineering -     111903011   Fire Protection Report            10/01/2011                  TVA will issue the as-constructed FPR for WBN Units 1 and 2 by October 1, 2011.
Engineering -
Mechanical                      ----------------------------
Mechanical FSAR RAI NRR 111903011 TVA will issue the as-constructed FPR for WBN Units 1 and 2 by October 1, 2011.
NRR                                                          (Item 1. of Enclosure 5 of letter T02 101218 001)
(Item 1. of Enclosure 5 of letter T02 101218 001) 10/01/2011 Engineering -
Engineering - 200  NCO080008033 Generic Communications:              / six                    GL 1989-04, Guidelines on Developing Acceptable Inservice Testing Programs - Submit an Mechanical                      GL 1989-04                        months                    ASME Section XI Inservice Test Program for the first ten year interval six months before receiving
Mechanical Fire Protection Report NRR NCO080008033 GL 1989-04, Guidelines on Developing Acceptable Inservice Testing Programs - Submit an ASME Section XI Inservice Test Program for the first ten year interval six months before receiving an Operating License.
                                --------------------------------    before                    an Operating License.
/ six months before receiving an Operating License Engineering -
Regulatory Framework            receiving an
Mechanical Generic Communications:
                                --------------------------------  Operating NRR                                License Engineering -     112236713   FSAR RAI                                                      A future amendment to the Unit 2 FSAR will incorporate the CVCS Malfunction analysis.
GL 1989-04 Regulatory Framework NRR 200 112236713 A future amendment to the Unit 2 FSAR will incorporate the CVCS Malfunction analysis.
Mechanical                      ----------------------------
[Item 2. of Enclosure 3 of letter T02 110429 003]
NRR                                                          [Item 2. of Enclosure 3 of letter T02 110429 003]
Engineering -
Engineering -     10175682     Regulatory Framework              10/31/2009                  Item 3 of Enclosure 1 of the Reference reads "Provide system description and information on QA Mechanical                      ----------------------------                                  provisions for the Unit 2 Solid Waste Management System and information on the Process NRR                                                          Control Program on or before October 31, 2009."
Mechanical FSAR RAI NRR 10175682 Item 3 of Enclosure 1 of the Reference reads "Provide system description and information on QA provisions for the Unit 2 Solid Waste Management System and information on the Process Control Program on or before October 31, 2009."
Page 13 of 19                                                                 * = Date Final Closure Package received by / closed by Licensing.                                       05/17/2011
10/31/2009 Engineering -
Mechanical Regulatory Framework NRR Page 13 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE         PKG IPS                                                    /          REC'D /
MAXIMO #
RESPONSIBLE    #    MAXIMO #            SOURCE                MILESTONE      CLOSED*                                               REQUIRED ACTION Engineering - 213  112054436   Generic Communications:              / within                  TVA will evaluate adopting the revised ISTS SR 3.5.2.3 (NUREG 1431) at WBN within 6 months Mechanical                    GL 2008-01                        6 months of                  of NRC approval of the Traveler.
REQUIRED ACTION DUE DATE  
                              ---------------------------------    NRC Regulatory Framework              approval of                  (item 1. of Enclosure 3 of letter T02 110311 005)
/
                              ----------------------------      the Traveler NRR Engineering -     111895229   RAI - SAMA                                                    TVA is awaiting a response to its request of NRC to provide the basis for its assertion that a Mechanical                    ----------------------------                                  HCLPF of 0.7g corresponds to a seismic induced core damage frequency approximately equal to NRR                                                            the internal events CDF. The basis for the seismic hazard curves and associated response spectra used in the development of this value are especially of interest. TVA will evaluate the requested information upon receipt and determine if a HCLPF of < 0.7 g is applicable to WBN Unit 2. A response will be provided following this evaluation.     (RAI 4.c Response)
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
112054436 TVA will evaluate adopting the revised ISTS SR 3.5.2.3 (NUREG 1431) at WBN within 6 months of NRC approval of the Traveler.
(item 1. of Enclosure 3 of letter T02 110311 005)
/ within 6 months of NRC approval of the Traveler Engineering -
Mechanical Generic Communications:
GL 2008-01 Regulatory Framework NRR 213 111895229 TVA is awaiting a response to its request of NRC to provide the basis for its assertion that a HCLPF of 0.7g corresponds to a seismic induced core damage frequency approximately equal to the internal events CDF. The basis for the seismic hazard curves and associated response spectra used in the development of this value are especially of interest. TVA will evaluate the requested information upon receipt and determine if a HCLPF of < 0.7 g is applicable to WBN Unit 2. A response will be provided following this evaluation. (RAI 4.c Response)
[Item 8. of Enclosure 2 of T02 110131 001]
[Item 8. of Enclosure 2 of T02 110131 001]
Engineering -     112046718   FSAR RAI                                                      TVA has reviewed the FSEIS and found Table 3-20 to be in error. This was caused by the use of Mechanical                    ----------------------------                                  values contained in FSAR Table 11.3.7 instead of values contained in FSAR Table 11.3.7c. The NRR                                                            correct source term used for calculating the site boundary doses is FSAR Table 11.3.7c. As a result, this accounts for the dose values being same between the FSEIS and the FSAR Table 11.3-10. (Question 15)
Engineering -
Mechanical RAI - SAMA NRR 112046718 TVA has reviewed the FSEIS and found Table 3-20 to be in error. This was caused by the use of values contained in FSAR Table 11.3.7 instead of values contained in FSAR Table 11.3.7c. The correct source term used for calculating the site boundary doses is FSAR Table 11.3.7c. As a result, this accounts for the dose values being same between the FSEIS and the FSAR Table 11.3-10. (Question 15)
[Item 3. of Enclosure 4 of letter T02 110225 002]
[Item 3. of Enclosure 4 of letter T02 110225 002]
Engineering -     112061258   Fire Protection Report            04/29/2011                  FPR Part V is undergoing revision in accordance with the commitment made in Reference 2 to Mechanical                    -------------                                                  incorporate criteria and assumptions used to ensure that Unit 2 manual actions (including manual NRR                                                            actions for alternate or dedicated shutdown) are feasible and reliable. FPR Part V will be submitted to NRC by April 29, 2011.
Engineering -
Mechanical FSAR RAI NRR 112061258 FPR Part V is undergoing revision in accordance with the commitment made in Reference 2 to incorporate criteria and assumptions used to ensure that Unit 2 manual actions (including manual actions for alternate or dedicated shutdown) are feasible and reliable. FPR Part V will be submitted to NRC by April 29, 2011.
[from Enclosure 5 of letter T02 110316 005]
[from Enclosure 5 of letter T02 110316 005]
Engineering -     PER 172598 Fire Protection CAP                                            NCO840187004: Submit cable separation drawings to NRC in conjunction with the detailed Mechanical                    ------------------------                                      Appendix R reanalysis report.
04/29/2011 Engineering -
NRR Engineering - 209  111029357   Generic Communications:                  /                    TVA will provide a closure document similar to Reference 1 for WBN Unit 2 GL 2004-02 prior to Mechanical                    GL 2004-02                        PRIOR to                   fuel load.
Mechanical Fire Protection Report NRR PER 172598 NCO840187004: Submit cable separation drawings to NRC in conjunction with the detailed Appendix R reanalysis report.
                              --------------------------------    fuel load Regulatory Framework NRR Engineering -      112068737   FSAR RAI                                                      The FPR will be revised to clarify that this reduction only applies to areas and/or equipment Mechanical                    ----------------------------                                  affecting the unit in Modes 5, 6, and core empty and does not apply to areas where the other unit NRR                                                            is in Modes 1 to 4 inclusive.     [RAI FPR II-8]
Engineering -
Mechanical Fire Protection CAP NRR 111029357 TVA will provide a closure document similar to Reference 1 for WBN Unit 2 GL 2004-02 prior to fuel load.
/
PRIOR to fuel load Engineering -
Mechanical Generic Communications:
GL 2004-02 Regulatory Framework NRR 209 112068737 The FPR will be revised to clarify that this reduction only applies to areas and/or equipment affecting the unit in Modes 5, 6, and core empty and does not apply to areas where the other unit is in Modes 1 to 4 inclusive. [RAI FPR II-8]
[Item 11. of Enclosure 2 of letter T02 110316 004]
[Item 11. of Enclosure 2 of letter T02 110316 004]
Page 14 of 19                                                                 * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
Engineering -
Mechanical FSAR RAI NRR Page 14 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE         PKG IPS                                                        /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #              SOURCE                MILESTONE      CLOSED*                                               REQUIRED ACTION Engineering -      111091647   RAI Response - IPE                                              TVA will provide information regarding how the model and the peer review process addressed the Mechanical                      ----------------------------                                    items in the Regulatory Guide 1.200 Revision 2 tables related to internal events including internal NRR                                                            flooding for which the NRC position was stated as Qualification.
REQUIRED ACTION DUE DATE  
[Item . 1 of Enclosure 4 of T02 100608 001.]
/
Engineering - 213  NCO081006001 Generic Communications:                  / 90                  Item 2 of Enclosure 2 stated "WBN Unit 2 will complete the required modifications and provide a Mechanical                      GL 2008-01                        days PRIOR                    submittal consistent with the information requested in the GL 90 days prior to fuel load. The
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
                                ---------------------------------  to fuel load                submittal will provide: a statement regarding which actions were completed, the schedule for Regulatory Framework                                            completing the remaining actions, and the basis for that schedule."
CLOSED*
NRR Engineering -       112068578   FSAR RAI                                                        Upon performing the final plant walkdowns as prescribed in FPR Sections 2.1.1, 2.4.3, and 2.3, Mechanical                      ----------------------------                                    TVA will review the information and submit the results for NRC approval if they differ from the NRR                                                            assumptions and details provided in Part V or the other parts of the FPR. Otherwise, TVA will inform the NRC when the walkdowns are complete and that no revisions to the FPR were required. [RAI FPR V-3]
111091647 TVA will provide information regarding how the model and the peer review process addressed the items in the Regulatory Guide 1.200 Revision 2 tables related to internal events including internal flooding for which the NRC position was stated as Qualification.
[Item. 1 of Enclosure 4 of T02 100608 001.]
Engineering -
Mechanical RAI Response - IPE NRR NCO081006001 Item 2 of Enclosure 2 stated "WBN Unit 2 will complete the required modifications and provide a submittal consistent with the information requested in the GL 90 days prior to fuel load. The submittal will provide: a statement regarding which actions were completed, the schedule for completing the remaining actions, and the basis for that schedule."
/ 90 days PRIOR to fuel load Engineering -
Mechanical Generic Communications:
GL 2008-01 Regulatory Framework NRR 213 112068578 Upon performing the final plant walkdowns as prescribed in FPR Sections 2.1.1, 2.4.3, and 2.3, TVA will review the information and submit the results for NRC approval if they differ from the assumptions and details provided in Part V or the other parts of the FPR. Otherwise, TVA will inform the NRC when the walkdowns are complete and that no revisions to the FPR were required. [RAI FPR V-3]
[Item 9. of Enclosure 2 of letter T02 110316 004]
[Item 9. of Enclosure 2 of letter T02 110316 004]
Engineering -       112068531    FSAR RAI                                                       Figures representing the as-constructed plant configuration will be provided after construction Mechanical                      ----------------------------                                    completion. [RAI FPR General - 4]
Engineering -
NRR
Mechanical FSAR RAI NRR 112068531 Figures representing the as-constructed plant configuration will be provided after construction completion. [RAI FPR General - 4]
[Item 6. of Enclosure 2 of letter T02 110316 004]
[Item 6. of Enclosure 2 of letter T02 110316 004]
Insp. Services      NCO080008038 Regulatory Framework                  / within                  Submit Inservice inspection (ISI) program within 6 months after receiving an operating license.
Engineering -
                                ----------------------------        6 months NRR                                    after receiving an operating license Insp. Services     112047866   ASME - Section III to                / within                  An Owners Summary Report shall be issued within 90 days following Unit 2 commercial operation Section XI                          90 days                    for those repairs or replacements, if any, which were performed under Section XI on Unit 2 prior
Mechanical FSAR RAI NRR NCO080008038 Submit Inservice inspection (ISI) program within 6 months after receiving an operating license.
                                ----------------------------        following                  to commercial operation.
/ within 6 months after receiving an operating license Insp. Services Regulatory Framework NRR 112047866 An Owners Summary Report shall be issued within 90 days following Unit 2 commercial operation for those repairs or replacements, if any, which were performed under Section XI on Unit 2 prior to commercial operation.
NRR                                    Unit 2 commercial                    [Enclosure 2 of T02 101012 001]
[Enclosure 2 of T02 101012 001]
operation Licensing -         112164522   FSAR RAI                                                        A future amendment to the Unit 2 FSAR will revise Section 9.2.1.3 as delineated in the response Mechanical                      ----------------------------                                    to Section 9.2.1 - Question (f).
/ within 90 days following Unit 2 commercial operation Insp. Services ASME - Section III to Section XI NRR 112164522 A future amendment to the Unit 2 FSAR will revise Section 9.2.1.3 as delineated in the response to Section 9.2.1 - Question (f).
NRR (Item 1. of Enclosure 2 of letter T02 110413 001)
(Item 1. of Enclosure 2 of letter T02 110413 001)
Licensing -         112164540    FSAR RAI                                                       A future amendment to the Unit 2 FSAR will revise Section 9.2.2.4 as delineated in the response Mechanical                      ----------------------------                                    to Section 9.2.2 - Question (d).
Licensing -
NRR (Item 2. of Enclosure 2 of letter T02 110413 001)
Mechanical FSAR RAI NRR 112164540 A future amendment to the Unit 2 FSAR will revise Section 9.2.2.4 as delineated in the response to Section 9.2.2 - Question (d).
Page 15 of 19                                                                   * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
(Item 2. of Enclosure 2 of letter T02 110413 001)
Licensing -
Mechanical FSAR RAI NRR Page 15 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                   REQUIRED ACTION NGD                  112179288   FSAR RAI                                                In Amendment 104 of the WBN Unit 2 FSAR, TVA will provide an update describing the increased
REQUIRED ACTION DUE DATE  
                                ----------------------------                            height at Fort Loudoun, Cherokee, WBN and Tellico dams as the current licensing basis for WBN NRR                                                      Unit 2.
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
112179288 In Amendment 104 of the WBN Unit 2 FSAR, TVA will provide an update describing the increased height at Fort Loudoun, Cherokee, WBN and Tellico dams as the current licensing basis for WBN Unit 2.
[Item 4. of Enclosure 2 of letter T02 110420 003]
[Item 4. of Enclosure 2 of letter T02 110420 003]
NGD                 112179285  FSAR RAI                     10/31/2011                  TVA will report the results of the hydrology analysis without use of sand baskets or the seismic
NGD FSAR RAI NRR 112179285 TVA will report the results of the hydrology analysis without use of sand baskets or the seismic test of the sand baskets to the NRC by October 31, 2011.
                                ----------------------------                            test of the sand baskets to the NRC by October 31, 2011.
NRR
[Item 1. of Enclosure 2 of letter T02 110420 003]
[Item 1. of Enclosure 2 of letter T02 110420 003]
NGD                  112179286  FSAR RAI                    08/31/2011                 TVA will provide an update of the WBN Unit 2 FSAR to describe the long-term stability analysis
10/31/2011 NGD FSAR RAI NRR 112179286 TVA will provide an update of the WBN Unit 2 FSAR to describe the long-term stability analysis methodology following the completion of the finite element analyses by August 31, 2012.
                                ----------------------------                            methodology following the completion of the finite element analyses by August 31, 2012.
NRR
[Item 2. of Enclosure 2 of letter T02 110420 003]
[Item 2. of Enclosure 2 of letter T02 110420 003]
NGDC Licensing      111906320   RAI                                /                    The Cf-252 sources are to be used as start-up sources for the Unit 2 reactor and have not been
08/31/2011 NGD FSAR RAI NRR 111906320 The Cf-252 sources are to be used as start-up sources for the Unit 2 reactor and have not been fabricated to date. The source capsule will be labeled with a unique serial number when fabricated. The forecast delivery date of these sources from the vendor is August 15, 2011. TVA will submit an amendment to the license requesting to add the Cf-252 sources prior to receipt.
                                ----------------------------  PRIOR to                  fabricated to date. The source capsule will be labeled with a unique serial number when NRR                          receipt of                fabricated. The forecast delivery date of these sources from the vendor is August 15, 2011. TVA source                  will submit an amendment to the license requesting to add the Cf-252 sources prior to receipt.
/
Operations          111880355   SAMA                        09/01/2011                  TVA commits to submit the revision to procedure FR-H.1 to the Pressurized Water Reactor
PRIOR to receipt of source NGDC Licensing RAI NRR 111880355 TVA commits to submit the revision to procedure FR-H.1 to the Pressurized Water Reactor Owners Group prior to September 1, 2011 (SAMA 300).
                                ----------------------------                            Owners Group prior to September 1, 2011 (SAMA 300).
NRR
[Item 10. of Enclosure 2. of letter T02 101014 003]
[Item 10. of Enclosure 2. of letter T02 101014 003]
Security            110850749   RAI Response - Physical                                  TVA will inform the NRC when the WBN Unit 2 Reactor Building is re-vitalized.
09/01/2011 Operations SAMA NRR 110850749 TVA will inform the NRC when the WBN Unit 2 Reactor Building is re-vitalized.
Security Plan NRR Unit 1 Radiation    112046612   FSAR RAI                                                TVA will provide an update in a future FSAR amendment. (Questions 22, 23, 28, and 29)
Security RAI Response - Physical Security Plan NRR 112046612 TVA will provide an update in a future FSAR amendment. (Questions 22, 23, 28, and 29)
Protection                      ----------------------------
[Item 7. of Enclosure 4 of letter T02 110225 002]
NRR                                                      [Item 7. of Enclosure 4 of letter T02 110225 002]
Unit 1 Radiation Protection FSAR RAI NRR 111364245 Amendment 101 to the Unit 2 FSAR will implement changes as noted in the applicable responses.
Unit 2 Licensing    111364245   RAI Response - FSAR                                      Amendment 101 to the Unit 2 FSAR will implement changes as noted in the applicable responses.
[Item 1. of Enclosure 3 of letter T02 100830 004]
NRR                                                      [Item 1. of Enclosure 3 of letter T02 100830 004]
Unit 2 Licensing RAI Response - FSAR NRR 111517786 Amendment 101 to the Unit 2 FSAR will implement changes as noted in responses to the following RAIs: 2.3.2 - 9, 2.3.2 - 10, 2.3.2 - 11, 2.3.2 1, 2.3.2 2, 2.3.2 3, 2.3.2 -
Unit 2 Licensing     111517786  RAI Response - FSAR                                     Amendment 101 to the Unit 2 FSAR will implement changes as noted in responses to the
13 - 4, 2.3.2 5, 2.3.2 6, 2.3.2 7, 2.3.2 8, 11 - 2.a, and 11 -2.c.
                                ----------------------------                            following RAIs: 2.3.2 - 9, 2.3.2 - 10, 2.3.2 - 11, 2.3.2 1, 2.3.2 2, 2.3.2 3, 2.3.2 -
NRR                                                      13 - 4, 2.3.2 5, 2.3.2 6, 2.3.2 7, 2.3.2 8, 11 - 2.a, and 11 -2.c.
[Item 1. of Enclosure 4 of letter # T02 101004 002]
[Item 1. of Enclosure 4 of letter # T02 101004 002]
Page 16 of 19                                                             * = Date Final Closure Package received by / closed by Licensing.                                               05/17/2011
Unit 2 Licensing RAI Response - FSAR NRR Page 16 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                 REQUIRED ACTION Unit 2 Licensing    112046368   FSAR RAI                                                Table 11.3-10 of the FSAR will be corrected to reflect the 2007 feeding factors and the offsite
REQUIRED ACTION DUE DATE  
                                ----------------------------                            radiation doses calculated without terrain adjustment factors. These changes to Table 11.3-10 NRR                                                    will be reflected in Amendment 103. (Question 14)
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
112046368 Table 11.3-10 of the FSAR will be corrected to reflect the 2007 feeding factors and the offsite radiation doses calculated without terrain adjustment factors. These changes to Table 11.3-10 will be reflected in Amendment 103. (Question 14)
[Item 2. of Enclosure 4 of letter T02 110225 002]
[Item 2. of Enclosure 4 of letter T02 110225 002]
Unit 2 Licensing     112046332  FSAR RAI                                               In the footnote added to Table 11.2-5 by Amendment 102, the term F/H1D in the formulation of
Unit 2 Licensing FSAR RAI NRR 112046332 In the footnote added to Table 11.2-5 by Amendment 102, the term F/H1D in the formulation of Column 5 and Mobile in the definition of D should be, F/H/D and Mobile, respectively.
                                ----------------------------                            Column 5 and Mobile in the definition of D should be, F/H/D and Mobile, respectively.
These items will be corrected in FSAR Amendment 103. (Question 9)
NRR                                                    These items will be corrected in FSAR Amendment 103. (Question 9)
[Item 1. of Enclosure 4 of letter T02 110225 002]
[Item 1. of Enclosure 4 of letter T02 110225 002]
Unit 2 Licensing     111028208   Regulatory Framework                                    TVA will provide periodic reports at approximately six month intervals on the status of the NUREG-
Unit 2 Licensing FSAR RAI NRR 111028208 TVA will provide periodic reports at approximately six month intervals on the status of the NUREG-0847 review topics as part of the construction completion and licensing of WBN Unit 2.
                                ----------------------------                            0847 review topics as part of the construction completion and licensing of WBN Unit 2.
Unit 2 Licensing Regulatory Framework NRR 111033038 TVA has revised the Security classification scheme to be consistent with changes being made to the WBN Security Plan in accordance with NEI 03-12. These changes completely eliminate the use of the phrase "Other security events as determined from (site-specific) Safeguards Contingency Plan," (HS1, HA4). TVA will provide the NRC staff an updated classification scheme that reflects these changes for WBN Unit 2.
NRR Unit 2 Licensing     111033038   RAI Response -              08/06/2010                TVA has revised the Security classification scheme to be consistent with changes being made to Radiological Emergency                                  the WBN Security Plan in accordance with NEI 03-12. These changes completely eliminate the Plan                                                    use of the phrase "Other security events as determined from (site-specific) Safeguards
                                ----------------------------                            Contingency Plan," (HS1, HA4). TVA will provide the NRC staff an updated classification scheme NRR                                                    that reflects these changes for WBN Unit 2.
[RAI Response 3.r of Enclosure 2. of T02 100427 001]
[RAI Response 3.r of Enclosure 2. of T02 100427 001]
Unit 2 Licensing     111948132   TS - TS Bases                                          A future Developmental Revision to the Unit 2 TS Bases will remove the "Prior to performance of Supplemental Information                                this SR in Modes 1 or 2, actions are taken to establish that adequate conditions exist for
08/06/2010 Unit 2 Licensing RAI Response -
                                ----------------------------                            performance of the SR. The required actions are defined in Bases Table 3.8.1-2." wording from NRR                                                    the TS Bases for SR 3.8.1.14.
Radiological Emergency Plan NRR 111948132 A future Developmental Revision to the Unit 2 TS Bases will remove the "Prior to performance of this SR in Modes 1 or 2, actions are taken to establish that adequate conditions exist for performance of the SR. The required actions are defined in Bases Table 3.8.1-2." wording from the TS Bases for SR 3.8.1.14.
(Item 2. Of Enclosure 5 of letter T02 110216 004)
(Item 2. Of Enclosure 5 of letter T02 110216 004)
Unit 2 Licensing     112046424   FSAR RAI                                                TVA has reviewed the FSEIS and found the land use data presented in Table 3-19 to be in error.
Unit 2 Licensing TS - TS Bases Supplemental Information NRR 112046424 TVA has reviewed the FSEIS and found the land use data presented in Table 3-19 to be in error.
                                ----------------------------                            The land use survey used to develop Table 11.3-10 was from 2007. Table 11.3-10 of the FSAR NRR                                                    will be revised to include 2007 feeding factors and the offsite radiation doses being calculated without terrain adjustment factors. These changes to Table 11.3-10 will be reflected in Amendment 103. (Question 21)
The land use survey used to develop Table 11.3-10 was from 2007. Table 11.3-10 of the FSAR will be revised to include 2007 feeding factors and the offsite radiation doses being calculated without terrain adjustment factors. These changes to Table 11.3-10 will be reflected in Amendment 103. (Question 21)
[Item 6. of Enclosure 4 of letter T02 110225 002]
[Item 6. of Enclosure 4 of letter T02 110225 002]
Unit 2 Licensing     112053537   FSAR                                                    If found acceptable by the staff, final Chapter 11 updates will be provided in A104.
Unit 2 Licensing FSAR RAI NRR 112053537 If found acceptable by the staff, final Chapter 11 updates will be provided in A104.
NRR                                                    (last part of item 1. of Enclosure 5 of letter T02 110315 001)
(last part of item 1. of Enclosure 5 of letter T02 110315 001)
Unit 2 Licensing     111948124   TS - TS Bases                                          A future Developmental Revision to the Unit 2 TS will correct the "58%" value in Unit 2 TS LCO Supplemental Information                                3.7.1, REQUIRED ACTION A.1 to "59%."
Unit 2 Licensing FSAR NRR 111948124 A future Developmental Revision to the Unit 2 TS will correct the "58%" value in Unit 2 TS LCO 3.7.1, REQUIRED ACTION A.1 to "59%."
NRR                                                    (Item 1. Of Enclosure 5 of letter T02 110216 004)
(Item 1. Of Enclosure 5 of letter T02 110216 004)
Page 17 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                         05/17/2011
Unit 2 Licensing TS - TS Bases Supplemental Information NRR Page 17 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #              SOURCE          MILESTONE    CLOSED*                                                 REQUIRED ACTION Unit 2 Licensing    NCO080008102 Regulatory Framework        10/23/2009                TVA plans to submit a waiver request to allow operators to hold a combined operating license for
REQUIRED ACTION DUE DATE  
                                  ----------------------------                            WBN Unit 1 and Unit 2 on or before October 23, 2009.
/
NRR Unit 2 Licensing     112046406   FSAR RAI                                                Further, comparisons with other models determined that MESOPUFF II is not suitable for
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
                                  ----------------------------                            calculating /Q values at WBN receptors, and that GELC adequately estimates /Q for WBN NRR                                                    receptors, without any need for adjustments. Therefore, WBN can eliminate the use adjustment factors and use GELC results directly. These changes will be reflected in Table 11.3-8 in FSAR, Amendment 103. (Question 20)
CLOSED*
NCO080008102 TVA plans to submit a waiver request to allow operators to hold a combined operating license for WBN Unit 1 and Unit 2 on or before October 23, 2009.
10/23/2009 Unit 2 Licensing Regulatory Framework NRR 112046406 Further, comparisons with other models determined that MESOPUFF II is not suitable for calculating /Q values at WBN receptors, and that GELC adequately estimates /Q for WBN receptors, without any need for adjustments. Therefore, WBN can eliminate the use adjustment factors and use GELC results directly. These changes will be reflected in Table 11.3-8 in FSAR, Amendment 103. (Question 20)
[Item 5. of Enclosure 4 of letter T02 110225 002]
[Item 5. of Enclosure 4 of letter T02 110225 002]
Unit 2 Licensing     112046388    FSAR RAI                                               FSAR Section 11.3.10.1, Assumptions and Calculation Methods incorrectly states the dose to
Unit 2 Licensing FSAR RAI NRR 112046388 FSAR Section 11.3.10.1, Assumptions and Calculation Methods incorrectly states the dose to the critical organ from radioiodines, tritium, and particulates is calculated for real pathways existing at the site during a land use survey conducted in 1994. The feeding factor of 70% is the feeding factor associated with the 1994 land use survey. The feeding factor of 65% listed in Table 3-21 of the FSEIS is in error and should be 0.33%. These changes to FSAR Section 11.3.10.1 will be reflected in Amendment 103. (Question 18)
                                  ----------------------------                            the critical organ from radioiodines, tritium, and particulates is calculated for real pathways NRR                                                    existing at the site during a land use survey conducted in 1994. The feeding factor of 70% is the feeding factor associated with the 1994 land use survey. The feeding factor of 65% listed in Table 3-21 of the FSEIS is in error and should be 0.33%. These changes to FSAR Section 11.3.10.1 will be reflected in Amendment 103. (Question 18)
[Item 4. of Enclosure 4 of letter T02 110225 002]
[Item 4. of Enclosure 4 of letter T02 110225 002]
Unit 2 Licensing     112053527   FSAR                                                    TVA will provide an advance version of Chapter 11 along with answers to the remaining RAI
Unit 2 Licensing FSAR RAI NRR 112053527 TVA will provide an advance version of Chapter 11 along with answers to the remaining RAI questions in separate correspondence.
                                  ----------------------------                            questions in separate correspondence.
(first part of item 1. of Enclosure 5 of letter T02 110315 001)
NRR (first part of item 1. of Enclosure 5 of letter T02 110315 001)
Unit 2 Licensing FSAR NRR 111360889 TVA will submit a combined Unit 1 and Unit 2 FSAR with the first update of the Unit 1 UFSAR after Unit 2 is licensed.
Unit 2 Licensing     111360889   FSAR - A100                        /                    TVA will submit a combined Unit 1 and Unit 2 FSAR with the first update of the Unit 1 UFSAR
                                  ----------------------------  AFTER                    after Unit 2 is licensed.
NRR                          LICENSED
[Item 2 of Enclosure 5 of letter T02 100901 002]
[Item 2 of Enclosure 5 of letter T02 100901 002]
Unit 2 Licensing     111877289   RAI                                                    If necessary, any revisions resulting from the above reviews will be provided in a later FSAR
/
                                  ----------------------------                            amendment.
AFTER LICENSED Unit 2 Licensing FSAR - A100 NRR 111877289 If necessary, any revisions resulting from the above reviews will be provided in a later FSAR amendment.
NRR (Item 3. of Enclosure 3 of letter T02 110124 001)
(Item 3. of Enclosure 3 of letter T02 110124 001)
Unit 2 Licensing     112145218   List of Design Differences                              Additional unit differences could emerge through field implementation. If significant unit
Unit 2 Licensing RAI NRR 112145218 Additional unit differences could emerge through field implementation. If significant unit differences emerge, then TVA will provide another updated list, if necessary, when field implementation is complete.
                                  ----------------------------                            differences emerge, then TVA will provide another updated list, if necessary, when field NRR                                                    implementation is complete.
[Item 1. of Enclosure 2 of letter T02 110406 005]
[Item 1. of Enclosure 2 of letter T02 110406 005]
Unit 2 Licensing     111027916   Regulatory Framework        07/30/2010                TVA will provide updates to the status of the Regulatory Framework and Generic
Unit 2 Licensing List of Design Differences NRR 111027916 TVA will provide updates to the status of the Regulatory Framework and Generic Communications tables quarterly, within 30 days of the end of the quarter. [Revision 3 is due 07/30/2010]
                                  ----------------------------                            Communications tables quarterly, within 30 days of the end of the quarter. [Revision 3 is due NRR                                                    07/30/2010]
07/30/2010 Unit 2 Licensing Regulatory Framework NRR Page 18 of 19 05/17/2011
Page 18 of 19                                                             * = Date Final Closure Package received by / closed by Licensing.                                           05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


DUE DATE       PKG IPS                                              /        REC'D /
MAXIMO #
RESPONSIBLE      #    MAXIMO #            SOURCE          MILESTONE    CLOSED*                                                 REQUIRED ACTION Unit 2 Licensing    111032952   RAI Response -              08/06/2010                TVA submits all changes to the TVA REP in accordance with 10 CFR 50.4, Appendix E. TVA will Radiological Emergency                                  provide the NRC with the latest revised information in Appendix C (WBN 1/2) to the REP when we Plan                                                    submit the updated plan as committed to in these RAI responses. If changes are made after
REQUIRED ACTION DUE DATE  
                                ----------------------------                            NRC review of the plan, TVA will provide the NRC with updates of all changes made to the WBN NRR                                                    Unit 1/2 REP to ensure that the NRC staff has accurate and complete information.
/
MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /
CLOSED*
111032952 TVA submits all changes to the TVA REP in accordance with 10 CFR 50.4, Appendix E. TVA will provide the NRC with the latest revised information in Appendix C (WBN 1/2) to the REP when we submit the updated plan as committed to in these RAI responses. If changes are made after NRC review of the plan, TVA will provide the NRC with updates of all changes made to the WBN Unit 1/2 REP to ensure that the NRC staff has accurate and complete information.
[RAI Response 1. of Enclosure 2. of T02 100427 001]
[RAI Response 1. of Enclosure 2. of T02 100427 001]
Unit 2 Licensing     112046353   FSAR RAI                                                The FSAR will be revised to eliminate the adjustment factors and use GELC results directly.
08/06/2010 Unit 2 Licensing RAI Response -
                                ----------------------------                            Specifically, Table 11.3-10 (Unit 2 only) dose values for Noble Gases and Iodines/Particulates will NRR                                                    be revised. In addition, due to elimination of the terrain adjustment factors, the highest dose pathway becomes vegetable ingestion instead of the cow milk with feeding factor. Doses reflected in this table will be of one unit (Unit 2) without a Tritium Producing Core. These changes will be submitted as part of Unit 2 FSAR, Amendment 103.
Radiological Emergency Plan NRR 112046353 The FSAR will be revised to eliminate the adjustment factors and use GELC results directly.
Specifically, Table 11.3-10 (Unit 2 only) dose values for Noble Gases and Iodines/Particulates will be revised. In addition, due to elimination of the terrain adjustment factors, the highest dose pathway becomes vegetable ingestion instead of the cow milk with feeding factor. Doses reflected in this table will be of one unit (Unit 2) without a Tritium Producing Core. These changes will be submitted as part of Unit 2 FSAR, Amendment 103.
(Enclosure 2 - Question 11.3.a)
(Enclosure 2 - Question 11.3.a)
[Item 12. of Enclosure 4 of letter T02 110225 002]
[Item 12. of Enclosure 4 of letter T02 110225 002]
TOTAL NUMBER OF OPEN ITEMS: 125 Page 19 of 19                                                           * = Date Final Closure Package received by / closed by Licensing.                                           05/17/2011
Unit 2 Licensing FSAR RAI NRR 125 TOTAL NUMBER OF OPEN ITEMS:
Page 19 of 19 05/17/2011
* = Date Final Closure Package received by / closed by Licensing.


SSER 22/23 Open Item Plan Item Question/Issue                               Lead                 Action Plan (1) Review evaluations and corrective actions   Const Complete - Addressed by Maximo letter associated with a power assisted cable             Commitment Closure package in  pull. (NRC safety evaluation dated August         10181059 folder 31, 2009, ADAMS Accession No. ML092151155)
SSER 22/23 Open Item Plan Item Question/Issue Lead Action Plan (1) letter in folder Review evaluations and corrective actions associated with a power assisted cable pull. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)
(2) Conduct appropriate inspection activities   Elec  Provide NRC Residents access to as-letter to verify cable lengths used in calculations       constructed ICRDS database and in  and analysis match as-installed                   associated calcs.
Const Complete - Addressed by Maximo Commitment Closure package 10181059 (2) letter in folder Conduct appropriate inspection activities to verify cable lengths used in calculations and analysis match as-installed configuration. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)
folder configuration. (NRC safety evaluation dated August 31, 2009, ADAMS                       Due date:02/29/2012 (Khan)
Elec Provide NRC Residents access to as-constructed ICRDS database and associated calcs.
Accession No. ML092151155)
Due date:02/29/2012 (Khan)
Note: Pending completion of the cable pull effort and updating ICRDS for as-installed cable lengths by construction.
Note: Pending completion of the cable pull effort and updating ICRDS for as-installed cable lengths by construction.
(4) Conduct appropriate inspection activities   Elec/ Complete - Close to Inspection Report letter to verify that TVAs maximum SWBP           Const 20100604 in  criteria for signal level and coaxial cables folder do not exceed the cable manufacturers maximum SWBP criteria. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)
(4) letter in folder Conduct appropriate inspection activities to verify that TVAs maximum SWBP criteria for signal level and coaxial cables do not exceed the cable manufacturers maximum SWBP criteria. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)
(7) Verify commitment completion and review     Elec  See commitments in TVA Letter.
Elec/
letter electrical design calculations. (TVA letter       Provide NRC Residents a copy of in  dated October 9, 1990, ADAMS Accession             related electrical calculation procedures folder No. ML073551056)                                  and provide NRC access to calculations Due date: 8/1/11 (Khan)
Const Complete - Close to Inspection Report 20100604 (7) letter in folder Verify commitment completion and review electrical design calculations. (TVA {{letter dated|date=October 9, 1990|text=letter dated October 9, 1990}}, ADAMS Accession No. ML073551056)
(9) Confirm that education and experience of     Lic  Obtain education and experience pg  management and principal supervisory               information from WBN Human 13-2  positions down through the shift                   Resources and provide info to NRC supervisory level conform to Regulatory           Residents.
Elec See commitments in TVA Letter.
Guide 1.8. (Section 13.1.3)
Provide NRC Residents a copy of related electrical calculation procedures and provide NRC access to calculations Due date: 8/1/11 (Khan)
(9) pg 13-2 Confirm that education and experience of management and principal supervisory positions down through the shift supervisory level conform to Regulatory Guide 1.8. (Section 13.1.3)
Lic Obtain education and experience information from WBN Human Resources and provide info to NRC Residents.
Due date: 7/15/11 (Elton)
Due date: 7/15/11 (Elton)
(10) Confirm that TVA has an adequate             Ops  Provide submittal that confirms we have pg  number of licensed and non-licensed               adequate personnel in the pipeline.
(10) pg 13-2 Confirm that TVA has an adequate number of licensed and non-licensed operators in the training pipeline to support the preoperational test program, fuel loading, and dual unit operation.
13-2  operators in the training pipeline to support the preoperational test program,           Due date: 7/15/11 (Wallace) fuel loading, and dual unit operation.
(Section 13.1.3)
(Section 13.1.3)
(11) The plant administrative procedures           Ops  Provide NRC Residents copy of pg  should clearly state that, when the               procedure that provides the controls of 13-2  Assistant Shift Engineer assumes his               this function.
Ops Provide submittal that confirms we have adequate personnel in the pipeline.
duties as Fire Brigade Leader, his control room duties are temporarily assumed by             Due date: 7/15/11 (Wallace)
Due date: 7/15/11 (Wallace)
(11) pg 13-2 The plant administrative procedures should clearly state that, when the Assistant Shift Engineer assumes his duties as Fire Brigade Leader, his control room duties are temporarily assumed by Ops Provide NRC Residents copy of procedure that provides the controls of this function.
Due date: 7/15/11 (Wallace)  


the Shift Supervisor (Shift Engineer), or by another SRO, if one is available. The plant administrative procedures should clearly describe this transfer of control room duties. (Section 13.1.3)
the Shift Supervisor (Shift Engineer), or by another SRO, if one is available. The plant administrative procedures should clearly describe this transfer of control room duties. (Section 13.1.3)
(12) TVAs implementation of NGDC PP-20           LIC  Provide self assessment related PER pg  and EDCR Appendix J is subject to future           closure packages to Licensing for NRR 25-3 NRC audit and inspection. (Section 25.9)           review.
(12) pg 25-3 TVAs implementation of NGDC PP-20 and EDCR Appendix J is subject to future NRC audit and inspection. (Section 25.9)
LIC Provide self assessment related PER closure packages to Licensing for NRR review.
Due date: 6/15/11 (Smith)
Due date: 6/15/11 (Smith)
(13) TVA is expected to submit an IST program     ISO  Provide submittal addressing IST pg  and specific relief requests for WBN Unit 2       program and relief requests.
(13) pg 3-11 TVA is expected to submit an IST program and specific relief requests for WBN Unit 2 nine months before the projected date of OL issuance. (Section 3.9.6)
3-11 nine months before the projected date of OL issuance. (Section 3.9.6)                       Due date: 7/15/11 (Tinley)
ISO Provide submittal addressing IST program and relief requests.
(16) Based on the uniqueness of EQ, the NRC       Elec Provide NRC Residents copies of EQ pg  staff must perform a detailed inspection           documents as requested for the onsite 3-12 and evaluation prior to fuel load to               inspections.
Due date: 7/15/11 (Tinley)
3-13 determine how the WBN Unit 2 EQ program complies with the requirements of         Due date: Ongoing Inspection (Khan) 10 CFR 50.49. (Section 3.11.2)
(16) pg 3-12 3-13 Based on the uniqueness of EQ, the NRC staff must perform a detailed inspection and evaluation prior to fuel load to determine how the WBN Unit 2 EQ program complies with the requirements of 10 CFR 50.49. (Section 3.11.2)
(17) The NRC staff should verify the accuracy     Elec Provide NRC Residents copies of EQ pg  of the WBN Unit 2 EQ list prior to fuel           documents as requested for the onsite 3-13 load. (Section 3.11.2.1)                           inspections.
Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspections.
Due date: Ongoing Inspection (Khan)
(17) pg 3-13 The NRC staff should verify the accuracy of the WBN Unit 2 EQ list prior to fuel load. (Section 3.11.2.1)
Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspections.
Due date: Ongoing Inspection (Khan)
Due date: Ongoing Inspection (Khan)
(19) The NRC staff should complete its review     Elec Provide NRC Residents copies of EQ pg  of TVAs EQ Program procedures for                 documents as requested for the onsite 3-14 WBN Unit 2 prior to fuel load. (Section           inspection 3.11.2.2.1)
(19) pg 3-14 The NRC staff should complete its review of TVAs EQ Program procedures for WBN Unit 2 prior to fuel load. (Section 3.11.2.2.1)
Complete - Expect NRC to close in next inspection report (21) The NRC staff should confirm that the         Elec Provide NRC Residents copies of EQ pg  Electrical Penetration Assemblies (EPAs)           documents as requested for the onsite 3-14 are installed in the tested configuration,         inspection and that the feedthrough module is manufactured by the same company and               Due date: 5/20/11 (Khan) is consistent with the EQ test report for the EPA. (Section 3.11.2.2.1)
Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspection Complete - Expect NRC to close in next inspection report (21) pg 3-14 The NRC staff should confirm that the Electrical Penetration Assemblies (EPAs) are installed in the tested configuration, and that the feedthrough module is manufactured by the same company and is consistent with the EQ test report for the EPA. (Section 3.11.2.2.1)
(25) Prior to the issuance of an operating         Lic Provide Insurance coverage submittal.
Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspection Due date: 5/20/11 (Khan)
pg  license, TVA is required to provide 22-1 satisfactory documentation that it has             Due date: 10/1/11 (Smith) obtained the maximum secondary liability insurance coverage pursuant to 10 CFR 140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to property insurance, and the NRC staff has reviewed and approved the documentation. (Section 22.3)
(25) pg 22-1 Prior to the issuance of an operating license, TVA is required to provide satisfactory documentation that it has obtained the maximum secondary liability insurance coverage pursuant to 10 CFR 140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to property insurance, and the NRC staff has reviewed and approved the documentation. (Section 22.3)
Lic Provide Insurance coverage submittal.
Due date: 10/1/11 (Smith)  


(29) Provide a detailed description of the       Elec  Provide response for submittal to NRR pg  transmission system grid conditions and 8-8 the operating characteristics of the offsite       Due date: 7/15/11 (Hilmes) power supply at the Watts Bar Hydro (for dual-unit operation), including the operating voltage range, post contingency voltage drops (including bounding values and post-unit trip values), and operating frequency range. Provide the design operating voltage range of the shutdown boards (minimum and maximum voltage) and information regarding how low the Watts Bar Hydro Station voltage could drop (assuming operation of the LTCs) while still supplying the worst-case shutdown board loads at the minimum design voltage of the shutdown boards.
(29) pg 8-8 Provide a detailed description of the transmission system grid conditions and the operating characteristics of the offsite power supply at the Watts Bar Hydro (for dual-unit operation), including the operating voltage range, post contingency voltage drops (including bounding values and post-unit trip values), and operating frequency range. Provide the design operating voltage range of the shutdown boards (minimum and maximum voltage) and information regarding how low the Watts Bar Hydro Station voltage could drop (assuming operation of the LTCs) while still supplying the worst-case shutdown board loads at the minimum design voltage of the shutdown boards.
The summary of the grid studies should address dual-unit operation, the transmission network interface available fault current changes, and the impact on the switchyard and plant switchgear and cabling. (Section 8.2.2)
The summary of the grid studies should address dual-unit operation, the transmission network interface available fault current changes, and the impact on the switchyard and plant switchgear and cabling. (Section 8.2.2)
(30) TVA should confirm that all other safety-   Elec  Provide response for submittal to NRR.
Elec Provide response for submittal to NRR Due date: 7/15/11 (Hilmes)
pg  related equipment (in addition to the Class 8-10 1E motors) will have adequate starting             Due date: 8/1/11 (Hilmes) and running voltage at the most limiting safety related components (such as motor           Note: This issue is with Corporate operated valves, contactors, solenoid             Licensing to resolve on Unit 1. Unit 2 valves or relays) at the degraded voltage         resolution will be the same as it is for relay setpoint dropout setting. TVA should         Unit 1.
(30) pg 8-10 TVA should confirm that all other safety-related equipment (in addition to the Class 1E motors) will have adequate starting and running voltage at the most limiting safety related components (such as motor operated valves, contactors, solenoid valves or relays) at the degraded voltage relay setpoint dropout setting. TVA should also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings. (Section 8.3.1.2)
also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings. (Section 8.3.1.2)
Elec Provide response for submittal to NRR.
(32) TVA should provide to the NRC staff the     Elec  Provide response for submittal to NRR.
Due date: 8/1/11 (Hilmes)
pg  details of the administrative limits of EDG 8-14 voltage and speed range, and the basis             Due date: 8/1/11 (Hilmes) for its conclusion that the impact is negligible, and describe how it accounts for the administrative limits in the Technical Specification surveillance requirements for EDG voltage and frequency. (Section 8.3.1.14)
Note: This issue is with Corporate Licensing to resolve on Unit 1. Unit 2 resolution will be the same as it is for Unit 1.
(35) TVA should provide information to the       Mech/ Complete - A104 Update received pg  NRC staff that the CCS will produce         Chem 10-9 feedwater purity in accordance with BTP MTEB 5-3 or, alternatively, provide justification for producing feedwater purity to another acceptable standard. (Section 10.4.6)
(32) pg 8-14 TVA should provide to the NRC staff the details of the administrative limits of EDG voltage and speed range, and the basis for its conclusion that the impact is negligible, and describe how it accounts for the administrative limits in the Technical Specification surveillance requirements for EDG voltage and frequency. (Section 8.3.1.14)
Elec Provide response for submittal to NRR.
Due date: 8/1/11 (Hilmes)
(35) pg 10-9 TVA should provide information to the NRC staff that the CCS will produce feedwater purity in accordance with BTP MTEB 5-3 or, alternatively, provide justification for producing feedwater purity to another acceptable standard. (Section 10.4.6)
Mech/
Chem Complete - A104 Update received


(37) The NRC staff will review the combined       REP Submit final Unit 1/2 REP to NRC pg  WBN Unit 1 and 2 Appendix C prior to 13-8 issuance of the Unit 2 OL to confirm (1)         Due date: October 1, 2011 that the proposed Unit 2 changes were incorporated into Appendix C, and (2) that changes made to Appendix C for Unit 1 since Revision 92 and the changes made to the NP-REP since Revision 92 do not affect the bases of the staffs findings in this SER supplement. (Section 13.3.2)
(37) pg 13-8 The NRC staff will review the combined WBN Unit 1 and 2 Appendix C prior to issuance of the Unit 2 OL to confirm (1) that the proposed Unit 2 changes were incorporated into Appendix C, and (2) that changes made to Appendix C for Unit 1 since Revision 92 and the changes made to the NP-REP since Revision 92 do not affect the bases of the staffs findings in this SER supplement. (Section 13.3.2)
(38) The NRC staff will confirm the availability REP The Emergency Response Data System pg  and operability of the ERDS for Unit 2           software has previously been modified 13-14 prior to issuance of the Unit 2 OL. (Section     and tested for the Watts Bar Unit 2 13.3.2.6)                                        addition. This unit can be selected from the ERDS menu to send data to the NRC at this time. In addition, the software has been developed and tested to send data from the WBN PEDS to the CECC. However, the official list of points for Watts Bar Unit 2 has not been provided by Unit 2 Design Engineering and, until this has been completed and submitted to the Computer Engineering Group for addition to the ERDS software, official testing of the software for this unit cannot be completed with the NRC in order to declare the WBN ERDS Unit 2 operational. This list is derived from the official Data Point List. Once developed, Unit 2 Licensing submits the data to the NRC. Once this list has been received by the NRC, it would require one month to add the list to the NRC data systems, write the test, schedule the test with TVA/NRC, run the test, and TVA submit the results.
REP Submit final Unit 1/2 REP to NRC Due date: October 1, 2011 (38) pg 13-14 The NRC staff will confirm the availability and operability of the ERDS for Unit 2 prior to issuance of the Unit 2 OL. (Section 13.3.2.6)
Due date: 10/1/11 (39) The NRC staff will confirm the adequacy     REP Provide NRC Residents copies of pg  of the communications capability to             related documents as requested for the 13-14 support dual unit operations prior to           onsite inspection. This item is covered issuance of the Unit 2 OL. (Section             by the response to Item 38 13.3.2.6)
REP The Emergency Response Data System software has previously been modified and tested for the Watts Bar Unit 2 addition. This unit can be selected from the ERDS menu to send data to the NRC at this time. In addition, the software has been developed and tested to send data from the WBN PEDS to the CECC. However, the official list of points for Watts Bar Unit 2 has not been provided by Unit 2 Design Engineering and, until this has been completed and submitted to the Computer Engineering Group for addition to the ERDS software, official testing of the software for this unit cannot be completed with the NRC in order to declare the WBN ERDS Unit 2 operational. This list is derived from the official Data Point List. Once developed, Unit 2 Licensing submits the data to the NRC. Once this list has been received by the NRC, it would require one month to add the list to the NRC data systems, write the test, schedule the test with TVA/NRC, run the test, and TVA submit the results.
Due date: See Item 38 (40) The NRC staff will confirm the adequacy     REP Perform self assessment to verify pg  of the emergency facilities and equipment       processes and materials in main control 13-15 to support dual unit operations prior to         room, TSC, OSC, EOF and local issuance of the Unit 2 OL. (Section             recivery facility. Provide NRC Residents 13.3.2.8)                                       copies of self assessment documents
Due date: 10/1/11 (39) pg 13-14 The NRC staff will confirm the adequacy of the communications capability to support dual unit operations prior to issuance of the Unit 2 OL. (Section 13.3.2.6)
REP Provide NRC Residents copies of related documents as requested for the onsite inspection. This item is covered by the response to Item 38 Due date: See Item 38 (40) pg 13-15 The NRC staff will confirm the adequacy of the emergency facilities and equipment to support dual unit operations prior to issuance of the Unit 2 OL. (Section 13.3.2.8)
REP Perform self assessment to verify processes and materials in main control room, TSC, OSC, EOF and local recivery facility. Provide NRC Residents copies of self assessment documents  


for the onsite inspection.
for the onsite inspection.
Due date: 10/1/11 (41) TVA committed to (1) update plant data     Computer 1) Provide demonstration of capability of pg  displays as necessary to include Unit 2,     Eng    SPDS, ICS and PEDS data system 13-16 and (2) to update dose assessment                   displays for Unit 2.
Due date: 10/1/11 (41) pg 13-16 TVA committed to (1) update plant data displays as necessary to include Unit 2, and (2) to update dose assessment models to provide capabilities for assessing releases from both WBN units.
models to provide capabilities for assessing releases from both WBN units.             Due date:
The NRC staff will confirm the adequacy of these items prior to issuance of the Unit 2 OL. (Section 13.3.2.9)
The NRC staff will confirm the adequacy of these items prior to issuance of the       REP    2) Submit EPIP-13. Describe RED, Unit 2 OL. (Section 13.3.2.9)                       FRED and BRED data systems..
Computer Eng REP
Due date: 10/1/11 (42) The NRC staff will confirm the adequacy     Computer Covered by Item 41 (1) pg  of the accident assessment capabilities to   Eng 13-16 support dual unit operations prior to               Due date: See Item 41(1) issuance of the Unit 2 OL. (Section 13.3.2.9)
: 1) Provide demonstration of capability of SPDS, ICS and PEDS data system displays for Unit 2.
(43) Section V of Appendix E to 10 CFR             REP    Submit Unit 1/2 REP implementing pg  Part 50 requires TVA to submit its detailed         procedures (EPIP-1 thru EPIP-17) to 13-23 implementing procedures for its                     NRC emergency plan no less than 180 days before the scheduled issuance of an                 Due date: October 1, 2011 operating license. Completion of this               (Detchemendy) requirement will be confirmed by the NRC staff prior to the issuance of an operating license. (Section 13.3.2.18)
Due date:
(47) The NRC staff noted that TVAs changes         Lic  Complete - A104 Update received pg  to Section 6.2.6 in FSAR Amendment 97, 6-12 regarding the implementation of Option B of Appendix J, were incomplete, because several statements remained regarding performing water-sealed valve leakage tests as specified in 10 CFR [Part] 50, Appendix J. With the adoption of Option B, the specified testing requirements are no longer applicable; Option A to Appendix J retains these requirements. The NRC discussed this discrepancy with TVA in a telephone conference on September 28, 2010. TVA stated that it would remove the inaccurate reference to Appendix J for specific water testing requirements in a future FSAR amendment. (Section 6.2.6)
: 2) Submit EPIP-13. Describe RED, FRED and BRED data systems..
(48) The NRC staff should verify that its         LIC    Complete - No TVA action pg  conclusions in the review of FSAR 6-15 Section 15.4.1 do not affect the                     Licensing to address in next SSER conclusions of the staff regarding the               update letter acceptability of Section 6.5.3. (Section
Due date: 10/1/11 (42) pg 13-16 The NRC staff will confirm the adequacy of the accident assessment capabilities to support dual unit operations prior to issuance of the Unit 2 OL. (Section 13.3.2.9)
Computer Eng Covered by Item 41 (1)
Due date: See Item 41(1)
(43) pg 13-23 Section V of Appendix E to 10 CFR Part 50 requires TVA to submit its detailed implementing procedures for its emergency plan no less than 180 days before the scheduled issuance of an operating license. Completion of this requirement will be confirmed by the NRC staff prior to the issuance of an operating license. (Section 13.3.2.18)
REP Submit Unit 1/2 REP implementing procedures (EPIP-1 thru EPIP-17) to NRC Due date: October 1, 2011 (Detchemendy)
(47) pg 6-12 The NRC staff noted that TVAs changes to Section 6.2.6 in FSAR Amendment 97, regarding the implementation of Option B of Appendix J, were incomplete, because several statements remained regarding performing water-sealed valve leakage tests as specified in 10 CFR [Part] 50, Appendix J. With the adoption of Option B, the specified testing requirements are no longer applicable; Option A to Appendix J retains these requirements. The NRC discussed this discrepancy with TVA in a telephone conference on September 28, 2010. TVA stated that it would remove the inaccurate reference to Appendix J for specific water testing requirements in a future FSAR amendment. (Section 6.2.6)
Lic Complete - A104 Update received (48) pg 6-15 The NRC staff should verify that its conclusions in the review of FSAR Section 15.4.1 do not affect the conclusions of the staff regarding the acceptability of Section 6.5.3. (Section LIC Complete - No TVA action Licensing to address in next SSER update letter


6.5.3)
6.5.3)
(49) The NRC staff was unable to determine               Mech  Provide NRC Residents how the refurb letter how TVA linked the training qualification                 training requirements are linked to the in  requirements of ANSI N45.2-1971 to TVA                   ANSI standard. Provide the training folder Procedure TI-119. Therefore, the                         records for refurb inspectors.
(49) letter in folder The NRC staff was unable to determine how TVA linked the training qualification requirements of ANSI N45.2-1971 to TVA Procedure TI-119. Therefore, the implementation of training and qualification for inspectors will be the subject of future NRC staff inspections.
implementation of training and qualification for inspectors will be the                 Due date: June 15, 2011 (Moll) subject of future NRC staff inspections.
(NRC {{letter dated|date=July 2, 2010|text=letter dated July 2, 2010}}, ADAMS Accession No. ML101720050)
(NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050)
Mech Provide NRC Residents how the refurb training requirements are linked to the ANSI standard. Provide the training records for refurb inspectors.
(50) TVA stated that about 5 percent of the             Const Notify NRC Residents of anchor bolt pull letter anchor bolts for safety-related pipe                     tests.
Due date: June 15, 2011 (Moll)
in  supports do not have quality control folder documentation, because the pull tests                     Due date: July 1, 2011 (Adair) have not yet been performed. Since the documentation is still under development, the NRC staff will conduct inspections to follow-up on the adequate implementation of this construction refurbishment program requirement. (NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050)
(50) letter in folder TVA stated that about 5 percent of the anchor bolts for safety-related pipe supports do not have quality control documentation, because the pull tests have not yet been performed. Since the documentation is still under development, the NRC staff will conduct inspections to follow-up on the adequate implementation of this construction refurbishment program requirement. (NRC {{letter dated|date=July 2, 2010|text=letter dated July 2, 2010}}, ADAMS Accession No. ML101720050)
(51) The implementation of TVA Procedure TI-             Mech  Provide NRC Residents the results of letter 119 will be the subject of NRC follow-up                 the refurb program.
Const Notify NRC Residents of anchor bolt pull tests.
in  inspection to determine if the construction folder refurbishment program requirements are                   Due date: Ongoing Inspection (Moll) being adequately implemented. (NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050) 52     TVA should provide an update to the FSAR         I&C    Complete - A104 Update received draft  replacing Table 12.2-3 with the expected source strength values of the freshly irradiated IITAs. (Section 12.3) 53     TVA should provide an update to the FSAR         Rad Pro Provide update to FSAR based on draft  reflecting the information provided in its               10/4/10 letter to NRC.
Due date: July 1, 2011 (Adair)
letter dated October 4, 2010, regarding the WBN radiation protection design features,                 Due Date: June 15, 2011 (Grim) including controlled access areas, decontamination areas, and onsite laboratories and counting rooms. (Section 12.4) 54     TVA should provide adequate technical             I&C    Provide requested info using correct draft  justification to the staff to relax the frequency         methodology of the radiation monitor channel quarterly operability tests. TVA should provide                     Due Date: June 30, 2011 (Hilmes) sufficient information to the staff to determine that the protable airborne radiation monitors comply with the requirements of 10 CFR 20.1501. TVA should provide sufficient information for the
(51) letter in folder The implementation of TVA Procedure TI-119 will be the subject of NRC follow-up inspection to determine if the construction refurbishment program requirements are being adequately implemented. (NRC {{letter dated|date=July 2, 2010|text=letter dated July 2, 2010}}, ADAMS Accession No. ML101720050)
Mech Provide NRC Residents the results of the refurb program.
Due date: Ongoing Inspection (Moll) 52 draft TVA should provide an update to the FSAR replacing Table 12.2-3 with the expected source strength values of the freshly irradiated IITAs. (Section 12.3)
I&C Complete - A104 Update received 53 draft TVA should provide an update to the FSAR reflecting the information provided in its {{letter dated|date=October 4, 2010|text=letter dated October 4, 2010}}, regarding the WBN radiation protection design features, including controlled access areas, decontamination areas, and onsite laboratories and counting rooms. (Section 12.4)
Rad Pro Provide update to FSAR based on 10/4/10 letter to NRC.
Due Date: June 15, 2011 (Grim) 54 draft TVA should provide adequate technical justification to the staff to relax the frequency of the radiation monitor channel quarterly operability tests. TVA should provide sufficient information to the staff to determine that the protable airborne radiation monitors comply with the requirements of 10 CFR 20.1501. TVA should provide sufficient information for the I&C Provide requested info using correct methodology Due Date: June 30, 2011 (Hilmes)


staff to determine that the licensing or TVA program requirements for the calibration and operability testing of area radiation monitors are sufficient to meet the regulatory requirements of 10 CFR 20.1501. (Section 12.4) 55   TVA should provide sufficient information to   Lic  Complete - Info provided by Question draft the staff to demonstrate that the two area         27 of 2/25/11 letter radiation monitors for the Spent Fuel Pit comply with the requirements of 10 CFR 70.24 and 10 CFR 50.68 for radiation monitoring in areas where fuel is handled or stored. (Section 12.4) 56   TVA should update the FSAR to reflect the     Lic Complete - TVA does not believe an draft information regarding the dose assessment          FSAR update is warranted. The info in program provided in its letter the NRC dated        the 6/3/10 letter is merely confirming June 3, 2010. (Section 12.5)                        that the WBN Unit 1/2 history meets the requirements of the FSAR.
staff to determine that the licensing or TVA program requirements for the calibration and operability testing of area radiation monitors are sufficient to meet the regulatory requirements of 10 CFR 20.1501. (Section 12.4) 55 draft TVA should provide sufficient information to the staff to demonstrate that the two area radiation monitors for the Spent Fuel Pit comply with the requirements of 10 CFR 70.24 and 10 CFR 50.68 for radiation monitoring in areas where fuel is handled or stored. (Section 12.4)
57   TVA should update the FSAR to reflect the     Lic  Develop FSAR change from 10/4/10 draft qualification standards of the RPM as               submittal - Question 12-13.
Lic Complete - Info provided by Question 27 of 2/25/11 letter 56 draft TVA should update the FSAR to reflect the information regarding the dose assessment program provided in its letter the NRC dated June 3, 2010. (Section 12.5)
provided in its letter to the NRC dated October 4, 2010. (Section 12.6)                     Due Date: 5/27/11 (Stockton) 58   The staff has insufficient information to     Lic  Discussion in progress with NRC draft conclude that TVA has taken appropriate             regarding this item versus Item 53 actions to reduce radiation levels and             (apparent contradiction in the increase the capability of operators to             questions).
Lic Complete - TVA does not believe an FSAR update is warranted. The info in the 6/3/10 letter is merely confirming that the WBN Unit 1/2 history meets the requirements of the FSAR.
control and mitigate the consequences of an accident at WBN Unit 2, in accordance with         Provide requested info the guidance of NUREG-0737, Item II.B.2, or can maintain occupational doses to plant         Due Date:
57 draft TVA should update the FSAR to reflect the qualification standards of the RPM as provided in its letter to the NRC dated October 4, 2010. (Section 12.6)
operators within the requirements of GDC
Lic Develop FSAR change from 10/4/10 submittal - Question 12-13.
: 19. Therefore, the staff cannot conclude that the plant shielding for WBN Unit 2 is acceptable. (Section 12.7.1) 59   The staff's evaluation of the compatibility of Mech Complete - Addressed by TVA letter draft the ESF system materials with containment           dated 3/4/11, question 3.o.1 sprays and core cooling water in the event of a LOCA is incomplete pending resolution of GSI-191 for WBN Unit 2. (Section 6.1.1.4) 60   TVA should amend the FSAR description of       Lic  Complete - A103 provided update draft the design and operation of the spent fuel pool cooling and cleanup system in FSAR Section 9.1.3 as proposed in its December 21, 2010, letter to the NRC. (Section 9.1.3) 61   TVA should provide information to the NRC     Lic  Complete - This will be addressed by a draft staff to demonstrate that PAD 4.0 can               License Condition conservatively calculate the fuel temperature and other impacted variables, such as stored energy, given the lack of a fuel thermal conductivity degradation model.
Due Date: 5/27/11 (Stockton) 58 draft The staff has insufficient information to conclude that TVA has taken appropriate actions to reduce radiation levels and increase the capability of operators to control and mitigate the consequences of an accident at WBN Unit 2, in accordance with the guidance of NUREG-0737, Item II.B.2, or can maintain occupational doses to plant operators within the requirements of GDC
: 19. Therefore, the staff cannot conclude that the plant shielding for WBN Unit 2 is acceptable. (Section 12.7.1)
Lic Discussion in progress with NRC regarding this item versus Item 53 (apparent contradiction in the questions).
Provide requested info Due Date:
59 draft The staff's evaluation of the compatibility of the ESF system materials with containment sprays and core cooling water in the event of a LOCA is incomplete pending resolution of GSI-191 for WBN Unit 2. (Section 6.1.1.4)
Mech Complete - Addressed by TVA letter dated 3/4/11, question 3.o.1 60 draft TVA should amend the FSAR description of the design and operation of the spent fuel pool cooling and cleanup system in FSAR Section 9.1.3 as proposed in its {{letter dated|date=December 21, 2010|text=December 21, 2010, letter}} to the NRC. (Section 9.1.3)
Lic Complete - A103 provided update 61 draft TVA should provide information to the NRC staff to demonstrate that PAD 4.0 can conservatively calculate the fuel temperature and other impacted variables, such as stored energy, given the lack of a fuel thermal conductivity degradation model.
Lic Complete - This will be addressed by a License Condition


(Section 4.2.2.1) 62   Confirm TVA's change to FSAR Section           Lic  Complete - A103 provided update draft 10.4.9 to reflect its intention to operate with each CST isolated from the other. (Section 10.4.9) 63   TVA should confirm to the NRC staff that       I&C  Provide requested info draft testing prior to Unit 2 fuel load has demonstrated that two-way communications             Due Date: 6/16/11 for plan is impossible with the Eagle 21 communications interface. (Section 7.2.1.1) 64   TVA stated that, "Post modification testing     I&C  Provide requested info draft will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD             Due Date: Need FDCN date from accuracy issue prior to WBN Unit 2 fuel               Westinghouse load." The issue is open pending NRC staff review of the testing results. (Section 7.2.1.1) 65   TVA should provide justification to the staff   I&C  Provide requested info draft regarding why different revisions of WCAP-13869 are referenced in WBN Unit 1 and               Due Date: 6/15/11 (Hilmes)
(Section 4.2.2.1) 62 draft Confirm TVA's change to FSAR Section 10.4.9 to reflect its intention to operate with each CST isolated from the other. (Section 10.4.9)
Unit 2. (Section 7.2.1.1) 66   TVA should clarify FSAR Section 9.2.5 to       Lic  Complete - A102 provided update to draft add the capability of the UHS to bring the           FSAR Section 9.2.2.4 to cover this non accident unit to cold shutdown within 72          question for both ERCW and CCS.
Lic Complete - A103 provided update 63 draft TVA should confirm to the NRC staff that testing prior to Unit 2 fuel load has demonstrated that two-way communications is impossible with the Eagle 21 communications interface. (Section 7.2.1.1)
hours. (Section 9.2.5) 67   TVA should confirm, and the NRC staff           Civil Provide EDCR closure documentation draft should verify, that the component cooling             for installation of CCS thermal barrier booster pumps for Unit 2 are above PMF               booster pump dike.
I&C Provide requested info Due Date: 6/16/11 for plan 64 draft TVA stated that, "Post modification testing will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD accuracy issue prior to WBN Unit 2 fuel load." The issue is open pending NRC staff review of the testing results. (Section 7.2.1.1)
level. (Section 9.2.2)
I&C Provide requested info Due Date: Need FDCN date from Westinghouse 65 draft TVA should provide justification to the staff regarding why different revisions of WCAP-13869 are referenced in WBN Unit 1 and Unit 2. (Section 7.2.1.1)
I&C Provide requested info Due Date: 6/15/11 (Hilmes) 66 draft TVA should clarify FSAR Section 9.2.5 to add the capability of the UHS to bring the non accident unit to cold shutdown within 72 hours. (Section 9.2.5)
Lic Complete - A102 provided update to FSAR Section 9.2.2.4 to cover this question for both ERCW and CCS.
67 draft TVA should confirm, and the NRC staff should verify, that the component cooling booster pumps for Unit 2 are above PMF level. (Section 9.2.2)
Civil Provide EDCR closure documentation for installation of CCS thermal barrier booster pump dike.
Due Date:
Due Date:
68   TVA should clarify to the NRC staff how the     Lic  Complete - A102 provided update draft CSS complies with GDC 5. (Section 9.2.2) 69   The WBN Unit 2 RCS vent system is               Mech  Provide EDCR closure documentation draft acceptable, pending verification that the             for installation of ECCS vents. EDCR RCS vent system is installed. (Section 5.4.5)         numbers 52637 (RHR) [P3 Completion Date 6/7/11], 53311 (SI) [P3 Completion Date 8/25/11]
68 draft TVA should clarify to the NRC staff how the CSS complies with GDC 5. (Section 9.2.2)
Due Date: See above 70   TVA should provide the revised WBN Unit 2       ISO  Provide requested info draft PSI program ASME Class 1, 2, and 3 Supports "Summary Tables," to include                 Due Date: 11/1/11 (Tinley) numbers of components so that the NRC staff can verify that the numbers meet the reference ASME Code. (Section 3.2.3 of Appendix Z of this SSER)
Lic Complete - A102 provided update 69 draft The WBN Unit 2 RCS vent system is acceptable, pending verification that the RCS vent system is installed. (Section 5.4.5)
Mech Provide EDCR closure documentation for installation of ECCS vents. EDCR numbers 52637 (RHR) [P3 Completion Date 6/7/11], 53311 (SI) [P3 Completion Date 8/25/11]
Due Date: See above 70 draft TVA should provide the revised WBN Unit 2 PSI program ASME Class 1, 2, and 3 Supports "Summary Tables," to include numbers of components so that the NRC staff can verify that the numbers meet the reference ASME Code. (Section 3.2.3 of Appendix Z of this SSER)
ISO Provide requested info Due Date: 11/1/11 (Tinley)  


71   TVA should confirm to the staff the           Lic  Complete - Letter issued 4/21/11 draft replacement of the current Unit 2 clevis insert bolts to the latest design, which uses an X-750 alloy with an HTH process, rolled threads, and a larger radius on the undercut of the cap screw head. (Section 3.9.5) 72   Based on its review, the staff asked TVA       Lic  Open pending NRC review draft several questions regarding the ICC instrumentation. TVA responded to the staff questions by letter dated October 26, 2010 (ADAMS Accession No. ML103020322).
71 draft TVA should confirm to the staff the replacement of the current Unit 2 clevis insert bolts to the latest design, which uses an X-750 alloy with an HTH process, rolled threads, and a larger radius on the undercut of the cap screw head. (Section 3.9.5)
The NRC staff has not completed the review of the additional information provided by TVA. The staff will provide its evaluation after completion of that review. (Section 4.4.8) 73   The NRC staff will inspect to confirm that     Ops  Provide copies of EOPs for inspection.
Lic Complete - Letter issued 4/21/11 72 draft Based on its review, the staff asked TVA several questions regarding the ICC instrumentation. TVA responded to the staff questions by {{letter dated|date=October 26, 2010|text=letter dated October 26, 2010}} (ADAMS Accession No. ML103020322).
draft TVA has completed the WBN Unit 2 EOPs prior to fuel load. (Section 7.5.3)                 Due Date: (Wallace) 74   The NRC staff will verify installation of the I&C  Provide EDCR closure documentation draft acoustic-monitoring system for the power-           for installation of acoustic monitors.
The NRC staff has not completed the review of the additional information provided by TVA. The staff will provide its evaluation after completion of that review. (Section 4.4.8)
operated relief valve (PORV) position indication in WBN Unit 2 before fuel load.           Panels installed 5/18/11 (Section 7.8.1)                                     Probes not installed Due Date:
Lic Open pending NRC review 73 draft The NRC staff will inspect to confirm that TVA has completed the WBN Unit 2 EOPs prior to fuel load. (Section 7.5.3)
75   The NRC staff will verify that the test        PreOp Provide copies of test procedures for draft procedures and qualification testing for             inspection.
Ops Provide copies of EOPs for inspection.
auxiliary feedwater initiation and control and flow indication are completed in WBN Unit 2         Due Date: (Olson) before fuel load. (Section 7.8.2) 76   The NRC staff will verify that the derivative I&C  Provide EDCR closure documentation draft time constant is set to zero in WBN Unit 2           for setting of time constant.
Due Date: (Wallace) 74 draft The NRC staff will verify installation of the acoustic-monitoring system for the power-operated relief valve (PORV) position indication in WBN Unit 2 before fuel load.
before fuel load. (Section 7.8.3)
(Section 7.8.1)
I&C Provide EDCR closure documentation for installation of acoustic monitors.
Panels installed 5/18/11 Probes not installed Due Date:
75 draft The NRC staff will verify that the test procedures and qualification testing for auxiliary feedwater initiation and control and flow indication are completed in WBN Unit 2 before fuel load. (Section 7.8.2)
PreOp Provide copies of test procedures for inspection.
Due Date: (Olson) 76 draft The NRC staff will verify that the derivative time constant is set to zero in WBN Unit 2 before fuel load. (Section 7.8.3)
I&C Provide EDCR closure documentation for setting of time constant.
Due Date:}}
Due Date:}}

Latest revision as of 05:51, 13 January 2025

OL - Commitments and Sser Open Items
ML11165A145
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/18/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11165A145 (30)


Text

1 WBN2Public Resource From:

Crouch, William D [wdcrouch@tva.gov]

Sent:

Wednesday, May 18, 2011 5:06 PM To:

Poole, Justin; Milano, Patrick; Campbell, Stephen Cc:

Bryan, Robert H Jr; Smith, James D; Smith, James D

Subject:

Commitments and SSER Open Items Attachments:

05-17 - OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf; Updated SSER 22-23 Open Items Plan.docx IhadTommyEltonsearchourcommitmenttrackingdatabaseforcommitmentswherewesaidwewouldsubmit somethingtoNRC.Theattachedlistresulted.Itdoesnothavetheitemsforthelastweek(Tommyisbehindsinceheis workingontheTechSpecrevision)andithassomeitemswherewehavealreadymadethesubmittalbuthavenot closedtheiteminthedatabase.Ihavesomeoneworkingoncleaningtheseitemsupanddocumentingthattheyare complete.

IhavealsoattachedourversionofSSER22/23AppendixHHOpenItems.Theduedatesshownarethedateswhen itemshavebeenpromisedtobeprovidedtoTVALicensing.Ingeneral,thedatetoyouwouldbewithinaboutoneweek ofthatdate.ItemsshownasCompletemeansthatTVALicensinghastheinputandwillincludetheiteminthenext closureletter.WhenanitemhasbeensubmittedtoyouIremoveitfromthislist.Whentheorganizationishighlighted inyellow,theitemisaninspectionitemratherthanasubmittalitem.Forthese,apackagewillbeprovidedtothe appropriateNRCperson.

InthenearfutureweneedtostartstatusingtheselistsaswellastheBucketList.

William D. (Bill) Crouch (423)3652004WBN (256)7777676Cell

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

386 Mail Envelope Properties (B75BE6D61CDE4A468D264343045CAC4F08499DE4)

Subject:

Commitments and SSER Open Items Sent Date:

5/18/2011 5:05:52 PM Received Date:

5/18/2011 5:06:16 PM From:

Crouch, William D Created By:

wdcrouch@tva.gov Recipients:

"Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 1258 5/18/2011 5:06:16 PM 05-17 - OPEN COMMITMENTS (MAXIMO) - NRR SUBMITTAL REQUIRED.pdf - Adobe Acrobat Professional.pdf 192905 Updated SSER 22-23 Open Items Plan.docx 32428 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

OPEN COMMITMENTS (ON MAXIMO) - NRR SUBMITTAL REQUIRED MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

111027893 Prior to fuel load, a final report will be submitted following certain validation activities as described in the IPEEE Design Report (Enclosure 1).

[Item 1 of Enclosure 2 of letter T02 100430 002]

/

PRIOR to fuel load Engineering -

Civil IPEE NRR 112145148 NRC will be notified when the physical work has been completed for DCNs 53421 and 54636.

(response to action item 33)

[Item 2. of Enclosure 4 of letter T02 110406 004]

Engineering -

Electrical RAI Response - SSER22 Open Items NRR 111900262 The OM interface, however, creates an additional digital communications path to a non-safety-related system. During the design review, TVA commented that the path needed to be eliminated or isolated. The final determination was made to eliminate the path. Westinghouse will eliminate the description of this path from the associated documentation by January 31, 2011 [Letter Item 18].

[Item 22 of Enclosure 4 of letter T02 101005 001]

01/31/2011 Engineering - I and C RAI Response - I and C NRR 111901446 The Common Q PAMS document discrepancies identified in TVA letter to NRC dated December 22, 2010, Attachment 15, will be corrected in the next revision of the identified documents. TVA will submit the revised documents within two weeks of receipt from Westinghouse.

(Item 5. of Enclosure 4 of T02 101222 006)

Engineering - I and C RAI Response - I and C NRR 112116781 contains the proprietary version of the GA-ESI qualification report 04508903-1TR, Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter, original release, dated April 1999. TVA will submit the nonproprietary version of this GA-ESI qualification report and its affidavit for withholding information from public disclosure within two weeks of receipt from the vendor.

(Enclosure 4 of letter T02 110331 005)

Engineering - I and C FSAR RAI NRR 112177792 TVA Engineering reviewed and approved proprietary versions of GA-ESI documents 04507007-1TR, 04508005 and 04508006 and these documents will be submitted within two weeks of receipt from GA-ESI.

(Letter Item #2 [OI-346])

[Item 4. of Enclosure 4 of letter T02 110415 001]

Engineering - I and C FSAR RAI NRR 111334414 A non-proprietary version of and an affidavit for withholding for 16690-QTR, Revision 0 will be submitted to the NRC by November 30, 2010.

[Item 6. of Enclosure 2 of letter T02 100731 001]

11/30/2010 Engineering - I and C RAI Response - FSAR NRR Page 1 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

111620753 Item (4) will be addressed by Westinghouse developing a WBN Unit 2 Common Q PAMS Specific Test Plan to compensate for the fact that NRC disapproved WNA-PT-00058-GEN during the original Common Q review. TVA will submit the test plan document to NRC by November 30, 2010. NRC RAI Matrix Item 245 tracks the commitment to develop and submit the WBN Unit 2 Specific Test Plan [Letter Item 8].

[Item 4. of Enclosure 4 of letter T02 101005 001]

11/30/2010 Engineering - I and C RAI Response - I and C NRR 111620928 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2 dated August 2010.

[Item 1.f. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR 111331649 Hardware details will be provided when the hardware drawings are updated to the as-built configuration. Westinghouse currently shows this activity to complete September 15, 2010. TVA will submit a hardware listing by October 1, 2010, two weeks after TVA receipt from Westinghouse. (RAI Item Number 14 [Matrix Item 120])

[Item 5. from Enclosure 2 of letter T02 100730 002) 10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 03/11/2011.

03/11/2011 Engineering - I and C RAI Response - I and C NRR 112250471 The Westinghouse qualification report for the IITAs has not been completed. The proprietary and non-proprietary versions and the affidavit for withholding will be submitted within two weeks of receipt from Westinghouse. (Letter Item #14/375 [Item 3])

[Item 7 of Enclosure 4 of letter T02 110506 002]

Engineering - I and C RAI NRR 112177783 The non-proprietary version of GA-ESI report 04509050, RM-1000 EMC Test Report and affidavit for withholding will be submitted within two weeks of receipt from GA-ESI. (Letter Item #1 [OI-340])

[Item 3. of Enclosure 4 of letter T02 110415 001]

Engineering - I and C FSAR RAI NRR 111620935 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Demarcated proprietary and nonproprietary versions of Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.

[Item 1.g. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR Page 2 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

10174938 The last part of item 4 of enclosure 2 of the reference reads "TVA will submit the results of this survey to the NRC. The submittal will include a description of the methodologies and test equipment that were used to perform the survey, a comparison between on-site and factory EMI/RFI test results, and an assessment of the margin between the measured EMI/RFI spectrum and a conservative threshold above which EMI/RFI problems could occur."

/

PRIOR to fuel load Engineering - I and C Eagle-21 Process Protection System NRR 111334372 The qualification for PAMS Cabinet and Components and Main Control Room Components will be submitted to the NRC by January 14, 2011.

[Item 3. of Enclosure 2 of letter T02 100731 001]

01/14/2011 Engineering - I and C RAI Response - FSAR NRR 112177753 TVA will perform an EMI survey of the containment high range radiation monitors after they are installed in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being completed. (Letter Item #4 [OI-355])

[Item 1. of Enclosure 4 of letter T02 110415 001]

Engineering - I and C FSAR RAI NRR 112177768 Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:

GA-ESI procedure OP-7.3-240 revision: April 30, 2011 (Letter Item #3 [OI-353])

[Item 2. - first part of Enclosure 4 of letter T02 110415 001]

04/30/2011 Engineering - I and C FSAR RAI NRR 111620882 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Demarcated proprietary and nonproprietary versions of Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, dated October 2010.

[Item 1.a. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR 111620889 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Demarcated proprietary and nonproprietary versions of Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.

[Item 1.b. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR Page 3 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

111620770 Revision 2 of the Common Q PAMS Licensing Technical Report will include the applicability of the guidance in the Common Q PAMS Topical Report. Revision 1 [sic 2] of the Licensing Technical Report will be submitted to NRC by December 7, 2010 [Letter Item 66].

[Item 14. of Enclosure 4 of letter T02 101005 001]

12/07/2010 Engineering - I and C RAI Response - I and C NRR 111620967 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Revision 2, dated September 2010.

[Item 1.k. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR 111900179 The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a more detailed description of the design process described in NABU-DP-00014-GEN, please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document. The next revision of the SRS will be submitted to NRC by October 29, 2010 [Letter Item 31(a)].

[Item 17. of Enclosure 4 of letter T02 101005 001]

10/29/2010 Engineering - I and C RAI Response - I and C NRR 111620959 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Affidavit for withholding for Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification, WNA-DS-01617-WBT, Revision 2, dated August 2010.

[Item 1.j. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR 111092634 The report on the final resolution of the Eagle 21 Rack 2 RTD input issue will be provided no later than December 3, 2010. This item has been added to the Licensee Open Items to be Resolved for SER Approval List, as Item 128.

[Item 6. of Enclosure 2 of letter T02 100621 001]

12/03/2010 Engineering - I and C RAI Response - I AND C NRR 111620761 The scope of the WBN BISI indications are based on engineering calculation WBPEVAR8807025 Rev. 7 (Attachment 10). This calculation has not been updated for Unit 2. The calculation does include Common and Unit 2 equipment required to support Unit 1 operation. The calculation will be submitted to NRC by February 14, 2011 [Letter Item 62F].

[Item 11. of Enclosure 4 of letter T02 101005 001]

02/14/2011 Engineering - I and C RAI Response - I and C NRR Page 4 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

112043571 The General Atomics Electronics Systems Inc. (GA-ESI) affidavits for withholding and non-proprietary versions of attachments 5, 6, 7, 8 and 23 will be submitted within two weeks of receipt from GA-ESI. [Cover Letter]

[Item 2. of Enclosure 4 of letter T02 110225 004]

Engineering - I and C FSAR RAIs NRR 111620949 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Demarcated proprietary and nonproprietary versions of Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), CNEQT-10-44, Revision 0, dated September 28, 2010

[Item 1.h of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR 111901406 The RM-1000 qualification reports 04038903-QSR and 04038903-7SP will be submitted no later than January 28, 2011.

(Item 4. of Enclosure 4 of T02 101222 006) 01/28/2011 Engineering - I and C RAI Response - I and C NRR 112058497 WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.

03/29/2011 Engineering - I and C FSAR RAI NRR 10175684 Item 4 of Enclosure 1 of the Reference reads "Provide system description and information on QA provisions for the Unit 2 Radiation Monitoring System on or before October 31, 2009."

10/31/2009 Engineering - I and C Regulatory Framework NRR 111620955 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Affidavit for withholding for Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, dated September 2010.

[Item 1.i. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR 111901209 FSAR Chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a future FSAR amendment.

(Item 3. of Enclosure 4 of T02 101222 006)

Engineering - I and C RAI Response - I and C NRR Page 5 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

112177804 An affidavit for withholding Westinghouse document NO-WBT-002, Westinghouse Incore Information Surveillance & Engineering (WINCISE') System Technical Manual, Section 2, Hardware Description, will submitted within two weeks of receipt from Westinghouse.

(Letter Item #7 [OI-360])

[Item 5. of Enclosure 4 of letter T02 110415 001]

Engineering - I and C FSAR RAI NRR 111620764 1 contains the proprietary version of the Common Q Software Requirements Specification Post Accident Monitoring System 00000-ICE-3238 Rev. 5 and the affidavit for withholding. The nonproprietary version will be submitted to NRC by April 8, 2011 [Letter Item 96].

[Item 16. of Enclosure 4 of letter T02 101005 001]

04/08/2011 Engineering - I and C RAI Response - I and C NRR 112177773 Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the NRC by:

Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 (Letter Item #3 [OI-353])

[Item 2. - last part of Enclosure 4 of letter T02 110415 001]

09/15/2011 Engineering - I and C FSAR RAI NRR 111902413 The nonproprietary version of Enclosure 4 and the applications for withholding will be provided two weeks after receipt from Westinghouse.

[RAI 15.0.0 - 1.b]

[Item 14. of Enclosure 6 of letter T02 101210 001]

Engineering - I and C RAI Response - FSAR NRR 111620766 The next IV&V report will include the Design Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011 [Letter Item 15].

[Item 20. of Enclosure 4 of letter T02 101005 001]

02/11/2011 Engineering - I and C RAI Response - I and C NRR 111620901 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Demarcated proprietary and nonproprietary versions of Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules to the Watts Bar Unit 2 (WBT)

Requirements (EQ-EV-62-WBT, Revision 0), dated September 10, 2010.

[Item 1.d. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR Page 6 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

111620894 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Demarcated proprietary and nonproprietary versions of AI687 and AI688 for use in Common Q PAMS EMC Test Report and Installation Limitations, (EQ-QR GEN, Revision 0), dated September 10, 2010.

[Item 1.c. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR 111331664 Westinghouse is scheduled to issue the FAT report to TVA on October 22, 2010. TVA will submit this report by November 8, 2010, two weeks after receipt from Westinghouse. (RAI Item Number 14 [Matrix Item 120]

[Item 6. from Enclosure 2 of letter T02 100730 002) 10/05/2010 Letter to the NRC (T02 101005 001) changed the due date to 02/25/2011.

02/25/2011 Engineering - I and C RAI Response - I and C NRR 111621260 (Letter Item 9) - This item will be corrected by a design change based on the following:

The Unit 1/Unit 2 Eagle 21 configuration has a sufficient number of spare Narrow Range (NR) and Wide Range (WR) RTD inputs available on the installed ERI-01 and ERI-02 boards to wire these spare inputs to the active channels. The spare input will provide the parallel resistance to resolve the problem. The WR RTD inputs provide the same input impedance as the NR RTD inputs. Jumpers will be installed at the Eagle 21 termination frame to provide a parallel connection from each existing NR RTD input to an existing spare input, thus simulating the hardware connection for shared RTDs. Therefore, as configured, the Rack 2 Loop Calculation Processor (LCP) will provide the correct temperature calculation for the NR RTDs. The design change will be issued by April 29, 2011.

(first part of Item 5. of Enclosure 4 of letter T02 101029 002) 04/29/2011 Engineering - I and C RAI Response - I and C NRR 111334376 A non-proprietary version of and an affidavit for withholding for EQ-EV-39-WBT, Revision 1 will be submitted to the NRC by November 30, 2010.

[Item 4. of Enclosure 2 of letter T02 100731 001]

11/30/2010 Engineering - I and C RAI Response - FSAR NRR 111620922 By April 29, 2011, the demarcated proprietary documents, nonproprietary documents, as well as the withholding affidavits for the proprietary documents listed in commitments i, j and k below, will be provided to NRC.

Demarcated proprietary and nonproprietary versions of Environmental and Seismic Test Report, AI687 & AI688 Modules for use in Common Q PAMS, (EQLR-171, Revision 0), dated September 10, 2010.

[Item 1.e. of Enclosure 2 of T02 101026 011]

04/29/2011 Engineering - I and C RAI Response - I and C NRR Page 7 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

112249893 Part III, Sections 2.3 and 3.4.3 provide qualitative statements regarding the need to control RCS pressure to maintain sub-cooling margin such that natural circulation would not be adversely affected by large bubble formation in the reactor vessel. Both statements convey the desired information, but for consistency Section 3.4.3 will be revised to say minimize void formation rather than prevent void formation and thereby be consistent with Section 2.3. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item

33. [NRC Question RAI FPR III-7])

(Item 8. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR 111334367 The analysis for Panels 2-L-11A and 2-L-11B will be submitted to the NRC by November 30, 2010.

[Item 2. of Enclosure 2 of letter T02 100731 001]

11/30/2010 Engineering - I and C RAI Response - FSAR NRR 112249887 It is TVAs position that only qualified personnel are allowed and required to make the decisions as to which of the three conditions apply to each individual circumstance. Only Sections 14.8.1.a and 14.8.1.b apply to ERFBS and radiant energy shields. Section 14.8.1.c does not apply to ERFBS configurations. Section 14.8.1.c will be clarified to denote that it does not apply to ERFBS and radiant energy shields. (Letter Item 27. [NRC Question RAI FPR II-36])

(Item 7. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR 112249875 The referenced conflicts and inconsistencies between Part II, Section 14.2 Water Supply and the Fire Pump Inoperability and Compensatory Actions Table has been reviewed and Section 14.2 and the Table has been revised to reflect consistency between the two parts. The revised table is included as Attachment 2 to this letter and will be incorporated into the FPR as part of the As-Constructed update of the FPR prior to Unit 2 initial fuel load. (Letter Item 24. [NRC Question (RAI FPR II-34)])

(Item 6. of Enclosure 2. of letter T02 110506 001)

/

PRIOR to fuel load Engineering - I and C FSAR RAI NRR 112249865 A review of the HVAC configuration control drawings (47A381 series, 47W866 series, and 47W920 series) has been performed to determine the correct identification number and fire resistance rating of the damper. The correct damper number is 1-ISD-31-2516 and correct fire rating of the damper is 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. A review of the damper information contained in Table 14.8.2 against the Damper tables provided in Part VI has also been completed. The information in the tables (Table 14.8.2 and Part VI Damper tables) has been verified and the discrepancies corrected. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 9. [NRC Question RAI FPR II-19])

(Item 5. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR 112249861 Part II and Part VI were corrected to show the damper (2-ISD-31-3872) is in the fire barrier separating rooms 713.0-A29 (not 737-A9) and 737.0-A8. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 8. [NRC Question RAI FPR II-18])

(Item 4. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR Page 8 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

112249919 TVAs response to Letter Item 42 [NRC Question RAI FPR V-3] states:

[1] Part IV, Section 3.3 is incorrect. The second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.

[2] A review of the FPR revealed three other places where the discussion concerns both units:

1. Table 14.3, item 14.3.c should read: Unit 1 and 2 Containment Purge Air Exhaust Filters,
2. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.
3. Part III, section 4.7 is incorrect. The third paragraph should read: The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.

These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.

(Item 10. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR 112249855 Table 14.1 contains detectors that are for protection of components and areas required for fire safe shutdown. The detection zone 413 contains the detectors provided for the Motor Driven Main Feedwater Pump located in the Turbine Building. The Motor Driven Main Feedwater Pump is not required for fire safe shutdown; therefore, this line item for zone 413 is deleted from Table 14.1. These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR. (Letter Item 6. [NRC Question RAI FPR II-16])

(Item 3. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR 112249904 TVAs response to Letter Item 39 [NRC Question RAI FPR III-13] states:

[1] Part III, Section 4.7 is incorrect and the third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.

[2] A review of the FPR revealed three other places where the discussion concerns both units:

1. Table 14.3, item 14.3.c should read: Unit 1 and 2 Containment Purge Air Exhaust Filters,
2. Part IV, Section 3.3, second sentence should read: The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.
3. Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.

These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.

(Item 9. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR Page 9 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

112249845 For dual unit operation, CCS Pump 2B-B will be returned to its Unit 2 functional role and will be included in the Technical Specification Bases Section 3.7.7. (Letter Item 4. [NRC Question RAI FPR II-14])

(Item 2. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR 112249817 TVAs response to Letter Item 3. [NRC Question RAI FPR II-13] states:

[1] Part II, Section 14.3.1.b.1 of the FPR should say For either Reactor Building.

[2] A review of the FPR revealed three other places where the discussion concerns both units:

1. Table 14.3, item 14.3.c should read Unit 1 and 2 Containment Purge Air Exhaust Filters,.
2. Part III, Section 4.7, third paragraph should read The CCS system provides cooling for the following safe shutdown equipment per unit. The CCS system equipment is for both units.
3. Part IV, Section 3.3, second sentence should read The number in ( ) is the number available for shutdown. This deletes the reference to Unit 1 only.

These changes will be incorporated into the next revision to the Unit 1/Unit 2 As-Designed FPR.

(Item 1. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR 111621250 (Letter Item 8) - Attachment 4 contains excerpts of EDCR 55385 (i.e., draft Scope, Intent, and Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.

(Item 4. of Enclosure 4 of letter T02 101029 002)

Engineering - I and C RAI Response - I and C NRR 111900989 The qualification information on the LPMS softline cable and charge converter/preamplifier will be submitted by March 11, 2011.

(Item 1. of Enclosure 4 of T02 101222 006) 03/11/2011 Engineering - I and C RAI Response - I and C NRR 111334387 A non-proprietary version of and an affidavit for withholding for TR-1136 will be submitted to the NRC by December 17, 2010.

[Item 5. of Enclosure 2 of letter T02 100731 001]

12/17/2010 Engineering - I and C RAI Response - FSAR NRR NCO840165002 Submit photographs of control panels 120 days after receipt of an operating license.

/

AFTER LICENSED Engineering - I and C Control Room Design Review SP Generic Communications:

NUREG-0737, I.D.1 Regulatory Framework NRR 166 Page 10 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

112043595 A FSAR change will be submitted in a future FSAR amendment to change the revision level for WCAP-13869 from 2 back to 1. [Item 11, (Matrix Item 323)]

[Item 4. of Enclosure 4 of letter T02 110225 004]

Engineering - I and C FSAR RAIs NRR 111621236 (Letter Item 4) - Attachment 1 contains excerpts of EDCR 52321 (i.e., draft Scope, Intent, and Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.

(Item 1. of Enclosure 4 of letter T02 101029 002)

Engineering - I and C RAI Response - I and C NRR 111334419 A corrected proprietary version of, a non-proprietary version of, and an affidavit for withholding for Thermo Fisher Scientific Qualification Report No. 864, Rev. 0 will be submitted to the NRC by November 15, 2010.

[Item 7. of Enclosure 2 of letter T02 100731 001]

11/15/2010 Engineering - I and C RAI Response - FSAR NRR 111360873 A revision to the WBN Unit 2 Technical Specifications will be provided via separate letter to provide consistency with the setpoint methodology changes provided in A100 and Technical Specification Tracking Form 493.

[Item 1. of Enclosure 5 of letter T02 100901 002]

Engineering - I and C FSAR - A100 NRR 111903557 The nonproprietary versions of Westinghouse documents Post Accident Monitoring System (PAMS) Test Plan (Attachment 9), PAMS Channel Integration Test/Factory Acceptance Test (Attachment 12), IV&V Summary Reports for PAMS (Attachments 14 and 16), and PAMS Licensing Technical Report (Attachment 19) will be provided upon issuance of the final proprietary documents.

(Enclosure 3 of letter T02 101203 001)

Engineering - I and C RAI Response - I and C NRR 112250468 The non-proprietary version of Westinghouse report DAR-ME-09-10, Revision 0, Qualification Summary Report for the WINCISE Cable and Connector Upgrade at Watts Bar Unit 2 and the affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.

(Letter Item #14/375 [Item 3])

[Item 6 of Enclosure 4 of letter T02 110506 002]

Engineering - I and C RAI NRR 112250459 Common Q PAMS is designed in accordance with RG 1.168, Revision 1, IEEE 1012-1998 and IEEE 1020-1997. These references will be added to FSAR Table 7.1-1. (Letter Item #11/370)

[Item 5 of Enclosure 4 of letter T02 110506 002]

Engineering - I and C RAI NRR 111621243 (Letter Item 5) - Attachment 2 contains excerpts of EDCR 52351 (i.e., draft Scope, Intent and Unit Difference and Technical Evaluation). The final excerpts will be submitted within two weeks after issuance of the EDCR.

(Item 2. of Enclosure 4 of letter T02 101029 002)

Engineering - I and C RAI Response - I and C NRR Page 11 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

111901163 The discrepancies identified in the Contract Compliance Matrix of WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, will be corrected in Revision 3 of the document.

(Item 2. of Enclosure 4 of T02 101222 006)

Engineering - I and C RAI Response - I and C NRR 112249939 As described in Enclosure 2 to TVA letter to NRC dated March 31, 2011, most of WBN Unit 2 operator manual actions are preventative rather than reactive. That is, they are driven by procedure rather than reacting to changing plant conditions as indicated by instrumentation and alarms. While there are some actions that are taken in response to the fire itself (de-energize electrical board that is on fire), most WBN Unit 2 actions are in response to tripping the reactor.

This clarification of T=0 is being included in the ongoing revision of Part V Section 2 which will be included in the next FPR revision. (Letter Item 43 [NRC Question RAI FPR V-11])

(Item 11. of Enclosure 2. of letter T02 110506 001)

Engineering - I and C FSAR RAI NRR 112250458 The Common Q PAMS will meet the cyber security requirements for the WBN Unit 2 Nuclear Security Program as mandated by 10 CFR 73.54 via WBN Unit 2 Procedure 25402-3DP-G04G-00508, Cyber Security Program. (Letter Item #10/368)

[Item 4 of Enclosure 4 of letter T02 110506 002]

Engineering - I and C RAI NRR 112250453 The Common Q PAMS and RM-1000 radiation monitors comply with IEEE 344-2004 and with RG 1.100 Revision 3 with the exception of testing above 30Hz. Table 7.1-1 will be updated to reflect conformance. (Letter Item #8/366)

[Item 3 of Enclosure 4 of letter T02 110506 002]

Engineering - I and C RAI NRR 112250445 FSAR Table 7.1-1 will be updated to reference IEEE Std 603-1991 for the Common Q PAMS.

(Letter Item #6/34 [Item 2])

[Item 2 of Enclosure 4 of letter T02 110506 002]

Engineering - I and C RAI NRR 112250439 The non-proprietary version of Westinghouse document WBT DMIMS-DX' Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DX') for Watts Bar Unit 2, EQ-QR WBT, Revision 0 and affidavit for withholding will be submitted within two weeks of receipt from Westinghouse. (Letter Item #4/362 [Item 1])

[Item 1 of Enclosure 4 of letter T02 110506 002]

Engineering - I and C RAI NRR 112145180 Amendment 104 to the Unit 2 FSAR will revise Table 3.2-2 to note that TVA Class G and H piping within the SGB System exists downstream of the safety-related containment isolation valves.

(response to action item 36)

[Item 3. of Enclosure 4 of letter T02 110406 004]

Engineering -

Mechanical RAI Response - SSER22 Open Items NRR 112068570 Response to RAI FPR V-2 will be provided by April 29, 2011. [RAI FPR V-2]

[Item 8. of Enclosure 2 of letter T02 110316 004]

04/29/2011 Engineering -

Mechanical FSAR RAI NRR Page 12 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

111334428 Once the date for issuance of an operating license becomes more certain, TVA will update the sentence regarding the Code of Record in accordance with 10 CFR 50.55a(f)(4)(i).

[Item 9. of Enclosure 2 of letter T02 100731 001]

Engineering -

Mechanical RAI Response - FSAR NRR 112068464 The as-designed Fire Protection Report (FPR) will be provided by March 16, 2011 except for Part V, which will be provided by April 29, 2011. [RAI FPR General - 2 Item A]

[Item 1. of Enclosure 2 of letter T02 110316 004]

This tracks the portion due 04/29/2011.

04/29/2011 Engineering -

Mechanical FSAR RAI NRR 112068520 contains Figures II-1A thru II-26A, which are the as-designed installed fire detection and suppression system drawings. These drawings will be annotated to reflect changes made to the figures and provided to NRC by March 16, 2011. [RAI FPR General-4]

[Item 5. of Enclosure 2 of letter T02 110316 004]

03/16/2011 Engineering -

Mechanical FSAR RAI NRR 112046729 FSAR section 12.3.2.2 will be revised to list any applicable additional areas addressed by the mission dose calculations. (Question 30.1.b)

[Item 8. of Enclosure 4 of letter T02 110225 002]

Engineering -

Mechanical FSAR RAI NRR 112236712 A future amendment to the Unit 2 FSAR will incorporate the Inadvertent ECCS Actuation analysis.

[Item 1. of Enclosure 3 of letter T02 110429 003]

Engineering -

Mechanical FSAR RAI NRR 111903011 TVA will issue the as-constructed FPR for WBN Units 1 and 2 by October 1, 2011.

(Item 1. of Enclosure 5 of letter T02 101218 001) 10/01/2011 Engineering -

Mechanical Fire Protection Report NRR NCO080008033 GL 1989-04, Guidelines on Developing Acceptable Inservice Testing Programs - Submit an ASME Section XI Inservice Test Program for the first ten year interval six months before receiving an Operating License.

/ six months before receiving an Operating License Engineering -

Mechanical Generic Communications:

GL 1989-04 Regulatory Framework NRR 200 112236713 A future amendment to the Unit 2 FSAR will incorporate the CVCS Malfunction analysis.

[Item 2. of Enclosure 3 of letter T02 110429 003]

Engineering -

Mechanical FSAR RAI NRR 10175682 Item 3 of Enclosure 1 of the Reference reads "Provide system description and information on QA provisions for the Unit 2 Solid Waste Management System and information on the Process Control Program on or before October 31, 2009."

10/31/2009 Engineering -

Mechanical Regulatory Framework NRR Page 13 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

112054436 TVA will evaluate adopting the revised ISTS SR 3.5.2.3 (NUREG 1431) at WBN within 6 months of NRC approval of the Traveler.

(item 1. of Enclosure 3 of letter T02 110311 005)

/ within 6 months of NRC approval of the Traveler Engineering -

Mechanical Generic Communications:

GL 2008-01 Regulatory Framework NRR 213 111895229 TVA is awaiting a response to its request of NRC to provide the basis for its assertion that a HCLPF of 0.7g corresponds to a seismic induced core damage frequency approximately equal to the internal events CDF. The basis for the seismic hazard curves and associated response spectra used in the development of this value are especially of interest. TVA will evaluate the requested information upon receipt and determine if a HCLPF of < 0.7 g is applicable to WBN Unit 2. A response will be provided following this evaluation. (RAI 4.c Response)

[Item 8. of Enclosure 2 of T02 110131 001]

Engineering -

Mechanical RAI - SAMA NRR 112046718 TVA has reviewed the FSEIS and found Table 3-20 to be in error. This was caused by the use of values contained in FSAR Table 11.3.7 instead of values contained in FSAR Table 11.3.7c. The correct source term used for calculating the site boundary doses is FSAR Table 11.3.7c. As a result, this accounts for the dose values being same between the FSEIS and the FSAR Table 11.3-10. (Question 15)

[Item 3. of Enclosure 4 of letter T02 110225 002]

Engineering -

Mechanical FSAR RAI NRR 112061258 FPR Part V is undergoing revision in accordance with the commitment made in Reference 2 to incorporate criteria and assumptions used to ensure that Unit 2 manual actions (including manual actions for alternate or dedicated shutdown) are feasible and reliable. FPR Part V will be submitted to NRC by April 29, 2011.

[from Enclosure 5 of letter T02 110316 005]

04/29/2011 Engineering -

Mechanical Fire Protection Report NRR PER 172598 NCO840187004: Submit cable separation drawings to NRC in conjunction with the detailed Appendix R reanalysis report.

Engineering -

Mechanical Fire Protection CAP NRR 111029357 TVA will provide a closure document similar to Reference 1 for WBN Unit 2 GL 2004-02 prior to fuel load.

/

PRIOR to fuel load Engineering -

Mechanical Generic Communications:

GL 2004-02 Regulatory Framework NRR 209 112068737 The FPR will be revised to clarify that this reduction only applies to areas and/or equipment affecting the unit in Modes 5, 6, and core empty and does not apply to areas where the other unit is in Modes 1 to 4 inclusive. [RAI FPR II-8]

[Item 11. of Enclosure 2 of letter T02 110316 004]

Engineering -

Mechanical FSAR RAI NRR Page 14 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

111091647 TVA will provide information regarding how the model and the peer review process addressed the items in the Regulatory Guide 1.200 Revision 2 tables related to internal events including internal flooding for which the NRC position was stated as Qualification.

[Item. 1 of Enclosure 4 of T02 100608 001.]

Engineering -

Mechanical RAI Response - IPE NRR NCO081006001 Item 2 of Enclosure 2 stated "WBN Unit 2 will complete the required modifications and provide a submittal consistent with the information requested in the GL 90 days prior to fuel load. The submittal will provide: a statement regarding which actions were completed, the schedule for completing the remaining actions, and the basis for that schedule."

/ 90 days PRIOR to fuel load Engineering -

Mechanical Generic Communications:

GL 2008-01 Regulatory Framework NRR 213 112068578 Upon performing the final plant walkdowns as prescribed in FPR Sections 2.1.1, 2.4.3, and 2.3, TVA will review the information and submit the results for NRC approval if they differ from the assumptions and details provided in Part V or the other parts of the FPR. Otherwise, TVA will inform the NRC when the walkdowns are complete and that no revisions to the FPR were required. [RAI FPR V-3]

[Item 9. of Enclosure 2 of letter T02 110316 004]

Engineering -

Mechanical FSAR RAI NRR 112068531 Figures representing the as-constructed plant configuration will be provided after construction completion. [RAI FPR General - 4]

[Item 6. of Enclosure 2 of letter T02 110316 004]

Engineering -

Mechanical FSAR RAI NRR NCO080008038 Submit Inservice inspection (ISI) program within 6 months after receiving an operating license.

/ within 6 months after receiving an operating license Insp. Services Regulatory Framework NRR 112047866 An Owners Summary Report shall be issued within 90 days following Unit 2 commercial operation for those repairs or replacements, if any, which were performed under Section XI on Unit 2 prior to commercial operation.

[Enclosure 2 of T02 101012 001]

/ within 90 days following Unit 2 commercial operation Insp. Services ASME - Section III to Section XI NRR 112164522 A future amendment to the Unit 2 FSAR will revise Section 9.2.1.3 as delineated in the response to Section 9.2.1 - Question (f).

(Item 1. of Enclosure 2 of letter T02 110413 001)

Licensing -

Mechanical FSAR RAI NRR 112164540 A future amendment to the Unit 2 FSAR will revise Section 9.2.2.4 as delineated in the response to Section 9.2.2 - Question (d).

(Item 2. of Enclosure 2 of letter T02 110413 001)

Licensing -

Mechanical FSAR RAI NRR Page 15 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

112179288 In Amendment 104 of the WBN Unit 2 FSAR, TVA will provide an update describing the increased height at Fort Loudoun, Cherokee, WBN and Tellico dams as the current licensing basis for WBN Unit 2.

[Item 4. of Enclosure 2 of letter T02 110420 003]

NGD FSAR RAI NRR 112179285 TVA will report the results of the hydrology analysis without use of sand baskets or the seismic test of the sand baskets to the NRC by October 31, 2011.

[Item 1. of Enclosure 2 of letter T02 110420 003]

10/31/2011 NGD FSAR RAI NRR 112179286 TVA will provide an update of the WBN Unit 2 FSAR to describe the long-term stability analysis methodology following the completion of the finite element analyses by August 31, 2012.

[Item 2. of Enclosure 2 of letter T02 110420 003]

08/31/2011 NGD FSAR RAI NRR 111906320 The Cf-252 sources are to be used as start-up sources for the Unit 2 reactor and have not been fabricated to date. The source capsule will be labeled with a unique serial number when fabricated. The forecast delivery date of these sources from the vendor is August 15, 2011. TVA will submit an amendment to the license requesting to add the Cf-252 sources prior to receipt.

/

PRIOR to receipt of source NGDC Licensing RAI NRR 111880355 TVA commits to submit the revision to procedure FR-H.1 to the Pressurized Water Reactor Owners Group prior to September 1, 2011 (SAMA 300).

[Item 10. of Enclosure 2. of letter T02 101014 003]

09/01/2011 Operations SAMA NRR 110850749 TVA will inform the NRC when the WBN Unit 2 Reactor Building is re-vitalized.

Security RAI Response - Physical Security Plan NRR 112046612 TVA will provide an update in a future FSAR amendment. (Questions 22, 23, 28, and 29)

[Item 7. of Enclosure 4 of letter T02 110225 002]

Unit 1 Radiation Protection FSAR RAI NRR 111364245 Amendment 101 to the Unit 2 FSAR will implement changes as noted in the applicable responses.

[Item 1. of Enclosure 3 of letter T02 100830 004]

Unit 2 Licensing RAI Response - FSAR NRR 111517786 Amendment 101 to the Unit 2 FSAR will implement changes as noted in responses to the following RAIs: 2.3.2 - 9, 2.3.2 - 10, 2.3.2 - 11, 2.3.2 1, 2.3.2 2, 2.3.2 3, 2.3.2 -

13 - 4, 2.3.2 5, 2.3.2 6, 2.3.2 7, 2.3.2 8, 11 - 2.a, and 11 -2.c.

[Item 1. of Enclosure 4 of letter # T02 101004 002]

Unit 2 Licensing RAI Response - FSAR NRR Page 16 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

112046368 Table 11.3-10 of the FSAR will be corrected to reflect the 2007 feeding factors and the offsite radiation doses calculated without terrain adjustment factors. These changes to Table 11.3-10 will be reflected in Amendment 103. (Question 14)

[Item 2. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing FSAR RAI NRR 112046332 In the footnote added to Table 11.2-5 by Amendment 102, the term F/H1D in the formulation of Column 5 and Mobile in the definition of D should be, F/H/D and Mobile, respectively.

These items will be corrected in FSAR Amendment 103. (Question 9)

[Item 1. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing FSAR RAI NRR 111028208 TVA will provide periodic reports at approximately six month intervals on the status of the NUREG-0847 review topics as part of the construction completion and licensing of WBN Unit 2.

Unit 2 Licensing Regulatory Framework NRR 111033038 TVA has revised the Security classification scheme to be consistent with changes being made to the WBN Security Plan in accordance with NEI 03-12. These changes completely eliminate the use of the phrase "Other security events as determined from (site-specific) Safeguards Contingency Plan," (HS1, HA4). TVA will provide the NRC staff an updated classification scheme that reflects these changes for WBN Unit 2.

[RAI Response 3.r of Enclosure 2. of T02 100427 001]

08/06/2010 Unit 2 Licensing RAI Response -

Radiological Emergency Plan NRR 111948132 A future Developmental Revision to the Unit 2 TS Bases will remove the "Prior to performance of this SR in Modes 1 or 2, actions are taken to establish that adequate conditions exist for performance of the SR. The required actions are defined in Bases Table 3.8.1-2." wording from the TS Bases for SR 3.8.1.14.

(Item 2. Of Enclosure 5 of letter T02 110216 004)

Unit 2 Licensing TS - TS Bases Supplemental Information NRR 112046424 TVA has reviewed the FSEIS and found the land use data presented in Table 3-19 to be in error.

The land use survey used to develop Table 11.3-10 was from 2007. Table 11.3-10 of the FSAR will be revised to include 2007 feeding factors and the offsite radiation doses being calculated without terrain adjustment factors. These changes to Table 11.3-10 will be reflected in Amendment 103. (Question 21)

[Item 6. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing FSAR RAI NRR 112053537 If found acceptable by the staff, final Chapter 11 updates will be provided in A104.

(last part of item 1. of Enclosure 5 of letter T02 110315 001)

Unit 2 Licensing FSAR NRR 111948124 A future Developmental Revision to the Unit 2 TS will correct the "58%" value in Unit 2 TS LCO 3.7.1, REQUIRED ACTION A.1 to "59%."

(Item 1. Of Enclosure 5 of letter T02 110216 004)

Unit 2 Licensing TS - TS Bases Supplemental Information NRR Page 17 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

NCO080008102 TVA plans to submit a waiver request to allow operators to hold a combined operating license for WBN Unit 1 and Unit 2 on or before October 23, 2009.

10/23/2009 Unit 2 Licensing Regulatory Framework NRR 112046406 Further, comparisons with other models determined that MESOPUFF II is not suitable for calculating /Q values at WBN receptors, and that GELC adequately estimates /Q for WBN receptors, without any need for adjustments. Therefore, WBN can eliminate the use adjustment factors and use GELC results directly. These changes will be reflected in Table 11.3-8 in FSAR, Amendment 103. (Question 20)

[Item 5. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing FSAR RAI NRR 112046388 FSAR Section 11.3.10.1, Assumptions and Calculation Methods incorrectly states the dose to the critical organ from radioiodines, tritium, and particulates is calculated for real pathways existing at the site during a land use survey conducted in 1994. The feeding factor of 70% is the feeding factor associated with the 1994 land use survey. The feeding factor of 65% listed in Table 3-21 of the FSEIS is in error and should be 0.33%. These changes to FSAR Section 11.3.10.1 will be reflected in Amendment 103. (Question 18)

[Item 4. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing FSAR RAI NRR 112053527 TVA will provide an advance version of Chapter 11 along with answers to the remaining RAI questions in separate correspondence.

(first part of item 1. of Enclosure 5 of letter T02 110315 001)

Unit 2 Licensing FSAR NRR 111360889 TVA will submit a combined Unit 1 and Unit 2 FSAR with the first update of the Unit 1 UFSAR after Unit 2 is licensed.

[Item 2 of Enclosure 5 of letter T02 100901 002]

/

AFTER LICENSED Unit 2 Licensing FSAR - A100 NRR 111877289 If necessary, any revisions resulting from the above reviews will be provided in a later FSAR amendment.

(Item 3. of Enclosure 3 of letter T02 110124 001)

Unit 2 Licensing RAI NRR 112145218 Additional unit differences could emerge through field implementation. If significant unit differences emerge, then TVA will provide another updated list, if necessary, when field implementation is complete.

[Item 1. of Enclosure 2 of letter T02 110406 005]

Unit 2 Licensing List of Design Differences NRR 111027916 TVA will provide updates to the status of the Regulatory Framework and Generic Communications tables quarterly, within 30 days of the end of the quarter. [Revision 3 is due 07/30/2010]

07/30/2010 Unit 2 Licensing Regulatory Framework NRR Page 18 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

MAXIMO #

REQUIRED ACTION DUE DATE

/

MILESTONE SOURCE RESPONSIBLE IPS PKG REC'D /

CLOSED*

111032952 TVA submits all changes to the TVA REP in accordance with 10 CFR 50.4, Appendix E. TVA will provide the NRC with the latest revised information in Appendix C (WBN 1/2) to the REP when we submit the updated plan as committed to in these RAI responses. If changes are made after NRC review of the plan, TVA will provide the NRC with updates of all changes made to the WBN Unit 1/2 REP to ensure that the NRC staff has accurate and complete information.

[RAI Response 1. of Enclosure 2. of T02 100427 001]

08/06/2010 Unit 2 Licensing RAI Response -

Radiological Emergency Plan NRR 112046353 The FSAR will be revised to eliminate the adjustment factors and use GELC results directly.

Specifically, Table 11.3-10 (Unit 2 only) dose values for Noble Gases and Iodines/Particulates will be revised. In addition, due to elimination of the terrain adjustment factors, the highest dose pathway becomes vegetable ingestion instead of the cow milk with feeding factor. Doses reflected in this table will be of one unit (Unit 2) without a Tritium Producing Core. These changes will be submitted as part of Unit 2 FSAR, Amendment 103.

(Enclosure 2 - Question 11.3.a)

[Item 12. of Enclosure 4 of letter T02 110225 002]

Unit 2 Licensing FSAR RAI NRR 125 TOTAL NUMBER OF OPEN ITEMS:

Page 19 of 19 05/17/2011

  • = Date Final Closure Package received by / closed by Licensing.

SSER 22/23 Open Item Plan Item Question/Issue Lead Action Plan (1) letter in folder Review evaluations and corrective actions associated with a power assisted cable pull. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)

Const Complete - Addressed by Maximo Commitment Closure package 10181059 (2) letter in folder Conduct appropriate inspection activities to verify cable lengths used in calculations and analysis match as-installed configuration. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)

Elec Provide NRC Residents access to as-constructed ICRDS database and associated calcs.

Due date:02/29/2012 (Khan)

Note: Pending completion of the cable pull effort and updating ICRDS for as-installed cable lengths by construction.

(4) letter in folder Conduct appropriate inspection activities to verify that TVAs maximum SWBP criteria for signal level and coaxial cables do not exceed the cable manufacturers maximum SWBP criteria. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155)

Elec/

Const Complete - Close to Inspection Report 20100604 (7) letter in folder Verify commitment completion and review electrical design calculations. (TVA letter dated October 9, 1990, ADAMS Accession No. ML073551056)

Elec See commitments in TVA Letter.

Provide NRC Residents a copy of related electrical calculation procedures and provide NRC access to calculations Due date: 8/1/11 (Khan)

(9) pg 13-2 Confirm that education and experience of management and principal supervisory positions down through the shift supervisory level conform to Regulatory Guide 1.8. (Section 13.1.3)

Lic Obtain education and experience information from WBN Human Resources and provide info to NRC Residents.

Due date: 7/15/11 (Elton)

(10) pg 13-2 Confirm that TVA has an adequate number of licensed and non-licensed operators in the training pipeline to support the preoperational test program, fuel loading, and dual unit operation.

(Section 13.1.3)

Ops Provide submittal that confirms we have adequate personnel in the pipeline.

Due date: 7/15/11 (Wallace)

(11) pg 13-2 The plant administrative procedures should clearly state that, when the Assistant Shift Engineer assumes his duties as Fire Brigade Leader, his control room duties are temporarily assumed by Ops Provide NRC Residents copy of procedure that provides the controls of this function.

Due date: 7/15/11 (Wallace)

the Shift Supervisor (Shift Engineer), or by another SRO, if one is available. The plant administrative procedures should clearly describe this transfer of control room duties. (Section 13.1.3)

(12) pg 25-3 TVAs implementation of NGDC PP-20 and EDCR Appendix J is subject to future NRC audit and inspection. (Section 25.9)

LIC Provide self assessment related PER closure packages to Licensing for NRR review.

Due date: 6/15/11 (Smith)

(13) pg 3-11 TVA is expected to submit an IST program and specific relief requests for WBN Unit 2 nine months before the projected date of OL issuance. (Section 3.9.6)

ISO Provide submittal addressing IST program and relief requests.

Due date: 7/15/11 (Tinley)

(16) pg 3-12 3-13 Based on the uniqueness of EQ, the NRC staff must perform a detailed inspection and evaluation prior to fuel load to determine how the WBN Unit 2 EQ program complies with the requirements of 10 CFR 50.49. (Section 3.11.2)

Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspections.

Due date: Ongoing Inspection (Khan)

(17) pg 3-13 The NRC staff should verify the accuracy of the WBN Unit 2 EQ list prior to fuel load. (Section 3.11.2.1)

Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspections.

Due date: Ongoing Inspection (Khan)

(19) pg 3-14 The NRC staff should complete its review of TVAs EQ Program procedures for WBN Unit 2 prior to fuel load. (Section 3.11.2.2.1)

Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspection Complete - Expect NRC to close in next inspection report (21) pg 3-14 The NRC staff should confirm that the Electrical Penetration Assemblies (EPAs) are installed in the tested configuration, and that the feedthrough module is manufactured by the same company and is consistent with the EQ test report for the EPA. (Section 3.11.2.2.1)

Elec Provide NRC Residents copies of EQ documents as requested for the onsite inspection Due date: 5/20/11 (Khan)

(25) pg 22-1 Prior to the issuance of an operating license, TVA is required to provide satisfactory documentation that it has obtained the maximum secondary liability insurance coverage pursuant to 10 CFR 140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to property insurance, and the NRC staff has reviewed and approved the documentation. (Section 22.3)

Lic Provide Insurance coverage submittal.

Due date: 10/1/11 (Smith)

(29) pg 8-8 Provide a detailed description of the transmission system grid conditions and the operating characteristics of the offsite power supply at the Watts Bar Hydro (for dual-unit operation), including the operating voltage range, post contingency voltage drops (including bounding values and post-unit trip values), and operating frequency range. Provide the design operating voltage range of the shutdown boards (minimum and maximum voltage) and information regarding how low the Watts Bar Hydro Station voltage could drop (assuming operation of the LTCs) while still supplying the worst-case shutdown board loads at the minimum design voltage of the shutdown boards.

The summary of the grid studies should address dual-unit operation, the transmission network interface available fault current changes, and the impact on the switchyard and plant switchgear and cabling. (Section 8.2.2)

Elec Provide response for submittal to NRR Due date: 7/15/11 (Hilmes)

(30) pg 8-10 TVA should confirm that all other safety-related equipment (in addition to the Class 1E motors) will have adequate starting and running voltage at the most limiting safety related components (such as motor operated valves, contactors, solenoid valves or relays) at the degraded voltage relay setpoint dropout setting. TVA should also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings. (Section 8.3.1.2)

Elec Provide response for submittal to NRR.

Due date: 8/1/11 (Hilmes)

Note: This issue is with Corporate Licensing to resolve on Unit 1. Unit 2 resolution will be the same as it is for Unit 1.

(32) pg 8-14 TVA should provide to the NRC staff the details of the administrative limits of EDG voltage and speed range, and the basis for its conclusion that the impact is negligible, and describe how it accounts for the administrative limits in the Technical Specification surveillance requirements for EDG voltage and frequency. (Section 8.3.1.14)

Elec Provide response for submittal to NRR.

Due date: 8/1/11 (Hilmes)

(35) pg 10-9 TVA should provide information to the NRC staff that the CCS will produce feedwater purity in accordance with BTP MTEB 5-3 or, alternatively, provide justification for producing feedwater purity to another acceptable standard. (Section 10.4.6)

Mech/

Chem Complete - A104 Update received

(37) pg 13-8 The NRC staff will review the combined WBN Unit 1 and 2 Appendix C prior to issuance of the Unit 2 OL to confirm (1) that the proposed Unit 2 changes were incorporated into Appendix C, and (2) that changes made to Appendix C for Unit 1 since Revision 92 and the changes made to the NP-REP since Revision 92 do not affect the bases of the staffs findings in this SER supplement. (Section 13.3.2)

REP Submit final Unit 1/2 REP to NRC Due date: October 1, 2011 (38) pg 13-14 The NRC staff will confirm the availability and operability of the ERDS for Unit 2 prior to issuance of the Unit 2 OL. (Section 13.3.2.6)

REP The Emergency Response Data System software has previously been modified and tested for the Watts Bar Unit 2 addition. This unit can be selected from the ERDS menu to send data to the NRC at this time. In addition, the software has been developed and tested to send data from the WBN PEDS to the CECC. However, the official list of points for Watts Bar Unit 2 has not been provided by Unit 2 Design Engineering and, until this has been completed and submitted to the Computer Engineering Group for addition to the ERDS software, official testing of the software for this unit cannot be completed with the NRC in order to declare the WBN ERDS Unit 2 operational. This list is derived from the official Data Point List. Once developed, Unit 2 Licensing submits the data to the NRC. Once this list has been received by the NRC, it would require one month to add the list to the NRC data systems, write the test, schedule the test with TVA/NRC, run the test, and TVA submit the results.

Due date: 10/1/11 (39) pg 13-14 The NRC staff will confirm the adequacy of the communications capability to support dual unit operations prior to issuance of the Unit 2 OL. (Section 13.3.2.6)

REP Provide NRC Residents copies of related documents as requested for the onsite inspection. This item is covered by the response to Item 38 Due date: See Item 38 (40) pg 13-15 The NRC staff will confirm the adequacy of the emergency facilities and equipment to support dual unit operations prior to issuance of the Unit 2 OL. (Section 13.3.2.8)

REP Perform self assessment to verify processes and materials in main control room, TSC, OSC, EOF and local recivery facility. Provide NRC Residents copies of self assessment documents

for the onsite inspection.

Due date: 10/1/11 (41) pg 13-16 TVA committed to (1) update plant data displays as necessary to include Unit 2, and (2) to update dose assessment models to provide capabilities for assessing releases from both WBN units.

The NRC staff will confirm the adequacy of these items prior to issuance of the Unit 2 OL. (Section 13.3.2.9)

Computer Eng REP

1) Provide demonstration of capability of SPDS, ICS and PEDS data system displays for Unit 2.

Due date:

2) Submit EPIP-13. Describe RED, FRED and BRED data systems..

Due date: 10/1/11 (42) pg 13-16 The NRC staff will confirm the adequacy of the accident assessment capabilities to support dual unit operations prior to issuance of the Unit 2 OL. (Section 13.3.2.9)

Computer Eng Covered by Item 41 (1)

Due date: See Item 41(1)

(43) pg 13-23 Section V of Appendix E to 10 CFR Part 50 requires TVA to submit its detailed implementing procedures for its emergency plan no less than 180 days before the scheduled issuance of an operating license. Completion of this requirement will be confirmed by the NRC staff prior to the issuance of an operating license. (Section 13.3.2.18)

REP Submit Unit 1/2 REP implementing procedures (EPIP-1 thru EPIP-17) to NRC Due date: October 1, 2011 (Detchemendy)

(47) pg 6-12 The NRC staff noted that TVAs changes to Section 6.2.6 in FSAR Amendment 97, regarding the implementation of Option B of Appendix J, were incomplete, because several statements remained regarding performing water-sealed valve leakage tests as specified in 10 CFR [Part] 50, Appendix J. With the adoption of Option B, the specified testing requirements are no longer applicable; Option A to Appendix J retains these requirements. The NRC discussed this discrepancy with TVA in a telephone conference on September 28, 2010. TVA stated that it would remove the inaccurate reference to Appendix J for specific water testing requirements in a future FSAR amendment. (Section 6.2.6)

Lic Complete - A104 Update received (48) pg 6-15 The NRC staff should verify that its conclusions in the review of FSAR Section 15.4.1 do not affect the conclusions of the staff regarding the acceptability of Section 6.5.3. (Section LIC Complete - No TVA action Licensing to address in next SSER update letter

6.5.3)

(49) letter in folder The NRC staff was unable to determine how TVA linked the training qualification requirements of ANSI N45.2-1971 to TVA Procedure TI-119. Therefore, the implementation of training and qualification for inspectors will be the subject of future NRC staff inspections.

(NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050)

Mech Provide NRC Residents how the refurb training requirements are linked to the ANSI standard. Provide the training records for refurb inspectors.

Due date: June 15, 2011 (Moll)

(50) letter in folder TVA stated that about 5 percent of the anchor bolts for safety-related pipe supports do not have quality control documentation, because the pull tests have not yet been performed. Since the documentation is still under development, the NRC staff will conduct inspections to follow-up on the adequate implementation of this construction refurbishment program requirement. (NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050)

Const Notify NRC Residents of anchor bolt pull tests.

Due date: July 1, 2011 (Adair)

(51) letter in folder The implementation of TVA Procedure TI-119 will be the subject of NRC follow-up inspection to determine if the construction refurbishment program requirements are being adequately implemented. (NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050)

Mech Provide NRC Residents the results of the refurb program.

Due date: Ongoing Inspection (Moll) 52 draft TVA should provide an update to the FSAR replacing Table 12.2-3 with the expected source strength values of the freshly irradiated IITAs. (Section 12.3)

I&C Complete - A104 Update received 53 draft TVA should provide an update to the FSAR reflecting the information provided in its letter dated October 4, 2010, regarding the WBN radiation protection design features, including controlled access areas, decontamination areas, and onsite laboratories and counting rooms. (Section 12.4)

Rad Pro Provide update to FSAR based on 10/4/10 letter to NRC.

Due Date: June 15, 2011 (Grim) 54 draft TVA should provide adequate technical justification to the staff to relax the frequency of the radiation monitor channel quarterly operability tests. TVA should provide sufficient information to the staff to determine that the protable airborne radiation monitors comply with the requirements of 10 CFR 20.1501. TVA should provide sufficient information for the I&C Provide requested info using correct methodology Due Date: June 30, 2011 (Hilmes)

staff to determine that the licensing or TVA program requirements for the calibration and operability testing of area radiation monitors are sufficient to meet the regulatory requirements of 10 CFR 20.1501. (Section 12.4) 55 draft TVA should provide sufficient information to the staff to demonstrate that the two area radiation monitors for the Spent Fuel Pit comply with the requirements of 10 CFR 70.24 and 10 CFR 50.68 for radiation monitoring in areas where fuel is handled or stored. (Section 12.4)

Lic Complete - Info provided by Question 27 of 2/25/11 letter 56 draft TVA should update the FSAR to reflect the information regarding the dose assessment program provided in its letter the NRC dated June 3, 2010. (Section 12.5)

Lic Complete - TVA does not believe an FSAR update is warranted. The info in the 6/3/10 letter is merely confirming that the WBN Unit 1/2 history meets the requirements of the FSAR.

57 draft TVA should update the FSAR to reflect the qualification standards of the RPM as provided in its letter to the NRC dated October 4, 2010. (Section 12.6)

Lic Develop FSAR change from 10/4/10 submittal - Question 12-13.

Due Date: 5/27/11 (Stockton) 58 draft The staff has insufficient information to conclude that TVA has taken appropriate actions to reduce radiation levels and increase the capability of operators to control and mitigate the consequences of an accident at WBN Unit 2, in accordance with the guidance of NUREG-0737, Item II.B.2, or can maintain occupational doses to plant operators within the requirements of GDC

19. Therefore, the staff cannot conclude that the plant shielding for WBN Unit 2 is acceptable. (Section 12.7.1)

Lic Discussion in progress with NRC regarding this item versus Item 53 (apparent contradiction in the questions).

Provide requested info Due Date:

59 draft The staff's evaluation of the compatibility of the ESF system materials with containment sprays and core cooling water in the event of a LOCA is incomplete pending resolution of GSI-191 for WBN Unit 2. (Section 6.1.1.4)

Mech Complete - Addressed by TVA letter dated 3/4/11, question 3.o.1 60 draft TVA should amend the FSAR description of the design and operation of the spent fuel pool cooling and cleanup system in FSAR Section 9.1.3 as proposed in its December 21, 2010, letter to the NRC. (Section 9.1.3)

Lic Complete - A103 provided update 61 draft TVA should provide information to the NRC staff to demonstrate that PAD 4.0 can conservatively calculate the fuel temperature and other impacted variables, such as stored energy, given the lack of a fuel thermal conductivity degradation model.

Lic Complete - This will be addressed by a License Condition

(Section 4.2.2.1) 62 draft Confirm TVA's change to FSAR Section 10.4.9 to reflect its intention to operate with each CST isolated from the other. (Section 10.4.9)

Lic Complete - A103 provided update 63 draft TVA should confirm to the NRC staff that testing prior to Unit 2 fuel load has demonstrated that two-way communications is impossible with the Eagle 21 communications interface. (Section 7.2.1.1)

I&C Provide requested info Due Date: 6/16/11 for plan 64 draft TVA stated that, "Post modification testing will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD accuracy issue prior to WBN Unit 2 fuel load." The issue is open pending NRC staff review of the testing results. (Section 7.2.1.1)

I&C Provide requested info Due Date: Need FDCN date from Westinghouse 65 draft TVA should provide justification to the staff regarding why different revisions of WCAP-13869 are referenced in WBN Unit 1 and Unit 2. (Section 7.2.1.1)

I&C Provide requested info Due Date: 6/15/11 (Hilmes) 66 draft TVA should clarify FSAR Section 9.2.5 to add the capability of the UHS to bring the non accident unit to cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. (Section 9.2.5)

Lic Complete - A102 provided update to FSAR Section 9.2.2.4 to cover this question for both ERCW and CCS.

67 draft TVA should confirm, and the NRC staff should verify, that the component cooling booster pumps for Unit 2 are above PMF level. (Section 9.2.2)

Civil Provide EDCR closure documentation for installation of CCS thermal barrier booster pump dike.

Due Date:

68 draft TVA should clarify to the NRC staff how the CSS complies with GDC 5. (Section 9.2.2)

Lic Complete - A102 provided update 69 draft The WBN Unit 2 RCS vent system is acceptable, pending verification that the RCS vent system is installed. (Section 5.4.5)

Mech Provide EDCR closure documentation for installation of ECCS vents. EDCR numbers 52637 (RHR) [P3 Completion Date 6/7/11], 53311 (SI) [P3 Completion Date 8/25/11]

Due Date: See above 70 draft TVA should provide the revised WBN Unit 2 PSI program ASME Class 1, 2, and 3 Supports "Summary Tables," to include numbers of components so that the NRC staff can verify that the numbers meet the reference ASME Code. (Section 3.2.3 of Appendix Z of this SSER)

ISO Provide requested info Due Date: 11/1/11 (Tinley)

71 draft TVA should confirm to the staff the replacement of the current Unit 2 clevis insert bolts to the latest design, which uses an X-750 alloy with an HTH process, rolled threads, and a larger radius on the undercut of the cap screw head. (Section 3.9.5)

Lic Complete - Letter issued 4/21/11 72 draft Based on its review, the staff asked TVA several questions regarding the ICC instrumentation. TVA responded to the staff questions by letter dated October 26, 2010 (ADAMS Accession No. ML103020322).

The NRC staff has not completed the review of the additional information provided by TVA. The staff will provide its evaluation after completion of that review. (Section 4.4.8)

Lic Open pending NRC review 73 draft The NRC staff will inspect to confirm that TVA has completed the WBN Unit 2 EOPs prior to fuel load. (Section 7.5.3)

Ops Provide copies of EOPs for inspection.

Due Date: (Wallace) 74 draft The NRC staff will verify installation of the acoustic-monitoring system for the power-operated relief valve (PORV) position indication in WBN Unit 2 before fuel load.

(Section 7.8.1)

I&C Provide EDCR closure documentation for installation of acoustic monitors.

Panels installed 5/18/11 Probes not installed Due Date:

75 draft The NRC staff will verify that the test procedures and qualification testing for auxiliary feedwater initiation and control and flow indication are completed in WBN Unit 2 before fuel load. (Section 7.8.2)

PreOp Provide copies of test procedures for inspection.

Due Date: (Olson) 76 draft The NRC staff will verify that the derivative time constant is set to zero in WBN Unit 2 before fuel load. (Section 7.8.3)

I&C Provide EDCR closure documentation for setting of time constant.

Due Date: