Operator Manual Action or Manual Operator Action is part of a pre-planned sequence in response to an event. Its specific to a required step when a person needs to perform an action. This is in contrast to an automatic action which is when an instrument detects and activates something.
Discussion on manual action vs automatic action
Automatic is generally more reliable then a human action. So if a plant uses a manual action to accomplish a safety function it receives scrutiny that its trained, practiced, and validated. In regard to a change per 50.59, changing an automatic to manual operator action will normally require NRC approval.
The reason to use manual action instead of automatic is because automatic could result in unnecessary automatic actuation. If time permits, it may be preferred for a person to interpret the plant conditions as valid prior to system actuation. For example, preventing scrams in response to invalid signals.
Topic |
|---|
|
|
| All by date | | | Start date | Site | Title |
|---|
| ML25324A400 | 20 November 2025 | Palisades | Joint Petitioners Motion to Withdraw All Petitions | | LR-N25-0083, Supplement to License Amendment Requests to Adopt TSTF-505, TSTF-591, and 10 CFR 50.69 | 10 October 2025 | Salem | Supplement to License Amendment Requests to Adopt TSTF-505, TSTF-591, and 10 CFR 50.69 | | L-MT-25-031, Site Specific Emergency Action Level Technical Basis Documents Change | 24 September 2025 | Monticello | Site Specific Emergency Action Level Technical Basis Documents Change | | ML25258A213 | 13 September 2025 | Palisades | Written Limited Appearance Statement from Sally Jane Gellert | | ML25220A106 | 8 August 2025 | 99902100 | Public - Enclosure - Terrapower, LLC - Final Safety Evaluation of Topical Report NAT-4950, Instrumentation & Control Architecture and Design Basis Topical Report, Rev 2 | | ML25219A707 | 8 August 2025 | Brunswick | Notification of Inspection and Request for Information for NRC PI&R Inspection | | ML25218A186 | 6 August 2025 | Hatch | Plan, Units 1 & 2 - Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | | ML25215A001 | 3 August 2025 | Palisades | Supplement One, to July 30, 2025 Petition Submittal, to Add Contention Two and Basis for Same. Palisades Nuclear Plant - License Amendment Request to Defer NFPA-805 Modification S2-15 | | ML25150A281 | 24 July 2025 | Palisades | Issuance of Amendment No. 278 Revise the Site Emergency Plan to Support Resumption of Power Operations | | ML25203A083 | 24 July 2025 | Surry | Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000280/2025404 and 05000281/2025404 |
|
|---|