{{#Wiki_filter:November 2, 2020 Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Plant 8315 County Road 459 Steedman, MO 65077 SUBJECT: CALLAWAY PLANT - INTEGRATED INSPECTION REPORT 05000483/2020003
{{#Wiki_filter:November 2, 2020
 
==SUBJECT:==
CALLAWAY PLANT - INTEGRATED INSPECTION REPORT 05000483/2020003


==Dear Mr. Diya:==
==Dear Mr. Diya:==
Line 30: Line 33:
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Callaway Plant. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Callaway Plant. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Cornelius Digitally signed by Cornelius F. O'Keefe F. O'Keefe Date: 2020.11.02 17:21:45 -06'00'
Sincerely, Neil F. O'Keefe, Chief Reactor Projects Branch B Division of Reactor Projects  
Neil F. O'Keefe, Chief Reactor Projects Branch B Division of Reactor Projects Docket No. 05000483 License No. NPF-30
 
Docket No. 05000483 License No. NPF-30  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Number: 05000483 License Number: NPF-30 Report Number: 05000483/2020003 Enterprise Identifier: I-2020-003-0007 Licensee: Union Electric Company Facility: Callaway Plant Location: Steedman, MO Inspection Dates: July 1, 2020 to September 30, 2020 Inspectors: D. Bradley, Senior Resident Inspector S. Janicki, Resident Inspector R. Alexander, Senior Emergency Preparedness Inspector K. Clayton, Senior Operations Engineer Approved By: Neil F. O'Keefe, Chief Reactor Projects Branch B Division of Reactor Projects Enclosure
Docket Number:
05000483  
 
License Number:
NPF-30  
 
Report Number:
05000483/2020003  
 
Enterprise Identifier: I-2020-003-0007  
 
Licensee:
Union Electric Company  
 
Facility:
Callaway Plant  
 
Location:
Steedman, MO  
 
Inspection Dates:
July 1, 2020 to September 30, 2020  
 
Inspectors:
D. Bradley, Senior Resident Inspector  
 
S. Janicki, Resident Inspector  
 
R. Alexander, Senior Emergency Preparedness Inspector  
 
K. Clayton, Senior Operations Engineer  
 
Approved By:
Neil F. O'Keefe, Chief
Reactor Projects Branch B
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
Line 43: Line 82:


===List of Findings and Violations===
===List of Findings and Violations===
 
Failure to Implement Emergency Diesel Generator Surveillance Procedures Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000483/2020003-01 Open/Closed
Failure to Implement Emergency Diesel Generator Surveillance Procedures Cornerstone         Significance                                 Cross-Cutting Report Aspect        Section Mitigating           Green                                         [H.12] - Avoid 71111.04 Systems              NCV 05000483/2020003-01                      Complacency Open/Closed The inspectors reviewed a self-revealed Green, non-cited violation of Technical Specification 5.4.1.a , Procedures, for the licensees failure to implement Procedure OSP-NE-0001B, Standby Diesel Generator B Periodic Tests. Specifically, the operator did not comply with the caution statement to raise generator load greater than 109 KW within three seconds to prevent actuating the reverse power relay and tripping emergency diesel generator output breaker NB0211. This resulted in emergency diesel generator B being inoperable for 12 hours while the licensee ruled out other causes through troubleshooting.
[H.12] - Avoid Complacency 71111.04 The inspectors reviewed a self-revealed Green, non-cited violation of Technical Specification 5.4.1.a, Procedures, for the licensees failure to implement Procedure OSP-NE-0001B, Standby Diesel Generator B Periodic Tests. Specifically, the operator did not comply with the caution statement to raise generator load greater than 109 KW within three seconds to prevent actuating the reverse power relay and tripping emergency diesel generator output breaker NB0211. This resulted in emergency diesel generator B being inoperable for 12 hours while the licensee ruled out other causes through troubleshooting.


===Additional Tracking Items===
===Additional Tracking Items===
Line 59: Line 98:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection External Flooding Sample (IP Section 03.03) ==
===External Flooding Sample (IP Section 03.03) (1 Sample)===
{{IP sample|IP=IP 71111.01|count=1}}
: (1) The inspectors evaluated that flood protection barriers, mitigation plans, procedures, and equipment for safety-related structures, including roofs, are consistent with the licensees design requirements and risk analysis assumptions for coping with external flooding on August 20, 2020.
: (1) The inspectors evaluated that flood protection barriers, mitigation plans, procedures, and equipment for safety-related structures, including roofs, are consistent with the licensees design requirements and risk analysis assumptions for coping with external flooding on August 20, 2020.


==71111.04 - Equipment Alignment Partial Walkdown Sample (IP Section 03.01) ==
==71111.04 - Equipment Alignment==
{{IP sample|IP=IP 71111.04|count=3}}
===Partial Walkdown Sample (IP Section 03.01) (3 Samples)===
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Emergency diesel generator output circuit breakers, including trip features, on July 24, 2020
: (1) Emergency diesel generator output circuit breakers, including trip features, on July 24, 2020
: (2) Motor-driven auxiliary feedwater system, train B, on August 25, 2020
: (2) Motor-driven auxiliary feedwater system, train B, on August 25, 2020
: (3) Rod control on September 7, 2020
: (3) Rod control on September 7, 2020  


===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated system configurations during a complete walkdown of           train A of component cooling water on August 31, 2020.
: (1) The inspectors evaluated system configurations during a complete walkdown of train A of component cooling water on August 31, 2020.
 
==71111.05 - Fire Protection Fire Area Walkdown and Inspection Sample (IP Section 03.01) ==
{{IP sample|IP=IP 71111.05|count=4}}


==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
: (1) Auxiliary building 1974' elevation, fire area A-1, on August 19, 2020
: (1) Auxiliary building 1974' elevation, fire area A-1, on August 19, 2020
: (2) Control building 2016' elevation including electrical equipment air conditioning room, switchboard and battery rooms, fire areas C-13 and C-15, on August 24, 2020
: (2) Control building 2016' elevation including electrical equipment air conditioning room, switchboard and battery rooms, fire areas C-13 and C-15, on August 24, 2020
: (3) Control building 2000' elevation including vital switchgear, fire area C-10, on September 12, 2020
: (3) Control building 2000' elevation including vital switchgear, fire area C-10, on September 12, 2020
: (4) Spent fuel pool area, fire area FB-1, on September 14, 2020
: (4) Spent fuel pool area, fire area FB-1, on September 14, 2020  


===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
Line 89: Line 125:
* Announced fire drill in the north electrical penetration room, fire area A-18, on July 20, 2020
* Announced fire drill in the north electrical penetration room, fire area A-18, on July 20, 2020


==71111.06 - Flood Protection Measures Cable Degradation (IP Section 03) ==
==71111.06 - Flood Protection Measures==
{{IP sample|IP=IP 71111.06|count=1}}
===Cable Degradation (IP Section 03) (1 Sample)===
 
The inspectors evaluated cable submergence protection in:
The inspectors evaluated cable submergence protection in:
: (1) Essential service water cable vaults MH01A and MH01B, on July 1, 2020
: (1) Essential service water cable vaults MH01A and MH01B, on July 1, 2020


==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
===Requalification Examination Results (IP Section 03.03) (1 Sample)===
===Requalification Examination Results (IP Section 03.03) (1 Sample)===
Annual Requalification Exam Results are reviewed.
Annual Requalification Exam Results are reviewed.
Line 102: Line 136:


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)
: (1) The inspectors observed and evaluated licensed operator performance in the control room during planned work on the train B motor-driven auxiliary feedwater system on August 12, 2020.
: (1) The inspectors observed and evaluated licensed operator performance in the control room during planned work on the train B motor-driven auxiliary feedwater system on August 12, 2020.
Line 108: Line 141:


===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated licensed control room operator training in the           simulator on July 6, 2020.
: (1) The inspectors observed and evaluated licensed control room operator training in the simulator on July 6, 2020.
 
==71111.12 - Maintenance Effectiveness Maintenance Effectiveness (IP Section 03.01) ==
{{IP sample|IP=IP 71111.12|count=2}}


==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (2 Samples)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
: (1) Auxiliary feedwater system, including issues during valve closure tests and pneumatic controls, on August 4, 2020
: (1) Auxiliary feedwater system, including issues during valve closure tests and pneumatic controls, on August 4, 2020
Line 118: Line 150:


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
Line 126: Line 157:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
Line 133: Line 163:
: (3) Control room emergency ventilation system opening, Condition Report 202003819, on August 25, 2020
: (3) Control room emergency ventilation system opening, Condition Report 202003819, on August 25, 2020


==71111.19 - Post-Maintenance Testing Post-Maintenance Test Sample (IP Section 03.01) ==
==71111.19 - Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=6}}
===Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)===
 
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
: (1) Emergency exhaust system train A following planned maintenance on July 6, 2020
: (1) Emergency exhaust system train A following planned maintenance on July 6, 2020
Line 144: Line 173:
: (6) Turbine-driven auxiliary feedwater pump following planned maintenance on August 25, 2020
: (6) Turbine-driven auxiliary feedwater pump following planned maintenance on August 25, 2020


==71111.20 - Refueling and Other Outage Activities Refueling/Other Outage Sample (IP Section 03.01) (1 Partial) ==
==71111.20 - Refueling and Other Outage Activities==
Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)
: (1) The inspectors evaluated refueling outage RF24 activities from September 27-30, 2020 (Partial).
: (1) The inspectors evaluated refueling outage RF24 activities from September 27-30, 2020 (Partial).


==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:==
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:  


===Surveillance Tests (other) (IP Section 03.01) (3 Samples)===
===Surveillance Tests (other) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=3}}
: (1) Control room emergency ventilation system air filtration unit B on August 10, 2020
: (1) Control room emergency ventilation system air filtration unit B on August 10, 2020
: (2) Emergency exhaust system - fuel building ventilation isolation test on August 17, 2020
: (2) Emergency exhaust system - fuel building ventilation isolation test on August 17, 2020
: (3) Ultimate heat sink train B cooling tower fan performance testing on August 19, 2020
: (3) Ultimate heat sink train B cooling tower fan performance testing on August 19, 2020  


===Inservice Testing (IP Section 03.01) (1 Sample)===
===Inservice Testing (IP Section 03.01) (1 Sample)===
: (1) Essential service water train B inservice test, including flow balance, on August 25,           2020
: (1) Essential service water train B inservice test, including flow balance, on August 25, 2020


==71114.02 - Alert and Notification System Testing Inspection Review (IP Section 02.01-02.04) ==
==71114.02 - Alert and Notification System Testing==
{{IP sample|IP=IP 71114.02|count=1}}
===Inspection Review (IP Section 02.01-02.04) (1 Sample)===
: (1) The inspectors evaluated the maintenance and testing of the alert and notification system between April 1, 2018, and June 30, 2020.
: (1) The inspectors evaluated the maintenance and testing of the alert and notification system between April 1, 2018, and June 30, 2020.


==71114.03 - Emergency Response Organization Staffing and Augmentation System==
==71114.03 - Emergency Response Organization Staffing and Augmentation System==
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
: (1) The inspectors evaluated the readiness of the Emergency Preparedness           Organization between April 1, 2018, and June 30, 2020.
: (1) The inspectors evaluated the readiness of the Emergency Preparedness Organization between April 1, 2018, and June 30, 2020.


==71114.04 - Emergency Action Level and Emergency Plan Changes Inspection Review (IP Section 02.01-02.03) ==
==71114.04 - Emergency Action Level and Emergency Plan Changes==
{{IP sample|IP=IP 71114.04|count=1}}
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
: (1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
: (1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
* Radiological Emergency Response Plan (RERP), Revision 52; issued on April 30, 2020 This evaluation does not constitute NRC approval.
* Radiological Emergency Response Plan (RERP), Revision 52; issued on April 30, 2020  


==71114.05 - Maintenance of Emergency Preparedness Inspection Review (IP Section 02.01 - 02.11) ==
This evaluation does not constitute NRC approval.
{{IP sample|IP=IP 71114.05|count=1}}
 
==71114.05 - Maintenance of Emergency Preparedness==
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)===
: (1) The inspectors evaluated the maintenance of the emergency preparedness program between April 1, 2018, and June 30, 2020.
: (1) The inspectors evaluated the maintenance of the emergency preparedness program between April 1, 2018, and June 30, 2020.


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation==
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
: (1) The inspectors evaluated the emergency response organization team 5 training drill on September 10, 2020.
: (1) The inspectors evaluated the emergency response organization team 5 training drill on September 10, 2020.


===Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
===Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the emergency response organization team 4 training drill             on September 15,
: (1) The inspectors evaluated the emergency response organization team 4 training drill on September 15,


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12)===
EP01: Drill/Exercise Performance (IP Section 02.12) ===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
: (1) April 1, 2019, through March 31, 2020
: (1) April 1, 2019, through March 31, 2020  


===EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
===EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
: (1) April 1, 2019, through March 31, 2020
: (1) April 1, 2019, through March 31, 2020  


===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
: (1) April 1, 2019, through March 31, 2020
: (1) April 1, 2019, through March 31, 2020  


===IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) (1 Sample)===
===IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) (1 Sample)===
: (1) July 1, 2019, through June 30, 2020 IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)
: (1) July 1, 2019, through June 30, 2020  
: (1) July 1, 2019, through June 30, 2020
 
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)
: (1) July 1, 2019, through June 30, 2020  


===IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)===
===IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)===
: (1) July 1, 2019, through June 30, 2020
: (1) July 1, 2019, through June 30, 2020


==71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03) ==
==71152 - Problem Identification and Resolution==
{{IP sample|IP=IP 71152|count=1}}
===Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)===
 
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Extent of condition inspection results for safety-related ventilation fan systems from Condition Report 202001783 on July 20, 2020
: (1) Extent of condition inspection results for safety-related ventilation fan systems from Condition Report 202001783 on July 20, 2020  


===71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01) ===
===71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)===
{{IP sample|IP=IP 71153|count=1}}
{{IP sample|IP=IP 71153|count=1}}
: (1) The inspectors evaluated a security diesel generator issue, Condition Report 20200494, and licensees response on September 29, 2020.
: (1) The inspectors evaluated a security diesel generator issue, Condition Report 20200494, and licensees response on September 29, 2020.


===Personnel Performance (IP Section 03.03) (1 Sample)===
===Personnel Performance (IP Section 03.03) (1 Sample)===
: (1) The inspectors evaluated the reactor trip caused by a main generator breaker trip and             licensees performance on September 27,
: (1) The inspectors evaluated the reactor trip caused by a main generator breaker trip and licensees performance on September 27,


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Failure to Implement Emergency Diesel Generator Surveillance Procedures Cornerstone           Significance                               Cross-Cutting   Report Aspect          Section Mitigating             Green                                     [H.12] - Avoid   71111.04 Systems                NCV 05000483/2020003-01                    Complacency Open/Closed The inspectors reviewed a self-revealed Green, non-cited violation of Technical Specification 5.4.1.a , Procedures, for the licensees failure to implement Procedure OSP-NE-0001B, Standby Diesel Generator B Periodic Tests. Specifically, the operator did not comply with the caution statement to raise generator load greater than 109 KW within three seconds to prevent actuating the reverse power relay and tripping the emergency diesel generator output breaker. This resulted in emergency diesel generator B being inoperable for 12 hours while the licensee ruled out other causes through troubleshooting.
Failure to Implement Emergency Diesel Generator Surveillance Procedures Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems
 
Green NCV 05000483/2020003-01 Open/Closed
[H.12] - Avoid Complacency 71111.04 The inspectors reviewed a self-revealed Green, non-cited violation of Technical Specification 5.4.1.a, Procedures, for the licensees failure to implement Procedure OSP-NE-0001B, Standby Diesel Generator B Periodic Tests. Specifically, the operator did not comply with the caution statement to raise generator load greater than 109 KW within three seconds to prevent actuating the reverse power relay and tripping the emergency diesel generator output breaker. This resulted in emergency diesel generator B being inoperable for 12 hours while the licensee ruled out other causes through troubleshooting.


=====Description:=====
=====Description:=====
Line 232: Line 268:
Corrective Actions: The licensee declared EDG B inoperable, performed troubleshooting to identify the cause of the output breaker trip, interviewed the operating crew, issued a night order to increase the initial EDG loading requirements, completed the EDG B surveillance test successfully, and generated a condition report.
Corrective Actions: The licensee declared EDG B inoperable, performed troubleshooting to identify the cause of the output breaker trip, interviewed the operating crew, issued a night order to increase the initial EDG loading requirements, completed the EDG B surveillance test successfully, and generated a condition report.


Corrective Action References: Condition Report 202003091
Corrective Action References: Condition Report 202003091  


=====Performance Assessment:=====
=====Performance Assessment:=====
Line 266: Line 302:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation       Description or Title                                     Revision or
Inspection
Procedure                                                                                                Date
Procedure
71111.01   Corrective Action Condition Reports 201706767, 201701110, 201806495, 201901917,
Type
Documents                          202002834
Designation
Miscellaneous     A-2327            Control Building and Communications Corridor Floor Plan @ 8
Description or Title
Revision or
Date
71111.01
Corrective Action
Documents
Condition Reports 201706767, 201701110, 201806495, 201901917,
2002834
Miscellaneous
27
Control Building and Communications Corridor Floor Plan @
Elevation 2073'6" and Roof Plan @ Elevation 2087'2"
Elevation 2073'6" and Roof Plan @ Elevation 2087'2"
FSAR SP S 2.4     Hydrologic Engineering                                   OL-13
FSAR SP S 2.4
M-07LF02         Plumbing and Drainage System                             9
Hydrologic Engineering
RFR 170332       Approve a Flat Diesel Building Roof Drain Cover           0
OL-13
RMT-1.PMB         Repetitive Maintenance Tasks                             8
M-07LF02
Procedures       PMDI0825412       Clean Debris from Auxiliary Building Roof Drains         6
Plumbing and Drainage System
PMID0825413       Clean Debris from D/G Roof Drains                         8
RFR 170332
PMID25415         Clean Debris from RQ Roof Drains                         7
Approve a Flat Diesel Building Roof Drain Cover
PMID25416         Clean Debris from FB Roof Drains                         7
RMT-1.PMB
71111.04   Corrective Action Condition Reports 199902065, 200001964, 20408637, 200602565,
Repetitive Maintenance Tasks
Documents                          200608195, 200908596, 201008319, 2012002567,
Procedures
PMDI0825412
Clean Debris from Auxiliary Building Roof Drains
PMID0825413
Clean Debris from D/G Roof Drains
PMID25415
Clean Debris from RQ Roof Drains
PMID25416
Clean Debris from FB Roof Drains
71111.04
Corrective Action
Documents
Condition Reports 199902065, 200001964, 20408637, 200602565,
200608195, 200908596, 201008319, 2012002567,
201208276, 2013003338, 201406950, 201502012,
201208276, 2013003338, 201406950, 201502012,
201806495
201806495
Miscellaneous     M-22EG02         Piping and Instrumentation Diagram - Component Cooling   26
Miscellaneous
M-22EG02
Piping and Instrumentation Diagram - Component Cooling
Water System
Water System
M-763-00831       Full Length Rod Control System                           13
M-763-00831
MP 07-0010       Modify MCB Switches for ECHV0011, ECHV0012,               0.1
Full Length Rod Control System
MP 07-0010
Modify MCB Switches for ECHV0011, ECHV0012,
EGHV0101 and EGHV0102
EGHV0101 and EGHV0102
Relay.BID         Protective Relays                                         2
0.1
RFR 019265A       Valves Locked/Surveilled per TS 4.7.4.A                   A
Relay.BID
RFR 4794         Diesel Generator Breakers NB0111 and NB0211               A
Protective Relays
Procedures       CTP-EG-06080     Component Cooling Water System Chemical Addition         18
RFR 019265A
MSE-NB-QY003     Operational Test Sequence of 4.16 kV Diesel Generator     16
Valves Locked/Surveilled per TS 4.7.4.A
A
RFR 4794
Diesel Generator Breakers NB0111 and NB0211
A
Procedures
CTP-EG-06080
Component Cooling Water System Chemical Addition
MSE-NB-QY003
Operational Test Sequence of 4.16 kV Diesel Generator
NE02 Air Circuit Breaker 152NB021
NE02 Air Circuit Breaker 152NB021
OSP-EG-0001A     Component Cooling Water Train A Valve Alignment           7
OSP-EG-0001A
Component Cooling Water Train A Valve Alignment
Surveillance
Surveillance
OSP-EG-0001B     Component Cooling Water Train B Valve Alignment           3
OSP-EG-0001B
Component Cooling Water Train B Valve Alignment
Surveillance
Surveillance
OSP-SF-00001     Shutdown Margin Calculations                             47
OSP-SF-00001
Inspection Type             Designation       Description or Title                                     Revision or
Shutdown Margin Calculations  
Procedure                                                                                              Date
 
OSP-SF-00002     Control Rod Partial Movement                             28
Inspection
OTO-SF-00001     Control Rod Malfunctions                                 23
Procedure
71111.05   Corrective Action Condition Reports 201707147, 201804247, 20190305, 201904398, 202003512
Type
Designation
Description or Title
Revision or
Date
OSP-SF-00002
Control Rod Partial Movement
OTO-SF-00001
Control Rod Malfunctions
71111.05
Corrective Action
Documents
Documents
Miscellaneous                       Fire Pre-Plan                                           40
Condition Reports 201707147, 201804247, 20190305, 201904398, 202003512
NFPA 805         Performance-Based Standard for Fire Protection for Light 2001
Miscellaneous
Fire Pre-Plan
NFPA 805
Performance-Based Standard for Fire Protection for Light
Water Reactor Electric Generating Plants
Water Reactor Electric Generating Plants
Procedures       APA-ZZ-00700     Fire Protection Program                                 26
2001
APA-ZZ-00701     Control of Fire Permits                                 25
Procedures
APA-ZZ-00750     Hazard Barrier Program                                   46
APA-ZZ-00700
FPP-ZZ-00009     Fire Protection Training Program                         35
Fire Protection Program
71111.06   Corrective Action Condition Reports 202003131, 202003220
APA-ZZ-00701
Control of Fire Permits
APA-ZZ-00750
Hazard Barrier Program
FPP-ZZ-00009
Fire Protection Training Program
71111.06
Corrective Action
Documents
Documents
Work Orders                         19510909, 19509056
Condition Reports 202003131, 202003220
71111.11Q Corrective Action Condition Reports 202003932
Work Orders
19510909, 19509056
71111.11Q Corrective Action
Documents
Documents
Miscellaneous     T61.08108         Simulator Scenario                                       02/04/2020
Condition Reports 202003932
Procedures       OSP-AL-P0002     Turbine-Driven Auxiliary Feedwater Pump Inservice Test   81
Miscellaneous
OSP-AL-P001B     Motor-Driven Auxiliary Feedwater Pump Inservice Test     66
T61.08108
ODP-ZZ-00001     Operations Department - Code of Conduct                 107
Simulator Scenario
Work Orders                         19003560, 18502371
2/04/2020
71111.12   Corrective Action Condition Reports 200308233, 201506272, 201703831, 201905886,
Procedures
Documents                          202002091, 202004225, 202004331
OSP-AL-P0002
Miscellaneous     NN-03             System Voltage Drop                                     3
Turbine-Driven Auxiliary Feedwater Pump Inservice Test
RFR 20117         Offsite Source Verification                             B
OSP-AL-P001B
RFR 6844         Diesel Generator Technical Specification Interpretation A
Motor-Driven Auxiliary Feedwater Pump Inservice Test
ULDBD-NE/KJ-     Emergency Diesel Generators                              3
ODP-ZZ-00001
Operations Department - Code of Conduct
107
Work Orders
19003560, 18502371
71111.12
Corrective Action
Documents
Condition Reports 200308233, 201506272, 201703831, 201905886,
2002091, 202004225, 202004331
Miscellaneous
NN-03
System Voltage Drop
RFR 20117
Offsite Source Verification
B
RFR 6844
Diesel Generator Technical Specification Interpretation
A
ULDBD-NE/KJ-
001
001
Procedures       OSP-NE-00001B     Standby Diesel Generator B Periodic Tests               68
Emergency Diesel Generators
OSP-NE-00003     Technical Specification Actions - A.C. Sources           34
Procedures
EDP-ZZ-01128     Maintenance Rule Program                                 29
OSP-NE-00001B
EDP-ZZ-01128,     Maintenance Rule System Functions                        23
Standby Diesel Generator B Periodic Tests
OSP-NE-00003
Technical Specification Actions - A.C. Sources
EDP-ZZ-01128
Maintenance Rule Program
EDP-ZZ-01128,
Appendix 4
Appendix 4
Inspection Type             Designation       Description or Title                                       Revision or
Maintenance Rule System Functions
Procedure                                                                                                Date
 
OTG-ZZ-00005     Plant Shutdown 20% Power to Hot Standby                   50
Inspection
OSP-AL-V001A     Train A Auxiliary Feedwater Valve Inservice Test           60
Procedure
71111.13   Corrective Action Condition Reports 202002470, 202002696, 202003483, 202003375
Type
Designation
Description or Title
Revision or
Date
OTG-ZZ-00005
Plant Shutdown 20% Power to Hot Standby
OSP-AL-V001A
Train A Auxiliary Feedwater Valve Inservice Test
71111.13
Corrective Action
Documents
Documents
Miscellaneous     NUMARC 93-01     Industry Guideline for Monitoring the Effectiveness of     4A
Condition Reports 202002470, 202002696, 202003483, 202003375
Miscellaneous
NUMARC 93-01
Industry Guideline for Monitoring the Effectiveness of
Maintenance at Nuclear Power Plants
Maintenance at Nuclear Power Plants
TSB 3.8.1         AC Sources - Operating                                     15
4A
Procedures       APA-ZZ-00312     Probabilistic Risk Assessment                             11
TSB 3.8.1
APA-ZZ-00312,     Online Work Integrated Risk Management                    19
AC Sources - Operating
Procedures
APA-ZZ-00312
Probabilistic Risk Assessment
APA-ZZ-00312,
Appendix F
Appendix F
EDP-GK-0113       Heat Exchanger Predictive Performance Manual               24
Online Work Integrated Risk Management
PRA-ZZ-00001     PRA Model Updates and Maintenance                         1
EDP-GK-0113
71111.15   Corrective Action Condition Reports 202001602, 202003794
Heat Exchanger Predictive Performance Manual
Documents        Condition Reports 201701745, 201804482, 202003819
PRA-ZZ-00001
Drawings         M-U2GD-1 (Q)     Piping and Instrumentation Diagram Essential Service Water 12
PRA Model Updates and Maintenance
71111.15
Corrective Action
Documents
Condition Reports 202001602, 202003794
Condition Reports 201701745, 201804482, 202003819
Drawings
M-U2GD-1 (Q)
Piping and Instrumentation Diagram Essential Service Water
Pumphouse & Ultimate Heat Sink Elec. Rm. HVAC
Pumphouse & Ultimate Heat Sink Elec. Rm. HVAC
Procedures       APA-ZZ-00013     Conduct of Maintenance                                     38
Procedures
PDP-ZZ-00017     Fix-it-Now Team Process 12/3/2019                         15
APA-ZZ-00013
Work Orders                         16005679.900
Conduct of Maintenance
71111.19   Corrective Action Condition Reports 202003334, 202003518, 202003531
PDP-ZZ-00017
Documents        Condition Reports 201400345, 201407748, 201408914, 201701135,
Fix-it-Now Team Process 12/3/2019
Work Orders
16005679.900
71111.19
Corrective Action
Documents
Condition Reports 202003334, 202003518, 202003531
Condition Reports 201400345, 201407748, 201408914, 201701135,
201805449, 201905399, 202000047, 202004285
201805449, 201905399, 202000047, 202004285
Miscellaneous     A210.0083         Valve Retest Manual                                       59
Miscellaneous
Job 19003907
A210.0083
MR633276         Material Request - Charcoal
Valve Retest Manual
RFR 18621         IST TDAFP Speed Reference Acceptance Range                 B
Job 19003907  
Procedures       APA-ZZ-00356     Pump and Valve Inservice Test Program                     26
 
OSP-AL-P0002     Turbine Driven Auxiliary Feedwater Pump Inservice Test -   81
MR633276
Material Request - Charcoal
RFR 18621
IST TDAFP Speed Reference Acceptance Range
B
Procedures
APA-ZZ-00356
Pump and Valve Inservice Test Program
OSP-AL-P0002
Turbine Driven Auxiliary Feedwater Pump Inservice Test -
Group B
Group B
OSP-EN-P001B     Train B Containment Spray Pump Inservice Test             52
OSP-EN-P001B
OTN-GK-00001     Control Building HVAC System                               61
Train B Containment Spray Pump Inservice Test
Work Orders                         19004892; 12502273; 20000658
OTN-GK-00001
71111.20   Corrective Action Condition Reports 202004895
Control Building HVAC System
Inspection Type             Designation       Description or Title                                           Revision or
Work Orders
Procedure                                                                                                    Date
19004892; 12502273; 20000658
71111.20
Corrective Action
Condition Reports 202004895  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Procedures
E-0
Reactor Trip or Safety Injection
ES-0.1
Reactor Trip Response
OTG-ZZ-00005
Plant Shutdown 20% Power to Hot Standby
71111.22
Procedures
OSP-GG-00004
Emergency Exhaust System FBVIS Test
71114.02
Corrective Action
Documents
Documents
Procedures        E-0              Reactor Trip or Safety Injection                              27
Condition Reports 201803901, 201805003, 201806927, 201806954,
ES-0.1            Reactor Trip Response                                          23
201905853, 201907255, 202001673, 202001710,
OTG-ZZ-00005      Plant Shutdown 20% Power to Hot Standby                        50
71111.22  Procedures        OSP-GG-00004      Emergency Exhaust System FBVIS Test                            18
71114.02  Corrective Action Condition Reports 201803901, 201805003, 201806927, 201806954,
Documents                          201905853, 201907255, 202001673, 202001710,
2001773, 202002446, 202002656
2001773, 202002446, 202002656
Miscellaneous                       Letter from FEMA Region VII, Approved January 2020 ANS         03/23/2020
Miscellaneous
Letter from FEMA Region VII, Approved January 2020 ANS
Design Report
Design Report
Siren Service Letter - Movement of Siren 53 and               05/27/2020
03/23/2020
Siren Service Letter - Movement of Siren 53 and
replacement of pole for Siren 51
replacement of pole for Siren 51
K260.0010         Callaway Plant Alert and Notification System Design Report     January
05/27/2020
K260.0010
Callaway Plant Alert and Notification System Design Report
January
20
20
Procedures                         Vendor Document - Callaway Semi-Annual Preventative           12/2019
Procedures
Vendor Document - Callaway Semi-Annual Preventative
Maintenance & Repair Checklist (for Sirens)
Maintenance & Repair Checklist (for Sirens)
KSP-ZZ-00008     Tone Alert Radios                                             9
2/2019
KSP-ZZ-00110     Siren Alerting System Testing                                 16
KSP-ZZ-00008
KSP-ZZ-00602     Verification of Emergency Instruction Postings                 6
Tone Alert Radios
71114.03   Corrective Action Condition Reports 201802480, 201803508, 201805536, 201805537,
KSP-ZZ-00110
Documents                          201901089, 201907623, 202000729, 202003776
Siren Alerting System Testing
Miscellaneous                       SNUPPS RERP (Revision 5A), Section 8.2                        02/1983
KSP-ZZ-00602
Licensing Impact Review (including RERP Evaluation Form)       01/22/1988
Verification of Emergency Instruction Postings
71114.03
Corrective Action
Documents
Condition Reports 201802480, 201803508, 201805536, 201805537,
201901089, 201907623, 202000729, 202003776
Miscellaneous
SNUPPS RERP (Revision 5A), Section 8.2
2/1983
Licensing Impact Review (including RERP Evaluation Form)
for RERP, Revision 11
for RERP, Revision 11
Surveillance     Augmentation Drill Report (touch the wall drill starting at 10/22/2018
01/22/1988
18507225          0323 on 10/19/2018)
Surveillance
Surveillance     Augmentation Drill Report (call-in drill starting at 0842 on 06/10/2019
18507225
19502304          06/08/2019)
Augmentation Drill Report (touch the wall drill starting at
Surveillance     Augmentation Drill Report (call-in drill starting at 0954 on 05/11/2020
23 on 10/19/2018)
20502588          05/08/2020)
10/22/2018
ULNRC-1732       Callaway Plant Radiological Emergency Response Plan,           02/26/1988
Surveillance
19502304
Augmentation Drill Report (call-in drill starting at 0842 on
06/08/2019)
06/10/2019
Surveillance
20502588
Augmentation Drill Report (call-in drill starting at 0954 on
05/08/2020)
05/11/2020
ULNRC-1732
Callaway Plant Radiological Emergency Response Plan,
Revision 11
Revision 11
Procedures       EIP-ZZ-00200     Augmentation of the Emergency Response Organization           21
2/26/1988
KOA-ZZ-00200     Activation of the Callaway Plant Emergency Callout System     17
Procedures
Inspection Type             Designation       Description or Title                                     Revision or
EIP-ZZ-00200
Procedure                                                                                              Date
Augmentation of the Emergency Response Organization
KSP-ZZ-00201     Emergency Augmentation Drill/Test                       11
KOA-ZZ-00200
71114.04   Corrective Action Condition Reports 202003573
Activation of the Callaway Plant Emergency Callout System  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
KSP-ZZ-00201
Emergency Augmentation Drill/Test
71114.04
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Miscellaneous                       Radiological Emergency Response Plan (RERP)             52
Condition Reports 202003573
EP Tracking No. 50.54(q) Screen - EIP-ZZ-00101 Add2, Revision 14        03/19/2018
Miscellaneous
Radiological Emergency Response Plan (RERP)
EP Tracking No.
2018011
2018011
EP Tracking No. 50.54(q) Evaluation - EIP-ZZ-01211, Accident Dose       02/26/2019
50.54(q) Screen - EIP-ZZ-00101 Add2, Revision 14
2018055          Assessment, Revision 38; URI Version 3.4 upgrade changes
03/19/2018
EP Tracking No. 50.54(q) Screen - EIP-ZZ-A00001, ERO, Revision 21;     03/12/2020
EP Tracking No.
20003          addition of POL0049 to Off-Normal Hours Definition
2018055
EP Tracking No. 50.54(q) Effectiveness Evaluation: CR 202001773,         04/13/2020
50.54(q) Evaluation - EIP-ZZ-01211, Accident Dose
20006          Relocation of Emergency Siren 053 & Radiological
Assessment, Revision 38; URI Version 3.4 upgrade changes
2/26/2019
EP Tracking No.
20003
50.54(q) Screen - EIP-ZZ-A00001, ERO, Revision 21;
addition of POL0049 to Off-Normal Hours Definition
03/12/2020
EP Tracking No.
20006
50.54(q) Effectiveness Evaluation: CR 202001773,
Relocation of Emergency Siren 053 & Radiological
Emergency Response Plan (RERP), Revision 52
Emergency Response Plan (RERP), Revision 52
EP Tracking No. 50.54(q) Evaluation - Response time impact for JIC ERO   05/04/2020
04/13/2020
20009          members (CR 202002249)
EP Tracking No.
Procedures       KDP-ZZ-00400     RERP Impact Evaluations and Changes                     26
20009
71114.05   Corrective Action Condition Reports 201802127, 201802748, 201803020, 201803725,
50.54(q) Evaluation - Response time impact for JIC ERO
Documents                          201803901, 201803903, 201803905, 201804072,
members (CR 202002249)
05/04/2020
Procedures
KDP-ZZ-00400
RERP Impact Evaluations and Changes
71114.05
Corrective Action
Documents
Condition Reports 201802127, 201802748, 201803020, 201803725,
201803901, 201803903, 201803905, 201804072,
201804685, 201805481, 201904169, 201904375,
201804685, 201805481, 201904169, 201904375,
201905453, 201906349, 201906484, 201906661,
201905453, 201906349, 201906484, 201906661,
Line 433: Line 674:
201906984, 201907878, 202000040, 202000869,
201906984, 201907878, 202000040, 202000869,
2002057, 202003581, 202003582
2002057, 202003581, 202003582
Miscellaneous                       Callaway Energy Center Muster Meeting Drill Report Third 07/30/2018
Miscellaneous
Callaway Energy Center Muster Meeting Drill Report Third
Quarter 2018
Quarter 2018
Contaminated Victim Drill Report                         10/21/2019
07/30/2018
Callaway Energy Center Annual ERO Drill (AED) Report     11/12/2019
Contaminated Victim Drill Report
AP18007           Nuclear Oversight Audit of Emergency Preparedness       09/06/2018
10/21/2019
AP20007           Emergency Preparedness Audit (Plan)                     06/17/2020
Callaway Energy Center Annual ERO Drill (AED) Report
Job 17504120     2018 Population Update Analysis                         04/10/2018
11/12/2019
Job 17506751-     Mini Scenario # 6 - Field Monitoring Team Report        05/24/2018
AP18007
Nuclear Oversight Audit of Emergency Preparedness
09/06/2018
AP20007
Emergency Preparedness Audit (Plan)
06/17/2020
Job 17504120
2018 Population Update Analysis
04/10/2018
Job 17506751-
500
500
Inspection Type             Designation       Description or Title                                       Revision or
Mini Scenario # 6 - Field Monitoring Team Report
Procedure                                                                                                  Date
05/24/2018
Job 17507545     2018 Letter of Agreement Information Surveillance:         09/10/2018
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Job 17507545
2018 Letter of Agreement Information Surveillance:
ST-12071
ST-12071
Job 18503865     2019 Population Update Analysis                             03/25/2019
09/10/2018
Job 18506769     Mini Scenario #8 Field Monitoring Team Drill Report         07/09/2019
Job 18503865
Job 18509626     Mini-Scenario Team Drill 6/6/19 Health Physics Drill Report 06/10/2019
2019 Population Update Analysis
Job 18510002     2019 Letter of Agreement Information Surveillance:         07/16/2019
03/25/2019
Job 18506769
Mini Scenario #8 Field Monitoring Team Drill Report
07/09/2019
Job 18509626
Mini-Scenario Team Drill 6/6/19 Health Physics Drill Report
06/10/2019
Job 18510002
2019 Letter of Agreement Information Surveillance:
ST-12071
ST-12071
Job 19503524     2019 Population Update Analysis (Part 2)                   05/22/2019
07/16/2019
Job 19507106     2020 Population Update Analysis                             05/26/2020
Job 19503524
Job 19511162     2020 Health Physics Drill Report                           06/23/2020
2019 Population Update Analysis (Part 2)
NES2019002       Notice of Closure Criteria to Escalation Letter OQC2019002 08/15/2019
05/22/2019
                                              (GTRE0032)
Job 19507106
OQC20180010      Escalation of Emergency Action Level Classification         08/23/2018
20 Population Update Analysis
05/26/2020
Job 19511162
20 Health Physics Drill Report
06/23/2020
NES2019002
Notice of Closure Criteria to Escalation Letter OQC2019002  
(GTRE0032)
08/15/2019
OQC20180010
Escalation of Emergency Action Level Classification
Weaknesses
Weaknesses
OQC2019002       Escalation of lack of a comprehensive plan to restore       03/27/2019
08/23/2018
OQC2019002
Escalation of lack of a comprehensive plan to restore
GTREOO32 to full compliance
GTREOO32 to full compliance
OQC2019005       NOS Closure of Escalation on Emergency Action Level         04/01/2019
03/27/2019
OQC2019005
NOS Closure of Escalation on Emergency Action Level
Classification Weaknesses
Classification Weaknesses
RERP, Appendix   Evacuation Time Estimates (ETE) for the Callaway Nuclear   0 (June
04/01/2019
G                Plant Emergency Planning Zone                               2012)
RERP, Appendix
SP19006           12-Month Regulatory Required Review of the Emergency       06/25/2019
G
Evacuation Time Estimates (ETE) for the Callaway Nuclear
Plant Emergency Planning Zone  
(June
2012)
SP19006
2-Month Regulatory Required Review of the Emergency
Preparedness Program in accordance with
Preparedness Program in accordance with
CFR 50.54(t)(1)(ii)
CFR 50.54(t)(1)(ii)
Procedures       EIP-ZZ-00212     Protective Action Recommendations                           30
06/25/2019
EIP-ZZ-A0020     Maintaining Emergency Preparedness                         32
Procedures
Self-Assessments 201900029-044     Exercise Readiness and Modified Program Inspection         03/26/2019
EIP-ZZ-00212
Work Orders       Job 18003592     TSC Filter Absorber Unit Issue, TSC Non-Functional - Adjust 09/13/2018
Protective Action Recommendations
EIP-ZZ-A0020
Maintaining Emergency Preparedness
Self-Assessments 201900029-044
Exercise Readiness and Modified Program Inspection
03/26/2019
Work Orders
Job 18003592
TSC Filter Absorber Unit Issue, TSC Non-Functional - Adjust
Air Dampers
Air Dampers
Job 19005574     Investigate ABRE0114 Lost Communication with RM-11 and     12/15/2019
09/13/2018
Job 19005574
Investigate ABRE0114 Lost Communication with RM-11 and
RM-23
RM-23
71114.06   Corrective Action Condition Reports
2/15/2019
71114.06
Corrective Action
Documents
Documents
Miscellaneous                       Drill Guide - ERO Team - 9/10/20
Condition Reports
Drill Guide - ERO Team - 9/15/20
Miscellaneous
Inspection Type             Designation       Description or Title                                     Revision or
Drill Guide - ERO Team - 9/10/20  
Procedure                                                                                              Date
 
71151     Miscellaneous                       Drill and Exercise Performance (DEP) PI Records (Annual 4Q/2019
Drill Guide - ERO Team - 9/15/20  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71151
Miscellaneous
Drill and Exercise Performance (DEP) PI Records (Annual
ERO Drill Crew 3/Team 2, Crew 5/Controller Team, 19-05
ERO Drill Crew 3/Team 2, Crew 5/Controller Team, 19-05
LORT Crew 1), and related ERO Participation PI Records
LORT Crew 1), and related ERO Participation PI Records
Drill and Exercise Performance (DEP) PI Records (ERO     1Q/2020
4Q/2019
Drill and Exercise Performance (DEP) PI Records (ERO
Training Drill Team 5, Proficiency DEP 20-1 Crew 6), and
Training Drill Team 5, Proficiency DEP 20-1 Crew 6), and
related ERO PI Participation Records
related ERO PI Participation Records
Drill and Exercise Performance (DEP) PI Records         2Q/2020
1Q/2020
                                              (Proficiency DEP 20-3 Crew 1 & Crew 5), and related ERO
Drill and Exercise Performance (DEP) PI Records  
(Proficiency DEP 20-3 Crew 1 & Crew 5), and related ERO
PI Participation Records
PI Participation Records
Performance Indicator Basis Document                     Various
2Q/2020
Alert & Notification System (ANS) PI - Weekly and Siren 3Q/2019,
Performance Indicator Basis Document
Tests Results                                            4Q/2019,
Various
Alert & Notification System (ANS) PI - Weekly and Siren
Tests Results
3Q/2019,
4Q/2019,
1Q/2020, &
1Q/2020, &
2Q/2020
2Q/2020
Drill and Exercise Performance (DEP) PI Records (19-04   3Q/2019
Drill and Exercise Performance (DEP) PI Records (19-04
LORT, 2019 WANO drill), and related ERO PI Participation
LORT, 2019 WANO drill), and related ERO PI Participation
Records
Records
Procedures       KDP-ZZ-02000     NRC Performance Indicator (PI) Data Collection           18 & 19
3Q/2019
71152     Corrective Action Condition Reports 202002097; 202003313; 202003346; 202003421;
Procedures
Documents                          202003567; 202003819; 202004179; 202004225;
KDP-ZZ-02000
NRC Performance Indicator (PI) Data Collection  
& 19
71152
Corrective Action
Documents
Condition Reports 202002097; 202003313; 202003346; 202003421;
2003567; 202003819; 202004179; 202004225;
2004243; 202004448; 202004496; 202004495
2004243; 202004448; 202004496; 202004495
18
}}
}}

Latest revision as of 14:12, 29 November 2024

Integrated Inspection Report 05000483/2020003
ML20307A663
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/02/2020
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-B
To: Diya F
Ameren Missouri
References
IR 2020003
Download: ML20307A663 (21)


Text

November 2, 2020

SUBJECT:

CALLAWAY PLANT - INTEGRATED INSPECTION REPORT 05000483/2020003

Dear Mr. Diya:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant. On October 7, 2020, the NRC discussed the results of this inspection with Mr. B. Cox, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Callaway Plant.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Callaway Plant. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Neil F. O'Keefe, Chief Reactor Projects Branch B Division of Reactor Projects

Docket No. 05000483 License No. NPF-30

Enclosure:

As stated

Inspection Report

Docket Number:

05000483

License Number:

NPF-30

Report Number:

05000483/2020003

Enterprise Identifier: I-2020-003-0007

Licensee:

Union Electric Company

Facility:

Callaway Plant

Location:

Steedman, MO

Inspection Dates:

July 1, 2020 to September 30, 2020

Inspectors:

D. Bradley, Senior Resident Inspector

S. Janicki, Resident Inspector

R. Alexander, Senior Emergency Preparedness Inspector

K. Clayton, Senior Operations Engineer

Approved By:

Neil F. O'Keefe, Chief

Reactor Projects Branch B

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Implement Emergency Diesel Generator Surveillance Procedures Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000483/2020003-01 Open/Closed

[H.12] - Avoid Complacency 71111.04 The inspectors reviewed a self-revealed Green, non-cited violation of Technical Specification 5.4.1.a, Procedures, for the licensees failure to implement Procedure OSP-NE-0001B, Standby Diesel Generator B Periodic Tests. Specifically, the operator did not comply with the caution statement to raise generator load greater than 109 KW within three seconds to prevent actuating the reverse power relay and tripping emergency diesel generator output breaker NB0211. This resulted in emergency diesel generator B being inoperable for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> while the licensee ruled out other causes through troubleshooting.

Additional Tracking Items

None.

PLANT STATUS

Callaway Plant began the inspection period at rated thermal power. The unit operated at or near rated thermal power through September 24, 2020. On September 24, 2020, the licensee began a coast-down of reactor power into the planned refueling outage. On September 27, 2020, the licensee experienced an automatic reactor trip due to a main generator trip. The unit remained shut down through the end of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week and during that time conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed onsite portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

External Flooding Sample (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated that flood protection barriers, mitigation plans, procedures, and equipment for safety-related structures, including roofs, are consistent with the licensees design requirements and risk analysis assumptions for coping with external flooding on August 20, 2020.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Emergency diesel generator output circuit breakers, including trip features, on July 24, 2020
(2) Motor-driven auxiliary feedwater system, train B, on August 25, 2020
(3) Rod control on September 7, 2020

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of train A of component cooling water on August 31, 2020.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Auxiliary building 1974' elevation, fire area A-1, on August 19, 2020
(2) Control building 2016' elevation including electrical equipment air conditioning room, switchboard and battery rooms, fire areas C-13 and C-15, on August 24, 2020
(3) Control building 2000' elevation including vital switchgear, fire area C-10, on September 12, 2020
(4) Spent fuel pool area, fire area FB-1, on September 14, 2020

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during the following drills:
  • Unannounced fire drill in the lower cable spreading room, fire area C-21, on July 2, 2020
  • Announced fire drill in the north electrical penetration room, fire area A-18, on July 20, 2020

71111.06 - Flood Protection Measures

Cable Degradation (IP Section 03) (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Essential service water cable vaults MH01A and MH01B, on July 1, 2020

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

Annual Requalification Exam Results are reviewed.

(1) On July 28, 2020, the inspectors completed one sample by reviewing and evaluating the licensed operator examination failure rates for the requalification annual operating exam administered for the exam cycle. There were no failures on the annual examinations.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the control room during planned work on the train B motor-driven auxiliary feedwater system on August 12, 2020.
(2) The inspectors observed and evaluated licensed operator performance in the control room during post-maintenance testing on the turbine-driven auxiliary feedwater pump and restoration of an intake pump on August 26, 2020.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed control room operator training in the simulator on July 6, 2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Auxiliary feedwater system, including issues during valve closure tests and pneumatic controls, on August 4, 2020
(2) Emergency diesel generator system, including issues with the air start system and output circuit breaker, on September 25, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Planned elevated risk for maintenance on train B components including the control room air conditioner and containment coolers on July 29, 2020
(2) Planned elevated risk for maintenance on train A essential service water and emergency diesel generator on August 3, 2020
(3) Unplanned elevated risk for maintenance on the alternate emergency power supply system on August 7, 2020.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Nuclear instrument surveillance testing results, Condition Report 202003415, on July 22, 2020
(2) Essential service water pump room supply fan damper failure to close, Condition Report 202003794, on August 6, 2020
(3) Control room emergency ventilation system opening, Condition Report 202003819, on August 25, 2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Emergency exhaust system train A following planned maintenance on July 6, 2020
(2) Control room air conditioning system train B following planned maintenance on July 22, 2020
(3) Containment spray system train B following planned maintenance on July 27, 2020
(4) Emergency diesel generator train A following planned maintenance on August 4, 2020
(5) Motor-driven auxiliary feedwater train B following planned maintenance on August 11, 2020
(6) Turbine-driven auxiliary feedwater pump following planned maintenance on August 25, 2020

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)

(1) The inspectors evaluated refueling outage RF24 activities from September 27-30, 2020 (Partial).

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Control room emergency ventilation system air filtration unit B on August 10, 2020
(2) Emergency exhaust system - fuel building ventilation isolation test on August 17, 2020
(3) Ultimate heat sink train B cooling tower fan performance testing on August 19, 2020

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Essential service water train B inservice test, including flow balance, on August 25, 2020

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the maintenance and testing of the alert and notification system between April 1, 2018, and June 30, 2020.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Preparedness Organization between April 1, 2018, and June 30, 2020.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
  • Radiological Emergency Response Plan (RERP), Revision 52; issued on April 30, 2020

This evaluation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program between April 1, 2018, and June 30, 2020.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated the emergency response organization team 5 training drill on September 10, 2020.

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the emergency response organization team 4 training drill on September 15,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

(1) April 1, 2019, through March 31, 2020

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1) April 1, 2019, through March 31, 2020

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) April 1, 2019, through March 31, 2020

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) (1 Sample)

(1) July 1, 2019, through June 30, 2020

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)

(1) July 1, 2019, through June 30, 2020

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

(1) July 1, 2019, through June 30, 2020

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Extent of condition inspection results for safety-related ventilation fan systems from Condition Report 202001783 on July 20, 2020

71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)

(1) The inspectors evaluated a security diesel generator issue, Condition Report 20200494, and licensees response on September 29, 2020.

Personnel Performance (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the reactor trip caused by a main generator breaker trip and licensees performance on September 27,

INSPECTION RESULTS

Failure to Implement Emergency Diesel Generator Surveillance Procedures Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems

Green NCV 05000483/2020003-01 Open/Closed

[H.12] - Avoid Complacency 71111.04 The inspectors reviewed a self-revealed Green, non-cited violation of Technical Specification 5.4.1.a, Procedures, for the licensees failure to implement Procedure OSP-NE-0001B, Standby Diesel Generator B Periodic Tests. Specifically, the operator did not comply with the caution statement to raise generator load greater than 109 KW within three seconds to prevent actuating the reverse power relay and tripping the emergency diesel generator output breaker. This resulted in emergency diesel generator B being inoperable for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> while the licensee ruled out other causes through troubleshooting.

Description:

On June 24, 2020, operations personnel were performing a startup of emergency diesel generator (EDG) B in accordance with Procedure OSP-NE-0001B, Standby Diesel Generator B Periodic Tests, Revision 67. After closing EDG B output circuit breaker NB0211, step 6.3.17 directed the operator to transfer load to the EDG greater than 0.2 MW. A caution statement prior to step 6.3.17 directed the operator to raise generator load greater than 109 KW within three seconds to prevent the EDG B reverse power relay from tripping the generator output breaker.

After closing the generator output breaker, the control room operator performed step 6.3.17 to raise EDG B loading. The first load adjustment failed to provide sufficient load requiring the operator to perform a second adjustment. During the second load adjustment, the generator output breaker tripped open on reverse power. The licensee declared EDG B inoperable and placed the EDG B hand switch in pull-to-lock.

Following the circuit breaker trip, the licensee conducted interviews and performed troubleshooting including a system walk-down of the diesel generator to identify the cause of the trip. The licensee determined the most probable cause of the trip was a legacy procedure issue regarding initial EDG loading given meter accuracy. The minimum required loading in the procedure, combined with the accuracy of the meter, places the generator loading near the 109 KW with little margin between the generator output and reverse power relay setpoints. To restore the EDG to operable, the licensee issued a night order to increase the initial loading of the EDG and re-performed the surveillance test successfully. The EDG was returned to operable 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after the initial trip.

The licensee benchmarked other utilities and determined initial EDG loading of 0.7 to 1.0 MW are commonly used values at other nuclear stations. The inspectors determined this initial loading range was appreciably higher than Callaways original value. Although the low margin to a reverse power trip existed in the surveillance procedure and contributed to the trip, the inspectors did not find the procedure guidance to be the primary cause of the output breaker trip.

The inspectors assessment found that the most likely cause of the EDG output breaker trip was a human performance error where the operator failed to properly implement the EDG startup procedure contained in Procedure OSP-NE-0001B in a timely manner. The inspectors noted that the EDG start up procedure has been used successfully without challenging the reverse power trip setpoint on initial loading for over 10 years. Additionally, the operator performing the EDG startup was standing a proficiency watch and not a normal member of the on-shift crew. As a result, the operator challenged the setpoints for the reverse power trip by performing two small load adjustments after closing the generator output breaker rather than a single timely load increase large enough to clear the reverse power setpoint. Further, the inspectors determined that, although the licensee discussed the lack of proficiency during the EDG surveillance pre-job brief, the human performance and error reduction tools of peer checker and switch flagging were not adequate to prevent the event.

Corrective Actions: The licensee declared EDG B inoperable, performed troubleshooting to identify the cause of the output breaker trip, interviewed the operating crew, issued a night order to increase the initial EDG loading requirements, completed the EDG B surveillance test successfully, and generated a condition report.

Corrective Action References: Condition Report 202003091

Performance Assessment:

Performance Deficiency: The failure of licensed operators to adequately load the emergency diesel generator upon initial startup is a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Human Performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in the EDG being declared inoperable for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> including being placed in pull-to-lock while troubleshooting was performed to identify the cause of the breaker tripping.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The finding was determined to be of very low safety significance (Green) because it

(1) was not a design deficiency,
(2) did not represent a loss of system and/or function,
(3) did not represent an actual loss of function of at least a single train for longer than its technical specification allowed outage time,
(4) did not represent a loss of the probabilistic risk assessment (PRA)function of two separate technical specification systems for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
(5) did not represent a loss of a PRA system and/or function for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and
(6) did not result in the loss of a high safety-significant, nontechnical specification train.

Cross-Cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Individuals implement appropriate error reduction tools. The finding had a human performance cross-cutting aspect associated with avoiding complacency, in that the watch team did not implement appropriate error reductions tools (H.12). Specifically, while it was acknowledged at the pre-job brief that the operator performing the startup was not a normal member of the watch team and was standing a proficiency watch, additional error reduction measures were not used. As a result, the operators initial loading caused the EDG output breaker to trip on the reverse power relay.

Enforcement:

Violation: Technical Specification 5.4.1.a, Procedures, states in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978.

Regulatory Guide 1.33, Revision 2, Appendix A, Section 3.s, requires procedures for startup, operation, and shutdown of safety-related pressurized water reactor systems, including emergency power sources such as diesel generators. The licensee established Procedure OSP-NE-0001B, in part, to meet this requirement. Procedure OSP-NE-0001B requires operators to raise EDG loading above 109 KW within three seconds of closing the EDG output breaker to prevent a reverse power trip.

Contrary to the above, on June 24, 2020, the licensee failed to implement required procedures for startup, operation, and shutdown of safety-related PWR systems for emergency power sources such as diesel generators. Specifically, the licensee failed to raise EDG loading above 109 KW within three seconds of closing the EDG output breaker. As a result, EDG B loading was inadequate and EDG output breaker tripped on reverse power.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 4, 2020, the inspectors presented the emergency preparedness program inspection results to Mr. B. Cox, Site Vice President, and other members of the licensee staff.
  • On September 24, 2020, the inspectors presented the annual operator requalification results to Mr. P. Swan, Operations Supervisor, and other members of the licensee staff.
  • On October 7, 2020, the inspectors presented the integrated inspection results to Mr. B. Cox, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

Condition Reports 201706767, 201701110, 201806495, 201901917,

2002834

Miscellaneous

27

Control Building and Communications Corridor Floor Plan @

Elevation 2073'6" and Roof Plan @ Elevation 2087'2"

FSAR SP S 2.4

Hydrologic Engineering

OL-13

M-07LF02

Plumbing and Drainage System

RFR 170332

Approve a Flat Diesel Building Roof Drain Cover

RMT-1.PMB

Repetitive Maintenance Tasks

Procedures

PMDI0825412

Clean Debris from Auxiliary Building Roof Drains

PMID0825413

Clean Debris from D/G Roof Drains

PMID25415

Clean Debris from RQ Roof Drains

PMID25416

Clean Debris from FB Roof Drains

71111.04

Corrective Action

Documents

Condition Reports 199902065, 200001964, 20408637, 200602565,

200608195, 200908596, 201008319, 2012002567,

201208276, 2013003338, 201406950, 201502012,

201806495

Miscellaneous

M-22EG02

Piping and Instrumentation Diagram - Component Cooling

Water System

M-763-00831

Full Length Rod Control System

MP 07-0010

Modify MCB Switches for ECHV0011, ECHV0012,

EGHV0101 and EGHV0102

0.1

Relay.BID

Protective Relays

RFR 019265A

Valves Locked/Surveilled per TS 4.7.4.A

A

RFR 4794

Diesel Generator Breakers NB0111 and NB0211

A

Procedures

CTP-EG-06080

Component Cooling Water System Chemical Addition

MSE-NB-QY003

Operational Test Sequence of 4.16 kV Diesel Generator

NE02 Air Circuit Breaker 152NB021

OSP-EG-0001A

Component Cooling Water Train A Valve Alignment

Surveillance

OSP-EG-0001B

Component Cooling Water Train B Valve Alignment

Surveillance

OSP-SF-00001

Shutdown Margin Calculations

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

OSP-SF-00002

Control Rod Partial Movement

OTO-SF-00001

Control Rod Malfunctions

71111.05

Corrective Action

Documents

Condition Reports 201707147, 201804247, 20190305, 201904398, 202003512

Miscellaneous

Fire Pre-Plan

NFPA 805

Performance-Based Standard for Fire Protection for Light

Water Reactor Electric Generating Plants

2001

Procedures

APA-ZZ-00700

Fire Protection Program

APA-ZZ-00701

Control of Fire Permits

APA-ZZ-00750

Hazard Barrier Program

FPP-ZZ-00009

Fire Protection Training Program

71111.06

Corrective Action

Documents

Condition Reports 202003131, 202003220

Work Orders

19510909, 19509056

71111.11Q Corrective Action

Documents

Condition Reports 202003932

Miscellaneous

T61.08108

Simulator Scenario

2/04/2020

Procedures

OSP-AL-P0002

Turbine-Driven Auxiliary Feedwater Pump Inservice Test

OSP-AL-P001B

Motor-Driven Auxiliary Feedwater Pump Inservice Test

ODP-ZZ-00001

Operations Department - Code of Conduct

107

Work Orders

19003560, 18502371

71111.12

Corrective Action

Documents

Condition Reports 200308233, 201506272, 201703831, 201905886,

2002091, 202004225, 202004331

Miscellaneous

NN-03

System Voltage Drop

RFR 20117

Offsite Source Verification

B

RFR 6844

Diesel Generator Technical Specification Interpretation

A

ULDBD-NE/KJ-

001

Emergency Diesel Generators

Procedures

OSP-NE-00001B

Standby Diesel Generator B Periodic Tests

OSP-NE-00003

Technical Specification Actions - A.C. Sources

EDP-ZZ-01128

Maintenance Rule Program

EDP-ZZ-01128,

Appendix 4

Maintenance Rule System Functions

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

OTG-ZZ-00005

Plant Shutdown 20% Power to Hot Standby

OSP-AL-V001A

Train A Auxiliary Feedwater Valve Inservice Test

71111.13

Corrective Action

Documents

Condition Reports 202002470, 202002696, 202003483, 202003375

Miscellaneous

NUMARC 93-01

Industry Guideline for Monitoring the Effectiveness of

Maintenance at Nuclear Power Plants

4A

TSB 3.8.1

AC Sources - Operating

Procedures

APA-ZZ-00312

Probabilistic Risk Assessment

APA-ZZ-00312,

Appendix F

Online Work Integrated Risk Management

EDP-GK-0113

Heat Exchanger Predictive Performance Manual

PRA-ZZ-00001

PRA Model Updates and Maintenance

71111.15

Corrective Action

Documents

Condition Reports 202001602, 202003794

Condition Reports 201701745, 201804482, 202003819

Drawings

M-U2GD-1 (Q)

Piping and Instrumentation Diagram Essential Service Water

Pumphouse & Ultimate Heat Sink Elec. Rm. HVAC

Procedures

APA-ZZ-00013

Conduct of Maintenance

PDP-ZZ-00017

Fix-it-Now Team Process 12/3/2019

Work Orders

16005679.900

71111.19

Corrective Action

Documents

Condition Reports 202003334, 202003518, 202003531

Condition Reports 201400345, 201407748, 201408914, 201701135,

201805449, 201905399, 202000047, 202004285

Miscellaneous

A210.0083

Valve Retest Manual

Job 19003907

MR633276

Material Request - Charcoal

RFR 18621

IST TDAFP Speed Reference Acceptance Range

B

Procedures

APA-ZZ-00356

Pump and Valve Inservice Test Program

OSP-AL-P0002

Turbine Driven Auxiliary Feedwater Pump Inservice Test -

Group B

OSP-EN-P001B

Train B Containment Spray Pump Inservice Test

OTN-GK-00001

Control Building HVAC System

Work Orders

19004892; 12502273; 20000658

71111.20

Corrective Action

Condition Reports 202004895

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Procedures

E-0

Reactor Trip or Safety Injection

ES-0.1

Reactor Trip Response

OTG-ZZ-00005

Plant Shutdown 20% Power to Hot Standby

71111.22

Procedures

OSP-GG-00004

Emergency Exhaust System FBVIS Test

71114.02

Corrective Action

Documents

Condition Reports 201803901, 201805003, 201806927, 201806954,

201905853, 201907255, 202001673, 202001710,

2001773, 202002446, 202002656

Miscellaneous

Letter from FEMA Region VII, Approved January 2020 ANS

Design Report

03/23/2020

Siren Service Letter - Movement of Siren 53 and

replacement of pole for Siren 51

05/27/2020

K260.0010

Callaway Plant Alert and Notification System Design Report

January

20

Procedures

Vendor Document - Callaway Semi-Annual Preventative

Maintenance & Repair Checklist (for Sirens)

2/2019

KSP-ZZ-00008

Tone Alert Radios

KSP-ZZ-00110

Siren Alerting System Testing

KSP-ZZ-00602

Verification of Emergency Instruction Postings

71114.03

Corrective Action

Documents

Condition Reports 201802480, 201803508, 201805536, 201805537,

201901089, 201907623, 202000729, 202003776

Miscellaneous

SNUPPS RERP (Revision 5A), Section 8.2

2/1983

Licensing Impact Review (including RERP Evaluation Form)

for RERP, Revision 11

01/22/1988

Surveillance

18507225

Augmentation Drill Report (touch the wall drill starting at

23 on 10/19/2018)

10/22/2018

Surveillance

19502304

Augmentation Drill Report (call-in drill starting at 0842 on

06/08/2019)

06/10/2019

Surveillance

20502588

Augmentation Drill Report (call-in drill starting at 0954 on

05/08/2020)

05/11/2020

ULNRC-1732

Callaway Plant Radiological Emergency Response Plan,

Revision 11

2/26/1988

Procedures

EIP-ZZ-00200

Augmentation of the Emergency Response Organization

KOA-ZZ-00200

Activation of the Callaway Plant Emergency Callout System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

KSP-ZZ-00201

Emergency Augmentation Drill/Test

71114.04

Corrective Action

Documents

Resulting from

Inspection

Condition Reports 202003573

Miscellaneous

Radiological Emergency Response Plan (RERP)

EP Tracking No.

2018011

50.54(q) Screen - EIP-ZZ-00101 Add2, Revision 14

03/19/2018

EP Tracking No.

2018055

50.54(q) Evaluation - EIP-ZZ-01211, Accident Dose

Assessment, Revision 38; URI Version 3.4 upgrade changes

2/26/2019

EP Tracking No.

20003

50.54(q) Screen - EIP-ZZ-A00001, ERO, Revision 21;

addition of POL0049 to Off-Normal Hours Definition

03/12/2020

EP Tracking No.

20006

50.54(q) Effectiveness Evaluation: CR 202001773,

Relocation of Emergency Siren 053 & Radiological

Emergency Response Plan (RERP), Revision 52

04/13/2020

EP Tracking No.

20009

50.54(q) Evaluation - Response time impact for JIC ERO

members (CR 202002249)

05/04/2020

Procedures

KDP-ZZ-00400

RERP Impact Evaluations and Changes

71114.05

Corrective Action

Documents

Condition Reports 201802127, 201802748, 201803020, 201803725,

201803901, 201803903, 201803905, 201804072,

201804685, 201805481, 201904169, 201904375,

201905453, 201906349, 201906484, 201906661,

201906688, 201906718, 201906844, 201906852,

201906984, 201907878, 202000040, 202000869,

2002057, 202003581, 202003582

Miscellaneous

Callaway Energy Center Muster Meeting Drill Report Third

Quarter 2018

07/30/2018

Contaminated Victim Drill Report

10/21/2019

Callaway Energy Center Annual ERO Drill (AED) Report

11/12/2019

AP18007

Nuclear Oversight Audit of Emergency Preparedness

09/06/2018

AP20007

Emergency Preparedness Audit (Plan)

06/17/2020

Job 17504120

2018 Population Update Analysis

04/10/2018

Job 17506751-

500

Mini Scenario # 6 - Field Monitoring Team Report

05/24/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Job 17507545

2018 Letter of Agreement Information Surveillance:

ST-12071

09/10/2018

Job 18503865

2019 Population Update Analysis

03/25/2019

Job 18506769

Mini Scenario #8 Field Monitoring Team Drill Report

07/09/2019

Job 18509626

Mini-Scenario Team Drill 6/6/19 Health Physics Drill Report

06/10/2019

Job 18510002

2019 Letter of Agreement Information Surveillance:

ST-12071

07/16/2019

Job 19503524

2019 Population Update Analysis (Part 2)

05/22/2019

Job 19507106

20 Population Update Analysis

05/26/2020

Job 19511162

20 Health Physics Drill Report

06/23/2020

NES2019002

Notice of Closure Criteria to Escalation Letter OQC2019002

(GTRE0032)

08/15/2019

OQC20180010

Escalation of Emergency Action Level Classification

Weaknesses

08/23/2018

OQC2019002

Escalation of lack of a comprehensive plan to restore

GTREOO32 to full compliance

03/27/2019

OQC2019005

NOS Closure of Escalation on Emergency Action Level

Classification Weaknesses

04/01/2019

RERP, Appendix

G

Evacuation Time Estimates (ETE) for the Callaway Nuclear

Plant Emergency Planning Zone

(June

2012)

SP19006

2-Month Regulatory Required Review of the Emergency

Preparedness Program in accordance with

CFR 50.54(t)(1)(ii)

06/25/2019

Procedures

EIP-ZZ-00212

Protective Action Recommendations

EIP-ZZ-A0020

Maintaining Emergency Preparedness

Self-Assessments 201900029-044

Exercise Readiness and Modified Program Inspection

03/26/2019

Work Orders

Job 18003592

TSC Filter Absorber Unit Issue, TSC Non-Functional - Adjust

Air Dampers

09/13/2018

Job 19005574

Investigate ABRE0114 Lost Communication with RM-11 and

RM-23

2/15/2019

71114.06

Corrective Action

Documents

Condition Reports

Miscellaneous

Drill Guide - ERO Team - 9/10/20

Drill Guide - ERO Team - 9/15/20

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71151

Miscellaneous

Drill and Exercise Performance (DEP) PI Records (Annual

ERO Drill Crew 3/Team 2, Crew 5/Controller Team, 19-05

LORT Crew 1), and related ERO Participation PI Records

4Q/2019

Drill and Exercise Performance (DEP) PI Records (ERO

Training Drill Team 5, Proficiency DEP 20-1 Crew 6), and

related ERO PI Participation Records

1Q/2020

Drill and Exercise Performance (DEP) PI Records

(Proficiency DEP 20-3 Crew 1 & Crew 5), and related ERO

PI Participation Records

2Q/2020

Performance Indicator Basis Document

Various

Alert & Notification System (ANS) PI - Weekly and Siren

Tests Results

3Q/2019,

4Q/2019,

1Q/2020, &

2Q/2020

Drill and Exercise Performance (DEP) PI Records (19-04

LORT, 2019 WANO drill), and related ERO PI Participation

Records

3Q/2019

Procedures

KDP-ZZ-02000

NRC Performance Indicator (PI) Data Collection

& 19

71152

Corrective Action

Documents

Condition Reports 202002097; 202003313; 202003346; 202003421;

2003567; 202003819; 202004179; 202004225;

2004243; 202004448; 202004496; 202004495