ML093370275: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 November 24, 2009                                                               10 CFR 50.4(b)(6) 10 CFR 50.34(b) 10 CFR 2.390(d)(1)
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 November 24, 2009 10 CFR 50.4(b)(6) 10 CFR 50.34(b) 10 CFR 2.390(d)(1)
.U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Docket No. 50-391
.U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Docket No. 50-391


==Subject:==
==Subject:==
WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 95
WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 95
: 1. TVA letter to the NRC dated August 27, 2009, "Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report Amendment 94"


==References:==
==References:==
: 1. TVA letter to the NRC dated August 27, 2009, "Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report Amendment 94"
: 2. NRC letter to TVA dated August 14, 2009, "Watts Bar Nuclear Plant Unit 2 -
: 2. NRC letter to TVA dated August 14, 2009, "Watts Bar Nuclear Plant Unit 2 -
Confirmation of Schedule for Submission of Information to Support Operating License Application Review" This letter transmits WBN Unit 2 FSAR Amendment 95 (A95), which reflects changes made since the issuance of Amendment 94 on August 27, 2009 (Reference 1). This Unit 2 amendment incorporates changes resulting from TVA's ongoing design/reverification effort in support of completing the WBN Unit 2 design basis. This letter also responds to NRC's letter dated August 14, 2009 (Reference 2), requesting TVA to verify the schedule for providing information amending the FSAR. Specifically, NRC requested TVA to verify the schedule dates for submitting amendments on specific Safety Evaluation Report (SER) sections listed in the enclosure to NRC's August 14 letter. Enclosure 1 contains TVA's updated schedule dates for submitting amendments for the FSAR sections listed in NRC's letter. SER Section 12.7.1, "Plant Shielding," that corresponds to FSAR Section 12.3 was scheduled to be incorporated into this amendment but was not completed due to outstanding calculation issues. This section has been rescheduled to January 2010. FSAR Section 12.3 was the only section listed in the NRC August 14 letter that was scheduled to be submitted with FSAR A95 that TVA did not complete the design/verification review.
Confirmation of Schedule for Submission of Information to Support Operating License Application Review" This letter transmits WBN Unit 2 FSAR Amendment 95 (A95), which reflects changes made since the issuance of Amendment 94 on August 27, 2009 (Reference 1). This Unit 2 amendment incorporates changes resulting from TVA's ongoing design/reverification effort in support of completing the WBN Unit 2 design basis. This letter also responds to NRC's {{letter dated|date=August 14, 2009|text=letter dated August 14, 2009}} (Reference 2), requesting TVA to verify the schedule for providing information amending the FSAR. Specifically, NRC requested TVA to verify the schedule dates for submitting amendments on specific Safety Evaluation Report (SER) sections listed in the enclosure to NRC's August 14 letter. Enclosure 1 contains TVA's updated schedule dates for submitting amendments for the FSAR sections listed in NRC's letter. SER Section 12.7.1, "Plant Shielding," that corresponds to FSAR Section 12.3 was scheduled to be incorporated into this amendment but was not completed due to outstanding calculation issues. This section has been rescheduled to January 2010. FSAR Section 12.3 was the only section listed in the NRC August 14 letter that was scheduled to be submitted with FSAR A95 that TVA did not complete the design/verification review. contains a "Summary Listing" of the location and corresponding Unit 2 FSAR change package numbers associated with the A95 changes. This is a listing of FSAR sections in which TVA has completed its design/reverification review and determined that design-related activities are complete, the verbiage is consistent with the Unit 1 Updated FSAR (UFSAR), as appropriate, and the section is ready for NRC review.
Enclosure 2 contains a "Summary Listing" of the location and corresponding Unit 2 FSAR change package numbers associated with the A95 changes. This is a listing of FSAR sections in which TVA has completed its design/reverification review and determined that design-related activities are complete, the verbiage is consistent with the Unit 1 Updated FSAR (UFSAR), as appropriate, and the section is ready for NRC review.                                     AD573 Printed on recycled paper
AD573 Printed on recycled paper


U.S. Nuclear Regulatory Commission Page 2 November 24,2009 FSAR A95 is contained on the enclosed Optical Storage Media (OSM #1) (Attachment 1).
U.S. Nuclear Regulatory Commission Page 2 November 24,2009 FSAR A95 is contained on the enclosed Optical Storage Media (OSM #1) (Attachment 1).
The FSAR contains security-related information identified by the designation "Security-Related Information - Withhold Under 10CFR2.390. TVA hereby requests this information be withheld from public disclosure in accordance with the provisions of 10CFR2.390. A redacted version of the FSAR is contained on OSM #2 (Attachment 2), which is suitable for public disclosure. contains a listing of the FSAR pages that have been redacted. Enclosure 4 lists the files and file sizes on the security-related OSM (OSM #1), and Enclosure 5 lists the files and file sizes on the publicly available 'OSM (OSM #2).
The FSAR contains security-related information identified by the designation "Security-Related Information - Withhold Under 10CFR2.390.
TVA hereby requests this information be withheld from public disclosure in accordance with the provisions of 10CFR2.390. A redacted version of the FSAR is contained on OSM #2 (Attachment 2), which is suitable for public disclosure. contains a listing of the FSAR pages that have been redacted. Enclosure 4 lists the files and file sizes on the security-related OSM (OSM #1), and Enclosure 5 lists the files and file sizes on the publicly available 'OSM (OSM #2).
Additionally, at the request of NRC/NRR, TVA is planning to expedite submittal of FSAR A96 that provides the rest of Section 7.0 on or about December 15, 2009. WBN is currently developing Unit 1 UFSAR Amendment 8.. TVA plans to incorporate any impacts from this UFSAR Amendment into Unit 2 A97, scheduled for January 2010.
Additionally, at the request of NRC/NRR, TVA is planning to expedite submittal of FSAR A96 that provides the rest of Section 7.0 on or about December 15, 2009. WBN is currently developing Unit 1 UFSAR Amendment 8.. TVA plans to incorporate any impacts from this UFSAR Amendment into Unit 2 A97, scheduled for January 2010.
This letter does not close any "Generic Communications" or contain any new commitments. If you have any questions, please contact me at (423) 365-2351.
This letter does not close any "Generic Communications" or contain any new commitments. If you have any questions, please contact me at (423) 365-2351.
I declare under the penalty of perjury that the foregoing is true and correct. Executed on November 24, 2009.
I declare under the penalty of perjury that the foregoing is true and correct. Executed on November 24, 2009.
Sincerely, Masoud Ba;J_ tani Watts Bar       it 2 Vice President
Sincerely, Masoud Ba;J_
tani Watts Bar it 2 Vice President


==Enclosures:==
==Enclosures:==
Line 47: Line 49:
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381


ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER                 SER Title             FSAR             FSAR Title       Schedulec Section                                     Section                             Submittal I_                                                                         Date 1.50     Summary Of Principal Review
ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title Schedulec Section Section Submittal I_
* Matters 1.9.0         License Conditions 2.4.6         Ultimate Heat Sink           9.2.5       Ultimate Heat Sink       A95 Nov 2009 3.0.0       Design Of Struct, Comp,         3.0.0     Design Of Struct, Comp,     Title Equip, & Sys                             Equip, & Sys         Section Only 3.1.0             Introduction             3.1.1           Introduction         A94 Aug 2009 3.1.1     Conformance W/Gen Design           3.1     Conformance w/NRC Gen         A94 Criteria                             Design Criteria     Aug 2009 3.1.2   Conformance W/Indust Codes &       3.2.3     Code Cases And Code         A95 Std                           Editions And Addenda     Nov 2009 3.2.0     Class Of Struct, Sys, & Comp       3.2   Class Of Struct, Sys, & Comp   A95 Nov 2009 3.2.1       Seismic Classifications       3.2.1     Seismic Classifications     A95 Nov 2009 3.2.2 Sys Quality Group Classifications   3.2.2       Sys Quality Group         A95 Classifications     Nov 2009 3.5.0           Missile Protection           3.5         Missile Protection       A95 Nov 2009 3.5.1   Missile Selection & Description 3.5.2         Struct, Sys, Comp To Be Protected 3.5.3       Barrier Design Structures 3.6.0       Protect Against Effects         3.6   Protection Against Dynamic     A95 Pipe Rupture                     Effects Associated With The Nov 2009 3.6.1     Plant Design Protect From               Postulated Rupture Of Piping Pipe Fail 3.6.2       Determine Brk Location Pipe Ruptures 3.6.3   Leak Before Break Eval Proced 3.10.0       Seismic & Dynamic Qual         3.10   Seismic Design Of Category I   A95 Of Equip                           Instrumentation And     Nov 2009 Electrical Equipment 4.0.0                 Reactor               4.0               Reactor           Title Section Only 4.1.0             Introduction             4.1       Summary Description         A95 Nov 2009 4.2.0         Fuel System Design           4.2         Mechanical Design         A95 Nov 2009 4.2.1               Description 4.2.2       Thermal Performance 4.2.3       Mechanical Performance
Date 1.50 Summary Of Principal Review Matters 1.9.0 License Conditions 2.4.6 Ultimate Heat Sink 9.2.5 Ultimate Heat Sink A95 Nov 2009 3.0.0 Design Of Struct, Comp, 3.0.0 Design Of Struct, Comp, Title Equip, & Sys Equip, & Sys Section Only 3.1.0 Introduction 3.1.1 Introduction A94 Aug 2009 3.1.1 Conformance W/Gen Design 3.1 Conformance w/NRC Gen A94 Criteria Design Criteria Aug 2009 3.1.2 Conformance W/Indust Codes &
3.2.3 Code Cases And Code A95 Std Editions And Addenda Nov 2009 3.2.0 Class Of Struct, Sys, & Comp 3.2 Class Of Struct, Sys, & Comp A95 Nov 2009 3.2.1 Seismic Classifications 3.2.1 Seismic Classifications A95 Nov 2009 3.2.2 Sys Quality Group Classifications 3.2.2 Sys Quality Group A95 Classifications Nov 2009 3.5.0 Missile Protection 3.5 Missile Protection A95 Nov 2009 3.5.1 Missile Selection & Description 3.5.2 Struct, Sys, Comp To Be Protected 3.5.3 Barrier Design Structures 3.6.0 Protect Against Effects 3.6 Protection Against Dynamic A95 Pipe Rupture Effects Associated With The Nov 2009 3.6.1 Plant Design Protect From Postulated Rupture Of Piping Pipe Fail 3.6.2 Determine Brk Location Pipe Ruptures 3.6.3 Leak Before Break Eval Proced 3.10.0 Seismic & Dynamic Qual 3.10 Seismic Design Of Category I A95 Of Equip Instrumentation And Nov 2009 Electrical Equipment 4.0.0 Reactor 4.0 Reactor Title Section Only 4.1.0 Introduction 4.1 Summary Description A95 Nov 2009 4.2.0 Fuel System Design 4.2 Mechanical Design A95 Nov 2009 4.2.1 Description 4.2.2 Thermal Performance 4.2.3 Mechanical Performance
 
ENCLOSURE 1 Schedule for Snecified Tonic Items and Corresnondina Sections of the FSAR TVA'S S TV.Ion chedule r.......
To ems and.
. r
*i Sections..........A.
SERI SER Title FSAR FSAR Title Schedule Section Section Submita I
I
.I I IDate 4.2.4 Surveillance 4.2.5 Fuel Design Considerations 4.3.0 Nuclear Design 4.3 Nuclear Design A95 Nov 2009 4.3.1 Design Basis 4.3.2 Design Description 4.3.3 Analytical Methods 4.3.4 Summary Of Evaluation Findings 4.4.0 Thermal Hydraulic Design 4.4 Thermal And Hydraulic A95 Design Nov 2009 4.4.1 Performance In Safety Criteria 4.4.1 Design Basis A95 Nov 2009 5.3.7 Thermal And Hydraulic A95 Characteristics Summary Nov 2009 Table 4.4.2 Design Basis 4.4.1 Design Basis A95 Nov 2009 4.4.3 Thermal Hydraulic Design Methodology 4.4.4 Operating Abnormalities 4.4.2 Thermal Hydraulic Design-A95 4.4.6 Thermal Hydraulic Comparison Description Nov 2009 4.4.7 N-1 Loop Operation 5.3.5 Load Following Characteristics A95 Nov 2009 4.4.9 Summary & Conclusion 4.4.3 Evaluation A95 Nov 2009 4.6.0 Functional Design Of 4.3.1 Nuclear Design -
A95 Reactivity Sys Design Bases Nov 2009 5.2.1 Compliance W/Codes & Code 3.2 Classification Of Structures, A95 Cases Systems, And Components Nov 2009 5.4.2 Steam Generators 5.5.2 Steam Generators A95 Nov 2009 5.5.4 Steam Outlet Flow Restrictor A94 (Steam Generator)
Aug 2009 5.4.4 Pressurizer Relief Tank 5.5.11 Pressurizer Relief Tank A95 Nov 2009 6.2.5 Combustible Gas 6.2.5 Combustible Gas Control A95 Control Systems In Containment Nov 2009 6.2.7 Fracture Prevention 3.1.2 WBNP Conformance A94 Containment with GDCs Aug 2009 6.3.0 Emergency Core Cooling 6.3 Emergency Core Cooling A95 System System Nov 2009
 
ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR f SERT1 SER Title FSAR FSAR Title Scheduled Section Section Submittal Date 6.3.1
 
===System Design===
6.3.2 Evaluation 6.3.3 Testing 6.3.4 Performance Evaluation 6.3.5 Conclusions 6.6.0 Inservice Inspect Of 6.6 Inservice Inspection Of ASME A95 Class 2 & 3 Comp Code Class 2 And 3 Nov 2009 Components Inspection Intervals 7.3.0 Engineered Safety 7.3 Engineered Safety Features A95 Features System Actuation System Nov 2009 7.3.1


ENCLOSURE 1 TVA'S Schedule for Snecified Tonic Items and Corresnondina Sections of the FSAR S TV.Ionchedule        r ....... To    ems and.      . r .... *i Sections..........A.
===System Description===
SERI      --          SER Title            FSAR                FSAR Title          Schedule Section                                    Section                                  Submita I          I        .I                                I IDate 4.2.4              Surveillance 4.2.5     Fuel Design Considerations 4.3.0            Nuclear Design            4.3            Nuclear Design            A95 Nov 2009 4.3.1              Design Basis 4.3.2           Design Description 4.3.3          Analytical Methods 4.3.4  Summary Of Evaluation Findings
5.5.5 Main Steam Line A94 Isolation System Aug 2009 5.6 Reactor Vessel Head A95 Vent System Nov 2009 7.3.2 Containment Sump Level 5.6 Reactor Vessel Head A95 Measurement Vent System Nov 2009 6.3 Emergency Core A95 Cooling System Nov 2009 7.3.3 Aux Feedwater Initiation 7.3 Engineered Safety Features A95
* 4.4.0      Thermal Hydraulic Design        4.4        Thermal And Hydraulic          A95 Design            Nov 2009 4.4.1    Performance In Safety Criteria    4.4.1            Design Basis              A95 Nov 2009 5.3.7       Thermal And Hydraulic          A95 Characteristics Summary      Nov 2009 Table 4.4.2              Design Basis            4.4.1            Design Basis              A95 Nov 2009 4.4.3       Thermal Hydraulic Design Methodology 4.4.4        Operating Abnormalities        4.4.2    Thermal Hydraulic Design-        A95 4.4.6  Thermal Hydraulic Comparison                            Description          Nov 2009 4.4.7           N-1 Loop Operation          5.3.5   Load Following Characteristics    A95 Nov 2009 4.4.9        Summary & Conclusion          4.4.3               Evaluation              A95 Nov 2009 4.6.0          Functional Design Of        4.3.1          Nuclear Design -            A95 Reactivity Sys                            Design Bases          Nov 2009 5.2.1    Compliance W/Codes & Code          3.2      Classification Of Structures,    A95 Cases                          Systems, And Components        Nov 2009 5.4.2          Steam Generators            5.5.2          Steam Generators            A95 Nov 2009 5.5.4   Steam Outlet Flow Restrictor      A94 (Steam Generator)        Aug 2009 5.4.4        Pressurizer Relief Tank      5.5.11      Pressurizer Relief Tank        A95 Nov 2009 6.2.5            Combustible Gas            6.2.5      Combustible Gas Control        A95 Control Systems                            In Containment          Nov 2009 6.2.7          Fracture Prevention        3.1.2        WBNP Conformance              A94 Containment                                  with GDCs            Aug 2009 6.3.0        Emergency Core Cooling          6.3      Emergency Core Cooling          A95 System                                    System              Nov 2009
& Control Actuation System Nov 2009 7.3.4 Failure Modes & Effects Analysis 7.3.5 IE Bulletin 80-06 7.3.6 Conclusions 7.4.0 Systems Required For 7.4 Systems Required For A95 Safe Shutdown Safe Shutdown Nov 2009 7.4.1  


ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR f SERT1              SER Title            FSAR              FSAR Title          Scheduled Section                                  Section                                Submittal Date 6.3.1          System Design 6.3.2            Evaluation 6.3.3              Testing 6.3.4      Performance Evaluation 6.3.5            Conclusions 6.6.0        Inservice Inspect Of        6.6  Inservice Inspection Of ASME      A95 Class 2 & 3 Comp                      Code Class 2 And 3        Nov 2009 Components Inspection Intervals 7.3.0        Engineered Safety          7.3    Engineered Safety Features      A95 Features System                        Actuation System        Nov 2009 7.3.1        System Description         5.5.5          Main Steam Line          A94 Isolation System      Aug 2009 5.6      Reactor Vessel Head          A95 Vent System          Nov 2009 7.3.2    Containment Sump Level          5.6      Reactor Vessel Head          A95 Measurement                              Vent System          Nov 2009 6.3          Emergency Core            A95 Cooling System        Nov 2009 7.3.3      Aux Feedwater Initiation      7.3    Engineered Safety Features      A95
===System Description===
                    & Control                          Actuation System        Nov 2009 7.3.4      Failure Modes & Effects Analysis 7.3.5          IE Bulletin 80-06 7.3.6            Conclusions 7.4.0      Systems Required For          7.4      Systems Required For        A95 Safe Shutdown                            Safe Shutdown        Nov 2009 7.4.1        System Description 7.4.2       Safe Shutdown From Aux Control Room 7.4.3           Conclusions 7.7.3     Volume Control Tank LvI Control Sys 8.1.0             General               8.1   Electric Power - Introduction   A95 Nov 2009 8.2.1         Compliance With           3.1.2     WBNP Conformance             A94 GDC5                                   with GDCs           Aug 2009 8.1   Electric Power - Introduction   A95 Nov 2009 8.2.2         Compliance With           3.1.2     WBNP Conformance             A94 GDC 17                                 with GDCs           Aug 2009
7.4.2 Safe Shutdown From Aux Control Room 7.4.3 Conclusions 7.7.3 Volume Control Tank LvI Control Sys 8.1.0 General 8.1 Electric Power - Introduction A95 Nov 2009 8.2.1 Compliance With 3.1.2 WBNP Conformance A94 GDC5 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.2.2 Compliance With 3.1.2 WBNP Conformance A94 GDC 17 with GDCs Aug 2009


ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER                 SER Title           FSAR                 FSAR Title           Schedule Section                                 Section                                   Submittal
ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title Schedule Section Section Submittal I _
_    I_      I                                 I Date 8.1     Electric Power - Introduction     A95 Nov 2009 8.2.3         Compliance With           3.1.2       WBNP Conformance               A94 GDC 18                                   with GDCs           Aug 2009 8.1     Electric Power - Introduction     A95 Nov 2009 8.2.4         Evaluation Findings
I I
* 8.3.0       Onsite Power Systems           8.1     Electric Power - Introduction     A95 Nov 2009 8.3       Onsite (Standby) Power         A95 System             Nov 2009 8.3.1   Onsite AC Pwr Sys Compliance     3.1.2       WBNP Conformance               A94 w/GDC 17                                   with GDCs           Aug 2009 8.1     Electric Power - Introduction     A95 Nov 2009 8.3.2 Onsite DC Sys Compliance With     3.1.2       WBNP Conformance               A94 GDC 17                                   with GDCs           Aug 2009 8.1     Electric Power - Introduction     A95 Nov 2009 8.3.3         Evaluation Findings         8.3       Onsite (Standby) Power         A95 Systems             Nov 2009 8.4.0           Station Blackout           8.1     Electric Power - Introduction     A95 Nov 2009 9.1.1         New Fuel Storage           9.1.1         New Fuel Storage             A95 Nov 2009 9.1.2         Spent Fuel Storage         9.1.2         Spent Fuel Storage           A94 Aug 2009 9.2.0           Water Systems             9.2             Water Systems             A95 Nov 2009 9.2.1         ERCW & RCWS               9.2.1   Essential Raw Cooling Water       A95 Sys (ERCW)           Nov 2009 9.2.8         Raw Cooling Water           A95 Sys(RCWS)             Nov 2009 9.2.2   Component Cooling System         9.2.2     Component Cooling System         A95 Nov 2009 9.2.3   Demineralized Water Makeup       9.2.3   Demineralized Water Makeup       A95 System                                   System             Nov 2009 9.2.4         Potable & Sanitary         9.2.4     Potable And SanitaryWater       A94 Water Systems                                 Systems             Aug 2009 9.2.5         Ultimate Heat Sink         9.2.5         Ultimate Heat Sink         A95 I                               Nov 2009 9.2.6       Condensate Storage           9.2.6       Condensate Storage           A95 Facilities                                 Facilities         Nov 2009 9.3.3       Equip & Floor Drainage       9.3.3       Equip & Floor Drainage         A95 System                                   System             Nov 2009 9.4.4   Turbine Building Area Vent Sys   9.4.4   Turbine Building Area Vent Sys     A94 Aug 2009
Date 8.1 Electric Power - Introduction A95 Nov 2009 8.2.3 Compliance With 3.1.2 WBNP Conformance A94 GDC 18 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.2.4 Evaluation Findings 8.3.0 Onsite Power Systems 8.1 Electric Power - Introduction A95 Nov 2009 8.3 Onsite (Standby) Power A95 System Nov 2009 8.3.1 Onsite AC Pwr Sys Compliance 3.1.2 WBNP Conformance A94 w/GDC 17 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.3.2 Onsite DC Sys Compliance With 3.1.2 WBNP Conformance A94 GDC 17 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.3.3 Evaluation Findings 8.3 Onsite (Standby) Power A95 Systems Nov 2009 8.4.0 Station Blackout 8.1 Electric Power - Introduction A95 Nov 2009 9.1.1 New Fuel Storage 9.1.1 New Fuel Storage A95 Nov 2009 9.1.2 Spent Fuel Storage 9.1.2 Spent Fuel Storage A94 Aug 2009 9.2.0 Water Systems 9.2 Water Systems A95 Nov 2009 9.2.1 ERCW & RCWS 9.2.1 Essential Raw Cooling Water A95 Sys (ERCW)
Nov 2009 9.2.8 Raw Cooling Water A95 Sys(RCWS)
Nov 2009 9.2.2 Component Cooling System 9.2.2 Component Cooling System A95 Nov 2009 9.2.3 Demineralized Water Makeup 9.2.3 Demineralized Water Makeup A95 System System Nov 2009 9.2.4 Potable & Sanitary 9.2.4 Potable And SanitaryWater A94 Water Systems Systems Aug 2009 9.2.5 Ultimate Heat Sink 9.2.5 Ultimate Heat Sink A95 I
Nov 2009 9.2.6 Condensate Storage 9.2.6 Condensate Storage A95 Facilities Facilities Nov 2009 9.3.3 Equip & Floor Drainage 9.3.3 Equip & Floor Drainage A95 System System Nov 2009 9.4.4 Turbine Building Area Vent Sys 9.4.4 Turbine Building Area Vent Sys A94 Aug 2009


ENCLOSURE 1 Schedule for Snecified Tonic Items and Corresnondina Sections of the FSAR TVA'S
ENCLOSURE 1 Schedule for Snecified Tonic Items and Corresnondina Sections of the FSAR TVA'S f
    .....    ........... f r ....... To.. i r n and..... Co
r.......
                                                          . . .resn         Sections
To i r n and...
                                                                              ...  .. of
Co resn Sections of th SER SER Title FSAR FSAR Title Scheduled S iSection Submittal 1 _Date 9.5.2 Communications System 9.5.2 Plant Communications A95 System Nov 2009 9.5.3 Lighting Systems 9.5.3 Lighting Systems A94 Aug 2009 9.5.4 Emerg Diesel Gen Fuel Oil 9.5.4 Diesel Gen Fuel Oil Storage A95 Storage And Transfer Sys Nov 2009 9.5.5 Emerg Diesel Gen Cooling 9.5.5 Diesel Gen Cooling Water Sy,,
                                                                                      . th SER                       SER Title             FSAR               FSAR Title           Scheduled S iSection                                   Submittal
A95 Water Sys Nov 2009 9.5.6 Emerg Diesel Gen 9.5.6 Diesel Gen Starting Sys A95 Starting Sys Nov 2009 9.5.8 Emerg Diesel Gen Intake &
_        __                                  1 _Date 9.5.2         Communications System             9.5.2       Plant Communications           A95 System               Nov 2009 9.5.3               Lighting Systems           9.5.3           Lighting Systems           A94 Aug 2009 9.5.4       Emerg Diesel Gen Fuel Oil           9.5.4     Diesel Gen Fuel Oil Storage       A95 Storage                               And Transfer Sys         Nov 2009 9.5.5       Emerg Diesel Gen Cooling           9.5.5   Diesel Gen Cooling Water Sy,, A95 Water Sys                                                         Nov 2009 9.5.6               Emerg Diesel Gen             9.5.6       Diesel Gen Starting Sys       A95 Starting Sys                                                       Nov 2009 9.5.8       Emerg Diesel Gen Intake &           9.5.8     Diesel Gen Combustion Air       A94 Exhaust Sys                           Intake And Exhaust Sys     Aug 2009 10.1.0           Summary Description             10.1         Summary Description           A95 Nov 2009 10.2.0               Turbine Generator           10.2           Turbine Generator           A95 Nov 2009 10.2.1       Turbine Generator Design 10.2.2           Turbine Disc Integrity 10.3.0       Main Steam Supply System             10.3       Main Steam Supply System         A95 10.3.1   Main Steam Supply Sys Include                                                     Nov 2009 Valves 10.3.2           Main Steam Supply Sys 10.3.3             Steam & Feedwater Sys Materials 10.3.4       Secondary Water Chamistry 10.4.1                 Main Condenser           10.4.1           Main Condenser             A95 Nov 2009 10.4.2   Main Condenser Evacuation Sys         10.4.2     Main Condenser Evacuation         A95 System             Nov 2009 10.4.4         Turbine Bypass System           10.4.4       Turbine Bypass System           A95 Nov 2009 11.0.0   Radioactive Waste Management           11.1               Source Term             A95 Nov 2009 11.6           Offsite Radiological         A95 Monitoring Program         Nov 2009 11.1             Summary Description
9.5.8 Diesel Gen Combustion Air A94 Exhaust Sys Intake And Exhaust Sys Aug 2009 10.1.0 Summary Description 10.1 Summary Description A95 Nov 2009 10.2.0 Turbine Generator 10.2 Turbine Generator A95 Nov 2009 10.2.1 Turbine Generator Design 10.2.2 Turbine Disc Integrity 10.3.0 Main Steam Supply System 10.3 Main Steam Supply System A95 10.3.1 Main Steam Supply Sys Include Nov 2009 Valves 10.3.2 Main Steam Supply Sys 10.3.3 Steam & Feedwater Sys Materials 10.3.4 Secondary Water Chamistry 10.4.1 Main Condenser 10.4.1 Main Condenser A95 Nov 2009 10.4.2 Main Condenser Evacuation Sys 10.4.2 Main Condenser Evacuation A95 System Nov 2009 10.4.4 Turbine Bypass System 10.4.4 Turbine Bypass System A95 Nov 2009 11.0.0 Radioactive Waste Management 11.1 Source Term A95 Nov 2009 11.6 Offsite Radiological A95 Monitoring Program Nov 2009 11.1 Summary Description 11.2.0 Liquid Waste Management 9.3.7 Boron Recycle System A95 Nov 2009 11.2 Liquid Waste Systems A95 Nov 2009
* 11.2.0       Liquid Waste Management             9.3.7         Boron Recycle System         A95 Nov 2009 11.2         Liquid Waste Systems         A95 Nov 2009


ENCLOSURE 1 TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER                 SER Title             FSAR           FSAR Title       ISchedule¢ Section                                     Section                             Submittal I I Date 11.2.8       Dilution Factors       A95 Nov 2009 11.2.9   Estimated Doses From       A95 Radionuclides In     Nov 2009 Liquid Effluents 11.3.0     Gaseous Waste Management         11.3   Gaseous Waste Systems       A95 Nov 2009 11.4.0       Solid Waste Management         11.5   Solid Waste Management       A95 System         Nov 2009 11.5.0   Process & Effluent Radiological   11.4     Process And Effluent       A95 Mon                       Radiological Monitoring And Nov 2009 Sampling System 11.6.0           Evaluation Findings 11.7.0         NUREG-0737 Items
ENCLOSURE 1 TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title ISchedule¢ Section Section Submittal I I
* 11.7.1           Wide Range Noble             .
Date 11.2.8 Dilution Factors A95 Nov 2009 11.2.9 Estimated Doses From A95 Radionuclides In Nov 2009 Liquid Effluents 11.3.0 Gaseous Waste Management 11.3 Gaseous Waste Systems A95 Nov 2009 11.4.0 Solid Waste Management 11.5 Solid Waste Management A95 System Nov 2009 11.5.0 Process & Effluent Radiological 11.4 Process And Effluent A95 Mon Radiological Monitoring And Nov 2009 Sampling System 11.6.0 Evaluation Findings 11.7.0 NUREG-0737 Items 11.7.1 Wide Range Noble Gas & Iodine 11.7.2 Primary Coolant Outside Containment 12.0.0 Radiation Protection Radiation Protection Title 12.0 Section Only 12.1 General 12.2.0 Assuring That Occup Radiation 12.1 Assuring That Occupational A94 Expose Radiation Exposures Are As Aug 2009 Low As Reasonably Achievable (ALARA) 12.3.0 Radiation Sources 12.2 Radiation Sources A95 Nov 2009 12.4.0 Radiation Protect 12.3 Radiation Protection A97 Design Features Design Features Jan 2010 12.5.0 Dose Assessment 12.4 Dose Assessment A95 I_
Gas & Iodine 11.7.2       Primary Coolant Outside Containment 12.0.0         Radiation Protection                   Radiation Protection     Title 12.0                               Section Only 12.1                 General
Nov 2009 12.6.0 Health Physics Program 12.5 Radiological Control A95 (Radcon) Program Nov 2009 12.7.0 NUREG-0737 Items A95 Nov 2009 12.7.1 Plant Shielding 12.3 Radiation Protection A97 Design Features Jan 2010 12.7.2 High Range Incontainment Monitor 12.7.3 Inplant Radioiodine Monitor 13.1.0 Org Structure Of The Applicant 13.1 Org Structure Of A95 13.1.1 Management & Technical Org The Applicant Nov 2009 13.1.2 Corp Org & Tech Support 13.1.3 Plant Staff Organization 13.1 Org Structure Of A95 The Applicant Nov 2009 13.4 Onsite Review A95 Nov 2009
* 12.2.0   Assuring That Occup Radiation     12.1 Assuring That Occupational     A94 Expose                     Radiation Exposures Are As Aug 2009 Low As Reasonably Achievable (ALARA) 12.3.0           Radiation Sources           12.2       Radiation Sources         A95 Nov 2009 12.4.0           Radiation Protect         12.3     Radiation Protection       A97 Design Features                       Design Features       Jan 2010 12.5.0           Dose Assessment           12.4       Dose Assessment           A95 I_                                                                     Nov 2009 12.6.0       Health Physics Program         12.5     Radiological Control       A95 (Radcon) Program       Nov 2009 12.7.0           NUREG-0737 Items             .                                  A95 Nov 2009 12.7.1             Plant Shielding           12.3     Radiation Protection       A97 Design Features       Jan 2010 12.7.2 High Range Incontainment Monitor
* 12.7.3     Inplant Radioiodine Monitor
* 13.1.0   Org Structure Of The Applicant     13.1       Org Structure Of         A95 13.1.1     Management & Technical Org                     The Applicant       Nov 2009 13.1.2       Corp Org & Tech Support 13.1.3       Plant Staff Organization       13.1       Org Structure Of         A95 The Applicant       Nov 2009 13.4         Onsite Review           A95 Nov 2009


ENCLOSURE 1 TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER                 SER Title               FSAR             FSAR Title         Scheduled Section                                     Section                                 Submittal
ENCLOSURE 1 TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title Scheduled Section Section Submittal I
_                I _ _                                  I   Date 13.2.0               Training                 13.2         Training Programs         A95 13.2.1     Licensed Operator Training                                             Nov 2009 Program 13.2.2       Training For Nonlicensed Personnel 13.3.0     Emergency Preparedness             13.3         Emergency Planning         A95 Evaluation                                                     Nov 2009 13.3.1             Introduction 13.3.2         Evaluations Of The Emergency Plan 13.3.3             Conclusion 13.4.0           Review & Audit               13.4         Review And Audit         A95 Nov 2009 15.3.6   Anticipated Transient Without       4.3     Reactors - Nuclear Design     A95 Scram                                                       Nov 2009
I Date 13.2.0 Training 13.2 Training Programs A95 13.2.1 Licensed Operator Training Nov 2009 Program 13.2.2 Training For Nonlicensed Personnel 13.3.0 Emergency Preparedness 13.3 Emergency Planning A95 Evaluation Nov 2009 13.3.1 Introduction 13.3.2 Evaluations Of The Emergency Plan 13.3.3 Conclusion 13.4.0 Review & Audit 13.4 Review And Audit A95 Nov 2009 15.3.6 Anticipated Transient Without 4.3 Reactors - Nuclear Design A95 Scram Nov 2009
* - No equivalent FSAR section exists for this SER section.
* - No equivalent FSAR section exists for this SER section.


ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item                                           Change NoI   Section               Section Title     Package Number
ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item Change NoI Section Section Title Package Number
: 1.       1.5       Requirements for Further 2-95-13 Technical Information
: 1.
: 2.       1.9       Nuclear Performance Plan   2-95-27 Geology, Seismology, and
1.5 Requirements for Further 2-95-13 Technical Information
: 3.       2.5       Geotechnical Engineering   2-95-30 Summary of Foundation Conditions Classification of
: 2.
: 4.       3.2       Structures, Systems And   2-95-42 Components
1.9 Nuclear Performance Plan 2-95-27 Geology, Seismology, and
: 5.       3.5             Missile Protection   2-95-69 Protection Against Dynamic Effects
: 3.
: 6.       3.6             Associated With     2-95-12 Postulated Rupture Of Piping Seismic Design of     2-95-66
2.5 Geotechnical Engineering 2-95-30 Summary of Foundation Conditions Classification of
: 7.     3.10       Category I Instrumentation 2-95-34 And Electrical Equipment
: 4.
: 8.       4.1         Summary Description     2-95-40
3.2 Structures, Systems And 2-95-42 Components
: 9.     4.2.1           Mechanical Design     2-95-56
: 5.
: 10. 4.2.2           Mechanical Design     2-95-51
3.5 Missile Protection 2-95-69 Protection Against Dynamic Effects
: 11. 4.2.3     Reactivity Control System   2-95-54 Tritium Producing
: 6.
: 12. 4.2.4       Burnable Absorber Rod -   2-95-52 Tritium Production Core
3.6 Associated With 2-95-12 Postulated Rupture Of Piping Seismic Design of 2-95-66
: 13.     4.3             Nuclear Design       2-95-49
: 7.
: 14.     4.4         Thermal and Hydraulic     2-95-53 Design
3.10 Category I Instrumentation 2-95-34 And Electrical Equipment
: 15.     5.3       Thermal Hydraulic System   2-95-07 Design         2-95_07
: 8.
: 16. 5.5.2           Steam Generator       2-95-36
4.1 Summary Description 2-95-40
: 17. 5.5.10               Pressurizer       2-95-01
: 9.
: 18. 5.5.11       Pressurizer Relief Tank   2-95-17
4.2.1 Mechanical Design 2-95-56
: 19. 5.5.12                 Valves         2-95-02
: 10.
: 20. 5.5.14         Component Supports     2-95-11
4.2.2 Mechanical Design 2-95-51
: 21.     5.6             Instrumentation     2-95-59 Application
: 11.
: 22. 6.2.5       Combustible Gas Control   2-95-48 in Containment
4.2.3 Reactivity Control System 2-95-54 Tritium Producing
: 23. 6.2.5A           Hydrogen Mitigation   2-95-48 System
: 12.
: 24.     6.3       Emergency Core Cooling     2-95-45 System Inservice Inspection of
4.2.4 Burnable Absorber Rod -
: 25.     6.6       ASME Code Class 2 and 3     2-95-20 Components
2-95-52 Tritium Production Core
: 13.
4.3 Nuclear Design 2-95-49
: 14.
4.4 Thermal and Hydraulic 2-95-53 Design
: 15.
5.3 Thermal Hydraulic System 2-95-07 Design 2-95_07
: 16.
5.5.2 Steam Generator 2-95-36
: 17.
5.5.10 Pressurizer 2-95-01
: 18.
5.5.11 Pressurizer Relief Tank 2-95-17
: 19.
5.5.12 Valves 2-95-02
: 20.
5.5.14 Component Supports 2-95-11
: 21.
5.6 Instrumentation 2-95-59 Application
: 22.
6.2.5 Combustible Gas Control 2-95-48 in Containment
: 23.
6.2.5A Hydrogen Mitigation 2-95-48 System
: 24.
6.3 Emergency Core Cooling 2-95-45 System Inservice Inspection of
: 25.
6.6 ASME Code Class 2 and 3 2-95-20 Components


ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item                                           Change No. Section             Section Title     Package Number
ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item Change No.
: 26.     7.3           Engineered Safety     2-95-63 Features Actuation System
Section Section Title Package Number
: 27.     7.4       Systems Required for Safe 2-95-09 Shutdown 28.
: 26.
28._    8.1 81Introduction Electric Power -     2-95-58
7.3 Engineered Safety 2-95-63 Features Actuation System
: 29.     8.3         Onsite (Standby) Power   2-95-55 System
: 27.
: 30. 9.1.1           New Fuel Storage     2-95-03
7.4 Systems Required for Safe 2-95-09 Shutdown
: 31. 9.2.1         Essential Raw Cooling   2-95-57 Water
: 28.
: 32. 9.2.2           Component Cooling     2-95-65 System
8.1 Electric Power -
: 33. 9.2.3         Demineralized Water   2-95-04 Makeup System
2-95-58 28._
: 34. 9.2.5           Ultimate Heat Sink   2-95-05
81Introduction
: 35. 9.2.6         Condensate     Storage 2-95-31 Facilities
: 29.
: 36. 9.2.7       Refueling Water Storage 2-95-33 Tank
8.3 Onsite (Standby) Power 2-95-55 System
: 37. 9.2.8           Raw Cooling Water     2-95-10 System
: 30.
: 38. 9.3.3         Equipment and Floor Drainage System     2-95-06
9.1.1 New Fuel Storage 2-95-03
: 39. 9.3.5         Failed Fuel Detection 2-95-18 System
: 31.
: 40. 9.3.7         Boron Recycle System   2-95-50 Post Accident Sampling
9.2.1 Essential Raw Cooling 2-95-57 Water
: 41. 9.4.9             Facility (PASF)     2-95-29 Environmental Control System
: 32.
: 42. 9.5.2           Plant Communication   2-95-37 System Diesel Generator Fuel Oil
9.2.2 Component Cooling 2-95-65 System
: 43. 9.5.4         Storage And Transfer   2-95-26 System
: 33.
: 44. 9.5.5       Diesel Generator Cooling 2-95-08 Water
9.2.3 Demineralized Water 2-95-04 Makeup System
: 45. 9.5.6             Diesel Generator     2-95-43 Starting Air
: 34.
: 46. 10.1         Summary Description     2-95-67
9.2.5 Ultimate Heat Sink 2-95-05
: 47. 10.2           Turbine Generator     2-95-70
: 35.
: 48. 10.3           Main Steam Supply     2-95-35 System
9.2.6 Condensate Storage 2-95-31 Facilities
: 49. 10.4.1           Main Condenser       2-95-71
: 36.
9.2.7 Refueling Water Storage 2-95-33 Tank
: 37.
9.2.8 Raw Cooling Water 2-95-10 System
: 38.
9.3.3 Equipment and Floor Drainage System 2-95-06
: 39.
9.3.5 Failed Fuel Detection 2-95-18 System
: 40.
9.3.7 Boron Recycle System 2-95-50 Post Accident Sampling
: 41.
9.4.9 Facility (PASF) 2-95-29 Environmental Control System
: 42.
9.5.2 Plant Communication 2-95-37 System Diesel Generator Fuel Oil
: 43.
9.5.4 Storage And Transfer 2-95-26 System
: 44.
9.5.5 Diesel Generator Cooling 2-95-08 Water
: 45.
9.5.6 Diesel Generator 2-95-43 Starting Air
: 46.
10.1 Summary Description 2-95-67
: 47.
10.2 Turbine Generator 2-95-70
: 48.
10.3 Main Steam Supply 2-95-35 System
: 49.
10.4.1 Main Condenser 2-95-71


ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item                                               Change No. Section               Section Title       Package Number Main Condenser
ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item Change No.
: 50.     10.4.2           ManCnesr2-95-44 Evacuation   System
Section Section Title Package Number Main Condenser
: 51.     10.4.4       Turbine Bypass System     2-95-46
: 50.
: 52.       11.1             Source Terms         2-95-19
10.4.2 ManCnesr2-95-44 Evacuation System
: 53.       11.2         Liquid Waste Systems     2-95-62
: 51.
: 54.       11.3       Gaseous Waste Systems       2-95-25 Process and Effluent
10.4.4 Turbine Bypass System 2-95-46
: 55.       11.4         Radiological Monitoring   2-95-47 and Sampling System
: 52.
: 56.       11.5       Solid Waste Management     2-95-38
11.1 Source Terms 2-95-19
: 57.       11.6           Offsite Radiological   2-95-24 Monitoring Program
: 53.
: 58.       12.2           Radiation Sources       2-95-39
11.2 Liquid Waste Systems 2-95-62
: 59.       12.4             Dose Assessment       2-95-61
: 54.
: 60.       12.5           Radiological Control     2-95-60 (RadCon) Program
11.3 Gaseous Waste Systems 2-95-25 Process and Effluent
: 61.       13.1       Organizational Structure of 2-95-21
: 55.
: 61. __13.1   _            Applicant         2-95_21
11.4 Radiological Monitoring 2-95-47 and Sampling System
: 62.       13.2           Training Programs       2-95-22
: 56.
: 63.       13.3           Emergency Planning       2-95-23
11.5 Solid Waste Management 2-95-38
: 64.       13.4             Review and Audit       2-95-25
: 57.
: 65.       13.6             Plant Records         2-95-16
11.6 Offsite Radiological 2-95-24 Monitoring Program
: 66.       13.7                 Security         2-95-15 Specific Information to be
: 58.
: 67.       14.1         Included in Preliminary   2-95-14 SAR
12.2 Radiation Sources 2-95-39
: 59.
12.4 Dose Assessment 2-95-61
: 60.
12.5 Radiological Control 2-95-60 (RadCon) Program
: 61.
13.1 Organizational Structure of 2-95-21
: 61. __13.1 Applicant 2-95_21
: 62.
13.2 Training Programs 2-95-22
: 63.
13.3 Emergency Planning 2-95-23
: 64.
13.4 Review and Audit 2-95-25
: 65.
13.6 Plant Records 2-95-16
: 66.
13.7 Security 2-95-15 Specific Information to be
: 67.
14.1 Included in Preliminary 2-95-14 SAR


ENCLOSURE3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)     Section No. Figure No.;         Basis For Redaction 1     1.2-15       1.2             1.2-1   Security Related, 10CFR2.390(d)(1) 1     1.2-16         1.2             1.2-2   Security Related, 10CFR2.390(d)(1) 1     1.2-17         1.2             1.2-3   Security Related, 10CFR2.390(d)(1) 1     1.2-18         1.2             1.2-4   Security Related, 10CFR2.390(d)(1) 1     1.2-19         1.2             1.2-5   Security Related, 10CFR2.390(d)(1) 1     1.2-20         1.2             1.2-6   Security Related, 10CFR2.390(d)(1) 1     1.2-21         1.2             1.2-7   Security Related, 10CFR2.390(d)(1) 1     1.2-22         1.2             1.2-8   Security Related, 10CFR2.390(d)(1) 1     1.2-23         1.2             1.2-9   Security Related, 10CFR2.390(d)(1) 1     1.2-24         1.2             1.2-10, Security Related, 10CFR2.390(d)(1) 1     1.2-25         1.2             1.2-11 Security Related, 10CFR2.390(d)(1) 1     1.2-26         1.2             1.2-12 Security Related, 10CFR2.390(d)(1) 1     1.2-27         1.2             1.2-13 Security Related, IOCFR2.390(d)(1) 1     1.2-28         1.2             1.2-14 Security Related, 10CFR2.390(d)(1) 1     1.2-29         1.2             1.2-15 Security Related, 10CFR2.390(d)(1) 2     2.2-7         2.2             2.2-1   Security Related, 10CFR2.390(d)(1) 2     2.2-8         2.2             22-2     Security Related, 10CFR2.390(d)(1) 2     2.4-90         2.4             2.4-2   Security Related, 10CFR2.390(d)(1) 2     2.4-91         2.4             2.4-3   Security Related, 10CFR2.390(d)(1) 2     2.4-92         2.4           2.4-3a   Security Related, 10CFR2.390(d)(1) 2     2.4-93         2.4             2.4-4   Security Related, 10CFR2.390(d)(1) 2     2.4-94         2.4             2.4-5   Security Related, 10CFR2.390(d)(1) 2     2.4-95         2.4             2.4-6   Security Related, 10CFR2.390(d)(1) 2     2.4-96         2.4             2.4-7   Security Related, IOCFR2.390(d)(1) 2     2.4-97         2.4             2.4-8   Security Related, 10CFR2.390(d)(1) 2     2.4-98         2.4             2.4-9   Security Related, 10CFR2.390(d)(1) 2     2.4-99         2.4           2.4-10   Security Related, 10CFR2.390(d)(1) 2     2.4-100         2.4           2.4-11   Security Related, 10CFR2.390(d)(1) 2     2.4-101         2.4           2.4-12   Security Related, 10CFR2.390(d)(1) 2     2.4-102         2.4           2.4-13   Security Related, 10CFR2.390(d)(1) 2     2.4-103         2.4           2.4-14   Security Related, 10CFR2.390(d)(1) 2     2.4-131         2.4           2.4-40a   Security Related, 10CFR2.390(d)(1)
ENCLOSURE3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)
Sheet 1 2   2.4-132         2.4           2.4-40a   Security Related, 10CFR2.390(d)(1)
Section No.
Sheet 2 2     2.4-134         2.4           2.4-40b   Security Related, 10CFR2.390(d)(1) 2     2.4-135         2.4           2.4-40c   Security Related, 10CFR2.390(d)(1) 2   2.4-136         2.4         2.4-40d-1   Security Related, 10CFR2.390(d)(1) 2     2.4-141         2.4           2.4-40f   Security Related, 10CFR2.390(d)(1)
Figure No.;
Sheet 1 2   2.4-144         2.4           2.4-40g   Security Related, 10CFR2.390(d)(1)
Basis For Redaction 1
Sheet 1 2     2.4-201         2.4           2.4-76   Security Related, 10CFR2.390(d)(1) 2     2.4-204         2.4           2.4-79   Security Related, 10CFR2.390(d)(1) 2     2.4-207         2.4           2.4-82   Security Related, 10CFR2.390(d)(1) 2     2.4-208         2.4           2.4-83   Security Related, 10CFR2.390(d)(1) 2     2.4-213         2.4           2.4-88   Security Related, 10CFR2.390(d)(1)
1.2-15 1.2 1.2-1 Security Related, 10CFR2.390(d)(1) 1 1.2-16 1.2 1.2-2 Security Related, 10CFR2.390(d)(1) 1 1.2-17 1.2 1.2-3 Security Related, 10CFR2.390(d)(1) 1 1.2-18 1.2 1.2-4 Security Related, 10CFR2.390(d)(1) 1 1.2-19 1.2 1.2-5 Security Related, 10CFR2.390(d)(1) 1 1.2-20 1.2 1.2-6 Security Related, 10CFR2.390(d)(1) 1 1.2-21 1.2 1.2-7 Security Related, 10CFR2.390(d)(1) 1 1.2-22 1.2 1.2-8 Security Related, 10CFR2.390(d)(1) 1 1.2-23 1.2 1.2-9 Security Related, 10CFR2.390(d)(1) 1 1.2-24 1.2 1.2-10, Security Related, 10CFR2.390(d)(1) 1 1.2-25 1.2 1.2-11 Security Related, 10CFR2.390(d)(1) 1 1.2-26 1.2 1.2-12 Security Related, 10CFR2.390(d)(1) 1 1.2-27 1.2 1.2-13 Security Related, IOCFR2.390(d)(1) 1 1.2-28 1.2 1.2-14 Security Related, 10CFR2.390(d)(1) 1 1.2-29 1.2 1.2-15 Security Related, 10CFR2.390(d)(1) 2 2.2-7 2.2 2.2-1 Security Related, 10CFR2.390(d)(1) 2 2.2-8 2.2 22-2 Security Related, 10CFR2.390(d)(1) 2 2.4-90 2.4 2.4-2 Security Related, 10CFR2.390(d)(1) 2 2.4-91 2.4 2.4-3 Security Related, 10CFR2.390(d)(1) 2 2.4-92 2.4 2.4-3a Security Related, 10CFR2.390(d)(1) 2 2.4-93 2.4 2.4-4 Security Related, 10CFR2.390(d)(1) 2 2.4-94 2.4 2.4-5 Security Related, 10CFR2.390(d)(1) 2 2.4-95 2.4 2.4-6 Security Related, 10CFR2.390(d)(1) 2 2.4-96 2.4 2.4-7 Security Related, IOCFR2.390(d)(1) 2 2.4-97 2.4 2.4-8 Security Related, 10CFR2.390(d)(1) 2 2.4-98 2.4 2.4-9 Security Related, 10CFR2.390(d)(1) 2 2.4-99 2.4 2.4-10 Security Related, 10CFR2.390(d)(1) 2 2.4-100 2.4 2.4-11 Security Related, 10CFR2.390(d)(1) 2 2.4-101 2.4 2.4-12 Security Related, 10CFR2.390(d)(1) 2 2.4-102 2.4 2.4-13 Security Related, 10CFR2.390(d)(1) 2 2.4-103 2.4 2.4-14 Security Related, 10CFR2.390(d)(1) 2 2.4-131 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)
Sheet 1 2
2.4-132 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)
Sheet 2 2
2.4-134 2.4 2.4-40b Security Related, 10CFR2.390(d)(1) 2 2.4-135 2.4 2.4-40c Security Related, 10CFR2.390(d)(1) 2 2.4-136 2.4 2.4-40d-1 Security Related, 10CFR2.390(d)(1) 2 2.4-141 2.4 2.4-40f Security Related, 10CFR2.390(d)(1)
Sheet 1 2
2.4-144 2.4 2.4-40g Security Related, 10CFR2.390(d)(1)
Sheet 1 2
2.4-201 2.4 2.4-76 Security Related, 10CFR2.390(d)(1) 2 2.4-204 2.4 2.4-79 Security Related, 10CFR2.390(d)(1) 2 2.4-207 2.4 2.4-82 Security Related, 10CFR2.390(d)(1) 2 2.4-208 2.4 2.4-83 Security Related, 10CFR2.390(d)(1) 2 2.4-213 2.4 2.4-88 Security Related, 10CFR2.390(d)(1)


ENCLOSURE 3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)     Section No. Figure No.         Basis For Redaction 2     2.4-214         2.4           2.4-89   Security Related, 10CFR2.390(d)(1) 2     2.4-215         2.4           2.4-90   Security Related, 10CFR2.390(d)(1) 2     2.4-223         2.4           2.4-98   Security Related, 10CFR2.390(d)(1) 2     2.5-473         2.5           2.5-185   Security Related, 10CFR2.390(d)(1) 2     2.5-474         2.5         2.5-185a   Security Related, 10CFR2.390(d)(1) 2     2.5-515         2.5           2.5-225   Security Related, 10CFR2.390(d)(1) 2     2.5-516         2.5           2.5-226   Security Related, 10CFR2.390(d)(1) 2     2.5-577         2.5         2.5-226a   Security Related, 10CFR2.390(d)(1) 2     2.5-577         2.5           2.5-273   Security Related, 10CFR2.390(d)(1) 2     2.5-692         2.5           2.5-358   Security Related, 10CFR2.390(d)(1) 2     2.5-936         2.5           2.5-592   Security Related, 10CFR2.390(d)(1) 3     3.5-53         3.5             3.5-3   Security Related, 10CFR2.390(d)(1) 3     3.5-54         3.5             3.5-4   Security Related, 10CFR2.390(d)(1) 3     3.6-73         3.6           3.6-21   Security Related, 10CFR2.390(d)(1) 3       3.6-74         3.6           3.6-22   Security Related, 10CFR2.390(d)(1) 3       3.6-75         3.6'           3.6-23   Security Related, 10CFR2.390(d)(1) 3       3.6-76         3.6           3.6-24   Security Related, 10CFR2.390(d)(1) 3     3.7-217         3.7           3.7-39   Security Related, 10CFR2.390(d)(1) 3     3.7-218         3.7           3.7-40   .Security Related, 10CFR2.390(d)(1) 3     3.7-219         3.7           3.7-41   Security Related, 10CFR2.390(d)(1) 3     3.7-222         3.7           3.7-44   Security Related, 10CFR2.390(d)(1) 3     3.8.3-62       3.8.3           3.8.3-6 Security Related, 10CFR2.390(d)(1) 3     3.8.3-63       3.8.3           3.8.3-7 Security Related, 10CFR2.390(d)(1) 3     3.8.4-88       3.8.4.         3.8.4-2 Security Related, 10CFR2.390(d)(1) 3     3.8.4-89       3.8.4           3.8.4-3 Security Related, 10CFR2.390(d)(1) 3     3.8.4-90       3.8.4           3.8.4-4 Security Related, 10CFR2.390(d)(1) 3     3.8.4-91       3.8.4           3.8.4-5 Security Related, 10CFR2.390(d)(1) 3     3.8.4-92       3.8.4           3.8.4-6 Security Related, 10CFR2.390(d)(1) 3     3.8.4-95       3.8.4           3.8.4-9 Security Related, 10CFR2.390(d)(1) 3     3.8.4-103       3.8.4         3.8.4-17 Security Related, 10CFR2.390(d)(1) 3     3.8.4-104       3.8.4         3.8.4-18 Security Related, 10CFR2.390(d)(1) 3     3.8.4-105       3.8.4         3.8.4-19 Security Related, 10CFR2.390(d)(1) 3     3.8.4-106       3.8.4         3.8.4-20 Security Related, 10CFR2.390(d)(1) 3     3.8.4-110       3.8.4         3.8.4-24 Security Related, 10CFR2.390(d)(1) 3     3.8.4-114       3.8.4         3.8.4-28 Security Related, 10CFR2.390(d)(1) 3     3.8.4-121       3.8.4         3.8.4-35 Security Related, 10CFR2.390(d)(1) 3     3.8.4-122       3.8.4         3.8.4-36 Security Related, 10CFR2.390(d)(1) 3     3.8.4-123       3.8.4         3.8.4-36a Security Related, 10CFR2.390(d)(1) 3     3.8.4-126       3.8.4         3.8.4-37 Security Related, 10CFR2.390(d)(1) 3     3.8.4-143       3.8.4         3.8.4-50 Security Related, 10CFR2.390(d)(1) 3     3.8.4-144       3.8.4         3.8.4-51 Security Related, 10CFR2.390(d)(1) 3     3.8.6-19       3.8.6           3.8.6-7 Security Related, 10CFR2.390(d)(1) 6     6.2.2-14       6.2.2           6.2.2-4 Security Related, 10CFR2.390(d)(1) 6     6.2.3-64       6.2.3           6.2.3-4 Security Related, 10CFR2.390(d)(1) 6     6.2.3-65       6.2.3           6.2.3-5 Security Related, 10CFR2.390(d)(1) 6     6.2.3-66       6.2.3           6.2.3-6 Security Related, 10CFR2.390(d)(1) 6     6.2.3-67       6.2.3           6.2.3-7 Security Related, 10CFR2.390(d)(1)
ENCLOSURE 3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)
Section No.
Figure No.
Basis For Redaction 2
2.4-214 2.4 2.4-89 Security Related, 10CFR2.390(d)(1) 2 2.4-215 2.4 2.4-90 Security Related, 10CFR2.390(d)(1) 2 2.4-223 2.4 2.4-98 Security Related, 10CFR2.390(d)(1) 2 2.5-473 2.5 2.5-185 Security Related, 10CFR2.390(d)(1) 2 2.5-474 2.5 2.5-185a Security Related, 10CFR2.390(d)(1) 2 2.5-515 2.5 2.5-225 Security Related, 10CFR2.390(d)(1) 2 2.5-516 2.5 2.5-226 Security Related, 10CFR2.390(d)(1) 2 2.5-577 2.5 2.5-226a Security Related, 10CFR2.390(d)(1) 2 2.5-577 2.5 2.5-273 Security Related, 10CFR2.390(d)(1) 2 2.5-692 2.5 2.5-358 Security Related, 10CFR2.390(d)(1) 2 2.5-936 2.5 2.5-592 Security Related, 10CFR2.390(d)(1) 3 3.5-53 3.5 3.5-3 Security Related, 10CFR2.390(d)(1) 3 3.5-54 3.5 3.5-4 Security Related, 10CFR2.390(d)(1) 3 3.6-73 3.6 3.6-21 Security Related, 10CFR2.390(d)(1) 3 3.6-74 3.6 3.6-22 Security Related, 10CFR2.390(d)(1) 3 3.6-75 3.6' 3.6-23 Security Related, 10CFR2.390(d)(1) 3 3.6-76 3.6 3.6-24 Security Related, 10CFR2.390(d)(1) 3 3.7-217 3.7 3.7-39 Security Related, 10CFR2.390(d)(1) 3 3.7-218 3.7 3.7-40  
.Security Related, 10CFR2.390(d)(1) 3 3.7-219 3.7 3.7-41 Security Related, 10CFR2.390(d)(1) 3 3.7-222 3.7 3.7-44 Security Related, 10CFR2.390(d)(1) 3 3.8.3-62 3.8.3 3.8.3-6 Security Related, 10CFR2.390(d)(1) 3 3.8.3-63 3.8.3 3.8.3-7 Security Related, 10CFR2.390(d)(1) 3 3.8.4-88 3.8.4.
3.8.4-2 Security Related, 10CFR2.390(d)(1) 3 3.8.4-89 3.8.4 3.8.4-3 Security Related, 10CFR2.390(d)(1) 3 3.8.4-90 3.8.4 3.8.4-4 Security Related, 10CFR2.390(d)(1) 3 3.8.4-91 3.8.4 3.8.4-5 Security Related, 10CFR2.390(d)(1) 3 3.8.4-92 3.8.4 3.8.4-6 Security Related, 10CFR2.390(d)(1) 3 3.8.4-95 3.8.4 3.8.4-9 Security Related, 10CFR2.390(d)(1) 3 3.8.4-103 3.8.4 3.8.4-17 Security Related, 10CFR2.390(d)(1) 3 3.8.4-104 3.8.4 3.8.4-18 Security Related, 10CFR2.390(d)(1) 3 3.8.4-105 3.8.4 3.8.4-19 Security Related, 10CFR2.390(d)(1) 3 3.8.4-106 3.8.4 3.8.4-20 Security Related, 10CFR2.390(d)(1) 3 3.8.4-110 3.8.4 3.8.4-24 Security Related, 10CFR2.390(d)(1) 3 3.8.4-114 3.8.4 3.8.4-28 Security Related, 10CFR2.390(d)(1) 3 3.8.4-121 3.8.4 3.8.4-35 Security Related, 10CFR2.390(d)(1) 3 3.8.4-122 3.8.4 3.8.4-36 Security Related, 10CFR2.390(d)(1) 3 3.8.4-123 3.8.4 3.8.4-36a Security Related, 10CFR2.390(d)(1) 3 3.8.4-126 3.8.4 3.8.4-37 Security Related, 10CFR2.390(d)(1) 3 3.8.4-143 3.8.4 3.8.4-50 Security Related, 10CFR2.390(d)(1) 3 3.8.4-144 3.8.4 3.8.4-51 Security Related, 10CFR2.390(d)(1) 3 3.8.6-19 3.8.6 3.8.6-7 Security Related, 10CFR2.390(d)(1) 6 6.2.2-14 6.2.2 6.2.2-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-64 6.2.3 6.2.3-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-65 6.2.3 6.2.3-5 Security Related, 10CFR2.390(d)(1) 6 6.2.3-66 6.2.3 6.2.3-6 Security Related, 10CFR2.390(d)(1) 6 6.2.3-67 6.2.3 6.2.3-7 Security Related, 10CFR2.390(d)(1)


ENCLOSURE3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)     Section No. Figure No.         Basis For Redaction 6   6.2.3-68       6.2.3         6.2.3-8   Security Related, 10CFR2.390(d)(1) 6     6.2.3-69       6.2.3         6.2.3-9   Security Related, 10CFR2.390(d)(1) 6     6.2.3-70       6.2.3         6.2.3-10   Security Related, 10CFR2.390(d)(1) 6     6.2.3-79       6.2.3         6.2.3-18   Security Related, 10CFR2.390(d)(1) 6     6.2.3-80       6.2.3         6.2.3-19   Security Related, 10CFR2.390(d)(1) 8     8.1-23         8.1           8.1-1   Security Related, 10CFR2.390(d)(1) 8     8.2-13         8.2                     Security Related, 10CFR2.390(d)(1) and 8.2-14 8     8.2-30         8.2           8.2-3   Security Related, 10CFR2.390(d)(1) 8     8.2-31         8.2           8.2-4   Security Related, 10CFR2.390(d)(1) 8     8.2-44         8.2           8.2-11   Security Related, 10CFR2.390(d)(1) 8     8.3-99         8.3           8.3-1   Security Related, 10CFR2.390(d)(1) 8     8.3-101         8.3           8.3-2   Security Related, 10CFR2.390(d)(1) 8     8.3-102         8.3           8.3-3   Security Related, 10CFR2.390(d)(1) 8     8.3-104         8.3           8.3-4b   Security Related, 10CFR2.390(d)(1) 8     8.3-207         8.3           8.3-46   Security Related, 10CFR2.390(d)(1) 8     8.3-220         8.3           8.3-59   Security Related, 10CFR2.390(d)(1) 9     9.2-208         9.2           9.2-40   Security Related, 10CFR2.390(d)(1) 9     9.4-286         9.4           9.4-21   Security Related, 10CFR2.390(d)(1) 9     9.4-290         9.4         9.4-22c   Security Related, 10CFR2.390(d)(1) 9     9.4-291         9.4           9.4-23   Security Related, 10CFR2.390(d)(1) 9     9.4-292         9.4           9.4-24   Security Related, 10CFR2.390(d)(1) 12     12.3-41       12.3           12.3-1   Security Related, 10CFR2.390(d)(1) 12   12.3-42       12.3           12.3-2   Security Related, 10CFR2.390(d)(1) 12     12.3-43       12.3           12.3-3   Security Related, 10CFR2.390(d)(1) 12     12.3-44       12.3           12.3-4   Security Related, 10CFR2.390(d)(1) 12     12.3-45       12.3           12.3-5   Security Related, 10CFR2.390(d)(1) 12     12.3-46       12.3           12.3-6   Security Related, 10CFR2.390(d)(1) 12     12.3-47       12.3           12.3-7   Security Related, 10CFR2.390(d)(1) 12     12.3-48       12.3           12.3-8   Security Related, 10CFR2.390(d)(1) 12     12.3-49       12.3           12.3-9   Security Related, 10CFR2.390(d)(1) 12     12.3-50       12.3         12.3-10   Security Related, 10CFR2.390(d)(1) 12   12.3-51       12.3         12.3-11   Security Related, 10CFR2.390(d)(1) 12   12.3-52       12.3         12.3-12   Security Related, 10CFR2.390(d)(1) 12   12.3-53       12.3         12.3-13   Security Related, 10CFR2.390(d)(1) 12   12.3-54       12.3         12.3-14   Security Related, 10CFR2.390(d)(1) 12   12.3-55       12.3         12.3-15   Security Related, 10CFR2.390(d)(1) 12   12.3-56       12.3         12.3-16   Security Related, 10CFR2.390(d)(1) 12   12.3-57       12.3         12.3-17   Security Related, 10CFR2.390(d)(1) 12   12.3-58       12.3         12.3-18   Security Related, 10CFR2.390(d)(1) 12   12.3-59       12.3         12.3-19   Security Related, 10CFR2.390(d)(1) 12     12.4-7       12.4           12.4-1   Security Related, 10CFR2.390(d)(1)
ENCLOSURE3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)
Section No.
Figure No.
Basis For Redaction 6
6.2.3-68 6.2.3 6.2.3-8 Security Related, 10CFR2.390(d)(1) 6 6.2.3-69 6.2.3 6.2.3-9 Security Related, 10CFR2.390(d)(1) 6 6.2.3-70 6.2.3 6.2.3-10 Security Related, 10CFR2.390(d)(1) 6 6.2.3-79 6.2.3 6.2.3-18 Security Related, 10CFR2.390(d)(1) 6 6.2.3-80 6.2.3 6.2.3-19 Security Related, 10CFR2.390(d)(1) 8 8.1-23 8.1 8.1-1 Security Related, 10CFR2.390(d)(1) 8 8.2-13 8.2 Security Related, 10CFR2.390(d)(1) and 8.2-14 8
8.2-30 8.2 8.2-3 Security Related, 10CFR2.390(d)(1) 8 8.2-31 8.2 8.2-4 Security Related, 10CFR2.390(d)(1) 8 8.2-44 8.2 8.2-11 Security Related, 10CFR2.390(d)(1) 8 8.3-99 8.3 8.3-1 Security Related, 10CFR2.390(d)(1) 8 8.3-101 8.3 8.3-2 Security Related, 10CFR2.390(d)(1) 8 8.3-102 8.3 8.3-3 Security Related, 10CFR2.390(d)(1) 8 8.3-104 8.3 8.3-4b Security Related, 10CFR2.390(d)(1) 8 8.3-207 8.3 8.3-46 Security Related, 10CFR2.390(d)(1) 8 8.3-220 8.3 8.3-59 Security Related, 10CFR2.390(d)(1) 9 9.2-208 9.2 9.2-40 Security Related, 10CFR2.390(d)(1) 9 9.4-286 9.4 9.4-21 Security Related, 10CFR2.390(d)(1) 9 9.4-290 9.4 9.4-22c Security Related, 10CFR2.390(d)(1) 9 9.4-291 9.4 9.4-23 Security Related, 10CFR2.390(d)(1) 9 9.4-292 9.4 9.4-24 Security Related, 10CFR2.390(d)(1) 12 12.3-41 12.3 12.3-1 Security Related, 10CFR2.390(d)(1) 12 12.3-42 12.3 12.3-2 Security Related, 10CFR2.390(d)(1) 12 12.3-43 12.3 12.3-3 Security Related, 10CFR2.390(d)(1) 12 12.3-44 12.3 12.3-4 Security Related, 10CFR2.390(d)(1) 12 12.3-45 12.3 12.3-5 Security Related, 10CFR2.390(d)(1) 12 12.3-46 12.3 12.3-6 Security Related, 10CFR2.390(d)(1) 12 12.3-47 12.3 12.3-7 Security Related, 10CFR2.390(d)(1) 12 12.3-48 12.3 12.3-8 Security Related, 10CFR2.390(d)(1) 12 12.3-49 12.3 12.3-9 Security Related, 10CFR2.390(d)(1) 12 12.3-50 12.3 12.3-10 Security Related, 10CFR2.390(d)(1) 12 12.3-51 12.3 12.3-11 Security Related, 10CFR2.390(d)(1) 12 12.3-52 12.3 12.3-12 Security Related, 10CFR2.390(d)(1) 12 12.3-53 12.3 12.3-13 Security Related, 10CFR2.390(d)(1) 12 12.3-54 12.3 12.3-14 Security Related, 10CFR2.390(d)(1) 12 12.3-55 12.3 12.3-15 Security Related, 10CFR2.390(d)(1) 12 12.3-56 12.3 12.3-16 Security Related, 10CFR2.390(d)(1) 12 12.3-57 12.3 12.3-17 Security Related, 10CFR2.390(d)(1) 12 12.3-58 12.3 12.3-18 Security Related, 10CFR2.390(d)(1) 12 12.3-59 12.3 12.3-19 Security Related, 10CFR2.390(d)(1) 12 12.4-7 12.4 12.4-1 Security Related, 10CFR2.390(d)(1)


ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name                           File Size - Bytes TVAWBN-2_FSARFiles 001 TVA WBFSAR TOC.pdf                                         537,926 002WTVAWBFSARLEP.pdf                                           753,751 003_TVA WB FSAR Section 1.pdf                                 4,564,354 004 TVA WB FSAR Section 2 A.pdf                               10,885,919 005WTVAWBFSARSection_2_B.pdf                                 21,212,923 006 TVAWBFSARSection_2_C.pdf                                   2,073,213 007WTVAWBFSARSection 2_D.pdf                                 31,335,862 008WTVAWBFSARSection_2_E.pdf                                 47,242,160 009 TVA WB FSAR Section 3 A.pdf                               2,619,007 010 TVA WB FSAR Section_3_B.pdf                               7,035,003 01   W-VA WB FSARSection_3_C.pdf                             30,018,925 012WTVA WB FSAR Section 3 D.pdf                               5,904,997 013 TVA WB FSAR Section 4.pdf                                 17,555,736 014 TVA WB FSAR Section 5.pdf                                 11,025,985 015WTVAWBFSAR Section 6 A.pdf                                 18,485,393 016 TVA_WBFSARSection_6_B.pdf                                 7,501,726 017 TVA WB_ SARSection_7.pdf                                   8,372,586 018_-VAWBFSAR Section 8.pdf                                   30,122,186 019 TVAWBFSARSection 9 A.pdf                                 23,136,998 020WTVA WB FSAR Section 9_B.pdf                               20,715,421 021 WTVAWBFSARSectionI 0.pdf                                 13,416,943 022WTVAWBFSARSectionI 1.pdf                                   3,927,239 023 TVA WB FSAR Section 12.pdf                                 7,025,098 024WTVAWBFSARSectionI 3.pdf                                     463,723 025 TVA WBFSARSection_ 14.pdf                                   1,396,432 026WTVA WB FSAR Section 15.pdf                                 14,869,229 Page 1 of 3
ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name File Size - Bytes TVAWBN-2_FSARFiles 001 TVA WBFSAR TOC.pdf 537,926 002WTVAWBFSARLEP.pdf 753,751 003_TVA WB FSAR Section 1.pdf 4,564,354 004 TVA WB FSAR Section 2 A.pdf 10,885,919 005WTVAWBFSARSection_2_B.pdf 21,212,923 006 TVAWBFSARSection_2_C.pdf 2,073,213 007WTVAWBFSARSection 2_D.pdf 31,335,862 008WTVAWBFSARSection_2_E.pdf 47,242,160 009 TVA WB FSAR Section 3 A.pdf 2,619,007 010 TVA WB FSAR Section_3_B.pdf 7,035,003 01 W-VA WB FSARSection_3_C.pdf 30,018,925 012WTVA WB FSAR Section 3 D.pdf 5,904,997 013 TVA WB FSAR Section 4.pdf 17,555,736 014 TVA WB FSAR Section 5.pdf 11,025,985 015WTVAWBFSAR Section 6 A.pdf 18,485,393 016 TVA_WBFSARSection_6_B.pdf 7,501,726 017 TVA WB_ SARSection_7.pdf 8,372,586 018_-VAWBFSAR Section 8.pdf 30,122,186 019 TVAWBFSARSection 9 A.pdf 23,136,998 020WTVA WB FSAR Section 9_B.pdf 20,715,421 021 WTVAWBFSARSectionI 0.pdf 13,416,943 022WTVAWBFSARSectionI 1.pdf 3,927,239 023 TVA WB FSAR Section 12.pdf 7,025,098 024WTVAWBFSARSectionI 3.pdf 463,723 025 TVA WBFSARSection_ 14.pdf 1,396,432 026WTVA WB FSAR Section 15.pdf 14,869,229 Page 1 of 3


ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name                             File Size - Bytes 027 TVA WBFSAR Section 16.pdf                                 161,788 028 TVA WB FSAR Section 17.pdf                                 163,900 Total     342,524,423 TVAWBN-2_Oversized_FSARFigures 001_TVA WB FSAR Figure 2.5 3.pdf                             1,757,743 002_TVA WBFSAR Figure 2.5 11.pdf                             1,689,538 003 TVA WBFSAR Figure 2.5 71.pdf                             2,263,087 004_TVA WB FSAR Figure 2.5 222.pdf                             909,429 005_--VAWBFSARFigure 2.5 281 1.pdf                           2,155,627 006_TVA WB FSARFigure 2.5 281_2.pdf                           2,117,562 007 TVA WB FSAR Figure 2.5 549_1.pdf                         3,600,807 008-TVAWBFSAR Figure 2.5 549 2.pdf                           3,989,180 009-TVA WBFSARFigure 2.5 549_3.pdf                           2,863,719 010_TVAWBFSAR Figure 2.5 549 4.pdf                           2,809,599 011_TVAWBFSAR Figure 2.5 550.pdf                             1,803,985 012-TVA WBFSARFigure 2.5 551.pdf                             1,996,869 013 TVA WB FSAR Figure 2.5 554 1.pdf                         3,081,060 014 TVA WB FSAR Figure_2.5_554 2.pdf                         1,996,707 015_TVAWBFSARFigure 2.5 555.pdf                               1,993,312 016_TVAWBFSAR Figure 2.5_556.pdf                             2,998,087 017_TVA WB FSAR Figure 2.5_571_1.pdf                           '844,484 018-TVA WBFSAR Figure 2.5 571 2.pdf                           3,128,329 019_TVAWBFSAR Figure_2.5_571 _3.pdf                           3,284,555 020-TVAWBFSAR Figure 2.5 571 4.pdf                           2,142,316 021 TVA WBFSAR Figure 2.5 572.pdf                             2,196,945 022 WVA WB FSAR Figure 2.5 573.pdf                           2,013,286 Page 2 of 3
ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name File Size - Bytes 027 TVA WBFSAR Section 16.pdf 161,788 028 TVA WB FSAR Section 17.pdf 163,900 Total 342,524,423 TVAWBN-2_Oversized_FSARFigures 001_TVA WB FSAR Figure 2.5 3.pdf 1,757,743 002_TVA WBFSAR Figure 2.5 11.pdf 1,689,538 003 TVA WBFSAR Figure 2.5 71.pdf 2,263,087 004_TVA WB FSAR Figure 2.5 222.pdf 909,429 005_--VAWBFSARFigure 2.5 281 1.pdf 2,155,627 006_TVA WB FSARFigure 2.5 281_2.pdf 2,117,562 007 TVA WB FSAR Figure 2.5 549_1.pdf 3,600,807 008-TVAWBFSAR Figure 2.5 549 2.pdf 3,989,180 009-TVA WBFSARFigure 2.5 549_3.pdf 2,863,719 010_TVAWBFSAR Figure 2.5 549 4.pdf 2,809,599 011_TVAWBFSAR Figure 2.5 550.pdf 1,803,985 012-TVA WBFSARFigure 2.5 551.pdf 1,996,869 013 TVA WB FSAR Figure 2.5 554 1.pdf 3,081,060 014 TVA WB FSAR Figure_2.5_554 2.pdf 1,996,707 015_TVAWBFSARFigure 2.5 555.pdf 1,993,312 016_TVAWBFSAR Figure 2.5_556.pdf 2,998,087 017_TVA WB FSAR Figure 2.5_571_1.pdf  
'844,484 018-TVA WBFSAR Figure 2.5 571 2.pdf 3,128,329 019_TVAWBFSAR Figure_2.5_571 _3.pdf 3,284,555 020-TVAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021 TVA WBFSAR Figure 2.5 572.pdf 2,196,945 022 WVA WB FSAR Figure 2.5 573.pdf 2,013,286 Page 2 of 3


ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name                           File Size - Bytes 023_TVAWBFSARFigure 2.5 576_1.pdf                           3,238,525 024_TVA WBFSAR Figure 2.5 576 2.pdf                         2,151,750 025-TVA WB FSAR Figure 2.5 577.pdf                           2,207,622 026_TVAWBFSAR Figure 2.5 578.pdf                             2,080,032 027-TVAWBFSAR Figure 2.5 579.pdf                             2,308,985 028 TVA WBFSAR Figure 2.5 583.pdf                           2,487,346 029_TVAWBFSAR Figure 2.5 588.pdf                             2,528,515 030-TVA WB_FSAR Figure 2.5 589.pdf                           2,480,438 031_TVAWBFSAR Figure 2.5 594.pdf                           13,054,127 032_TVAWBFSAR Figure 2.5 595.pdf                             2,323,267 033_TVA WBFSAR Figure 2.5_596.pdf                           5,732,107 034_TVA WB FSAR Figure 2.5 597.pdf                           1,287,336 035 TVA WBFSAR Figure 2.5 602.pdf                           5,549,537 036_TVA WBFSAR Figure 2.5 603.pdf                           4,830,835 037_TVA WB FSAR Figure 2.5 604.pdf                           6,392,279 038-TVAWBFSAR Figure 2.5 605.pdf                           20,823,108 Total       131,112,035 TVAWBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf                           2,899,519 Total       2,899,519 Page 3 of 3
ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name File Size - Bytes 023_TVAWBFSARFigure 2.5 576_1.pdf 3,238,525 024_TVA WBFSAR Figure 2.5 576 2.pdf 2,151,750 025-TVA WB FSAR Figure 2.5 577.pdf 2,207,622 026_TVAWBFSAR Figure 2.5 578.pdf 2,080,032 027-TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028 TVA WBFSAR Figure 2.5 583.pdf 2,487,346 029_TVAWBFSAR Figure 2.5 588.pdf 2,528,515 030-TVA WB_FSAR Figure 2.5 589.pdf 2,480,438 031_TVAWBFSAR Figure 2.5 594.pdf 13,054,127 032_TVAWBFSAR Figure 2.5 595.pdf 2,323,267 033_TVA WBFSAR Figure 2.5_596.pdf 5,732,107 034_TVA WB FSAR Figure 2.5 597.pdf 1,287,336 035 TVA WBFSAR Figure 2.5 602.pdf 5,549,537 036_TVA WBFSAR Figure 2.5 603.pdf 4,830,835 037_TVA WB FSAR Figure 2.5 604.pdf 6,392,279 038-TVAWBFSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVAWBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf 2,899,519 Total 2,899,519 Page 3 of 3


ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSARAmendment 95 List of Files on Publicly Available OSM File Name                         File Size - Bytes TVA WBN-2 FSARFilesREDACTED 001 TVA WBFSARTOC.pdf                                     537,926 002_TVA WBFSARLEP.pdf                                     753,751 003 TVA WB FSAR Section 1.pdf                           1,069,968 004 TVA WBFSAR Section 2_A.pdf                         10,548,551 005WTVA WB FSAR Section 2_B.pdf                         15,820,719 006 TVA WB FSAR Section 2_C.pdf                         2,073,197 007_-VAWBFSAR Section 2_D.pdf                           31,335,862 008 WVA WB FSAR Section 2_E.pdf                         46,018,892 009 TVA WB FSAR Section 3_A.pdf                         2,334,359 010WTVAWBFSARSection_3_B.pdf                             5,740,215 011 TVA WB FSAR Section 3_C.pdf                         25,401,100 012WTVA WB FSAR Section 3_D.pdf                         5,643,654 013_-VAWBFSARSection_4.pdf                             17,555,718 014 TVA WB FSAR Section 5.pdf                           11,025,982 015 TVA WBFSAR Section 6_A.pdf                         13,987,035 016_-VAWBFSARSection_6_B.pdf                             7,501,726 017 TVA WB FSAR Section_7.pdf                           8,372,586 018_WVA_WBFSARSection_8.pdf                             27,528,640 019WTVA WB FSAR Section_9_A.pdf                         22,901,163 020 TVA WB FSARSection 9_B.pdf                         13,866,916 021 TVA WBFSAR Section 10.pdf                           13,416,930 022_-VA WB FSAR SectionI 1.pdf                           3,927,216 023 WVA WB FSAR Section 12.pdf                           1,980,681 024 WVA WB FSAR Section 13.pdf                           463,726 025WTVA WB FSAR Section_14.pdf                           1,386,504 026 TVA WBFSAR Section 15.pdf                           14,869,229 027_-VA WB FSAR Section 16.pdf                           161,788 Page 1 of 3
ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSARAmendment 95 List of Files on Publicly Available OSM File Name File Size - Bytes TVA WBN-2 FSARFilesREDACTED 001 TVA WBFSARTOC.pdf 537,926 002_TVA WBFSARLEP.pdf 753,751 003 TVA WB FSAR Section 1. pdf 1,069,968 004 TVA WBFSAR Section 2_A.pdf 10,548,551 005WTVA WB FSAR Section 2_B.pdf 15,820,719 006 TVA WB FSAR Section 2_C.pdf 2,073,197 007_-VAWBFSAR Section 2_D.pdf 31,335,862 008 WVA WB FSAR Section 2_E.pdf 46,018,892 009 TVA WB FSAR Section 3_A.pdf 2,334,359 010WTVAWBFSARSection_3_B.pdf 5,740,215 011 TVA WB FSAR Section 3_C.pdf 25,401,100 012WTVA WB FSAR Section 3_D.pdf 5,643,654 013_-VAWBFSARSection_4.pdf 17,555,718 014 TVA WB FSAR Section 5.pdf 11,025,982 015 TVA WBFSAR Section 6_A.pdf 13,987,035 016_-VAWBFSARSection_6_B.pdf 7,501,726 017 TVA WB FSAR Section_7.pdf 8,372,586 018_WVA_WBFSARSection_8.pdf 27,528,640 019WTVA WB FSAR Section_9_A.pdf 22,901,163 020 TVA WB FSARSection 9_B.pdf 13,866,916 021 TVA WBFSAR Section 10.pdf 13,416,930 022_-VA WB FSAR SectionI 1.pdf 3,927,216 023 WVA WB FSAR Section 12.pdf 1,980,681 024 WVA WB FSAR Section 13.pdf 463,726 025WTVA WB FSAR Section_14.pdf 1,386,504 026 TVA WBFSAR Section 15.pdf 14,869,229 027_-VA WB FSAR Section 16.pdf 161,788 Page 1 of 3


ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 List of Files on Publicly Available OSM File Name                         File Size - Bytes 028 TVA WB FSAR Section 17.pdf                             163,900 Total   306,387,934 TVAWBN-2_Oversized_FSARFigures 001 -VA WBFSARFigure 2.5_3.pdf                           1,757,743 002_TVA WBFSARFigure 2.5 11 .pdf                         1,689,538 003 TVA WB FSAR Figure 2.5 71.pdf                         2,263,087 004-TVAWBFSAR Figure 2.5 222.pdf                           909,429 005-TVAWBFSAR Figure 2.5 281 1.pdf                       2,155,627 006-TVAWBFSARFigure 2.5 281 2.pdf                         2,117,562 007-TVAWBFSARFigure 2.5_549 l.pdf                         3,600,807 008_-VA WBFSAR Figure 2.5 549 2.pdf                       3,989,180 009-TVAWBFSAR Figure 2.5 549 3.pdf                       2,863,719 010 TVA WB FSAR Figure 2.5 549 4.pdf                     2,809,599 011_-VAWBFSARFigure 2.5 550.pdf                           1,803,985 012_-VAWBFSARFigure 2.5 551.pdf                           1,996,869 013-TVA WB FSAR Figure 2.5 554 1.pdf                     3,081,060 014_-VA WB FSAR Figure 2.5 554 2.pdf                     1,996,707 015_WVA WB FSAR Figure_2.5 555.pdf                       1,993,312 016 TVA WB FSAR Figure 2.5 556.pdf                       2,998,087 017WTVA WB FSARFigure 2.5 571 1.pdf                       844,484 018_-VA WBFSAR Figure 2.5 571 2.pdf                       3,128,329 019_-VAWB FSAR Figure 2.5 571_3.pdf                       3,284,555 020_-VAWBFSAR Figure 2.5 571 4.pdf                       2,142,316 021_-VAWBFSAR Figure 2.5 572.pdf                         2,196,945 022_-VAWBFSARFigure 2.5 573.pdf                           2,013,286 023 WVA WBFSARFigure 2.5_576 l.pdf                       3,238,525 024_WAWBFSAR Figure 2.5 576 2.pdf                         2,151,750 Page 2 of 3
ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 List of Files on Publicly Available OSM File Name File Size - Bytes 028 TVA WB FSAR Section 17.pdf 163,900 Total 306,387,934 TVAWBN-2_Oversized_FSARFigures 001 -VA WBFSARFigure 2.5_3.pdf 1,757,743 002_TVA WBFSARFigure 2.5 11.pdf 1,689,538 003 TVA WB FSAR Figure 2.5 71.pdf 2,263,087 004-TVAWBFSAR Figure 2.5 222.pdf 909,429 005-TVAWBFSAR Figure 2.5 281 1.pdf 2,155,627 006-TVAWBFSARFigure 2.5 281 2.pdf 2,117,562 007-TVAWBFSARFigure 2.5_549 l.pdf 3,600,807 008_-VA WBFSAR Figure 2.5 549 2.pdf 3,989,180 009-TVAWBFSAR Figure 2.5 549 3.pdf 2,863,719 010 TVA WB FSAR Figure 2.5 549 4.pdf 2,809,599 011_-VAWBFSARFigure 2.5 550.pdf 1,803,985 012_-VAWBFSARFigure 2.5 551.pdf 1,996,869 013-TVA WB FSAR Figure 2.5 554 1.pdf 3,081,060 014_-VA WB FSAR Figure 2.5 554 2.pdf 1,996,707 015_WVA WB FSAR Figure_2.5 555.pdf 1,993,312 016 TVA WB FSAR Figure 2.5 556.pdf 2,998,087 017WTVA WB FSARFigure 2.5 571 1.pdf 844,484 018_-VA WBFSAR Figure 2.5 571 2.pdf 3,128,329 019_-VAWB FSAR Figure 2.5 571_3.pdf 3,284,555 020_-VAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021_-VAWBFSAR Figure 2.5 572.pdf 2,196,945 022_-VAWBFSARFigure 2.5 573.pdf 2,013,286 023 WVA WBFSARFigure 2.5_576 l.pdf 3,238,525 024_WAWBFSAR Figure 2.5 576 2.pdf 2,151,750 Page 2 of 3


ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 List of Files on Publicly Available OSM File Name                           File Size - Bytes 025_TVAWBFSARFigure 2.5 577.pdf                           2,207,622 026_TVA WB FSAR Figure_2.5_578.pdf                       2,080,032 027-TVAWBFSAR Figure 2.5 579.pdf                         2,308,985 028_TVAWBFSARFigure 2.5_583.pdf                           2,487,346 029_TVAWBFSAR Figure_2.5 588.pdf                         2,528,515 030_TVA WBFSAR Figure 2.5 589.pdf                         2,480,438 031 WTVAWBFSARFigure 2.5 594.pdf                         13,054,127 032 TVA WBFSAR Figure 2.5 595.pdf                         2,323,267 033WTVAWBFSAR Figure 2.5 596.pdf                         5,732,107 034_TVAWBFSAR Figure 2.5 597.pdf                           1,287,336 035WTVAWBFSAR Figure 2.5 602.pdf                         5,549,537 036_TVA WBFSAR Figure 2.5 603.pdf                         4,830,835 037_TVAWBFSAR Figure 2.5 604.pdf                         6,392,279 038WTVA WBFSAR Figure 2.5 605.pdf                       20,823,108 Total     131,112,035 TVA WBN-2_OversizedFSARTable 001W-VA WB FSARTable_6.2.4-1.pdf                         2,899,519 Total     2,899,519 Page 3 of 3}}
ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 List of Files on Publicly Available OSM File Name File Size - Bytes 025_TVAWBFSARFigure 2.5 577.pdf 2,207,622 026_TVA WB FSAR Figure_2.5_578.pdf 2,080,032 027-TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028_TVAWBFSARFigure 2.5_583.pdf 2,487,346 029_TVAWBFSAR Figure_2.5 588.pdf 2,528,515 030_TVA WBFSAR Figure 2.5 589.pdf 2,480,438 031 WTVAWBFSARFigure 2.5 594.pdf 13,054,127 032 TVA WBFSAR Figure 2.5 595.pdf 2,323,267 033WTVAWBFSAR Figure 2.5 596.pdf 5,732,107 034_TVAWBFSAR Figure 2.5 597.pdf 1,287,336 035WTVAWBFSAR Figure 2.5 602.pdf 5,549,537 036_TVA WBFSAR Figure 2.5 603.pdf 4,830,835 037_TVAWBFSAR Figure 2.5 604.pdf 6,392,279 038WTVA WBFSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA WBN-2_OversizedFSARTable 001W-VA WB FSARTable_6.2.4-1.pdf 2,899,519 Total 2,899,519 Page 3 of 3}}

Latest revision as of 07:58, 14 January 2025

Final Safety Analysis Report, Amendment 95, Cover Letter
ML093370275
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/24/2009
From: Bajestani M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML093370275 (22)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 November 24, 2009 10 CFR 50.4(b)(6) 10 CFR 50.34(b) 10 CFR 2.390(d)(1)

.U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 95

1. TVA letter to the NRC dated August 27, 2009, "Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report Amendment 94"

References:

2. NRC letter to TVA dated August 14, 2009, "Watts Bar Nuclear Plant Unit 2 -

Confirmation of Schedule for Submission of Information to Support Operating License Application Review" This letter transmits WBN Unit 2 FSAR Amendment 95 (A95), which reflects changes made since the issuance of Amendment 94 on August 27, 2009 (Reference 1). This Unit 2 amendment incorporates changes resulting from TVA's ongoing design/reverification effort in support of completing the WBN Unit 2 design basis. This letter also responds to NRC's letter dated August 14, 2009 (Reference 2), requesting TVA to verify the schedule for providing information amending the FSAR. Specifically, NRC requested TVA to verify the schedule dates for submitting amendments on specific Safety Evaluation Report (SER) sections listed in the enclosure to NRC's August 14 letter. Enclosure 1 contains TVA's updated schedule dates for submitting amendments for the FSAR sections listed in NRC's letter. SER Section 12.7.1, "Plant Shielding," that corresponds to FSAR Section 12.3 was scheduled to be incorporated into this amendment but was not completed due to outstanding calculation issues. This section has been rescheduled to January 2010. FSAR Section 12.3 was the only section listed in the NRC August 14 letter that was scheduled to be submitted with FSAR A95 that TVA did not complete the design/verification review. contains a "Summary Listing" of the location and corresponding Unit 2 FSAR change package numbers associated with the A95 changes. This is a listing of FSAR sections in which TVA has completed its design/reverification review and determined that design-related activities are complete, the verbiage is consistent with the Unit 1 Updated FSAR (UFSAR), as appropriate, and the section is ready for NRC review.

AD573 Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 November 24,2009 FSAR A95 is contained on the enclosed Optical Storage Media (OSM #1) (Attachment 1).

The FSAR contains security-related information identified by the designation "Security-Related Information - Withhold Under 10CFR2.390.

TVA hereby requests this information be withheld from public disclosure in accordance with the provisions of 10CFR2.390. A redacted version of the FSAR is contained on OSM #2 (Attachment 2), which is suitable for public disclosure. contains a listing of the FSAR pages that have been redacted. Enclosure 4 lists the files and file sizes on the security-related OSM (OSM #1), and Enclosure 5 lists the files and file sizes on the publicly available 'OSM (OSM #2).

Additionally, at the request of NRC/NRR, TVA is planning to expedite submittal of FSAR A96 that provides the rest of Section 7.0 on or about December 15, 2009. WBN is currently developing Unit 1 UFSAR Amendment 8.. TVA plans to incorporate any impacts from this UFSAR Amendment into Unit 2 A97, scheduled for January 2010.

This letter does not close any "Generic Communications" or contain any new commitments. If you have any questions, please contact me at (423) 365-2351.

I declare under the penalty of perjury that the foregoing is true and correct. Executed on November 24, 2009.

Sincerely, Masoud Ba;J_

tani Watts Bar it 2 Vice President

Enclosures:

1. TVA's Schedule for Specified Topic Items and Corresponding Sections of the FSAR
2. List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes"
3. Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95, "Summary of Redacted Pages"
4. List of files and file sizes on the security-related OSM (OSM #1)
5. List of files and file sizes on the publicly available OSM (OSM #2)

Attachments:

1. OSM #1: WBNP Unit 2 FSAR Amendment 95 - Security-Related Information - Withhold Under 10CFR2.390
2. OSM #2: WBNP Unit 2 FSAR Amendment 95 - Public Version cc: See page 3

U.S. Nuclear Regulatory Commission Page 3 November 24, 2009 cc (w/enclosures):

U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title Schedulec Section Section Submittal I_

Date 1.50 Summary Of Principal Review Matters 1.9.0 License Conditions 2.4.6 Ultimate Heat Sink 9.2.5 Ultimate Heat Sink A95 Nov 2009 3.0.0 Design Of Struct, Comp, 3.0.0 Design Of Struct, Comp, Title Equip, & Sys Equip, & Sys Section Only 3.1.0 Introduction 3.1.1 Introduction A94 Aug 2009 3.1.1 Conformance W/Gen Design 3.1 Conformance w/NRC Gen A94 Criteria Design Criteria Aug 2009 3.1.2 Conformance W/Indust Codes &

3.2.3 Code Cases And Code A95 Std Editions And Addenda Nov 2009 3.2.0 Class Of Struct, Sys, & Comp 3.2 Class Of Struct, Sys, & Comp A95 Nov 2009 3.2.1 Seismic Classifications 3.2.1 Seismic Classifications A95 Nov 2009 3.2.2 Sys Quality Group Classifications 3.2.2 Sys Quality Group A95 Classifications Nov 2009 3.5.0 Missile Protection 3.5 Missile Protection A95 Nov 2009 3.5.1 Missile Selection & Description 3.5.2 Struct, Sys, Comp To Be Protected 3.5.3 Barrier Design Structures 3.6.0 Protect Against Effects 3.6 Protection Against Dynamic A95 Pipe Rupture Effects Associated With The Nov 2009 3.6.1 Plant Design Protect From Postulated Rupture Of Piping Pipe Fail 3.6.2 Determine Brk Location Pipe Ruptures 3.6.3 Leak Before Break Eval Proced 3.10.0 Seismic & Dynamic Qual 3.10 Seismic Design Of Category I A95 Of Equip Instrumentation And Nov 2009 Electrical Equipment 4.0.0 Reactor 4.0 Reactor Title Section Only 4.1.0 Introduction 4.1 Summary Description A95 Nov 2009 4.2.0 Fuel System Design 4.2 Mechanical Design A95 Nov 2009 4.2.1 Description 4.2.2 Thermal Performance 4.2.3 Mechanical Performance

ENCLOSURE 1 Schedule for Snecified Tonic Items and Corresnondina Sections of the FSAR TVA'S S TV.Ion chedule r.......

To ems and.

. r

  • i Sections..........A.

SERI SER Title FSAR FSAR Title Schedule Section Section Submita I

I

.I I IDate 4.2.4 Surveillance 4.2.5 Fuel Design Considerations 4.3.0 Nuclear Design 4.3 Nuclear Design A95 Nov 2009 4.3.1 Design Basis 4.3.2 Design Description 4.3.3 Analytical Methods 4.3.4 Summary Of Evaluation Findings 4.4.0 Thermal Hydraulic Design 4.4 Thermal And Hydraulic A95 Design Nov 2009 4.4.1 Performance In Safety Criteria 4.4.1 Design Basis A95 Nov 2009 5.3.7 Thermal And Hydraulic A95 Characteristics Summary Nov 2009 Table 4.4.2 Design Basis 4.4.1 Design Basis A95 Nov 2009 4.4.3 Thermal Hydraulic Design Methodology 4.4.4 Operating Abnormalities 4.4.2 Thermal Hydraulic Design-A95 4.4.6 Thermal Hydraulic Comparison Description Nov 2009 4.4.7 N-1 Loop Operation 5.3.5 Load Following Characteristics A95 Nov 2009 4.4.9 Summary & Conclusion 4.4.3 Evaluation A95 Nov 2009 4.6.0 Functional Design Of 4.3.1 Nuclear Design -

A95 Reactivity Sys Design Bases Nov 2009 5.2.1 Compliance W/Codes & Code 3.2 Classification Of Structures, A95 Cases Systems, And Components Nov 2009 5.4.2 Steam Generators 5.5.2 Steam Generators A95 Nov 2009 5.5.4 Steam Outlet Flow Restrictor A94 (Steam Generator)

Aug 2009 5.4.4 Pressurizer Relief Tank 5.5.11 Pressurizer Relief Tank A95 Nov 2009 6.2.5 Combustible Gas 6.2.5 Combustible Gas Control A95 Control Systems In Containment Nov 2009 6.2.7 Fracture Prevention 3.1.2 WBNP Conformance A94 Containment with GDCs Aug 2009 6.3.0 Emergency Core Cooling 6.3 Emergency Core Cooling A95 System System Nov 2009

ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR f SERT1 SER Title FSAR FSAR Title Scheduled Section Section Submittal Date 6.3.1

System Design

6.3.2 Evaluation 6.3.3 Testing 6.3.4 Performance Evaluation 6.3.5 Conclusions 6.6.0 Inservice Inspect Of 6.6 Inservice Inspection Of ASME A95 Class 2 & 3 Comp Code Class 2 And 3 Nov 2009 Components Inspection Intervals 7.3.0 Engineered Safety 7.3 Engineered Safety Features A95 Features System Actuation System Nov 2009 7.3.1

System Description

5.5.5 Main Steam Line A94 Isolation System Aug 2009 5.6 Reactor Vessel Head A95 Vent System Nov 2009 7.3.2 Containment Sump Level 5.6 Reactor Vessel Head A95 Measurement Vent System Nov 2009 6.3 Emergency Core A95 Cooling System Nov 2009 7.3.3 Aux Feedwater Initiation 7.3 Engineered Safety Features A95

& Control Actuation System Nov 2009 7.3.4 Failure Modes & Effects Analysis 7.3.5 IE Bulletin 80-06 7.3.6 Conclusions 7.4.0 Systems Required For 7.4 Systems Required For A95 Safe Shutdown Safe Shutdown Nov 2009 7.4.1

System Description

7.4.2 Safe Shutdown From Aux Control Room 7.4.3 Conclusions 7.7.3 Volume Control Tank LvI Control Sys 8.1.0 General 8.1 Electric Power - Introduction A95 Nov 2009 8.2.1 Compliance With 3.1.2 WBNP Conformance A94 GDC5 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.2.2 Compliance With 3.1.2 WBNP Conformance A94 GDC 17 with GDCs Aug 2009

ENCLOSURE I TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title Schedule Section Section Submittal I _

I I

Date 8.1 Electric Power - Introduction A95 Nov 2009 8.2.3 Compliance With 3.1.2 WBNP Conformance A94 GDC 18 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.2.4 Evaluation Findings 8.3.0 Onsite Power Systems 8.1 Electric Power - Introduction A95 Nov 2009 8.3 Onsite (Standby) Power A95 System Nov 2009 8.3.1 Onsite AC Pwr Sys Compliance 3.1.2 WBNP Conformance A94 w/GDC 17 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.3.2 Onsite DC Sys Compliance With 3.1.2 WBNP Conformance A94 GDC 17 with GDCs Aug 2009 8.1 Electric Power - Introduction A95 Nov 2009 8.3.3 Evaluation Findings 8.3 Onsite (Standby) Power A95 Systems Nov 2009 8.4.0 Station Blackout 8.1 Electric Power - Introduction A95 Nov 2009 9.1.1 New Fuel Storage 9.1.1 New Fuel Storage A95 Nov 2009 9.1.2 Spent Fuel Storage 9.1.2 Spent Fuel Storage A94 Aug 2009 9.2.0 Water Systems 9.2 Water Systems A95 Nov 2009 9.2.1 ERCW & RCWS 9.2.1 Essential Raw Cooling Water A95 Sys (ERCW)

Nov 2009 9.2.8 Raw Cooling Water A95 Sys(RCWS)

Nov 2009 9.2.2 Component Cooling System 9.2.2 Component Cooling System A95 Nov 2009 9.2.3 Demineralized Water Makeup 9.2.3 Demineralized Water Makeup A95 System System Nov 2009 9.2.4 Potable & Sanitary 9.2.4 Potable And SanitaryWater A94 Water Systems Systems Aug 2009 9.2.5 Ultimate Heat Sink 9.2.5 Ultimate Heat Sink A95 I

Nov 2009 9.2.6 Condensate Storage 9.2.6 Condensate Storage A95 Facilities Facilities Nov 2009 9.3.3 Equip & Floor Drainage 9.3.3 Equip & Floor Drainage A95 System System Nov 2009 9.4.4 Turbine Building Area Vent Sys 9.4.4 Turbine Building Area Vent Sys A94 Aug 2009

ENCLOSURE 1 Schedule for Snecified Tonic Items and Corresnondina Sections of the FSAR TVA'S f

r.......

To i r n and...

Co resn Sections of th SER SER Title FSAR FSAR Title Scheduled S iSection Submittal 1 _Date 9.5.2 Communications System 9.5.2 Plant Communications A95 System Nov 2009 9.5.3 Lighting Systems 9.5.3 Lighting Systems A94 Aug 2009 9.5.4 Emerg Diesel Gen Fuel Oil 9.5.4 Diesel Gen Fuel Oil Storage A95 Storage And Transfer Sys Nov 2009 9.5.5 Emerg Diesel Gen Cooling 9.5.5 Diesel Gen Cooling Water Sy,,

A95 Water Sys Nov 2009 9.5.6 Emerg Diesel Gen 9.5.6 Diesel Gen Starting Sys A95 Starting Sys Nov 2009 9.5.8 Emerg Diesel Gen Intake &

9.5.8 Diesel Gen Combustion Air A94 Exhaust Sys Intake And Exhaust Sys Aug 2009 10.1.0 Summary Description 10.1 Summary Description A95 Nov 2009 10.2.0 Turbine Generator 10.2 Turbine Generator A95 Nov 2009 10.2.1 Turbine Generator Design 10.2.2 Turbine Disc Integrity 10.3.0 Main Steam Supply System 10.3 Main Steam Supply System A95 10.3.1 Main Steam Supply Sys Include Nov 2009 Valves 10.3.2 Main Steam Supply Sys 10.3.3 Steam & Feedwater Sys Materials 10.3.4 Secondary Water Chamistry 10.4.1 Main Condenser 10.4.1 Main Condenser A95 Nov 2009 10.4.2 Main Condenser Evacuation Sys 10.4.2 Main Condenser Evacuation A95 System Nov 2009 10.4.4 Turbine Bypass System 10.4.4 Turbine Bypass System A95 Nov 2009 11.0.0 Radioactive Waste Management 11.1 Source Term A95 Nov 2009 11.6 Offsite Radiological A95 Monitoring Program Nov 2009 11.1 Summary Description 11.2.0 Liquid Waste Management 9.3.7 Boron Recycle System A95 Nov 2009 11.2 Liquid Waste Systems A95 Nov 2009

ENCLOSURE 1 TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title ISchedule¢ Section Section Submittal I I

Date 11.2.8 Dilution Factors A95 Nov 2009 11.2.9 Estimated Doses From A95 Radionuclides In Nov 2009 Liquid Effluents 11.3.0 Gaseous Waste Management 11.3 Gaseous Waste Systems A95 Nov 2009 11.4.0 Solid Waste Management 11.5 Solid Waste Management A95 System Nov 2009 11.5.0 Process & Effluent Radiological 11.4 Process And Effluent A95 Mon Radiological Monitoring And Nov 2009 Sampling System 11.6.0 Evaluation Findings 11.7.0 NUREG-0737 Items 11.7.1 Wide Range Noble Gas & Iodine 11.7.2 Primary Coolant Outside Containment 12.0.0 Radiation Protection Radiation Protection Title 12.0 Section Only 12.1 General 12.2.0 Assuring That Occup Radiation 12.1 Assuring That Occupational A94 Expose Radiation Exposures Are As Aug 2009 Low As Reasonably Achievable (ALARA) 12.3.0 Radiation Sources 12.2 Radiation Sources A95 Nov 2009 12.4.0 Radiation Protect 12.3 Radiation Protection A97 Design Features Design Features Jan 2010 12.5.0 Dose Assessment 12.4 Dose Assessment A95 I_

Nov 2009 12.6.0 Health Physics Program 12.5 Radiological Control A95 (Radcon) Program Nov 2009 12.7.0 NUREG-0737 Items A95 Nov 2009 12.7.1 Plant Shielding 12.3 Radiation Protection A97 Design Features Jan 2010 12.7.2 High Range Incontainment Monitor 12.7.3 Inplant Radioiodine Monitor 13.1.0 Org Structure Of The Applicant 13.1 Org Structure Of A95 13.1.1 Management & Technical Org The Applicant Nov 2009 13.1.2 Corp Org & Tech Support 13.1.3 Plant Staff Organization 13.1 Org Structure Of A95 The Applicant Nov 2009 13.4 Onsite Review A95 Nov 2009

ENCLOSURE 1 TVA'S Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER Title FSAR FSAR Title Scheduled Section Section Submittal I

I Date 13.2.0 Training 13.2 Training Programs A95 13.2.1 Licensed Operator Training Nov 2009 Program 13.2.2 Training For Nonlicensed Personnel 13.3.0 Emergency Preparedness 13.3 Emergency Planning A95 Evaluation Nov 2009 13.3.1 Introduction 13.3.2 Evaluations Of The Emergency Plan 13.3.3 Conclusion 13.4.0 Review & Audit 13.4 Review And Audit A95 Nov 2009 15.3.6 Anticipated Transient Without 4.3 Reactors - Nuclear Design A95 Scram Nov 2009

  • - No equivalent FSAR section exists for this SER section.

ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item Change NoI Section Section Title Package Number

1.

1.5 Requirements for Further 2-95-13 Technical Information

2.

1.9 Nuclear Performance Plan 2-95-27 Geology, Seismology, and

3.

2.5 Geotechnical Engineering 2-95-30 Summary of Foundation Conditions Classification of

4.

3.2 Structures, Systems And 2-95-42 Components

5.

3.5 Missile Protection 2-95-69 Protection Against Dynamic Effects

6.

3.6 Associated With 2-95-12 Postulated Rupture Of Piping Seismic Design of 2-95-66

7.

3.10 Category I Instrumentation 2-95-34 And Electrical Equipment

8.

4.1 Summary Description 2-95-40

9.

4.2.1 Mechanical Design 2-95-56

10.

4.2.2 Mechanical Design 2-95-51

11.

4.2.3 Reactivity Control System 2-95-54 Tritium Producing

12.

4.2.4 Burnable Absorber Rod -

2-95-52 Tritium Production Core

13.

4.3 Nuclear Design 2-95-49

14.

4.4 Thermal and Hydraulic 2-95-53 Design

15.

5.3 Thermal Hydraulic System 2-95-07 Design 2-95_07

16.

5.5.2 Steam Generator 2-95-36

17.

5.5.10 Pressurizer 2-95-01

18.

5.5.11 Pressurizer Relief Tank 2-95-17

19.

5.5.12 Valves 2-95-02

20.

5.5.14 Component Supports 2-95-11

21.

5.6 Instrumentation 2-95-59 Application

22.

6.2.5 Combustible Gas Control 2-95-48 in Containment

23.

6.2.5A Hydrogen Mitigation 2-95-48 System

24.

6.3 Emergency Core Cooling 2-95-45 System Inservice Inspection of

25.

6.6 ASME Code Class 2 and 3 2-95-20 Components

ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item Change No.

Section Section Title Package Number

26.

7.3 Engineered Safety 2-95-63 Features Actuation System

27.

7.4 Systems Required for Safe 2-95-09 Shutdown

28.

8.1 Electric Power -

2-95-58 28._

81Introduction

29.

8.3 Onsite (Standby) Power 2-95-55 System

30.

9.1.1 New Fuel Storage 2-95-03

31.

9.2.1 Essential Raw Cooling 2-95-57 Water

32.

9.2.2 Component Cooling 2-95-65 System

33.

9.2.3 Demineralized Water 2-95-04 Makeup System

34.

9.2.5 Ultimate Heat Sink 2-95-05

35.

9.2.6 Condensate Storage 2-95-31 Facilities

36.

9.2.7 Refueling Water Storage 2-95-33 Tank

37.

9.2.8 Raw Cooling Water 2-95-10 System

38.

9.3.3 Equipment and Floor Drainage System 2-95-06

39.

9.3.5 Failed Fuel Detection 2-95-18 System

40.

9.3.7 Boron Recycle System 2-95-50 Post Accident Sampling

41.

9.4.9 Facility (PASF) 2-95-29 Environmental Control System

42.

9.5.2 Plant Communication 2-95-37 System Diesel Generator Fuel Oil

43.

9.5.4 Storage And Transfer 2-95-26 System

44.

9.5.5 Diesel Generator Cooling 2-95-08 Water

45.

9.5.6 Diesel Generator 2-95-43 Starting Air

46.

10.1 Summary Description 2-95-67

47.

10.2 Turbine Generator 2-95-70

48.

10.3 Main Steam Supply 2-95-35 System

49.

10.4.1 Main Condenser 2-95-71

ENCLOSURE 2 List of Unit 2 FSAR Amendment 95 "Completed Sections and Required FSAR Changes" Item Change No.

Section Section Title Package Number Main Condenser

50.

10.4.2 ManCnesr2-95-44 Evacuation System

51.

10.4.4 Turbine Bypass System 2-95-46

52.

11.1 Source Terms 2-95-19

53.

11.2 Liquid Waste Systems 2-95-62

54.

11.3 Gaseous Waste Systems 2-95-25 Process and Effluent

55.

11.4 Radiological Monitoring 2-95-47 and Sampling System

56.

11.5 Solid Waste Management 2-95-38

57.

11.6 Offsite Radiological 2-95-24 Monitoring Program

58.

12.2 Radiation Sources 2-95-39

59.

12.4 Dose Assessment 2-95-61

60.

12.5 Radiological Control 2-95-60 (RadCon) Program

61.

13.1 Organizational Structure of 2-95-21

61. __13.1 Applicant 2-95_21
62.

13.2 Training Programs 2-95-22

63.

13.3 Emergency Planning 2-95-23

64.

13.4 Review and Audit 2-95-25

65.

13.6 Plant Records 2-95-16

66.

13.7 Security 2-95-15 Specific Information to be

67.

14.1 Included in Preliminary 2-95-14 SAR

ENCLOSURE3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)

Section No.

Figure No.;

Basis For Redaction 1

1.2-15 1.2 1.2-1 Security Related, 10CFR2.390(d)(1) 1 1.2-16 1.2 1.2-2 Security Related, 10CFR2.390(d)(1) 1 1.2-17 1.2 1.2-3 Security Related, 10CFR2.390(d)(1) 1 1.2-18 1.2 1.2-4 Security Related, 10CFR2.390(d)(1) 1 1.2-19 1.2 1.2-5 Security Related, 10CFR2.390(d)(1) 1 1.2-20 1.2 1.2-6 Security Related, 10CFR2.390(d)(1) 1 1.2-21 1.2 1.2-7 Security Related, 10CFR2.390(d)(1) 1 1.2-22 1.2 1.2-8 Security Related, 10CFR2.390(d)(1) 1 1.2-23 1.2 1.2-9 Security Related, 10CFR2.390(d)(1) 1 1.2-24 1.2 1.2-10, Security Related, 10CFR2.390(d)(1) 1 1.2-25 1.2 1.2-11 Security Related, 10CFR2.390(d)(1) 1 1.2-26 1.2 1.2-12 Security Related, 10CFR2.390(d)(1) 1 1.2-27 1.2 1.2-13 Security Related, IOCFR2.390(d)(1) 1 1.2-28 1.2 1.2-14 Security Related, 10CFR2.390(d)(1) 1 1.2-29 1.2 1.2-15 Security Related, 10CFR2.390(d)(1) 2 2.2-7 2.2 2.2-1 Security Related, 10CFR2.390(d)(1) 2 2.2-8 2.2 22-2 Security Related, 10CFR2.390(d)(1) 2 2.4-90 2.4 2.4-2 Security Related, 10CFR2.390(d)(1) 2 2.4-91 2.4 2.4-3 Security Related, 10CFR2.390(d)(1) 2 2.4-92 2.4 2.4-3a Security Related, 10CFR2.390(d)(1) 2 2.4-93 2.4 2.4-4 Security Related, 10CFR2.390(d)(1) 2 2.4-94 2.4 2.4-5 Security Related, 10CFR2.390(d)(1) 2 2.4-95 2.4 2.4-6 Security Related, 10CFR2.390(d)(1) 2 2.4-96 2.4 2.4-7 Security Related, IOCFR2.390(d)(1) 2 2.4-97 2.4 2.4-8 Security Related, 10CFR2.390(d)(1) 2 2.4-98 2.4 2.4-9 Security Related, 10CFR2.390(d)(1) 2 2.4-99 2.4 2.4-10 Security Related, 10CFR2.390(d)(1) 2 2.4-100 2.4 2.4-11 Security Related, 10CFR2.390(d)(1) 2 2.4-101 2.4 2.4-12 Security Related, 10CFR2.390(d)(1) 2 2.4-102 2.4 2.4-13 Security Related, 10CFR2.390(d)(1) 2 2.4-103 2.4 2.4-14 Security Related, 10CFR2.390(d)(1) 2 2.4-131 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)

Sheet 1 2

2.4-132 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)

Sheet 2 2

2.4-134 2.4 2.4-40b Security Related, 10CFR2.390(d)(1) 2 2.4-135 2.4 2.4-40c Security Related, 10CFR2.390(d)(1) 2 2.4-136 2.4 2.4-40d-1 Security Related, 10CFR2.390(d)(1) 2 2.4-141 2.4 2.4-40f Security Related, 10CFR2.390(d)(1)

Sheet 1 2

2.4-144 2.4 2.4-40g Security Related, 10CFR2.390(d)(1)

Sheet 1 2

2.4-201 2.4 2.4-76 Security Related, 10CFR2.390(d)(1) 2 2.4-204 2.4 2.4-79 Security Related, 10CFR2.390(d)(1) 2 2.4-207 2.4 2.4-82 Security Related, 10CFR2.390(d)(1) 2 2.4-208 2.4 2.4-83 Security Related, 10CFR2.390(d)(1) 2 2.4-213 2.4 2.4-88 Security Related, 10CFR2.390(d)(1)

ENCLOSURE 3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)

Section No.

Figure No.

Basis For Redaction 2

2.4-214 2.4 2.4-89 Security Related, 10CFR2.390(d)(1) 2 2.4-215 2.4 2.4-90 Security Related, 10CFR2.390(d)(1) 2 2.4-223 2.4 2.4-98 Security Related, 10CFR2.390(d)(1) 2 2.5-473 2.5 2.5-185 Security Related, 10CFR2.390(d)(1) 2 2.5-474 2.5 2.5-185a Security Related, 10CFR2.390(d)(1) 2 2.5-515 2.5 2.5-225 Security Related, 10CFR2.390(d)(1) 2 2.5-516 2.5 2.5-226 Security Related, 10CFR2.390(d)(1) 2 2.5-577 2.5 2.5-226a Security Related, 10CFR2.390(d)(1) 2 2.5-577 2.5 2.5-273 Security Related, 10CFR2.390(d)(1) 2 2.5-692 2.5 2.5-358 Security Related, 10CFR2.390(d)(1) 2 2.5-936 2.5 2.5-592 Security Related, 10CFR2.390(d)(1) 3 3.5-53 3.5 3.5-3 Security Related, 10CFR2.390(d)(1) 3 3.5-54 3.5 3.5-4 Security Related, 10CFR2.390(d)(1) 3 3.6-73 3.6 3.6-21 Security Related, 10CFR2.390(d)(1) 3 3.6-74 3.6 3.6-22 Security Related, 10CFR2.390(d)(1) 3 3.6-75 3.6' 3.6-23 Security Related, 10CFR2.390(d)(1) 3 3.6-76 3.6 3.6-24 Security Related, 10CFR2.390(d)(1) 3 3.7-217 3.7 3.7-39 Security Related, 10CFR2.390(d)(1) 3 3.7-218 3.7 3.7-40

.Security Related, 10CFR2.390(d)(1) 3 3.7-219 3.7 3.7-41 Security Related, 10CFR2.390(d)(1) 3 3.7-222 3.7 3.7-44 Security Related, 10CFR2.390(d)(1) 3 3.8.3-62 3.8.3 3.8.3-6 Security Related, 10CFR2.390(d)(1) 3 3.8.3-63 3.8.3 3.8.3-7 Security Related, 10CFR2.390(d)(1) 3 3.8.4-88 3.8.4.

3.8.4-2 Security Related, 10CFR2.390(d)(1) 3 3.8.4-89 3.8.4 3.8.4-3 Security Related, 10CFR2.390(d)(1) 3 3.8.4-90 3.8.4 3.8.4-4 Security Related, 10CFR2.390(d)(1) 3 3.8.4-91 3.8.4 3.8.4-5 Security Related, 10CFR2.390(d)(1) 3 3.8.4-92 3.8.4 3.8.4-6 Security Related, 10CFR2.390(d)(1) 3 3.8.4-95 3.8.4 3.8.4-9 Security Related, 10CFR2.390(d)(1) 3 3.8.4-103 3.8.4 3.8.4-17 Security Related, 10CFR2.390(d)(1) 3 3.8.4-104 3.8.4 3.8.4-18 Security Related, 10CFR2.390(d)(1) 3 3.8.4-105 3.8.4 3.8.4-19 Security Related, 10CFR2.390(d)(1) 3 3.8.4-106 3.8.4 3.8.4-20 Security Related, 10CFR2.390(d)(1) 3 3.8.4-110 3.8.4 3.8.4-24 Security Related, 10CFR2.390(d)(1) 3 3.8.4-114 3.8.4 3.8.4-28 Security Related, 10CFR2.390(d)(1) 3 3.8.4-121 3.8.4 3.8.4-35 Security Related, 10CFR2.390(d)(1) 3 3.8.4-122 3.8.4 3.8.4-36 Security Related, 10CFR2.390(d)(1) 3 3.8.4-123 3.8.4 3.8.4-36a Security Related, 10CFR2.390(d)(1) 3 3.8.4-126 3.8.4 3.8.4-37 Security Related, 10CFR2.390(d)(1) 3 3.8.4-143 3.8.4 3.8.4-50 Security Related, 10CFR2.390(d)(1) 3 3.8.4-144 3.8.4 3.8.4-51 Security Related, 10CFR2.390(d)(1) 3 3.8.6-19 3.8.6 3.8.6-7 Security Related, 10CFR2.390(d)(1) 6 6.2.2-14 6.2.2 6.2.2-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-64 6.2.3 6.2.3-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-65 6.2.3 6.2.3-5 Security Related, 10CFR2.390(d)(1) 6 6.2.3-66 6.2.3 6.2.3-6 Security Related, 10CFR2.390(d)(1) 6 6.2.3-67 6.2.3 6.2.3-7 Security Related, 10CFR2.390(d)(1)

ENCLOSURE3 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 Summary of Redacted Pages Chapter Page(S)

Section No.

Figure No.

Basis For Redaction 6

6.2.3-68 6.2.3 6.2.3-8 Security Related, 10CFR2.390(d)(1) 6 6.2.3-69 6.2.3 6.2.3-9 Security Related, 10CFR2.390(d)(1) 6 6.2.3-70 6.2.3 6.2.3-10 Security Related, 10CFR2.390(d)(1) 6 6.2.3-79 6.2.3 6.2.3-18 Security Related, 10CFR2.390(d)(1) 6 6.2.3-80 6.2.3 6.2.3-19 Security Related, 10CFR2.390(d)(1) 8 8.1-23 8.1 8.1-1 Security Related, 10CFR2.390(d)(1) 8 8.2-13 8.2 Security Related, 10CFR2.390(d)(1) and 8.2-14 8

8.2-30 8.2 8.2-3 Security Related, 10CFR2.390(d)(1) 8 8.2-31 8.2 8.2-4 Security Related, 10CFR2.390(d)(1) 8 8.2-44 8.2 8.2-11 Security Related, 10CFR2.390(d)(1) 8 8.3-99 8.3 8.3-1 Security Related, 10CFR2.390(d)(1) 8 8.3-101 8.3 8.3-2 Security Related, 10CFR2.390(d)(1) 8 8.3-102 8.3 8.3-3 Security Related, 10CFR2.390(d)(1) 8 8.3-104 8.3 8.3-4b Security Related, 10CFR2.390(d)(1) 8 8.3-207 8.3 8.3-46 Security Related, 10CFR2.390(d)(1) 8 8.3-220 8.3 8.3-59 Security Related, 10CFR2.390(d)(1) 9 9.2-208 9.2 9.2-40 Security Related, 10CFR2.390(d)(1) 9 9.4-286 9.4 9.4-21 Security Related, 10CFR2.390(d)(1) 9 9.4-290 9.4 9.4-22c Security Related, 10CFR2.390(d)(1) 9 9.4-291 9.4 9.4-23 Security Related, 10CFR2.390(d)(1) 9 9.4-292 9.4 9.4-24 Security Related, 10CFR2.390(d)(1) 12 12.3-41 12.3 12.3-1 Security Related, 10CFR2.390(d)(1) 12 12.3-42 12.3 12.3-2 Security Related, 10CFR2.390(d)(1) 12 12.3-43 12.3 12.3-3 Security Related, 10CFR2.390(d)(1) 12 12.3-44 12.3 12.3-4 Security Related, 10CFR2.390(d)(1) 12 12.3-45 12.3 12.3-5 Security Related, 10CFR2.390(d)(1) 12 12.3-46 12.3 12.3-6 Security Related, 10CFR2.390(d)(1) 12 12.3-47 12.3 12.3-7 Security Related, 10CFR2.390(d)(1) 12 12.3-48 12.3 12.3-8 Security Related, 10CFR2.390(d)(1) 12 12.3-49 12.3 12.3-9 Security Related, 10CFR2.390(d)(1) 12 12.3-50 12.3 12.3-10 Security Related, 10CFR2.390(d)(1) 12 12.3-51 12.3 12.3-11 Security Related, 10CFR2.390(d)(1) 12 12.3-52 12.3 12.3-12 Security Related, 10CFR2.390(d)(1) 12 12.3-53 12.3 12.3-13 Security Related, 10CFR2.390(d)(1) 12 12.3-54 12.3 12.3-14 Security Related, 10CFR2.390(d)(1) 12 12.3-55 12.3 12.3-15 Security Related, 10CFR2.390(d)(1) 12 12.3-56 12.3 12.3-16 Security Related, 10CFR2.390(d)(1) 12 12.3-57 12.3 12.3-17 Security Related, 10CFR2.390(d)(1) 12 12.3-58 12.3 12.3-18 Security Related, 10CFR2.390(d)(1) 12 12.3-59 12.3 12.3-19 Security Related, 10CFR2.390(d)(1) 12 12.4-7 12.4 12.4-1 Security Related, 10CFR2.390(d)(1)

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name File Size - Bytes TVAWBN-2_FSARFiles 001 TVA WBFSAR TOC.pdf 537,926 002WTVAWBFSARLEP.pdf 753,751 003_TVA WB FSAR Section 1.pdf 4,564,354 004 TVA WB FSAR Section 2 A.pdf 10,885,919 005WTVAWBFSARSection_2_B.pdf 21,212,923 006 TVAWBFSARSection_2_C.pdf 2,073,213 007WTVAWBFSARSection 2_D.pdf 31,335,862 008WTVAWBFSARSection_2_E.pdf 47,242,160 009 TVA WB FSAR Section 3 A.pdf 2,619,007 010 TVA WB FSAR Section_3_B.pdf 7,035,003 01 W-VA WB FSARSection_3_C.pdf 30,018,925 012WTVA WB FSAR Section 3 D.pdf 5,904,997 013 TVA WB FSAR Section 4.pdf 17,555,736 014 TVA WB FSAR Section 5.pdf 11,025,985 015WTVAWBFSAR Section 6 A.pdf 18,485,393 016 TVA_WBFSARSection_6_B.pdf 7,501,726 017 TVA WB_ SARSection_7.pdf 8,372,586 018_-VAWBFSAR Section 8.pdf 30,122,186 019 TVAWBFSARSection 9 A.pdf 23,136,998 020WTVA WB FSAR Section 9_B.pdf 20,715,421 021 WTVAWBFSARSectionI 0.pdf 13,416,943 022WTVAWBFSARSectionI 1.pdf 3,927,239 023 TVA WB FSAR Section 12.pdf 7,025,098 024WTVAWBFSARSectionI 3.pdf 463,723 025 TVA WBFSARSection_ 14.pdf 1,396,432 026WTVA WB FSAR Section 15.pdf 14,869,229 Page 1 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name File Size - Bytes 027 TVA WBFSAR Section 16.pdf 161,788 028 TVA WB FSAR Section 17.pdf 163,900 Total 342,524,423 TVAWBN-2_Oversized_FSARFigures 001_TVA WB FSAR Figure 2.5 3.pdf 1,757,743 002_TVA WBFSAR Figure 2.5 11.pdf 1,689,538 003 TVA WBFSAR Figure 2.5 71.pdf 2,263,087 004_TVA WB FSAR Figure 2.5 222.pdf 909,429 005_--VAWBFSARFigure 2.5 281 1.pdf 2,155,627 006_TVA WB FSARFigure 2.5 281_2.pdf 2,117,562 007 TVA WB FSAR Figure 2.5 549_1.pdf 3,600,807 008-TVAWBFSAR Figure 2.5 549 2.pdf 3,989,180 009-TVA WBFSARFigure 2.5 549_3.pdf 2,863,719 010_TVAWBFSAR Figure 2.5 549 4.pdf 2,809,599 011_TVAWBFSAR Figure 2.5 550.pdf 1,803,985 012-TVA WBFSARFigure 2.5 551.pdf 1,996,869 013 TVA WB FSAR Figure 2.5 554 1.pdf 3,081,060 014 TVA WB FSAR Figure_2.5_554 2.pdf 1,996,707 015_TVAWBFSARFigure 2.5 555.pdf 1,993,312 016_TVAWBFSAR Figure 2.5_556.pdf 2,998,087 017_TVA WB FSAR Figure 2.5_571_1.pdf

'844,484 018-TVA WBFSAR Figure 2.5 571 2.pdf 3,128,329 019_TVAWBFSAR Figure_2.5_571 _3.pdf 3,284,555 020-TVAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021 TVA WBFSAR Figure 2.5 572.pdf 2,196,945 022 WVA WB FSAR Figure 2.5 573.pdf 2,013,286 Page 2 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 - List of Files on Security-Related OSM File Name File Size - Bytes 023_TVAWBFSARFigure 2.5 576_1.pdf 3,238,525 024_TVA WBFSAR Figure 2.5 576 2.pdf 2,151,750 025-TVA WB FSAR Figure 2.5 577.pdf 2,207,622 026_TVAWBFSAR Figure 2.5 578.pdf 2,080,032 027-TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028 TVA WBFSAR Figure 2.5 583.pdf 2,487,346 029_TVAWBFSAR Figure 2.5 588.pdf 2,528,515 030-TVA WB_FSAR Figure 2.5 589.pdf 2,480,438 031_TVAWBFSAR Figure 2.5 594.pdf 13,054,127 032_TVAWBFSAR Figure 2.5 595.pdf 2,323,267 033_TVA WBFSAR Figure 2.5_596.pdf 5,732,107 034_TVA WB FSAR Figure 2.5 597.pdf 1,287,336 035 TVA WBFSAR Figure 2.5 602.pdf 5,549,537 036_TVA WBFSAR Figure 2.5 603.pdf 4,830,835 037_TVA WB FSAR Figure 2.5 604.pdf 6,392,279 038-TVAWBFSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVAWBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf 2,899,519 Total 2,899,519 Page 3 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSARAmendment 95 List of Files on Publicly Available OSM File Name File Size - Bytes TVA WBN-2 FSARFilesREDACTED 001 TVA WBFSARTOC.pdf 537,926 002_TVA WBFSARLEP.pdf 753,751 003 TVA WB FSAR Section 1. pdf 1,069,968 004 TVA WBFSAR Section 2_A.pdf 10,548,551 005WTVA WB FSAR Section 2_B.pdf 15,820,719 006 TVA WB FSAR Section 2_C.pdf 2,073,197 007_-VAWBFSAR Section 2_D.pdf 31,335,862 008 WVA WB FSAR Section 2_E.pdf 46,018,892 009 TVA WB FSAR Section 3_A.pdf 2,334,359 010WTVAWBFSARSection_3_B.pdf 5,740,215 011 TVA WB FSAR Section 3_C.pdf 25,401,100 012WTVA WB FSAR Section 3_D.pdf 5,643,654 013_-VAWBFSARSection_4.pdf 17,555,718 014 TVA WB FSAR Section 5.pdf 11,025,982 015 TVA WBFSAR Section 6_A.pdf 13,987,035 016_-VAWBFSARSection_6_B.pdf 7,501,726 017 TVA WB FSAR Section_7.pdf 8,372,586 018_WVA_WBFSARSection_8.pdf 27,528,640 019WTVA WB FSAR Section_9_A.pdf 22,901,163 020 TVA WB FSARSection 9_B.pdf 13,866,916 021 TVA WBFSAR Section 10.pdf 13,416,930 022_-VA WB FSAR SectionI 1.pdf 3,927,216 023 WVA WB FSAR Section 12.pdf 1,980,681 024 WVA WB FSAR Section 13.pdf 463,726 025WTVA WB FSAR Section_14.pdf 1,386,504 026 TVA WBFSAR Section 15.pdf 14,869,229 027_-VA WB FSAR Section 16.pdf 161,788 Page 1 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 List of Files on Publicly Available OSM File Name File Size - Bytes 028 TVA WB FSAR Section 17.pdf 163,900 Total 306,387,934 TVAWBN-2_Oversized_FSARFigures 001 -VA WBFSARFigure 2.5_3.pdf 1,757,743 002_TVA WBFSARFigure 2.5 11.pdf 1,689,538 003 TVA WB FSAR Figure 2.5 71.pdf 2,263,087 004-TVAWBFSAR Figure 2.5 222.pdf 909,429 005-TVAWBFSAR Figure 2.5 281 1.pdf 2,155,627 006-TVAWBFSARFigure 2.5 281 2.pdf 2,117,562 007-TVAWBFSARFigure 2.5_549 l.pdf 3,600,807 008_-VA WBFSAR Figure 2.5 549 2.pdf 3,989,180 009-TVAWBFSAR Figure 2.5 549 3.pdf 2,863,719 010 TVA WB FSAR Figure 2.5 549 4.pdf 2,809,599 011_-VAWBFSARFigure 2.5 550.pdf 1,803,985 012_-VAWBFSARFigure 2.5 551.pdf 1,996,869 013-TVA WB FSAR Figure 2.5 554 1.pdf 3,081,060 014_-VA WB FSAR Figure 2.5 554 2.pdf 1,996,707 015_WVA WB FSAR Figure_2.5 555.pdf 1,993,312 016 TVA WB FSAR Figure 2.5 556.pdf 2,998,087 017WTVA WB FSARFigure 2.5 571 1.pdf 844,484 018_-VA WBFSAR Figure 2.5 571 2.pdf 3,128,329 019_-VAWB FSAR Figure 2.5 571_3.pdf 3,284,555 020_-VAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021_-VAWBFSAR Figure 2.5 572.pdf 2,196,945 022_-VAWBFSARFigure 2.5 573.pdf 2,013,286 023 WVA WBFSARFigure 2.5_576 l.pdf 3,238,525 024_WAWBFSAR Figure 2.5 576 2.pdf 2,151,750 Page 2 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 95 List of Files on Publicly Available OSM File Name File Size - Bytes 025_TVAWBFSARFigure 2.5 577.pdf 2,207,622 026_TVA WB FSAR Figure_2.5_578.pdf 2,080,032 027-TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028_TVAWBFSARFigure 2.5_583.pdf 2,487,346 029_TVAWBFSAR Figure_2.5 588.pdf 2,528,515 030_TVA WBFSAR Figure 2.5 589.pdf 2,480,438 031 WTVAWBFSARFigure 2.5 594.pdf 13,054,127 032 TVA WBFSAR Figure 2.5 595.pdf 2,323,267 033WTVAWBFSAR Figure 2.5 596.pdf 5,732,107 034_TVAWBFSAR Figure 2.5 597.pdf 1,287,336 035WTVAWBFSAR Figure 2.5 602.pdf 5,549,537 036_TVA WBFSAR Figure 2.5 603.pdf 4,830,835 037_TVAWBFSAR Figure 2.5 604.pdf 6,392,279 038WTVA WBFSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA WBN-2_OversizedFSARTable 001W-VA WB FSARTable_6.2.4-1.pdf 2,899,519 Total 2,899,519 Page 3 of 3