{{#Wiki_filter:uary 11, 2013
{{#Wiki_filter:January 11, 2013


==SUBJECT:==
==SUBJECT:==
Line 36: Line 36:


Sincerely,
Sincerely,
/RA/
/RA/  
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
 
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74  


===Enclosure:===
===Enclosure:===
Inspection Report 05000315/2012007; 05000316/2012007(DRS)
Inspection Report 05000315/2012007; 05000316/2012007(DRS)
w/Attachment: Supplemental Information
w/Attachment: Supplemental Information  


REGION III==
REGION III==
Docket Nos: 05000315; 05000316 License Nos: DPR-58; DPR-74 Report No: 05000315/2012007; 05000316/2012007(DRS)
Docket Nos:
Licensee: Indiana Michigan Power Company Facility: D. C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: July 23, 2012, through December 31, 2012 Inspectors: C. Tilton, Senior Reactor Engineer, Lead R. Baker, Operations Engineer C. Brown, Reactor Engineer, Electrical J. Corujo-Sandín, Reactor Engineer, Mechanical W. Sherbin, Mechanical Contractor G. Skinner, Electrical Contractor Approved by: Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Enclosure
05000315; 05000316 License Nos:
DPR-58; DPR-74 Report No:
05000315/2012007; 05000316/2012007(DRS)
Licensee:
Indiana Michigan Power Company Facility:
D. C. Cook Nuclear Power Plant, Units 1 and 2 Location:
Bridgman, MI Dates:
July 23, 2012, through December 31, 2012 Inspectors:
C. Tilton, Senior Reactor Engineer, Lead  


SUMMARY OF FINDINGS IR 05000315/2012007; 05000316/2012007(DRS); 07/23/2012 - 12/31/2012; D.C. Cook Nuclear Power Plant, Units 1 and 2; Component Design Bases Inspection (CDBI).
R. Baker, Operations Engineer
 
C. Brown, Reactor Engineer, Electrical
 
J. Corujo-Sandín, Reactor Engineer, Mechanical
 
W. Sherbin, Mechanical Contractor
 
G. Skinner, Electrical Contractor Approved by:
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety
 
Enclosure SUMMARY OF FINDINGS IR 05000315/2012007; 05000316/2012007(DRS); 07/23/2012 - 12/31/2012; D.C. Cook Nuclear Power Plant, Units 1 and 2; Component Design Bases Inspection (CDBI).


The inspection was a 3-week onsite baseline inspection that focused on the design of components. The inspection was conducted by regional engineering inspectors and two consultants. One Green finding was identified by the inspectors. The finding was considered a Non-Cited Violation (NCV) of NRC regulations. The significance of inspection findings are indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using IMC 0609, Significance Determination Process, dated June 2, 2011. Cross-cutting aspects are determined using IMC 0310, Components within the Cross Cutting Areas, dated October 28, 2011. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy dated June 7, 2012. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.
The inspection was a 3-week onsite baseline inspection that focused on the design of components. The inspection was conducted by regional engineering inspectors and two consultants. One Green finding was identified by the inspectors. The finding was considered a Non-Cited Violation (NCV) of NRC regulations. The significance of inspection findings are indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using IMC 0609, Significance Determination Process, dated June 2, 2011. Cross-cutting aspects are determined using IMC 0310, Components within the Cross Cutting Areas, dated October 28, 2011. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy dated June 7, 2012. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.


A. NRC-Identified and Self-Revealed Findings Cornerstone: Mitigating Systems
A.
* Green. The inspectors identified a finding of very low safety significance and associated Non-Cited Violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to ensure sufficient water volume in the condensate storage tank when both units auxiliary feedwater (AFW) pumps are aligned to a single condensate storage tank (CST.) Specifically, the licensee failed to perform a calculation to demonstrate sufficient volume and level to prevent net positive suction head and vortex issues when a single CST is providing water to all six AFW pumps as allowed by procedures. The licensees corrective action included performing a formal calculation and increasing the available water volume in the CST when both units AFW pumps are cross-tied.
 
Cornerstone: Mitigating Systems NRC-Identified and Self-Revealed Findings  
*
Green. The inspectors identified a finding of very low safety significance and associated Non-Cited Violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to ensure sufficient water volume in the condensate storage tank when both units auxiliary feedwater (AFW) pumps are aligned to a single condensate storage tank (CST.) Specifically, the licensee failed to perform a calculation to demonstrate sufficient volume and level to prevent net positive suction head and vortex issues when a single CST is providing water to all six AFW pumps as allowed by procedures. The licensees corrective action included performing a formal calculation and increasing the available water volume in the CST when both units AFW pumps are cross-tied.


The performance deficiency was determined to be more than minor because it was associated with the Mitigating System Cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The finding screened as of very low safety significance (Green) because it was a design deficiency confirmed not to result in loss of operability. Specifically, the licensee performed an operability determination which concluded the actual useable tank level during the previous 12 months had been sufficient. The inspectors determined the cause of this finding did not represent current licensee performance and, thus, no cross-cutting aspect was assigned. (Section 1R21.3b.(1))
The performance deficiency was determined to be more than minor because it was associated with the Mitigating System Cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The finding screened as of very low safety significance (Green) because it was a design deficiency confirmed not to result in loss of operability. Specifically, the licensee performed an operability determination which concluded the actual useable tank level during the previous 12 months had been sufficient. The inspectors determined the cause of this finding did not represent current licensee performance and, thus, no cross-cutting aspect was assigned. (Section 1R21.3b.(1))
B. Licensee-Identified Violations No violations were identified.
B.
 
No violations were identified.


1  Enclosure
Licensee-Identified Violations


REPORT DETAIL 1. REACTOR SAFETY Cornerstone: Initiating Events, Mitigating Systems, and Barrier Integrity 1R21 Component Design Bases Inspection (71111.21)
Enclosure 1.
.1 Introduction The objective of the component design bases inspection is to verify the design bases have been correctly implemented for the selected risk significant components and the operating procedures and operator actions are consistent with design and licensing bases. As plants age, their design bases may be difficult to determine and an important design feature may be altered or disabled during a modification. The Probabilistic Risk-Assessment (PRA) model assumes the capability of safety systems and components to perform their intended safety function successfully. This inspectable area verifies aspects of the Initiating Events, Mitigating Systems, and Barrier Integrity cornerstones for which there are no indicators to measure performance.


Specific documents reviewed during the inspection are listed in the Attachment to the report.
REACTOR SAFETY REPORT DETAIL Cornerstone: Initiating Events, Mitigating Systems, and Barrier Integrity 1R21 Component Design Bases Inspection (71111.21)
.1 The objective of the component design bases inspection is to verify the design bases have been correctly implemented for the selected risk significant components and the operating procedures and operator actions are consistent with design and licensing bases. As plants age, their design bases may be difficult to determine and an important design feature may be altered or disabled during a modification. The Probabilistic Risk-Assessment (PRA) model assumes the capability of safety systems and components to perform their intended safety function successfully. This inspectable area verifies aspects of the Initiating Events, Mitigating Systems, and Barrier Integrity cornerstones for which there are no indicators to measure performance.


.2 Inspection Sample Selection Process The inspectors used information contained in the licensees PRA and the D.C. Cook Nuclear Power Plant Standardized Plant Analysis Risk-Model to identify a scenario to use as the basis for component selection. The design basis accident scenario selected was steam generator tube rupture coincident with a loss of offsite power. Based on this scenario, a number of risk significant components were selected for the inspection.
Introduction Specific documents reviewed during the inspection are listed in the Attachment to the report.


The inspectors also used additional component information such as a margin assessment in the selection process. This design margin assessment considered original design reductions caused by design modification, power uprates, or reductions due to degraded material condition. Equipment reliability issues were also considered in the selection of components for detailed review. These included items such as performance test results, significant corrective actions, repeated maintenance activities, Maintenance Rule (a)(1) status, components requiring an operability evaluation, NRC resident inspector input of problem areas/equipment, and system health reports.
.2 The inspectors used information contained in the licensees PRA and the D.C. Cook Nuclear Power Plant Standardized Plant Analysis Risk-Model to identify a scenario to use as the basis for component selection. The design basis accident scenario selected was steam generator tube rupture coincident with a loss of offsite power. Based on this scenario, a number of risk significant components were selected for the inspection.
 
Inspection Sample Selection Process The inspectors also used additional component information such as a margin assessment in the selection process. This design margin assessment considered original design reductions caused by design modification, power uprates, or reductions due to degraded material condition. Equipment reliability issues were also considered in the selection of components for detailed review. These included items such as performance test results, significant corrective actions, repeated maintenance activities, Maintenance Rule (a)(1) status, components requiring an operability evaluation, NRC resident inspector input of problem areas/equipment, and system health reports.


Consideration was also given to the uniqueness and complexity of the design, operating experience, and the available defense-in-depth margins. A summary of the reviews performed and the specific inspection findings identified are included in the following sections of the report.
Consideration was also given to the uniqueness and complexity of the design, operating experience, and the available defense-in-depth margins. A summary of the reviews performed and the specific inspection findings identified are included in the following sections of the report.
Line 74: Line 101:
This inspection constituted 19 samples as defined in Inspection Procedure 71111.21-05.
This inspection constituted 19 samples as defined in Inspection Procedure 71111.21-05.


Enclosure
Enclosure  
.3 a.


.3 Component Design a. Inspection Scope The inspectors reviewed the Updated Final Safety Analysis Report (UFSAR), Technical Specifications (TS), design basis documents, drawings, calculations and other available design basis information, to determine the performance requirements of the selected components. The inspectors used applicable industry standards, such as the American Society of Mechanical Engineers (ASME) Code, Institute of Electrical and Electronics Engineers (IEEE) Standards and the National Electric Code, to evaluate acceptability of the systems design. The inspectors also evaluated licensee actions, if any, taken in response to NRC-issued operating experience, such as Bulletins, Generic Letters (GLs),
Component Design The inspectors reviewed the Updated Final Safety Analysis Report (UFSAR), Technical Specifications (TS), design basis documents, drawings, calculations and other available design basis information, to determine the performance requirements of the selected components. The inspectors used applicable industry standards, such as the American Society of Mechanical Engineers (ASME) Code, Institute of Electrical and Electronics Engineers (IEEE) Standards and the National Electric Code, to evaluate acceptability of the systems design. The inspectors also evaluated licensee actions, if any, taken in response to NRC-issued operating experience, such as Bulletins, Generic Letters (GLs),
Regulatory Issue Summaries (RISs), and Information Notices (INs). The review was to verify the selected components would function as designed when required and support proper operation of the associated systems. The attributes that were needed for a component to perform its required function included process medium, energy sources, control systems, operator actions, and heat removal. The attributes to verify the component condition and tested capability was consistent with the design bases and was appropriate may include installed configuration, system operation, detailed design, system testing, equipment and environmental qualification, equipment protection, component inputs and outputs, operating experience, and component degradation.
Regulatory Issue Summaries (RISs), and Information Notices (INs). The review was to verify the selected components would function as designed when required and support proper operation of the associated systems. The attributes that were needed for a component to perform its required function included process medium, energy sources, control systems, operator actions, and heat removal. The attributes to verify the component condition and tested capability was consistent with the design bases and was appropriate may include installed configuration, system operation, detailed design, system testing, equipment and environmental qualification, equipment protection, component inputs and outputs, operating experience, and component degradation.


For each of the components selected, the inspectors reviewed the maintenance history, preventive maintenance activities, system health reports, operating experience-related information, vendor manuals, electrical and mechanical drawings, and licensee Corrective Action Program documents. Field walkdowns were conducted for all accessible components to assess material condition and to verify the as-built condition was consistent with the design. Other attributes reviewed are included as part of the scope for each individual component.
Inspection Scope For each of the components selected, the inspectors reviewed the maintenance history, preventive maintenance activities, system health reports, operating experience-related information, vendor manuals, electrical and mechanical drawings, and licensee Corrective Action Program documents. Field walkdowns were conducted for all accessible components to assess material condition and to verify the as-built condition was consistent with the design. Other attributes reviewed are included as part of the scope for each individual component.


The following 14 components were reviewed:
The following 14 components were reviewed:  
* Unit 1 East Essential Service Water (ESW) Pump (1-PP-7E): The inspectors reviewed design analyses associated with the ESW pump capacity, net positive suction head (NPSH), and minimum flow to verify the equipments capacity to perform its required functions. The pumps test procedures and recent results were reviewed to verify the actual capability of the installed equipment. The potential susceptibility of the pump to external flooding events was reviewed to verify the capability of the pump to perform its required function. Also reviewed was the potential susceptibility of the pump in the event of a Turbine Building high energy line break (HELB.) In addition, the inspectors reviewed the capability of the ESW pump to serve as the safety-related source of backup water supply to the AFW system. The inspectors reviewed control circuitry for the motor to determine whether manual and automatic functions were consistent with the design bases. The inspectors reviewed protective relaying schemes and calculations to determine whether the motor was adequately protected and whether it was susceptible to spurious tripping.
*
Unit 1 East Essential Service Water (ESW) Pump (1-PP-7E): The inspectors reviewed design analyses associated with the ESW pump capacity, net positive suction head (NPSH), and minimum flow to verify the equipments capacity to perform its required functions. The pumps test procedures and recent results were reviewed to verify the actual capability of the installed equipment. The potential susceptibility of the pump to external flooding events was reviewed to verify the capability of the pump to perform its required function. Also reviewed was the potential susceptibility of the pump in the event of a Turbine Building high energy line break (HELB.) In addition, the inspectors reviewed the capability of the ESW pump to serve as the safety-related source of backup water supply to the AFW system. The inspectors reviewed control circuitry for the motor to determine whether manual and automatic functions were consistent with the design bases. The inspectors reviewed protective relaying schemes and calculations to determine whether the motor was adequately protected and whether it was susceptible to spurious tripping.


Unit 1 East Essential Service Water (ESW) Pump Discharge Strainer (1-OME-34E): Inspectors reviewed design and licensing bases documents for the component. Included in the items reviewed was the safety-related backflush 3  Enclosure
Unit 1 East Essential Service Water (ESW) Pump Discharge Strainer (1-OME-34E): Inspectors reviewed design and licensing bases documents for the component. Included in the items reviewed was the safety-related backflush  


function of the strainer and the differential pressure setpoints associated with the backflush function. In addition, the inspectors reviewed maintenance and operational history of the component. A sample of procedures associated with the components operations was also reviewed.
Enclosure function of the strainer and the differential pressure setpoints associated with the backflush function. In addition, the inspectors reviewed maintenance and operational history of the component. A sample of procedures associated with the components operations was also reviewed.
* Unit 1 East Component Cooling Water (CCW) Heat Exchanger Outlet Shutoff Valve (1-WMO-733)
*
: The inspectors reviewed the design and licensing bases associated with the component. Calculations related to weak link components and thrust analyses were reviewed. The inspectors reviewed recent test and maintenance records for the component. Automatic functions/actuations were reviewed in order to ensure the component could meet its safety-related functions. The inspectors also reviewed control circuitry for the motor to determine whether manual and automatic functions were consistent with the design bases. The inspectors reviewed the thermal overload (TOL) protection scheme for the motor operated valve (MOV), including drawings, calculations, and test procedures to determine whether it was consistent with NRC Regulatory Guide 1.106, Position C.2. The inspectors reviewed voltage and torque calculations for the MOV to determine whether they were conservative and properly incorporated appropriate correction factors specified in limitorque technical data.


* Unit 1 East Component Cooling Water (CCW) Heat Exchanger Outlet Shutoff Valve (1-WMO-733): The inspectors reviewed the design and licensing bases associated with the component. Calculations related to weak link components and thrust analyses were reviewed. The inspectors reviewed recent test and maintenance records for the component. Automatic functions/actuations were reviewed in order to ensure the component could meet its safety-related functions. The inspectors also reviewed control circuitry for the motor to determine whether manual and automatic functions were consistent with the design bases. The inspectors reviewed the thermal overload (TOL) protection scheme for the motor operated valve (MOV), including drawings, calculations, and test procedures to determine whether it was consistent with NRC Regulatory Guide 1.106, Position C.2. The inspectors reviewed voltage and torque calculations for the MOV to determine whether they were conservative and properly incorporated appropriate correction factors specified in limitorque technical data.
Unit 1 East Motor Driven Auxiliary Feedwater Pump (1-PP-3E)
 
*
* Unit 1 East Motor Driven Auxiliary Feedwater Pump (1-PP-3E): The inspectors reviewed design analyses associated with the motor driven auxiliary feedwater (MDAFW) pumps capacity. The licensing bases documents for the AFW system were reviewed, in particular as they relate to the UFSAR credited source of water (CST) and the safety-related backup source of water (ESW). The seismic qualification of the system and some of the support systems (CST) were also reviewed by the inspectors. A sample of procedures used during normal and emergency conditions was reviewed. The inspectors emphasized their review on the interaction between the AFW system and its safety-related backup source of water, including review for potential air binding of the pump as a result of the swap of water sources. The inspectors reviewed industry experience issues associated with potential fouling of the pumps minimum flow recirculation line.
: The inspectors reviewed design analyses associated with the motor driven auxiliary feedwater (MDAFW) pumps capacity. The licensing bases documents for the AFW system were reviewed, in particular as they relate to the UFSAR credited source of water (CST) and the safety-related backup source of water (ESW). The seismic qualification of the system and some of the support systems (CST) were also reviewed by the inspectors. A sample of procedures used during normal and emergency conditions was reviewed. The inspectors emphasized their review on the interaction between the AFW system and its safety-related backup source of water, including review for potential air binding of the pump as a result of the swap of water sources. The inspectors reviewed industry experience issues associated with potential fouling of the pumps minimum flow recirculation line.


The maintenance and testing history of the pump were also reviewed. The inspectors reviewed control circuitry for the motor to determine whether manual and automatic functions were consistent with the design bases. The inspectors review protective relaying schemes and calculations to determine whether the motor was adequately protected and whether it was susceptible to spurious tripping.
The maintenance and testing history of the pump were also reviewed. The inspectors reviewed control circuitry for the motor to determine whether manual and automatic functions were consistent with the design bases. The inspectors review protective relaying schemes and calculations to determine whether the motor was adequately protected and whether it was susceptible to spurious tripping.


* 4kV Bus (T-11D): The inspectors reviewed bus loading calculations to determine whether the 4.16kV system had sufficient capacity to support its required loads under worst case accident loading and grid voltage conditions. The inspectors reviewed the design of the degraded voltage protection scheme to determine whether it afforded adequate voltage to safety-related devices at all voltage distribution levels. This included review of degraded voltage relay setpoint calculations, and a review of the degraded voltage logic scheme. The inspectors reviewed the overcurrent protection scheme for the 4.16kV buses including drawings and calculations to determine whether loads were adequately protected and immune from spurious tripping. The inspectors reviewed calculations and 4  Enclosure
4kV Bus (T-11D): The inspectors reviewed bus loading calculations to determine whether the 4.16kV system had sufficient capacity to support its required loads under worst case accident loading and grid voltage conditions. The inspectors reviewed the design of the degraded voltage protection scheme to determine whether it afforded adequate voltage to safety-related devices at all voltage distribution levels. This included review of degraded voltage relay setpoint calculations, and a review of the degraded voltage logic scheme. The inspectors reviewed the overcurrent protection scheme for the 4.16kV buses including drawings and calculations to determine whether loads were adequately protected and immune from spurious tripping. The inspectors reviewed calculations and  


procedures used to determine operability of the offsite power supplies to the 4160V buses. This included review of switchyard voltage drop criteria and the interface agreements between the station and the transmission system operator.
Enclosure procedures used to determine operability of the offsite power supplies to the 4160V buses. This included review of switchyard voltage drop criteria and the interface agreements between the station and the transmission system operator.


The inspectors reviewed calculations and drawings for the Reserve Auxiliary Transformer load tap changer (LTC) control to determine whether it would have adequate voltage to operate under design basis conditions. The inspectors reviewed 125Vdc system voltage drop calculations to determine whether 4.16kV bus circuit breakers had adequate control voltage.
The inspectors reviewed calculations and drawings for the Reserve Auxiliary Transformer load tap changer (LTC) control to determine whether it would have adequate voltage to operate under design basis conditions. The inspectors reviewed 125Vdc system voltage drop calculations to determine whether 4.16kV bus circuit breakers had adequate control voltage.
 
* Condensate Storage Tanks (1-TK-32, 2-TK-32)
* Condensate Storage Tanks (1-TK-32, 2-TK-32): The inspectors reviewed design calculations to ensure the CST contained sufficient volume to meet the TS requirement and to ensure vortexing would not occur prior to operators taking manual actions to lineup the AFW pumps to their safety-related source of water.
*
: The inspectors reviewed design calculations to ensure the CST contained sufficient volume to meet the TS requirement and to ensure vortexing would not occur prior to operators taking manual actions to lineup the AFW pumps to their safety-related source of water.


Each units AFW pumps suction pipe is normally aligned to a CST, and there is no automatic swap-over to a safety-related source of water for pump suction in the event of a loss of CST. The inspectors reviewed the seismic, tornado wind, and tornado missile licensing basis requirements for the tanks. The inspectors reviewed structural calculations to verify seismic and tornado wind design capabilities of the tanks to maintain the required water volume during these natural hazards. In addition, the inspectors reviewed operating procedures that would be entered during a loss of CST to ensure design bases requirements for AFW pumps suction are maintained.
Each units AFW pumps suction pipe is normally aligned to a CST, and there is no automatic swap-over to a safety-related source of water for pump suction in the event of a loss of CST. The inspectors reviewed the seismic, tornado wind, and tornado missile licensing basis requirements for the tanks. The inspectors reviewed structural calculations to verify seismic and tornado wind design capabilities of the tanks to maintain the required water volume during these natural hazards. In addition, the inspectors reviewed operating procedures that would be entered during a loss of CST to ensure design bases requirements for AFW pumps suction are maintained.


* Emergency Diesel Generator (EDG) (1-CD): The inspectors reviewed the load voltage drop calculation, maximum and minimum voltage profile, and DC field flashing circuit design to ensure that the EDG met the design requirements. The inspectors also verified that the EDG would properly start under degraded voltage conditions. Surveillance test results were reviewed to ensure TS requirements were met. The inspectors reviewed the adequacy and appropriateness of design assumptions and calculations related to EDG protection and relay coordination during test mode and during emergency operation. The EDG output breaker control logic diagrams were reviewed to verify the breaker tripping and closing logic was consistent with design basis description and interlocking requirements. The inspectors reviewed applicable CRs, maintenance activities, and EDG monitoring in accordance with the station blackout (SBO) rule. The inspectors also reviewed the latest operating experience with the system engineer.
Emergency Diesel Generator (EDG) (1-CD)
 
*
* Unit 1 Turbine-Driven AFW Pump 250 Vdc N Train Battery: To ensure that the N-train battery conformed to the design bases, the inspectors performed a walkdown of the turbine-driven (TD) AFW pump room and the N train battery room. The inspectors observed the N train battery, which supplies control power for the pump and noted the room temperature was high. The inspectors reviewed the battery load test results and completed surveillances to ensure the electrolyte levels were being maintained and the effects of the high temperature had been factored into the projections on battery life and performance. The inspectors confirmed the battery room had not approached the maximum allowable room temperature. The inspectors also reviewed the applicable operating procedures and the recent condition reports (CRs) and operability evaluations. The inspectors also reviewed the minimum voltage for the battery during the most limiting conditions of operation.
: The inspectors reviewed the load voltage drop calculation, maximum and minimum voltage profile, and DC field flashing circuit design to ensure that the EDG met the design requirements. The inspectors also verified that the EDG would properly start under degraded voltage conditions. Surveillance test results were reviewed to ensure TS requirements were met. The inspectors reviewed the adequacy and appropriateness of design assumptions and calculations related to EDG protection and relay coordination during test mode and during emergency operation. The EDG output breaker control logic diagrams were reviewed to verify the breaker tripping and closing logic was consistent with design basis description and interlocking requirements. The inspectors reviewed applicable CRs, maintenance activities, and EDG monitoring in accordance with the station blackout (SBO) rule. The inspectors also reviewed the latest operating experience with the system engineer.
 
5  Enclosure
 
* Unit 1 250 Vdc Transfer Cabinet (1-TDAB): To ensure the transfer cabinet and the breakers met the design requirements, the inspectors reviewed the vendor ratings for the Bus and breakers against the breaker specifications. The inspectors also reviewed the short circuit calculations, fuse ratings, and the coordination scheme to ensure proper sizing of protection devices. In addition, the inspectors reviewed the related operations procedures and recent condition reports and operability evaluations.
 
* Unit 1 250 Vdc Battery and Busses (1-BATT-AB): The inspectors performed a walkdown of the battery room and the surrounding areas to inspect for discrepant conditions. The inspectors reviewed the battery sizing and loading calculation to verify all loads were accounted for, that the loads did not exceed the battery bank capacity, and that the calculated load profile bounded all accident scenarios. The inspectors also reviewed the short circuit calculation to confirm the maximum calculated short circuit current available under faulted conditions did not exceed the equipment rating and the protective fuses were adequately sized to isolate the fault and protect the affected equipment. In addition, the inspectors reviewed voltage drop calculations to verify the minimum voltage available at the equipment for the duration of the duty cycle was sufficient to ensure the proper operation of the equipment under limiting operating and environmental conditions. The review included verification that the battery tests conformed to the design and TS requirements, enveloped the calculated load profile for the duration of the duty cycle, confirmed the battery capacity exceeded the minimum capacity required under limiting conditions, and were capable of detecting battery degradation. One-line diagrams and wiring schematic diagrams were also reviewed to verify proper configuration of the 250 Vdc electrical distribution systems. The inspectors reviewed battery charger sizing calculations to verify the chargers were capable of carrying the continuous load after a design basis accident (DBA) and would be able to recharge the batteries to full capacity within the specified period. Additionally, the inspectors reviewed battery chargers tests to verify their capability of performing their intended function under design condition before their scheduled replacement. The inspectors reviewed system health reports, selected preventive and corrective maintenance history, as well as selected corrective action system documents to verify potential degradation was monitored or prevented and that corrective actions were appropriate and performed in a timely manner.


* Steam Generator (SG) Power Operated Relief Valves (PORVs) (MRV-213, -223,
Unit 1 Turbine-Driven AFW Pump 250 Vdc N Train Battery: To ensure that the N-train battery conformed to the design bases, the inspectors performed a walkdown of the turbine-driven (TD) AFW pump room and the N train battery room. The inspectors observed the N train battery, which supplies control power for the pump and noted the room temperature was high. The inspectors reviewed the battery load test results and completed surveillances to ensure the electrolyte levels were being maintained and the effects of the high temperature had been factored into the projections on battery life and performance. The inspectors confirmed the battery room had not approached the maximum allowable room temperature. The inspectors also reviewed the applicable operating procedures and the recent condition reports (CRs) and operability evaluations. The inspectors also reviewed the minimum voltage for the battery during the most limiting conditions of operation.
-233,and 243): The inspectors reviewed the UFSAR, TS, applicable plant calculations, and drawings to identify the design bases requirements of the SG PORVs to determine if they were subject to common cause failure. The inspectors examined system health reports, and records of surveillance testing for the pneumatic operating components. Additionally, the inspectors reviewed station operating and off-normal response procedures to verify design bases requirements had been adequately translated into procedural instructions. The inspectors reviewed design bases documentation and drawings of the instrument air system to verify the support function provided to the SG PORVs was consistent with design requirements. The inspectors reviewed calculations for a postulated design bases steam generator tube rupture (SGTR) event to verify the ability of operators to perform required actions within the time frames assumed in the plants design and licensing basis accident analysis. The inspectors 6  Enclosure


reviewed preventative maintenance and corrective maintenance history for trends, and reviewed recent corrective action documents to ensure problems were identified and corrected. In addition, the inspectors reviewed the sources of power, and control schemes to determine consistency with the design bases and to verify intended operation during accident conditions.
Enclosure
*
Unit 1 250 Vdc Transfer Cabinet (1-TDAB)
*
Unit 1 250 Vdc Battery and Busses (1-BATT-AB): The inspectors performed a walkdown of the battery room and the surrounding areas to inspect for discrepant conditions. The inspectors reviewed the battery sizing and loading calculation to verify all loads were accounted for, that the loads did not exceed the battery bank capacity, and that the calculated load profile bounded all accident scenarios. The inspectors also reviewed the short circuit calculation to confirm the maximum calculated short circuit current available under faulted conditions did not exceed the equipment rating and the protective fuses were adequately sized to isolate the fault and protect the affected equipment. In addition, the inspectors reviewed voltage drop calculations to verify the minimum voltage available at the equipment for the duration of the duty cycle was sufficient to ensure the proper operation of the equipment under limiting operating and environmental conditions. The review included verification that the battery tests conformed to the design and TS requirements, enveloped the calculated load profile for the duration of the duty cycle, confirmed the battery capacity exceeded the minimum capacity required under limiting conditions, and were capable of detecting battery degradation. One-line diagrams and wiring schematic diagrams were also reviewed to verify proper configuration of the 250 Vdc electrical distribution systems. The inspectors reviewed battery charger sizing calculations to verify the chargers were capable of carrying the continuous load after a design basis accident (DBA) and would be able to recharge the batteries to full capacity within the specified period. Additionally, the inspectors reviewed battery chargers tests to verify their capability of performing their intended function under design condition before their scheduled replacement. The inspectors reviewed system health reports, selected preventive and corrective maintenance history, as well as selected corrective action system documents to verify potential degradation was monitored or prevented and that corrective actions were appropriate and performed in a timely manner.
: To ensure the transfer cabinet and the breakers met the design requirements, the inspectors reviewed the vendor ratings for the Bus and breakers against the breaker specifications. The inspectors also reviewed the short circuit calculations, fuse ratings, and the coordination scheme to ensure proper sizing of protection devices. In addition, the inspectors reviewed the related operations procedures and recent condition reports and operability evaluations.
* Steam Generator (SG) Power Operated Relief Valves (PORVs) (MRV-213, -223,
-233,and 243): The inspectors reviewed the UFSAR, TS, applicable plant calculations, and drawings to identify the design bases requirements of the SG PORVs to determine if they were subject to common cause failure. The inspectors examined system health reports, and records of surveillance testing for the pneumatic operating components. Additionally, the inspectors reviewed station operating and off-normal response procedures to verify design bases requirements had been adequately translated into procedural instructions. The inspectors reviewed design bases documentation and drawings of the instrument air system to verify the support function provided to the SG PORVs was consistent with design requirements. The inspectors reviewed calculations for a postulated design bases steam generator tube rupture (SGTR) event to verify the ability of operators to perform required actions within the time frames assumed in the plants design and licensing basis accident analysis. The inspectors


Enclosure reviewed preventative maintenance and corrective maintenance history for trends, and reviewed recent corrective action documents to ensure problems were identified and corrected. In addition, the inspectors reviewed the sources of power, and control schemes to determine consistency with the design bases and to verify intended operation during accident conditions.
* Unit 1 Train A Pressurizer PORV (1-NRV-153): The inspectors reviewed the translation of design bases into surveillance testing of the pressurizer PORV to ensure it is capable of performing as required in SGTR event. The inspectors also reviewed the design and testing of the backup pneumatic supply to the PORV actuator to ensure there is a sufficient quantity at adequate pressure to stroke the PORV when required on a loss of normal plant air. Plant alarm response procedure for low PORV accumulator pneumatic pressure was also reviewed to ensure operators have sufficient time to align additional pneumatic supply sources. The inspectors also reviewed thermal hydraulic calculations which determined the required stroke time of the PORV, and ensured testing demonstrated that stroke time requirements were met. In addition, the inspectors reviewed the sources of power, and control schemes to determine consistency with the design bases and to verify intended operation during accident conditions.
* Unit 1 Train A Pressurizer PORV (1-NRV-153): The inspectors reviewed the translation of design bases into surveillance testing of the pressurizer PORV to ensure it is capable of performing as required in SGTR event. The inspectors also reviewed the design and testing of the backup pneumatic supply to the PORV actuator to ensure there is a sufficient quantity at adequate pressure to stroke the PORV when required on a loss of normal plant air. Plant alarm response procedure for low PORV accumulator pneumatic pressure was also reviewed to ensure operators have sufficient time to align additional pneumatic supply sources. The inspectors also reviewed thermal hydraulic calculations which determined the required stroke time of the PORV, and ensured testing demonstrated that stroke time requirements were met. In addition, the inspectors reviewed the sources of power, and control schemes to determine consistency with the design bases and to verify intended operation during accident conditions.
* Unit 1 TDAFW Pump Discharge Check Valve (1-135): The inspectors reviewed system design criteria, selected drawings, and maintenance and test procedures for the Unit 1 TDAFW pump discharge check valve (1-135). The inspectors also performed walkdowns and reviewed corrective action documents. Additionally, the inspectors reviewed inservice test basis documents and associated test results, including forward flow. The inspectors also reviewed calculations that provided the bases for the inservice test acceptance criteria. Recent check valve internal inspection/examination results were also reviewed.
* Unit 1 TDAFW Pump Discharge Check Valve (1-135): The inspectors reviewed system design criteria, selected drawings, and maintenance and test procedures for the Unit 1 TDAFW pump discharge check valve (1-135). The inspectors also performed walkdowns and reviewed corrective action documents. Additionally, the inspectors reviewed inservice test basis documents and associated test results, including forward flow. The inspectors also reviewed calculations that provided the bases for the inservice test acceptance criteria. Recent check valve internal inspection/examination results were also reviewed.
* Unit 1 TDAFW Pump Room Coolers (1-HV-AFP-T1AC And T2AC): The inspectors reviewed analyses addressing the maximum potential TDAFW room temperatures under accident and SBO conditions and room cooler sizing calculations. The review verified the capability of required equipment in the room to perform their required functions with elevated room temperatures. The inspectors reviewed recent flow testing to ensure adequate cooling water flow to the room coolers and reviewed recent heat exchanger tube inspection results to verify heat transfer capability is maintained. The inspectors reviewed design documents which determined tube plugging limits and verified these limits were in plant maintenance procedures. The inspectors also performed walkdowns, reviewed corrective action documents and seismic qualification documents for the room coolers and structural supports.


* Unit 1 TDAFW Pump Room Coolers (1-HV-AFP-T1AC And T2AC): The inspectors reviewed analyses addressing the maximum potential TDAFW room temperatures under accident and SBO conditions and room cooler sizing calculations. The review verified the capability of required equipment in the room to perform their required functions with elevated room temperatures. The inspectors reviewed recent flow testing to ensure adequate cooling water flow to the room coolers and reviewed recent heat exchanger tube inspection results to verify heat transfer capability is maintained. The inspectors reviewed design documents which determined tube plugging limits and verified these limits were in plant maintenance procedures. The inspectors also performed walkdowns, reviewed corrective action documents and seismic qualification documents for the room coolers and structural supports.
b.


b. Findings (1) Non-Conservative Condensate Storage Tank (CST) Cross-Tie NPSH Calculation Introduction: A finding of very-low-safety significance and associated Non-Cited Violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, was identified by the inspectors for the failure to ensure sufficient water volume in the condensate storage tank when both units AFW pumps are aligned to a single CST. Specifically, the licensee 7  Enclosure
Findings (1) Non-Conservative Condensate Storage Tank (CST) Cross-Tie NPSH Calculation Introduction: A finding of very-low-safety significance and associated Non-Cited Violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, was identified by the inspectors for the failure to ensure sufficient water volume in the condensate storage tank when both units AFW pumps are aligned to a single CST. Specifically, the licensee  


failed to perform a calculation to show that there would be adequate NPSH and vortexing issues would be prevented when a single CST is providing water to all six AFW pumps as allowed by procedures.
Enclosure failed to perform a calculation to show that there would be adequate NPSH and vortexing issues would be prevented when a single CST is providing water to all six AFW pumps as allowed by procedures.


Description: On August 24, 2012, while reviewing calculation MD-12-CST-002-N, Operation of the AFW System Using the Condensate Storage Tank of the Other Unit, the inspectors noted the calculation concluded that a level of seven feet above the centerline of the discharge pipe to the AFW pumps was required to provide adequate NPSH when cross-tied to the other units CST. The inspectors also noted this calculation assumed only three AFW pumps in a single unit in operation drawing water from the opposite units CST.
Description: On August 24, 2012, while reviewing calculation MD-12-CST-002-N, Operation of the AFW System Using the Condensate Storage Tank of the Other Unit, the inspectors noted the calculation concluded that a level of seven feet above the centerline of the discharge pipe to the AFW pumps was required to provide adequate NPSH when cross-tied to the other units CST. The inspectors also noted this calculation assumed only three AFW pumps in a single unit in operation drawing water from the opposite units CST.
Line 139: Line 173:
Analysis: The inspectors determined the failure to ensure sufficient water volume in the condensate storage tank when both units AFW pumps are aligned to a single CST was contrary to 10 CFR Part 50, Appendix B, Criterion III, Design Control, and was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the Mitigating System Cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to perform a calculation to demonstrate adequate NPSH and vortexing issues would be prevented when a single CST is providing water to all six AFW pumps does not ensure the availability and reliability of the AFW system to provide its accident mitigating function.
Analysis: The inspectors determined the failure to ensure sufficient water volume in the condensate storage tank when both units AFW pumps are aligned to a single CST was contrary to 10 CFR Part 50, Appendix B, Criterion III, Design Control, and was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the Mitigating System Cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to perform a calculation to demonstrate adequate NPSH and vortexing issues would be prevented when a single CST is providing water to all six AFW pumps does not ensure the availability and reliability of the AFW system to provide its accident mitigating function.


The inspectors determined the finding could be evaluated using the SDP in accordance with IMC 0609, Significance Determination Process, Attachment 0609.04, Initial Characterization of Findings. Because the finding impacted the Mitigating Systems cornerstone, the inspectors screened the finding through IMC 0609 Appendix A, 8  Enclosure
The inspectors determined the finding could be evaluated using the SDP in accordance with IMC 0609, Significance Determination Process, Attachment 0609.04, Initial Characterization of Findings. Because the finding impacted the Mitigating Systems cornerstone, the inspectors screened the finding through IMC 0609 Appendix A,


The Significance Determination Process for Findings At-Power, using Exhibit 2, Mitigating Systems Screening Questions. The finding screened as of very low safety significance (Green) because it was a design deficiency confirmed not to result in loss of operability. Specifically, the licensee performed an operability determination which concluded that in the past 12 months the volume and level in each CST was adequate to allow for a single CST to supply both units AFW pumps without affecting operability of the AFW systems.
Enclosure The Significance Determination Process for Findings At-Power, using Exhibit 2, Mitigating Systems Screening Questions. The finding screened as of very low safety significance (Green) because it was a design deficiency confirmed not to result in loss of operability. Specifically, the licensee performed an operability determination which concluded that in the past 12 months the volume and level in each CST was adequate to allow for a single CST to supply both units AFW pumps without affecting operability of the AFW systems.


The inspectors determined the cause of this finding did not represent current licensee performance and, thus, no cross-cutting aspect was assigned.
The inspectors determined the cause of this finding did not represent current licensee performance and, thus, no cross-cutting aspect was assigned.
Line 157: Line 191:
At the time of the inspection, none of the installed HFA relays had exceeded the 41-year service life. This issue is considered an unresolved item pending consultation with personnel in the Office of Nuclear Reactor Regulation (NRR) and further NRC review of the licensee response. (URI 05000315/2012007-02, 05000316/2012007-02; Qualification Basis for Safety-Related Relays and Motor-Starter Contactors).
At the time of the inspection, none of the installed HFA relays had exceeded the 41-year service life. This issue is considered an unresolved item pending consultation with personnel in the Office of Nuclear Reactor Regulation (NRR) and further NRC review of the licensee response. (URI 05000315/2012007-02, 05000316/2012007-02; Qualification Basis for Safety-Related Relays and Motor-Starter Contactors).


Enclosure
Enclosure (3) Concerns with Periodic Design Basis Testing of Installed Relays and Motor-Starter Contactors Introduction: The inspectors identified an unresolved item (URI) regarding periodic design basis testing of installed relays and motor-starter contactors. Specifically, the licensee had neither a periodic testing program nor had any record of testing critical SSCs to ensure the SSCs continued to meet their respective design criteria (minimum pickup voltage, minimum drop-out voltage, and timing tests).
 
(3) Concerns with Periodic Design Basis Testing of Installed Relays and Motor-Starter Contactors Introduction: The inspectors identified an unresolved item (URI) regarding periodic design basis testing of installed relays and motor-starter contactors. Specifically, the licensee had neither a periodic testing program nor had any record of testing critical SSCs to ensure the SSCs continued to meet their respective design criteria (minimum pickup voltage, minimum drop-out voltage, and timing tests).


Description: As part of the review for exceeding the recommended relay service life, the inspectors determined the licensee did not periodically test the safety-related relays and motor-starter contactors to the design specifications and had not since the plant started power operations.
Description: As part of the review for exceeding the recommended relay service life, the inspectors determined the licensee did not periodically test the safety-related relays and motor-starter contactors to the design specifications and had not since the plant started power operations.
Line 173: Line 205:
(URI 05000315/2012007-03, 05000316/2012007-03; Concerns with Periodic Design Basis Testing of Installed Relays and Motor-Starter Contactors).
(URI 05000315/2012007-03, 05000316/2012007-03; Concerns with Periodic Design Basis Testing of Installed Relays and Motor-Starter Contactors).


.4 Operating Experience a. Inspection Scope The inspectors reviewed five operating experience issues to ensure that NRC generic concerns had been adequately evaluated and addressed by the licensee. The operating experience issues listed below were reviewed and are considered inspection samples:
.4 Operating Experience a.
* GL 1979-36, "Adequacy of Station Electric Distribution Systems Voltages";
 
* GL 2006-02, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power; 10   Enclosure
Inspection Scope The inspectors reviewed five operating experience issues to ensure that NRC generic concerns had been adequately evaluated and addressed by the licensee. The operating experience issues listed below were reviewed and are considered inspection samples:  
*
GL 1979-36, "Adequacy of Station Electric Distribution Systems Voltages";  
*
GL 2006-02, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power;
 
Enclosure
*
IN 2004-01, Auxiliary Feedwater Pump Recirculation Line Orifice Fouling -
Potential Common Cause Failure;
*
GL 1991-13, Request for Information Related to the Resolution of Generic Issue 130, Essential Service Water System Failures at Multi-Unit Sites Pursuant to 10 CFR 50.54 (F); and
*
RIS 2008-14, Use of TORMIS Computer Code for Assessment of Tornado Missile Protection.
 
b.
 
Findings No findings of significance were identified.
 
.5 Modifications a.


* IN 2004-01, Auxiliary Feedwater Pump Recirculation Line Orifice Fouling -
Inspection Scope The inspectors reviewed one permanent plant modifications related to selected risk significant components to verify the design bases, licensing bases, and performance capability of the components had not been degraded through modifications. The modifications listed below were reviewed as part of this inspection effort:
Potential Common Cause Failure;
*
* GL 1991-13, Request for Information Related to the Resolution of Generic Issue 130, Essential Service Water System Failures at Multi-Unit Sites Pursuant to 10 CFR 50.54 (F); and
DCP 4690, 250 Vdc Fuse Replacement Project b.
* RIS 2008-14, Use of TORMIS Computer Code for Assessment of Tornado Missile Protection.


b. Findings No findings of significance were identified.
Findings No findings of significance were identified.


.5 Modifications a. Inspection Scope The inspectors reviewed one permanent plant modifications related to selected risk significant components to verify the design bases, licensing bases, and performance capability of the components had not been degraded through modifications. The modifications listed below were reviewed as part of this inspection effort:
.6 Operating Procedure Accident Scenarios a.
* DCP 4690, 250 Vdc Fuse Replacement Project b. Findings No findings of significance were identified.


.6 Operating Procedure Accident Scenarios a. Inspection Scope The inspectors performed a detailed review of the procedures listed below associated with the selected scenario, steam generator tube rupture. The procedures were compared to UFSAR content, design assumptions, regulatory requirements, and training materials to assure constancy. For the procedures listed, operator actions were reviewed for reasonableness, in plant actions were walked down with a licensed operator, and any interfaces with other departments were evaluated.
Inspection Scope The inspectors performed a detailed review of the procedures listed below associated with the selected scenario, steam generator tube rupture. The procedures were compared to UFSAR content, design assumptions, regulatory requirements, and training materials to assure constancy. For the procedures listed, operator actions were reviewed for reasonableness, in plant actions were walked down with a licensed operator, and any interfaces with other departments were evaluated.


The following operating procedures were reviewed in detail:
The following operating procedures were reviewed in detail:  
* 1(2)-OHP-4023-E-0, Reactor Trip or Safety Injection;
*
* 1(2)-OHP-4023-E-3, Steam Generator Tube Rupture;
1(2)-OHP-4023-E-0, Reactor Trip or Safety Injection;  
* 1(2)-OHP-4023-ECA-3.1, SGTR With Loss of Reactor Coolant-Subcooled Recovery Desired;
*
* 1(2)-OHP-4023-ES-3.1, Post-SGTR Cooldown Using Backfill; and
1(2)-OHP-4023-E-3, Steam Generator Tube Rupture;  
* 1(2)-OHP-4023-ES-3.2, Post-SGTR Cooldown Using Blowdown.
*
1(2)-OHP-4023-ECA-3.1, SGTR With Loss of Reactor Coolant-Subcooled Recovery Desired;  
*
1(2)-OHP-4023-ES-3.1, Post-SGTR Cooldown Using Backfill; and  
*
1(2)-OHP-4023-ES-3.2, Post-SGTR Cooldown Using Blowdown.


11  Enclosure
Enclosure For the following selected time critical operator actions, the inspectors performed detailed walkthroughs of specific procedure steps, including observing the performance of required actions in the stations simulator and local actions in the plant by appropriate plant operators to assess operator knowledge level, adequacy of procedures, and availability of special equipment where required.


For the following selected time critical operator actions, the inspectors performed detailed walkthroughs of specific procedure steps, including observing the performance of required actions in the stations simulator and local actions in the plant by appropriate plant operators to assess operator knowledge level, adequacy of procedures, and availability of special equipment where required.
The following operator actions were assessed in detail:
*
Actions to isolate AFW flow to steam generator with ruptured tube;
*
Actions to isolate steam flow from steam generator with ruptured tube;
*
Actions to initiate reactor coolant system (RCS) cooldown following steam generator tube rupture;
*
Actions to initiate RCS depressurization following steam generator tube rupture;
*
Actions to terminate safety injection following steam generator tube rupture; and  
*
Actions to align backup nitrogen to and locally operate the steam generator power operated relief valves on the intact steam generators.


The following operator actions were assessed in detail:
b.
* Actions to isolate AFW flow to steam generator with ruptured tube;
* Actions to isolate steam flow from steam generator with ruptured tube;
* Actions to initiate reactor coolant system (RCS) cooldown following steam generator tube rupture;
* Actions to initiate RCS depressurization following steam generator tube rupture;
* Actions to terminate safety injection following steam generator tube rupture; and
* Actions to align backup nitrogen to and locally operate the steam generator power operated relief valves on the intact steam generators.


b. Findings (1) Concerns with Ensuring Margin to Overfill in a Ruptured SG Introduction: The inspectors identified an URI related to the adequacy of the licensees emergency operating procedures (EOPs) which mitigate the consequences of a SGTR.
Findings (1) Concerns with Ensuring Margin to Overfill in a Ruptured SG Introduction: The inspectors identified an URI related to the adequacy of the licensees emergency operating procedures (EOPs) which mitigate the consequences of a SGTR.


Specifically, procedures EOP 1(2) OHP-4023-E-3, Steam Generator Tube Rupture, did not provide adequate actions to mitigate the consequences of a SGTR in sufficient time to prevent overfilling the ruptured steam generator which could lead to exceeding calculated offsite doses.
Specifically, procedures EOP 1(2) OHP-4023-E-3, Steam Generator Tube Rupture, did not provide adequate actions to mitigate the consequences of a SGTR in sufficient time to prevent overfilling the ruptured steam generator which could lead to exceeding calculated offsite doses.
Line 218: Line 278:
The facilitys EOPs 1(2) OHP-4023-E-3, Steam Generator Tube Rupture, Step 7, directs the operators to perform a rapid RCS cooldown by fully opening the SG PORVs on the 3 intact SGs. The margin to overfill (MTO) analysis assumes this step occurs on demand (the SGTR PORVs open immediately as soon as the operators manipulate the valves from the control room). Once the SG PORVs are full open, the MTO analysis assumes it takes 12 minutes to complete the RCS cooldown. This is a calculated (modeled) value which takes into account plant specific characteristics.
The facilitys EOPs 1(2) OHP-4023-E-3, Steam Generator Tube Rupture, Step 7, directs the operators to perform a rapid RCS cooldown by fully opening the SG PORVs on the 3 intact SGs. The margin to overfill (MTO) analysis assumes this step occurs on demand (the SGTR PORVs open immediately as soon as the operators manipulate the valves from the control room). Once the SG PORVs are full open, the MTO analysis assumes it takes 12 minutes to complete the RCS cooldown. This is a calculated (modeled) value which takes into account plant specific characteristics.


12  Enclosure
Enclosure If the SG PORVs do not open, the EOPs direct operators to establish backup Nitrogen.
 
If the SG PORVs do not open, the EOPs direct operators to establish backup Nitrogen.


Because aligning Nitrogen to the SG PORVs is a manual operation requiring multiple manipulations outside the control room, the inspectors were concerned the additional time to complete these actions would result in a longer time to complete the RCS cooldown than assumed in the MTO analysis and the affected SG could overfill.
Because aligning Nitrogen to the SG PORVs is a manual operation requiring multiple manipulations outside the control room, the inspectors were concerned the additional time to complete these actions would result in a longer time to complete the RCS cooldown than assumed in the MTO analysis and the affected SG could overfill.
Line 236: Line 294:
Although the inspectors received a response from NRR, the issue remained open awaiting additional licensing bases information from the licensee. This issue is considered an unresolved item (URI) pending further review this information (URI 05000315/2012007-04, 05000316/2012007-04; Concerns with Ensuring Margin to Overfill in a Ruptured SG).
Although the inspectors received a response from NRR, the issue remained open awaiting additional licensing bases information from the licensee. This issue is considered an unresolved item (URI) pending further review this information (URI 05000315/2012007-04, 05000316/2012007-04; Concerns with Ensuring Margin to Overfill in a Ruptured SG).


(2) Concerns with Operability of SG PORVs with the Control Air Compressor Unavailable Introduction: The inspectors identified an URI related to the operability of the SG PORVs as defined in TS 3.7.4 when the associated CAC was unavailable and incapable of providing its required support function. Specifically, the licensee may have failed to 13  Enclosure
(2) Concerns with Operability of SG PORVs with the Control Air Compressor Unavailable Introduction: The inspectors identified an URI related to the operability of the SG PORVs as defined in TS 3.7.4 when the associated CAC was unavailable and incapable of providing its required support function. Specifically, the licensee may have failed to  


declare the affected units SG PORVs inoperable and complete the TS required actions when the non-safety-related CAC was made unavailable thus affecting the SG PORVs capability to mitigate the consequences of a SGTR coincident with a loss of offsite power to the station, in sufficient time to prevent overfilling the ruptured steam generator.
Enclosure declare the affected units SG PORVs inoperable and complete the TS required actions when the non-safety-related CAC was made unavailable thus affecting the SG PORVs capability to mitigate the consequences of a SGTR coincident with a loss of offsite power to the station, in sufficient time to prevent overfilling the ruptured steam generator.


Description: The inspectors identified an issue related to the definition of operability of the SG PORVs as specified by the TS. The most limiting design bases accident for the SG PORVs, is a tube rupture event. During this accident, the operators prevent overfill of the ruptured steam generator using the SG PORVs. Assuming a coincident loss of offsite power (LOOP) to the station (affecting both units), the only readily available source of pneumatic motive force for the SG PORVs is the unit-specific CAC, which has the capability of being powered from onsite emergency power (EDGs). The TS bases for the SG PORVs (B 3.7.4) states the Control Air System (the system composed of the CAC)
Description: The inspectors identified an issue related to the definition of operability of the SG PORVs as specified by the TS. The most limiting design bases accident for the SG PORVs, is a tube rupture event. During this accident, the operators prevent overfill of the ruptured steam generator using the SG PORVs. Assuming a coincident loss of offsite power (LOOP) to the station (affecting both units), the only readily available source of pneumatic motive force for the SG PORVs is the unit-specific CAC, which has the capability of being powered from onsite emergency power (EDGs). The TS bases for the SG PORVs (B 3.7.4) states the Control Air System (the system composed of the CAC)
Line 247: Line 305:
The inspectors indentified several occasions when the CAC was non-functional; however, the licensee did not declare the PORVs inoperable. Specifically, a review of the facilitys unavailability records for the Unit 1 and Unit 2 CACs from January 1, 2000 to August 20, 2012 identified 13 instances (5 associated with Unit 1 and 8 associated Unit 2) when the units CAC was unavailable for greater than 24 hours, the TS allowed outage time for two or more SG PORVs being inoperable. In three of those instances for Unit 1 (April 18, 2001, for 79.8 hrs, November 23, 2003, for 133.2 hrs, and April 7, 2008, for 108.9 hrs) and two of those instances for Unit 2 (February 12, 2003, for 71.8 hrs and January 16, 2006, for 103.5 hrs) the unavailability time of the CAC was in excess of the total TS allowed outage times of 54 hours to place the unit in a mode where the limiting condition of operation does not apply.
The inspectors indentified several occasions when the CAC was non-functional; however, the licensee did not declare the PORVs inoperable. Specifically, a review of the facilitys unavailability records for the Unit 1 and Unit 2 CACs from January 1, 2000 to August 20, 2012 identified 13 instances (5 associated with Unit 1 and 8 associated Unit 2) when the units CAC was unavailable for greater than 24 hours, the TS allowed outage time for two or more SG PORVs being inoperable. In three of those instances for Unit 1 (April 18, 2001, for 79.8 hrs, November 23, 2003, for 133.2 hrs, and April 7, 2008, for 108.9 hrs) and two of those instances for Unit 2 (February 12, 2003, for 71.8 hrs and January 16, 2006, for 103.5 hrs) the unavailability time of the CAC was in excess of the total TS allowed outage times of 54 hours to place the unit in a mode where the limiting condition of operation does not apply.


As stated in Section 1R21.6(b)(1), the licensee disagreed with the inspectors initial assumption with respect to the initial conditions of a LOOP affecting both units. The licensee believes their licensing basis for a SGTR is a concurrent LOOP in the affected unit and the unaffected unit maintains an intact source of offsite power. In the licensees scenario, the affected units SG PORVs would still have a source of immediate remote 14  Enclosure
As stated in Section 1R21.6(b)(1), the licensee disagreed with the inspectors initial assumption with respect to the initial conditions of a LOOP affecting both units. The licensee believes their licensing basis for a SGTR is a concurrent LOOP in the affected unit and the unaffected unit maintains an intact source of offsite power. In the licensees scenario, the affected units SG PORVs would still have a source of immediate remote  


(from the control room) motive force via the compressed air system. On the contrary, the inspectors believe the licensees design basis accident is a SGTR coincident with a LOOP to the station (both units). To resolve this issue, the inspectors requested support from NRR through a concurrence Task Interface Agreement (TIA) to determine the licensing bases for this event. In a TIA memorandum dated December 7, 2012, NRR concluded the licensing bases included a LOOP for both units (ML13011A382).
Enclosure (from the control room) motive force via the compressed air system. On the contrary, the inspectors believe the licensees design basis accident is a SGTR coincident with a LOOP to the station (both units). To resolve this issue, the inspectors requested support from NRR through a concurrence Task Interface Agreement (TIA) to determine the licensing bases for this event. In a TIA memorandum dated December 7, 2012, NRR concluded the licensing bases included a LOOP for both units (ML13011A382).


Although the inspectors received a response from NRR, the issue remained open awaiting additional licensing bases information from the licensee. This issue is considered an unresolved item (URI) pending further review of this information (URI 05000315/2012007-05, 05000316/2012007-05; Concerns with Operability of SG PORVs with Control Air Compressor Unavailable).
Although the inspectors received a response from NRR, the issue remained open awaiting additional licensing bases information from the licensee. This issue is considered an unresolved item (URI) pending further review of this information (URI 05000315/2012007-05, 05000316/2012007-05; Concerns with Operability of SG PORVs with Control Air Compressor Unavailable).


4. OTHER ACTIVITIES 4OA2 Identification and Resolution of Problems
4.
.1 Review of Items Entered Into the Corrective Action Program a. Inspection Scope The inspectors reviewed a sample of the selected component problems that were identified by the licensee and entered into the Corrective Action Program. The inspectors reviewed these issues to verify an appropriate threshold for identifying issues and to evaluate the effectiveness of corrective actions related to design issues. In addition, corrective action documents written on issues identified during the inspection were reviewed to verify adequate problem identification and incorporation of the problem into the Corrective Action Program. The specific corrective action documents that were sampled and reviewed by the inspectors are listed in the attachment to this report.
 
OTHER ACTIVITIES 4OA2 Identification and Resolution of Problems  
.1 Review of Items Entered Into the Corrective Action Program a.
 
Inspection Scope The inspectors reviewed a sample of the selected component problems that were identified by the licensee and entered into the Corrective Action Program. The inspectors reviewed these issues to verify an appropriate threshold for identifying issues and to evaluate the effectiveness of corrective actions related to design issues. In addition, corrective action documents written on issues identified during the inspection were reviewed to verify adequate problem identification and incorporation of the problem into the Corrective Action Program. The specific corrective action documents that were sampled and reviewed by the inspectors are listed in the attachment to this report.
 
b.


b. Findings No findings of significance were identified.
Findings No findings of significance were identified.


4OA6 Meeting(s)
4OA6 Meeting(s)  
.1 Exit Meeting Summary On December 31, 2012, the inspectors presented the inspection results to Mr. M.
.1 Exit Meeting Summary On December 31, 2012, the inspectors presented the inspection results to Mr. M.


Carlson, and other members of the licensee staff. The licensee acknowledged the issues presented. Several documents reviewed by the inspectors were considered proprietary information and were either returned to the licensee or handled in accordance with NRC policy on proprietary information.
Carlson, and other members of the licensee staff. The licensee acknowledged the issues presented. Several documents reviewed by the inspectors were considered proprietary information and were either returned to the licensee or handled in accordance with NRC policy on proprietary information.


ATTACHMENT: SUPPLEMENTAL INFORMATION 15   Enclosure
ATTACHMENT: SUPPLEMENTAL INFORMATION
 
Attachment SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee M. Carlson, VP Site Support Services S. Lies, Plant Manager M. Scarpello, Regulatory Affairs and Performance Improvement Department Manager W. Hodge, I&C Design Engineering Supervisor S. Mitchell, Licensing Activity Coordinator (Compliance)
Nuclear Regulatory Commission A. M. Stone, Chief, Engineering Branch 2, DRS J. Ellegood, Senior Resident Inspector P. LaFlamme, Resident Inspector LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Opened/Closed 05000315/2012007-01; 05000316/2012007-01 NCV Non-conservative Condensate Storage Tank (CST) Cross-Tie NPSH Calculation (1R21.3(b)(1))
Opened 05000315/2012007-02; 05000316/2012007-02 URI Qualification Basis for Safety-Related Relays and Motor-Starter Contactors (1R21.3(b)(2))
05000315/2012007-03; 05000316/2012007-03 URI Concerns with Periodic Design Basis Testing of Installed Relays and Motor-Starter Contactors (1R21.3(b)(3))
05000315/2012007-04; 05000316/2012007-04 URI Concerns with Ensuring Margin to Overfill in a Ruptured SG (1R21.6(b)(1))
05000315/2012007-05; 05000316/2012007-05 URI Concerns with Operability of SG PORVs with Control Air Compressor Unavailable 1R21.6(b)(2)
 
Attachment LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless stated in the body of the inspection report.
 
CALCULATIONS Number Description or Title Revision 01-E-N-ELCP-120-004 120 VAC Distribution panel Control Circuit Voltage Drop
 
01-E-N-PROT-TOL-001 600v System Continuous Duty Safety-related Motor Thermal Overload (TOL) Heater Selection
 
12-E-N-PROT-RLY-001 4KV Electrical Protection Coordination Study
 
12-E-N-PROT-TOL-MOV-001 Generic Thermal Overload Heater Sizing Calculation for AC Motor Operated Valves Within the GL 89-10 Program
 
1-EN-N-ELCP-250-008 250Vdc Battery 1N System Analysis
 
1-E-N-ELCP-600-003 600 Motor Control Center (MCC) Control Circuit Voltage Drop
 
12-E-S-ELCP-765-002 Cook Load Flow Program (CKOLF) Description and Validation
 
1-E-N-ELCP-4KV-001-Model Unit 1 4 kV/600 V Load Control Model Calculation
 
1-E-N-ELCP-4KV-001-VOLT Unit 1 Voltage Adequacy
 
1-E-N-PROT-RLY-002 4kV Safety-related Motors Phase Instantaneous Relay (PJC)
Settings Calculation, Unit 1
 
1-E-N-PROT-RLY-002A 4kV Safety-related Motors Phase Instantaneous Relay (PJC)
Settings Calculation, Unit 1
 
1-E-N-PROT-RLY-003 Degraded Grid and Loss of Voltage Relay Setting Calculation
 
1-SV-2A-1 SQUG-Steam Generator OME-3-1 Safety Valve 2A
 
2-E-N-DCP-4247-001 Fan Thermal Overload Evaluation During HELB Transient
 
2-E-N-ELCP-4KV-001 Unit 2 4 kV/600 V Load Control Calculation
 
Attachment CALCULATIONS Number Description or Title Revision DC-D-02-ESW-19 Piping and Pipe Support Analysis of Unit 2 Condensate and Essential Service Water Piping System from the Condensate Storage Tank to the three suction nozzles of the Auxiliary Feedwater Pumps.
 
DIT-0-01161-
 
ESW Loads - Concurrently Supplying CTS & AFW Supply 5/15/00 DIT-B-01074-
 
ESW Strainer Differential Pressure Switch and Alarm Setting 4/18/00 DIT-B-02317-
 
ESW Flow Verification Test Target Flows for 01-OHP-4030-119-022FV & 02-OHP-4030-219-022FV 4/19/08 DIT-S-01153-
 
Minimum Flow for the Unit 1 and Unit 2 ESW Pumps 2/9/03 DIT-S-01153-
 
ESW Pump Flow Recommendation 2/10/03 DIT-S-01153-
 
ESW Pump Flow Recommendation 2/10/10 MD-01-ESW-084-N Torque Setup Calculation for 1-WMO-733 and 1-WMO-737
 
MD-12-AFW-001-N Auxiliary Feedwater System Design Basis Analysis
 
MD-12-AFW-001-N Aux. Feedwater System Design Bases Analysis
 
MD-12-CA-004-S Determination of Available Pressurizer PORV Strokes Using the Auxiliary Air Supply
 
MD-12-CST-002-N Operation of Auxiliary Feedwater System Using the CST of the Other Unit
 
MD-12-ESW-076-N ESW Pump NPSH Available and Submergence
 
MD-12-ESW-109-N ESW Supply to the Suction of the AFW pumps
 
MD-12-HV-018-N Aux. Feedwater Pump Room and Hallway Heat Load Calculation
 
MD-12-RCS-021-N Maximum Differential Pressure Calculation For Pressurizer Power Operated Relief Valves 1(2)-NRV-151, 152 and 153
 
MD-12-RCS-022-N Actuator Capability Calculation For Pressurizer Power Operated Relief Valves 1(2)-NRV-151, 152 and 153
 
PS-4KVP-001 4 KV Safety Motor Electrical Protection
 
PS-4KVP-001 4 KV Safety Motor Electrical Protection
 
PS-4KVP-003 Ground Relay Settings 4-kV ESS and BOP Buses
 
PS-4KVP-004 Relay Setting Basis - 69kV Alt. Pwr. Supply


SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee M. Carlson, VP Site Support Services S. Lies, Plant Manager M. Scarpello, Regulatory Affairs and Performance Improvement Department Manager W. Hodge, I&C Design Engineering Supervisor S. Mitchell, Licensing Activity Coordinator (Compliance)
PS-4KVP-005 Unit & Reserve Feed Phase-Overcurrent Relay Settings
Nuclear Regulatory Commission A. M. Stone, Chief, Engineering Branch 2, DRS J. Ellegood, Senior Resident Inspector P. LaFlamme, Resident Inspector LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Opened/Closed 05000315/2012007-01; NCV Non-conservative Condensate Storage Tank (CST) Cross-05000316/2012007-01  Tie NPSH Calculation (1R21.3(b)(1))
Opened 05000315/2012007-02; URI Qualification Basis for Safety-Related Relays and Motor-05000316/2012007-02  Starter Contactors (1R21.3(b)(2))
05000315/2012007-03; URI Concerns with Periodic Design Basis Testing of Installed 05000316/2012007-03  Relays and Motor-Starter Contactors (1R21.3(b)(3))
05000315/2012007-04; URI Concerns with Ensuring Margin to Overfill in a Ruptured 05000316/2012007-04  SG (1R21.6(b)(1))
05000315/2012007-05; URI Concerns with Operability of SG PORVs with Control Air 05000316/2012007-05  Compressor Unavailable 1R21.6(b)(2)
1  Attachment


LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless stated in the body of the inspection report.
SD-990825-047 Seismic/Weak Link Torque Calculation for l-WMO-733


CALCULATIONS Number Description or Title    Revision 01-E-N-ELCP-120 VAC Distribution panel Control Circuit Voltage Drop  1 120-004 01-E-N-600v System Continuous Duty Safety-related Motor Thermal PROT-TOL-      12 Overload (TOL) Heater Selection 001 12-E-N-PROT-RLY- 4KV Electrical Protection Coordination Study  1 001 12-E-N-Generic Thermal Overload Heater Sizing Calculation for AC Motor PROT-TOL-      1 Operated Valves Within the GL 89-10 Program MOV-001 1-EN-N- 250Vdc Battery 1N System Analysis  0 ELCP-250-008 1-E-N-ELCP- 600 Motor Control Center (MCC) Control Circuit Voltage Drop  5 600-003 12-E-S-ELCP-Cook Load Flow Program (CKOLF) Description and Validation  2 765-002 1-E-N-ELCP-4KV-001- Unit 1 4 kV/600 V Load Control Model Calculation  10 Model 1-E-N-ELCP-4KV-001- Unit 1 Voltage Adequacy    4 VOLT 1-E-N-PROT- 4kV Safety-related Motors Phase Instantaneous Relay (PJC)
SD-990930-004 Probability of Tornado Missile Strike on Targets at D. C. Cook Nuclear Plant


RLY-002 Settings Calculation, Unit 1 1-E-N-PROT- 4kV Safety-related Motors Phase Instantaneous Relay (PJC)
Attachment CALCULATIONS Number Description or Title Revision SEWS-1-TK-


RLY-002A Settings Calculation, Unit 1 1-E-N-PROT-Degraded Grid and Loss of Voltage Relay Setting Calculation  0 RLY-003 1-SV-2A-1 SQUG- Steam Generator OME-3-1 Safety Valve 2A  1 2-E-N-DCP-Fan Thermal Overload Evaluation During HELB Transient  1 4247-001 2-E-N-ELCP-Unit 2 4 kV/600 V Load Control Calculation  4 4KV-001 2  Attachment
SQUG Seismic Evaluation of CST 1-TK-32


CALCULATIONS Number Description or Title    Revision Piping and Pipe Support Analysis of Unit 2 Condensate and DC-D-02- Essential Service Water Piping System from the Condensate
SEWS-2-TK-


ESW-19 Storage Tank to the three suction nozzles of the Auxiliary Feedwater Pumps.
SQUG Seismic Evaluation of CST 2-TK-32


DIT-0-01161-ESW Loads - Concurrently Supplying CTS & AFW Supply  5/15/00
SQUG 1-BATT-AB Seismic Qualification of Station AB Batteries


DIT-B-01074-ESW Strainer Differential Pressure Switch and Alarm Setting 4/18/00
TH-00-03 D.C. Cook Unit 2 Steam Generator Tube Rupture with Operator Actions


DIT-B-02317- ESW Flow Verification Test Target Flows for 01-OHP-4030-119-4/19/08 05 022FV & 02-OHP-4030-219-022FV DIT-S-01153-Minimum Flow for the Unit 1 and Unit 2 ESW Pumps  2/9/03
TH-00-05 AFW Pump Room Heat-Up Temperatures


DIT-S-01153-ESW Pump Flow Recommendation  2/10/03
TH-00-06 D.C. Cook Unit 1 Steam Generator Tube Rupture with Operator Actions


DIT-S-01153-ESW Pump Flow Recommendation  2/10/10
TH-04-11 Impact of New EOP Footnotes on Steam Generator Tube Rupture Overfill


MD-01-ESW-Torque Setup Calculation for 1-WMO-733 and 1-WMO-737  1 084-N MD-12-AFW-Auxiliary Feedwater System Design Basis Analysis 2 001-N MD-12-AFW-Aux. Feedwater System Design Bases Analysis  2 001-N MD-12-CA- Determination of Available Pressurizer PORV Strokes
TH-04-11-ADD MDAFP BHP Impact on SGTR Overfill Analysis  


004-S Using the Auxiliary Air Supply MD-12-CST- Operation of Auxiliary Feedwater System Using the CST of the
CORRECTIVE ACTION DOCUMENTS GENERATED DUE TO THE INSPECTION Number Description or Title Date GT 2012-9163 Update Report No. PRA-NB-SY-MS 7/26/12 AR 2012-9209 Update Vendor Manuals in Calc 1-E-N-PROT-TOL-001 7/27/12 AR 2012-9233 SGTR DBA Analysis May Not Be Met with Some Unavailable Equipment 7/27/12 GT 2012-9592 Procedure note needs to be revised 8/6/12 GT2012-9681 1-OHP-4025-LS-4 Section LS-4-3 Enhancement 8/8/12 AR 2012-9701 CNAQ - Condition Not Adverse to Quality 8/8/12 AR 2012-10342 MOV Voltage Analysis 8/23/12 AR 2012-10362 Loss of Controlled Document 8/23/12 AR 2012-10381 2012 CDBI Enhancement to Loss of CST Inventory Response 8/23/12 AR 2012-10385 2012 CDBI - ESW to AFW Void Mod or Analysis Required 8/23/12 AR 2012-10381 2012 CDBI Enhancement to Loss of CST Inventory Response 8/23/12 AR 2012-10398 PJM Manual #3 Does Not Reflect Cook NPIRs 8/24/12 AR 2012-10425 GL 2006-2 Response 8/24/12


002-N Other Unit MD-12-ESW-ESW Pump NPSH Available and Submergence  2 076-N MD-12-ESW-ESW Supply to the Suction of the AFW pumps  0 109-N MD-12-HV-Aux. Feedwater Pump Room and Hallway Heat Load Calculation  1 018-N MD-12-RCS- Maximum Differential Pressure Calculation For Pressurizer Power
Attachment CORRECTIVE ACTION DOCUMENTS GENERATED DUE TO THE INSPECTION Number Description or Title Date AR 2012-10547 Application of Limitorque Technical Bulletin 93-03 8/27/12 AR 2012-10556 Potential for Inconsistent Application of LCO 3.0.6 8/27/12 GT 2012-10519 2012 CDBI: CST Tornado Qualification Question 8/27/12 AR 2012-11028 2012 CDBI Periodic Testing of HGA Relays 9/6/12  


021-N Operated Relief Valves 1(2)-NRV-151, 152 and 153 MD-12-RCS- Actuator Capability Calculation For Pressurizer Power Operated
CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title Date CR 99-02960 Procedures 01(and 02)-0HP4022.0550003 do not Alert Operations to a Change in Flow When ESW is Valved Over to Supply AFW 2/17/99 CR 05177018 The Licensing and Design Basis Documentation That Establishes The Safety Classification and Seismic Qualification Basis for the Condensate Storage Tanks is Not Easily Retrievable or Clear to Interpret.


022-N Relief Valves 1(2)-NRV-151, 152 and 153 PS-4KVP-001 4 KV Safety Motor Electrical Protection  5 PS-4KVP-001 4 KV Safety Motor Electrical Protection  5 PS-4KVP-003 Ground Relay Settings 4-kV ESS and BOP Buses  1 PS-4KVP-004 Relay Setting Basis - 69kV Alt. Pwr. Supply  1 PS-4KVP-005 Unit & Reserve Feed Phase-Overcurrent Relay Settings  0 SD-990825-Seismic/Weak Link Torque Calculation for l-WMO-733  3 047 SD-990930- Probability of Tornado Missile Strike on Targets at D. C. Cook
6/26/05 AR 2008-13401 Calculation TH-95-01 Does Not Model Gap At Column Line A 5/9/07 AR 2008-13401 Calculation TH-95-01 Does Not Model Gap At Column Line A 5/9/07 AR 2008-41539 - 03 Reportability eval re: Screen House Wall/HELB Issue 11/13/08 AR 2008-49389 Vibes on East MDAFP Greater Than Alert Limits 4/9/09 AR 2008-49389 Vibes on East MDAFP greater than alert limits 4/9/09 AR 2008-49714 Unit 1 CAC Running at Higher Amps 4/13/200


004 Nuclear Plant 3  Attachment
GT 2008-51617 Project Required for Identifying Alternate Method of Providing ESW Min Flow Protection 5/18/09 AR 2008-52630 Control Air Compressor Amperage is Higher Than Normal 6/5/2009 GT 2008-61464 Union Leaking in Safety Valve 1-SV-1B-4 12/2/09 AR 2008-62364 2-OME-42 Motor Elevated Vibration Level 12/18/20


CALCULATIONS Number Description or Title  Revision SEWS-1-TK-SQUG Seismic Evaluation of CST 1-TK-32  0
GT 2010-8756 Clarification of DBD for Transfer of Buses 8/30/10 GT 2010-9468 Revise Calculations 1(2)-E-N-ELCP-4KV-001-VOLT "Unit 1/2-Voltage Adequacy Analysis" to Better Describe the Basis for the Allowed Differences in T-bus Voltage When Connected to the UAT/RATs Versus 69KV (EP)
9/15/10


SEWS-2-TK-SQUG Seismic Evaluation of CST 2-TK-32  0
Attachment CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title Date AR 2010-9960 TOLs Trip Prematurely 9/27/10 AR 2011-0619 Loss of ESW Header Pressure on pump swap 1/15/11 AR 2011-0632 U1 EESW Pump Test Pump DP Less Than Low Alert Limit 1/16/11 AR 2011-1788 1-WMO-733 Overtorque 2/9/11 GT 2011-2277 Evaluate Practice Of Starting All AFW pps On Loss Of A MFP.


SQUG 1-Seismic Qualification of Station AB Batteries  0 BATT-AB D.C. Cook Unit 2 Steam Generator Tube Rupture with Operator TH-00-03    0 Actions TH-00-05 AFW Pump Room Heat-Up Temperatures  0 D.C. Cook Unit 1 Steam Generator Tube Rupture with Operator TH-00-06    0 Actions Impact of New EOP Footnotes on Steam Generator Tube Rupture TH-04-11     0 Overfill TH-04-11-MDAFP BHP Impact on SGTR Overfill Analysis  0 ADD CORRECTIVE ACTION DOCUMENTS GENERATED DUE TO THE INSPECTION Number Description or Title    Date GT 2012-Update Report No. PRA-NB-SY-MS  7/26/12 9163 AR 2012-Update Vendor Manuals in Calc 1-E-N-PROT-TOL-001  7/27/12 9209 AR 2012- SGTR DBA Analysis May Not Be Met with Some Unavailable 7/27/12 9233 Equipment GT 2012-Procedure note needs to be revised  8/6/12 9592 GT2012-9681 1-OHP-4025-LS-4 Section LS-4-3 Enhancement  8/8/12 AR 2012- CNAQ - Condition Not Adverse to Quality  8/8/12 9701 AR 2012-MOV Voltage Analysis  8/23/12 10342 AR 2012-Loss of Controlled Document  8/23/12 10362 AR 2012-2012 CDBI Enhancement to Loss of CST Inventory Response 8/23/12 10381 AR 2012-2012 CDBI - ESW to AFW Void Mod or Analysis Required 8/23/12 10385 AR 2012-2012 CDBI Enhancement to Loss of CST Inventory Response 8/23/12 10381 AR 2012-PJM Manual #3 Does Not Reflect Cook NPIRs  8/24/12 10398 AR 2012-GL 2006-2 Response    8/24/12 10425 4  Attachment
2/21/11 GT 2011-2590 1-OME-34E, Extent Of Cause Inspection 2/28/11 GT 2011-3224 OE32888 - Voltage Cal. Failed to Include LTC Voltage 3/14/11 GT 2011-4445 Prepare Calculation for RAT LTC Control Power 4/12/11 AR 2011-5154 Air Voids in AFW Pump Emergency Suction Source from ESW 4/29/11 AR 2011-5492 When Starting Unit 1 CAC for Surveillance it Tripped and Restarted 5/6/2011 GT 2011-8565 OE-Evaluation of NRC IN 2011-14, Component Cooling Water System Gas Accumulation 7/26/11 AR 2011-9439 AFI CM.2-1 - Time Credited Operator Actions 8/18/201


CORRECTIVE ACTION DOCUMENTS GENERATED DUE TO THE INSPECTION Number Description or Title    Date AR 2012-Application of Limitorque Technical Bulletin 93-03  8/27/12 10547 AR 2012-Potential for Inconsistent Application of LCO 3.0.6  8/27/12 10556 GT 2012-2012 CDBI: CST Tornado Qualification Question  8/27/12 10519 AR 2012- 2012 CDBI Periodic Testing of HGA Relays  9/6/12 11028 CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title    Date Procedures 01(and 02)-0HP4022.0550003 do not Alert Operations CR 99-02960    2/17/99 to a Change in Flow When ESW is Valved Over to Supply AFW The Licensing and Design Basis Documentation That Establishes The Safety Classification and Seismic Qualification Basis for the CR 05177018    6/26/05 Condensate Storage Tanks is Not Easily Retrievable or Clear to Interpret.
AR 2011-9779 U-1 CAC Run Scheduled for Sunday with Recording Vibrations on Monday 8/28/201


AR 2008-Calculation TH-95-01 Does Not Model Gap At Column Line A  5/9/07 13401 AR 2008-Calculation TH-95-01 Does Not Model Gap At Column Line A  5/9/07 13401 AR 2008-Reportability eval re: Screen House Wall/HELB Issue  11/13/08 41539 - 03 AR 2008-Vibes on East MDAFP Greater Than Alert Limits  4/9/09 49389 AR 2008-Vibes on East MDAFP greater than alert limits  4/9/09 49389 AR 2008-     4/13/200 Unit 1 CAC Running at Higher Amps 49714      9 GT 2008- Project Required for Identifying Alternate Method of Providing ESW 5/18/09 51617 Min Flow Protection AR 2008-Control Air Compressor Amperage is Higher Than Normal  6/5/2009 52630 GT 2008-Union Leaking in Safety Valve 1-SV-1B-4  12/2/09 61464 AR 2008-     12/18/20 2-OME-42 Motor Elevated Vibration Level 62364      09 GT 2010-Clarification of DBD for Transfer of Buses  8/30/10 8756 Revise Calculations 1(2)-E-N-ELCP-4KV-001-VOLT "Unit 1/2-GT 2010- Voltage Adequacy Analysis" to Better Describe the Basis for the 9/15/10 9468 Allowed Differences in T-bus Voltage When Connected to the UAT/RATs Versus 69KV (EP)
AR 2012-10271 Evaluate Calculation 12-E-N-ELCP-250-009 8/22/12 AR 2011-10411 Air Void detected in Alt Suction line to U2 TDAFW pump 9/14/11 AR 2011-12301 T11D7 East CCP Breaker Failed Timing Per 1-OHP-4030-132-217A 10/21/11 AR 2011-13233 1-PP-3E (East Motor Driven Auxiliary Feedwater Pump) Oil 11/10/11 AR 2011-14229-02 Tube Plugging Limits 11/21/11 AR 2012-0710 Print Does Not Match Field Wiring for 2-OME-42 Motor 1/16/201
5  Attachment


CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title    Date AR 2010-TOLs Trip Prematurely    9/27/10 9960 AR 2011-Loss of ESW Header Pressure on pump swap  1/15/11 0619 AR 2011-U1 EESW Pump Test Pump DP Less Than Low Alert Limit  1/16/11 0632 AR 2011-1-WMO-733 Overtorque    2/9/11 1788 GT 2011-Evaluate Practice Of Starting All AFW pps On Loss Of A MFP. 2/21/11 2277 GT 2011-1-OME-34E, Extent Of Cause Inspection  2/28/11 2590 GT 2011-OE32888 - Voltage Cal. Failed to Include LTC Voltage  3/14/11 3224 GT 2011-Prepare Calculation for RAT LTC Control Power  4/12/11 4445 AR 2011-Air Voids in AFW Pump Emergency Suction Source from ESW  4/29/11 5154 AR 2011-When Starting Unit 1 CAC for Surveillance it Tripped and Restarted 5/6/2011 5492 GT 2011- OE-Evaluation of NRC IN 2011-14, Component Cooling Water 7/26/11 8565 System Gas Accumulation AR 2011-    8/18/201 AFI CM.2-1 - Time Credited Operator Actions 9439      1 AR 2011- U-1 CAC Run Scheduled for Sunday with Recording Vibrations on 8/28/201 9779 Monday    1 AR 2012- Evaluate Calculation 12-E-N-ELCP-250-009  8/22/12 10271 AR 2011-Air Void detected in Alt Suction line to U2 TDAFW pump  9/14/11 10411 AR 2011-T11D7 East CCP Breaker Failed Timing Per 1-OHP-4030-132-217A 10/21/11 12301 AR 2011-1-PP-3E (East Motor Driven Auxiliary Feedwater Pump) Oil 11/10/11 13233 AR 2011-Tube Plugging Limits    11/21/11 14229-02 AR 2012-    1/16/201 Print Does Not Match Field Wiring for 2-OME-42 Motor 0710      2 AR 2012-Potential Risk to 4kV bus From Undetected Voltage Unbalance 5/11/12 6200 GT 2012-Packing Leak 2-NMO-152   5/29/12 6873 AR 2012-1-OME-34E East ESW Strainer Gate is Leaking 1 gpm. 6/14/12 7514 6  Attachment
AR 2012-6200 Potential Risk to 4kV bus From Undetected Voltage Unbalance 5/11/12 GT 2012-6873 Packing Leak 2-NMO-152 5/29/12 AR 2012-7514 1-OME-34E East ESW Strainer Gate is Leaking 1 gpm.


CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title    Date AR 2012-1-MRV-212, No. 1 SG Stop Valve Dump Valve Lost Power  7/19/12 8833 AR 2012-1-MRV-222, No. 2 SG Stop Valve Dump Valve Failure  7/19/12 8834 AR 2012 -
6/14/12  
Electrical Load Flow Calculations  8/8/12 9358 DRAWINGS Number Description or Title  Revision 1-2-AEP-GRAV- General Assy. And Orientation for Hardtop Floating Roof


L-24989 Condensate Storage Tank Dresser # CP-Flanged Inlet 1200 psig. Safety Valve  0 1795 E-1300 DC Cook Station One Line Diagram  19 E-1700 DC Cook Station One Line Diagram  5 Main Auxiliary One-Line Diagram Bus A and B Engineered OP-1-12001-80    80 Safety System (Train B)
Attachment CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title Date AR 2012-8833 1-MRV-212, No. 1 SG Stop Valve Dump Valve Lost Power 7/19/12 AR 2012-8834 1-MRV-222, No. 2 SG Stop Valve Dump Valve Failure 7/19/12 AR 2012 -
Main Auxiliary One-Line Diagram Bus C and D Engineered OP-1-12002-63    63 Safety System (Train A)
9358 Electrical Load Flow Calculations 8/8/12
MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety OP-1-12030-34    34 System (Train A)
MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety OP-1-12031-34    34 System (Train A)
MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety OP-1-12032-20    20 System (Train A)
MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety OP-1-12033-33    33 System (Train A)
MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety OP-1-12034-4    4 System (Train A)
Distr Pnl One-Line 600V Bus 11C, 11D Engineered Safety OP-1-12035-33    33 System (Train A)
120/208V AC Control Room Instrumentation Cabinets CRID-I OP-1-12050-26    26 Thru CRID-IV Engineered Safety System 120V AC Critical Control Room Power Cabinets CCRP-1 Thru OP-1-12051-31    31 CCRP-3 Flow Diagram Nitrogen and Hydrogen Gas Reactor System Units OP-12-5118B-46    46 1 and 2 Flow Diagram, Containment Control Air, 85 No. and 50 No. Ring OP-1-5102D      34 Headers, Unit 1 OP-1-5105A-36 Flow Diagram, Main Steam, Unit 1  36 OP-1-5105A-60 Flow Diagram, Aux. Feedwater, Unit 1  60 OP-1-5105D-10 Flow Diagram, Steam Generating System, Unit 1  10 OP-1-5105D-10 Flow Diagram Steam Generating System Unit No. 1  10 7  Attachment


DRAWINGS Number Description or Title   Revision OP-1-5106A-60 Flow Diagram Aux-Feedwater Unit 1  60 OP-1-5113-92 Flow Diagram Essential Service Water  92 OP-1-5113B-1 Flow Diagram, TDAFW Pump Room Coolers, Unit 1  1 Flow Diagram Compressed Air System Plant Air Turbine Room OP-1-5120A-60    60 Unit 1 OP-1-5120R-6 Control Air System, Aux. Bldg. Tapoffs, Unit 1  6 OP-1-5120S-14 Control Air System Auxiliary Bldg. Tapoffs Unit 1  14 OP-1-5120V-6 Control Air System Auxiliary Bldg. Tapoffs Unit 1  6 OP-1-5120X-7 Control Air System Auxiliary Bldg. Tapoffs Unit 1  7 OP-1-5128-29 Flow Diagram, Reactor Coolant, Unit 1  29 Transformer 101 AB Temperature and Cooling Elementary OP-1-98002-4    4 Diagram Transformer 101 AB load Tap Changer Motor Drive Control OP-1-98003-2    2 Elementary Diagram OP-1-98043-56 4kV Diesel Generator 1AB A.C.B. Elementary Diagram  56 4Kv 600V Auxiliary Transformers 11B and 11D Elementary OP-1-980461-6    6 Diagram Sh 2 of 2 4Kv 600V Auxiliary Transformers 11B and 11D Elementary OP-1-98046-33    33 Diagram Sh 1 of 2 Reserve Bus Tran. and Auxiliary Buses Low Voltage Protection OP-1-98050-28    28 Elementary Diagram OP-1-98062-14 120 V.A.C. Distribution Cabinet CCRP-3 Elementary Diagram 14 15KVA Static Inverter 1-CCRP-INV and 120VAC Distribution OP-1-98063-29    29 Cab. CCRP-1 Elementary Diagram 15KVA Static Inverter 1-CCRP-INV & 120VAC Dist Elementary OP-1-98063-29    29 Diagram Motor Driven Aux. Feedwater Supply Sys. Sheet No. 1 OP-1-98214-46    46 Elementary Diagram Chemical and Volume Control System Reactor Coolant Charging OP-1-98273-54    54 Elementary Diagram Emergency Core Cooling (Safety Injection) Sheet No. 1 OP-1-98281-49    49 Elementary Diagram Emergency Core Cooling (Residual Heat Removal) Sheet #2 OP-1-982841-21    21 Elementary Diagram OP-1-982851-12 Containment Spray System Elementary Diagram Sheet #2 12 Component Cooling Water System (East) Sh 1 of 3 Elementary OP-1-98404-35    35 Diagram Essential Service Water System East Sheet No. 2 Elementary OP-1-98416-24    24 Diagram OP-1-98538-17 Steam Line and Feedwater Isolation Elementary Diagram 17 OP-1-98538-17 Steam Line and Feedwater Isolation Elementary Diagram 17 Steam Generator Relief Valve Position Indicators Elementary OP-1-98583-11    11 Diagram OP-1-985841-4 Steam Pressure Protection Channel 3 Elementary Diagram 4 8  Attachment
DRAWINGS Number Description or Title Revision 1-2-AEP-GRAV-L-24989 General Assy. And Orientation for Hardtop Floating Roof Condensate Storage Tank


DRAWINGS Number Description or Title  Revision OP-1-985842-3 Steam Pressure Protection Channel 4 Elementary Diagram  3 Compressed Air Control Elementary Diagram Sheet No. 1 Unit 1 OP-1-98701-29    29 CIA-42373 OP-1-98701-29 Compressed Air Control Elementary Diagram Sheet No. 1 Unit 1 29 Relay Diagram 4kV Bus T11D Standby Feed Overload RSC1-4097      2 Protection Relay Diagram 4kV Bus T11D Emergency Diesel Gen. Overload RSC1-4104      1 Protection Relay Diagram 4kV Bus T11D Essential Service Water Pump RSC1-4106      3 1E Motor Protection Relay Diagram 4kV Bus T11D Motor Driven Aux. Feedwater RSC1-4107      3 Pump 1E Motor Protection Relay Diagram 4kV Bus T11D Standby Feed Overload RSC1-4108      2 Protection RSC1-4281 Relay Diagram 4kV Bus T11D Under voltage Protection  5 MISCELLANEOUS Date or Number Description or Title Revision Letter from NRC to J. Dolan, D. C. Cook, Subject: Response to 6/25/86 06/13/86 letter Maintenance Rule Scoping Document - Compressed Air
Dresser # CP-1795 Flanged Inlet 1200 psig. Safety Valve


System 12-E-N-ELCP- Auxiliary Relays - Hand Reset Type HEA  0 250-009 2584 Commitment Number Report 2584  10/05/88 AEP Report No.
E-1300 DC Cook Station One Line Diagram


NED-2000-536 Seismic Qualification Test Report for NLI Room Coolers 1 REP Letter from M. P. Alexich, D. C. Cook Plant to NRC, Subject:
E-1700 DC Cook Station One Line Diagram
AEP: NRC: 0976    6/13/86 Auxiliary Feedwater System Low Suction Pressure Pump Trip AEP:NRC:00268 Response to NRC GL 79-36  12/17/79 AEP:NRC:00268 Grid Degraded Voltage  1/27/81 C
AEP:NRC:00486 Seismic Qualification of Auxiliary Feedwater Systems: GL 81-8/28/81 A 14 AEP:NRC:0981 Letter Documenting Commitment 3870  7/10/86 Generic Letter 91-13, Request for Information Related to the Resolution of Generic Issue 130, Essential Service Water AEP:NRC:1104C    3/13/92 System Failures at Multi-Unit Sites Pursuant to 10 CFR 50.54 (F)
AEP:NRC:1246A DC Cook Response to Generic Letter(GL) 96-01, Testing of 10/28/97 Safety-related Logic Circuits 9  Attachment


MISCELLANEOUS Date or Number Description or Title Revision AEP:NRC:1246B DC Cook Response to Generic Letter(GL) 96-01, Testing of 01/30/99 Safety-Related Logic Circuits AEP:NRC;1246 DC Cook Response to Generic Letter(GL) 96-01, Testing of 04/17/96 Safety-Related Logic Circuits AEP-NRC-2011-LER 315/2011-002-00  12/20/11
OP-1-12001-80 Main Auxiliary One-Line Diagram Bus A and B Engineered Safety System (Train B)  


Enforcement Discretion Regarding Engineered Safety Feature AEP-NRC-2012- Actuation System Steam Line Isolation Automatic Actuation 7/23/12 61 Logic and Actuation Relays for Steam Generator Stop Valve Dump Valve Technical Specification Change Request 4kV Bus Undervoltage C1 101-03    11/16/01 Setpoint C1299-17 DC Cook Supplement to the Generic Letter (GL) 96-01 12/17/99 Response DB- 12-4KV Design Basis Document for the 4kV System 3 DB- 12-ESW Design Basis Document for the ESW System  7 DB-12-AFWS Design Basis Document for AFW  4 DIT-B-00176-02 Design Input Transmittal; Aux. Bldg. Seismic Response Spectra 1/14/00 DIT-B-00435-00 Updated MOV Data for the Voltage Drop Calculations  0 DIT-B-00621-06 AC Powered Motor Operated Valves (MOVs) 6 DIT-B-00980-01 Unit 2 SGTR Supplemental Analysis Input Assumptions  01 Design Input Transmittal; Main Steam and Reactor Coolant DIT-B-009801-01    3/31/00 System DIT-B-01061-14 EOP Operator Action Times from Accident Analyses  14 DIT-B-01093-07 Minimum Switchyard Voltage Requirements  7 DIT-B-01399-01 Unit 1 SGTR Supplemental Analysis Input Assumptions  1 Minimum Allowable Switchyard Voltage Swings With pre-LOCA DIT-B-02600-00    0 Mode 1 Loading on RATs Trip Times for Slow Trip Class 30 Eutectic Cutler Hammer DIT-B-03072-00    0 Thermal Overload Relay Trip Times for Eutectic and Bimetallic Standard Trip Class 20 DIT-B-03106-01    1 Cutler Hammer Thermal Overload Relays Technical Evaluation Report, Adequacy of Station Electric ECG-EA-5339 Distribution Systems Voltages, D. C. Cook Nuclear Station, 1/31/81 Units 2 and 3, Docket Nos. 50-315 and 50-316 ECP-1-2-O0-14 Emergency Operation Procedure Footnotes  18 EHI-5202 Gas Accumulation Condition Monitoring  3 Flowserve Report Potentially Reduced Flow Capacity of WKM PORVs  6/7/12 No. 10 CFR 21-67 GEH-2024A Multicontact Auxiliary Relay, Type HFA51  0 GEI-10190G DC Auxiliary Relays Type HGA  0 GQE No. 101.7 Generic Qualification Guide for ASCO Model 206-832-3RF 0 10  Attachment
OP-1-12002-63 Main Auxiliary One-Line Diagram Bus C and D Engineered Safety System (Train A)  


MISCELLANEOUS Date or Number Description or Title Revision LER 315/1999- Electrical Bus Degraded Voltage Too Low For Safety-related 3/23/00 022-01, Loads Minimum flow requirements for Johnston Service Water Pumps 6/14/90 Model 30CC/2 Stage Pump and Valve Inservice Test Program for Donald C. Cook
OP-1-12030-34 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)


Nuclear Plant Fourth Ten Year Interval PJM Manual M03 Transmission Operations  40 PJM Manual M39 Nuclear Plant Interface Coordination  4 PO 01530931 Receipt No. 95518, TYCO Relay AGASTAT Relay Quality 02/13/09 Certificate PO 01545871 Receipt No. 117063, Relay HEA Type Quality Certificate 02/25/11 PO 01551747 Receipt No. 126896, Relay Auxiliary HFA Quality Certificate 04/30/12 Essential Service Water System Electrical Power Support PRA-NB-SY-ESW    3 Systems RQ-S-2012-CDBI-2012 CDBI Scenario No. 1  0
OP-1-12031-34 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)


1-FW-135, Turbine Driven Auxiliary Feed Pump PP-4 6/2009 -
OP-1-12032-20 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)  
Trend Data Discharge Check Valve Trend Data  6/2012 1-NRV-153 Pressurizer OME-4 Train 'A' Pressure Relief Valve 6/2009 -
Trend Data Trend Data    6/2012 VTD-AGAS-0001 ASCO Engineering Information for Solenoid Valves In Nuclear 0 Power Plants VTD-AGAS-0011 AGASTAT E7000 Series Nuclear Qualified Time Delay Relays 1
  [PUB. # E70-1]
VTD-AREV-0007 AREVA NP, Inc. HK-VR Instruction Book for DC COOK VTD-ASCO-0001 ASCO Engineering Information for Solenoid Valves in Nuclear 0 Power Plants VTD-ATWD-0034 Atwood & Morrill Co., Inc. Instruction Manual For Check Valves 2 VTD-CDBA-0001 C&D Technologies Standby Battery Vented Cell Installation and 4 Operating Instructions VTD-CDBA-0005 Condensed Installation and Operating Instructions for C and D 0 Standby Batteries (Flooded)
VTD-CHAM-0021 Cutler-Hammer Data Sheets for CN15 and CN55 A-C  0 Contactors VTD-CHAM-0022 Cutler-Hammer Parts and Instruction Publication for NEMA 0 Size 2 3-Pole Starter with Standard Trip Eutectic Overload Relay Cutler-Hammer Instruction Manual For Unitrol Motor Control VTD-CHAM-0056    2 Center [Pub. No. 15412]
VTD-CHAM-0087 Cutler-Hammer Technical Information Publication for NEMA 0 Contactors and Starters (Pub. No. 8231)
11  Attachment


MISCELLANEOUS Date or Number Description or Title Revision Cutler-Hammer (Eaton Corporation) Instructions for VR-Series VTD-CHAM-01 03 Replacement Breakers for ITE Type 5HK and 15HK [PUB. No. 0 I.B. 94A5990R17]
OP-1-12033-33 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)
VTD-GENE-0013 General Electric Instructions for Type HFA151 Multi-Contact 3 Auxiliary Relay VTD-GENE-1182 General Electric Instructions for Type HEFA61and HEA62 t  1 Auxiliary Relay Limitorque Technical Update on Reliance 3-Phase Actuator VTD-LIMIT-0023    0 Motors [Pub. No. 93-03]
Masoneilan 20000 Series VTD-MASN-0076    2 Control Valve Instructions VTD-TATE-0001 ESW Pump Discharge Strainer Vendor Manual  0 MODIFICATIONS Number Description or Title  Date or Revision DCP 4690 250 Vdc Fuse Replacement Project  0 Installation of Flange Sets and Orifice Plates in ESW Lines 2-DCP-4786    10/2/00 for AFW Pump Room Coolers PROCEDURES Number Description or Title  Revision 01-IHP-6030-IMP- 4KV Bus Loss Of Voltage And 4KV Bus Degraded Voltage


309  Relay Calibration 01-OHL-4030-SOM-Annunciator No. 108, Drop 28  10 039 1-0HP-4030-119-ESW Flow Verification  16 022FV 12-EHP-4075-TCA-Operator Time Critical Actions  0 001 12-EHP-5030-CAR-Characterization Testing Program  7 001 12-EHP-5043-EDC-    16 Evaluation of Discrepant Conditions 001 12-IHP-5021-EMP-Eaton/Cutler-Hammer 4kV Circuit Breaker Maintenance 13 080 12-IHP-5030-EMP-MCCB/TOLR Testing and Electrical Enclosure Maintenance 029 006 12-MHP-5021-056- Motor Driven and Turbine Driven Auxiliary Feed Pump
OP-1-12034-4 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)


001  Maintenance 12  Attachment
OP-1-12035-33 Distr Pnl One-Line 600V Bus 11C, 11D Engineered Safety System (Train A)


PROCEDURES Number Description or Title  Revision 12-OHP-4021-019-Operation of the Essential Service Water System 49 001 12-OHP-4022-082-Degraded Offsite AC Voltage Response  006 004 12-OHP-4023-E-0 Reactor Trip or Safety Injection  29 12-OHP-4023-E-3 Steam Generator Tube Rupture  12 12-OHP-4023-ECA- SGTR With Loss of Reactor Coolant-Subcooled Recovery
OP-1-12050-26 120/208V AC Control Room Instrumentation Cabinets CRID-I Thru CRID-IV Engineered Safety System


3.1 Desired 12-OHP-4023-ES-Post-SGTR Cooldown Using Backfill  4 3.1 12-OHP-4023-ES-Post-SGTR Cooldown Using Blowdown  6 3.2 1-OHP-4022-001 Earthquake    15 1-OHP-4022-002-Steam Generator Tube Leak  13 021 1-OHP-4022-055-Loss of Condensate to Auxiliary Feedwater Pumps 9 003 1-OHP-4022-056-Steam Binding in Auxiliary Feedwater System 5 001 1-OHP-4022-064-Control Air Malfunction  8 001 1-OHP-4022-064-Loss of Control Air Recovery  12 002 1-OHP-4023-E-0 Reactor Trip or Safety Injection  33 1-OHP-4023-E-3 Steam Generator Tube Rupture  15 1-OHP-4023-ECA- SGTR With Loss of Reactor Coolant-Subcooled Recovery
OP-1-12051-31 120V AC Critical Control Room Power Cabinets CCRP-1 Thru CCRP-3  


3.1 Desired 1-OHP-4023-ES-0.1 Reactor Trip Response  26 1-OHP-4023-ES-3.1 Post-SGTR Cooldown Using Backfill  10 1-OHP-4023-ES-3.2 Post-SGTR Cooldown Using Blowdown  10 1-OHP-4023-FR-Response to Loss of Secondary Heat Sink  21 H.1 1-OHP-4024-108 Annunciator No. 108 Response: Pressurizer  20 1-OHP-4025-LS-3 Steam Generator 2/3 Level Control  3 1-OHP-4025-LS-4 Steam Generator 1/4 Level Control  3 1-OHP-4025-R-12 Component Restoration  5 1-OHP-4025-R-7 Restore Control Air  0a 12-IHP-4030-082- AB, CD, and N-Train Battery Yearly Surveillance and 8 006 Maintenance 1-OHP-4030-114-Inoperable Power Supply  19 021 1-OHP-4030-114-Breaker Alignment  20 031 13  Attachment
OP-12-5118B-46 Flow Diagram Nitrogen and Hydrogen Gas Reactor System Units 1 and 2  


PROCEDURES Number Description or Title  Revision 1-OHP-4030-114- Operations Weekly Surveillance Checks  19 031 1-OHP-4030-119-ESW Flow Verification  16 022FV 1-OHP-4030-132- CD Diesel Generator Operability Test (Train A) 20 027CD 1-OHP-4030-156-East Motor Drive Auxiliary Feedwater System Test 7 017E 1-OHP-4030-156-Turbine Driven Auxiliary Feedwater System Test 10 017T 1-OHP-5030-119-ESW to AFW Pump Cleanout Connection Flush  4 003 12-IHP-5030-EMP- Electrical Enclosure 10 Year Preventive Maintenance 22 013 12-IHP-6030-RLY- General Electric Type HFA51 and HFA151 Multi-Contact 14 022 Auxiliary Relay Adjustment and Maintenance 2-OHP-4023-E-0 Reactor Trip or Safety Injection  37 2-OHP-4023-E-3 Steam Generator Tube Rupture  16 2-OHP-4023-ECA- SGTR With Loss of Reactor Coolant-Subcooled Recovery
OP-1-5102D Flow Diagram, Containment Control Air, 85 No. and 50 No. Ring Headers, Unit 1  


3.1 Desired 2-OHP-4023-ES-3.1 Post-SGTR Cooldown Using Backfill  9 2-OHP-4023-ES-3.2 Post-SGTR Cooldown Using Blowdown  9 AE-O-E232 Local Operation of U1 Steam Generator PORV  8 OHI-4023 Abnormal/Emergency Procedure Users Guide  31 PMI-2010 Written Instructions  36 PMI-4075 Operator Time Critical Actions  1 PMP-2010-PRC-Procedure Alteration, Review, and Approval  38 002 PMP-2291-OLR-On-Line Risk Management  22 001 PMP-4075-TCA-001 Time Critical Action Validation and Verification 1&2 Electrical and Instrumentation and Controls Engineering PMP-6065-EIC-001    1 Information Control Process PMP-7030-SFD-001 Safety Function Determination Program  2 WORK ORDERS Number Description or Title  Date 1-OHP-4030-156-    9/20/11, Turbine Driven AFW Pump System Test 017T    06/21/12 01-OHL-4030-102-    10/16/11 Pressurizer PORV Testing
OP-1-5105A-36 Flow Diagram, Main Steam, Unit 1  


14  Attachment
OP-1-5105A-60 Flow Diagram, Aux. Feedwater, Unit 1


WORK ORDERS Number Description or Title  Date 01-OHL-4030-114-    10/17/11 Pressurizer PORV Position Indication Test 034 JO 3135065 1-WMO-733, Replace Valve  4/11/05 55225736 01 l-WMO-733-ACT, As-Found/As-Left Diagnosis  12/22/10 55231048 01 1-T11D, Inspect/Clean Switchgear Bus  10/7/06 55237882 03 Clean/Inspect/Test BKR 1-T11D11  7/8/09 55240935 01 1-87X-t11A Trip Test Lockout Relay  3/12/10 55244511 01 1-PP-3E-MTR, Lube Bearings and Clean  7/8/09 55245339 01 Clean/Inspect/Test BKR 1-T11D10  2/11/09 55245436 01 l-OME-34E, Disassemble /Inspect Strainer  12/16/08 55265288 1-S V-1A-1: Perform Setpoint Verification  9/19/11 55270942 01 Remove/Refurbish/Replace 1-PP-7E-MTR  3/5/08 55292664 03 MTM, l-FW-124, Remove/Replace Check Valve  1/31/11 Flush and Replace Oil in the Upper Bearing Reservoir on 1- 2/9/11 55358182 01 PP-7E-MTR Clean The Air Screens on 1-PP-7E-MTR, "East Essential 2/9/11 55358183 01 Service Water Pump PP7E Motor" 55366415 01 Perform Infrared Inspection on 1-PP-3E-MTR  7/7/11 Perform Characterization Testing on 1-PP-3E-MTR (East 7/7/11 55366416 01 Motor Driven Auxiliary Feedwater Pump PP-3E Motor) in Accordance With 12-EHP-5030-CAR-001 Clean Motor Screens on l-PP-3E-MTR, (East Motor Driven 7/7/11 55366416 02 Auxiliary Feedwater Pump PP-3E MOTOR)
OP-1-5105D-10 Flow Diagram, Steam Generating System, Unit 1  
Support Characterization Testing on 1-PP-3E-MTR (East 7/7/11 55366416 03 Motor Driven Auxiliary Feedwater Pump PP-3E Motor), at Breaker Cubicle l-TllDT1.


55366421 04 Sample/ Drain /Refill Pump Brg and Clean 1-PP-3E-MTR 7/7/11 55378968 01 Lube Lower Bearing: (1-PP-7E-MTR)  2/8/12 Obtain an Oil Sample From 1-PP-7E-MTR, "East Essential 2/9/12 55378969 01 Service Water Pump PP-7E MOTOR" for Analysis 1-FW-135; Perform Non-Intrusive Turbine Driven AFW Pump 8/31/201 55379811-01 PMTM    1 55379811 1-FW-135; Perform Non-intrusive Test  8/31/11 55380536 01 1-PP-7E-MTR; Perform Motor Characterization Test 2/7/12 Perform Surveillance Procedure 01-IHP-6030-IMP-309 (4KV 1/6/12 55386933 01 Bus Loss of Voltage and 4kV Bus Degraded Voltage Relay Calibration).
OP-1-5105D-10 Flow Diagram Steam Generating System Unit No. 1  


Perform Surveillance Procedure 01-IHP-6030-IMP-309 (4KV 7/6/12 55397158 01 Bus Loss of Voltage and 4kV Bus Degraded Voltage Relay Calibration).
Attachment DRAWINGS Number Description or Title Revision OP-1-5106A-60 Flow Diagram Aux-Feedwater Unit 1


55407760 01 1-MRV-222, No. 2 SG Stop Valve Dump Valve  7/21/12 PM 00109769 1-87X-t11A Trip Test Lockout Relay  1 PM 00110736 U1 CD EDG, Replace Relays  1 PM 00114641 1-5A6-LCTA, Replace HFA Relay  1 15  Attachment
OP-1-5113-92 Flow Diagram Essential Service Water


LIST OF ACRONYMS USED AFW Auxiliary Feedwater ASME American Society of Mechanical Engineers CAC Control Air Compressor CAS Compressed Air System CCW Closed Cooling Water CDBI Component Design Basis Inspection CFR Code of Federal Regulations CR Condition Report CST Condensate Storage Tank DBA Design Basis Accident DRS Division of Reactor Safety EDG Emergency Diesel Generator EOP Emergency Operating Procedure ESW Emergency Service Water GL Generic Letter HELB High Energy Line Break IEEE Institute of Electrical and Electronics Engineers IMC Inspection Manual Chapter IN Information Notice LTC Load Tap Changer MDAFW Motor Driven Auxiliary Feedwater MOV Motor Operated Valve MTO Margin to Overfill NCV Non-Cited Violation NPSH Net Positive Suction Head NRC Nuclear Regulatory Commission NRR Nuclear Reactor Regulation PARS Publicly Available Records System PORV Power Operated Relief Valve PRA Probabilistic Risk Assessment RCS Reactor Coolant System RIS Regulatory Issue Summary RG Regulatory Guide SBO Station Blackout SG Steam Generator SGTR Steam Generator Tube Rupture SR Safety-related SSC Structures, Systems or Components TDAFW Turbine Driven Auxiliary Feedwater TIA Task Interface Agreement TOL Thermal Overload TS Technical Specification TSO Transmission System Operator UFSAR Updated Final Safety Evaluation Report URI Unresolved Item 16 Attachment In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
OP-1-5113B-1 Flow Diagram, TDAFW Pump Room Coolers, Unit 1
 
OP-1-5120A-60 Flow Diagram Compressed Air System Plant Air Turbine Room Unit 1
 
OP-1-5120R-6 Control Air System, Aux. Bldg. Tapoffs, Unit 1
 
OP-1-5120S-14 Control Air System Auxiliary Bldg. Tapoffs Unit 1
 
OP-1-5120V-6 Control Air System Auxiliary Bldg. Tapoffs Unit 1
 
OP-1-5120X-7 Control Air System Auxiliary Bldg. Tapoffs Unit 1
 
OP-1-5128-29 Flow Diagram, Reactor Coolant, Unit 1
 
OP-1-98002-4 Transformer 101 AB Temperature and Cooling Elementary Diagram
 
OP-1-98003-2 Transformer 101 AB load Tap Changer Motor Drive Control Elementary Diagram
 
OP-1-98043-56 4kV Diesel Generator 1AB A.C.B. Elementary Diagram
 
OP-1-980461-6 4Kv 600V Auxiliary Transformers 11B and 11D Elementary Diagram Sh 2 of 2
 
OP-1-98046-33 4Kv 600V Auxiliary Transformers 11B and 11D Elementary Diagram Sh 1 of 2
 
OP-1-98050-28 Reserve Bus Tran. and Auxiliary Buses Low Voltage Protection Elementary Diagram
 
OP-1-98062-14 120 V.A.C. Distribution Cabinet CCRP-3 Elementary Diagram
 
OP-1-98063-29 15KVA Static Inverter 1-CCRP-INV and 120VAC Distribution Cab. CCRP-1 Elementary Diagram
 
OP-1-98063-29 15KVA Static Inverter 1-CCRP-INV & 120VAC Dist Elementary Diagram
 
OP-1-98214-46 Motor Driven Aux. Feedwater Supply Sys. Sheet No. 1 Elementary Diagram
 
OP-1-98273-54 Chemical and Volume Control System Reactor Coolant Charging Elementary Diagram
 
OP-1-98281-49 Emergency Core Cooling (Safety Injection) Sheet No. 1 Elementary Diagram
 
OP-1-982841-21 Emergency Core Cooling (Residual Heat Removal) Sheet #2 Elementary Diagram
 
OP-1-982851-12 Containment Spray System Elementary Diagram Sheet #2
 
OP-1-98404-35 Component Cooling Water System (East) Sh 1 of 3 Elementary Diagram
 
OP-1-98416-24 Essential Service Water System East Sheet No. 2 Elementary Diagram
 
OP-1-98538-17 Steam Line and Feedwater Isolation Elementary Diagram
 
OP-1-98538-17 Steam Line and Feedwater Isolation Elementary Diagram
 
OP-1-98583-11 Steam Generator Relief Valve Position Indicators Elementary Diagram
 
OP-1-985841-4 Steam Pressure Protection Channel 3 Elementary Diagram
 
Attachment DRAWINGS Number Description or Title Revision OP-1-985842-3 Steam Pressure Protection Channel 4 Elementary Diagram
 
OP-1-98701-29 Compressed Air Control Elementary Diagram Sheet No. 1 Unit 1 CIA-42373
 
OP-1-98701-29 Compressed Air Control Elementary Diagram Sheet No. 1 Unit 1
 
RSC1-4097 Relay Diagram 4kV Bus T11D Standby Feed Overload Protection
 
RSC1-4104 Relay Diagram 4kV Bus T11D Emergency Diesel Gen. Overload Protection
 
RSC1-4106 Relay Diagram 4kV Bus T11D Essential Service Water Pump 1E Motor Protection
 
RSC1-4107 Relay Diagram 4kV Bus T11D Motor Driven Aux. Feedwater Pump 1E Motor Protection
 
RSC1-4108 Relay Diagram 4kV Bus T11D Standby Feed Overload Protection
 
RSC1-4281 Relay Diagram 4kV Bus T11D Under voltage Protection
 
MISCELLANEOUS Number Description or Title Date or Revision
 
Letter from NRC to J. Dolan, D. C. Cook, Subject: Response to 06/13/86 letter 6/25/86
 
Maintenance Rule Scoping Document - Compressed Air System
 
12-E-N-ELCP-250-009 Auxiliary Relays - Hand Reset Type HEA
 
2584 Commitment Number Report 2584 10/05/88 AEP Report No.
 
NED-2000-536 REP Seismic Qualification Test Report for NLI Room Coolers
 
AEP: NRC: 0976 Letter from M. P. Alexich, D. C. Cook Plant to NRC, Subject:
Auxiliary Feedwater System Low Suction Pressure Pump Trip 6/13/86 AEP:NRC:00268 Response to NRC GL 79-36 12/17/79 AEP:NRC:00268 C
Grid Degraded Voltage 1/27/81 AEP:NRC:00486 A
Seismic Qualification of Auxiliary Feedwater Systems: GL 81-
 
8/28/81 AEP:NRC:0981 Letter Documenting Commitment 3870 7/10/86 AEP:NRC:1104C Generic Letter 91-13, Request for Information Related to the Resolution of Generic Issue 130, Essential Service Water System Failures at Multi-Unit Sites Pursuant to 10 CFR 50.54 (F)
3/13/92 AEP:NRC:1246A DC Cook Response to Generic Letter(GL) 96-01, Testing of Safety-related Logic Circuits 10/28/97
 
Attachment MISCELLANEOUS Number Description or Title Date or Revision AEP:NRC:1246B DC Cook Response to Generic Letter(GL) 96-01, Testing of Safety-Related Logic Circuits 01/30/99 AEP:NRC;1246 DC Cook Response to Generic Letter(GL) 96-01, Testing of Safety-Related Logic Circuits 04/17/96 AEP-NRC-2011-
 
LER 315/2011-002-00 12/20/11 AEP-NRC-2012-
 
Enforcement Discretion Regarding Engineered Safety Feature Actuation System Steam Line Isolation Automatic Actuation Logic and Actuation Relays for Steam Generator Stop Valve Dump Valve 7/23/12 C1 101-03 Technical Specification Change Request 4kV Bus Undervoltage Setpoint 11/16/01 C1299-17 DC Cook Supplement to the Generic Letter (GL) 96-01 Response 12/17/99 DB-12-4KV Design Basis Document for the 4kV System
 
DB-12-ESW Design Basis Document for the ESW System
 
DB-12-AFWS Design Basis Document for AFW
 
DIT-B-00176-02 Design Input Transmittal; Aux. Bldg. Seismic Response Spectra 1/14/00 DIT-B-00435-00 Updated MOV Data for the Voltage Drop Calculations
 
DIT-B-00621-06 AC Powered Motor Operated Valves (MOVs)
 
DIT-B-00980-01 Unit 2 SGTR Supplemental Analysis Input Assumptions
 
DIT-B-009801-01 Design Input Transmittal; Main Steam and Reactor Coolant System 3/31/00 DIT-B-01061-14 EOP Operator Action Times from Accident Analyses
 
DIT-B-01093-07 Minimum Switchyard Voltage Requirements
 
DIT-B-01399-01 Unit 1 SGTR Supplemental Analysis Input Assumptions
 
DIT-B-02600-00 Minimum Allowable Switchyard Voltage Swings With pre-LOCA Mode 1 Loading on RATs
 
DIT-B-03072-00 Trip Times for Slow Trip Class 30 Eutectic Cutler Hammer Thermal Overload Relay
 
DIT-B-03106-01 Trip Times for Eutectic and Bimetallic Standard Trip Class 20 Cutler Hammer Thermal Overload Relays
 
ECG-EA-5339 Technical Evaluation Report, Adequacy of Station Electric Distribution Systems Voltages, D. C. Cook Nuclear Station, Units 2 and 3, Docket Nos. 50-315 and 50-316 1/31/81 ECP-1-2-O0-14 Emergency Operation Procedure Footnotes
 
EHI-5202 Gas Accumulation Condition Monitoring
 
Flowserve Report No. 10 CFR 21-67 Potentially Reduced Flow Capacity of WKM PORVs 6/7/12 GEH-2024A Multicontact Auxiliary Relay, Type HFA51
 
GEI-10190G DC Auxiliary Relays Type HGA
 
GQE No. 101.7 Generic Qualification Guide for ASCO Model 206-832-3RF
 
Attachment MISCELLANEOUS Number Description or Title Date or Revision LER 315/1999-022-01, Electrical Bus Degraded Voltage Too Low For Safety-related Loads 3/23/00
 
Minimum flow requirements for Johnston Service Water Pumps Model 30CC/2 Stage 6/14/90
 
Pump and Valve Inservice Test Program for Donald C. Cook Nuclear Plant Fourth Ten Year Interval
 
PJM Manual M03 Transmission Operations
 
PJM Manual M39 Nuclear Plant Interface Coordination
 
PO 01530931 Receipt No. 95518, TYCO Relay AGASTAT Relay Quality Certificate 02/13/09 PO 01545871 Receipt No. 117063, Relay HEA Type Quality Certificate 02/25/11 PO 01551747 Receipt No. 126896, Relay Auxiliary HFA Quality Certificate 04/30/12 PRA-NB-SY-ESW Essential Service Water System Electrical Power Support Systems
 
RQ-S-2012-CDBI-
 
2012 CDBI Scenario No. 1
 
Trend Data 1-FW-135, Turbine Driven Auxiliary Feed Pump PP-4 Discharge Check Valve Trend Data 6/2009 -
6/2012 Trend Data 1-NRV-153 Pressurizer OME-4 Train 'A' Pressure Relief Valve Trend Data 6/2009 -
6/2012 VTD-AGAS-0001 ASCO Engineering Information for Solenoid Valves In Nuclear Power Plants
 
VTD-AGAS-0011 AGASTAT E7000 Series Nuclear Qualified Time Delay Relays
[PUB. # E70-1]
 
VTD-AREV-0007 AREVA NP, Inc. HK-VR Instruction Book for DC COOK
 
VTD-ASCO-0001 ASCO Engineering Information for Solenoid Valves in Nuclear Power Plants
 
VTD-ATWD-0034 Atwood & Morrill Co., Inc. Instruction Manual For Check Valves
 
VTD-CDBA-0001 C&D Technologies Standby Battery Vented Cell Installation and Operating Instructions
 
VTD-CDBA-0005 Condensed Installation and Operating Instructions for C and D Standby Batteries (Flooded)
 
VTD-CHAM-0021 Cutler-Hammer Data Sheets for CN15 and CN55 A-C Contactors
 
VTD-CHAM-0022 Cutler-Hammer Parts and Instruction Publication for NEMA Size 2 3-Pole Starter with Standard Trip Eutectic Overload Relay
 
VTD-CHAM-0056 Cutler-Hammer Instruction Manual For Unitrol Motor Control Center [Pub. No. 15412]
 
VTD-CHAM-0087 Cutler-Hammer Technical Information Publication for NEMA Contactors and Starters (Pub. No. 8231)
 
Attachment MISCELLANEOUS Number Description or Title Date or Revision VTD-CHAM-01 03 Cutler-Hammer (Eaton Corporation) Instructions for VR-Series Replacement Breakers for ITE Type 5HK and 15HK [PUB. No.
 
I.B. 94A5990R17]
 
VTD-GENE-0013 General Electric Instructions for Type HFA151 Multi-Contact Auxiliary Relay
 
VTD-GENE-1182 General Electric Instructions for Type HEFA61and HEA62 t Auxiliary Relay
 
VTD-LIMIT-0023 Limitorque Technical Update on Reliance 3-Phase Actuator Motors [Pub. No. 93-03]
 
VTD-MASN-0076 Masoneilan 20000 Series Control Valve Instructions
 
VTD-TATE-0001 ESW Pump Discharge Strainer Vendor Manual
 
MODIFICATIONS Number Description or Title Date or Revision DCP 4690 250 Vdc Fuse Replacement Project
 
2-DCP-4786 Installation of Flange Sets and Orifice Plates in ESW Lines for AFW Pump Room Coolers 10/2/00
 
PROCEDURES Number Description or Title Revision 01-IHP-6030-IMP-309 4KV Bus Loss Of Voltage And 4KV Bus Degraded Voltage Relay Calibration
 
01-OHL-4030-SOM-039 Annunciator No. 108, Drop 28
 
1-0HP-4030-119-022FV ESW Flow Verification
 
12-EHP-4075-TCA-001 Operator Time Critical Actions
 
12-EHP-5030-CAR-001 Characterization Testing Program
 
12-EHP-5043-EDC-001 Evaluation of Discrepant Conditions
 
12-IHP-5021-EMP-080 Eaton/Cutler-Hammer 4kV Circuit Breaker Maintenance
 
12-IHP-5030-EMP-006 MCCB/TOLR Testing and Electrical Enclosure Maintenance 029 12-MHP-5021-056-001 Motor Driven and Turbine Driven Auxiliary Feed Pump Maintenance
 
Attachment PROCEDURES Number Description or Title Revision 12-OHP-4021-019-001 Operation of the Essential Service Water System
 
12-OHP-4022-082-004 Degraded Offsite AC Voltage Response 006 12-OHP-4023-E-0 Reactor Trip or Safety Injection
 
12-OHP-4023-E-3 Steam Generator Tube Rupture
 
12-OHP-4023-ECA-3.1 SGTR With Loss of Reactor Coolant-Subcooled Recovery Desired
 
12-OHP-4023-ES-3.1 Post-SGTR Cooldown Using Backfill
 
12-OHP-4023-ES-3.2 Post-SGTR Cooldown Using Blowdown
 
1-OHP-4022-001 Earthquake
 
1-OHP-4022-002-021 Steam Generator Tube Leak
 
1-OHP-4022-055-003 Loss of Condensate to Auxiliary Feedwater Pumps
 
1-OHP-4022-056-001 Steam Binding in Auxiliary Feedwater System
 
1-OHP-4022-064-001 Control Air Malfunction
 
1-OHP-4022-064-002 Loss of Control Air Recovery
 
1-OHP-4023-E-0 Reactor Trip or Safety Injection
 
1-OHP-4023-E-3 Steam Generator Tube Rupture
 
1-OHP-4023-ECA-3.1 SGTR With Loss of Reactor Coolant-Subcooled Recovery Desired
 
1-OHP-4023-ES-0.1 Reactor Trip Response
 
1-OHP-4023-ES-3.1 Post-SGTR Cooldown Using Backfill
 
1-OHP-4023-ES-3.2 Post-SGTR Cooldown Using Blowdown
 
1-OHP-4023-FR-H.1 Response to Loss of Secondary Heat Sink
 
1-OHP-4024-108 Annunciator No. 108 Response: Pressurizer
 
1-OHP-4025-LS-3 Steam Generator 2/3 Level Control
 
1-OHP-4025-LS-4 Steam Generator 1/4 Level Control
 
1-OHP-4025-R-12 Component Restoration
 
1-OHP-4025-R-7 Restore Control Air 0a 12-IHP-4030-082-006 AB, CD, and N-Train Battery Yearly Surveillance and Maintenance
 
1-OHP-4030-114-021 Inoperable Power Supply
 
1-OHP-4030-114-031 Breaker Alignment
 
Attachment PROCEDURES Number Description or Title Revision 1-OHP-4030-114-031 Operations Weekly Surveillance Checks
 
1-OHP-4030-119-022FV ESW Flow Verification
 
1-OHP-4030-132-027CD CD Diesel Generator Operability Test (Train A)
 
1-OHP-4030-156-017E East Motor Drive Auxiliary Feedwater System Test
 
1-OHP-4030-156-017T Turbine Driven Auxiliary Feedwater System Test
 
1-OHP-5030-119-003 ESW to AFW Pump Cleanout Connection Flush
 
12-IHP-5030-EMP-013 Electrical Enclosure 10 Year Preventive Maintenance
 
12-IHP-6030-RLY-022 General Electric Type HFA51 and HFA151 Multi-Contact Auxiliary Relay Adjustment and Maintenance
 
2-OHP-4023-E-0 Reactor Trip or Safety Injection
 
2-OHP-4023-E-3 Steam Generator Tube Rupture
 
2-OHP-4023-ECA-3.1 SGTR With Loss of Reactor Coolant-Subcooled Recovery Desired
 
2-OHP-4023-ES-3.1 Post-SGTR Cooldown Using Backfill
 
2-OHP-4023-ES-3.2 Post-SGTR Cooldown Using Blowdown
 
AE-O-E232 Local Operation of U1 Steam Generator PORV
 
OHI-4023 Abnormal/Emergency Procedure Users Guide
 
PMI-2010 Written Instructions
 
PMI-4075 Operator Time Critical Actions
 
PMP-2010-PRC-002 Procedure Alteration, Review, and Approval
 
PMP-2291-OLR-001 On-Line Risk Management
 
PMP-4075-TCA-001 Time Critical Action Validation and Verification 1 & 2 PMP-6065-EIC-001 Electrical and Instrumentation and Controls Engineering Information Control Process
 
PMP-7030-SFD-001 Safety Function Determination Program
 
WORK ORDERS Number Description or Title Date 1-OHP-4030-156-017T Turbine Driven AFW Pump System Test 9/20/11, 06/21/12 01-OHL-4030-102-
 
Pressurizer PORV Testing 10/16/11
 
Attachment WORK ORDERS Number Description or Title Date 01-OHL-4030-114-034 Pressurizer PORV Position Indication Test 10/17/11 JO 3135065 1-WMO-733, Replace Valve 4/11/05 55225736 01 l-WMO-733-ACT, As-Found/As-Left Diagnosis 12/22/10 55231048 01 1-T11D, Inspect/Clean Switchgear Bus 10/7/06 55237882 03 Clean/Inspect/Test BKR 1-T11D11 7/8/09 55240935 01 1-87X-t11A Trip Test Lockout Relay 3/12/10 55244511 01 1-PP-3E-MTR, Lube Bearings and Clean 7/8/09 55245339 01 Clean/Inspect/Test BKR 1-T11D10 2/11/09 55245436 01 l-OME-34E, Disassemble /Inspect Strainer 12/16/08 55265288 1-S V-1A-1: Perform Setpoint Verification 9/19/11 55270942 01 Remove/Refurbish/Replace 1-PP-7E-MTR 3/5/08 55292664 03 MTM, l-FW-124, Remove/Replace Check Valve 1/31/11 55358182 01 Flush and Replace Oil in the Upper Bearing Reservoir on 1-PP-7E-MTR 2/9/11 55358183 01 Clean The Air Screens on 1-PP-7E-MTR, "East Essential Service Water Pump PP7E Motor" 2/9/11 55366415 01 Perform Infrared Inspection on 1-PP-3E-MTR 7/7/11 55366416 01 Perform Characterization Testing on 1-PP-3E-MTR (East Motor Driven Auxiliary Feedwater Pump PP-3E Motor) in Accordance With 12-EHP-5030-CAR-001 7/7/11 55366416 02 Clean Motor Screens on l-PP-3E-MTR, (East Motor Driven Auxiliary Feedwater Pump PP-3E MOTOR)
7/7/11 55366416 03 Support Characterization Testing on 1-PP-3E-MTR (East Motor Driven Auxiliary Feedwater Pump PP-3E Motor), at Breaker Cubicle l-TllDT1.
 
7/7/11 55366421 04 Sample/ Drain /Refill Pump Brg and Clean 1-PP-3E-MTR 7/7/11 55378968 01 Lube Lower Bearing: (1-PP-7E-MTR)
2/8/12 55378969 01 Obtain an Oil Sample From 1-PP-7E-MTR, "East Essential Service Water Pump PP-7E MOTOR" for Analysis 2/9/12 55379811-01 1-FW-135; Perform Non-Intrusive Turbine Driven AFW Pump PMTM 8/31/201
 
55379811 1-FW-135; Perform Non-intrusive Test 8/31/11 55380536 01 1-PP-7E-MTR; Perform Motor Characterization Test 2/7/12 55386933 01 Perform Surveillance Procedure 01-IHP-6030-IMP-309 (4KV Bus Loss of Voltage and 4kV Bus Degraded Voltage Relay Calibration).
 
1/6/12 55397158 01 Perform Surveillance Procedure 01-IHP-6030-IMP-309 (4KV Bus Loss of Voltage and 4kV Bus Degraded Voltage Relay Calibration).
 
7/6/12 55407760 01 1-MRV-222, No. 2 SG Stop Valve Dump Valve 7/21/12 PM 00109769 1-87X-t11A Trip Test Lockout Relay
 
PM 00110736 U1 CD EDG, Replace Relays
 
PM 00114641 1-5A6-LCTA, Replace HFA Relay
 
Attachment LIST OF ACRONYMS USED AFW Auxiliary Feedwater ASME American Society of Mechanical Engineers CAC  
 
Control Air Compressor CAS  
 
Compressed Air System CCW Closed Cooling Water CDBI Component Design Basis Inspection CFR  
 
Code of Federal Regulations CR  
 
Condition Report CST  
 
Condensate Storage Tank DBA  
 
Design Basis Accident DRS  
 
Division of Reactor Safety EDG  
 
Emergency Diesel Generator EOP  
 
Emergency Operating Procedure ESW Emergency Service Water GL  
 
Generic Letter HELB High Energy Line Break IEEE Institute of Electrical and Electronics Engineers IMC  
 
Inspection Manual Chapter IN  
 
Information Notice LTC  
 
Load Tap Changer MDAFW Motor Driven Auxiliary Feedwater MOV Motor Operated Valve MTO Margin to Overfill NCV  
 
Non-Cited Violation NPSH Net Positive Suction Head NRC  
 
Nuclear Regulatory Commission NRR  
 
Nuclear Reactor Regulation PARS Publicly Available Records System PORV Power Operated Relief Valve PRA  
 
Probabilistic Risk Assessment RCS  
 
Reactor Coolant System RIS  
 
Regulatory Issue Summary RG  
 
Regulatory Guide SBO  
 
Station Blackout SG  
 
Steam Generator SGTR Steam Generator Tube Rupture SR  
 
Safety-related SSC  
 
Structures, Systems or Components TDAFW Turbine Driven Auxiliary Feedwater TIA  
 
Task Interface Agreement TOL  
 
Thermal Overload TS  
 
Technical Specification TSO  
 
Transmission System Operator UFSAR Updated Final Safety Evaluation Report URI  
 
Unresolved Item
 
Attachment In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,
Sincerely,
/RA/
/RA/  
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Enclosure: Inspection Report 05000315/2012007; 05000316/2012007(DRS)
 
w/Attachment: Supplemental Information cc w/encl: Distribution via ListServ'
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Enclosure:
Inspection Report 05000315/2012007; 05000316/2012007(DRS)
w/Attachment: Supplemental Information cc w/encl:
Distribution via ListServ'  
 
DISTRIBUTION:
DISTRIBUTION:
Cayetano Santos RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPreports.Resource@nrc.gov DOCUMENT NAME: DCCOOK 2012 007 CDBI CET.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII   RIII N NAME RBaker:ls   AMStone DATE 01/10/13   01/11/13 OFFICIAL RECORD CO 1    Attachment
Cayetano Santos RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPreports.Resource@nrc.gov  
 
DOCUMENT NAME: DCCOOK 2012 007 CDBI CET.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII  
 
RIII N  
 
NAME RBaker:ls AMStone  
 
DATE 01/10/13 01/11/13  
 
OFFICIAL RECORD CO
}}
}}

Latest revision as of 19:16, 11 January 2025

IR 05000315-12-007, 05000316-12-007(DRS), 07/23/2012 Through 12/31/2012, D.C. Cook Nuclear Power Plant, Units 1 and 2, Component Design Bases Inspection (CDBI)
ML13011A401
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/11/2013
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Weber L
Indiana Michigan Power Co
Caroline Tilton
References
IR-12-007
Download: ML13011A401 (35)


Text

January 11, 2013

SUBJECT:

D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, COMPONENT DESIGN BASES INSPECTION 05000315/2012007; 05000316/2012007(DRS)

Dear Mr. Weber:

On December 31, 2012, the U.S. Nuclear Regulatory Commission, (NRC) completed a Component Design Bases Inspection, (CDBI) at your D. C. Cook Nuclear Power Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on December 31, 2012, with Mr. M. Carlson, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, one NRC-identified finding of very low safety significance was identified. The finding involved a violation of NRC requirements. However, because of its very low safety significance, and because the issue was entered into your Corrective Action Program, the NRC is treating this issue as a Non-Cited Violation (NCV) in accordance with Section 2.3.2 of the NRC Enforcement Policy.

If you contest the subject or severity of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector Office at the D.C. Cook Nuclear Power Plant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

Inspection Report 05000315/2012007; 05000316/2012007(DRS)

w/Attachment: Supplemental Information

REGION III==

Docket Nos:

05000315; 05000316 License Nos:

DPR-58; DPR-74 Report No:

05000315/2012007; 05000316/2012007(DRS)

Licensee:

Indiana Michigan Power Company Facility:

D. C. Cook Nuclear Power Plant, Units 1 and 2 Location:

Bridgman, MI Dates:

July 23, 2012, through December 31, 2012 Inspectors:

C. Tilton, Senior Reactor Engineer, Lead

R. Baker, Operations Engineer

C. Brown, Reactor Engineer, Electrical

J. Corujo-Sandín, Reactor Engineer, Mechanical

W. Sherbin, Mechanical Contractor

G. Skinner, Electrical Contractor Approved by:

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety

Enclosure SUMMARY OF FINDINGS IR 05000315/2012007; 05000316/2012007(DRS); 07/23/2012 - 12/31/2012; D.C. Cook Nuclear Power Plant, Units 1 and 2; Component Design Bases Inspection (CDBI).

The inspection was a 3-week onsite baseline inspection that focused on the design of components. The inspection was conducted by regional engineering inspectors and two consultants. One Green finding was identified by the inspectors. The finding was considered a Non-Cited Violation (NCV) of NRC regulations. The significance of inspection findings are indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using IMC 0609, Significance Determination Process, dated June 2, 2011. Cross-cutting aspects are determined using IMC 0310, Components within the Cross Cutting Areas, dated October 28, 2011. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy dated June 7, 2012. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.

A.

Cornerstone: Mitigating Systems NRC-Identified and Self-Revealed Findings

Green. The inspectors identified a finding of very low safety significance and associated Non-Cited Violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to ensure sufficient water volume in the condensate storage tank when both units auxiliary feedwater (AFW) pumps are aligned to a single condensate storage tank (CST.) Specifically, the licensee failed to perform a calculation to demonstrate sufficient volume and level to prevent net positive suction head and vortex issues when a single CST is providing water to all six AFW pumps as allowed by procedures. The licensees corrective action included performing a formal calculation and increasing the available water volume in the CST when both units AFW pumps are cross-tied.

The performance deficiency was determined to be more than minor because it was associated with the Mitigating System Cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The finding screened as of very low safety significance (Green) because it was a design deficiency confirmed not to result in loss of operability. Specifically, the licensee performed an operability determination which concluded the actual useable tank level during the previous 12 months had been sufficient. The inspectors determined the cause of this finding did not represent current licensee performance and, thus, no cross-cutting aspect was assigned. (Section 1R21.3b.(1))

B.

No violations were identified.

Licensee-Identified Violations

Enclosure 1.

REACTOR SAFETY REPORT DETAIL Cornerstone: Initiating Events, Mitigating Systems, and Barrier Integrity 1R21 Component Design Bases Inspection (71111.21)

.1 The objective of the component design bases inspection is to verify the design bases have been correctly implemented for the selected risk significant components and the operating procedures and operator actions are consistent with design and licensing bases. As plants age, their design bases may be difficult to determine and an important design feature may be altered or disabled during a modification. The Probabilistic Risk-Assessment (PRA) model assumes the capability of safety systems and components to perform their intended safety function successfully. This inspectable area verifies aspects of the Initiating Events, Mitigating Systems, and Barrier Integrity cornerstones for which there are no indicators to measure performance.

Introduction Specific documents reviewed during the inspection are listed in the Attachment to the report.

.2 The inspectors used information contained in the licensees PRA and the D.C. Cook Nuclear Power Plant Standardized Plant Analysis Risk-Model to identify a scenario to use as the basis for component selection. The design basis accident scenario selected was steam generator tube rupture coincident with a loss of offsite power. Based on this scenario, a number of risk significant components were selected for the inspection.

Inspection Sample Selection Process The inspectors also used additional component information such as a margin assessment in the selection process. This design margin assessment considered original design reductions caused by design modification, power uprates, or reductions due to degraded material condition. Equipment reliability issues were also considered in the selection of components for detailed review. These included items such as performance test results, significant corrective actions, repeated maintenance activities, Maintenance Rule (a)(1) status, components requiring an operability evaluation, NRC resident inspector input of problem areas/equipment, and system health reports.

Consideration was also given to the uniqueness and complexity of the design, operating experience, and the available defense-in-depth margins. A summary of the reviews performed and the specific inspection findings identified are included in the following sections of the report.

The inspectors also identified procedures and modifications for review that were associated with the selected components. In addition, the inspectors selected operating experience issues associated with the selected components.

This inspection constituted 19 samples as defined in Inspection Procedure 71111.21-05.

Enclosure

.3 a.

Component Design The inspectors reviewed the Updated Final Safety Analysis Report (UFSAR), Technical Specifications (TS), design basis documents, drawings, calculations and other available design basis information, to determine the performance requirements of the selected components. The inspectors used applicable industry standards, such as the American Society of Mechanical Engineers (ASME) Code, Institute of Electrical and Electronics Engineers (IEEE) Standards and the National Electric Code, to evaluate acceptability of the systems design. The inspectors also evaluated licensee actions, if any, taken in response to NRC-issued operating experience, such as Bulletins, Generic Letters (GLs),

Regulatory Issue Summaries (RISs), and Information Notices (INs). The review was to verify the selected components would function as designed when required and support proper operation of the associated systems. The attributes that were needed for a component to perform its required function included process medium, energy sources, control systems, operator actions, and heat removal. The attributes to verify the component condition and tested capability was consistent with the design bases and was appropriate may include installed configuration, system operation, detailed design, system testing, equipment and environmental qualification, equipment protection, component inputs and outputs, operating experience, and component degradation.

Inspection Scope For each of the components selected, the inspectors reviewed the maintenance history, preventive maintenance activities, system health reports, operating experience-related information, vendor manuals, electrical and mechanical drawings, and licensee Corrective Action Program documents. Field walkdowns were conducted for all accessible components to assess material condition and to verify the as-built condition was consistent with the design. Other attributes reviewed are included as part of the scope for each individual component.

The following 14 components were reviewed:

Unit 1 East Essential Service Water (ESW) Pump (1-PP-7E): The inspectors reviewed design analyses associated with the ESW pump capacity, net positive suction head (NPSH), and minimum flow to verify the equipments capacity to perform its required functions. The pumps test procedures and recent results were reviewed to verify the actual capability of the installed equipment. The potential susceptibility of the pump to external flooding events was reviewed to verify the capability of the pump to perform its required function. Also reviewed was the potential susceptibility of the pump in the event of a Turbine Building high energy line break (HELB.) In addition, the inspectors reviewed the capability of the ESW pump to serve as the safety-related source of backup water supply to the AFW system. The inspectors reviewed control circuitry for the motor to determine whether manual and automatic functions were consistent with the design bases. The inspectors reviewed protective relaying schemes and calculations to determine whether the motor was adequately protected and whether it was susceptible to spurious tripping.

Unit 1 East Essential Service Water (ESW) Pump Discharge Strainer (1-OME-34E): Inspectors reviewed design and licensing bases documents for the component. Included in the items reviewed was the safety-related backflush

Enclosure function of the strainer and the differential pressure setpoints associated with the backflush function. In addition, the inspectors reviewed maintenance and operational history of the component. A sample of procedures associated with the components operations was also reviewed.

  • Unit 1 East Component Cooling Water (CCW) Heat Exchanger Outlet Shutoff Valve (1-WMO-733)
The inspectors reviewed the design and licensing bases associated with the component. Calculations related to weak link components and thrust analyses were reviewed. The inspectors reviewed recent test and maintenance records for the component. Automatic functions/actuations were reviewed in order to ensure the component could meet its safety-related functions. The inspectors also reviewed control circuitry for the motor to determine whether manual and automatic functions were consistent with the design bases. The inspectors reviewed the thermal overload (TOL) protection scheme for the motor operated valve (MOV), including drawings, calculations, and test procedures to determine whether it was consistent with NRC Regulatory Guide 1.106, Position C.2. The inspectors reviewed voltage and torque calculations for the MOV to determine whether they were conservative and properly incorporated appropriate correction factors specified in limitorque technical data.

Unit 1 East Motor Driven Auxiliary Feedwater Pump (1-PP-3E)

The inspectors reviewed design analyses associated with the motor driven auxiliary feedwater (MDAFW) pumps capacity. The licensing bases documents for the AFW system were reviewed, in particular as they relate to the UFSAR credited source of water (CST) and the safety-related backup source of water (ESW). The seismic qualification of the system and some of the support systems (CST) were also reviewed by the inspectors. A sample of procedures used during normal and emergency conditions was reviewed. The inspectors emphasized their review on the interaction between the AFW system and its safety-related backup source of water, including review for potential air binding of the pump as a result of the swap of water sources. The inspectors reviewed industry experience issues associated with potential fouling of the pumps minimum flow recirculation line.

The maintenance and testing history of the pump were also reviewed. The inspectors reviewed control circuitry for the motor to determine whether manual and automatic functions were consistent with the design bases. The inspectors review protective relaying schemes and calculations to determine whether the motor was adequately protected and whether it was susceptible to spurious tripping.

4kV Bus (T-11D): The inspectors reviewed bus loading calculations to determine whether the 4.16kV system had sufficient capacity to support its required loads under worst case accident loading and grid voltage conditions. The inspectors reviewed the design of the degraded voltage protection scheme to determine whether it afforded adequate voltage to safety-related devices at all voltage distribution levels. This included review of degraded voltage relay setpoint calculations, and a review of the degraded voltage logic scheme. The inspectors reviewed the overcurrent protection scheme for the 4.16kV buses including drawings and calculations to determine whether loads were adequately protected and immune from spurious tripping. The inspectors reviewed calculations and

Enclosure procedures used to determine operability of the offsite power supplies to the 4160V buses. This included review of switchyard voltage drop criteria and the interface agreements between the station and the transmission system operator.

The inspectors reviewed calculations and drawings for the Reserve Auxiliary Transformer load tap changer (LTC) control to determine whether it would have adequate voltage to operate under design basis conditions. The inspectors reviewed 125Vdc system voltage drop calculations to determine whether 4.16kV bus circuit breakers had adequate control voltage.

  • Condensate Storage Tanks (1-TK-32, 2-TK-32)
The inspectors reviewed design calculations to ensure the CST contained sufficient volume to meet the TS requirement and to ensure vortexing would not occur prior to operators taking manual actions to lineup the AFW pumps to their safety-related source of water.

Each units AFW pumps suction pipe is normally aligned to a CST, and there is no automatic swap-over to a safety-related source of water for pump suction in the event of a loss of CST. The inspectors reviewed the seismic, tornado wind, and tornado missile licensing basis requirements for the tanks. The inspectors reviewed structural calculations to verify seismic and tornado wind design capabilities of the tanks to maintain the required water volume during these natural hazards. In addition, the inspectors reviewed operating procedures that would be entered during a loss of CST to ensure design bases requirements for AFW pumps suction are maintained.

Emergency Diesel Generator (EDG) (1-CD)

The inspectors reviewed the load voltage drop calculation, maximum and minimum voltage profile, and DC field flashing circuit design to ensure that the EDG met the design requirements. The inspectors also verified that the EDG would properly start under degraded voltage conditions. Surveillance test results were reviewed to ensure TS requirements were met. The inspectors reviewed the adequacy and appropriateness of design assumptions and calculations related to EDG protection and relay coordination during test mode and during emergency operation. The EDG output breaker control logic diagrams were reviewed to verify the breaker tripping and closing logic was consistent with design basis description and interlocking requirements. The inspectors reviewed applicable CRs, maintenance activities, and EDG monitoring in accordance with the station blackout (SBO) rule. The inspectors also reviewed the latest operating experience with the system engineer.

Unit 1 Turbine-Driven AFW Pump 250 Vdc N Train Battery: To ensure that the N-train battery conformed to the design bases, the inspectors performed a walkdown of the turbine-driven (TD) AFW pump room and the N train battery room. The inspectors observed the N train battery, which supplies control power for the pump and noted the room temperature was high. The inspectors reviewed the battery load test results and completed surveillances to ensure the electrolyte levels were being maintained and the effects of the high temperature had been factored into the projections on battery life and performance. The inspectors confirmed the battery room had not approached the maximum allowable room temperature. The inspectors also reviewed the applicable operating procedures and the recent condition reports (CRs) and operability evaluations. The inspectors also reviewed the minimum voltage for the battery during the most limiting conditions of operation.

Enclosure

Unit 1 250 Vdc Transfer Cabinet (1-TDAB)

Unit 1 250 Vdc Battery and Busses (1-BATT-AB): The inspectors performed a walkdown of the battery room and the surrounding areas to inspect for discrepant conditions. The inspectors reviewed the battery sizing and loading calculation to verify all loads were accounted for, that the loads did not exceed the battery bank capacity, and that the calculated load profile bounded all accident scenarios. The inspectors also reviewed the short circuit calculation to confirm the maximum calculated short circuit current available under faulted conditions did not exceed the equipment rating and the protective fuses were adequately sized to isolate the fault and protect the affected equipment. In addition, the inspectors reviewed voltage drop calculations to verify the minimum voltage available at the equipment for the duration of the duty cycle was sufficient to ensure the proper operation of the equipment under limiting operating and environmental conditions. The review included verification that the battery tests conformed to the design and TS requirements, enveloped the calculated load profile for the duration of the duty cycle, confirmed the battery capacity exceeded the minimum capacity required under limiting conditions, and were capable of detecting battery degradation. One-line diagrams and wiring schematic diagrams were also reviewed to verify proper configuration of the 250 Vdc electrical distribution systems. The inspectors reviewed battery charger sizing calculations to verify the chargers were capable of carrying the continuous load after a design basis accident (DBA) and would be able to recharge the batteries to full capacity within the specified period. Additionally, the inspectors reviewed battery chargers tests to verify their capability of performing their intended function under design condition before their scheduled replacement. The inspectors reviewed system health reports, selected preventive and corrective maintenance history, as well as selected corrective action system documents to verify potential degradation was monitored or prevented and that corrective actions were appropriate and performed in a timely manner.

To ensure the transfer cabinet and the breakers met the design requirements, the inspectors reviewed the vendor ratings for the Bus and breakers against the breaker specifications. The inspectors also reviewed the short circuit calculations, fuse ratings, and the coordination scheme to ensure proper sizing of protection devices. In addition, the inspectors reviewed the related operations procedures and recent condition reports and operability evaluations.

-233,and 243): The inspectors reviewed the UFSAR, TS, applicable plant calculations, and drawings to identify the design bases requirements of the SG PORVs to determine if they were subject to common cause failure. The inspectors examined system health reports, and records of surveillance testing for the pneumatic operating components. Additionally, the inspectors reviewed station operating and off-normal response procedures to verify design bases requirements had been adequately translated into procedural instructions. The inspectors reviewed design bases documentation and drawings of the instrument air system to verify the support function provided to the SG PORVs was consistent with design requirements. The inspectors reviewed calculations for a postulated design bases steam generator tube rupture (SGTR) event to verify the ability of operators to perform required actions within the time frames assumed in the plants design and licensing basis accident analysis. The inspectors

Enclosure reviewed preventative maintenance and corrective maintenance history for trends, and reviewed recent corrective action documents to ensure problems were identified and corrected. In addition, the inspectors reviewed the sources of power, and control schemes to determine consistency with the design bases and to verify intended operation during accident conditions.

  • Unit 1 Train A Pressurizer PORV (1-NRV-153): The inspectors reviewed the translation of design bases into surveillance testing of the pressurizer PORV to ensure it is capable of performing as required in SGTR event. The inspectors also reviewed the design and testing of the backup pneumatic supply to the PORV actuator to ensure there is a sufficient quantity at adequate pressure to stroke the PORV when required on a loss of normal plant air. Plant alarm response procedure for low PORV accumulator pneumatic pressure was also reviewed to ensure operators have sufficient time to align additional pneumatic supply sources. The inspectors also reviewed thermal hydraulic calculations which determined the required stroke time of the PORV, and ensured testing demonstrated that stroke time requirements were met. In addition, the inspectors reviewed the sources of power, and control schemes to determine consistency with the design bases and to verify intended operation during accident conditions.
  • Unit 1 TDAFW Pump Discharge Check Valve (1-135): The inspectors reviewed system design criteria, selected drawings, and maintenance and test procedures for the Unit 1 TDAFW pump discharge check valve (1-135). The inspectors also performed walkdowns and reviewed corrective action documents. Additionally, the inspectors reviewed inservice test basis documents and associated test results, including forward flow. The inspectors also reviewed calculations that provided the bases for the inservice test acceptance criteria. Recent check valve internal inspection/examination results were also reviewed.
  • Unit 1 TDAFW Pump Room Coolers (1-HV-AFP-T1AC And T2AC): The inspectors reviewed analyses addressing the maximum potential TDAFW room temperatures under accident and SBO conditions and room cooler sizing calculations. The review verified the capability of required equipment in the room to perform their required functions with elevated room temperatures. The inspectors reviewed recent flow testing to ensure adequate cooling water flow to the room coolers and reviewed recent heat exchanger tube inspection results to verify heat transfer capability is maintained. The inspectors reviewed design documents which determined tube plugging limits and verified these limits were in plant maintenance procedures. The inspectors also performed walkdowns, reviewed corrective action documents and seismic qualification documents for the room coolers and structural supports.

b.

Findings (1) Non-Conservative Condensate Storage Tank (CST) Cross-Tie NPSH Calculation Introduction: A finding of very-low-safety significance and associated Non-Cited Violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, was identified by the inspectors for the failure to ensure sufficient water volume in the condensate storage tank when both units AFW pumps are aligned to a single CST. Specifically, the licensee

Enclosure failed to perform a calculation to show that there would be adequate NPSH and vortexing issues would be prevented when a single CST is providing water to all six AFW pumps as allowed by procedures.

Description: On August 24, 2012, while reviewing calculation MD-12-CST-002-N, Operation of the AFW System Using the Condensate Storage Tank of the Other Unit, the inspectors noted the calculation concluded that a level of seven feet above the centerline of the discharge pipe to the AFW pumps was required to provide adequate NPSH when cross-tied to the other units CST. The inspectors also noted this calculation assumed only three AFW pumps in a single unit in operation drawing water from the opposite units CST.

The inspectors also reviewed Procedure 1(2)-OHP-4022-055-003, Loss of Condensate to Auxiliary Feedwater Pumps. The inspectors noted this procedure allowed for cross-tie operation of both units AFW pumps (three on each unit) from a single CST whenever a CST level is less than 15 percent. The inspectors confirmed this value did not account for single CST providing water to all six AFW pumps. The 15 percent value represented operation of a single CST providing three AFW pumps in one unit.

The inspectors were concerned because a 15 percent level in a single CST could potentially result in not having sufficient NPSH and potentially introducing vortexing in the system rendering all six AFW pumps inoperable. The licensee issued AR 2012-10381 to document the inspectors concerns.

After further assessment, the licensee performed a NPSH calculation given the configuration in question (ability to operate all six AFW pumps from one CST) and determined the required level is about 6 feet higher than the minimum level determined from calculation MD-12-CST-002-N and correlates to 38 percent. In addition, the licensee researched the minimum CST level during plant operation within the past 12 months, and determined the lowest level in any CST was 58 percent. Therefore, although the vulnerability existed, the pumps had been operable since CST level had been greater than 38 percent.

Analysis: The inspectors determined the failure to ensure sufficient water volume in the condensate storage tank when both units AFW pumps are aligned to a single CST was contrary to 10 CFR Part 50, Appendix B, Criterion III, Design Control, and was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the Mitigating System Cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to perform a calculation to demonstrate adequate NPSH and vortexing issues would be prevented when a single CST is providing water to all six AFW pumps does not ensure the availability and reliability of the AFW system to provide its accident mitigating function.

The inspectors determined the finding could be evaluated using the SDP in accordance with IMC 0609, Significance Determination Process, Attachment 0609.04, Initial Characterization of Findings. Because the finding impacted the Mitigating Systems cornerstone, the inspectors screened the finding through IMC 0609 Appendix A,

Enclosure The Significance Determination Process for Findings At-Power, using Exhibit 2, Mitigating Systems Screening Questions. The finding screened as of very low safety significance (Green) because it was a design deficiency confirmed not to result in loss of operability. Specifically, the licensee performed an operability determination which concluded that in the past 12 months the volume and level in each CST was adequate to allow for a single CST to supply both units AFW pumps without affecting operability of the AFW systems.

The inspectors determined the cause of this finding did not represent current licensee performance and, thus, no cross-cutting aspect was assigned.

Enforcement: Title 10 CFR Part 50, Appendix B, Criterion III, Design Control, requires, in part, that measures shall be established to assure applicable regulatory requirements and the design basis are correctly translated into specifications, drawings, procedures, and instructions.

Contrary to the above, as of August 24, 2012, the licensees design control measures failed to translate applicable design basis into procedures. Specifically, the procedure for cross-tie operation of a CST to both units AFW pumps did not consider the minimum volume of water required in the CST to prevent NPSH and vortexing issues. Because this violation was of very low safety significance and was entered into the licensees CAP as AR 2012-10381, this violation is being treated as a Non-Cited Violation, consistent with Section 2.3.2 of the NRC Enforcement Policy.

(NCV 05000315/2012007-01; 05000316/2012007-01, Non-conservative CST Cross-Tie NPSH Calculation).

(2) Qualification Basis for Safety-Related Relays and Motor-Starter Contactors Introduction: The inspectors identified an unresolved item (URI) regarding the licensees actions to maintain or extend the qualification basis for safety-related relays and motor-starter contactors used in safety-related applications greater than vendor service-life recommendations. Specifically, the licensee did not have a time based replacement program for aging active components that ensured that the SSCs were replaced or the service life was evaluated and extended before the vendor recommended service life was exceeded.

Description: As part of the review of the electrical systems and systems, structures and components (SSCs), the inspectors noted the certificate of compliance for the HFA relays stated a 41-year service life. A 21-year service life was noted for the HEA and HGA relays and a 10-year service life from the time of manufacture for the Agastat relays. The inspectors noted the licensee was not managing the replacement of the safety-related (SR) relays and contactors associated with the electrical systems and SSCs to prevent exceeding the manufacturers recommended service lives. Based on the inspectors questions, the licensee initiated AR 2012-9701, Condition Not Adverse to Quality, on August 8, 2012, to investigate the impact of service life on the relay and contactor operability.

At the time of the inspection, none of the installed HFA relays had exceeded the 41-year service life. This issue is considered an unresolved item pending consultation with personnel in the Office of Nuclear Reactor Regulation (NRR) and further NRC review of the licensee response. (URI 05000315/2012007-02, 05000316/2012007-02; Qualification Basis for Safety-Related Relays and Motor-Starter Contactors).

Enclosure (3) Concerns with Periodic Design Basis Testing of Installed Relays and Motor-Starter Contactors Introduction: The inspectors identified an unresolved item (URI) regarding periodic design basis testing of installed relays and motor-starter contactors. Specifically, the licensee had neither a periodic testing program nor had any record of testing critical SSCs to ensure the SSCs continued to meet their respective design criteria (minimum pickup voltage, minimum drop-out voltage, and timing tests).

Description: As part of the review for exceeding the recommended relay service life, the inspectors determined the licensee did not periodically test the safety-related relays and motor-starter contactors to the design specifications and had not since the plant started power operations.

The inspectors noted Regulatory Guide (RG) 1.33, Quality Assurance Program Requirements (Operation), stated additional documents were to be included in a licensees Quality Assurance Program, specifically RG 1.30 Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment and ANSI Standard N45.2.4-1972, (also known as IEEE Std 336-1971).

Section C.3 of RG 1.30 states, Although Subdivision 1.1 of ANSI N45.2.4-1972 states that the requirements promulgated apply during the construction phase of a nuclear power plant, these requirements are also to be considered applicable for the installation, inspection, and testing of instrumentation and electric equipment during the operation phase of a nuclear power plant. In addition, the inspectors noted Section 3.3 of IEEE 336, Procedures and Instructions, states documents shall be kept current by controlled supervision so that installation, inspections, and tests are performed in accordance with the latest approved design and manufacturers instructions.

The inspectors were concerned the assumptions in the degraded voltage calculations were challenged in that the licensee has not performed any testing to ensure that the design ratings for the SR relays and contactors would continue to operate at or below the manufacturers design ratings. Only functional testing at full voltage has been performed to check the operation. In response, the licensee initiated AR 2012-11028, 2012 CDBI - Periodic Testing of HGA Relays, on September 6, 2012.

This issue is considered an unresolved item pending consultation with NRR personnel to confirm the testing requirements and further NRC review of the licensee response.

(URI 05000315/2012007-03, 05000316/2012007-03; Concerns with Periodic Design Basis Testing of Installed Relays and Motor-Starter Contactors).

.4 Operating Experience a.

Inspection Scope The inspectors reviewed five operating experience issues to ensure that NRC generic concerns had been adequately evaluated and addressed by the licensee. The operating experience issues listed below were reviewed and are considered inspection samples:

GL 1979-36, "Adequacy of Station Electric Distribution Systems Voltages";

GL 2006-02, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power;

Enclosure

IN 2004-01, Auxiliary Feedwater Pump Recirculation Line Orifice Fouling -

Potential Common Cause Failure;

GL 1991-13, Request for Information Related to the Resolution of Generic Issue 130, Essential Service Water System Failures at Multi-Unit Sites Pursuant to 10 CFR 50.54 (F); and

RIS 2008-14, Use of TORMIS Computer Code for Assessment of Tornado Missile Protection.

b.

Findings No findings of significance were identified.

.5 Modifications a.

Inspection Scope The inspectors reviewed one permanent plant modifications related to selected risk significant components to verify the design bases, licensing bases, and performance capability of the components had not been degraded through modifications. The modifications listed below were reviewed as part of this inspection effort:

DCP 4690, 250 Vdc Fuse Replacement Project b.

Findings No findings of significance were identified.

.6 Operating Procedure Accident Scenarios a.

Inspection Scope The inspectors performed a detailed review of the procedures listed below associated with the selected scenario, steam generator tube rupture. The procedures were compared to UFSAR content, design assumptions, regulatory requirements, and training materials to assure constancy. For the procedures listed, operator actions were reviewed for reasonableness, in plant actions were walked down with a licensed operator, and any interfaces with other departments were evaluated.

The following operating procedures were reviewed in detail:

1(2)-OHP-4023-E-0, Reactor Trip or Safety Injection;

1(2)-OHP-4023-E-3, Steam Generator Tube Rupture;

1(2)-OHP-4023-ECA-3.1, SGTR With Loss of Reactor Coolant-Subcooled Recovery Desired;

1(2)-OHP-4023-ES-3.1, Post-SGTR Cooldown Using Backfill; and

1(2)-OHP-4023-ES-3.2, Post-SGTR Cooldown Using Blowdown.

Enclosure For the following selected time critical operator actions, the inspectors performed detailed walkthroughs of specific procedure steps, including observing the performance of required actions in the stations simulator and local actions in the plant by appropriate plant operators to assess operator knowledge level, adequacy of procedures, and availability of special equipment where required.

The following operator actions were assessed in detail:

Actions to isolate AFW flow to steam generator with ruptured tube;

Actions to isolate steam flow from steam generator with ruptured tube;

Actions to initiate reactor coolant system (RCS) cooldown following steam generator tube rupture;

Actions to initiate RCS depressurization following steam generator tube rupture;

Actions to terminate safety injection following steam generator tube rupture; and

Actions to align backup nitrogen to and locally operate the steam generator power operated relief valves on the intact steam generators.

b.

Findings (1) Concerns with Ensuring Margin to Overfill in a Ruptured SG Introduction: The inspectors identified an URI related to the adequacy of the licensees emergency operating procedures (EOPs) which mitigate the consequences of a SGTR.

Specifically, procedures EOP 1(2) OHP-4023-E-3, Steam Generator Tube Rupture, did not provide adequate actions to mitigate the consequences of a SGTR in sufficient time to prevent overfilling the ruptured steam generator which could lead to exceeding calculated offsite doses.

Description: During the week of July 23, 2012, the inspectors reviewed the licensing bases and plant response to a SGTR event. During the postulated design basis event, operators prevent overfill of the ruptured SG using the SG PORVs. During a SGTR, the normal source of motive force for the SG PORVs is air supplied by the compressed air system (CAS). The CAS compressors are powered from the offsite power supply and are non-safety-related. Assuming a concurrent loss of offsite power (LOOP) to the station, the only available source of immediate and remote (from the control room) motive force is air supplied by the control air compressor (CAC) since it could be powered from an EDG.

The CAC is also non-safety-related. The inspectors also noted the backup Nitrogen system could be manually aligned to provide motive force for the SG PORVs.

The facilitys EOPs 1(2) OHP-4023-E-3, Steam Generator Tube Rupture, Step 7, directs the operators to perform a rapid RCS cooldown by fully opening the SG PORVs on the 3 intact SGs. The margin to overfill (MTO) analysis assumes this step occurs on demand (the SGTR PORVs open immediately as soon as the operators manipulate the valves from the control room). Once the SG PORVs are full open, the MTO analysis assumes it takes 12 minutes to complete the RCS cooldown. This is a calculated (modeled) value which takes into account plant specific characteristics.

Enclosure If the SG PORVs do not open, the EOPs direct operators to establish backup Nitrogen.

Because aligning Nitrogen to the SG PORVs is a manual operation requiring multiple manipulations outside the control room, the inspectors were concerned the additional time to complete these actions would result in a longer time to complete the RCS cooldown than assumed in the MTO analysis and the affected SG could overfill.

On Friday, July 27, 2012, the inspectors requested the licensee to provide a non-licensed operator to perform a walkthrough of the procedures for establishing backup Nitrogen to locally open the SG PORVs. Although no significant issues were discovered during performance of the evolution, the operator required 13 minutes to establish backup Nitrogen to the auxiliary building and 14 minutes to place the local control stations in service and open the SG PORVs, a total of 27 minutes.

The inspectors were concerned because this additional 27 minutes was not accounted for in the MTO analysis. Specifically, the MTO analysis assumes a total of 12 minutes for RCS cooldown to occur from the moment the operators get direction to open the SG PORVs (assumed to occur immediately) until commencement of RCS depressurization.

The MTO analysis calculates it will take the operators and the plant a total of 52 minutes to mitigate the SGTR accident (no more RCS flow through the ruptured SG) and thus prevent overfilling the affect SG with a calculated MTO of approximated 8ft3. The MTO analysis has no margin to accommodate the additional 27 minutes for RCS cooldown and therefore the procedure fails to potentially prevent overfilling the ruptured SG.

In response to the inspectors concerns, the licensee implemented immediate compensatory actions to ensure (1) backup Nitrogen was continuously available to the auxiliary building and (2) an operator would be immediately dispatched to commence lining up backup Nitrogen to the SG PORVs if a SGTR with a concurrent LOOP occurred while the EDG or CAC was unavailable.

The licensee disagreed with the inspectors assumption with respect to the initial conditions of a LOOP affecting both units. The licensee believes their licensing basis for a SGTR is a concurrent LOOP in the affected unit and the unaffected unit maintains an intact source of offsite power. In the licensees scenario, the affected units SG PORVs would still have a source of immediate remote (from the control room) motive force via the compressed air system. On the contrary, the inspectors believe the licensees design bases accident is a SGTR coincident with a LOOP to the station (both units). To resolve this issue, the inspectors requested support from NRR through a concurrence Task Interface Agreement (TIA) to determine the licensing bases for this event. In a TIA memorandum dated December 7, 2012, NRR concluded the licensing bases included a LOOP for both units (ML13011A382).

Although the inspectors received a response from NRR, the issue remained open awaiting additional licensing bases information from the licensee. This issue is considered an unresolved item (URI) pending further review this information (URI 05000315/2012007-04, 05000316/2012007-04; Concerns with Ensuring Margin to Overfill in a Ruptured SG).

(2) Concerns with Operability of SG PORVs with the Control Air Compressor Unavailable Introduction: The inspectors identified an URI related to the operability of the SG PORVs as defined in TS 3.7.4 when the associated CAC was unavailable and incapable of providing its required support function. Specifically, the licensee may have failed to

Enclosure declare the affected units SG PORVs inoperable and complete the TS required actions when the non-safety-related CAC was made unavailable thus affecting the SG PORVs capability to mitigate the consequences of a SGTR coincident with a loss of offsite power to the station, in sufficient time to prevent overfilling the ruptured steam generator.

Description: The inspectors identified an issue related to the definition of operability of the SG PORVs as specified by the TS. The most limiting design bases accident for the SG PORVs, is a tube rupture event. During this accident, the operators prevent overfill of the ruptured steam generator using the SG PORVs. Assuming a coincident loss of offsite power (LOOP) to the station (affecting both units), the only readily available source of pneumatic motive force for the SG PORVs is the unit-specific CAC, which has the capability of being powered from onsite emergency power (EDGs). The TS bases for the SG PORVs (B 3.7.4) states the Control Air System (the system composed of the CAC)

provides the normal air supply for pneumatic control. Each unit-specific CAC is not safety-related and is not subject to a TS limiting condition for operation. Therefore, these compressors could be unavailable (i.e., for maintenance) for an indeterminate length of time, consistent with the performance goals established for the maintenance rule, regardless of the units current mode of operation. With the exception of emergent repair maintenance, all preventive maintenance is performed on the CACs when the units are online, in Mode 1.

As defined in the facilitys Unit 1 and Unit 2 TS, A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication and other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its specified safety function are also capable of performing their related support function(s). The electrical and control air appurtenances for the SG PORVs are non-safety grade and do not have an associated TS operability requirement. However, since the electrical control power and control air system are credited to ensure the SG PORVs will operate to perform the mitigating function of cooling the RCS during the SGTR accident with a LOOP, the inspectors concluded this equipment is required to be functional for the SG PORVs to be considered OPERABLE.

The inspectors indentified several occasions when the CAC was non-functional; however, the licensee did not declare the PORVs inoperable. Specifically, a review of the facilitys unavailability records for the Unit 1 and Unit 2 CACs from January 1, 2000 to August 20, 2012 identified 13 instances (5 associated with Unit 1 and 8 associated Unit 2) when the units CAC was unavailable for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the TS allowed outage time for two or more SG PORVs being inoperable. In three of those instances for Unit 1 (April 18, 2001, for 79.8 hrs, November 23, 2003, for 133.2 hrs, and April 7, 2008, for 108.9 hrs) and two of those instances for Unit 2 (February 12, 2003, for 71.8 hrs and January 16, 2006, for 103.5 hrs) the unavailability time of the CAC was in excess of the total TS allowed outage times of 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> to place the unit in a mode where the limiting condition of operation does not apply.

As stated in Section 1R21.6(b)(1), the licensee disagreed with the inspectors initial assumption with respect to the initial conditions of a LOOP affecting both units. The licensee believes their licensing basis for a SGTR is a concurrent LOOP in the affected unit and the unaffected unit maintains an intact source of offsite power. In the licensees scenario, the affected units SG PORVs would still have a source of immediate remote

Enclosure (from the control room) motive force via the compressed air system. On the contrary, the inspectors believe the licensees design basis accident is a SGTR coincident with a LOOP to the station (both units). To resolve this issue, the inspectors requested support from NRR through a concurrence Task Interface Agreement (TIA) to determine the licensing bases for this event. In a TIA memorandum dated December 7, 2012, NRR concluded the licensing bases included a LOOP for both units (ML13011A382).

Although the inspectors received a response from NRR, the issue remained open awaiting additional licensing bases information from the licensee. This issue is considered an unresolved item (URI) pending further review of this information (URI 05000315/2012007-05, 05000316/2012007-05; Concerns with Operability of SG PORVs with Control Air Compressor Unavailable).

4.

OTHER ACTIVITIES 4OA2 Identification and Resolution of Problems

.1 Review of Items Entered Into the Corrective Action Program a.

Inspection Scope The inspectors reviewed a sample of the selected component problems that were identified by the licensee and entered into the Corrective Action Program. The inspectors reviewed these issues to verify an appropriate threshold for identifying issues and to evaluate the effectiveness of corrective actions related to design issues. In addition, corrective action documents written on issues identified during the inspection were reviewed to verify adequate problem identification and incorporation of the problem into the Corrective Action Program. The specific corrective action documents that were sampled and reviewed by the inspectors are listed in the attachment to this report.

b.

Findings No findings of significance were identified.

4OA6 Meeting(s)

.1 Exit Meeting Summary On December 31, 2012, the inspectors presented the inspection results to Mr. M.

Carlson, and other members of the licensee staff. The licensee acknowledged the issues presented. Several documents reviewed by the inspectors were considered proprietary information and were either returned to the licensee or handled in accordance with NRC policy on proprietary information.

ATTACHMENT: SUPPLEMENTAL INFORMATION

Attachment SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee M. Carlson, VP Site Support Services S. Lies, Plant Manager M. Scarpello, Regulatory Affairs and Performance Improvement Department Manager W. Hodge, I&C Design Engineering Supervisor S. Mitchell, Licensing Activity Coordinator (Compliance)

Nuclear Regulatory Commission A. M. Stone, Chief, Engineering Branch 2, DRS J. Ellegood, Senior Resident Inspector P. LaFlamme, Resident Inspector LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Opened/Closed 05000315/2012007-01; 05000316/2012007-01 NCV Non-conservative Condensate Storage Tank (CST) Cross-Tie NPSH Calculation (1R21.3(b)(1))

Opened 05000315/2012007-02; 05000316/2012007-02 URI Qualification Basis for Safety-Related Relays and Motor-Starter Contactors (1R21.3(b)(2))05000315/2012007-03; 05000316/2012007-03 URI Concerns with Periodic Design Basis Testing of Installed Relays and Motor-Starter Contactors (1R21.3(b)(3))05000315/2012007-04; 05000316/2012007-04 URI Concerns with Ensuring Margin to Overfill in a Ruptured SG (1R21.6(b)(1))05000315/2012007-05; 05000316/2012007-05 URI Concerns with Operability of SG PORVs with Control Air Compressor Unavailable 1R21.6(b)(2)

Attachment LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless stated in the body of the inspection report.

CALCULATIONS Number Description or Title Revision 01-E-N-ELCP-120-004 120 VAC Distribution panel Control Circuit Voltage Drop

01-E-N-PROT-TOL-001 600v System Continuous Duty Safety-related Motor Thermal Overload (TOL) Heater Selection

12-E-N-PROT-RLY-001 4KV Electrical Protection Coordination Study

12-E-N-PROT-TOL-MOV-001 Generic Thermal Overload Heater Sizing Calculation for AC Motor Operated Valves Within the GL 89-10 Program

1-EN-N-ELCP-250-008 250Vdc Battery 1N System Analysis

1-E-N-ELCP-600-003 600 Motor Control Center (MCC) Control Circuit Voltage Drop

12-E-S-ELCP-765-002 Cook Load Flow Program (CKOLF) Description and Validation

1-E-N-ELCP-4KV-001-Model Unit 1 4 kV/600 V Load Control Model Calculation

1-E-N-ELCP-4KV-001-VOLT Unit 1 Voltage Adequacy

1-E-N-PROT-RLY-002 4kV Safety-related Motors Phase Instantaneous Relay (PJC)

Settings Calculation, Unit 1

1-E-N-PROT-RLY-002A 4kV Safety-related Motors Phase Instantaneous Relay (PJC)

Settings Calculation, Unit 1

1-E-N-PROT-RLY-003 Degraded Grid and Loss of Voltage Relay Setting Calculation

1-SV-2A-1 SQUG-Steam Generator OME-3-1 Safety Valve 2A

2-E-N-DCP-4247-001 Fan Thermal Overload Evaluation During HELB Transient

2-E-N-ELCP-4KV-001 Unit 2 4 kV/600 V Load Control Calculation

Attachment CALCULATIONS Number Description or Title Revision DC-D-02-ESW-19 Piping and Pipe Support Analysis of Unit 2 Condensate and Essential Service Water Piping System from the Condensate Storage Tank to the three suction nozzles of the Auxiliary Feedwater Pumps.

DIT-0-01161-

ESW Loads - Concurrently Supplying CTS & AFW Supply 5/15/00 DIT-B-01074-

ESW Strainer Differential Pressure Switch and Alarm Setting 4/18/00 DIT-B-02317-

ESW Flow Verification Test Target Flows for 01-OHP-4030-119-022FV & 02-OHP-4030-219-022FV 4/19/08 DIT-S-01153-

Minimum Flow for the Unit 1 and Unit 2 ESW Pumps 2/9/03 DIT-S-01153-

ESW Pump Flow Recommendation 2/10/03 DIT-S-01153-

ESW Pump Flow Recommendation 2/10/10 MD-01-ESW-084-N Torque Setup Calculation for 1-WMO-733 and 1-WMO-737

MD-12-AFW-001-N Auxiliary Feedwater System Design Basis Analysis

MD-12-AFW-001-N Aux. Feedwater System Design Bases Analysis

MD-12-CA-004-S Determination of Available Pressurizer PORV Strokes Using the Auxiliary Air Supply

MD-12-CST-002-N Operation of Auxiliary Feedwater System Using the CST of the Other Unit

MD-12-ESW-076-N ESW Pump NPSH Available and Submergence

MD-12-ESW-109-N ESW Supply to the Suction of the AFW pumps

MD-12-HV-018-N Aux. Feedwater Pump Room and Hallway Heat Load Calculation

MD-12-RCS-021-N Maximum Differential Pressure Calculation For Pressurizer Power Operated Relief Valves 1(2)-NRV-151, 152 and 153

MD-12-RCS-022-N Actuator Capability Calculation For Pressurizer Power Operated Relief Valves 1(2)-NRV-151, 152 and 153

PS-4KVP-001 4 KV Safety Motor Electrical Protection

PS-4KVP-001 4 KV Safety Motor Electrical Protection

PS-4KVP-003 Ground Relay Settings 4-kV ESS and BOP Buses

PS-4KVP-004 Relay Setting Basis - 69kV Alt. Pwr. Supply

PS-4KVP-005 Unit & Reserve Feed Phase-Overcurrent Relay Settings

SD-990825-047 Seismic/Weak Link Torque Calculation for l-WMO-733

SD-990930-004 Probability of Tornado Missile Strike on Targets at D. C. Cook Nuclear Plant

Attachment CALCULATIONS Number Description or Title Revision SEWS-1-TK-

SQUG Seismic Evaluation of CST 1-TK-32

SEWS-2-TK-

SQUG Seismic Evaluation of CST 2-TK-32

SQUG 1-BATT-AB Seismic Qualification of Station AB Batteries

TH-00-03 D.C. Cook Unit 2 Steam Generator Tube Rupture with Operator Actions

TH-00-05 AFW Pump Room Heat-Up Temperatures

TH-00-06 D.C. Cook Unit 1 Steam Generator Tube Rupture with Operator Actions

TH-04-11 Impact of New EOP Footnotes on Steam Generator Tube Rupture Overfill

TH-04-11-ADD MDAFP BHP Impact on SGTR Overfill Analysis

CORRECTIVE ACTION DOCUMENTS GENERATED DUE TO THE INSPECTION Number Description or Title Date GT 2012-9163 Update Report No. PRA-NB-SY-MS 7/26/12 AR 2012-9209 Update Vendor Manuals in Calc 1-E-N-PROT-TOL-001 7/27/12 AR 2012-9233 SGTR DBA Analysis May Not Be Met with Some Unavailable Equipment 7/27/12 GT 2012-9592 Procedure note needs to be revised 8/6/12 GT2012-9681 1-OHP-4025-LS-4 Section LS-4-3 Enhancement 8/8/12 AR 2012-9701 CNAQ - Condition Not Adverse to Quality 8/8/12 AR 2012-10342 MOV Voltage Analysis 8/23/12 AR 2012-10362 Loss of Controlled Document 8/23/12 AR 2012-10381 2012 CDBI Enhancement to Loss of CST Inventory Response 8/23/12 AR 2012-10385 2012 CDBI - ESW to AFW Void Mod or Analysis Required 8/23/12 AR 2012-10381 2012 CDBI Enhancement to Loss of CST Inventory Response 8/23/12 AR 2012-10398 PJM Manual #3 Does Not Reflect Cook NPIRs 8/24/12 AR 2012-10425 GL 2006-2 Response 8/24/12

Attachment CORRECTIVE ACTION DOCUMENTS GENERATED DUE TO THE INSPECTION Number Description or Title Date AR 2012-10547 Application of Limitorque Technical Bulletin 93-03 8/27/12 AR 2012-10556 Potential for Inconsistent Application of LCO 3.0.6 8/27/12 GT 2012-10519 2012 CDBI: CST Tornado Qualification Question 8/27/12 AR 2012-11028 2012 CDBI Periodic Testing of HGA Relays 9/6/12

CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title Date CR 99-02960 Procedures 01(and 02)-0HP4022.0550003 do not Alert Operations to a Change in Flow When ESW is Valved Over to Supply AFW 2/17/99 CR 05177018 The Licensing and Design Basis Documentation That Establishes The Safety Classification and Seismic Qualification Basis for the Condensate Storage Tanks is Not Easily Retrievable or Clear to Interpret.

6/26/05 AR 2008-13401 Calculation TH-95-01 Does Not Model Gap At Column Line A 5/9/07 AR 2008-13401 Calculation TH-95-01 Does Not Model Gap At Column Line A 5/9/07 AR 2008-41539 - 03 Reportability eval re: Screen House Wall/HELB Issue 11/13/08 AR 2008-49389 Vibes on East MDAFP Greater Than Alert Limits 4/9/09 AR 2008-49389 Vibes on East MDAFP greater than alert limits 4/9/09 AR 2008-49714 Unit 1 CAC Running at Higher Amps 4/13/200

GT 2008-51617 Project Required for Identifying Alternate Method of Providing ESW Min Flow Protection 5/18/09 AR 2008-52630 Control Air Compressor Amperage is Higher Than Normal 6/5/2009 GT 2008-61464 Union Leaking in Safety Valve 1-SV-1B-4 12/2/09 AR 2008-62364 2-OME-42 Motor Elevated Vibration Level 12/18/20

GT 2010-8756 Clarification of DBD for Transfer of Buses 8/30/10 GT 2010-9468 Revise Calculations 1(2)-E-N-ELCP-4KV-001-VOLT "Unit 1/2-Voltage Adequacy Analysis" to Better Describe the Basis for the Allowed Differences in T-bus Voltage When Connected to the UAT/RATs Versus 69KV (EP)

9/15/10

Attachment CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title Date AR 2010-9960 TOLs Trip Prematurely 9/27/10 AR 2011-0619 Loss of ESW Header Pressure on pump swap 1/15/11 AR 2011-0632 U1 EESW Pump Test Pump DP Less Than Low Alert Limit 1/16/11 AR 2011-1788 1-WMO-733 Overtorque 2/9/11 GT 2011-2277 Evaluate Practice Of Starting All AFW pps On Loss Of A MFP.

2/21/11 GT 2011-2590 1-OME-34E, Extent Of Cause Inspection 2/28/11 GT 2011-3224 OE32888 - Voltage Cal. Failed to Include LTC Voltage 3/14/11 GT 2011-4445 Prepare Calculation for RAT LTC Control Power 4/12/11 AR 2011-5154 Air Voids in AFW Pump Emergency Suction Source from ESW 4/29/11 AR 2011-5492 When Starting Unit 1 CAC for Surveillance it Tripped and Restarted 5/6/2011 GT 2011-8565 OE-Evaluation of NRC IN 2011-14, Component Cooling Water System Gas Accumulation 7/26/11 AR 2011-9439 AFI CM.2-1 - Time Credited Operator Actions 8/18/201

AR 2011-9779 U-1 CAC Run Scheduled for Sunday with Recording Vibrations on Monday 8/28/201

AR 2012-10271 Evaluate Calculation 12-E-N-ELCP-250-009 8/22/12 AR 2011-10411 Air Void detected in Alt Suction line to U2 TDAFW pump 9/14/11 AR 2011-12301 T11D7 East CCP Breaker Failed Timing Per 1-OHP-4030-132-217A 10/21/11 AR 2011-13233 1-PP-3E (East Motor Driven Auxiliary Feedwater Pump) Oil 11/10/11 AR 2011-14229-02 Tube Plugging Limits 11/21/11 AR 2012-0710 Print Does Not Match Field Wiring for 2-OME-42 Motor 1/16/201

AR 2012-6200 Potential Risk to 4kV bus From Undetected Voltage Unbalance 5/11/12 GT 2012-6873 Packing Leak 2-NMO-152 5/29/12 AR 2012-7514 1-OME-34E East ESW Strainer Gate is Leaking 1 gpm.

6/14/12

Attachment CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title Date AR 2012-8833 1-MRV-212, No. 1 SG Stop Valve Dump Valve Lost Power 7/19/12 AR 2012-8834 1-MRV-222, No. 2 SG Stop Valve Dump Valve Failure 7/19/12 AR 2012 -

9358 Electrical Load Flow Calculations 8/8/12

DRAWINGS Number Description or Title Revision 1-2-AEP-GRAV-L-24989 General Assy. And Orientation for Hardtop Floating Roof Condensate Storage Tank

Dresser # CP-1795 Flanged Inlet 1200 psig. Safety Valve

E-1300 DC Cook Station One Line Diagram

E-1700 DC Cook Station One Line Diagram

OP-1-12001-80 Main Auxiliary One-Line Diagram Bus A and B Engineered Safety System (Train B)

OP-1-12002-63 Main Auxiliary One-Line Diagram Bus C and D Engineered Safety System (Train A)

OP-1-12030-34 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)

OP-1-12031-34 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)

OP-1-12032-20 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)

OP-1-12033-33 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)

OP-1-12034-4 MCC Aux One-Line 600V Bus 11C, 11D, Engineered Safety System (Train A)

OP-1-12035-33 Distr Pnl One-Line 600V Bus 11C, 11D Engineered Safety System (Train A)

OP-1-12050-26 120/208V AC Control Room Instrumentation Cabinets CRID-I Thru CRID-IV Engineered Safety System

OP-1-12051-31 120V AC Critical Control Room Power Cabinets CCRP-1 Thru CCRP-3

OP-12-5118B-46 Flow Diagram Nitrogen and Hydrogen Gas Reactor System Units 1 and 2

OP-1-5102D Flow Diagram, Containment Control Air, 85 No. and 50 No. Ring Headers, Unit 1

OP-1-5105A-36 Flow Diagram, Main Steam, Unit 1

OP-1-5105A-60 Flow Diagram, Aux. Feedwater, Unit 1

OP-1-5105D-10 Flow Diagram, Steam Generating System, Unit 1

OP-1-5105D-10 Flow Diagram Steam Generating System Unit No. 1

Attachment DRAWINGS Number Description or Title Revision OP-1-5106A-60 Flow Diagram Aux-Feedwater Unit 1

OP-1-5113-92 Flow Diagram Essential Service Water

OP-1-5113B-1 Flow Diagram, TDAFW Pump Room Coolers, Unit 1

OP-1-5120A-60 Flow Diagram Compressed Air System Plant Air Turbine Room Unit 1

OP-1-5120R-6 Control Air System, Aux. Bldg. Tapoffs, Unit 1

OP-1-5120S-14 Control Air System Auxiliary Bldg. Tapoffs Unit 1

OP-1-5120V-6 Control Air System Auxiliary Bldg. Tapoffs Unit 1

OP-1-5120X-7 Control Air System Auxiliary Bldg. Tapoffs Unit 1

OP-1-5128-29 Flow Diagram, Reactor Coolant, Unit 1

OP-1-98002-4 Transformer 101 AB Temperature and Cooling Elementary Diagram

OP-1-98003-2 Transformer 101 AB load Tap Changer Motor Drive Control Elementary Diagram

OP-1-98043-56 4kV Diesel Generator 1AB A.C.B. Elementary Diagram

OP-1-980461-6 4Kv 600V Auxiliary Transformers 11B and 11D Elementary Diagram Sh 2 of 2

OP-1-98046-33 4Kv 600V Auxiliary Transformers 11B and 11D Elementary Diagram Sh 1 of 2

OP-1-98050-28 Reserve Bus Tran. and Auxiliary Buses Low Voltage Protection Elementary Diagram

OP-1-98062-14 120 V.A.C. Distribution Cabinet CCRP-3 Elementary Diagram

OP-1-98063-29 15KVA Static Inverter 1-CCRP-INV and 120VAC Distribution Cab. CCRP-1 Elementary Diagram

OP-1-98063-29 15KVA Static Inverter 1-CCRP-INV & 120VAC Dist Elementary Diagram

OP-1-98214-46 Motor Driven Aux. Feedwater Supply Sys. Sheet No. 1 Elementary Diagram

OP-1-98273-54 Chemical and Volume Control System Reactor Coolant Charging Elementary Diagram

OP-1-98281-49 Emergency Core Cooling (Safety Injection) Sheet No. 1 Elementary Diagram

OP-1-982841-21 Emergency Core Cooling (Residual Heat Removal) Sheet #2 Elementary Diagram

OP-1-982851-12 Containment Spray System Elementary Diagram Sheet #2

OP-1-98404-35 Component Cooling Water System (East) Sh 1 of 3 Elementary Diagram

OP-1-98416-24 Essential Service Water System East Sheet No. 2 Elementary Diagram

OP-1-98538-17 Steam Line and Feedwater Isolation Elementary Diagram

OP-1-98538-17 Steam Line and Feedwater Isolation Elementary Diagram

OP-1-98583-11 Steam Generator Relief Valve Position Indicators Elementary Diagram

OP-1-985841-4 Steam Pressure Protection Channel 3 Elementary Diagram

Attachment DRAWINGS Number Description or Title Revision OP-1-985842-3 Steam Pressure Protection Channel 4 Elementary Diagram

OP-1-98701-29 Compressed Air Control Elementary Diagram Sheet No. 1 Unit 1 CIA-42373

OP-1-98701-29 Compressed Air Control Elementary Diagram Sheet No. 1 Unit 1

RSC1-4097 Relay Diagram 4kV Bus T11D Standby Feed Overload Protection

RSC1-4104 Relay Diagram 4kV Bus T11D Emergency Diesel Gen. Overload Protection

RSC1-4106 Relay Diagram 4kV Bus T11D Essential Service Water Pump 1E Motor Protection

RSC1-4107 Relay Diagram 4kV Bus T11D Motor Driven Aux. Feedwater Pump 1E Motor Protection

RSC1-4108 Relay Diagram 4kV Bus T11D Standby Feed Overload Protection

RSC1-4281 Relay Diagram 4kV Bus T11D Under voltage Protection

MISCELLANEOUS Number Description or Title Date or Revision

Letter from NRC to J. Dolan, D. C. Cook, Subject: Response to 06/13/86 letter 6/25/86

Maintenance Rule Scoping Document - Compressed Air System

12-E-N-ELCP-250-009 Auxiliary Relays - Hand Reset Type HEA

2584 Commitment Number Report 2584 10/05/88 AEP Report No.

NED-2000-536 REP Seismic Qualification Test Report for NLI Room Coolers

AEP: NRC: 0976 Letter from M. P. Alexich, D. C. Cook Plant to NRC, Subject:

Auxiliary Feedwater System Low Suction Pressure Pump Trip 6/13/86 AEP:NRC:00268 Response to NRC GL 79-36 12/17/79 AEP:NRC:00268 C

Grid Degraded Voltage 1/27/81 AEP:NRC:00486 A

Seismic Qualification of Auxiliary Feedwater Systems: GL 81-

8/28/81 AEP:NRC:0981 Letter Documenting Commitment 3870 7/10/86 AEP:NRC:1104C Generic Letter 91-13, Request for Information Related to the Resolution of Generic Issue 130, Essential Service Water System Failures at Multi-Unit Sites Pursuant to 10 CFR 50.54 (F)

3/13/92 AEP:NRC:1246A DC Cook Response to Generic Letter(GL) 96-01, Testing of Safety-related Logic Circuits 10/28/97

Attachment MISCELLANEOUS Number Description or Title Date or Revision AEP:NRC:1246B DC Cook Response to Generic Letter(GL) 96-01, Testing of Safety-Related Logic Circuits 01/30/99 AEP:NRC;1246 DC Cook Response to Generic Letter(GL) 96-01, Testing of Safety-Related Logic Circuits 04/17/96 AEP-NRC-2011-

LER 315/2011-002-00 12/20/11 AEP-NRC-2012-

Enforcement Discretion Regarding Engineered Safety Feature Actuation System Steam Line Isolation Automatic Actuation Logic and Actuation Relays for Steam Generator Stop Valve Dump Valve 7/23/12 C1 101-03 Technical Specification Change Request 4kV Bus Undervoltage Setpoint 11/16/01 C1299-17 DC Cook Supplement to the Generic Letter (GL) 96-01 Response 12/17/99 DB-12-4KV Design Basis Document for the 4kV System

DB-12-ESW Design Basis Document for the ESW System

DB-12-AFWS Design Basis Document for AFW

DIT-B-00176-02 Design Input Transmittal; Aux. Bldg. Seismic Response Spectra 1/14/00 DIT-B-00435-00 Updated MOV Data for the Voltage Drop Calculations

DIT-B-00621-06 AC Powered Motor Operated Valves (MOVs)

DIT-B-00980-01 Unit 2 SGTR Supplemental Analysis Input Assumptions

DIT-B-009801-01 Design Input Transmittal; Main Steam and Reactor Coolant System 3/31/00 DIT-B-01061-14 EOP Operator Action Times from Accident Analyses

DIT-B-01093-07 Minimum Switchyard Voltage Requirements

DIT-B-01399-01 Unit 1 SGTR Supplemental Analysis Input Assumptions

DIT-B-02600-00 Minimum Allowable Switchyard Voltage Swings With pre-LOCA Mode 1 Loading on RATs

DIT-B-03072-00 Trip Times for Slow Trip Class 30 Eutectic Cutler Hammer Thermal Overload Relay

DIT-B-03106-01 Trip Times for Eutectic and Bimetallic Standard Trip Class 20 Cutler Hammer Thermal Overload Relays

ECG-EA-5339 Technical Evaluation Report, Adequacy of Station Electric Distribution Systems Voltages, D. C. Cook Nuclear Station, Units 2 and 3, Docket Nos. 50-315 and 50-316 1/31/81 ECP-1-2-O0-14 Emergency Operation Procedure Footnotes

EHI-5202 Gas Accumulation Condition Monitoring

Flowserve Report No. 10 CFR 21-67 Potentially Reduced Flow Capacity of WKM PORVs 6/7/12 GEH-2024A Multicontact Auxiliary Relay, Type HFA51

GEI-10190G DC Auxiliary Relays Type HGA

GQE No. 101.7 Generic Qualification Guide for ASCO Model 206-832-3RF

Attachment MISCELLANEOUS Number Description or Title Date or Revision LER 315/1999-022-01, Electrical Bus Degraded Voltage Too Low For Safety-related Loads 3/23/00

Minimum flow requirements for Johnston Service Water Pumps Model 30CC/2 Stage 6/14/90

Pump and Valve Inservice Test Program for Donald C. Cook Nuclear Plant Fourth Ten Year Interval

PJM Manual M03 Transmission Operations

PJM Manual M39 Nuclear Plant Interface Coordination

PO 01530931 Receipt No. 95518, TYCO Relay AGASTAT Relay Quality Certificate 02/13/09 PO 01545871 Receipt No. 117063, Relay HEA Type Quality Certificate 02/25/11 PO 01551747 Receipt No. 126896, Relay Auxiliary HFA Quality Certificate 04/30/12 PRA-NB-SY-ESW Essential Service Water System Electrical Power Support Systems

RQ-S-2012-CDBI-

2012 CDBI Scenario No. 1

Trend Data 1-FW-135, Turbine Driven Auxiliary Feed Pump PP-4 Discharge Check Valve Trend Data 6/2009 -

6/2012 Trend Data 1-NRV-153 Pressurizer OME-4 Train 'A' Pressure Relief Valve Trend Data 6/2009 -

6/2012 VTD-AGAS-0001 ASCO Engineering Information for Solenoid Valves In Nuclear Power Plants

VTD-AGAS-0011 AGASTAT E7000 Series Nuclear Qualified Time Delay Relays

[PUB. # E70-1]

VTD-AREV-0007 AREVA NP, Inc. HK-VR Instruction Book for DC COOK

VTD-ASCO-0001 ASCO Engineering Information for Solenoid Valves in Nuclear Power Plants

VTD-ATWD-0034 Atwood & Morrill Co., Inc. Instruction Manual For Check Valves

VTD-CDBA-0001 C&D Technologies Standby Battery Vented Cell Installation and Operating Instructions

VTD-CDBA-0005 Condensed Installation and Operating Instructions for C and D Standby Batteries (Flooded)

VTD-CHAM-0021 Cutler-Hammer Data Sheets for CN15 and CN55 A-C Contactors

VTD-CHAM-0022 Cutler-Hammer Parts and Instruction Publication for NEMA Size 2 3-Pole Starter with Standard Trip Eutectic Overload Relay

VTD-CHAM-0056 Cutler-Hammer Instruction Manual For Unitrol Motor Control Center [Pub. No. 15412]

VTD-CHAM-0087 Cutler-Hammer Technical Information Publication for NEMA Contactors and Starters (Pub. No. 8231)

Attachment MISCELLANEOUS Number Description or Title Date or Revision VTD-CHAM-01 03 Cutler-Hammer (Eaton Corporation) Instructions for VR-Series Replacement Breakers for ITE Type 5HK and 15HK [PUB. No.

I.B. 94A5990R17]

VTD-GENE-0013 General Electric Instructions for Type HFA151 Multi-Contact Auxiliary Relay

VTD-GENE-1182 General Electric Instructions for Type HEFA61and HEA62 t Auxiliary Relay

VTD-LIMIT-0023 Limitorque Technical Update on Reliance 3-Phase Actuator Motors [Pub. No. 93-03]

VTD-MASN-0076 Masoneilan 20000 Series Control Valve Instructions

VTD-TATE-0001 ESW Pump Discharge Strainer Vendor Manual

MODIFICATIONS Number Description or Title Date or Revision DCP 4690 250 Vdc Fuse Replacement Project

2-DCP-4786 Installation of Flange Sets and Orifice Plates in ESW Lines for AFW Pump Room Coolers 10/2/00

PROCEDURES Number Description or Title Revision 01-IHP-6030-IMP-309 4KV Bus Loss Of Voltage And 4KV Bus Degraded Voltage Relay Calibration

01-OHL-4030-SOM-039 Annunciator No. 108, Drop 28

1-0HP-4030-119-022FV ESW Flow Verification

12-EHP-4075-TCA-001 Operator Time Critical Actions

12-EHP-5030-CAR-001 Characterization Testing Program

12-EHP-5043-EDC-001 Evaluation of Discrepant Conditions

12-IHP-5021-EMP-080 Eaton/Cutler-Hammer 4kV Circuit Breaker Maintenance

12-IHP-5030-EMP-006 MCCB/TOLR Testing and Electrical Enclosure Maintenance 029 12-MHP-5021-056-001 Motor Driven and Turbine Driven Auxiliary Feed Pump Maintenance

Attachment PROCEDURES Number Description or Title Revision 12-OHP-4021-019-001 Operation of the Essential Service Water System

12-OHP-4022-082-004 Degraded Offsite AC Voltage Response 006 12-OHP-4023-E-0 Reactor Trip or Safety Injection

12-OHP-4023-E-3 Steam Generator Tube Rupture

12-OHP-4023-ECA-3.1 SGTR With Loss of Reactor Coolant-Subcooled Recovery Desired

12-OHP-4023-ES-3.1 Post-SGTR Cooldown Using Backfill

12-OHP-4023-ES-3.2 Post-SGTR Cooldown Using Blowdown

1-OHP-4022-001 Earthquake

1-OHP-4022-002-021 Steam Generator Tube Leak

1-OHP-4022-055-003 Loss of Condensate to Auxiliary Feedwater Pumps

1-OHP-4022-056-001 Steam Binding in Auxiliary Feedwater System

1-OHP-4022-064-001 Control Air Malfunction

1-OHP-4022-064-002 Loss of Control Air Recovery

1-OHP-4023-E-0 Reactor Trip or Safety Injection

1-OHP-4023-E-3 Steam Generator Tube Rupture

1-OHP-4023-ECA-3.1 SGTR With Loss of Reactor Coolant-Subcooled Recovery Desired

1-OHP-4023-ES-0.1 Reactor Trip Response

1-OHP-4023-ES-3.1 Post-SGTR Cooldown Using Backfill

1-OHP-4023-ES-3.2 Post-SGTR Cooldown Using Blowdown

1-OHP-4023-FR-H.1 Response to Loss of Secondary Heat Sink

1-OHP-4024-108 Annunciator No. 108 Response: Pressurizer

1-OHP-4025-LS-3 Steam Generator 2/3 Level Control

1-OHP-4025-LS-4 Steam Generator 1/4 Level Control

1-OHP-4025-R-12 Component Restoration

1-OHP-4025-R-7 Restore Control Air 0a 12-IHP-4030-082-006 AB, CD, and N-Train Battery Yearly Surveillance and Maintenance

1-OHP-4030-114-021 Inoperable Power Supply

1-OHP-4030-114-031 Breaker Alignment

Attachment PROCEDURES Number Description or Title Revision 1-OHP-4030-114-031 Operations Weekly Surveillance Checks

1-OHP-4030-119-022FV ESW Flow Verification

1-OHP-4030-132-027CD CD Diesel Generator Operability Test (Train A)

1-OHP-4030-156-017E East Motor Drive Auxiliary Feedwater System Test

1-OHP-4030-156-017T Turbine Driven Auxiliary Feedwater System Test

1-OHP-5030-119-003 ESW to AFW Pump Cleanout Connection Flush

12-IHP-5030-EMP-013 Electrical Enclosure 10 Year Preventive Maintenance

12-IHP-6030-RLY-022 General Electric Type HFA51 and HFA151 Multi-Contact Auxiliary Relay Adjustment and Maintenance

2-OHP-4023-E-0 Reactor Trip or Safety Injection

2-OHP-4023-E-3 Steam Generator Tube Rupture

2-OHP-4023-ECA-3.1 SGTR With Loss of Reactor Coolant-Subcooled Recovery Desired

2-OHP-4023-ES-3.1 Post-SGTR Cooldown Using Backfill

2-OHP-4023-ES-3.2 Post-SGTR Cooldown Using Blowdown

AE-O-E232 Local Operation of U1 Steam Generator PORV

OHI-4023 Abnormal/Emergency Procedure Users Guide

PMI-2010 Written Instructions

PMI-4075 Operator Time Critical Actions

PMP-2010-PRC-002 Procedure Alteration, Review, and Approval

PMP-2291-OLR-001 On-Line Risk Management

PMP-4075-TCA-001 Time Critical Action Validation and Verification 1 & 2 PMP-6065-EIC-001 Electrical and Instrumentation and Controls Engineering Information Control Process

PMP-7030-SFD-001 Safety Function Determination Program

WORK ORDERS Number Description or Title Date 1-OHP-4030-156-017T Turbine Driven AFW Pump System Test 9/20/11, 06/21/12 01-OHL-4030-102-

Pressurizer PORV Testing 10/16/11

Attachment WORK ORDERS Number Description or Title Date 01-OHL-4030-114-034 Pressurizer PORV Position Indication Test 10/17/11 JO 3135065 1-WMO-733, Replace Valve 4/11/05 55225736 01 l-WMO-733-ACT, As-Found/As-Left Diagnosis 12/22/10 55231048 01 1-T11D, Inspect/Clean Switchgear Bus 10/7/06 55237882 03 Clean/Inspect/Test BKR 1-T11D11 7/8/09 55240935 01 1-87X-t11A Trip Test Lockout Relay 3/12/10 55244511 01 1-PP-3E-MTR, Lube Bearings and Clean 7/8/09 55245339 01 Clean/Inspect/Test BKR 1-T11D10 2/11/09 55245436 01 l-OME-34E, Disassemble /Inspect Strainer 12/16/08 55265288 1-S V-1A-1: Perform Setpoint Verification 9/19/11 55270942 01 Remove/Refurbish/Replace 1-PP-7E-MTR 3/5/08 55292664 03 MTM, l-FW-124, Remove/Replace Check Valve 1/31/11 55358182 01 Flush and Replace Oil in the Upper Bearing Reservoir on 1-PP-7E-MTR 2/9/11 55358183 01 Clean The Air Screens on 1-PP-7E-MTR, "East Essential Service Water Pump PP7E Motor" 2/9/11 55366415 01 Perform Infrared Inspection on 1-PP-3E-MTR 7/7/11 55366416 01 Perform Characterization Testing on 1-PP-3E-MTR (East Motor Driven Auxiliary Feedwater Pump PP-3E Motor) in Accordance With 12-EHP-5030-CAR-001 7/7/11 55366416 02 Clean Motor Screens on l-PP-3E-MTR, (East Motor Driven Auxiliary Feedwater Pump PP-3E MOTOR)

7/7/11 55366416 03 Support Characterization Testing on 1-PP-3E-MTR (East Motor Driven Auxiliary Feedwater Pump PP-3E Motor), at Breaker Cubicle l-TllDT1.

7/7/11 55366421 04 Sample/ Drain /Refill Pump Brg and Clean 1-PP-3E-MTR 7/7/11 55378968 01 Lube Lower Bearing: (1-PP-7E-MTR)

2/8/12 55378969 01 Obtain an Oil Sample From 1-PP-7E-MTR, "East Essential Service Water Pump PP-7E MOTOR" for Analysis 2/9/12 55379811-01 1-FW-135; Perform Non-Intrusive Turbine Driven AFW Pump PMTM 8/31/201

55379811 1-FW-135; Perform Non-intrusive Test 8/31/11 55380536 01 1-PP-7E-MTR; Perform Motor Characterization Test 2/7/12 55386933 01 Perform Surveillance Procedure 01-IHP-6030-IMP-309 (4KV Bus Loss of Voltage and 4kV Bus Degraded Voltage Relay Calibration).

1/6/12 55397158 01 Perform Surveillance Procedure 01-IHP-6030-IMP-309 (4KV Bus Loss of Voltage and 4kV Bus Degraded Voltage Relay Calibration).

7/6/12 55407760 01 1-MRV-222, No. 2 SG Stop Valve Dump Valve 7/21/12 PM 00109769 1-87X-t11A Trip Test Lockout Relay

PM 00110736 U1 CD EDG, Replace Relays

PM 00114641 1-5A6-LCTA, Replace HFA Relay

Attachment LIST OF ACRONYMS USED AFW Auxiliary Feedwater ASME American Society of Mechanical Engineers CAC

Control Air Compressor CAS

Compressed Air System CCW Closed Cooling Water CDBI Component Design Basis Inspection CFR

Code of Federal Regulations CR

Condition Report CST

Condensate Storage Tank DBA

Design Basis Accident DRS

Division of Reactor Safety EDG

Emergency Diesel Generator EOP

Emergency Operating Procedure ESW Emergency Service Water GL

Generic Letter HELB High Energy Line Break IEEE Institute of Electrical and Electronics Engineers IMC

Inspection Manual Chapter IN

Information Notice LTC

Load Tap Changer MDAFW Motor Driven Auxiliary Feedwater MOV Motor Operated Valve MTO Margin to Overfill NCV

Non-Cited Violation NPSH Net Positive Suction Head NRC

Nuclear Regulatory Commission NRR

Nuclear Reactor Regulation PARS Publicly Available Records System PORV Power Operated Relief Valve PRA

Probabilistic Risk Assessment RCS

Reactor Coolant System RIS

Regulatory Issue Summary RG

Regulatory Guide SBO

Station Blackout SG

Steam Generator SGTR Steam Generator Tube Rupture SR

Safety-related SSC

Structures, Systems or Components TDAFW Turbine Driven Auxiliary Feedwater TIA

Task Interface Agreement TOL

Thermal Overload TS

Technical Specification TSO

Transmission System Operator UFSAR Updated Final Safety Evaluation Report URI

Unresolved Item

Attachment In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Enclosure:

Inspection Report 05000315/2012007; 05000316/2012007(DRS)

w/Attachment: Supplemental Information cc w/encl:

Distribution via ListServ'

DISTRIBUTION:

Cayetano Santos RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPreports.Resource@nrc.gov

DOCUMENT NAME: DCCOOK 2012 007 CDBI CET.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII

RIII N

NAME RBaker:ls AMStone

DATE 01/10/13 01/11/13

OFFICIAL RECORD CO