| | Start date | Site | Title | Topic |
|---|
| LG-25-132, License Amendment and Alternative Request Related to One-Time Exception of Primary Containment Isolation Valve Testing | 9 October 2025 | Limerick | License Amendment and Alternative Request Related to One-Time Exception of Primary Containment Isolation Valve Testing | Coatings Anchor Darling Incorporated by reference High Energy Line Break Integrated leak rate test |
| IR 05000387/2025010 | 22 September 2025 | Susquehanna | Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000387/2025010 and 05000388/2025010 | Stroke time Aging Management |
| 05000318/LER-2025-001, Loss of Station Transformer U-4000-12 | 29 August 2025 | Calvert Cliffs | Loss of Station Transformer U-4000-12 | |
| IR 05000315/2025010 | 22 August 2025 | Cook | Fire Protection Team Inspection Report 05000315/2025010 and 05000316/2025010 | Safe Shutdown License Renewal Fire Protection Program Fire Watch Scaffolding |
| 05000251/LER-2025-004, Unplanned Reactor Scram | 14 August 2025 | Turkey Point | Unplanned Reactor Scram | |
| IR 05000317/2025002 | 11 August 2025 | Calvert Cliffs | Integrated Inspection Report 05000317/2025002 and 05000318/2025002 | Safe Shutdown Boric Acid Packing leak Enforcement Discretion Functionality Assessment FLEX Operability Determination Spent Fuel Pool Instrumentation Through Wall Leak Fire Protection Program |
| IR 05000354/2025090 | 7 August 2025 | Hope Creek | NRC Inspection Report 05000354/2025090 and Preliminary White Finding and Apparent Violation | Time of Discovery High winds Mission time Past operability Enforcement Discretion Probabilistic Risk Assessment Condition Adverse to Quality FLEX Significance Determination Process Job Performance Measure Surveillance Frequency Control Program Notice of Violation Large early release frequency Loss of Offsite Power Eddy Current Testing Operability Determination Preliminary White Finding Downpower Regulatory Conference |
| IR 05000333/2025002 | 7 August 2025 | FitzPatrick | Integrated Inspection Report 05000333/2025002 | High Radiation Area Enforcement Discretion Functionality Assessment Locked High Radiation Area Missed surveillance Feedwater Heater Main Steam Line Radiation Monitor Operability Determination Containment high range radiation monitor Offsite Circuit Fire Protection Program Downpower Overthrust |
| IR 05000382/2025002 | 6 August 2025 | Waterford | Integrated Inspection Report 05000382/2025002 | Boric Acid High Radiation Area Ultimate heat sink Stroke time Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment FLEX Significance Determination Process Annual Radioactive Effluent Release Report Notice of Violation Operability Determination Liquid penetrant Fire Protection Program Scaffolding Seal weld |
| IR 05000335/2025002 | 6 August 2025 | Saint Lucie 07200061 | Integrated Inspection Report 05000335/2025002, 05000389/2025002, 07200061/2024001 and 07200061/2025001 | Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Surveillance Frequency Control Program Large early release frequency Loss of Offsite Power Operability Determination Earthquake Through-Wall Leak Fire Protection Program Downpower |