Notice of Violation from Insp on 971108-1227.Violation Noted:On 971116,inspector Identified Failure to Maintain Records Which Contained Written Safety Evaluation for Three Control Room Annunciators
ML17334A643
Person / Time
Site: Cook, 07100108  American Electric Power icon.png
Issue date: 01/23/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17334A642 List:
References
50-315-97-24, 50-316-97-24, NUDOCS 9802040078
Download: ML17334A643 (4)


Text

NOTICE OF VIOLATION Indiana Michigan Power Company Donald C. Cook Nuclear Power Plant Docket No. 50-315; 50-316 License No. DPR-58; DPR-74 During an NRC inspection conducted from November 8'through December 27, 1997, two violations of NRC requirements were identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violations are listed below:

10 CFR 50.59; "Changes, Tests,'and Experiments," requires, in.part, that the licensee shall maintain records of changes in the facilityas described in the Safety Analysis Report.-These records must include a written safety evaluation which provides the basis for the determination that the change does not involve an unreviewed safety question.

\\

Contrary to the above, on November 16, 1997, the inspectors identified a failure to maintain records which contained a written safety evaluation for three control room annunciators.

The three annuciators were physically or electronically blocked, preventing them from operating, constituting a change to the facilityas described in Chapters 7.5 and 10.3 of the Safety Analysis Report.

This is a Severity Level IVviolation (Supplement I).

2.

10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings,"

requires, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.

Contrary to the above, on December 18, 1997, the inspectors identified that a procedure of a type appropriate to the circumstances did not exist for an activity affecting quality, the manual backwashing of the ESW pump discharge strainers, a support system necessaiy to ensure ESW system operability.

This is a Severity Level IVviolation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Indiana Michigan Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region III, and a copy to the NRC Resident Inspector at the facilitythat is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, ifcontested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that willbe taken to avoid further violations, and (4) the date when full compliance will be achieved.

Your response may reference or include previously docketed correspondence, ifthe correspondence adequately addresses the required response.

Ifan adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration willbe given to extending the response time.

9802040078 980123 PDR ADOCK 050003l5

PDR

0'

I[

t l

Notice of Violation-2-Because your response willbe placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction.

Ifpersonal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. Ifyou request withholding of such material, you must specifically identify the portion that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information willcreate an unwarranted invasion of personal privacy or. provide the information required by 10 CFR 2.790(b)

to support a request forwithholding confidential commercial or financial information)..lf safeguards information is necessary to provide an acceptable, response, please provide the level of protection described in 10 CFR 73.21

~

Dated at Lisle, illinois this 23th day of January 1998

~ ~ I Fit

I