Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RS-06-095, Extension of Requested Response Date Associated with the Request for Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power + (Extension of Requested Response Date Associated with the Request for Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power)
- ML033510384 + (Extension of Response Time for Divestiture Plan Regarding Indirect Transfer of the Aerotest Radiography and Research Reactor (Arrr) to Autoliv ASP, Inc., and Autoliv, Inc)
- RS-11-032, Extension of Response to RAI for License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode + (Extension of Response to RAI for License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode)
- ML20094C151 + (Extension of Retainer Lifetime to 4 Cycles)
- ML050800154 + (Extension of Risk-Informed Inservice Inspection Applicability)
- LR-N04-0230, Extension of Risk-Informed Inservice Inspection Applicability + (Extension of Risk-Informed Inservice Inspection Applicability)
- ML030770210 + (Extension of Schedule for Reporting River Bend Station Surveillance Capsule Test Results Under BWR Integrated Surveillance Program)
- ML20356A083 + (Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program (EPRI Letter 2020-100))
- ML14140A701 + (Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program (TAC No. MF3926)(EPRI Letters 2013-185, and 2013-211))
- ML16082A265 + (Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program)
- ML053270264 + (Extension of Schedule for Reporting Surveillance Capsule Test Results)
- ML19011A333 + (Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program (EPRI Letter 2018-151))
- ML072120050 + (Extension of Schedule for the Conduct of Review of the Vermont Yankee Nuclear Power Station License Renewal Application)
- RC-04-0012, Extension of Second Inspection Interval for Inservice Testing Program (0-C-03-1864) + (Extension of Second Inspection Interval for Inservice Testing Program (0-C-03-1864))
- ML063480522 + (Extension of Site Specific Response - Mitigation Strategy Assessments and Closure Process for B.5.b Phases 1, 2, and 3)
- L-2020-160, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years + (Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years)
- EPID:L-2020-LLR-0283 + (Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years)
- ML052870573 + (Extension of Staff Review Schedule for Nine Mile Point Nuclear Station, Units 1 and 2, Amended License Renewal Application)
- ML050660147 + (Extension of Staff Review Schedule for Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application)
- ML22341A197 + (Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval)
- ML070090037 + (Extension of TS Completion Times, Associated with the Residual Heat Removal Service Water System, Diesel Generator Cooling Water System, and the Core Standby Cooling System)
- ML071490004 + (Extension of Technical Specifications 3.8.1 AC Source-Operating, Emergency Diesel Generator (EDG) Completion Time (Tac Nos. MC9001 and MC9002))
- ML071800311 + (Extension of Ten-Year Program Intervals)
- TSTF-017 + (Extension of Testing Frequency of Containment Airlock Interlock Mechanism from 184 Days to 24 Months)
- ML20246M710 + (Extension of Time for Implementation of Decontamination Priority & Trusteeship Provisions of Property Insurance Requirements, 10CFR50 Final Rule.Rule Amends Implementation Schedule to Change Effective Date)
- NRC 2009-0574, Extension of Time to Request Hearing (Dec. 30, 2009) - Letter to R. P. Zimmerman + (Extension of Time to Request Hearing (Dec. 30, 2009) - Letter to R. P. Zimmerman)
- ML100191116 + (Extension of Time to Request Hearing - Letter to Edward Pugh)
- ML20318A035 + (Extension of Timeframe Required to Complete Biennial Emergency Exercise Per Oregon State Triga Reactor Emergency Response Plan, Facility Operating License No. R-106)
- ML20350B726 + (Extension of Timeframe Required to Complete Biennial Emergency Exercise Per Oregon State Triga Reactor Emergency Response Plan, Facility Operating License No. R-106)
- EPID:L-2020-NFO-0005 + (Extension of Timeframe Required to Complete Biennial Emergency Exercise Per Oregon State Triga Reactor Emergency Response Plan, Facility Operating License No. R-106)
- ML18331A061 + (Extension of Uniform Low Level Radioactive Waste Manifest Rev 3 Comment Period FRN)
- ML071380410 + (Extension of the Completion Time for an Inoperable EDG)
- SVP-06-081, Extension of the Provisional Variance of National Pollutant Discharge Elimination System Permit No. IL0005037 + (Extension of the Provisional Variance of National Pollutant Discharge Elimination System Permit No. IL0005037)
- ML25177C976 + (Extension of the Regulatory Audit Plan in Support of the Review of the LAR to Add a New Reactor Coolant System Tcold - High Function to Engineered Safety Feature Actuation System Instrumentation)
- ML17346A262 + (Extension to 811109 Schedular Exemption from Requirements of 10CFR50.48 & Related Section Iii.A of App R Re Water Supplies for Fire Suppression)
- JAFP-14-0121, Extension to Commitment in Flooding Walkdown Report for Restricted Access Equipment + (Extension to Commitment in Flooding Walkdown Report for Restricted Access Equipment)
- JAFP-16-0060, Extension to Commitments Made in Response to March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3, Emergency Communication and Staffing Assessments + (Extension to Commitments Made in Response to March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3, Emergency Communication and Staffing Assessments)
- ML061390079 + (Extension to Licensed Requalification Program)
- ML082620691 + (Extension to Request for Additional Information Regarding the Spent Fuel Pool Storage License Amendment Request)
- STC-20-056, Extension: Proposed Rule for Emergency Preparedness for Small Modular Reactors and Other New Technologies (Federal Register Notice) - Enclosure (STC-20-056) + (Extension: Proposed Rule for Emergency Preparedness for Small Modular Reactors and Other New Technologies (Federal Register Notice) - Enclosure (STC-20-056))
- ML20009E068 + (Extent & Character of the CARTHAGE-COLTON Mylonite Zone, Northwest Adirondacks,New York)
- 05000331/FIN-2013004-01 + (Extent of Condition Not Properly Evaluated)
- ML23233A150 + (Extent of Condition Request for 2023 Confirmatory Survey)
- 05000324/FIN-2013009-01 + (Extent of Condition Review for NCR 490292)
- ML18158A133 + (Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station)
- 05000277/FIN-2008405-01 + (Extent of Condition and Corrective Action Program Usage for Operator Watch Standing Issues. (Section 4OA2.2))
- ML20259B157 + (Exterior Concrete DETS-SH 3 Reactor Containment. Sheet 3. Issue 6)
- ML20259B163 + (Exterior Concrete DETS-SH 4 Reactor Containment. Sheet 4. Issue 3)
- ML20265E511 + (Exterior Concrete Dets Reactor Containment. Sheet 3)
- ML20266H570 + (Exterior Elevations. No Rev Date)