May 31, 1983 Note to:
J. Martin, Regional Administrator, Region V D. Eisenhut, Director, Division of Licensing
SUBJECT:
DIABLO CANYON - STAFF RESPONSE TO MOTIONS TO RE0 PEN THE RECORD ON CONSTRUCTION QUALITY ASSURANCE Attached in a copy of the draft Staff Response to the Motions to Reopen the Record on Construction Quality Assurance ' filed by the Joint Intervenors and Governor.
The Staff's response to this motion is du' e on June 6th.
Please let me have your thoughts and comments by C.O.B. June 2nd, so that they can be factored into our filing.
Please note that because of the format used for draft material on our word processing equipment, footnotes appear in the middle of the text. This is routinely corrected in the final product and can be safely ignored in your review.
1, Lawr nce J.
andler Deputy Assistant Chief Hearing Counsel
Attachment:
As stated cc w/ enclosure:
J. Tay1or W. Haass l
b g o2 g 9 060930 HOLMES86-151 PDR
--...v..r.......
o 1.
Date reported to PG&E and.TES 6/6/82 2'.
Schcdulcd for ate:
(Originator) Semimenthly Report No. Juna 1903
/ 3.
Re'sponsive to PG&E Technical Program: Task (if applicable) 4: Prepared as a result of:
- a. O QA Audit and Review Report of
- b. O Field Inspection Deficiency
- c. O Independent Calculation Deficiency
- d. O Seismic Input Deficiency g
- e. O Design Methodology Deficiency-
- f. s.0ther Deficiency 5.
Structure (s), system (s) or component (s) involved:
Auxiliary Building (Corrective Action Program) 7.
Significance of Concern:
There is no present concern,with the engineeringjnalysis of the slats.
'Ihis item is a design area which was reported by the DCP,to be complete and acceptable.
However, the slabs require additional analyses as stated at the June 1, 1983 meeting. The significance of the concern is that requ,1 red corrective action was not fully implemented, yet reported as complete.
~
ITR #8 Revision 0 requires the IDVP to verify t' hat the DCP correctivo
, action program has been fully implemented. This aspect of ITR #8 was accomplished as folicws:-
a..
Select. samples from lists of completed design work b.
Sample each category of work following completion of the entire, scope' 8.
Recommendation:
RLCA will continue the review in the civil / structural area to assure that the Corrective Action Program is fully implemented, as required by the program plan.
1.
i
. Page 2 of 2 9.
Signature:
L j_ f.3 (Originator / Organization) 6
,,e 1
.A Desiga (ri fers' A.
bemo ra6td km I7 oscy; R esPoust5puAra
?,r S4roaures, S 163 4(,mgo.m.;f y
Drale Gupu Ou;h L (1 i
. $ d.er'iwy Coog auc'. dit l
c-4 l
recewer g I P.ku;3 M fr.Lar
~
P. p ! <
6p kuo l.Do LfLo[3) k Ar'7 bc(k t_d Q w cop M, Qe; &
( 3 \\lL)
- r.
CONTROLLED DOCUMENT COVER SHEET 9
DCM C -17 REVISION 6
BIE121$1PV l
~
CONTROLLED COPY NCi. /3Y l
ISSUED TO:
hM6AH" Copy #134 i
"FOR !NFORMAT!ON ON
- x-
..