ML20211B873

From kanterella
Jump to navigation Jump to search
Forwards Listed Info Re Util Semimonthly Repts 5,6 & 8-15, R.L. Cloud & Assoc Semimonthly Repts 7-15,Teledyne Semimonthly Repts 11-15 & Teledyne Program Plan for Phases I & Ii,Per Request.W/O Encl
ML20211B873
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 07/02/1982
From: Schierling H
NRC
To: Hartzman M
NRC
Shared Package
ML20209B155 List:
References
FOIA-86-151 NUDOCS 8610210208
Download: ML20211B873 (2)


Text

.

=

M 1 h G r u u a u......-.

u av.

v, t'

b......bt. It h

-.....Il owhy

.brd Io.f....,,,,,,;cu y o u. A.kr

. WdI%

On f y vadd 1-.........

... _.... _ _.. _..... a.i

. P G d E l i a r. Q o s M T ~ r i ~; 2 fs... 5 K 6 ( / r.. l.e i.

~

-ac.y S

. ' f. ',

- n fh l.. _.

2-Cloud See:

(.witw reporh are.yreporb 3 (L r...........4 iS~~..

o9

_6

. k d ~ d d tu PG4 2 repoch

... _,4l, 3.

D A d y a.

.s w......~.J...

..........( Tehd u 4:d uJ pepace. y>och it %f tr<rs p o r h,.

I L o y L i 0) o Llyr y

4 - [jdP g ? p..._

P A - G r..-b I w.Ider. 4 e

s' T A~ u?

^

L.-

Wu I u. l.Ac C % t 8 8 r

g

~

.".I 6.

C(wd EW T4it' Pap <rf v.LJW

.2 L 9 l(%

.M

.a. a:. -

?.-.54wllwI 7,g g 3

'2.7 2 %

a.va w y.

'y h02 8 860930 ~

HOLMES 86-1bl

" - ~ ' ' ' ' * * * ' ' ' ' ' " ~ " ~

PDR

l i

)

2]

Z,3 }I h 27 l

DIABLO CANYON Docket Nos.: 50-275/323 NRC Estimate Construction Completion:

Location: San Luis Obispo, CA Applicant Estimate Construction Completion:

Utility: Pacific Gas & Electric Co.

SER Issued: 10/74, 08/80 (LP), 03/81 (LP), 04/81 (

Vendor: Westinghouse SSER Issued: 09/81 EQ Reactor Type: PWR ASLB Decision: 07/82 Containment Type: Dry OL Issuance Estimated:

  • Architect / Engineer: Pacific Gas & Electric Co.

MWe Rating: #1 - 1084, #2 - 1106 y

Overview CP Issued: 04/23/68,12/09/70 CP Hearings: 02/20/68; 01/13/70 to 02/21/68; 08/07/

Major Issues at CP Stage: Seismic, evacuation plan, storage-disposal and transportation of radioactive waste OL FSAR Docketed: 10/02/73 Last Amendment Submitted: 85 Safety Review Status Status of Q-1, ()-2: Full power TMI and Non-TMI SSERs issued April,1981. Full power SSER on equipment oualification of safety related electrical equipment issued in September, 1982.

Number & Basic Subject of Outstanding Issues Non-TMI: DOE - 3 (seismic design verification program, inservice testing of materials, pumps and valv and breakwater structure)

Number & Basic Subject of Outstanding Issues - TMI: 1 Emergency Planning (IE)

Unique Design Features: None ACRS Meeting: 07/06/78 Conunission Briefing:

Other Items of Importance, Potential Problems:

Emergency Planning: SSER Emergency Planning awaiting FEMA findings. Drill conducted on July 14, 1982 Environmental Review Status DES Date: 12/12/72 FES Date: 05/30/73 Class 9 Evaluation Required: None Hearings Noticed: 01/01/74 Discovery Completed: 03/25/81 Expected Start: 01/82 (FP)

Expected End: PID issued on 07/17/81 (LP)

Major Intervenors:

1.

Governor Brown, CA; 2.

Joint Intervenors Major Contentions: Emergency Preparedness and PORVs and Safety Valves Other Items: Appeal Board decision on physical security issues issued on September 10 1981. Full power hearings completed January 26, 1982 Other Special Problems or Considerations

(

Low power license issued September 22, 1981 and suspended Ncvember 19, 1981.

License suspended because of discuvery of certain seismic design deficiencies.

Non THI Issues: 3 outstanding issues (seismic design verification program, inservice testing of materials, pumps and valves, and breakwater structure)

DOE - (seismic design verification program, inservice testing of materials, pumps and valves, and breakwater / structure Delay due to on-going seismic design verification program