ML20211B873
| ML20211B873 | |
| Person / Time | |
|---|---|
| Site: | 05000000, Diablo Canyon |
| Issue date: | 07/02/1982 |
| From: | Schierling H NRC |
| To: | Hartzman M NRC |
| Shared Package | |
| ML20209B155 | List:
|
| References | |
| FOIA-86-151 NUDOCS 8610210208 | |
| Download: ML20211B873 (2) | |
Text
.
=
M 1 h G r u u a u......-.
u av.
v, t'
- b......bt. It h
-.....Il owhy
.brd Io.f....,,,,,,;cu y o u. A.kr
. WdI%
On f y vadd 1-.........
... _.... _ _.. _..... a.i
. P G d E l i a r. Q o s M T ~ r i ~; 2 fs... 5 K 6 ( / r.. l.e i.
~
-ac.y S
. ' f. ',
- n fh l.. _.
2-Cloud See:
(.witw reporh are.yreporb 3 (L r...........4 iS~~..
o9
_6
. k d ~ d d tu PG4 2 repoch
... _,4l, 3.
D A d y a.
.s w......~.J...
..........( Tehd u 4:d uJ pepace. y>och it %f tr<rs p o r h,.
I L o y L i 0) o Llyr y
4 - [jdP g ? p..._
P A - G r..-b I w.Ider. 4 e
s' T A~ u?
^
L.-
Wu I u. l.Ac C % t 8 8 r
g
~
.".I 6.
C(wd EW T4it' Pap <rf v.LJW
.2 L 9 l(%
.M
.a. a:. -
?.-.54wllwI 7,g g 3
'2.7 2 %
a.va w y.
'y h02 8 860930 ~
HOLMES 86-1bl
" - ~ ' ' ' ' * * * ' ' ' ' ' " ~ " ~
l i
)
2]
Z,3 }I h 27 l
DIABLO CANYON Docket Nos.: 50-275/323 NRC Estimate Construction Completion:
Location: San Luis Obispo, CA Applicant Estimate Construction Completion:
Utility: Pacific Gas & Electric Co.
SER Issued: 10/74, 08/80 (LP), 03/81 (LP), 04/81 (
Vendor: Westinghouse SSER Issued: 09/81 EQ Reactor Type: PWR ASLB Decision: 07/82 Containment Type: Dry OL Issuance Estimated:
- Architect / Engineer: Pacific Gas & Electric Co.
MWe Rating: #1 - 1084, #2 - 1106 y
Overview CP Issued: 04/23/68,12/09/70 CP Hearings: 02/20/68; 01/13/70 to 02/21/68; 08/07/
Major Issues at CP Stage: Seismic, evacuation plan, storage-disposal and transportation of radioactive waste OL FSAR Docketed: 10/02/73 Last Amendment Submitted: 85 Safety Review Status Status of Q-1, ()-2: Full power TMI and Non-TMI SSERs issued April,1981. Full power SSER on equipment oualification of safety related electrical equipment issued in September, 1982.
Number & Basic Subject of Outstanding Issues Non-TMI: DOE - 3 (seismic design verification program, inservice testing of materials, pumps and valv and breakwater structure)
Number & Basic Subject of Outstanding Issues - TMI: 1 Emergency Planning (IE)
Unique Design Features: None ACRS Meeting: 07/06/78 Conunission Briefing:
Other Items of Importance, Potential Problems:
Emergency Planning: SSER Emergency Planning awaiting FEMA findings. Drill conducted on July 14, 1982 Environmental Review Status DES Date: 12/12/72 FES Date: 05/30/73 Class 9 Evaluation Required: None Hearings Noticed: 01/01/74 Discovery Completed: 03/25/81 Expected Start: 01/82 (FP)
Expected End: PID issued on 07/17/81 (LP)
Major Intervenors:
1.
Governor Brown, CA; 2.
Joint Intervenors Major Contentions: Emergency Preparedness and PORVs and Safety Valves Other Items: Appeal Board decision on physical security issues issued on September 10 1981. Full power hearings completed January 26, 1982 Other Special Problems or Considerations
(
Low power license issued September 22, 1981 and suspended Ncvember 19, 1981.
License suspended because of discuvery of certain seismic design deficiencies.
Non THI Issues: 3 outstanding issues (seismic design verification program, inservice testing of materials, pumps and valves, and breakwater structure)
DOE - (seismic design verification program, inservice testing of materials, pumps and valves, and breakwater / structure Delay due to on-going seismic design verification program