March 30, 1995 Mr. Thomas K. McLellan, Project Officer j
c/o Document Control Desk
- }
Civil Engineering & Geosciences Branch Division of Engineering 4
U.S. Nuclear Regulatory Commission -
Washington, DC 20555 TRANSMITTAL OF TECHNICAL EVALUATION REPORT INEL-94/0147, ON THE SECOND 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN FOR ST. LUCIE NUCLEAR PLANT, UNIT 2 j
- BWB-14-95
Reference:
NRC Form 189, " Technical Assistance in Support of the NRC l
Inservice Inspection Program" (FIN-L2556, Task Order 20, NRC TAC No. M87208)
Dear Mr. McLellan:
i The subject report documents our review of the St. Lucie Nuclear Plant, Unit 2,.Second 10-Year Interval Inservice Inspection Program Plan, Revision 0, as submitted by Florida Power and Light Company, August 4, 1993. This report also includes evaluation of the requests for relief from the American Society of Mechanical Engineers (ASME) Boller and Pressure Vessel Code Section XI-j requirements that the licensee has determined to be impractical, i
This report completes the work under Task Assignment 20 of NRC FIN-L2556 for NRC TAC No. M87208.
i Sincerely.
C B. W. Brown, INEL Principal Investigater NDE Engineering Analysis and Applications BWB
Enclosure:
As Stated j
cc:
S. F. Armour, DOE-ID, MS 1219 I
G. Bagcht, NRR, MS 7H15 (w/o Enc 1)
D. Terao, NRR, MS 7H15 (w/o Encl)
'40 4
O40115 4Locleeed h
I
}lJ) 9 Idaho Technologies Company P. O. Box 1625 Idaho falls, ID 8341S
- 8. ".6.0 4' O yD 2s22M I
i