ML20030C729

From kanterella
Jump to navigation Jump to search

Notice of Issuance & Availability of Amend 42 to License DPR-72
ML20030C729
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/12/1981
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20030C724 List:
References
TAC-46962, NUDOCS 8108270882
Download: ML20030C729 (4)


Text

-

7590 01

~

UNITED STATES NUCLEAR REGULATORY COMMISSION

~

DOCKET NO. 50-302 FLORIDA POWER CORPORATION, ET AL NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 42 to Facility Ope' rating License No. DPR-72, issued to the Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimmee, City of Leesburg, City of New Smyrna Beach and Utilities Commission, City of New Smyrna Beach, City of Ocala, Orlando Utilities Commission and City of Orlando, Sebring Utilitias Cemmission, Seminole Electric Cooperative, Inc.,

and the City of Tallahassee (the licensees) which revised the license for operation for the Crystal River Unit No. 3 Nuclear Generating Plant (the facility) located in Citrus County, Florida.

~

The amendment was authorized by telephone on July 24,1981, and was confirmed by handw'ritten letter dated July 24, 1981. The amendment extends the effective date of Amendment Nc. 41 to Facility Operating License No. DPR-72 issued on July 21, 1981. Amendment No. 41 will become effective upon notification that the facility's Reactor Coolant Pump Power Monitors are operable and the operability has been verified by the Commission's Office of Inspection and Enforcement.

".his amendment permits the licensee to operate the facility in accordance with the license in effect prior to the issuance of Amendment No. 41 and was issued on an expedited basis to prevent a facility shutdown.

8108270882 810812'-

PDR ADOCK 05000302

'S<

P

7590-01 2

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and'the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chaptdr I, which are set forth in the license ameadment. Prior public, notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration ~ and environmental impact appraisal need not be prepared in connection with issuance of th:s amendment.

For further details with respect to this action, see (1) the application for amendment dated July 27, 1981, which confirms the licensee's verbal request of July 2 ",, 1981, ( 2 ) the Commission's handwritten letter to the licensee dated July 24, 1981, (3) Amendment No. 42 to License No. DDR-72, and (4) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW, Washington, D.C., and at the Crystal River Public Library, 668 N.W. First Avenue, Crystal River, Florida. A copy of

7590-01 items (2) and (3) may be obtained upon request addressed to the U.S.

Nuclear Regulatory Commission, Washington, D.C.

20555, Attentinn: Director, Division of Licensing.

i Dated at Bethesda, Maryland, this 12th day of August 1981.

FOR TME NUCLEAR REGULATORY COVIISSION W<

phn'F. Stolz, Chief /

J Opeiating Reactors Branch !4 Division of Licensing b'

l t

9 I

i e

i

0%

h, -

4 e-BUUDN:

M UNITED STATES o'

NUCLEAR REGULATORY COMMISSION ORB #4 Rdg

\\

g' Ringram WASHINGTON. D C. 20555 August 12, 1981 Docket No. 50-r2 Docketing and SeNice Section Office of the Secretary of the Commission

SUBJECT:

CRYSTAL RIVER lf!IT NO. 3 Two signed originals of the Federal Register Notice identified ba!ow are enclosed for our transmittal to t ie Office of the Federal Ragister for publication. Additional conformed copies ( l )of the Notice are enclosed for your use.

O Notice of Receipt of Application for, Construction Permit (s) and Operating Ucense(s).

O Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): Time for Submission of Views on Antitrust Matters.

O Notice of Availability of Applicant's Environmental Report.

O Notice of Proposed Issuance of Amendment to Facility Operating License.

O Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License (s) and Notice of Opportunity for Hea-ing.

O Notice of Availability of NRC Draft l Final Environmental Statement.

O Notice of Limited Work Authorization.

O Notice of Availability of Safety Evaluation Pep O Notice of issuance of Construction Permit (s).

D Notice of issuance of Facility Operating License (s) or Amendment (s).

XX Other:

Amendment No. 42 ReTerenced documents have been provided PDR I

Division of Licensing, ORBf8 "9 # "

Enclosure:

As Stated ORB #4:DL orres--.-

R a

suwwt ---

821 / 8 &

e

- n,.,

c p

_, -