ML18033A457
| ML18033A457 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 12/08/1988 |
| From: | Black S NRC OFFICE OF SPECIAL PROJECTS |
| To: | Kingsley O TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18033A458 | List: |
| References | |
| TAC-00018, TAC-18, TAC-62258, NUDOCS 8812130054 | |
| Download: ML18033A457 (3) | |
Text
December 8, 1988 Docket No. 50-260 Mr. Oliver D. Kingsley, Jr.
Senior Vice President, Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
Dear Mr. Kingsley:
Distribution NRC PDR Local PDR Projects Reading OSP Reading JPartlow SRichardson SBlack BDLiaw FMcCoy WSLittle MSimms GGears DMoran JRutberg DCrutchfield BGrimes EJordan ACRS(10)
GPA/PA GPA/CA BFN Rdg.
SUBJECT:
VOLUME 3, SECTION III.2.0 (CONFIGURATION MANAGEMENT PROGRAM-DESIGN BASELINE AND VERIFICATION PROGRAM)
OF THE NUCLEAR PERFORMANCE PLAN BROWNS FERRY NUCLEAR PLANT, UNIT 2 (TAC NO. 62258)
Section III.2.0 of Volume 3 of the Nuclear Performance Plan for the Browns Ferry Nuclear Plant (Unit 2) specifically responded to the NRC concerns of September 17, 1985 pertaining to design control programs.
The staff has completed its evaluation of the Configuration Management
- Program, including the Design Baseline and Verification Program (DBVP) and concludes that this program contains the essential elements to assess and re-establish the Browns Ferry, Unit 2, design basis and evaluate the plant configuration to ensure that it satisfies the design basis.
In addition, we have reviewed the Bender Report; a TVA contractor report identified in your letter of December 16, 1986.
We conclude that the DBVP adequately addresses the concerns raised in this report.
Full implementation of the program is pending completion of the supporting calculations and modifications.
We will continue to monitor implementation of the Design Baseline and Verification Program through future inspections.
If you have any questions concerning the above, please call the Browns Ferry Project Manager, Gerald Gears, at 301-492-0767.
o MHa ooh.
go wo
%LA mo LD0 oo oa ecr-ea eo.L
Enclosure:
Safety Evaluation cc w/enclosure:
See next page Sincerely, Original Signed by Suzanne Black, Assistant Director for Projects TVA Projects Division Office of Special Projects OF
'OSP:
VA/LA
- OSP:TVA PM NAME :MSimms ~
- GGears:as DATE:11
/88:11/
OFFICIAL RECORD COPY
- TV '
- BDL~a
- 11
~/88 TVA:A~D: gA D
W SBlack SR chardson:
/88
~
~
1 f
Mr. Oliver D. Kingsley, Jr.
CC:
General Counsel Tennessee Valley Authority 400 West Summit Hill Drive E11 B33 Knoxville, Tennessee 37902 Mr. R. L. Gridley Tennessee Valley Authority 5N 157B Lookout Place Chattanooga, Tennessee 37402-2801 Mr. C.
Mason Tennessee Valley Authority Browns Ferry Nuclear Plant P.O.
Box 2000
Box 2000
- Decatur, Alabama 35602 Mr. D. L. Williams Tennessee Valley Authority 400 West Summit Hill Drive W10 B85 Knoxville, Tennessee 37902 Browns Ferry Nuclear Plant Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Atlanta, Georgia 30323 Resident Inspector/Browns Ferry NP U.S. Nuclear Regulatory Commission Route 12, Box 637
- Athens, Alabama 35611 Dr. Henry Myers, Science Advisor Committee on Interior and Insular Affairs U. S.
House of Representatives Washington, D.C.
20515 Tennessee Valley Authority Rockville Office 11921 Rockville Pike Suite 402 Rockvi 1 1 e, Maryland 20852
- Chairman, Limestone County Commission P.O.
Box 188
- Athens, Alabama 35611 Claude Earl Fox, M.D.
State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130