Facility NRC EXAM Scenario __

Appendix D Scenario Outline Form ES-D-1 Facility: LaSalle Scenario No.: NRC Scenario 1 Op-Test No.: NRC 15-1 Examiners: ____________________________ Operators:

Initial Conditions: Unit 1 is at 4% power during a Startup.

Turnover: Secure the RWCU drain to the Main Condenser. Continue control rod withdrawal in preparation for taking the Mode Switch to RUN.

Event No.

Malf. No.

Event Type*

Event Description 1

none N (BOP)

Secure RT Reject IAW LOP-RT-09 2

none R (ATC)

Control Rod Withdrawals 3

none T (SRO)

Damage to Fire Hose Station 109 Reported (TRM) 4 mni018 I (ATC)

A IRM fails UPSCALE, Half SCRAM 5

g8c75g14 C (BOP)

TBCCW Header Pressure Low 6

meh002 C (BOP)

B EHC Pump TRIP, Standby Pumps Fails to Auto-Start 7

R0601 T (SRO)

Low ADS Bottle Bank Nitrogen Pressure (TS) 8 mrd279 C (ATC)

CRD FCV Fails CLOSED 9

mrw010 M (ALL)

RWCU Leak in RT Pump Room 10 none C (ALL)

RWCU Fails to Isolate 11 none M (ALL)

Two Areas Above Max Safe, Emergency RPV Blowdown (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor (T)echnical Specification ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 6 Malfunction(s) after EOP (1-2): 1 Abnormal Events (2-4): 4 Major Transient(s) /E-Plan entry (1-2): 2 EOPs (1-2): 2 EOP Contingencies (0-2): 1 Critical Tasks (2-3): 2 ES-301-5 Quantitative attributes:

BOP Normal: 1 ATC Reactivity (1 per set): 1 BOP I/C (4 / set): 2 ATC I/C (4 / set): 2 SRO-I I/C (4 / set inc 2 as ATC): 5 SRO Tech Spec (2 per set): 2 ALL Major Transients (2 per set): 2

Facility NRC EXAM Scenario __

Appendix D Scenario Outline Form ES-D-1 Facility: LaSalle Scenario No.: NRC Scenario 2 Op-Test No.: _NRC 15-1_______

Examiners: ____________________________ Operators:

Initial Conditions: 100% power Turnover: SPE Blower swap IAW LOP-GS-05 Event No.

Malf. No.

Event Type*

Event Description 1

none N (BOP)

SPE Blower SWAP IAW LOP-GS-05 2

none T (SRO)

U-2 Reports DIV 2 DG INOPERABLE 3

mcw014 C (BOP) 1A WR Pump TRIP 4

r0342 R (ATC) 1E MPT Transformer Hot Spot 5

r0742 T (SRO)

SBLC Squib Valve Continuity Lost 6

none C (BOP)

B VR Exhaust Fan TRIP 7

mcw015 mcw013 C (ATC)

Complete Loss of RBCCW 8

mrp017 M (ALL)

Electrical ATWS 9

none C (ATC)

ARI Fails (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 6 Malfunction(s) after EOP (1-2): 1 Abnormal Events (2-4): 3 Major Transient(s) /E-Plan entry (1-2): 1 EOPs (1-2): 1 EOP Contingencies (0-2): 1 Critical Tasks (2-3): 3 ES-301-5 Quantitative attributes:

BOP Normal: 1 ATC Reactivity (1 per set): 1 BOP I/C (4 / set): 2 ATC I/C (4 / set): 2 SRO-I I/C (4 / set inc 2 as ATC): 4 SRO Tech Spec (2 per set): 2 ALL Major Transients (2 per set): 1

Facility NRC EXAM Scenario __

Appendix D Scenario Outline Form ES-D-1 Facility: LaSalle Scenario No.: NRC Scenario 3 Op-Test No.: __NRC 15-1______

Examiners: ____________________________ Operators:

Initial Conditions: 100% Reactor power, RCIC is OOS ready to be returned to Standby.

Turnover: Warm RCIC Steam Line and return to Standby IAW LOP-RI-05 step E.9 Event No.

Malf. No.

Event Type*

Event Description 1

none N (BOP)

Warm RCIC Steam Lines and Return to Standby (Optional) 2 mrw001 C (BOP)

RT Pump TRIP (Optional) 3 r0414 C (BOP)

OG Building Exhaust Fan TRIP (Optional) 4 mcn017 R (ATC)

Earthquake Below OBE/SSE Limit, Small Condenser Air Leak 5

k3k02p1y C (ATC)

Failure of the RR Ganged Controller in AUTO 6

mca014 M (ALL)

Scram, Suppression Pool Leak 7

mrd040 C (ATC)

Five Control Rods Remain Out 8

none M (ALL)

Blowdown (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor (T)echnical Specification ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 6 Malfunction(s) after EOP (1-2): 1 Abnormal Events (2-4): 4 Major Transient(s) /E-Plan entry (1-2): 2 EOPs (1-2): 2 EOP Contingencies (0-2): 2 Critical Tasks (2-3): 3 ES-301-5 Quantitative attributes:

BOP Normal: 1 ATC Reactivity (1 per set): 1 BOP I/C (4 / set): 2 ATC I/C (4 / set): 2 SRO-I I/C (4 / set inc 2 as ATC): 4 SRO Tech Spec (2 per set): 0 ALL Major Transients (2 per set): 2

Facility NRC EXAM Scenario __

Appendix D Scenario Outline Form ES-D-1 Facility: LaSalle Scenario No.: NRC Scenario 4 Op-Test No.: __NRC 15-1______

Examiners: ____________________________ Operators:

Initial Conditions: 100% Reactor power, C CD/CB OOS Turnover: Swap VR Supply/Exhaust Fans IAW LOP-VR-01 Event No.

Malf. No.

Event Type*

Event Description 1

none N (BOP)

Swap VR Supply/Exhaust Fans IAW LOP-VR-01 2

mms056 R (ATC)

Abnormal Turbine Generator Vibrations 3

mai006 mai007 C (BOP)

Station Air Compressor TRIP, Standby Fails to Auto Start 4

mni073 I (ATC)

LPRM Fails Downscale 5

mnb061 I (ATC) 1NB10B Instrument Line Leak 6

none T (SRO) 1NB10B Instrument Line Leak 7

mms056 M (ALL)

Abnormal Turbine Generator Vibrations, Manual SCRAM 8

mcf034 M (ALL)

Feedwater Rupture Inside Primary Containment 9

mes032 C (BOP)

HPCS Fails to Auto-Start (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 7 Malfunction(s) after EOP (1-2): 2 Abnormal Events (2-4): 4 Major Transient(s) /E-Plan entry (1-2): 2 EOPs (1-2): 2 EOP Contingencies (0-2): 0 Critical Tasks (2-3): 2 ES-301-5 Quantitative attributes:

BOP Normal: 1 ATC Reactivity (1 per set): 1 BOP I/C (4 / set): 2 ATC I/C (4 / set): 2 SRO-I I/C (4 / set inc 2 as ATC): 4 SRO Tech Spec (2 per set): 1 ALL Major Transients (2 per set): 2

Facility NRC EXAM Scenario __

Appendix D Scenario Outline Form ES-D-1 Facility: LaSalle Scenario No.: NRC Scenario 5 Op-Test No.: _NRC 15-1_______

Examiners: ____________________________ Operators:

Initial Conditions: Shutdown in progress at approximately 35% power. Currently at Step E.1.9, ready to downshift RR Pumps to Slow Speed per LOP-RR-08.

Turnover: Continue Shutdown and swap to the A VP Chiller and follow-up with RR downshift.

Event No.

Malf. No.

Event Type*

Event Description 1

none N (BOP)

Swap VP Chiller Trains IAW LOP-VP-02 2

none R (ATC)

Downshift RR Pumps IAW LOP-RR-08 3

k2h06jti C (ATC)

RR Pump TRIPs to Zero Speed after Downshift 4

none T (SRO)

RR Pump TRIPs to Zero Speed after Downshift 5

k1k21p1n C (BOP)

Spurious LPCS Initiation 6

none T (SRO)

Spurious LPCS Initiation 7

k9d782rr I (BOP)

Primary Containment Pressure Controller Fails 8

vhtm60ad C (ATC)

TDRFP Oil Leak 9

mrc041 M (ALL)

RR LOCA 10 mrp018 C (ATC)

B RPS Channel Fails to De-Energize (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor (T)echnical Specification ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 6 Malfunction(s) after EOP (1-2): 1 Abnormal Events (2-4): 4 Major Transient(s) /E-Plan entry (1-2): 1 EOPs (1-2): 2 EOP Contingencies (0-2): 0 Critical Tasks (2-3): 2 ES-301-5 Quantitative attributes:

BOP Normal: 1 ATC Reactivity (1 per set): 1 BOP I/C (4 / set): 2 ATC I/C (4 / set): 3 SRO-I I/C (4 / set inc 2 as ATC): 5 SRO Tech Spec (2 per set): 2 ALL Major Transients (2 per set): 1

Facility NRC EXAM Scenario __

Appendix D Scenario Outline Form ES-D-1 Facility: LaSalle Scenario No.: NRC Scenario 6 Op-Test No.: __NRC 15-1______

Examiners: ____________________________ Operators:

Initial Conditions: Unit 1 is at 100% Reactor Power, Suppression Pool water level is currently at 1, Non-Divisional Work Week Turnover: Lower Suppression Pool water level to 0 IAW LOP-RH-16 to Main Condenser.

Event No.

Malf. No.

Event Type*

Event Description 1

none N (BOP)

Lower Suppression Pool Water Level to 0 IAW LOP-RH-16 2

r1211 C (BOP)

Gland Steam Packing Exhaust Blower Trip 3

mvp001 C (BOP)

VP Chiller TRIP 4

r0591 r0593 C (ATC)

A RR Pump Loss of Cooling Water Flow 5

none T (SRO)

Single Loop Operation (TS) 6 k1n32e12 mnb103 R (ATC)

Spurious MSIV Closure, Fuel Failure 7

mrp005 C (ATC)

B RR Pump TRIP, Automatic SCRAM Fails 8

mnb106 M (ALL)

Main Steam Line Leak in Main Steam Tunnel 9

none C (ALL)

D Inboard and Outboard MSIVs Fail to Isolate 10 none M (ALL) 1VT79YA/B/C Fail OPEN, High Off-site Release, Blowdown (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor (T)echnical Specification ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 8 Malfunction(s) after EOP (1-2): 2 Abnormal Events (2-4): 4 Major Transient(s) /E-Plan entry (1-2): 2 EOPs (1-2): 3 EOP Contingencies (0-2): 1 Critical Tasks (2-3): 2 ES-301-5 Quantitative attributes:

BOP Normal: 1 ATC Reactivity (1 per set): 1 BOP I/C (4 / set): 2 ATC I/C (4 / set): 2 SRO-I I/C (4 / set inc 2 as ATC): 5 SRO Tech Spec (2 per set): 1 ALL Major Transients (2 per set): 2

Facility NRC EXAM Scenario __

Appendix D Scenario Outline Form ES-D-1 Facility: LaSalle Scenario No.: NRC Scenario 7 Op-Test No.: __NRC 15-1______

Examiners: ____________________________ Operators:

Initial Conditions: Reactor power at approximately 71%, Startup is in progress IAW LGP-1-1, Suppression Pool Cooling Online, ACB 1522 OOS.

Turnover: Continue power ascension per LGP-3-1 and QNE direction, Secure Suppression Pool Cooling IAW LOP-RH-13.

Event No.

Malf. No.

Event Type*

Event Description 1

none R (ATC)

Continue Power Ascension Using RR FCV 2

none N (BOP)

Secure Suppression Pool Cooling IAW LOP-RH-13 3

mrd280 C (ATC)

CRD Pump TRIP 4

k5e17prr C (BOP)

Hydrogen Cooling TCV Fails CLOSED 5

mrd079 I (ATC)

Control Rod Drifts In 6

none T (SRO)

INOPERABLE Control Rod 7

mee027 C (BOP)

Loss of 135X-2 8

none T (SRO)

Loss of 135X-2 9

mnb104 M (ALL)

MSL Break Inside Primary Containment 10 mca015 C (ALL)

Containment Bypass Path 11 none M (ALL)

RPV Blowdown (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor (T)echnical Specification ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 6 Malfunction(s) after EOP (1-2): 1 Abnormal Events (2-4): 4 Major Transient(s) /E-Plan entry (1-2): 2 EOPs (1-2): 2 EOP Contingencies (0-2): 1 Critical Tasks (2-3): 2 ES-301-5 Quantitative attributes:

BOP Normal: 1 ATC Reactivity (1 per set): 1 BOP I/C (4 / set): 2 ATC I/C (4 / set): 2 SRO-I I/C (4 / set inc 2 as ATC): 5 SRO Tech Spec (2 per set): 2 ALL Major Transients (2 per set): 2