December 16, 2004 MEMORANDUM TO: Darrell J. Roberts, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

Daniel S. Collins, Senior Project Manager, Section Project Directorate I

/RA by R. Fretz for/

Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

HOPE CREEK GENERATING STATION - PSEGS PRELIMINARY RESPONSES TO NRC STAFF QUESTIONS REGARDING B RECIRCULATION PUMP VIBRATION (TAC MC5111)

On December 17, 2004, NRC staff will be conducting a public meeting with representatives of PSEG, the licensed owner and operator of the Hope Creek Generating Station. The purpose of the meeting is to discuss PSEGs responses to NRC staff questions regarding Hope Creek B recirculation pump high vibrations and high pressure coolant injection system exhaust pipe damage issues. The document attached to this memo was provided informally by the licensee to assist the NRC staff in its inspection activities regarding the pump vibration issue and to facilitate technical discussions between NRC and PSEG. The document provides preliminary responses to NRC staff questions that had been verbally transmitted to the licensee. This memorandum and the attachment do not convey a formal response by the licensee or represent an NRC staff position.

Docket No. 50-354

Attachment:

As stated CONTACT: D. Collins, NRR 301-415-1427

December 17, 2004 MEMORANDUM TO: Darrell J. Roberts, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

Daniel S. Collins, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

HOPE CREEK GENERATING STATION - PSEGS PRELIMINARY RESPONSES TO NRC STAFF QUESTIONS REGARDING B RECIRCULATION PUMP VIBRATION (TAC MC5111)

On December 17, 2004, NRC staff will be conducting a public meeting with representatives of PSEG, the licensed owner and operator of the Hope Creek Generating Station. The purpose of the meeting is to discuss PSEGs responses to NRC staff questions regarding Hope Creek B recirculation pump high vibrations and high pressure coolant injection system exhaust pipe damage issues. The document attached to this memo was provided informally by the licensee to assist the NRC staff in its inspection activities regarding the pump vibration issue and to facilitate technical discussions between NRC and PSEG. The document provides preliminary responses to NRC staff questions that had been verbally transmitted to the licensee. This memorandum and the attachment do not convey a formal response by the licensee or represent an NRC staff position.