Category:Letter type:CNL
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:CNL"
The following 200 pages are in this category, out of 1,155 total.
(previous page) (next page)C
- CNL-13-101, 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance 9168 - Cask 8-120B
- CNL-13-102, TVA - Submittal of Revision 39 to Central Emergency Control Center - Emergency Plan Implementing Procedure CECC EPIP-8, Dose Assessment Staff Activities During Nuclear Plant Radiological Emergencies
- CNL-13-103, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Sets 8 (B.1.33-1), 10 (3.0.3-1 Request 1), 12 (B.1.23-2b), 13 (30-day), 14 (B.0.4-1a)
- CNL-13-104, Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87)
- CNL-13-105, Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a)
- CNL-13-106, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B
- CNL-13-108, Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld Inservice Inspection Interval
- CNL-13-110, Central Emergency Control Center - Revision 20 to Emergency Plan Implementing Procedure Revision CECC EPIP-19, Post Accident Fuel Damage Assessment
- CNL-13-111, Registration of Use of Cask to Store Spent Fuel
- CNL-13-112, Response to NRC Request for Additional Information Related to License Amendment Request to Updated Final Safety Analysis Report Changes Associated with Hydrologic Analysis from Mechanical and Civil Engineering Branch
- CNL-13-113, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-9, Revision 50
- CNL-13-114, The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2013 Status Report
- CNL-13-115, Change to Commitment Date Response to NRC Request for Additional Information Related to Integrated Plan in Response to Commission Order EA-12-051
- CNL-13-116, Response to NRC Request for Additional Information Related to 2012 Steam Generator Inspection Report
- CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report
- CNL-13-118, Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk
- CNL-13-119, Revision to Watts Bar Nuclear Plant, Unit 1, Reactor Vessel Surveillance Capsule Withdrawal Schedule
- CNL-13-121, Service List Update for Routine Information
- CNL-13-122, Service List Update for Documents Containing Official Use Only and Safeguards Information
- CNL-13-123, Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term
- CNL-13-124, Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Watts Bar Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term Ta
- CNL-13-125, Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNL-13-130, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1
- CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A
- CNL-13-135, Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18)
- CNL-13-137, Third Progress Update on Improved Flood Mitigation System Project
- CNL-13-139, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TS-SQN-13-01 and 13-02)
- CNL-13-140, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
- CNL-13-141, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants - Set 1
- CNL-13-143, TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures
- CNL-13-144, Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request
- CNL-13-145, TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures
- CNL-13-146, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
- CNL-13-147, Supplemental Response to NRC Health Physics & Human Performance Branch Request for Additional Information Related to License Amendment Request for Watts Bar Unit 1, Updated Final Safety Analysis Report Changes Associated with Hydrologic A
- CNL-13-148, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484)
- CNL-13-149, Updated Inservice Test (IST) Program (Unit 1) and Ist/Preservice Test (Pst) Program
- CNL-14-001, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plant
- CNL-14-004, Response to an NRC Verbal Request for Additional Information Related to the License Amendment Request to Updated Final Safety Analysis Report Changes Associated with the Hydrologic Analysis
- CNL-14-006, Response to NRC Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for Browns Ferry Plant, Units 1, 2
- CNL-14-007, Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number
- CNL-14-008, The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2014 Status Report
- CNL-14-009, Response to NRC Request for Additional Information Related to Review of Potential Breaches of Hesco Modular Flood Barriers and Earthen Embankments Affecting the Updated Hydrologic Analysis Results
- CNL-14-010, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, 3.0.3-1 (Requests 3b, -3a, 4b, 6b); B.1.34-8; B.1.34-9; A.1-2; Tables 3.3.1, 3.3.2-11, and
- CNL-14-010, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, 3.0.3-1 (Requests 3b, -3a, 4b, 6b); B.1.34-8; B.1.34-9; A.1-2; Tables 3.3.1, 3.3.2-11, and
- CNL-14-011, Change in Commitment Related to External Flooding Concerns (TAC Nos. ME8805, ME8806 and ME8807
- CNL-14-013, Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding.
- CNL-14-014, Revised Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)
- CNL-14-015, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02)
- CNL-14-016, Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electrical Power System
- CNL-14-017, Update Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin (APM) Assessments
- CNL-14-018, Response to NRC Request for Additional Information Re Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) Tac Nos MF2446.
- CNL-14-020, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants
- CNL-14-021, Response to Request for Clarification to NRC Request for Additional Information Re Review of License Renewal Application, LRA B.1.31, B.1.25.1b, B.1.34-8a, B.1.34-9A, LRA Annual Update (TAC MF0481 & MF0482)
- CNL-14-022, Withdrawal of Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18)
- CNL-14-024, Transmittal of Corrected Figure for Application to Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (SQN-TS-12-02)
- CNL-14-025, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants
- CNL-14-026, Transmittal of Supplemental Clarification Information for the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, TAC No. ME8200 (WBN-UFSAR-12-01)
- CNL-14-028, Second Six Month Status Report in Response to Order No. EA-12-051, Spent Fuel Pool Instrumentation
- CNL-14-029, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant
- CNL-14-030, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNL-14-031, CNL-14-031, Response to RAI Regarding Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
- CNL-14-032, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNL-14-033, Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
- CNL-14-034, Correction to Unique Component Identifier Number
- CNL-14-035, CFR 50.46 30-Day Report of Changes & Errors to Calculated Peak Cladding Temperature
- CNL-14-036, Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1, Flooding, Of...
- CNL-14-037, Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Leakage Rate Through Main Steam Isolation Valves - TS-485
- CNL-14-038, Tennessee Valley Authoritys Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acci
- CNL-14-039, Tennessee Valley Authority - Submittal of Radiological Emergency Plan Revision
- CNL-14-040, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule, Revision 1
- CNL-14-042, Updated Probabilistic Risk Analysis (PRA) Model
- CNL-14-043, Response to Apparent Violation in NRC Integrated Inspection Report 05000259-13-005, 05000260-13-005, and 05000296-13-005, EA-14-005
- CNL-14-045, License Amendment Request (TS-488) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8
- CNL-14-047, License Amendment Request (WBN-TS-14-02) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8
- CNL-14-048, Fourth Progress Update on Improved Flood Mitigation System Project
- CNL-14-049, CNL-14-049, TVA Guarantee of Payment of Deferred Premiums - 2013 Annual Report
- CNL-14-050, Fourth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request
- CNL-14-052, TVA Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application: RAIs B.1.13-4 and 3.0.3-1-3c, Commitment 9.G, and 2013 LRA Annual Update
- CNL-14-053, Notification of the Number of Tritium Producing Burnable Absorber Rods for the Operating Cycle 13 Reactor Core
- CNL-14-055, Response to Request for Additional Information Regarding License Amendment to Update the Final Safety Analysis Report Regarding Changes to the Hydrologic Analysis
- CNL-14-058, Project Schedule for the Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1, Flooding, of the
- CNL-14-059, License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501 Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (BFN TS-493)
- CNL-14-059, License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501 Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (BFN TS-493)
- CNL-14-063, The Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2014 Status Report
- CNL-14-065, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits (BFN TS-491)
- CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)
- CNL-14-071, Bellefonte, Unit 2 - Request for Extension of Construction Permit CPPR-123
- CNL-14-072, Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-0
- CNL-14-073, 151-1 and 13-151-2 Relief Request Interval Applicability Clarification
- CNL-14-074, Redacted Version of License Amendment Request (TS-488) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8
- CNL-14-075, Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8
- CNL-14-076, Redacted Version of License Amendment Request (WBN-TS-14-02) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8
- CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information
- CNL-14-081, Units, 1, 2 & 3, Revised Pages to Technical Specification Change TS-478-Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Tech Spec 2.1.1.2 in Support of ATRIUM-10 Xm Fuel Use at Browns Ferry
- CNL-14-083, Withdrawal of Application to Modify Technical Specifications (TS) 3.8.4, 3.8.5, and 3.8.6 (WBN-TS-12-07)
- CNL-14-085, Documents for the Environmental Review of License Renewal Application - Env 3
- CNL-14-089, (Bfn), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN-TS-492)
- CNL-14-090, Response to NRC Request for Additional Information on the Proposed License Amendment for Browns Ferry Nuclear Plant, Unit 1
- CNL-14-093, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
- CNL-14-094, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, 2.5-4, 3.0.3-1-3 Request 4c, and B.1.13-4a
- CNL-14-097, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants.
- CNL-14-098, Request to Revise the Watts Bar Nuclear Plant Unit 2 Cyber Security Milestone Implementation Schedule and Implementation License Conditions
- CNL-14-099, Application to Modify Technical Specifications Regarding Reactor Coolant Pump Motor Flywheel Examination Periodicity (TS-WBN-13-03)
- CNL-14-100, Tennessee Valley Authoritys Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident
- CNL-14-102, Resolution of Generic Safety Issue (GSI)-191 - Commitment Change
- CNL-14-103, Response to Request for Additional Information 2 Regarding Ultimate Heat Sink License Amendment Request
- CNL-14-106, Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs - TS-485
- CNL-14-107, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02)
- CNL-14-109, Submittal Extension to the Fifth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request
- CNL-14-110, Submittal Extension to the Fifth Progress Update on Improved Flood Mitigation System Project
- CNL-14-114, Resolution of Generic Safety Issue (GSI)-191
- CNL-14-116, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor
- CNL-14-117, Response to NRC Request for Additional Information Related to Potential Loss of Spent Fuel Cooling
- CNL-14-118, Confirmatory Action Letter Tier 2 Commitments Related to Integrated Improvement Plan
- CNL-14-119, The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - July 2014 Status Report
- CNL-14-123, Brown Ferry Units 1, 2 & 3, Sequoyah Units 1 & 2 and Watts Bar Unit 1 - Submittal of Revision 59 to Emergency Plan Implementing Procedure CECC EPIP-1, Central Emergency Control Center (CECC) Operations
- CNL-14-124, Sampling Plan for NRC Confirmatory Order EA-14-005
- CNL-14-127, Response to Request for Additional Information Related to Potential Loss of Spent Fuel Pool Cooling
- CNL-14-128, Response to Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation (Order No. EA-14-044)
- CNL-14-129, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Browns Ferry Nuclear Plant
- CNL-14-130, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant
- CNL-14-131, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant
- CNL-14-132, Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Bro
- CNL-14-133, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)(TAC Nos
- CNL-14-134, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order Number EA-12-049) for Watts Bar Nucle
- CNL-14-135, Central Emergency Control Center - Central Emergency Control Center (CECC) Operations Procedure Revision
- CNL-14-136, Confirmatory Action Letter Tier 2 Commitments Related to Integrated Improvement Plan
- CNL-14-138, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
- CNL-14-139, Request for Alternative ISPT-03
- CNL-14-140, Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk
- CNL-14-141, Response to Request for Additional Information on the Radiological Emergency Plan
- CNL-14-142, Response to Request for Additional Information Related to Relief Requests Associated with Unit 2 Inservice Testing and Preservice Test Programs (MF4118)
- CNL-14-143, Response to NRC Requests Related to Granting an Operating License
- CNL-14-144, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits (BFN TS-494)
- CNL-14-145, Bellefonte Nuclear Plant Units 1 and 2, Tennessee Valley Authority - Proposed Alternative Submittal Schedule as Described in the Attached Enclosures Due to the Deferred Construction Status
- CNL-14-147, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants
- CNL-14-148, Response to Request for Additional Information Draft Two-Unit Offsite Dose Calculation Manual, Revision B
- CNL-14-150, Response to Requests for Additional Information, Developmental Revision I Technical Specification (Section 3.3) and Technical Specification Bases (Limiting Condition for Operation B 3.0.6)
- CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12
- CNL-14-155, Submittal of Revision to the Radiological Emergency Plan and On-Shift Staffing Analysis
- CNL-14-156, Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Withdrawal of Requests and Update to EPU Plans and Schedules
- CNL-14-157, Response to NRC Request for Additional Information Related to Technical Specification 3.7.1
- CNL-14-159, Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk
- CNL-14-160, Update to the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2 and 3
- CNL-14-162, Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 & 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A
- CNL-14-166, Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479)
- CNL-14-169, Confirmatory Action Letter Tier 2 Commitments Related to Integrated Improvement Plan
- CNL-14-176, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03)
- CNL-14-178, Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program
- CNL-14-180, Technical Specification Sections 3.0 and 3.10.1
- CNL-14-181, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Set 22, B.1.34-9c
- CNL-14-182, Response to NRC Questions on Nuclear Safety Culture Assessment
- CNL-14-191, Compliance Status Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049
- CNL-14-192, Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant
- CNL-14-195, The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2014 Status Report
- CNL-14-196, Response to Request for Additional Information on Radiological Emergency Plan
- CNL-14-197, Two-Unit Offsite Dose Calculation Manual, Revision 0
- CNL-14-198, Response to NRC Request for Additional Information on the Proposed License Amendment Request to Modify P/T Limits (BFN TS-491)
- CNL-14-199, Response to Request for Additional Information Regarding NRC Review of Final Safety Analysis Report Amendment 112 for Chapter 6
- CNL-14-200, Revised Response to Request for Additional Information Related to Potential Loss of Spent Fuel Pool Cooling - NRC RAI 1
- CNL-14-201, Response to Questions Regarding the Unit 1/Unit 2 As-Constructed Fire Protection Report
- CNL-14-202, Eagle 21 Test Plan and Test Results
- CNL-14-203, Response to Request for Additional Information on EP Chapter 13.3 and Staffing Analysis
- CNL-14-207, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 15
- CNL-14-208, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Pl
- CNL-14-209, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revisions
- CNL-14-210, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima
- CNL-14-211, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima
- CNL-14-212, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident
- CNL-14-214, Bellefonte, Units 1 and 2 - Response to Request for Additional Information Regarding Near-Term Task Force Recommendation 2.1: Seismic Hazard and Screening Report
- CNL-14-217, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7
- CNL-14-218, Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)
- CNL-14-219, Submittal of Pre-operational Test Instruction, 2-PTI-999-02, Rv. 0, Thermal Expansion
- CNL-14-221, Response to NRC Request for Additional Information Regarding Review of License Renewal Application, Set 23, B.1.34-9.d (Follow Up)
- CNL-14-222, First Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident
- CNL-14-223, TVA - Seventh Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request
- CNL-14-226, Organization Topical Report, TVA-NPOD89-A
- CNL-14-228, Request for Additional Information Related to License Amendment Request to Updated Final Safety Analysis Report Changes Associated with Hydrologic Analysis
- CNL-14-229, American Society of Mechanical Engineers Request for Relief RP-07
- CNL-14-230, Submittal of Pre-operational Test Instruction, 2-PTI-074-02B, Rev. 0, RHR Hft Heatup/Cooldown
- CNL-14-231, Notification of Intent to Use Code Case N-716-1
- CNL-14-232, Closure of Open Item Discussed in Tennessee Valley Authoritys Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)
- CNL-14-233, Compliance Letter & Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No EA-12-049
- CNL-14-233, Watts Bar, Units 1 & 2 - Compliance Letter & Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order
- CNL-14-234, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 1
- CNL-14-235, Transmittal of Part V of the Unit 1/Unit 2 Fire Protection Report
- CNL-15-001, Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)
- CNL-15-002, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Saftey Limits (TS-499)
- CNL-15-007, Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.
- CNL-15-008, Response to Request for Additional Information Related to ISPT-03
- CNL-15-009, Resolution of Generic Safety Issue 191
- CNL-15-013, Request for Alternate ASME Code Section XI for Containment Inservice Inspection Utilizing ASME Code Section XI, 2007-2008
- CNL-15-014, Updated Inservice Test Program and Relief Requests for Third Ten Year Interval
- CNL-15-015, Service List Update for Routine Information
- CNL-15-016, Service List Update for Documents Containing Official Use Only and Safeguards Information
- CNL-15-017, Decommissioning Funding Status Report
- CNL-15-018, Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2015 Status Report
- CNL-15-019, License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501)
- CNL-15-020, Supplement to the Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) and Response to NRC Requests for Additional Information
- CNL-15-021, Request for Approval of the Revised Cyber Security Plan (CSP) and Associated License Condition (WBN-TS-15-005)