Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revisions
ML15205A171
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/05/2014
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-14-209
Download: ML15205A171 (2)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-209 November 5, 2014 10 CFR 50, Appendix E, Section V 10 CFR 50.4 10 CFR 50.54(q)(5) 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390

Subject:

Central Emergency Control Center - Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V and 10 CFR 72.44(f), this submittal provides the revised Central Emergency Control Center (CECC)

Emergency Plan Implementing Procedures (EPIPs) as listed below.

EPIP Revision Title Effective Date CECC EPIP-2 46 Operations Duty Specialist Procedure for Notification of Unusual Event 10/20/2014 CECC EPIP-3 47 Operations Duty Specialist Procedure for Alert, Site Area Emergency, or General Emergency 10/20/2014 L44 141105 001

U. S. Nuclear Regulatory Commission Page 2 Date November 5, 2014 provides a summary of the changes and the analyses performed that concluded the changes do not constitute a reduction in effectiveness of the EPIPs. The CECC EPIP-2 and CECC EPIP-3 procedures continue to comply with the requirements of 10 CFR 50.47(b) and 10 CFR 50 Appendix E. Enclosures 2 and 3 provide a copy of the revised EPIPs.

There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact Edward D. Schrull at (423) 751-3850.

\\!.lice P sident, Nuclear Licensing

Enclosures:

1. Central Emergency Control Center-Emergency Plan Implementing Procedure Revision - Summary of Changes and Analysis
2. CECC EPIP-2, "Operations Duty Specialist Procedure for Notification of Unusual Event," Revision 46
3. CECC EPIP-3, "Operations Duty Specialist Procedure for Alert, Site Area Emergency, or General Emergency," Revision 47 cc (Enclosures):