Pages that link to "ML17279A284"
Jump to navigation
Jump to search
The following pages link to ML17279A284:
Displayed 26 items.
- ML17278B167 (← links)
- ML17278B165 (← links)
- ML17278B108 (← links)
- ML17278B101 (← links)
- ML17278B099 (← links)
- 05000397/LER-1985-042, :on 850621,primary Containment Valve in Traversing in-core Probe Purge Line Identified to Be in Noncompliance W/License Commitments.Redesign Prepared & Implemented.Further Investigation Underway (← links)
- TAC:64838 (← links)
- ML17279A316 (← links)
- ML17279A314 (← links)
- ML17279A311 (← links)
- ML17279A309 (← links)
- ML17279A306 (← links)
- ML17279A303 (← links)
- GO2-87-144, Provides Clarifications to 870327 Request for Tech Spec Changes Supporting Operation Following Spring 1987 Reload, Cycle 3 (← links)
- GO2-87-135, Advises That Util Satisfied Requirement of 10CFR50.56 by Designing TIP-V-15 to Be Installed Approx 3 Ft Outside Containment Penetration,Per 870401 Telcon.Installation Expected to Allow Sufficient Access for Testing & Maint (← links)
- GO2-87-010, Requests Timely Review of 870330 Request for Deferral of Requirement to Install wide-range Neutron Monitoring Sys Until Third Refueling Outage.Application for Amend to License NPF-21,submitted on 861118,should Be Delayed (← links)
- GO2-87-105, Application for Amend to License NPF-21,changing Tech Specs to Allow Use of Advanced Nuclear Fuels Corp,Inc Reload Fuel in Cycle 3.Fee Paid (← links)
- GO2-87-080, Application to Amend License NPF-21,deleting License Condition 2.C.(16),Attachment 2,Item 3(b) Requiring Implementation of Reg Guide 1.97,Rev 2 for Flux Monitoring Prior to Startup Following Second Refueling.Fee Paid (← links)
- GO2-87-091, Clarifies 870303 Request for Amend to Tech Spec 3/4.1.5, Figures 3.1.5-1 & 3.1.5-2 Re Standby Liquid Control (SLC) Sys.Acceptance Testing to Demonstrate Capability of SLC Sys Will Be Performed W/Both SLC Pumps Operating Simultaneously (← links)
- GO2-87-073, Responds to 870212 Request for Clarification Re 870106 Application for Amend to License NPF-21,revising Tech Specs Concerning Standby Liquid Control Sys.Info Re Acceptance Testing for Min Flow Rate Provided (← links)
- GO2-87-064, Clarifies Util Re 861118 Application for Amend to License NPF-21,reflecting Mods to Traversing Incore Probe (TIP) Purge Line.Type B Testing Will Be Scheduled for Penetration & Type C Testing W/Air for TIPs V-6 & V-15 (← links)
- GO2-87-003, Forwards Table 6.2-16 in Response to NRC 861223 Request for Addl Info Re 861118 Application for Amend to License NPF-21 Concerning Mods to Traversing in-core Probe Purge Line. Description of NRC Questions & Util Response Also Encl (← links)
- ML17278B157 (← links)
- GO2-86-102, Application for Amend to License NPF-21,revising Tech Spec Tables 3.6.3-1 & 6.2-16 to Change Configuration of Traversing in-core Probe Sys Nitrogen Purge Line to Meet GDC 54 & 56 Configuration Criteria.Fee Paid (← links)
- ML17278A823 (← links)
- ML17278A820 (← links)