ML17278A820

From kanterella
Jump to navigation Jump to search

Amend 23 to License NPF-21,revising License Condition 2.C.(16),extending Flux Monitoring Implementation Requirements Deadline to Second Refueling Outage
ML17278A820
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/05/1986
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17278A821 List:
References
TAC-60415, TAC-64838, NUDOCS 8605130343
Download: ML17278A820 (4)


Text

~ 'p,g REg~

c<

Cy I

8

+~*yW UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET Nn. 5O-397 WPPSS NUCLEAR PROilECT NO.

2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

23 License Nn. NPF-21 1.

The Nuclear Reaulatorv Commission (the Commission or the NRC) havinq found that:

A.

The application for amendment filed by the Washinqton Public Power Supply System (the Supply Svstem, also the licensee),

dated October 14, 1985, complies with the standards and requirements of the Atomic Enerqy Act of 1954, as amended (the Act), and the Commission's reaulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Comission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endanaerina the health and safety of the public, and (ii> that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the puhlic; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's requlations and all applicable reauirements have been satisfied.

Accordinaly, Facility Operating License No. NPF-21, Attachment 2, Item 3.(b) of License Condition 2.C.(16) is herebv amended to read as follows:, Paragraph 3.(b)

(b)

The licensee shall implement (installation or upgrade) requirements of Regulatory Guide 1.97, Revision 2, for flux monitoring prior to startup following the second refueling outaqe.

Sb05130343 Bb0505 PDR

  • DOCH," 0500039?

P PDR

il t

l

'L r

3.

This amendment is effective as of the date of issuance.'OR THE NUCLEAR REGULATORY COYYISSION Elinor G. Adensam, Director BMR Proiect Directorate No.

3 Division of 8WR Licensing Date of Issuance:

Hay 5,

'f986

4g