ML20028C423

From kanterella
Revision as of 18:59, 20 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Confirmation of NRC Understanding of Listed Actions to Be Taken by Licensee Re 771213 Detonations of Combustible Gases in Offgas Sys & Stack Basement,Per 771214 Telcon
ML20028C423
Person / Time
Site: 05000000, Millstone
Issue date: 12/14/1977
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Switzer D
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20027A594 List: ... further results
References
FOIA-82-545 NUDOCS 8301100108
Download: ML20028C423 (2)


Text

.-

1

. /.,).

M o,

h-; rec.4.,r.L, & e/ d 5 9

14 DEC 1977; Oocket No. 50-245

~

1 4

-. 7 Northeast Nuclear Energy Compairy 3.

ATTEt. Mr.' D. C.. Switzer President i

~

P O. Box 270 Hari.74, Counscticut 06101 D

Gentlemmar

~

l

-}

This refers to the trimphone conversation between Mr. E. McCabe and Mr.

~4 A. Davis of this effice and Mr E. Ferland of your staff on December 14, i

Igni regarding the detonaticas of combustible gases in the Millstone Point Statico, Unit 1, Offges System and. Stack n====gt on n=e==d=r 13,

. i, 19U With regard to the matters-disdussed, we understand that you have under-

.]

taken or_ will undertake the foi, lowing actions:

Revise the say=are of events; determine safety significance and a

define specific measures ta prevent mcurrence;

-b Consider the need for additional instrumentation to detect com-1,j bestible orexplosive gaseous mixtures in enclosed spaces, and for plant equipment to remove or diluta such mixtures; I

l c.

Review the adequacy of p. Mal and management contmis for prirvesting and responding to events of this nature, including but 4

not liettad to the actions taken in this case to review the initial explosino and to assure proper pertiornmoca of w...i.ive actions j

such as refilling loop sealsj t

d.

Identify and correct insthematation, equipment, piping, and structural damage resulting fitas the explosions; and,

~

e Report, in writing, to this office, the results of your evaluations I

and the completion of corrective actionr necessary to minimize the l

potential for disrt.ptive explosicos.

c Further, we understand that you will limit Unit l's operation to less

.,y them.or equal to 4 percent rated power until your cormctive actions have been reviewed and accepted by this office. If our understanding of 8301100100 021207 ll./h[

PDR FOIA 1

HIATTO2-545 PDR x 'R, RONS

,, N W<._

k,RONS___,,_

RONS

_ DJ_ RET _0R omes >

II" (m

f Ma tin / 1

_3h,ed_1 os ky,___ _ Mc_Ca_b_q, _ __ _Q.r_yqq. f__ _ _....Grj e

.1....

suan u >

e f,

I2/l4/77 I W )_b_

___dN//'_'____

Ak o4rr >

N?c Foroa mus-1st.nacco4o

_ e _ u a w

~..........,____ _ -... _

J

e s

14 DEC 1977 liertheast Nuclear Energy Company 2

your planned actions as described above is no't in accordance with the actual plant and actions being implemented, please contact this office insediately Sfncorely.

taw y

3 J

Boyce H. Grier

.h s

ce r:

y[

E J. Forland, Plant Superintendent D. G Diedrick. Manager of Quality Assurance A. I. Raisman., Counsel for Citizens Coomdttee i

for the Protection of the Environment t

I.

bec's:

IE Mail & FiTes (For Appropriate Distribution)

Central Files Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Infonnation Center (NSIC)

Technical Information Center (TIC)

REG:.L Reading Room State of Connecticut G. L. Snyder

~

Lana Cobb, IE:HQ

.t W. P. Ellis, IE:HQ l

\\

i I.

z

..+

I t

i 9

i i

omeo.

1

)

su anau =>

.=

DAftte Desm NRC 318 (7.75) NRCM 0240 o u e. eevennuaw, ene.m=e screes. tre me.ee

... - -2~'*T.-.._._,-

W M :::.. -

-,_ : ~ ': L -.

- i

^^~~~ Q?~ ^

~'L

_