Request for Additional Information, Section B.2.35
ML080720288
Person / Time
Site: Beaver Valley
Issue date: 03/21/2008
From: Kent Howard
NRC/NRR/ADRO/DLR
To: Sena P
FirstEnergy Nuclear Operating Co
Howard K, NRR/DLR/RLRB, 415-2989
References
TAC MD6593, TAC MD6594
Download: ML080720288 (7)


Text

March 21, 2008 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-BV-SEB-1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MD6593 AND MD6594)

Dear Mr. Sena:

By letter dated August 27, 2007, FirstEnergy Nuclear Operating Company submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Beaver Valley Power Station, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.

Items in the enclosure were discussed with Mr. Cliff Custer of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2989 or e-mail klh1@nrc.gov.

Sincerely,

\RA\

Kent L. Howard, Sr., Project Manager Reactor Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

Request for Additional Information cc w/encl: See next page

Beaver Valley Power Station, Units 1 and 2 cc:

Joseph J. Hagan Peter P. Sena III President and Chief Nuclear Officer Site Vice President FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-SEB-1 Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 James H. Lash Senior Vice President of Operations Director, Fleet Regulatory Affairs and Chief Operating Officer FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 Mail Stop A-GO-14 76 South Main Street 76 South Main Street Akron, OH 44308 Akron, OH 44308 Manager, Site Regulatory Compliance Danny L. Pace FirstEnergy Nuclear Operating Company Senior Vice President, Fleet Engineering Beaver Valley Power Station FirstEnergy Nuclear Operating Company Mail Stop A-BV-A Mail Stop A-GO-14 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308 Commissioner James R. Lewis Jeannie M. Rinckel West Virginia Division of Labor Vice President, Fleet Oversight 749-B, Building No. 6 FirstEnergy Nuclear Operating Company Capitol Complex Mail Stop A-GO-14 Charleston, WV 25305 76 South Main Street Akron, OH 44308 Director, Utilities Department Public Utilities Commission David W. Jenkins, Attorney 180 East Broad Street FirstEnergy Nuclear Operating Company Columbus, OH 43266-0573 Mail Stop A-GO-15 76 South Main Street Director, Pennsylvania Emergency Akron, OH 44308 Management Agency 2605 Interstate Drive Manager, Fleet Licensing Harrisburg, PA 17110-9364 FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 Dr. Judith Johnsrud 76 South Main Street Environmental Coalition on Nuclear Power Akron, OH 44308 Sierra Club 433 Orlando Avenue Ohio EPA-DERR State College, PA 16803 ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149

Beaver Valley Power Station, Units 1 and 2 cc:

Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 Cliff Custer FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Julie Firestone FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077

ML080720288 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME IKing KHoward RFranovich DATE 3/13/08 3/13/08 3/21/08 DISTRIBUTION: Ltr From K. Howard to P. Sena dated March 21, 2008

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MD6593 AND MD6594)

HARD COPY:

DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSbwb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter KHoward ESayoc PBuckberg NMorgan MModes, RI PCataldo, RI DWerkheiser, RI

REQUEST FOR ADDITTIONAL INFORMATION REVISED REACTOR VESSEL INTEGRITY AGING MANAGEMENT PROGRAM BEAVER VALLEY POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION, AMENDMENT1 RAI B.2.35-1 In order to ensure compliance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix G, Appendix H, and 10 CFR 50.61, through the end of the period of extended operation, it is necessary that any standby surveillance capsules removed from the reactor vessel (RV) be made available for future use if the need for additional surveillance test data arises. These standby surveillance capsules play an important role in the RV material surveillance program. They are irreplaceable because they have been subjected to a unique radiation exposure history, and the potential need for supplemental surveillance test data necessitates that these capsules be maintained in a condition that would permit their future use. Therefore, the staff requests that the applicant provide a formal commitment to store and maintain standby surveillance capsules in a condition that would permit their future use through the end of the period of extended operation.

ENCLOSURE