Other: L-07-113, License Renewal Application. Appendix E: Applicants Environmental Report, L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System, L-08-189, Drawing Lr 2-27A-2, Rev. 4, Auxiliary Steam and Condensate System (Ass), L-08-261, Schedule for Submittal of Annual Update for License Renewal Application, L-08-262, License Renewal Application Amendment No. 23 and Revised License Renewal Boundary Drawings, L-08-263, Submittal of Revision to License Renewal Application Amendment No. 24, L-08-292, License Renewal Application Amendment No. 29 (Annual Update) and Revised License Renewal Application Boundary Drawing, L-08-316, License Renewal Application Amendment No. 26 (TAC Nos. MD6593 and MD6594), Revisions, L-08-393, License Renewal Application, Amendment No. 33, L-09-058, Comments on Safety Evaluation Report with Open Item Related to the License Renewal, L-09-138, License Renewal Application, Amendment No. 36, L-09-151, License Renewal Application Amendment No. 37, ML081000322, ML081000323, ML081000324, ML081000326, ML081000327, ML081000328, ML081000329, ML081000330, ML081000331, ML081000332, ML081640592, ML081640593, ML081640594, ML081640596, ML081640597, ML081640598, ML081640599, ML081640600, ML081640601, ML081640602, ML081640603, ML081640604, ML082550686, ML082550687, ML082550688, ML082550689, ML083010249, ML083040266, ML092740576, ML092920050, ML092920056, NRC-2009-0496, Beaver Valley Federal Register Notice - Record of Decision to Renew License
|
MONTHYEARL-07-113, License Renewal Application. Appendix E: Applicants Environmental Report2007-08-27027 August 2007 License Renewal Application. Appendix E: Applicants Environmental Report Project stage: Other L-07-130, Submittal of Pressure and Temperature Limits Report, Revision 42007-09-19019 September 2007 Submittal of Pressure and Temperature Limits Report, Revision 4 Project stage: Request ML0805902622008-03-0303 March 2008 Request for Additional Information, License Renewal Application Project stage: RAI ML0806402162008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 and 2, LRA Project stage: RAI ML0806010202008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807202882008-03-21021 March 2008 Request for Additional Information, Section B.2.35 Project stage: RAI ML0807907442008-03-26026 March 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application, for Sections B.2.6, B.2.19, and B.2.23 Project stage: RAI L-08-122, Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings2008-03-31031 March 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings Project stage: Response to RAI ML0807903922008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807905382008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI L-08-124, Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 52008-04-0202 April 2008 Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 5 Project stage: Response to RAI ML0807907352008-04-0303 April 2008 RAI for the Reveiw of the Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI ML0810002962008-04-0303 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application, Amendment No. 4, and Revised License Renewal Boundary Drawings Project stage: Response to RAI ML0810003222008-04-0303 April 2008 Drawing Lr 1-07-2, Rev. 4, Chemical and Volume Control System Project stage: Other ML0810003232008-04-0303 April 2008 Drawing Lr 1-07-3, Rev. 6, Chemical and Volume Control System Project stage: Other ML0810003242008-04-0303 April 2008 Drawing Lr 1-08-1, Rev. 4, Boron Recovery Degasifiers Project stage: Other ML0810003262008-04-0303 April 2008 Drawing Lr 1-09-2, Rev. 4, Vent and Drain System Project stage: Other ML0810003272008-04-0303 April 2008 Drawing Lr 1-12-1, Rev. 5, Containment Vacuum and Leakage Monitoring System Project stage: Other ML0810003282008-04-0303 April 2008 Drawing Lr 1-14A-1, Rev. 7, Sample System Project stage: Other ML0810003292008-04-0303 April 2008 Drawing Lr 1-14A-2, Rev. 5, Sample System Project stage: Other ML0810003302008-04-0303 April 2008 Drawing Lr 1-19-1, Rev. 5, Gaseous Waste Disposal System Project stage: Other ML0810003322008-04-0303 April 2008 Drawing Lr 1-30-1, Rev. 5, River Water System Project stage: Other L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System2008-04-0303 April 2008 Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System Project stage: Other ML0810003312008-04-0303 April 2008 Drawing Lr 1-24-1, Rev. 6, Feedwater System Project stage: Other ML0809804832008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810503332008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI L-08-143, Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 62008-04-18018 April 2008 Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 6 Project stage: Response to RAI L-08-144, Reply to Request for Additional Information for the Review of License Renewal Application2008-04-25025 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application Project stage: Response to RAI ML0811303942008-04-28028 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810502702008-04-30030 April 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI L-08-146, Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 72008-04-30030 April 2008 Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 7 Project stage: Response to RAI L-08-174, Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-0202 May 2008 Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-149, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-0505 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0814104162008-05-0808 May 2008 Transmittal of Correction to Reply to RAI for the Review of License Renewal Application, License Renewal Application Amendment No. 8 & Revised License Renewal Boundary Drawings Project stage: Request ML0810505432008-05-0808 May 2008 Request for Additional Information, Sections 3.5.2.2, B.2.1, B.2.3 and 4.6 of License Renewal Application Project stage: RAI ML0811604672008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0812009202008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0811205392008-05-15015 May 2008 Request for Additional Information, License Renewal Application Project stage: RAI ML0814405432008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Amendment No. 9. and Revised License Renewal Boundary Drawings Project stage: Response to RAI L-08-169, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0811304122008-05-22022 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0813605572008-05-22022 May 2008 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0811505772008-05-28028 May 2008 Request for Additional Information for Sections B.2.27, 4.3 and 4.7.4 of the BVPS LRA Project stage: RAI L-08-180, Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-28028 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-147, Reply to Request for Additional Information for Renewal License Application2008-06-0202 June 2008 Reply to Request for Additional Information for Renewal License Application Project stage: Response to RAI ML0814306872008-06-0404 June 2008 Request for Additional Information the Review of Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI L-08-181, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 102008-06-0606 June 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 10 Project stage: Response to RAI ML0816405972008-06-0909 June 2008 Drawing Lr 1-25-1, Rev. 5, Steam Generator Blowdown System (Bd) Project stage: Other L-08-189, Drawing Lr 2-27A-2, Rev. 4, Auxiliary Steam and Condensate System (Ass)2008-06-0909 June 2008 Drawing Lr 2-27A-2, Rev. 4, Auxiliary Steam and Condensate System (Ass) Project stage: Other ML0816406012008-06-0909 June 2008 Drawing Lr 2-14A-1, Rev. 6, Reactor Plant Sample System, (Ssr) Project stage: Other 2008-04-28
[Table View] |
Text
Beaver Valley Power Station FENOC P.O. Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Peter P. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 October 10, 2008 L-08-324 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos. MD6593 and MD6594)
Reference 1 provided the FirstEnergy Nuclear Operating Company (FENOC) License Renewal Application (LRA) for the Beaver Valley Power Station (BVPS). Reference 2 requested additional information from FENOC regarding the BVPS license renewal integrated plant assessment in Section B.2.6 of the BVPS LRA. Reference 3 provided the FENOC reply to Reference 2.
During a conference call on September 26, 2008 between FENOC and the U. S.
Nuclear Regulatory Commission (NRC), the NRC requested additional justification for a reviewer-identified difference in the BVPS LRA, Section B.2.6. The Attachment provides supplemental information to FENOC's response to RAI B.2.6-2 (see Reference
- 3) for review.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
I declare under penalty of perjury that the foregoing is true and correct. Executed on October le_, 2008.
Sincerely, Pee P Peter P. Sena III KAi
Beaver Valley Power Station, Unit Nos. 1 and 2 L-08-324 Page 2
References:
- 1.
FENOC Letter L-07-113, "License Renewal Application," August 27, 2007.
- 2.
NRC Letter, "Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos.
MD6593 and MD6594)," March 26, 2008.
- 3.
FENOC Letter L-08-144, "Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos. MD6593 and MD6594)," April 25, 2008.
Attachment:
Supplemental Information Regarding Beaver Valley Power Station, Units 1 and2, License Renewal Application, Section B.2.6 cc:
Mr. K. L. Howard, NRC DLR Project Manager Mr. S. J. Collins, NRC Region I Administrator cc:
w/o Attachment Mr. B. E. Holian, NRC DLR Director Mr. D. L. Werkheiser, NRC Senior Resident Inspector Ms. N. S. Morgan, NRC DORL Project Manager Mr. D. J. Allard, PA BRP/DEP Director Mr. L. E. Ryan, PA BRP/DEP
ATTACHMENT L-08-324 Supplemental Information Regarding Beaver Valley Power Station, Units 1 and 2, License Renewal Application, Section B.2.6 Page 1 of 2 Section B.2.6 In a teleconference on Friday, September 26, 2008 between the NRC staff and FENOC License Renewal Staff, the NRC requested more detail regarding how FENOC manages identified leaks in non-ASME bolted connections. FENOC agreed to send additional justification for the reviewer-identified difference in RAI B.2.6-2.
SUPPLEMENTAL RESPONSE RAI B.2.6-2 In order to provide additional justification for the reviewer-identified difference in RAI B.2.6-2, the following information is submitted regarding management of bolted connections at Beaver Valley Power Station (BVPS).
BVPS has no specific written guidance that requires daily monitoring of identified leaks in non-ASME bolted connections. However, leaks that are "conditions adverse to quality" (i.e, that could result in a challenge to a system or component function) are entered into the FENOC Corrective Action Program. The FENOC Corrective Action Program is relied upon to ensure evaluations are performed and appropriate corrective actions are applied. Depending on the magnitude and significance of the leak, corrective actions may include periodic monitoring and trending of leakage.
Leaks that do not constitute a condition adverse to quality are documented in the SAP database, entered into the Work Management Process, and are monitored and tracked by the BVPS Leak Elimination Program. Operators performing daily rounds, Maintenance personnel in the plant, System Engineers performing walkdowns, and other personnel passing through accessible plant areas provide additional resources to identify leaks that could result in a challenge to system or component intended functions.
The BVPS Work Management Process is used to prioritize site work, including repair of leaks. BVPS characterizes work in accordance with Institute for Nuclear Power Operations (INPO) document INPO AP-928, "Work Management Process Description."
The prioritization of leak repairs is based on work classification, system significance, and operational significance.
Attachment L-08-324 Page 2 of 2 Based on the above, leaks that do not constitute a condition adverse to quality may not be monitored as frequently as daily, weekly, or biweekly. However, the monitoring and trending performed by the BVPS Leak Elimination Program provides adequate monitoring of these types of leaks to ensure that system or component functions are not challenged.