Mid-Cycle Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2015005 and 05000370/2015005)
ML15244B034
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/01/2015
From: Ehrhardt F J
NRC/RGN-II/DRP/RPB1
To: Capps S D
Duke Energy Carolinas
References
IR 2015005
Download: ML15244B034 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 September 1, 2015 Steven Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078

-8985

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/201 5005 AND 05000370/201 5005)

Dear Mr. Capps:

On August 11, 2015, the NRC completed its mid-cycle performance review of the McGuire Nuclear Station

, Units 1 and 2

. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, McGuire Nuclear Station was operated in a manner that preserved public health and safety and met all cornerstone objectives.

The NRC determined the performance at McGuire Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e.,

green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e.,

green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the second half of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contac t you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security related inspections which will be sent via separate, non

-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events

." The order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond

-design-basis external event.

Additionally, the Commission issued Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation

." The order requires licensees to have a reliable means of remotely monitoring wide

-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond

-design-basis external event.

The NRC is conducting audits of licensee efforts towards compliance with these orders.

The audit was completed for the McGuire Nuclear Station, and the information gathered will aid staff in development of the ultimate safety evaluation for the site.

After the NRC staff receives the final compliance letter for the site, the final safety evaluation will be issued.

Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 191: "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans."

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

.

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.

50-369, 50-370 License Nos.
NPF-9, NPF-17

Enclosure:

McGuire Inspection/Activity Plan (09/01/2015 - 06/30/2017)

cc: distribution via ListServ

_________________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE JGW1 FJE NAME J. Worosilo F. Ehrhardt DATE 8/17/2015 8/31/2015 9/ /2015 9/ /2015 9/ /2015 9/ /2015 9/ /2015 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Steven from Frank Ehrhardt dated September 1, 2015

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/201 5005 AND 05000370/201 5005) DISTRIBUTION

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 09/01/2015 10:22:40Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteMcGuireInspection / Activity Plan 09/01/2015

-06/30/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P09/21/2015 09/25/2015 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0109/21/2015 09/25/2015 1,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/21/2015 09/25/2015 1,2 IPPerformance Indicator Verification7115109/21/2015 09/25/2015 TFPI-TRIENNIAL FIRE PROTECTION INSP 41,2 IPFire Protection - NFPA 805 (Triennial)7111105X11/16/201511/20/2015 1,2 IPFire Protection - NFPA 805 (Triennial)7111105X12/07/201512/11/2015OL EXAM-INITIAL LICENSE EXAM PREP 31 MCGUIRE MARCH 2016 INITIAL EXAM AT POWER FACILITIES V2346703/07/201603/11/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 1 21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/21/2016 03/25/2016 1,2 IPOccupational ALARA Planning and Controls71124.0203/21/2016 03/25/2016 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/21/2016 03/25/2016 1,2 IPOccupational Dose Assessment71124.0403/21/2016 03/25/2016 1,2 IPRadiation Monitoring Instrumentation71124.0503/21/2016 03/25/2016 1,2 IPPerformance Indicator Verification7115103/21/2016 03/25/2016 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P03/28/2016 04/01/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 31,2 IPRadiological Hazard Assessment and Exposure Controls71124.0104/04/2016 04/08/2016 1,2 IPOccupational ALARA Planning and Controls71124.0204/04/2016 04/08/2016 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/04/2016 04/08/2016 1,2 IPOccupational Dose Assessment71124.0404/04/2016 04/08/2016 1,2 IPRadiation Monitoring Instrumentation71124.0504/04/2016 04/08/2016 1,2 IPPerformance Indicator Verification7115104/04/2016 04/08/2016OL EXAM-INITIAL LICENSE EXAM 31 MCGUIRE MARCH 2016 INITIAL EXAM AT POWER FACILITIES V2346704/04/2016 04/15/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41,2 IPProblem Identification and Resolution71152B05/02/2016 05/06/2016 1,2 IPProblem Identification and Resolution71152B05/16/2016 05/20/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 09/01/2015 10:22:40Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteMcGuireInspection / Activity Plan 09/01/2015

-06/30/2017OL RQ-REQUAL INSP 21,2 IPLicensed Operator Requalification Program7111111B06/20/2016 06/24/2016 EP-EP PROGRAM INSPECTION 41,2 IPAlert and Notification System Testing711140208/08/2016 08/12/2016 1,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/08/2016 08/12/2016 1,2 IPEmergency Action Level and Emergency Plan Changes711140408/08/2016 08/12/2016 1,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/08/2016 08/12/2016 1,2 IPPerformance Indicator Verification7115108/08/2016 08/12/2016 MODS-PLANT MODIFICATIONS INSPECTION 31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/12/2016 09/16/2016 1,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/26/2016 09/30/2016 ISI-UNIT 2 IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P04/03/2017 04/07/2017 RP-RAD HAZARDS AND PIV 11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0104/03/2017 04/07/2017 1,2 IPPerformance Indicator Verification7115104/03/2017 04/07/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P04/10/2017 04/14/2017 RP-RP PUBLIC RAD SAFETY BASELINE 31,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/05/2017 06/09/2017 1,2 IPRadiological Environmental Monitoring Program71124.0706/05/2017 06/09/2017 1,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0806/05/2017 06/09/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.