| | Start date | Site | Title |
|---|
| L-MT-25-031, Site Specific Emergency Action Level Technical Basis Documents Change | 24 September 2025 | Monticello | Site Specific Emergency Action Level Technical Basis Documents Change |
| IR 05000456/2025010 | 4 September 2025 | Braidwood | Comprehensive Engineering Team Inspection (Ceti) Report 05000456/2025010 and 05000457/2025010 |
| ML25238A202 | 31 August 2025 | | NUREG/KM-0020, Severe Accident Regulatory Decisions: a Historical Perspective and the Role of the Advisory Committee on Reactor Safeguards |
| IR 05000454/2025002 | 13 August 2025 | Byron | Integrated Inspection Report 05000454/2025002 and 05000455/2025002 |
| IR 05000317/2025002 | 11 August 2025 | Calvert Cliffs | Integrated Inspection Report 05000317/2025002 and 05000318/2025002 |
| ML25150A281 | 24 July 2025 | Palisades | Issuance of Amendment No. 278 Revise the Site Emergency Plan to Support Resumption of Power Operations |
| ML25139A101 | 27 June 2025 | | IP 60801 Decommissioning Spent Fuel Pool Maintenance, Surveillance, and Safety |
| ML25155A090 | 3 June 2025 | | Joint Appendix 397-443 |
| ML25097A179 | 22 May 2025 | 05200050 | SDAA - FSER Appendix B - References |
| IR 05000454/2025001 | 30 April 2025 | Byron | Integrated Inspection Report 05000454/2025001 and 05000455/2025001 |